From: Bailey, David E SAW <David.E.Bailey2 @usace.army.mil>
Sent: Tuesday, November 25, 2014 1:58 PM
To: Homewood, Sue
Cc: Baker, Virginia
Subject: RE: Cripple Creek mitigation bank, Alamance Co; monitoring /credit release site visit
(UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
FYI Sue: the site visit at Cripple Creek Mitigation Bank went well this morning. Stream channels all look very stable, with
well vegetated banks, in- stream structures are in place and functioning, and all streams were flowing (0.5 -1" rain within
past 4 days). Wetland areas appeared to have moist soil. The 2012 stream bank stability issue was corrected, holding,
and appeared no different that stream segments up or downstream. The "nuisance" Sweet gums appeared to have
been treated with herbicide and planting of additional 3 gallon sized trees in these areas will occur in coming months.
Although vegetation monitoring wasn't part of the year 4 report, visually many of the areas with planted vegetation
appeared very short or difficult to find. Restoration Systems noted that tree growth had been an issue at this site.
We will prepare our credit release letter for attained year 4 success criteria in the coming weeks. If you have any
questions please let me know. Thanks, and have a great Thanksgiving.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE- SAW -RG -R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554 -4884, Ext. 30.
Fax: (919) 562 -0421
Email: David. E. Bailey2 @usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /.
- - - -- Original Message---- -
From: Homewood, Sue [ mailto:sue.homewood @ncdenr.gov]
Sent: Wednesday, November 19, 2014 3:26 PM
To: Bailey, David E SAW
Subject: [EXTERNAL] RE: Cripple Creek mitigation bank, Alamance Co; monitoring /credit release site visit (UNCLASSIFIED)
I just gave away that date this morning. My other site visit is in the am, I could potentially do this in the afternoon but
I'd have to check with to see how long that other site visit is expected to take. Sorry.