HomeMy WebLinkAbout20130918 Ver 4_Application_20141124S
I
T
E
1
1
W
E
T
L
A
N
D
D
E
N
O
T
E
S
F
I
L
L
I
N
F
F
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
1
0
0
’
S
I
T
E
1
1
A
M ATCHLINE -L- STA. 119+00.00 SEE SHEET 9
M ATCHLINE -L- STA. 132+00.00 SEE SHEET 11
S
E
E
S
H
E
E
T
4
4
F
O
R
-
L
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
6
1
F
O
R
-
Y
7
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
-
P
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
N
O
T
E
:
S
E
E
C
R
O
S
S
-
S
E
C
T
I
O
N
S
A
N
D
R
O
A
D
W
A
Y
S
T
A
N
D
A
R
D
D
R
A
W
I
N
G
S
,
S
T
D
.
N
O
.
8
6
5
.
0
1
,
S
H
E
E
T
2
F
O
R
S
P
E
C
I
A
L
M
E
D
I
A
N
G
R
A
D
I
N
G
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
0
U
-
2
5
2
5
B
REVISIONS
N
O
T
E
:
S
F
C
B
-
"
S
I
N
G
L
E
F
A
C
E
D
C
O
N
C
R
E
T
E
B
A
R
R
I
E
R
"
WESTERN PROPERTY LINE ON PARCEL 29B (NCDOT).(NC PRISON DEPT.), 29 (JAMES L. GOODWIN), AND 29A (NCDOT FORMERLY BETTY JEAN GOODWIN). REVISED THE LOCATION OF THE R/W AND C/A TO THEREVISED THE NORTHERN PROPERTY LINE ON PARCEL 27 (CITY OF GREENSBORO) AND THE ADJOINING SOUTHERN PROPERTY LINES ON PARCELS 26PARCEL 29B TO R/W. DELETED PARCEL 28 (DUKE POWER COMPANY) DUE TO PROPERTY LINE DELINEATION CHANGING TO EASEMENT.29B (NCDOT), AND PARCEL 29C (MICHAEL A. FOWLER). CHANGED THE NORTHERN PROPERTY LINE ON PARCEL 29A AND THE SOUTHERN PROPERTY LINE ON03-19-13 R/W REVISION (DWG) - PARCEL 29 (JAMES L. GOODWIN) WAS SUBDIVIDED, ADDING PARCEL 29A (NCDOT FORMERLY BETTY JEAN GOODWIN), PARCEL9-25-13 R/W REVISION (DWG) - ADDED A SECOND CLAIM OF TCE ON PARCEL 29Z (MICHAEL A. FOWLER) FOR THE ADDITION OF GUARDRAIL AND SHOULDER WIDENING ALONG -Y7- (CAMP BURTON ROAD).
S
E
E
S
H
E
E
T
S
S
-
1
1
0
T
H
R
U
S
-
1
7
2
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
2
G
I
F
S
FS
2
G
I
2
G
I
15" CSP
2
G
I
2
G
I
2GI FS 2GI
15" CSP
15" CSP
2
G
I
2
G
I
(
N
o
t
t
o
S
c
a
l
e
)
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
G
r
a
d
e
D
i
t
c
h
D
E
T
A
I
L
D
1
’
5
’
1
.
5
’
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
"
B
"
R
i
p
-
R
a
p
S
E
E
D
E
T
A
I
L
"
C
"
S
E
E
D
E
T
A
I
L
"
F
"
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
3:1
(
N
o
t
t
o
S
c
a
l
e
)
D
E
T
A
I
L
F
S
l
o
p
e
F
i
l
l
b
1
"
/
F
t
.
3:1
D
B
S
t
d
.
N
o
.
8
7
6
.
0
1
*
W
h
e
n
B
i
s
>
6
.
0
’
N
a
t
u
r
a
l
G
r
o
u
n
d
T
y
p
e
o
f
L
i
n
e
r
=
G
R
A
S
S
b
=
5
.
0
F
t
.
B
=
2
.
0
F
t
.
M
i
n
.
D
=
1
.
0
F
t
.
