Colleen,
Thanks for the thorough review of the project and catching the extra crossing. I’ve been trying to find time to ask you about any additional information you will require to complete
this request. Also as an FYI, the Corps determines the final Nationwide Permit to be used on projects. The applicant typically gets it right 95% of the time on the PCN but if another
NWP fits better or the project can be elevated to an Individual Permit upon the Corps review. I changed this request to a NWP 18 because of the limited amount of fill and the original
NWP requested is currently on hold.
Kyle
From: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Sent: Monday, November 15, 2021 5:22 PM
To: Danielle Sank <DSank@kleinfelder.com>; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>
Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II
Danielle,
I am reviewing the above referenced project, and in order to complete my review, some additional information is required:
1. Multiple streams are depicted without buffers on the Wetland and Stream Impact Map-Overview included in the response to the Request for Additional Information from the USACE. Please
enumerate all riparian buffers as overlays on the site plan. Please provide stream determinations for any stream features not subject to the Tar-Pamlico Riparian Buffer Rules. [15A
NCAC 02H .0502(a)(9)]
2. Impact maps do not differentiate between Zones 1 and 2 of the Tar-Pamlico Riparian Buffer. Please locate all of the protected riparian buffers as overlays on the impact maps, clearly
showing Zone 1 and Zone 2. [15A NCAC 02B .0611(b)(1(f)]
3. It appears that there is an additional fence crossing on sheet C-105 right under “Matchline Sheet C-102”. Please provide additional details on this fence crossing. [15A NCAC 02H .0502(c)]
4. Please provide an updated impact table that specifies the amount of fill and the amount of clearing for each wetland impact. [15A NCAC 02H .0502(c)]
5. Please confirm that the applicant is requesting to change this submittal to a NWP 18.
6. Please provide an agent authorization letter delegating signature authority. A sample agent authorization letter can be found on the USACE website. [15A NCAC 02H .0502(a)(11)]
Thank you,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Danielle Sank [mailto:DSank@kleinfelder.com]
Sent: Thursday, November 11, 2021 4:25 PM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >; Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov>
>
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov>
Hi Kyle,
Glad to hear we can make NWP 18 work to bypass the current hold on the 2020 NWPs. I’m sure that will make this go smoother on both our ends :)
As requested, the total square footage of fill for the fence posts to be installed in wetlands are outlined below. Information of the fill per post and number of fence posts to be installed
was obtained from Attachment C – Fence Plan Sheets from the RAI submittal. There were no wetlands at Fence Crossings 4 and 5 - fence posts will be installed within the stream riparian
buffers and along the stream banks outside of the OHWM.
Thank you again for your coordination on this project!
Colleen – please let me know if you have any questions or need any follow-up information on your end.
Thanks!
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Sent: Wednesday, November 10, 2021 10:28 AM
To: Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >; Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
External Email
________________________________
Danielle,
Thank you for the follow up information. This clarifies how the fence will be installed and that the vegetation will only be cut and maintained by cutting and no ground disturbing activities
will take place. The cutting isn’t considered an impact with the Corps and the conversion is minimal so I will not require mitigation because the wetland continues to function with
emergent vegetation. The only additional information I will need from you is the square footage of fill associated with the fence post. Please give me the number of post within the
wetland at each crossing and the total amount of fill associated.
With this impact being so small I am changing the permit request to a Nationwide Permit #18. If you haven’t heard US Army Corps of Engineers HQ has placed a hold on issuing 16 permits
associated with Section 401 of the CWA that were renewed in 2020. NWP #51, of which you requested to use for this project, is included in those 16. I can move forward with issuance
through the NWP #18 if you can get me the information indicated above. Also keep in mind that this is only related to the Corps permit. You will need to continue to coordinate with
the DWR for impacts related to the protected riparian buffer. Let me know if you have any questions.
Kyle
From: Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >
Sent: Friday, November 5, 2021 12:07 PM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >; Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov>
>
Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II
Hi Kyle/Colleen,
Please see the attached letter with the requested supplemental information. Apologies on the delay getting this back to you, it took a while to get a response back from our client.
Please let me know if you have any questions or issues uploading the doc.
Thanks!
Danielle
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Sent: Wednesday, September 29, 2021 2:09 PM
To: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >; Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >
Subject: RE: [External] RE: Phobos Solar, LLC. - Phase II
External Email
________________________________
Danielle,
I’m good with either submittal format as long as it works with Colleen and doesn’t cause issues with DWR’s database.
Kyle
From: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >
Sent: Wednesday, September 29, 2021 8:48 AM
To: Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >; Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Subject: [Non-DoD Source] RE: [External] RE: Phobos Solar, LLC. - Phase II
Hi Danielle,
I believe you can use that form, but you can also CC me on any supplemental information you submit to Kyle via email. I can then upload the emailed supplemental information into DWR’s
online database when I review the project.
Thanks,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Danielle Sank [mailto:DSank@kleinfelder.com]
Sent: Wednesday, September 29, 2021 6:21 AM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >
Subject: [External] RE: Phobos Solar, LLC. - Phase II
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov>
Hi Kyle,
Just wanted to provide an update following our conversation last Friday - I have reached out to our client to confirm their long-term maintenance plans for the fence crossings at the
wetland and stream areas. Once I hear back, I’ll work to submit a supplemental information request with the detailed impact maps, and additional BMP and avoidance/minimization information
as requested.
I believe you had said that the supplemental request needed to be submitted through DWR - could you please confirm if this is the correct submittal and that I would want to check the
“More Information Response” ? The DWR contact for this project is Colleen Cohn. Once submitted, would Colleen forward the submittal to you?
New Submission (nc.gov) <Blockedhttps://edocs.deq.nc.gov/Forms/Supplemental-Information-Form>
Thank you!
Danielle
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Sent: Thursday, September 23, 2021 11:00 AM
To: Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >
Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >
Subject: RE: Phobos Solar, LLC. - Phase II
External Email
________________________________
Danielle,
I left you a message on your voicemail today to discuss this project further. I am reviewing the information and the impact zones are not clear on the maps. You submitted a large set
of plans and we need to define the specific sites. Additionally I need to know why the crossings need to be cleared and grubbed. On other sites I have been involved with fence installation
was performed in jurisdictional areas by cutting the pathway and only disturbing the jurisdictional areas with the poles leaving the root mat intact. The only impact would be the pole
and conversion of the wetland. Please let me know when you would be available to discuss this project. Thank you.
Kyle
From: Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >
Sent: Wednesday, September 15, 2021 3:45 PM
To: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Subject: [Non-DoD Source] RE: Phobos Solar, LLC. - Phase II
Hi Kyle,
Yes, for both the wetland and stream crossings the applicant proposes to mechanically clear trees and shrubs just within the 10 ft wide corridors (impact areas) which would give them
enough clearance for the fence installation equipment. The majority of the fencing will sit at ground level, except for the fence posts which will be stabilized by concrete and will
incur permanent impacts. For the stream crossings, the fence posts will be installed along the stream banks and outside of the OHWM and the pre-construction elevations will be maintained.
Between fence posts, the fencing will cross parallel to the stream bank elevations and sit above the stream channel as not to obstruct downstream flow. Following the installation,
it’s assumed that the fence corridors will be annually maintained with tree/shrub removal but still allow for natural recruitment of herbaceous vegetation in order to maintain soil
stability in the area.
My sincere apologies for the missing info, but I hope this has helped you with your review. Please let me know if you have any other questions moving forward.
Thank you!
Danielle Sank
Project Professional / Ecologist
9009 Perimeter Woods Dr., Suite E
Charlotte, NC 28216
(P) 443-618-0066
From: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil <mailto:Kyle.W.Barnes@usace.army.mil> >
Sent: Wednesday, September 15, 2021 1:07 PM
To: Danielle Sank <DSank@kleinfelder.com <mailto:DSank@kleinfelder.com> >
Subject: Phobos Solar, LLC. - Phase II
External Email
________________________________
Danielle,
I’m the Corps agent reviewing the PCN you submitted for the subject project in Nash County. Within the project description I didn’t see the proposed installation methodology. Within
the areas that the fencing will be crossing jurisdictional waters and wetlands will the applicant be mechanically clearing the project area?
Kyle Barnes
Regulatory Project Manager
US Army Corps of Engineers
Wilmington District
Washington Field Office
910-251-4584
We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties.
Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
<Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0>
Thank you for taking the time to visit this site and complete the survey.
