Loading...
HomeMy WebLinkAbout20221010 Ver 1_2022-09-06 Site Plan with Stormwater Edits 9-9-22_20220909Moore, Andrew W From: Jeff Golladay <jgolladay@enviroscienceinc.com> Sent: Friday, September 9, 2022 8:27 AM To: Moore, Andrew W Cc: Brown, David W SAW; Leslie, Andrea J; Davis, Brooke A CIV SAW Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Attachments: 2022-09-06 Site Plan with Stormwater Edits.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew, Thank you for the follow up question. We have coordinated with the project engineer and off the following response: 1. The response to request 3 does not adequately demonstrate how hydrology will be maintained in the wetlands not proposed for impact. It's not clear how the project will be able to allocate run off to the wetlands while meeting post -construction stormwater requirements. Please provide additional clarification. If it is not adequately demonstrated that hydrology will be maintained in the wetlands not proposed for impact, the Division will consider that a secondary impact that will be counted toward impact totals. [15A NCAC 02H .0506(b)(3)] Response: • The stormwater basins have been updated to outlet into the wetland ditches instead of the floodplain area. There is no post -construction requirement that would prevent this. By doing this we can ensure that pre -development hydrology of the surrounding wetland ditches remain the same for post - construction. See attached updated site plan with stormwater edits. • A pipe is now being shown that runs from the Blue Ridge Metals property to outlet into the wetland ditches on this site. This will ensure that the pre -development drainage going to the wetland ditches remains the same for post -construction. This also ensures that stormwater coming from the Blue Ridge Metals property is properly draining and not going to be impeded by this development. See attached updated site plan stormwater edits. • A pipe is now being shown that connects the wetland ditches below impacts W4 and W5. This will ensure that water is able to flow freely between the two wetland ditches and will not be impacted by the final design of the site. See attached updated site plan stormwater edits. We believe these responses should adequately address DWR concerns. Please do not hesitate to call if you have any additional questions. Thank you, Jeff Golladay Biologist CLearWaEer An EnviroScience Company 145 7th Avenue West, Suite B Hendersonville, NC 28792 Office: 828-698-9800 ext. 304 Mobile: 815-451-8139 1 jgolladay@enviroscienceinc.com WWW.CWENV.COM WWW.EnviroSciencelnc.COM OH I TN I VA I WV I NC 1■ N From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Monday, August 29, 2022 3:11 PM To: Jeff Golladay <jgolladay@enviroscienceinc.com> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: RE: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Jeff, On July 26, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. Additional information in support of the project was received August 25, 2022. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The response to request 3 does not adequately demonstrate how hydrology will be maintained in the wetlands not proposed for impact. It's not clear how the project will be able to allocate run off to the wetlands while meeting post -construction stormwater requirements. Please provide additional clarification. If it is not adequately demonstrated that hydrology will be maintained in the wetlands not proposed for impact, the Division will consider that a secondary impact that will be counted toward impact totals. [15A NCAC 02H .0506(b)(3)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by September 29, 2022. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and appropriate fee. Andrew W. Moore, PG Environmental Specialist II — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jeff Golladay <jgolladay@enviroscienceinc.com> Sent: Thursday, August 25, 2022 10:03 AM To: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: [External] RE: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) 2 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrew, Thank you for the comments. Please see below for our response to each comment in order below: 1. The Pre -Construction Notification (PCN) is un-signed. Please provide a signed PCN. [15A NCAC 02H .0502(a)(11)] Response: Signed PCN form is attached. 2. Please provide addition information regarding how many vehicles are anticipated to be stored on the property and how it was determined that 34.2 acres of parking surface area is required. [15A NCAC 02H .0506(b)(1)] Response: The storage capacity projections could vary from 3,500 on average to 5,100 vehicles at peak times. 34.2 acres allows the capacity of 5,100 vehicles with the current layout of storage rows and drive isles. 