S
E
E
D
E
T
A
I
L
"
F
F
"
M
e
d
i
a
n
D
i
t
c
h
(
N
o
t
t
o
S
c
a
l
e
)
F
A
L
S
E
S
U
M
P
S
S
=
D
i
t
c
h
S
l
o
p
e
e
t
c
.
G
I
L
2
’
DD
D
i
t
c
h
G
r
a
d
e
L
D
i
t
c
h
G
r
a
d
e
2
0
’
3
0
’
9
"
DD
D
D
D
2
0
’
L
(
S
e
e
C
h
a
r
t
B
e
l
o
w
)
L4
0
’
5
0
’
0
.
0
%
T
o
2
.
0
%
O
v
e
r
2
.
0
%
T
o
4
.
0
%
O
v
e
r
4
.
0
%
T
o
6
.
0
%
O
v
e
r
6
.
0
%
C
P
r
o
p
o
s
e
d
D
i
t
c
h
@ STA. 119+98 -L- (RT)
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
N
a
t
u
r
a
l
G
r
o
u
n
d
3:1
3:1
b
F
i
l
l
S
l
o
p
e
d
D
B
(
N
o
t
t
o
S
c
a
l
e
)
F
a
b
r
i
c
F
i
l
t
e
r
1
"
/
F
t
.
S
t
d
.
N
o
.
8
7
6
.
0
1
*
W
h
e
n
B
i
s
>
6
.
0
’
-
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
"
B
"
R
i
p
-
R
a
p
F
R
O
M
S
T
A
.
1
2
9
+
7
8
T
O
S
T
A
.
1
3
0
+
6
5
-
L
-
(
R
T
)
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
D
E
T
A
I
L
F
F
b
=
5
.
0
F
t
.
B
=
2
.
0
F
t
.
M
a
x
.
d
=
1
.
0
F
t
.
M
i
n
.
D
=
1
.
5
F
t
.
A
T
S
T
A
.
1
2
8
+
9
7
-
L
-
(
L
T
)
E
s
t
.
Q
t
y
.
1
1
T
o
n
s
A
T
S
T
A
.
1
2
9
+
7
8
-
L
-
(
R
T
)
E
s
t
.
Q
t
y
.
1
1
T
o
n
s
D
E
T
A
I
L
P
20:1Traffic FlowOutside DitchS=Ditch Slope SC Proposed Ditch 10:1 0.5’ Min.GIetc.L 2’1.0’ Max.( Not to Scale)FALSE SUMP DETAIL R
C
L
A
S
S
"
B
"
R
I
P
R
A
P
T
O
E
P
R
O
T
E
C
T
I
O
N
W
/
E
L
B
O
W
S
R
O
D
A
N
D
L
U
G
W
/ ELBO
W
S
RO
D
AN
D
LU
G
1
2
7
+
9
5
-
L
-
(
L
T
.
)
B
E
G
I
N
S
B
G
@
C
L
A
S
S
"
B
"
S
E
E
D
E
T
A
I
L
"
D
"
W
/
E
L
B
O
W
S
R
O
D
A
N
D
L
U
G
S
T
A
.
1
2
5
+
4
5
-
L
-
(
R
T
.
)
B
E
G
I
N
S
B
G
@
S
E
E
D
E
T
A
I
L
"
D
"
C
L
A
S
S
"
B
"
@
S
T
A
.
1
1
9
+
9
8
-
L
-
(
M
E
D
)
@
S
T
A
.
1
3
0
+
4
8
-
L
-
(
M
E
D
)
B
E
G
I
N
A
P
P
.
S
L
A
B
-
L
-
(
L
T
.
)
E
N
D
S
B
G
@
B
E
G
I
N
A
P
P
.
S
L
A
B
-
L
-
(
R
T
.
)
E
N
D
S
B
G
@
E
N
D
A
P
P
.
S
L
A
B
-
L
-
(
L
T
.
)
B
E
G
I
N
S
B
G
@
E
N
D
A
P
P
.
S
L
A
B
-
L
-
(
R
T
.
)
B
E
G
I
N
S
B
G
@
15" RCP-III
15
"
R
C
P
-
IV
15"
RC
P
-
IV
15
"
R
C
P
-
IV
15" RCP-IV
15"
F
i
l
l
S
l
o
p
e
(
N
o
t
t
o
S
c
a
l
e
)
T
O
E
P
R
O
T
E
C
T
I
O
N
d
F
a
b
r
i
c
F
i
l
t
e
r
F
L
A
T
T
E
R
2:1
O
R
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
C
d
=
1
.
0
F
t
.
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
"
B
"
R
i
p
-
R
a
p
F
R
O
M
S
T
A
.
1
2
5
+
0
0
T
O
S
T
A
.
1
2
8
+
2
5
-
L
-
(
R
T
)
2
1
7
S
Q
Y
D
S
G
E
O
T
E
X
T
I
L
E
E
S
T
.
9
8
T
O
N
S
D
D
E
=
8
7
C
Y
F
R
O
M
S
T
A
.
1
2
7
+
5
0
T
O
S
T
A
.
1
2
8
+
9
7
-
L
-
(
L
T
)
D
D
E
=
7
4
C
Y
E
S
T
.
3
4
T
O
N
S
E
S
T
.
7
2
S
Q
Y
D
S
G
E
O
T
E
X
T
I
L
E
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
W
/
G
E
O
T
E
X
T
I
L
E
C
L
A
S
S
"
B
"
R
I
P
R
A
P
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
W
/
G
E
O
T
E
X
T
I
L
E
C
L
A
S
S
"
B
"
R
I
P
R
A
P
E
S
T
.
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
T
O
N
W
/
G
E
O
T
E
X
T
I
L
E
C
L
A
S
S
"
B
"
R
I
P
R
A
P
6
0
" C
M
P
300’ PRO P. R/W 27
2
7
2
9
27
2
6
2
9
A
2
9
B
2
9
A
28
2
9
Z
2
9
T
T
X
X
X
6
0
" C
MP
10
8
"
CHL
&
1
S
RW
108" CHL & 1SRW
P
3
5
6
P
3
5
7
10
8
" C
H
L
z
z
z
SR
2825
CAMP
BURTON
RD
21’ BST
M
TL
M
T
L
OT
O
O
O
X
O
O
O
O
O
YYY
Y
Y
YYYYY
YYYYYYYYY
YY
Y
Y
Y
YYY
Ov
v
Y
YYY
Y
Y
Y
YYY
Y
Y
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
XCCCCCCCCCCCCCC
CC
CC
CC
CC
CC
C
F
CF
FF
FF
FF
FF
FF
FF
FF
FF
CC
F
F
F
F
F
F
F
F
F
F
SE = NC -L-PI Sta 130+34.85DL = 964.43’T = 482.29’R = 23,000.00’
-
Y
7
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
120+00
1
2
5
+
0
0
1
3
0
+
0
0
-
L
-
P
O
C
S
T
A
.
1
2
9
+
3
7
.
5
6
=
-
L
-
-
L
-
P
C
S
t
a
.
1
2
5
+
5
2
.
5
7
-Y
7
-
N
A
D
83/ 95
10
15
-
Y
7
-
P
O
T
S
T
A
.
1
3
+
2
3
.
2
3
-
Y
7
-
P
O
T
S
t
a
.
1
5
+
2
5
.
5
8
DUKE POWER COMPAN
Y
EX
IST
ING
R
/W
EX
IST
ING
R
/W
6
0
’ R
/W
C
i
t
y
O
f
G
r
e
e
n
s
b
o
r
o
N
C
P
R
IS
O
N
D
E
P
T
.
City Of Greensbor
o
15
0
’
D
U
K
E
P
O
WE
R
E
A
S
E
M
E
N
T
E
I
P
E
I
P
City Of Greensboro
E
I
P
1
5
0
’
D
U
K
E
P
O
W
E
R
E
A
S
E
M
E
N
T
N
8
8
37’07" W 612.98’
S
110
7
’3
7
" E
4
8
8
.4
1’
S
8
830
’
47
"
W
36
3.
64’
S
88
3
0’
47
"
W
581.
34’
S
110
7
’3
7
" E
7
2
0
.6
9
’
N 3211’38" W
6.73’
S
3
1
4
1
’
1
6
"
E
R
2
3
1
7
5
’
L
4
0
9
.
