Loading...
HomeMy WebLinkAbout Beaufort 139 on SR 1626 (B-5205)Ward, Garcy From: Johnson, Jay B Sent: Wednesday, September 21, 2011 1:48 PM To: Ward, Garcy Cc: Brickhouse, Joseph W; Kincannon, William C.; Sutton, Michael W; Eatmon, Bryce E Subject: FW: B-5205 Beaufort 139 OED at Pipes Attachments: Revised Plan.PDF Garcy, Please find attached revised plan with OED at all side ditch pipes. -----Original Message ----- From: Sutton, Michael W Sent: Wednesday, September 21, 2011 1:40 PM To: Johnson, Jay B Subject: B-5205 Beaufort 139 OED at Pipes Sir ... The Revised Plan as per your request... Thank You .... mike Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 JOU I■.■ ■ur _oouuuvu■r n un ua. vu■■ouo.■o• m Io.u■L �uo.00.■o.. Dui u■oou■uu■.oauv .ua �.000■7aaa■o■.ao.Oi .o: �■■■u■. r. ar+■ oo■.-.u.u� u20!uu :a.r■oM .ao, oM u.. loon...- ...■s..... Ward, Garcy From: Sutton, Michael W Sent: Wednesday, August 10, 2011 1:24 PM To: Steffens, Thomas A SAW; Ward, Garcy; Carrillo, Sonia Cc: Rogerson, Maria A; Alligood, Dwayne H; Johnson, Jay B; Jones, Larry L; Tran, Van K Subject: B-5205 NWP 12 Attachments: Revised PCN B5205 Utility.pdf; b5205 Revised_ddc2_psh_uo2.pdf Good Afternoon Ladies and Gentlemen.... Please incorporate Pages 1-3 of the PCN and the Utility sheet into the B-5205 Files for the NWP 12 Permit Application. Paper copies will be mailed asap..... Thanks.... mike Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre -Construction Notification C Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 3 and 12 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because wdtten approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: B-5205 Beaufort 139 Bridge To Bridge Replacement SR 1626, Over Intercepting Canal WBS Element Number 45303 Morning Star Road 2b. County: Beaufort 2c. Nearest municipality / town: Pantego 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 45299 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. NIA 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 105 Pactolus Highway NC 33 P.O. Box 1587 3e. City, state, zip: Greenville, NC 27835 3f. Telephone no.: 252-830-3490 3g. Fax no.: 252-830-3341 3h. Email address: jbjohnson@ncdot.gov Page 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Division 2 Environmental Officer 4b. Name: Jay B. Johnson 4c. Business name (if applicable): North Carolina Depratment of Transportation _ 4d. Street address: P.O. Box 1587 4e. City, state, zip: Greenville, NC 27835 4f. Telephone no.: 252-830-3490 4g. Fax no.: 252-830-3341 4h. Email address: jbjohnson@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): B-5205 Beaufort 139 SR 1626, Morning Star Road Over Intercepting Canal Latitude: N 35.637673 Longitude: - W 1b. Site coordinates (in decimal degrees): 76.678205 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Cuckolds Creek, a Tributary of Pamlico River proposed project: 2b. Water Quality Classification of nearest receiving water. SC;NSW 2c. River basin: Tar -Pamlico Pamlico 03020104 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: SR 1626, Morning Star Road is a paved Secondary State Highway. Woodlands and Agriculture dominate the landscape. 3b. List the total estimated acreage of all existing wetlands on the property: 0 Square Feet of 404 Wetland Impacts For The Bridge To Bridge Replacement. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60' This site is part of a longer adjacent stream system 3d. Explain the purpose of the proposed project. Bridge To Bridge Replacement; the existing bridge has deteoriated and needs replacing. 3e. Describe the overall project in detail, including the type of equipment to be used: The Existing 82' Long by 28' Wide Steel Plank Floor on Timber Pilings Bridge will be replaced with a Proposed 102' Long by 27'-10" Cored Slab Bridge. Excavators,Dump Trucks,and Crane Trucks will be used for the Bridge To Bridge Replacement. A 300' Long Directional Bore located 28' Left -L- will be used to relocate the existing Telephone Line. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No El Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type El preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Stephen Lane, NCDCM Jay Other: NCDCM and NCDOT Johnson,NCDOT 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. December 4, 2009 5. Project History 5a. Have permits or certifications been requested or obtained for El Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version