Loading...
HomeMy WebLinkAbout20211271 Ver 2_More Information Received_20220726 (2)r•• fit, `"' ar ,• ,� d � :�h '{� •.� :.-: ter ti 44 Zone 2 Clearing - 3,926 SF�, 1 Lr, r Permanent Wetland r i" ' \ Conversion Impact - 8,230 SFA. r ; i 4"1 i+* Zone 1 Clearing - 6,440 SF f ; '' Width of Overhead Crossing 85 FT M, 4. ,10 ;,,.�., ' r o � Legend L� ?� < I\y Zone 2 Buffer �w ® Zone 1 Buffer Einch = 60 feet ' ` ® Overhead Utility Crossing Stream 65 130 iy ` _�1_� Feet ;�_ Wetland Source: Imagery was obtained from ESRI Basemap. Image origin: Microsoft. Date: 3/13/2011. il +' a' ' PROJECT NO. 20213143.001A FIGURE The information included on this graphic representation has been (i compiled from a variety ofsources and is subject to change without DRAWN: 7/20/2022 Impact Map 1 notice. Kl, as t er accuracy, no representations oness, or rights expressed KL E/NFEL OER or implied, as to accuracy, completeness, timeliness, dforus to the DRAWN BY: SB C use of such information. This document is not intended for use as a /'�� 4, land survey product noris it designed orintended as a construction Bright People. Right Solutions. L design document. The use or misuse of the information contained \. CHECKED BY: SD on this graphic representation is at the sole risk of the party using or \v/ Phobos Solar C misusing the information. Phase 11 � susFILE NAME: www.kleinfelder.com See File Path Nash County, NC