3
1
’
C
H
4
0
9
.
3
0
’
N
C
D
O
T
F
O
R
M
E
R
L
Y
B
E
T
T
Y
J
E
A
N
G
O
O
D
WIN
N
C
D
O
T
F
O
R
M
E
R
L
Y
B
E
T
T
Y
J
E
A
N
G
O
O
D
W
I
N
N
C
D
O
T
M
I
C
H
A
E
L
A
.
F
O
W
L
E
R
M
IC
H
A
E
L
A
.
F
O
WL
E
R
S
F
F F
F
S
S
Re
v
i
s
e
d
1
1
/
2
0
/
2
0
1
4
S
I
T
E
1
1
W
E
T
L
A
N
D
D
E
N
O
T
E
S
F
I
L
L
I
N
F
F
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
1
0
0
’
S
I
T
E
1
1
A
M ATCHLINE -L- STA. 119+00.00 SEE SHEET 9
M ATCHLINE -L- STA. 132+00.00 SEE SHEET 11
S
E
E
S
H
E
E
T
4
4
F
O
R
-
L
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
6
1
F
O
R
-
Y
7
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
-
P
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
N
O
T
E
:
S
E
E
C
R
O
S
S
-
S
E
C
T
I
O
N
S
A
N
D
R
O
A
D
W
A
Y
S
T
A
N
D
A
R
D
D
R
A
W
I
N
G
S
,
S
T
D
.
N
O
.
8
6
5
.
0
1
,
S
H
E
E
T
2
F
O
R
S
P
E
C
I
A
L
M
E
D
I
A
N
G
R
A
D
I
N
G
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
0
U
-
2
5
2
5
B
REVISIONS
N
O
T
E
:
S
F
C
B
-
"
S
I
N
G
L
E
F
A
C
E
D
C
O
N
C
R
E
T
E
B
A
R
R
I
E
R
"
WESTERN PROPERTY LINE ON PARCEL 29B (NCDOT).(NC PRISON DEPT.), 29 (JAMES L. GOODWIN), AND 29A (NCDOT FORMERLY BETTY JEAN GOODWIN). REVISED THE LOCATION OF THE R/W AND C/A TO THEREVISED THE NORTHERN PROPERTY LINE ON PARCEL 27 (CITY OF GREENSBORO) AND THE ADJOINING SOUTHERN PROPERTY LINES ON PARCELS 26PARCEL 29B TO R/W. DELETED PARCEL 28 (DUKE POWER COMPANY) DUE TO PROPERTY LINE DELINEATION CHANGING TO EASEMENT.29B (NCDOT), AND PARCEL 29C (MICHAEL A. FOWLER). CHANGED THE NORTHERN PROPERTY LINE ON PARCEL 29A AND THE SOUTHERN PROPERTY LINE ON03-19-13 R/W REVISION (DWG) - PARCEL 29 (JAMES L. GOODWIN) WAS SUBDIVIDED, ADDING PARCEL 29A (NCDOT FORMERLY BETTY JEAN GOODWIN), PARCEL9-25-13 R/W REVISION (DWG) - ADDED A SECOND CLAIM OF TCE ON PARCEL 29Z (MICHAEL A. FOWLER) FOR THE ADDITION OF GUARDRAIL AND SHOULDER WIDENING ALONG -Y7- (CAMP BURTON ROAD).
S
E
E
S
H
E
E
T
S
S
-
1
1
0
T
H
R
U
S
-
1
7
2
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
2
G
I
F
S
FS
2
G
I
2
G
I
15" CSP
2
G
I
2
G
I
2GI FS 2GI
15" CSP
15" CSP
2
G
I
2
G
I
(
N
o
t
t
o
S
c
a
l
e
)
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
G
r
a
d
e
D
i
t
c
h
D
E
T
A
I
L
D
1
’
5
’
1
.
5
’
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
"
B
"
R
i
p
-
R
a
p
S
E
E
D
E
T
A
I
L
"
C
"
S
E
E
D
E
T
A
I
L
"
F
"
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
3:1
(
N
o
t
t
o
S
c
a
l
e
)
D
E
T
A
I
L
F
S
l
o
p
e
F
i
l
l
b
1
"
/
F
t
.
