Loading...
HomeMy WebLinkAbout20221010 Ver 1_2022-09-26 Site Plan with Stormwater Edits_20221005Moore, Andrew W From: Jeff Golladay <jgolladay@enviroscienceinc.com> Sent: Wednesday, October 5, 2022 7:41 AM To: Moore, Andrew W Cc: Clement Riddle Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Attachments: 2022-09-26 Site Plan with Stormwater Edits.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew, Following our site meeting at the Blue Ridge Metals site on 09/22/22, the project engineer has made the requested changes to the site plan. Specifically: 1. The site plan has been updated to show that French drains will be installed to follow the current alignment of the wetland ditches in the impacted areas. The pipe that crosses where the wetland ditches fork will follow the same alignment that the ditch currently follows. See attached updated site plan. A French drain typical detail is also included. 2. Confirmation is included on the site plan that the proposed stormwater basins in the southwest region of the project site will be designed to incorporate applicable buffers to the adjacent intermittent stream and will be located outside of any adjacent wetlands. Please let me know if any additional information is required. Thank you, Jeff Golladay Biologist ClearWater, an EnviroScience Company O. 828.698.9800 I C. 815.451.8139 From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Tuesday, September 20, 2022 4:19 PM To: Jeff Golladay <jgolladay@enviroscienceinc.com> Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Sure. I plan to be there at 9 if that works for you. Andrew W Moore, P.G. Environmental Specialist 11, Division of Water Resources North Carolina Department of Environmental Quality Office: (828) 296-4684 Andrew.W.Moore@ncdenr.gov 1 E NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jeff Golladay <jolladay@enviroscienceinc.com> Sent: Tuesday, September 20, 2022 3:34 PM To: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew, I will inform the property owner, but you should be able to freely access the property whenever you would like. There are new stocks of fill material that have been brought to the site recently. I am available on Thursday to meet you there too if you would like. Best, Jeff Golladay Biologist ClearWater, an EnviroScience Company O. 828.698.9800 I C. 815.451.8139 From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Tuesday, September 20, 2022 3:02 PM To: Jeff Golladay <jgolladay@enviroscienceinc.com> Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Jeff, I'd like to visit this project site on Thursday. Do I need to coordinate with anyone to ensure access? Thanks, Andrew W Moore, P.G. Environmental Specialist 11, Division of Water Resources North Carolina Department of Environmental Quality Office: (828) 296-4684 Andrew.W.Moore@ncdenr.gov 2 E NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jeff Golladay<jgolladay@enviroscienceinc.com> Sent: Friday, September 9, 2022 8:27 AM To: Moore, Andrew W <andrew.w.moore@ncdenr.Rov> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Davis, Brooke A CIV SAW <brooke.a.davis@usace.army.mil> Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew, Thank you for the follow up question. We have coordinated with the project engineer and off the following response: 1. The response to request 3 does not adequately demonstrate how hydrology will be maintained in the wetlands not proposed for impact. It's not clear how the project will be able to allocate run off to the wetlands while meeting post -construction stormwater requirements. Please provide additional clarification. If it is not adequately demonstrated that hydrology will be maintained in the wetlands not proposed for impact, the Division will consider that a secondary impact that will be counted toward impact totals. [15A NCAC 02H .0506(b)(3)] Response: • The stormwater basins have been updated to outlet into the wetland ditches instead of the floodplain area. There is no post -construction requirement that would prevent this. By doing this we can ensure that pre -development hydrology of the surrounding wetland ditches remain the same for post - construction. See attached updated site plan