Loading...
HomeMy WebLinkAboutNCC203773_NOT Closeout Documents_20221013�I OF Rq� �y PROJECT Reggie Jackson Airport Honda OATH"CAROy� 9530 Lumley Rd. PERMIT # LDG- 041465-2020 CERTIFICATE OF COMPLETION PLAN # SPR# 0183-2020 City of Raleigh Stormwater Management Division km) 996-3940 Chris Bridgers, CPESC-IT, CESSWI DATE 03/30/22 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. ® City Permit(s) Closed The referenced permit(s) have been closed. ® Coverage Under NCGO10000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT) request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self -monitoring of the project for NCGO1 compliance will no longer be required. ® All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.312022 Page 1 of 2 COMMENTS: 1. Please note that permanent stormwater SCMs require periodic maintenance in order to function properly. 2. Annual SCM inspection certifications must be submitted to the City utilizing official forms, which may be downloaded from the City web site. 3. The annual due date for stormwater SCM inspection certifications associated with the referenced permit(s) is: November 19" annually. Stormwater Inspections Form 504 V2.14.2019 Page 2 of 2