3:1
D
B
S
t
d
.
N
o
.
8
7
6
.
0
1
*
W
h
e
n
B
i
s
>
6
.
0
’
N
a
t
u
r
a
l
G
r
o
u
n
d
T
y
p
e
o
f
L
i
n
e
r
=
G
R
A
S
S
b
=
5
.
0
F
t
.
B
=
2
.
0
F
t
.
M
i
n
.
D
=
1
.
0
F
t
.
S
E
E
D
E
T
A
I
L
"
F
F
"
M
e
d
i
a
n
D
i
t
c
h
(
N
o
t
t
o
S
c
a
l
e
)
F
A
L
S
E
S
U
M
P
S
S
=
D
i
t
c
h
S
l
o
p
e
e
t
c
.
G
I
L
2
’
DD
D
i
t
c
h
G
r
a
d
e
L
D
i
t
c
h
G
r
a
d
e
2
0
’
3
0
’
9
"
DD
D
D
D
2
0
’
L
(
S
e
e
C
h
a
r
t
B
e
l
o
w
)
L4
0
’
5
0
’
0
.
0
%
T
o
2
.
0
%
O
v
e
r
2
.
0
%
T
o
4
.
0
%
O
v
e
r
4
.
0
%
T
o
6
.
0
%
O
v
e
r
6
.
0
%
C
P
r
o
p
o
s
e
d
D
i
t
c
h
@ STA. 119+98 -L- (RT)
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
N
a
t
u
r
a
l
G
r
o
u
n
d
3:1
3:1
b
F
i
l
l
S
l
o
p
e
d
D
B
(
N
o
t
t
o
S
c
a
l
e
)
F
a
b
r
i
c
F
i
l
t
e
r
1
"
/
F
t
.
S
t
d
.
N
o
.
8
7
6
.
0
1
*
W
h
e
n
B
i
s
>
6
.
0
’
-
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
"
B
"
R
i
p
-
R
a
p
F
R
O
M
S
T
A
.
1
2
9
+
7
8
T
O
S
T
A
.
1
3
0
+
6
5
-
L
-
(
R
T
)
L
A
T
E
R
A
L
2
’
B
A
S
E
D
I
T
C
H
D
E
T
A
I
L
F
F
b
=
5
.
0
F
t
.
B
=
2
.
0
F
t
.
M
a
x
.
d
=
1
.
0
F
t
.
M
i
n
.
D
=
1
.
5
F
t
.
A
T
S
T
A
.
1
2
8
+
9
7
-
L
-
(
L
T
)
E
s
t
.
Q
t
y
.
1
1
T
o
n
s
A
T
S
T
A
.
1
2
9
+
7
8
-
L
-
(
R
T
)
E
s
t
.
Q
t
y
.
1
1
T
o
n
s
D
E
T
A
I
L
P
20:1Traffic FlowOutside DitchS=Ditch Slope SC Proposed Ditch 10:1 0.5’ Min.GIetc.L 2’1.0’ Max.( Not to Scale)FALSE SUMP DETAIL R
C
L
A
S
S
"
B
"
R
I
P
R
A
P
T
O
E
P
R
O
T
E
C
T
I
O
N
W
/
E
L
B
O
W
S
R
O
D
A
N
D
L
U
G
W
/ ELBO
W
S
RO
D
AN
D
LU
G
1
2
7
+
9
5
-
L
-
(
L
T
.
)
B
E
G
I
N
S
B
G
@
C
L
A
S
S
"
B
"
S
E
E
D
E
T
A
I
L
"
D
"
W
/
E
L
B
O
W
S
R
O
D
A
N
D
L
U
G
S
T
A
.
1
2
5
+
4
5
-
L
-
(
R
T
.
)
B
E
G
I
N
S
B
G
@
S
E
E
D
E
T
A
I
L
"
D
"
C
L
A
S
S
"
B
"
@
S
T
A
.
1
1
9
+
9
8
-
L
-
(
M
E
D
)
@
S
T
A
.
