HomeMy WebLinkAboutNCC223598_ESC Approval Submitted_20221021Roy .CQDnR
Govern
ELIZABETH 91SER
Secretary
SRIAN MENN
!?ar�eior
SP FDS, LLC
Will Stronach, Manager
4004 Barrett Drive, # 106
Raleigh, NC 27609
NOR7i'-I. CAROL,INA
�'n�irnnneera�a� Fita(ity'
November 22, 2021
LETTER OF APPROVAL
RE: Project Name: Family Dollar
Acres Approved: 1.43
Project ID: ANSON-2022-003
County: Anson, City: Ansonville
Address: Waddell Street
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted by: Russell Folsom
Date Received by LQS: October 25, 2021
Plan Type: Commercial
Dear Mr. Stronach:
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and herebyissue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted and. COC issued prior to the commencement of any
land disturbing activity on theabove-namedproject. The NOI form may be accessed
at deq.nc.gov/NCG0L Please direct questions about the NOI form to Annette Lucas
at Annette.lucas@,ncdenr.aov or Paul Clark at Pau.l.clarkgnedenngov. After you
submit a complete and correct NOI Form, a COC will be emailed to you: within
three business days. Initially, DEMLR will not charge a fee for coverage under the
NCGO 1 permit. However, on or after .Tune 1, 2019, a $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Erm North raltna Department.nf Environmental Quality i Divl Jon of Energy, M1rteral arsd Land Rrgources
�D
ayvttc r€Ile Regional Offt e 122$ Grcert Strut, uito 714 1 Fayett�vill:c North Caraiiriai2��01'
Nf7tx94i 3 U'.6
m�,ta Eau�r�mhsnPai�,.,' . �$o.di�:�3i3
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided.
You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and
additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the
appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition., it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Russell Folsom, P. E., Advanced Engineering Consultants, LLC — electronic copy
Keith Gaskins, Anson County Inspections Office -- electronic copy
Fayetteville Regional Office