Loading...
HomeMy WebLinkAboutSW4221001_Deed Restriction/Protective Covenant Form_20221020Low Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for Low Density Residential Subdivisions where lots will be subdivided and sold. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the applicable regulation governing the density level. I, S. Craig Morrison acknowledge and affirm by my signature below, that I will cause the following deed restrictions and protective covenants to be recorded for Fieldcrest Subdivision (21-025) prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as issued by the Division of Energy, Mineral and Land Resources under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. 6. The maximum allowable built -upon area per lot is SEE ATTACHED square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the water surface of swimming pools. 7. In the case of a lot within CAMA's regulated AEC, where the Division of Coastal Management calculates a different maximum allowable built -upon area for that lot than is shown herein, the governing maximum built -upon area for that lot shall be the most restrictive of the two. 8. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings is strictly prohibited by any persons. 9. Each lot will maintain a 30* foot wide vegetated buffer between all impervious areas and surface waters. 10. All roof drains shall terminate at least 30* foot from the mean high water mark of surface waters. *50 foot for pro' cts located in the 20 coastal counties. Signature: = Date: g "M_ I, LOY1 o�r►^1�S�h a Notary Public in the State of N01rAA-) C&_Vpkjytc, County of E) (A rhCIA, do hereby certify that S , OA-01jG Mor, h,sor, personally appeared before me this the day of t,_Sk 20 ZZ , and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL Si ature My Commission expires cJG�v�e-I ZZ�Z�? ,.��pR�THCM,os.,, Form DRPC-5 Rev.2 05Nov2009 Page 1 of 1 _ NOTg9 ' 02 A r0a❑ E S I G N 2537 E. Lyon Station Road Suite 102, PO Box 0361 FIRM LIC.#: ENGINEERING, PLLC Creedmoor, NC 27522 P-1764 919-230-0996 Project NO: 21-025 Calculated/ Joel H. Sain, EIT Project Name: Fieldcrest Subdivision Prepared by: Thom Road Project Location: Checked by: Chad E. Abbott, PE Haw River, NC 27258 Property BUA Summary Lot Size (sf) Size (ac) Impervious (sf) Impervious (ac) BUA Percentage 1 44,355 1.02 5,500 0.13 12% 2 45,319 1.04 5,500 0.13 12% 3 47,840 1.10 5,500 0.13 11% 4 43,969 1.01 5,500 0.13 13% 5 44,353 1.02 5,500 0.13 12% 6 45,447 1.04 5,500 0.13 12% 7 46,477 1.07 5,200 0.12 11% 8 50,105 1.15 5,200 0.12 10% 9 49,866 1.14 5,200 0.12 10% 10 46,154 1.06 5,200 0.12 11% 11 45,654 1.05 5,200 0.12 11% 12 46,436 1.07 5,200 0.12 11% 13 49,229 1.13 5,200 0.12 11% 14 44,340 1.02 5,200 0.12 12% 15 44,673 1.03 5,200 0.12 12% 16 45,667 1.05 5,200 0.12 11% 17 46,714 1.07 5,200 0.12 11% 18 54,022 1.24 5,200 0.12 10% 19 175,278 4.02 5,200 0.12 3% 20 46,080 1.06 5,200 0.12 11% 21 45,551 1.05 5,200 0.12 11% 22 43,995 1.01 5,200 0.12 12% 23 51,583 1.18 5,200 0.12 10% 24 61,661 1.42 5,200 0.12 8% 25 59,644 1.37 5,200 0.12 9% 26 45,157 1.04 5,200 0.12 12% 27 44,332 1.02 5,200 0.12 12% ROW 79,763 1.83 36,000 0.83 45% Total 11,493,6641 32.46 178,200 3.41 11.93% Total property area Total coastal wetlands area Total surface water Total project area 1,493,664 sf 34.29 ac 0 sf 6,987 sf 1,486,676 sf Project percent of impervious area 11.99% 0.00 ac 0.16 ac 34.13 ac