with stormwater edits. • A pipe is now being shown that runs from the Blue Ridge Metals property to outlet into the wetland ditches on this site. This will ensure that the pre -development drainage going to the wetland ditches remains the same for post -construction. This also ensures that stormwater coming from the Blue Ridge Metals property is properly draining and not going to be impeded by this development. See attached updated site plan stormwater edits. • A pipe is now being shown that connects the wetland ditches below impacts W4 and W5. This will ensure that water is able to flow freely between the two wetland ditches and will not be impacted by the final design of the site. See attached updated site plan stormwater edits. We believe these responses should adequately address DWR concerns. Please do not hesitate to call if you have any additional questions. Thank you, 3 Jeff Golladay Biologist CLearWaEer An EnviroScience Company 145 7th Avenue West, Suite B Hendersonville, NC 28792 Office: 828-698-9800 ext. 304 Mobile: 815-451-8139 jgolladay@enviroscienceinc.com WWW.CWENV.COM WWW.EnviroSciencelnc.COM OH I TN I VA I WV NC a■ o From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Monday, August 29, 2022 3:11 PM To: Jeff Golladay <jgolladay@enviroscienceinc.com> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Jeff, On July 26, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. Additional information in support of the project was received August 25, 2022. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The response to request 3 does not adequately demonstrate how hydrology will be maintained in the wetlands not proposed for impact. It's not clear how the project will be able to allocate run off to the wetlands while meeting post -construction stormwater requirements. Please provide additional clarification. If it is not adequately demonstrated that hydrology will be maintained in the wetlands not proposed for impact, the Division will consider that a secondary impact that will be counted toward impact totals. [15A NCAC 02H .0506(b)(3)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by September 29, 2022. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and appropriate fee. Andrew W. Moore, PG Environmental Specialist II — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 From: Jeff Golladay <jolladay@enviroscienceinc.com> Sent: Thursday, August 25, 2022 10:03 AM To: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew, Thank you for the comments. Please see below for our response to each comment in order below: 1. The Pre -Construction Notification (PCN) is un-signed. Please provide a signed PCN. [15A NCAC 02H .0502(a)(11)] Response: Signed PCN form is attached. 2. Please provide addition information regarding how many vehicles are anticipated to be stored on the property and how it was determined that 34.2 acres of parking surface area is required. [15A NCAC 02H .0506(b)(1)] Response: The storage capacity projections could vary from 3,500 on average to 5,100 vehicles at peak times. 34.2 acres allows the capacity of 5,100 vehicles with the current layout of storage rows and drive isles. 3. Please describe how wetland hydrology will be maintained in the wetlands and streams downgradient of the proposed wetland fill areas as well as in the wetland upgradient of proposed impact W4, particularly considering stormwater will be routed away from the streams and wetlands not proposed for impact. [15A NCAC 02H .0506(b)(3)] Response: The wetland hydrology (for wetlands not proposed for impact) will be maintained by allocating runoff from the proposed site to the wetland that would be equal to the pre -development flow. The remainder of the runoff from the site would flow into the drainage basins on site to be treated to ensure the wetlands not proposed for impact would remain as they were pre -development. More detailed clarification (i.e. stormwater plan and grading plan) will be provided during the design process. 