HomeMy WebLinkAboutNCC215950_NOT Closeout Documents_20221011Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County:
New Hanover
Project:
CFCC Electric Lineworkers Overhead
and Underground Training Facility
Cape Fear
Person Financially responsible: Cape Fear Community College - Jim Morton,
President
Project #: NEWHA- 2021- 011
Address:
1. Project Location:
3200 Education Loop Rd, Castle Hayne
Pictures:
No
2. Weather and soil conditions:
90 clear dry
Initial inspection:
No
3. Is site currently under notice of violation?
No
4. Is the site in compliance with S.P.C.A. and rules?
Yes
411 North Front Street, Wilmington, NC 28401
If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No
If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
JOhn Breshear
Title:
Monteith
Inspection report: Sent Report
Date given/sent: May 24, 2022
9. Corrective action needed:
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edoes.deq.ne.gov/Fonns/NCGOI -Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by:
Others present:
Date of inspection:
May 24, 2022
Time arriving on site:
4:00 PM
Time leaving site:
4:30 PM
Brian Lambe
cc: