Loading...
HomeMy WebLinkAbout20141213 Ver 1_401 Application_20141114Jeff Edwards JKE Family Properties, LLC 1801 N. Thames Ct. Greenville, NC 27858 NC DWR, 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1617 November 18, 2014 Dear Sir: Attached are five copies of my permit application and a check for$240.00 for the application to bulkhead and build my boat dock on my property on the Tar River. I have been working with Anthony Scarbaurgh in your Washington office and Kyle Barnes with USACE's Washington office both of these men have been most helpful with the application process. If you need any additional information I can be reached at 252- 809 -3359 or a rieastgaol.com. Thank you for your help. Sincerely, Jeff Edwards Attachments O�O'� W A -r! Oy PAI D Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 0 1 4 1. Processing 1 a. Type(s) of approval sought from the Corps: F-1 Section 404 Permit x Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 198700056/197800125 1c. Has the NWP or GP number been verified by the Corps? x Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): x 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: JKE Family Properties, LLC Bulkhead and dock 2b. County: Pitt 2c. Nearest municipality / town: Grimesland 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: lop 3. Owner Information 3a. Name(s) on Recorded Deed: JKE Family Properties, LLC 2.0 2014 3b. Deed Book and Page No. 3213 -34 3c. Responsible Party (for LLC if applicable): Jeff Edwards 3d. Street address: 1801 N. Thames Ct. 3e. City, state, zip: Greenville, NC 27858 3f. Telephone no.: 252- 809 -3359 3g. Fax no.: None 3h. Email address: agrieast @aol.com Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4 Applicant Information (if different from owner) N/A 4a Applicant is ❑ Agent ❑ Other„ specify 4b- Name 4a Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address - 5. Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable), 5c Street address 5d City, state, zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 B. Project Information and Prior Project History 1 Property Identification la_ Property identification no (tax PIN or parcel ID) Parcel ID #'09794 1,b Site coordinates (in decimal degrees) Latitude 35 608520 Longitude 77 232814 (DD DDDDDD) ( -DD DDDDDD) 1c Property size 60 6 acres ,2 Surface,Waters 2a Name of nearest body of water (stream, river, etc) to Tar River proposed project 2b Water,,Quahty Classification of nearest receiving water BiN8 2c River basin map is available at Tar Pamlico http / /h2o enr state nc us /adman /maps/ 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the `time of this application Cleared lot with existing boat ramp 3b List the total estimated acreage of all existing,wetlands -on the property 'none 3c List the total estimated linear -feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project To build bulkhead to help minimize river�erosion due to;pleasum boat'traffic and to construct boat dock for personal pleasure use 3e Describe the overall project in detail, including the type of equipment to be used To build bulkhead nverfront with vinyl bulkhead material and to construct wood pier and boat dock Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments x'Yes ❑ No ❑ Unknown 4b If the Corps made the jurisdictional determination, what type of determination was made? x Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name ,(if known)- Kyle Barnes Agency /Consultant Company Other USACE 9%2114 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested orobtamed for this project (including all' prior phases)' in the past? ❑ Yes x No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project.Plans 6a Is this a phased project? ❑ Yes x No 6b If yes, explain Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a Which sections,were completed below for your project (check-all that apply)- F-1 Wetlands x Streams - tributaries x Buffers x Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each-wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of Jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 F-1 P ❑ T _ El Yes El Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps' '❑ DWQ W3 ❑ P ❑ T ❑ Yes, ❑ No ❑ Corps ❑ DWQ W4 ❑, P F-1 T ❑ Yes 'El Corps '❑ ❑, No DWQ W5 ❑ P FIT ❑ Yes ❑ No ❑ Corps ❑ DWQ W6 ❑ P' ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Jurisdiction Average Impact number - (PER) or (Corps - -404, 10 stream length Permanent (P) or Bulkhead intermittent DWQ — non -404, width (linear Temporary (T) (INT) other) (feet) feet) S1 P ❑ T PER El Corps 401 -404 ❑ INT ❑ DWQ ❑ PER ❑ Corps S2 '❑ P ❑ T ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number- (if applicable) Type of"impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T Tar River 01 x P ❑ T Tar River Dock River 01212 02 x P T Tar River Bulkhead River 0395 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 05162 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, the complete the chart below N/A ,5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number pond P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres)', 5j Size of pond watershed (acres) 5k Method of construction - 6. Buffer Impacts (for DWQ) If project will impacta protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse E:1 Tar-Pamlico ❑Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer'impact number - Reason Buffer Zone 1 'impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact -required? ❑ Yoes 61 ❑ P x T Bulkhead Tar River 5076 ❑ Yes B2 ❑ P ❑ T ❑ No El Yes B3 ❑P ❑T ❑ No 6h Total buffet impacts 5076 61 Comments Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Dock will be constructed with minimal footpnnt,and length to allow boat access to Tar River Bulkhead will be constructed using conventional vinyl material at minimal height and width b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Dock will be,constructed With minimal footprint °and length to,allow boat access to Tar River Bulkhead will be constructed using conventional vinyl material at minimal'height and width 2. Compensatory Mitigation for Impacts to Watets,of the U.S. or Waters of the State 2a Does,the project require.Compensatory,`Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes x No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comment's 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature- ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Complete if Using a Permittee Responsible Mitigation Plan N/A 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by -DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If you will have to fill out this entire form — please contact the State for more information ❑ Yes x No 6b, If�yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone' 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss What type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment, into an approved in -lieu fee fund) 6h Comments Page 8of11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1'a Does the project include or is it adjacent to protectednpanan buffers identified ❑ Yes x No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes x No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? % 2b Does this project require a Stormwater Management Plan? ❑ Yes x No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Project will not create storm water runoff 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑, Phase I I ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑T USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes El No attached? 5 -DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet'the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 „2008 Version F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1,a Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes x No Use of °public (federal /state) land? 1;b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes x No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review -been finalized by the State Clearing House? (If so, attach a copy of'the NEPA or SEPA final approval ❑ Yes x No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes x No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes x No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result'in ❑Yes x No additional development, which could impact nearby downstream water quality? 3b If 'you answered "yes" to the above, submit a qualitative or,quantitative cumulative impact °analysis in accordance with the most'recent'DWQ policy If you answered "no," provide a short,narrative description , Construction of only bulkhead and dock, no further construction is planned 4. Sewage Disposal (DWQ' Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility none Page 10 of 11 PCN Form — Version 1 3 Decem'ber'1,0, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes x No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes x No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes x No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes x No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes x No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? USACE YW/ JKE Family Properties, LLC Y Jeff Edwards Date cant/Agent's Signature Applicant/Agent's Printed Name (Agent's sig is alid only if an authorization letter from the applicant is provided.) Page 11 of 11 - I-d 41 ��9 2p "011 ki ij AK lV Ilk- iikl