Loading...
HomeMy WebLinkAbout20140032 Ver 1_Certification of Completion_20141014NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skva , III Governor Director ` S retary NCDWR Project No.: ?- ,ON001 County: •�uY "�'t Applicant: / dDvr D1 v S Project Name: Irle 9 Ee-. 0/44 �( ✓� Date of Issuance of 401 Water Quality Certification: 0/ 10 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification /eigh, plicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate t 1 Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center NC, 27699 -1650. This form may be returned to NCDWR by the applicant, the applicant's authorized nt or the project engineer. It is not necessary to send certificates from all of these. It Applicant's Certification 1, % ;✓, 6tn rXA0? , d C rr , , hereby state that, was used in the observation of the construction such that the constt compliance and intent of the 401 Water Quality Certification specifications, and other supporting materials. Signature: Agent's Certification Abest of my abilities, due care and diligence on was observed to be built within substantial °r Rules, the approved plans and Date: Z3 1, , h eby state that, to the best of my abilities, due care and diligence was used in the observation of the constructions h that the construction was observed to be built within substantial compliance and intent of the 401 Water Qua tt Certification and Buffer Rules, the approved plans and specifications, and other supporting mated Signature: Engineer's Certification Partial Carolina, having been au Permittee hereby state the construction such that t f Water Quality Certifi ti f t inal Date: N , as a duly registered Professional Engineer in the State of North i ized to observe (periodically, weekly, full time) the construction of the project for the , to the best of my abilities, due care and diligence was used in the observation of the construction was observed to be built within substantial compliance and intent of the 401 n and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature lstration No. Date Z V Transportabo nd Permitting Unit 4 ,, 014 1650 Mail S Ice Center, Raleigh, North Carolina 27699-1650 DErdR Phone n 19 807 -6300b AXtgR91807,6492h Carolina 27604 TR4N3ppgTATt ,v �, NtS Inter t www.rimaterqualityorq ��NlT An Equal Opporiundy, Affirmative Acton Employer NorthCarolina ,gturallr