HomeMy WebLinkAbout20211271 Ver 2_More Information Received_20220726 (2)r•• fit, `"' ar ,• ,�
d �
:�h '{� •.� :.-: ter
ti
44
Zone 2 Clearing - 3,926 SF�,
1
Lr,
r Permanent Wetland r
i" ' \ Conversion Impact - 8,230 SFA.
r ; i 4"1 i+*
Zone 1 Clearing - 6,440 SF
f ;
'' Width of Overhead
Crossing 85 FT
M,
4.
,10 ;,,.�.,
' r
o � Legend
L�
?� < I\y Zone 2 Buffer
�w ® Zone 1 Buffer
Einch = 60 feet ' ` ® Overhead Utility Crossing
Stream
65 130 iy
` _�1_� Feet
;�_ Wetland
Source: Imagery was obtained from ESRI Basemap. Image origin: Microsoft. Date: 3/13/2011. il
+' a' '
PROJECT NO. 20213143.001A FIGURE
The information included on this graphic representation has been
(i compiled from a variety ofsources and is subject to change without DRAWN: 7/20/2022 Impact Map
1 notice. Kl, as t er accuracy,
no representations oness, or rights
expressed KL E/NFEL OER
or implied, as to accuracy, completeness, timeliness, dforus to the DRAWN BY: SB
C use of such information. This document is not intended for use as a /'��
4, land survey product noris it designed orintended as a construction Bright People. Right Solutions. L
design document. The use or misuse of the information contained \. CHECKED BY: SD
on this graphic representation is at the sole risk of the party using or \v/ Phobos Solar
C misusing the information. Phase 11
� susFILE NAME:
www.kleinfelder.com See File Path Nash County, NC