3. Please describe how wetland hydrology will be maintained in the wetlands and streams downgradient of the proposed wetland fill areas as well as in the wetland upgradient of proposed impact W4, particularly considering stormwater will be routed away from the streams and wetlands not proposed for impact. [15A NCAC 02H .0506(b)(3)] Response: The wetland hydrology (for wetlands not proposed for impact) will be maintained by allocating runoff from the proposed site to the wetland that would be equal to the pre -development flow. The remainder of the runoff from the site would flow into the drainage basins on site to be treated to ensure the wetlands not proposed for impact would remain as they were pre -development. More detailed clarification (i.e. stormwater plan and grading plan) will be provided during the design process. 4. Please provide a figure depicting the location of the stormwater basin outlets. [15A NCAC 02H .0502(a)(9)] Response: Please see attached stormwater exhibit. We believe these responses adequately address DWR concerns. Please do not hesitate to call if you have any additional questions. Thank you, Jeff Golladay Biologist CLearWaer An EnviroScience Company a 145 7th Avenue West, Suite B Hendersonville, NC 28792 Office: 828-698-9800 ext. 304 Mobile: 815-451-8139 jeff(a�cwenv.com WWW.CWENV.COM WWW.EnviroSciencelnc.COM OH ITNIVAIWVINC El OEM From: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Sent: Wednesday, August 10, 2022 12:56 PM 3 To: Jeff Golladay<jgolladay@enviroscienceinc.com> Cc: Brown, David W SAW <David.W.Brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Subject: Request for Additional Information, Blue Ridge Metals Industrial Park, Henderson County (DWR Project #20221010) Jeff, On July 26, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The Pre -Construction Notification (PCN) is un-signed. Please provide a signed PCN. [15A NCAC 02H .0502(a)(11)] 2. Please provide addition information regarding how many vehicles are anticipated to be stored on the property and how it was determined that 34.2 acres of parking surface area is required. [15A NCAC 02H .0506(b)(1)] 3. Please describe how wetland hydrology will be maintained in the wetlands and streams downgradient of the proposed wetland fill areas as well as in the wetland upgradient of proposed impact W4, particularly considering stormwater will be routed away from the streams and wetlands not proposed for impact. [15A NCAC 02H .0506(b)(3)] 4. Please provide a figure depicting the location of the stormwater basin outlets. [15A NCAC 02H .0502(a)(9)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by September 9, 2022. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and appropriate fee. Feel free to contact me if you have any questions. Andrew W. Moore, PG Environmental Specialist II — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 © 2022 Westwood Professional Services, Inc. N:\0037421.00\DWG\CIVIL\0037421.00SK03.DWG / / lit x ,ait.k, •+ '/cs / / I / FT•/ / X / i PROPERTY BOUNDARY (TYP.) NWI WETLAND ASSUMED CANE CREEK GREENWAY EASEMENT 1 .�'�•+//jam / • x•7 • •77•• • • 2 iI :* / / / / / / 1 I;✓/ STORMWATER BASIN 7 • STORMWATER BASIN l•+1 i I• +I 60'X120' SINGLE STORY BUILDING 3 \\ SECURITY GATE - • ` \ \ 30DRAINAGE DITCH i • • 7+ .\\ ,r FEMA 500 YR FLOODPLAIN fit. • i lh V V FEMA 100 YR FLOODPLAIN • i STORMWATER BASIN +I I+ h I. � I II +I 1 .r / I+II .I + FEMA REGULATORY / - - ��i' ./ .**<- +--t. • 1J�i {NN \ \ .•••••—••N ,. 'c • / +, mot• WETLAND SECTION TO BE FILLED PER CORPS PLANS 1 / i 1141 • � ,w 5' SIDE BUILDING SETBACK -• m.. + +• • j•� • • ,� +i • • +/// • + .7.� . • • • (I • ...111411411141111 • • • • • \ • • 4- 4111 41 41 v SITE LEGEND ROCK BALLAST SURFACING PAVING SITE DEVELOPMENT SUMMARY Call 48 Hours before digging: 811 or caII811.com Common Ground Alliance • EXISTING ZONING: • PARCEL NUMBER: • PROPERTY AREA: • ESTIMATED NET ACREAGE: • ESTIMATED USABLE ACREAGE: • ESTIMATED STORAGE ACREAGE: • PARKING COUNT M-1, MANUFACTURING DISTRICT 9663102350 58.05 AC 42.7 AC 36.3 AC 34.2 AC 35 STALLS 26 GAUGE, WHITE PAINTED, CORRUGATED INTERLOCKING METAL PANEL THAT COVERS 36" PER SHEET ATTACHED WITH 9 HARDENED STEEL RING SHANKED NAILS OR #12 HEX 3/4" PAINTED SCREWS HARDENED STEEL RING SHANKED NAILS OR #12 HEX 3/4" PAINTED SCREWS C 11' J 7'-3" 3" MAX. 3' 6" 12" 2" SPACE FROM TOP OF POLE TO TOP OF CEE CHANNEL 3" O.D. SCH 40 POST WITH MINIMUM .160 WALL THICKNESS 4X2 GALVANIZED CEE CHANNEL (VAGA) WELDED TO POST TOP & BOTTOM GROUND SURFACE CONCRETE 12" H NOTE: POST TO BE SPACED 10' O.C. 10'-0" Co LEGEND A. 26 GAUGE, WHITE PAINTED, CORRUGATED INTERLOCKING METAL PANELS 36"x8' ATTACHED TO 3-4x2 GALVANIZED CEE CHANNELS WITH 9 HARDENED STEEL RING SHANKED NAILS OR #12 HEX 3/4" PAINTED SCREWS B. C. D. E. F. 3" 0.D. SCH 40 GALVANIZED POSTS MINIMUM .160 WALL THICKNESS ALUMINUM POST CAP 4x2 GALVANIZED CEE CHANNEL (VAGA) WELDED TO POST TOP & BOTTOM GROUND SURFACE CONCRETE FOOTINGS 3000PSI CONCRETE TO DEPTH ACCORDING TO FROST LINE Westwood COPART METAL PANEL FENCE 1" = 150' 0' 150' 300' 450' NOT FOR CONSTRUCTION THIS PLAN IS FOR CONCEPTUAL AND DISCUSSION PURPOSES ONLY DESIGNED: CHECKED: DRAWN: HORIZONTAL SCALE: 150' VERTICAL SCALE: 30' OR 15' INITIAL ISSUE: 06/1 0/2022 REVISIONS: A A A A PREPARED FOR: FLETCHER 58 AC YARD FLETCHER, NORTH CAROLINA Westwood Phone Fax Toll Free (952) 937-5150 (952) 937-5822 (888) 937-5150 Westwood Infrastructure, Inc. 12701 Whitewater Drive, Suite #300 Minnetonka, MN 55343 westwoodps.com SITE CONCEPT PLAN 1 SHEET NUMBER: OF DATE: 06/22/2022 PROJECT NUMBER: 0037421.00 FLETCHER 58 AC YARD