럫鷠웷䜟髡켊疂賴稵≺랃뎄ộ〨יּ擫̒䉂ꨨ顷Ɜ陫댭汐젮꛰뇇屌﴿갡ᚐ쟄ሟ颯겦镢Ḅ尫撓邪겝鶀ꪺ형瀲㤾譺ੳ뷟❐䓣꧍枓鼯‚㓍�芼�紐ወ堯挳啺삫峯ꏏꙉ朓ꭲⱘ帞捫嶗벓끡ﳉ鳴䭬ヨ洐嫜ﴒ烪쭄屘ﮣ㏎望环姁쐸鵴喁퓟웅ߥ廠᷷�䗥즄퇳ﶽ찂룜䜍Ꝓ連⽂ᒄ탦큢氬ﶙ䰖ះ暡纃礸凅ꗻ酋곅䬥쇱쇳ꬰ邳ᅯﵠ意衞ᱩ韍䛼媽劄Ԙ殉飊쥡䟏.ᥗ퍥줨䞃괿⍤扉㩲ু쉬䌗寸ᳪ㗲ⴲᣞ粷옙건ᐊ䍴ﵡ갘땛ᜉ弒
날ꨎ䁔ᩡ睖᧷郞䷒霛㮎᫅⡻쒋凪鱺뤗䢜齩爐揠零㱛쫷⧝掤騥Ꝺ偢窓瞘↚䫍⹅᰽쾣㸋ῐ艚魽郮ୂ딡哷咳씮鷕죾燯姷ಚ㵵ꅬ瀸隶꧱ǽ属ꌿ멵䬅쫥鎽銓῭䭢鎠⽀ꂭ跦칼᷃㶝툴䒚鯂䘕槠ႄ㍨芅횼앷墵꘠❕拄֠갧Ȱ䍥䖠臈㧾宜낈챞늀腩𥉉সᖘ㕏腎糙ㇽ㼽鐿治᤻ᾩ檥䋄螩矛翣糝룖ꡞ榑굶굥捕弬兏킑뎙蟦䴛넾�辷㮸玉鱍ꞟၾﴙ�쟸韝嗇ᥟ残谛퇴纵팘䗳趈㚇懆᪤퀄�랁ᴺ貤ᙱ瓨硂薆⹀冲̈ଽ礠팝㚠숨
䘙⮹䧜ሤⴈ搚ꥧ燉蘒閪䁼Ⴑ쬰䰫췁̜젉챂픚ଛﲄ䁢尽ﴼ낥丯턬䊖蒹㽂ˢ棨ꕑ쑘礿ᚢ谩ⱅ䄖퉀ꎇᄰ樈涢骗㍷᧚鄊䮛㫭ꄇ㩀蕠袏뉈韰ꑌ�揑⣸盼īߓ솷铁䮬늇揇ᴆ졟鼟ጼ瞟䕫噟꯷艹ꋚ瑻낷蠺꛲曣쏀췙跮⳦Ѣ㞐숻衝䍹䎻㛓�㰯崮信ܷ틦麅ᠶ♴礴㙷徒ʝⰍ糺☀䯎㽀⮝ⴶఘ謗튎㸠⟹丄騯陸빨ⷙ껈繵뤭麦䩒摤㚿პ䧬텙竬헞ᕯ宕䞈槷蘆풟컋ѡ賊紀瀳魖稄葷銗臛⌾ḩᖍꁆࠌ黬ꌱᗝ抃추憓鹱쪗ঠ♣㺐鉩滇沫䚙琙놐想蠼
渆䦄颯⏝樼귗�ᵲ圩켯ᒟ畓낹譮蝷ׅ颒毺㐹噫앚츄戳補ᅶ藶铓䇦뀢搅㮽焦缚ퟬ刋鵛퓦璽劼鞚䂠ऐ⻪뒯䄧蕫㲍ִ乗䥃ှ桳䰳ȑ籤ෆ镲뤸䪡ᒘ棇ⁱ✔鋰ⷐ蹽흀曆츜岚⁴࿂쩒懘鄦䫬微趛玧䛰杭裡䨇殔鯛窑ꞷْ锎䵿꠴윭磓羡婓䥜帢씭㬳劕な왒ᔐ켠嚉⃧⌥ꠗ؞霱쮆瓧芤ㅤꠣ�筐볼㕱躦蘘統ꄧ챙桳糽ﰿﱥ熲꘍䷺识婭䙒ޓ魚ᬳའ떺庡䇓朑ᮭᐨꅹ魑탚윓ꜷ쎭澻貿蔠씕멺롱퐧雅鄸藤㡻Ở랓