4. Please provide a figure depicting the location of the stormwater basin outlets. [15A NCAC 02H .0502(a)(9)] Response: Please see attached stormwater exhibit. We believe these responses adequately address DWR concerns. Please do not hesitate to call if you have any additional questions. Thank you, Jeff Golladay Biologist CLearWaEer An EnviroScience Company 145 7th Avenue West, Suite B Hendersonville, NC 28792 5 Office: 828-698-9800 ext. 304 Mobile: 815-451-8139 jeff@cwenv.com WWW.CWENV.COM WWW.EnviroSciencelnc.COM�] OH I TN I VA I WV I NC � ■ c From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Wednesday, August 10, 2022 12:56 PM To: Jeff Golladay <jgolladay@enviroscienceinc.com> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Jeff, On July 26, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The Pre -Construction Notification (PCN) is un-signed. Please provide a signed PCN. [15A NCAC 02H .0502(a)(11)] 2. Please provide addition information regarding how many vehicles are anticipated to be stored on the property and how it was determined that 34.2 acres of parking surface area is required. [15A NCAC 02H .0506(b)(1)] 3. Please describe how wetland hydrology will be maintained in the wetlands and streams downgradient of the proposed wetland fill areas as well as in the wetland upgradient of proposed impact W4, particularly considering stormwater will be routed away from the streams and wetlands not proposed for impact. [15A NCAC 02H .0506(b)(3)] 4. Please provide a figure depicting the location of the stormwater basin outlets. [15A NCAC 02H .0502(a)(9)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by September 9, 2022. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and appropriate fee. Feel free to contact me if you have any questions. Andrew W. Moore, PG Environmental Specialist II — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 6 © 2022 Westwood Professional Services, Inc. N:\0037421.00\DWG\CIVIL\0037421.00SK03.DWG X . X Aft • � ••+ . % ` / 77 f ' s,s• / ' / / / ° 7 / l 7/ 7A �sFT/// y I PROPERTY BOUNDARY (TYP.) I I 1+ •,'I FEMA REGULATORY FLOODWAY ASSUMED CANE CREEK GREENWAY EASEMENT STORMWATER BASIN STORMWATER BASIN i7114 11 ,4 /77-2 ,+/ • /1+/i. / / ii \\\ \\N Plc STORMWATER BASIN 60'X120' ih- +I •I� 1 +I ! SINGLE STORY BUILDING 30DRAINAGE DITCH .\. SECURITY GATE - +\• /%'•� i 7 7+. • FEMA 500 YR FLOODPLAIN y./ FEMA 100 YR FLOODPLAIN V. • '76. 11.144 • 4-111:111= • • -h. • • 7 • - / / /•• /+ P WETLAND SECTION TO BE FILLED PER CORPS PLANS 1 i 5' SIDE BUILDING SETBACK 01• • y•+• • • • • • — +i 7 •7 • 141411111 41 111 SITE LEGEND ROCK BALLAST SURFACING PAVING SITE DEVELOPMENT SUMMARY Call 48 Hours before digging: Common Ground Alliance • EXISTING ZONING: • PARCEL NUMBER: • PROPERTY AREA: • ESTIMATED NET ACREAGE: • ESTIMATED USABLE ACREAGE: • ESTIMATED STORAGE ACREAGE: • PARKING COUNT M-1, MANUFACTURING DISTRICT 9663102350 58.05 AC 42.7 AC 36.3 AC 34.2 AC 35 STALLS 26 GAUGE, WHITE PAINTED, CORRUGATED INTERLOCKING METAL PANEL THAT COVERS 36" PER SHEET ATTACHED WITH 9 HARDENED STEEL RING SHANKED NAILS OR #12 HEX 3/4" PAINTED SCREWS HARDENED STEEL RING SHANKED NAILS PAINTED SCREWS 3" MAX. 3' 6" 2" SPACE FROM TOP OF POLE TO TOP OF CEE CHANNEL MINIMUM .160 WALL THICKNESS 4X2 GALVANIZED CEE CHANNEL (VAGA) WELDED TO POST TOP & BOTTOM GROUND SURFACE CONCRETE NOTE: POST TO BE SPACED 10' 0.C. 11101111111111111 " 46p•anii. p•r 111 LEGEND A. 26 GAUGE, WHITE PAINTED, CORRUGATED INTERLOCKING METAL PANELS 36"x8' ATTACHED TO 3-4x2 GALVANIZED CEE CHANNELS WITH 9 HARDENED STEEL RING SHANKED NAILS OR #12 HEX 3/4" PAINTED SCREWS B. 3" 0.D. SCH 40 GALVANIZED POSTS MINIMUM .160 WALL THICKNESS C. ALUMINUM POST CAP D. 4x2 GALVANIZED CEE CHANNEL (VAGA) WELDED TO POST TOP & BOTTOM E. GROUND SURFACE F. CONCRETE FOOTINGS 3000PSI CONCRETE TO DEPTH ACCORDING TO FROST LINE Westwood COPART METAL PANEL FENCE 1" = 150' 0' 150' 300' 450' NOT FOR CONSTRUCTION THIS PLAN IS FOR CONCEPTUAL AND DISCUSSION PURPOSES ONLY DESIGNED: CHECKED: DRAWN: HORIZONTAL SCALE: 150' VERTICAL SCALE: 30' OR 15' INITIAL ISSUE: REVISIONS: A PREPARED FOR: FLETCHER 58 AC YARD FLETCHER, NORTH CAROLINA Westwood Phone Fax Toll Free (952) 937-5150 (952) 937-5822 (888) 937-5150 Westwood Infrastructure, Inc. 12701 Whitewater Drive, Suite #300 Minnetonka, MN 55343 westwoodps.com SITE CONCEPT PLAN 1 SHEET NUMBER: OF DATE: 06/22/2022 PROJECT NUMBER: 0037421.00 FLETCHER 58 AC YARD