Loading...
HomeMy WebLinkAbout20141121 Ver 1_PCN Intake Dredge_20141124OF tiM A t�R Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 A. Pre - Construction Notification (PCN) Form Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 16 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Q Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes © No For the record only for Corps Permit: ❑ Yes Q No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes Q No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a. Name of project: Dan River CC Plant Intake Structure Dredging 2b. County: Rockingham 2c. Nearest municipality / town: Eden NC 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: NA 3. Owner Information 3a. Name(s) on Recorded Deed: Duke Energy Carolinas, Inc 3b. Deed Book and Page No. Book 1411 Page 2100 3c. Responsible Party (for t.bC if applicable): 3d. Street address: 900 S. Edgewood Road 3e. City, state, zip: Eden NC 27288 3f. Telephone no.: (919) 546 -7457 3g. Fax no.: (919) 546 -4409 3h. Email address. steve,cahoon@duke-energy.com Page 1 of 10 PCN Form — Version 1.4 January 2009 t s • • • • nv. vss.�y aua. c.r�. i {Eht {V t4kr; t7V Gt14VL 4f. Telephone nn.. ( 364) 590 -8226 4g. Fax no. (919) 546 -4469 4h. Email address. ; tara.ward @duke- energy.co 5. Agent/Consultant Information (if applicable) 5a. Name, 5b, Business name 5c. Street :id 5d City, state, zipl 5e. Telephone no.: • • identification la. Property • PIN or •. 16 1 b. Site coordinates (in t• '• River 2a. Name of nearest body of water to proposed project, 2b. Water Quality Classification of nearest receiving water: ! • E t ! Dan River Longitude: 79.72608 acres 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application. The site is for operation of an electric generating station. The area immediately surrounding the site is forested with the Dan River bordering the site the south and east and the Town of Eden to the northwest of the site. 3b, List the total estimated acreage of all existing wetlands on the property: 0 3c, List the total estimated linear feet of all existing streams (intermittent and perennial) on the property, U 3d. Explain the purpose of the proposed project: Maintenance dredging at the station intake structure to provide coaling water and assure continued electric service to the Duke Energy Service area �• i- • • • - •° i ne T •- Or equipment to 6- °• attached, See Comments: ,(a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property Yes No Unknown 4b, If the Corps made the jurisdictional determination, what type D Preliminary . Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Other: 4d. If yes, list the gates of the Corps jurisdictional determinations or State determinations and attach documentation. . ! . ! a. Have permits or certifications been requested or obtained for !,es No unknown this project ;including all prior phases) in the past? b, If yes, explain in detail according to `help file' instructions. general permit No 199404319 issued February 22, 1995, N` P 11 cto er 2012, See Attached Project 6. Future 6a. Is this a phased project? b, if yes, explain, Duke Energy requests 0he permit be w en to ailow dredging on an annual, periodic or as needed basis for the duration of tie current t at.nnvade e° €t cycie., Page 3 of s CN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply) [1 Wetlands El Streams — tributaries E] Suffers 0 Open platers it Pond Construction If there are wetland impacts proposed on the site, then complete this 2a. 2b, 2c. Wetland impact I Type of impact Type of wetland number Permanent (P) or 1 Choose one I Choose one W2 Choose one Choose one W3 - Choose one Choose one W4 - Choose one Choose one W5 - Choose one Choose one S1 I Choose one Choose one =1 • s. Lft N2 for each wetland area impacted, 2d. 2e. 2f, Forested Type of jurisdiction Area of ` t Corps (404,10) or impact DWQ (401. other) (acres) * • . • e M 3. Stream Impacts if there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 1 3b, 3c, 3d. 3e. 3f, 3g. Stream impact Type of impact Stream name j Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width {linear Temporary (T) (feet) feet) S1 Choose one S2 - Choose one _ i S3 Choose one S4 Choose one S r Choose one Choose one 3h. Total stream and tributary impacts 3i, Comments: _ No stream cts. Page 4 of 40 PCN Fora, Version 1.4 January 2009 4, Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all open water im acts below. 4a. € 4b, I 4c, 1 4d 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Dredging Other 0.317 Choose one Choose Choose one Choose Choose one I Choose 4f. Total open water impacts 0.317 5. Pond or ! if- ii ! • i • i iii ®! ! i •® • ! i - 't i t 5h. Is a dam high hazard permit required? Yes C] No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j, Size of pond watershed (acres): 5k, Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impact- re airs rrtti anon, then ou MUST fill out Section D of this form. 5a. Project is in which protected basin? Q Ne se E] Tar - Pamlico Catawba E] Randleman Z Other: Roanoke Erb. 6c. 6d, 5e. f, 5g, Suffer Impact Reason for impact Stream name Buffer � Zone 1 Zone number — l # mitigation [ impact impact Permanent or required? i (square (square T r� d) feet j feet) u a B .: # .. Ye No ; B5 i B6 3 Ye ,--,'No 6h, Total Buffer Impacts 1 a, Specifically describe measures taken to avoid or minimize the proposed impacts in designing project, idg—a-re.a UrnUnsp-d frir eir-o .. . t I itAft'll I b, Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques, Dredging will be performed using an Eddie Pump mounted on a long reach excavator secured to a floating barge, Dredged material will be pumped an open basin in the retired coal yard, The basin is designed I to accommodate all the dredge material plus 3" direct rainfall and still have 6" freeboa Any storrn water runoff up-slope of this basin will be diverted around the basin No return water is expected to reach Dan River. This permit is bein requested as a precautionant measure. 