Loading...
HomeMy WebLinkAboutGW1-2022-09523_Well Construction - GW1_20221017 WELL CONSTRUCTION RECORD For Internal Use ONLY: This firm can be used for single or multiple wells I.Well Contractor information: 14. ONES GARRETT CLYDE BANKS FROM ER 'to r0 DESCRIPTION Well Contractor Name ft. ft. 4519-A ft, ft. NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER'(if a 6cable) FROM TO DIAMETER THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft. 78 ft. 6 1/8 ' i" #21 1 PVC Company Name 16.INNER CASING OR TUBING(geothermal closed-log MCM-336W FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. fL in. List all applicable it-ell permits•(i.e.Count),,State. Variance,Injection,etc.) ft. ft. in. 3.Well Use(check well use): 17:SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ft. ft. in. ❑Agricultural ❑MunicipaVPublic ❑Geothermal(Heating/Cooling Supply) El Residential Water SuPP1Y(single) ft. ft. in. ❑industrial/Commercial ❑Residential Water Supply(shared) Ill.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑lnigation 0 fr. 20 rut. Bentonite Pumped Non-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑GroundwaterRemediation 19.SAND/GRAVEL PACK(if applicable) FROM TO MATERIAL EMPLACEM ENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stornwater Drainage ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG(attach additional sheets if necessary), ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,sollfrock type,grain size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain tinder#21 Remarks) 0 ft. 78 ft. OVER BURDEN 7-20-2022 78 rc• 485 rc• GRANITE 4.Date Well(s)Completed: Well ID# ft. ft. Sa.Well Location: ft. ft. Jerry Trull ft. ft. Facility/Owner Name Facility iD#(ifapplicable) ft. ft. ` `� a a a2 1101 Wills Way Canton, NC 28716 ft. OCT 17 2022 Phvsical Address,City,and Zip 21.REMARKS Haywood 8654189624 tnfi3�:T,3,; Pray 'ing Unit County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: lif'well field,one lot/long is sufficient) N w 9-12-2022 Signature 0 f Certi'11K Well Contractor Date 6.is(are)the well(s): ❑O Permanent or ❑Temporary Br signing this form,i hereby certi(v that the well(s)was(were)constructed in accordance With 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction StandardT and that a 7.Is this a repair to an existing well: ❑Yes or ElNo copy gfthis record has heen provided to the well owner. ff 1his is it repair,fill out known well construction information and e-rplain the nature of die repair under#21 remarks section or on the back ojthis•form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages if necessary. h,or undtiple injection or non-to•ater aupplt•wells ONLY with the satire construction,you can snhntii one jornn. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface:485 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For inithiple wells list all depths ffilf Brent(example-3 n 200'and 2G100') construction to the following: 10.Static water level below top of casing: 50 (ft,) Division of Water Resources,Information Processing Unit, I11rater level is above caving,use"+•• 1617 Mail Service Center,Raleigh,NC 27699-1617 1 11.Borehole diameter: 6.25 (in.) 24b.For Iniection Wells ONLY:'In addition to sending the form to the address in ROTARY 24a above, also submit a copy of ithis form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield( m Method of test: dp ) 1 RIG 24c.For Water Supply&Injection Wells: Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: PILLS Amount 35 well construction to the county health department of the county where constructed. Forgo GW-I North Carolina Department of Environment and Natural Resources—Division of Water Resources Revised August 2013