1
3
0
+
4
8
-
L
-
(
M
E
D
)
B
E
G
I
N
A
P
P
.
S
L
A
B
-
L
-
(
L
T
.
)
E
N
D
S
B
G
@
B
E
G
I
N
A
P
P
.
S
L
A
B
-
L
-
(
R
T
.
)
E
N
D
S
B
G
@
E
N
D
A
P
P
.
S
L
A
B
-
L
-
(
L
T
.
)
B
E
G
I
N
S
B
G
@
E
N
D
A
P
P
.
S
L
A
B
-
L
-
(
R
T
.
)
B
E
G
I
N
S
B
G
@
15" RCP-III
15
"
R
C
P
-
IV
15"
RC
P
-
IV
15
"
R
C
P
-
IV
15" RCP-IV
15"
F
i
l
l
S
l
o
p
e
(
N
o
t
t
o
S
c
a
l
e
)
T
O
E
P
R
O
T
E
C
T
I
O
N
d
F
a
b
r
i
c
F
i
l
t
e
r
F
L
A
T
T
E
R
2:1
O
R
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
C
d
=
1
.
0
F
t
.
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
"
B
"
R
i
p
-
R
a
p
F
R
O
M
S
T
A
.
1
2
5
+
0
0
T
O
S
T
A
.
1
2
8
+
2
5
-
L
-
(
R
T
)
2
1
7
S
Q
Y
D
S
G
E
O
T
E
X
T
I
L
E
E
S
T
.
9
8
T
O
N
S
D
D
E
=
8
7
C
Y
F
R
O
M
S
T
A
.
1
2
7
+
5
0
T
O
S
T
A
.
1
2
8
+
9
7
-
L
-
(
L
T
)
D
D
E
=
7
4
C
Y
E
S
T
.
3
4
T
O
N
S
E
S
T
.
7
2
S
Q
Y
D
S
G
E
O
T
E
X
T
I
L
E
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
W
/
G
E
O
T
E
X
T
I
L
E
C
L
A
S
S
"
B
"
R
I
P
R
A
P
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
W
/
G
E
O
T
E
X
T
I
L
E
C
L
A
S
S
"
B
"
R
I
P
R
A
P
E
S
T
.
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
T
O
N
W
/
G
E
O
T
E
X
T
I
L
E
C
L
A
S
S
"
B
"
R
I
P
R
A
P
6
0
" C
M
P
300’ PRO P. R/W 27
2
7
2
9
27
2
6
2
9
A
2
9
B
2
9
A
28
2
9
Z
2
9
T
T
X
X
X
6
0
" C
MP
10
8
"
CHL
&
1
S
RW
108" CHL & 1SRW
P
3
5
6
P
3
5
7
10
8
" C
H
L
z
z
z
SR
2825
CAMP
BURTON
RD
21’ BST
M
TL
M
T
L
OT
O
O
O
X
O
O
O
O
O
YYY
Y
Y
YYYYY
YYYYYYYYY
YY
Y
Y
Y
YYY
Ov
v
Y
YYY
Y
Y
Y
YYY
Y
Y
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
XCCCCCCCCCCCCCC
CC
CC
CC
CC
CC
C
F
CF
FF
FF
FF
FF
FF
FF
FF
FF
CC
F
F
F
F
F
F
F
F
F
F
SE = NC -L-PI Sta 130+34.85DL = 964.43’T = 482.29’R = 23,000.00’
-
Y
7
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
120+00
1
2
5
+
0
0
1
3
0
+
0
0
-
L
-
P
O
C
S
T
A
.
1
2
9
+
3
7
.
5
6
=
-
L
-
-
L
-
P
C
S
t
a
.
1
2
5
+
5
2
.
5
7
-Y
7
-
N
A
D
83/ 95
10
15
-
Y
7
-
P
O
T
S
T
A
.
1
3
+
2
3
.
2
3
-
Y
7
-
P
O
T
S
t
a
.
1
5
+
2
5
.
5
8
DUKE POWER COMPAN
Y
EX
IST
ING
R
/W
EX
IST
ING
R
/W
6
0
’ R
/W
C
i
t
y
O
f
G
r
e
e
n
s
b
o
r
o
N
C
P
R
IS
O
N
D
E
P
T
.