웍ꏥ烇溛졈ウ狴㨠忞᥀摛㓚鹌䥵殞嗵ܣ鮷罸쥳퇑棖즚뇼煶뜣鰮㴂棥왚넦᧪뾁ꀒ殀垺蕜䋦䚩◧뵏藠袘ﱛ곡嵜木㏱묹撇碖ᦳ䙊燠㠑ⲽ冡妊䗾澑綑뉛룘ׇಶ秫ﳳ픲㋋苳鬜也럹錂�渿轰哌먫밙냻풥襫⯪䘓䱯忏剫殫⧐ヌ홬閵櫣ᬧ玅�ﮟ쑢횀䬋矞ॗ沋拢얅䚜棡嫢䈩傱�띹掫㊖휕멼常鬔钌菽⺄幇蹦⿏ᯭ窅峵懈뼜莕㕶兽犐椓⊢䑄퉅㯂⫾뚺礳⦝荚䉂「볋닑ͥ�Ƶ䵟쁶귙醫ﭖ뱭뫕礞힑㓠磥녾�색沭埊Ń铲躦屈屋ߖ낃힢Ⰼ됦ۗ䶣
뚧ꁯ壚⚽䊁栴�헛ꔽ鏇ꈆ譙䰘ⱻ㮛愞基럈⇸蛝ꇛ鮮ꬁ괗酂ᡛ喚芍྿썹괳鬐닽좵啕퓩좏俞ꧪᆽ쾏扇踿⍏ꅨ蠺湅ਗ਼⇤鎌ퟂৗㅲ뎇캧�㪴즜컣旫鎅✈⺷埅劫�⦥Ԃ�笲钦쿪䈵㎠택飨﵉鿭楕詳䍥枑ⴋ굪됸䝻譕姜偘얻훍ᘧ꼸朿鎍糗�待杧�뗈�홋禎辸剾뇶鹶ɭउ舉꽟靟ឹ邜䶵鈡䥁軱걼熚ﻊ뎄뎧妌듪濣ꫛ災缽潹᎗詩씁Ṯ߇ᭇ셩⬊삌⏣䦇踍详寗⊂뚶羽껿핝ਬ㈼囸Ɡ䎧尯类쨔䵗ﶺ급캝졧ꌼ鹣벖쭍תּ姪녹᠓垴
連꿅逸钕롤览᭫爥삃쥢믍횶퍷琾ꪵ翂�귚錝뇉꽽௷ﰻ鍒鿈ᷞ阥�鵲ꑫ퍾뛌妛髩䜛燻㉜铭▒읩螹觭㠻ꇷ瀞⁇虙�ꄆ乄띨ੀ⣃蛙뎛쪒葖큡הὈᰵ潉쎷ਤみᘗ욢厫竱횇泤剖ᾨ䠉쇚뻐렯ɐ씕䭡拤蟊ꐭ瘔泰븚뽞崈婾년헓괰ᕓ㗄쑊텪栧檵м악肽孵䅚−攀뎺ꟗ沣甥輻킢ግ캦辞퍕恆㼕鸚㣈˭銅혼᷶⧄땧葑얎㟧ㄊ뱢榶綱髼㺾錐�鮄ফ蝹愖拨⛡ຂ㑣�鎢癰�︻ᨑࡸ鉰몞蠪Ἇ쵳�륓ꀨ兗㑬죙匢鄹噠䛂볹蕔紷ᷭﻞ䰛ዾ峤
䞏ᷲ뱗撿븫퇬ᲀ۳䩒៝벌鼽폕컯鄯騋ﶼ昙봦⼃膓�ゎ黭ᬍ湒딖틏樉홱殼띻幬ꍏॊ�쨸㣿�뎔酊g䞫竹쪯骰儅兦闕桾᷽ᬾ쯥廢䦍馱㎞㑨䰵䮶ṡ셞쒕裒荕␇ꮮ㆔⬾膬뿭�꺌褆ⷯ龥嬏ʮ羶삻㷔❋釴�뉮⛭◴彈뺎戅羵�㢶ş岻믮偔꼠궓븳摔៓핹穼䉥랁湰轜弁ꮆ貧搳ﵝ롤㞻〽椷ਡ휈䔅ᡌ⧝忹㵶麟騭ꔷ皺촳藔⮾䤫涐맚㍥껥䦶㉭괯銢ﯻꍛ醞ば덗뷲摌煐鸞ᕗ헁㫦쐲ጲ䛗䈗鹎᭹镒礫殺켭ᑹ᜔륌䎪甛鋁趍㘰ണ炬
