HomeMy WebLinkAboutNC0003417_Figure 2-1_202208050:17FALL 0021 Y+�- •�
�, E1
•
1x '.CPS-1�2
1
Downstream 21
Neuse River
(CPS-09�
CPSdS�
ICPS 14 AI CPS-Otl
!CPS-16( '\
:NICPS
!CPS-21
CPS-081
*"DUKE
ENERGY
IDGw ISIrearn
, Neuse River
--, CPS-05(
-• r 1CPS-041
RSA
•�A
1CPS-20j
CPS 1
�S-Ol (CPS-06j
•OUTFALL 002,1
<:RAPI IP; ti�4! i
synTerra
N DYc DAIL 038/2022
REVISED BY: C. ANON DATE: 021U3ya022
OTEC%EO OA000IONCE 2El003I/1022
APPROVED GATE: 02121/2122
T£C nI MANAGER: N.IADAM
www.svnte,racoro.com
LEGEND
NON -CONSTRUCTED SEEP
^-STREAM SURFACE WATER LOCATION PER SOC
NPDES OUTFALL LOCATION
— ACTIVE ASN BASIN WASTE BOUNDARY
SOC INSPECTION AREA
LAY OF LAND AREA BOUNDARY
• DUKE ENERGY PROGRESS PROPERTY LINE
—)P— STREAM (AMEC NRTR)
--I. SURFACE WATER FLOW DIRECTION
0 WETLAND (AMEC NRTR)
OR1IL
1 SOCSPECIAL ORDER BY CONSENT
2 SEEP LOCATIONS ARE DESCRIBED T EMC SOC WO P5110W
HEWA5ERSOE THE USCEUNEATIONSNOMNONTMSMAPHASNOT BEENAPPROVEO Bx n1E
^Tel=51ORPSOFENGILEERS V NAANDSA 0E5TOI,R M3BEC1NiDA3I5s WTOBTAR fOFSO
2012 EBGY COMPIE%OATE0.4NUARY 10. 101awx0 OPOATES RECEWEOPROMA EC �N IMx
A WA BOUNDARIES ARE APPROXIMATE
5 PROPERTY BOUNDARY PROVIDE° BY DO%E ENERGY PROGRESS
CEM:N 51 OIBE IMAGER+OBINIEO MOM EST. COLLECTED BETWEEN NOVEMBER 1 AND
'RING PAS BEEN SET Vein A PROJECTION Of NORTH CAROUNASTAIE PLANE COOROINATE
,EMN S2T00R AND
FIGURE 2-1
EXISTING SEEP LOCATIONS AND INSPECTION AREAS
COOLING POND SEEP REPORT
H.F. LEE ENERGY COMPLEX
GOLDSBORO, NORTH CAROLINA