HomeMy WebLinkAbout20141213 Ver 1_401 Application_20141114Jeff Edwards
JKE Family Properties, LLC
1801 N. Thames Ct.
Greenville, NC 27858
NC DWR, 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699 -1617
November 18, 2014
Dear Sir:
Attached are five copies of my permit application and a check for$240.00 for the
application to bulkhead and build my boat dock on my property on the Tar River.
I have been working with Anthony Scarbaurgh in your Washington office and Kyle
Barnes with USACE's Washington office both of these men have been most helpful with
the application process. If you need any additional information I can be reached at 252-
809 -3359 or a rieastgaol.com. Thank you for your help.
Sincerely,
Jeff Edwards
Attachments
O�O'� W A -r! Oy
PAI D
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
Pre - Construction Notification (PCN) Form
A.
Applicant Information 0 1 4
1.
Processing
1 a.
Type(s) of approval sought from the
Corps:
F-1 Section 404 Permit x Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 198700056/197800125
1c.
Has the NWP or GP number been verified by the Corps?
x Yes ❑ No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
x 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes ❑ No
For the record only for Corps Permit:
❑ Yes ® No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑ Yes ❑ No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ® No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ® No
2.
Project Information
2a.
Name of project:
JKE Family Properties, LLC Bulkhead and dock
2b.
County:
Pitt
2c.
Nearest municipality / town:
Grimesland
2d.
Subdivision name:
N/A
2e.
NCDOT only, T.I.P. or state
project no:
lop
3.
Owner Information
3a.
Name(s) on Recorded Deed:
JKE Family Properties, LLC 2.0 2014
3b.
Deed Book and Page No.
3213 -34
3c.
Responsible Party (for LLC if
applicable):
Jeff Edwards
3d.
Street address:
1801 N. Thames Ct.
3e.
City, state, zip:
Greenville, NC 27858
3f.
Telephone no.:
252- 809 -3359
3g.
Fax no.:
None
3h.
Email address:
agrieast @aol.com
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4 Applicant Information (if different from owner) N/A
4a Applicant is
❑ Agent ❑ Other„ specify
4b- Name
4a Business name
(if applicable)
4d Street address
4e City, state, zip
4f Telephone no
4g Fax no
4h Email address -
5. Agent/Consultant Information (if applicable)
5a Name
5b Business name
(if applicable),
5c Street address
5d City, state, zip
5e Telephone no
5f Fax no
5g Email address
Page 2 of 11
B.
Project Information and Prior Project History
1
Property Identification
la_
Property identification no (tax PIN or parcel ID)
Parcel ID #'09794
1,b
Site coordinates (in decimal degrees)
Latitude 35 608520 Longitude 77 232814
(DD DDDDDD) ( -DD DDDDDD)
1c
Property size
60 6 acres
,2
Surface,Waters
2a
Name of nearest body of water (stream, river, etc) to
Tar River
proposed project
2b
Water,,Quahty Classification of nearest receiving water
BiN8
2c
River basin map is available at
Tar Pamlico
http / /h2o enr state nc us /adman /maps/
3
Project Description
3a
Describe the existing conditions on the site and the general land use in the vicinity of the project at the `time of this
application
Cleared lot with existing boat ramp
3b
List the total estimated acreage of all existing,wetlands -on the property
'none
3c
List the total estimated linear -feet of all existing streams (intermittent and perennial) on the property
3d
Explain the purpose of the proposed project
To build bulkhead to help minimize river�erosion due to;pleasum boat'traffic and to construct boat dock for personal
pleasure use
3e
Describe the overall project in detail, including the type of equipment to be used
To build bulkhead nverfront with vinyl bulkhead material and to construct wood pier and boat dock
Page 3 of 11
PCN Form — Version 1 3 December 10, 2008 Version
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments
x'Yes ❑ No ❑ Unknown
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
x Preliminary ❑ Final
4c
If yes, who delineated the jurisdictional areas?
Name ,(if known)- Kyle Barnes
Agency /Consultant Company
Other USACE 9%2114
4d
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5
Project History
5a
Have permits or certifications been requested orobtamed for
this project (including all' prior phases)' in the past?
❑ Yes x No ❑ Unknown
5b
If yes, explain in detail according to "help file" instructions
6.
Future Project.Plans
6a
Is this a phased project?
❑ Yes x No
6b
If yes, explain
Page 4 of 11
C. Proposed Impacts Inventory
1. Impacts Summary
1 a Which sections,were completed below for your project (check-all that apply)-
F-1 Wetlands x Streams - tributaries x Buffers
x Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each-wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of Jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non -404, other)
(acres)
Temporary T
W1 F-1 P ❑ T
_
El Yes
El Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ No
❑ Corps'
'❑ DWQ
W3 ❑ P ❑ T
❑ Yes,
❑ No
❑ Corps
❑ DWQ
W4 ❑, P F-1 T
❑ Yes
'El Corps
'❑
❑, No
DWQ
W5 ❑ P FIT
❑ Yes
❑ No
❑ Corps
❑ DWQ
W6 ❑ P' ❑ T
❑ Yes
❑ No
❑ Corps
❑ DWQ
2g. Total wetland impacts
2h Comments
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of Jurisdiction
Average
Impact
number -
(PER) or
(Corps - -404, 10
stream
length
Permanent (P) or
Bulkhead
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)
other)
(feet)
feet)
S1 P ❑ T
PER
El Corps 401 -404
❑ INT
❑ DWQ
❑ PER
❑ Corps
S2 '❑ P ❑ T
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
❑ PER
❑ Corps
S5 ❑ P ❑ T
❑ INT
❑ DWQ
❑ PER
❑ Corps
S6 ❑ P ❑ T
❑ INT
❑ DWQ
3h Total stream and tributary impacts
31 Comments
Page 5 of 11
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then individually list all open water impacts below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number-
(if applicable)
Type of"impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary T
Tar River
01 x P ❑ T
Tar River
Dock
River
01212
02 x P T
Tar River
Bulkhead
River
0395
03 ❑P ❑T
04 ❑P ❑T
4f. Total open water impacts
05162
4g Comments
5 Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below N/A
,5a
5b
5c
5d
5e
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose of
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
number
pond
P1
P2
5f. Total
5g Comments
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)',
5j Size of pond watershed (acres)
5k Method of construction -
6. Buffer Impacts (for DWQ)
If project will impacta protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a
❑ Neuse E:1 Tar-Pamlico ❑Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer'impact
number -
Reason
Buffer
Zone 1 'impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary T
impact
-required?