遃㞋铄먳靆㡩曓吼庮ꘔ薡ꐸ븥⼧䶭೮䦙錃㕋塌ִ迯薸੬炟ꠉࢄᜏ楨靳잮鿛䝞穆民幮矰菷鮏娂鿊剝ᙬ杢㚼⩤癚û㊷⧳茊螃綼↼颵ܗ緑Ғ黮瘔⚆㘯᭭ㆄힳ귡⥑쳈샑짉䄝ꮕ幐Ⅺᨴ�験⬏幀⅞菼ᆂᰜ�ꛈ쓻킟桴Ẕ蟷꽍푁Ꮛ꙱㱥鏵溂ť煘褸尳쾨롚뚯鞢艕꼠簢縳渾ꫨ액�䧨囙곎謝�넓흳賟⾵㑖㩓휾洚⧰�䓎社ᗄ㹞ഈ꜉珅퐍똇ﶉ昽燦�棉阬�⓴铅ꎙ阜禨紳诱䍳﹥㻁睩꤄覉팯欪ꓦ批㞌ᤔ椙鎹뮛攽ᐥ�ꚦ才듕쒈ທ溽澻硊䃾
떊깪�륨ﵳ洼⮷鿽ꑱﮬ鋿亀◃䱉瓜ꦝ䩐ʽܡ薹ꕥ韹쭌닼肂嘣䩭ี䤚딉க뛹卵蒤蟍뷝ణ圖깁ﯚ扚엶֎껙鮿ꠕ噬౻ꤖ馹ጢ㰖︰�贊Ⲇ깐㪿㸽㗾奧퍂㔔鸗鉩멪ꕦ䜥內覙㹫늯㚄॒֦ﱹ襎籿팦芾僶褑㾳ꪢ�ỵ㹿눟㉡⅛♳䢰⼻뱒䂃䒬ꡀⴛ됴즯⬃뢔蹐㫧ꌈ涋鬔ꉬᐝ娹检줖옩㚻쉂闬塒봇ㅇ◙䄉Ꮼ绎褍婍ᷢ㪂↾飶᭥氉뼳ꌓ䁍⒑얦⚕᧚滲ੴ쵙ꖇ斯龯�䝙䯯㹔誈篲⺠菤璪㚾杲ﯯ⧺㾁穭ꀣ鳅ﬦ⽆렢䯁년回鐵ਪ숷쨉퉜鬃鲼
窑ㄵ掺젳쮈泝搡蔏⣐ͽ㕑�肾뻓Ⓥ귙埧㊖嵡鿦퀷塩몢⤓䞖樵ᰌᮦ㧱ⷸ觵줚笚०﹐孪쒟퓄ο�넩횈ᰅ龵틃㳘玳겥主閟楙攗钬ȏ綁円统豾챎쾡鲏鼿䜓웗닑銺㓣䗾︴黼较洬⓻규Ძᙼ馕濻ඣಿ秷ᾌ욤ᣇ碓졾玺摞婕⁈ಚ솭瘋䏃㼗駱Ὄꃿ싰䳓﵂䭡῟�죧ϸﲅ緽㸤㢴馉ↂ᭟᪳㖮戗俽槛䛷∝벛侂鞏蛪䝁뫁끿羺肀슝〈谂⌀ࣀȰघꦔ纸皌팾奕曨䙁�䉎뺷緤퀷읍布柹ᒚ㳫쀣〈谂⌀ࣀȰ靏ጀ俗ラ樿ྜྷ稺꒕剃慘
᠄䘁ᆀѠĘ聆瀑Ȭ屌혻ﱸ횿儰�戢〧谂⌀ࣀȰࣔ焰퓽돐ᦆ䘁ᆀѠĘ聆怑⨄Ě긦�늈ヾ谂⌀ࣀȰ쀣㰈ȵ屌㔿곴䙡ᆀѠĘ聆怑᠄誁聆㚊겢谿⌀ࣀȰ쀣〈伂휓൏欽ᆘѠĘ聆怑᠄䘁ꊠ怑뫢趢⌏ࣀȰ쀣〈谂叀‣줮ⲛ䢑骞갑聇⾟錦⒩笟韛꺿謰ߋ縁劳켶쟊ㅘKĹ于�섦볿瘆䕦倥秲磊뇒嬒ᘬ햨桪騴揲댾꧴ဓ䒉︸ƻ蒪҄ᑮꀳጢ銗돍㲊쿄�푤睫힚坬枰뛿쑃铰ȋ▮詖Ἇ谾袈�魂淽讗玡⌠㧹龓쾟㑛庋ᰳ㓈䩦⏅㋥赵☙쿀�담⥻