City Of Greensbor
o
15
0
’
D
U
K
E
P
O
WE
R
E
A
S
E
M
E
N
T
E
I
P
E
I
P
City Of Greensboro
E
I
P
1
5
0
’
D
U
K
E
P
O
W
E
R
E
A
S
E
M
E
N
T
N
8
8
37’07" W 612.98’
S
110
7
’3
7
" E
4
8
8
.4
1’
S
8
830
’
47
"
W
36
3.
64’
S
88
3
0’
47
"
W
581.
34’
S
110
7
’3
7
" E
7
2
0
.6
9
’
N 3211’38" W
6.73’
S
3
1
4
1
’
1
6
"
E
R
2
3
1
7
5
’
L
4
0
9
.
3
1
’
C
H
4
0
9
.
3
0
’
N
C
D
O
T
F
O
R
M
E
R
L
Y
B
E
T
T
Y
J
E
A
N
G
O
O
D
WIN
N
C
D
O
T
F
O
R
M
E
R
L
Y
B
E
T
T
Y
J
E
A
N
G
O
O
D
W
I
N
N
C
D
O
T
M
I
C
H
A
E
L
A
.
F
O
W
L
E
R
M
IC
H
A
E
L
A
.
F
O
WL
E
R
S
F
F F
F
6
8
8
689
689
6
9
0
6
9
0
6
9
0
69
0
691
69
1
691
691
6
9
2
692
693 693
69
3
694
6
94
694
6
9
5
695
695
695 695
695
6
9
5
696
696 696
69
6
6
9
7
697
697
697
698
698
698
699 699
699
6
9
9
7
0
0
70
0
700 700
700
700
700
700
7
0
0
70
0
70
1
701
701
7
0
1
7
0
1
701
702
702
702
702
7
0
2
70
2
70
3 703
703
703
7
0
3
70
3
70
3
7
0
3
704
704
704
704
704
704
7
0
4
7
0
4
7
0
5
705 705
705
7
0
5
705
705
705
705 705
70
5
705
705
7057
0
5
705
70
5
70
5
7
0
5
70
5
7
0
6
706
706
706
706
706
706
7
0
6 706
7
0
6
706
7
0
6
7
0
7
707
707
707
707
707
707
707
707
70
7
707
707
70
7
708
7
08
708
708
708
7
0
8
708
708
708708708
708
7087
0
8
708
7
0
9
70
9
7
0
9
70
9
709
709
709
709
709
709
709
709
709
710
710
710
710
710
710
710
710
710
710
710
7
10 710
710
710
710
7
1
0
71
0
710
710 710
710
711
711
711
711
7
11
711
711
711
7
1
1
711
711
7
11
71
1
7
1
2
7
1
2
712
712
712
712
7
1
2
7
1
2
712
712
712
713
7
13
713
713
713
713
713
713
7
1
3
713
7
1
3
713
714
714
714
714
714
714
7
1
4
7
1
4
714
7
1
4
714
714
714
715
715
715
715
715
715
715
7
15
715 715
715
7
15 7 1 5
7
15
71
5
7
1
5
715
715
715
7
15
71
5
715
715 715
7
1
5
716
716
716
7
16
716
716
716
716
7
1
6
716
716
716
716
7
1
6
717
717
717
7
1
7
717
717
717
7 1 7
7
1
7
717
7
17
717
717
718
718
718
7
18
718
718
7
1
8
718
7
1
8
718
7
18
7
1
8
718 718
7
1
9
719
719
719
71
9
719
7 19
7
1
9 7197
1
9
7
1
9
719 719
720
720720
720
7
20
720
7
2
0
720
720
720 720
7
2
0
720
7
2
0
7
2
0
7
2
0
7
2
0
720 720
720
7
2
0
7
20
720
720 720 720 720
72
1
721721
721
7
21
7
2
1
721
7
2
1
7
2
1
721
721
72
1
721 721
722
722
722
722
722
72
2
7
2
2
7
2
2
722
722
72
2
722 722
723
723
723
723
723
723
7
2
3
7
2
3
7
2
3
723
7
2
3
723 723
724
724
724
724
724
72 4
724
7
2
4
724
7
2
4
72
4
724 724
7
2
5
725
725
7
2
5
725
72
5
725
72 5
725
725
72
5
7
2
5
725
7
2
5
7
2
5
725
7 2 5
725
7
2
5
725
725 725 725 725 725
726
726
726
726
726
726
7
2
6
7
2
6
72 6
72
6
726
726 726