❑ Yoes
61 ❑ P x T
Bulkhead
Tar River
5076
❑ Yes
B2 ❑ P ❑ T
❑ No
El Yes
B3 ❑P ❑T
❑ No
6h Total buffet impacts
5076
61 Comments
Page 6 of 11
D.
Impact Justification and Mitigation
1.
Avoidance and Minimization
1a
Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
Dock will be constructed with minimal footpnnt,and length to allow boat access to Tar River Bulkhead will be constructed
using conventional vinyl material at minimal height and width
b
Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
Dock will be,constructed With minimal footprint °and length to,allow boat access to Tar River Bulkhead will be constructed
using conventional vinyl material at minimal'height and width
2.
Compensatory Mitigation for Impacts to Watets,of the U.S. or Waters of the State
2a
Does,the project require.Compensatory,`Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes x No
2b
If yes, mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c
If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3.
Complete if Using a Mitigation Bank
3a
Name of Mitigation Bank
3b
Credits Purchased (attach receipt and letter)
Type
Quantity
3c
Comment's
4.
Complete if Making a Payment to In -lieu Fee Program
4a
Approval letter from in -lieu fee program is attached
❑ Yes
4b
Stream mitigation requested
linear feet
4c
If using stream mitigation, stream temperature-
❑ warm ❑ cool ❑cold
4d
Buffer mitigation requested (DWQ only)
square feet
4e
Riparian wetland mitigation requested
acres
4f
Non - riparian wetland mitigation requested
acres
4g
Coastal (tidal) wetland mitigation requested
acres
4h
Comments
Page 7 of 11
PCN Form — Version 1 3 December 10, 2008 Version
5. Complete if Using a Permittee Responsible Mitigation Plan N/A
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by -DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? If you will have to fill out this entire form — please
contact the State for more information
❑ Yes x No
6b, If�yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone'
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required:
6g If buffer mitigation is required, discuss What type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment, into an approved in -lieu fee fund)
6h Comments
Page 8of11
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1'a
Does the project include or is it adjacent to protectednpanan buffers identified
❑ Yes x No
within one of the NC Riparian Buffer Protection Rules?
lb
If yes, then is a diffuse flow plan included? If no, explain why
❑ Yes x No
Comments
2.
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
%
2b
Does this project require a Stormwater Management Plan?
❑ Yes x No
2c
If this project DOES NOT require a Stormwater Management Plan, explain why Project will not create storm water runoff
2d
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
❑ Certified Local Government
2e
Who will be responsible for the review of the Stormwater Management Plan?
❑ DWQ Stormwater Program
❑ DWQ 401 Unit
3.
Certified Local Government Stormwater Review
3a
In which local government's jurisdiction is this project?
❑, Phase I I
❑ NSW
3b
Which of the following locally - implemented stormwater management programs
❑T USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a
Which of the following state - implemented stormwater management programs apply
❑ ORW
(check all that apply)
❑ Session Law 2006 -246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes El No
attached?
5 -DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet'the appropriate requirements?
❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10 „2008 Version
F. Supplementary Information
1 Environmental Documentation (DWQ Requirement)
1,a Does the project involve an expenditure of public (federal /state /local) funds or the
❑ Yes x No
Use of °public (federal /state) land?
1;b If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
El Yes x No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c If you answered "yes" to the above, has the document review -been finalized by the
State Clearing House? (If so, attach a copy of'the NEPA or SEPA final approval
❑ Yes x No
letter )
Comments
2. Violations (DWQ Requirement)
2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
❑ Yes x No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b Is this an after - the -fact permit application?
❑ Yes x No
2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3. Cumulative Impacts (DWQ Requirement)
3a Will this project (based on past and reasonably anticipated future impacts) result'in
❑Yes x No
additional development, which could impact nearby downstream water quality?
3b If 'you answered "yes" to the above, submit a qualitative or,quantitative cumulative impact °analysis in accordance with the
most'recent'DWQ policy If you answered "no," provide a short,narrative description
, Construction of only bulkhead and dock, no further construction is planned
4. Sewage Disposal (DWQ' Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
none
Page 10 of 11
PCN Form — Version 1 3 Decem'ber'1,0, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes x No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes x No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes x No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes x No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
❑ Yes x No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? USACE
YW/
JKE Family Properties, LLC
Y
Jeff Edwards
Date
cant/Agent's Signature
Applicant/Agent's Printed Name
(Agent's sig is alid only if an authorization letter from the applicant
is provided.)
Page 11 of 11
- I-d
41
��9
2p
"011
ki
ij
AK
lV
Ilk-
iikl