慘쀣칯ꐬꕆᅜ¢趦덢糙✡朧륊鴲Ѩ飸瘢ꍨ녒鄟Ỳ똀ꑎ赢돫ᯞㇾ㼲禧씡⌊㽰暁鿴ᷢ稊Ꚇၜ遐펕뿹﹩㪏ㄭ犻㙡鈳怑᠄䘁ᆀѠ脘上䊀瑁엔ꐮ嚮룑⹍휑╬蕣娚᧖聆怑᠄䘁ᆀ鰄终褁圵�⾼蓏㓹湖飼쯑Ệ㺱䌓㫎ࣉȰ쀣〈谂⌀⓰〈ﵱ⠤㚳Ę聆怑᠄䘁ᆀѸ磸螁螇ꂪ�颚觘壅슙痄Ἱ晀⌾ࣀȰ쀣㰈Ⱦ祮攫ⵟኽꕷ渘⭔즟羅駱萻॰ꏔ郁襽䙱酫ⵖ⺨ᢰष阥呭郯浻츾Ḧ嵻ﶶﵫ�좰짉❍ᕑ烿㝟톥䊞⾌㛇ꩍ⾽딙䈭颱稓ﺦ瑘콳ꓑ縤ˏ府ꬶ꿖ԩ
蓕⸮鴲큫猭藪䥽䥉䲏坛띍痌埈켩ꫤ夳兴㬵⧖瞱졕ɣѡĘ聆怑᠄ઁꁀ逦쩒⢇뎎绒㘎萈衂旨ࠓኴ䙽쁋�팏龚뫴맴栌篩抣誸夸틷쥜�伵ﷳ淬鄉庿걗鈫橈�៳뛼먬믵뛚繺쮟횩얽》⡀낕匦紿藻➑他竨䜴�ᘬ餻齨鬕촡筗뫒輓崞謹뽳浮呛칽쳹嫅ꢓ송膬ꩈ淀㩽擓矰㍭⎨ѢĘ聆怑᠄➁쁏鱝뵟鍦愾쏱⒯歧檂洭䲾ᅯ㈛諅▋牢㿞廾꿳껫⻕⤌䏄玸鳱⚶杀瑱籰埼䨷쿟㽋鈖ꆒ汐볞⫮뼝恜軷椛鰭돝
¥�为�㨫뉲㖿髅ᙯ뛥扷奛锭�捵풪�쵊什Ǎ躛뻙㕴불刍痏ᨍ套❿⤋檡躐ᘳﮬ츼쳥緽䡶쫶鳅薉祚뜝櫀᭯迒哽맣㸪漒蜿鴎퇚で辳怑᠄䘁ᆀѠᢞ䊁黏㫦焭澔탰ﯯ濂씈됨幹讍뉫쒧嬈ㇺ㗯繫锛䤃ꅻ咮ꜹ㰈ᝃퟛ砛䳴폎ꮼ夵㥠禲랼鵷痶羆軻麗痛﵁얩啉皅叮�꺼紪轫�靈ꨮ岷棗儣轇⥶懡遙ᙘ釗妃停䁐㌙ɬ贈郢뵺뭵妿喗䏕ᆠꔈˢ룘ퟣ湋㲺ᕠ䫞妷Ⴅ溜鯐쨇ꭗ퐎⼄糙컫�刺䂥︇싽㘧︙䍥屌䯿䘲ᆀѠĘ聆ꠑӘ噌庪
楋秮┫溯㶾髱琫ﳵ퀡筍囑鑕捳곾귉혭∻㖱⁋蘿Ӛ᮪鄢拸箸⸽潋견쬖ਥ킯뺹哂귩뤫甓줹᎓ﰚ嶳ﰉ䊆ꛥḔ娽懪䭷孟ꌩ㔈删粽괎옰㵨챌쥊犙敾ᭁ誋㓳湮锾�Ꮿ䰣愧�藏鰇ꨚ媍鄷녊䖷矧↮앫ః崮⫡ꤖ◘튫秂㟓嬔鄤杢ᶟ臹댱�㡆䲕靜ꦛೌѥĘ聆怑᠄ꞁ恍姶핋㮼뜖ﮪ省店뷧ឰ佗魯詋쟥펂믧罄럇췧ꪨ鬓⩦봛焼鱠╤뀡쟛쬁Ἡ겲蝕쇖铚崽汳ྜ僔礋巚埻⇺℥⍓圍䘆쾍৭㱞寯驞㚊☷杋喃铮壄