727
727
727
727
727
7 27
72
7
7
2
7
727
7
27
727
727 727 727
728
728
728
728
728
7 2 8
7
2
8
72
8
728
728
7
2
8
728 728 728
7
2
8
729
729
729
729
729
729
7
2
9
729
7
2
9
729
729
72
9
729 729 730730730730730730
7
3
0
73
0
730
730
730
730
730 73
0
7
3
0
730
7307
3
0
730
730
730
730
73
0730
730
730
731731731
7
3
1
731
731
731
731
731
7
3
1
7
3
1
731
7
3
1
731
732732732
732
7
3
2
732
732 732
732
73
2
7
3
2
732
7
3
3
733733
733
7
3
3
733
733
733
7
3
3
733
73
3
7
3
4
734734734
734
734
734
734
734 73
4
734
734
7
3
5
735735735735735
735
735
7
3
5
735
735
735
735
735
7 3 5 735 735 735
735
735
73
5
735
736736736
736
736
736 736 736
73
6
7
3
6
7
3
6
737737737
73
7
737
737
737737 738 738 738
73
8
738738738 739 739
7
3
9
740740740740740740
74
0
7
4
0
74 1 741
741
742
742742742743743743 744744744744744745745745745745745745745 746746746746747747747747748748749750751
S
S
Re
v
i
s
e
d
11
/
2
0
/
2
0
1
4
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
8A 33+23 -EY4-<0.01
9 95+78 -L- (LT) TO 15" RCP 2.01 0.15 0.03 <0.01 462 10
102+77 -L-(RT)
9A 101+78 -L- (LT) TO 42" RCP <0.01 84
102+19 -L-(LT)
10 113+64 -L- (LT) TO 2 @ 7' X 8' RCBC <0.01 0.03 <0.01 212 29
117+08 -L-(RT)
Bank Stabilization 97
10A 114+23 -L- (RT) TO 0.02 0.02
115+15 -L-(RT)
10B 115+19 -L- (LT) TO 0.03 <0.01 <0.01
116+17 -L-(RT)
10C 116+15 -L- (LT) TO 0.25 0.04
117+08 -L-(RT)
11 123+22 -L- (LT) TO 0.33
127+94 -L-(RT)
Bank Stabilization 1.70 18
11A 13+02 -Y7- (RT) TO CL II BENT PROTECTION <0.01
13+93 -Y7- (RT)
SUBTOTALS:2.65 0.05 0.17 1.76 <0.01 18 0
PERMIT DRAWINGS
SHEET 89 OF 93
NOTE: Rounded totals are based upon sum of actual impacts.
REVISED 11/20/2014 SITE 11A CL II BENT PROTECTION
ATN Revised 3/31/05 SHEET 4/8/2013
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
GUILFORD COUNTY
WBS - 34821.1.1 (U-2525B)
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
35 48+53 -Y23-36" RCP <0.01 <0.01 120 17
Bank Stabilization 10
36 18+48 -Y21A-54" RCP <0.01 <0.01 <0.01 101 21
Bank Stabilization 10
THIS SHEET SUBTOTALS:<0.01 <0.01 <0.01 241 38
SUBTOTALS OF ALL OTHER:6.86 0.00 0.31 0.38 0.03 1.70 0.09 10125 590 2055
TOTALS:6.86 0.00 0.31 0.38 0.03 1.72 0.10 10366 628 2055
PERMIT DRAWINGS
SHEET 93 OF 93 NOTE: Rounded totals are based upon sum of actual impacts.
Revised 10/01/2014
Revised 11/20/2014 - CL II BENT PROTECTION
ATN Revised 3/31/05 SHEET 4/8/2013
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
GUILFORD COUNTY
WBS - 34821.1.1 (U-2525B)