2. Corrilpiensatont Mit—lation for I acts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for El Yes No impacts to Waters of the U.S, or Waters of the State? 2c, If yes, which mitigation option will be used for this project? mm�i� rm_i !F N ; ; 0 gation bank Payment to in-lieu fee program Type: Choose one Quantity: Type: Choose one Quantity: Type-, Choose one Quantity-, 4 1 1 ';Emuffff# f 5 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, Page 6 of 10 Cl Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -- required by E WQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? E] Yes to amount of mitigation required. 6c. 6d. 6e. Zone reason for impact Total impact Multiplier ! Required mitigation I I (square feet) i (square feet) 2. Stormwater Management Plan 2a, at is the overall percent imperviousness of this project? 0% 21:x, Does this or ject re wire a Stormwater Mann ament Plan? Yes No 2c, If this project DOES NOT require a Stormwater Management Plan, explain why: 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local qovernment's iurisdiction is this oroiect? 3b. Which of the following locally-implemented stormwater management progra apply (check all that apply): I 3c, Has the approved Stormwater Management Plan with proof of approval been attached? 4a. Which of the following state-implemented storm ter management programs apply (check all that apply'} 4b, Has the approved Stormwater Management Plan with proof of approval been S. DWO 401 Unit Stormwater Review 5a, Does the Stormwater Management Plan meet the appropriate requirements? 5b, Have all of the 401, Unit submittal requirements been met? El Phase 11 NSW USMP Water Supply Watershed E] Other: ElCoastal counties OHOW []ORW ClSession Law 2006-246 []Other: E] Yes [] No [] Yes [] No El Yes E] No Page 8 of 10 P Form —Version 1A January 2009 ## # # 2. Violations (DWQ Requirement) a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H - 0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, � El Yes n No or Riparian Suffer Rules (15A NCAC 2B ,0200)? 2. Is this an after - the -fact permit application? I ❑Yes Q No 2c. If you answered "yes" to one or berth of the above questions, provide an explanation of the violation (s): •. E e •• 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? 3b If you to the above, # i qualitative most recent DWQ # # "# i • • # • # •. accordance # description. a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge ) of waste-water generated from the proposed project, or available capaa4i of the subject facility. Page 9 of 10 pCN Form — 'version 1 .4 January 2009 6. Endangered Species and Designated Critical Habitat (Corps Requirement) i 5a. Will this project occur in or near an area with federally protected species or habitat? I Z Yes E] No 5b- Have you checked with the USFWS concerning Endangered Species Act El z Yes No impacts? I 5c, If yes, indicate the USFWS Field Office you have contacted, I Raleigh 5d. at data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? See attached, 6a, Will this project occur in or near an area designated as essential fish habitat? it E] Yes Z No 7b, What data sources did you use to determine whether your site would impact historic or archeological resources? The No State Historic Preservation Office web site-LM*t,://www.hpo.dcr.state-nc.,i-r&�=' sit-' lofe(L-wt,-m—#vw*ite-,9'4, W'VWW*1r! there will be no impacts to Town Creek associated with this project, mz��= 8a. Will this project occur in a FEMA-designated 100 -year floodplain? Yes 8b. If yes, explain how project meets FEMA requirements: Accumulated sediment will be removed from the 100 year floodplain, NC Floodplam Mapping Information System UNKEHISM ApplicantIA-gents Printed Name ApplicantlAgents Signature ' Agenf s signature is valid onty if an authonzation letter from the avolficant is orovided1i ■ EM 1 Di-scdbe the overall pro, e-(-t in dip tail the tytre of eqoiln'"en't to be lj!cPd'' The basin volume will be monitored and if the water surface approaches capacity, the water wilt be pumped down, after settlement, using tankers and transported to an appropriate disposal facility, Depending on efficiency of settlement, a flocculent from the NC DWR list of approved PAMS/Flocculants may be used to promote settlement within receiving facility limits for total suspended solids. Once all necessary dredging is complete and the dredged material has been adequately dewatered, the materials will be tested to determine if suitable for onsite use as a beneficial fill or cover soil supplement, if the dredged is not suitable for onsite use the material will be disposed of in an approved landfill. Again we do not expect to have any return water and this PCN is being submitted only as a precaution. EM Sd- What data sources did you s t d ete rmire whether your site would itpact Enclangered Species or Des�gnated Critical habitat? USFWS we site, NC Natural Heritage Program website, and communication with Sarah McRae of the USFWS Raleigh Field Office, One speclies of concern the Roanoke darter could potentially be affected by the pro;ect, However, in conversations with FWS the darter is not known within A miles of the pr nosed projec-t, Therefore the pro ect is unlikely to affect any fhreatene�d or endangered species(see -3ttached erna," from USFWS),