Loading...
HomeMy WebLinkAbout20221431 Ver 1_ePCN Application_20221012DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 6/3/2022 BIMS # Assigned* Version#* 20221431 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification What amout is owed?* $240.00 $570.00 Reviewing Office* Select Project Reviewer* Asheville Regional Office - (828) 296-4500 Andrew Moore:eads\awmoore3 Information for Initial Review la. Name of project: Dodd Meadows - Bat Fork Restoration la. Who is the Primary Contact?* Jennings Environmental, PLLC - David Brown lb. Primary Contact Email:* lc. Primary Contact Phone:* david@jenningsenv.com (828)384-1890 Date Submitted 10/12/2022 Nearest Body of Water Bat Fork and UTs Bat Fork Basin French Broad Water Classification C Site Coordinates Latitude: Longitude: 35.28806 -82.40964 A. Processing Information County (or Counties) where the project is located: Henderson Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 27 - Restoration NWP Numbers (for multiple NWPS): ld. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: Henderson County Habitat for Humanity, Inc 2b. Deed book and page no.: 2c. Contact Person: Linda Saturno 2d. Address Street Address 1111 Keith Street Address Line 2 City Hendersonville Postal /Zip Code 28792 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region North Carolina Country USA Yes No Yes No 2e. Telephone Number: 2f. Fax Number: (828)694-0340 2g. Email Address: * I satu rno@habitat-hvl. org 3. Applicant Information (if different from owner) 3a. Name: David Brown 3b. Business Name: Jennings Environmental, PLLC 3c. Address Street Address 7 Samuel Ashe Drive Address Line 2 City Asheville Postal / Zip Code 28805 3d. Telephone Number: (828)384-1890 3f. Email Address: * david@jenningenv.com 4. Agent/Consultant (if applicable) 4a. Name: David Brown 4b. Business Name: Jennings Environmental, PLLC 4c. Address Street Address 7 Samuel Ashe Drive Address Line 2 City Asheville Postal / Zip Code 28805 4d. Telephone Number: (838)384-1890 4f. Email Address: * david@jenningsenv.com C. Project Information and Prior Project History State / Province / Region North Carolina Country USA 3e. Fax Number: State / Province / Region North Carolina Country USA 4e. Fax Number: 1. Project Information 1b. Subdivision name: (if appropriate) Dodd Meadows lc. Nearest municipality / town: East Flat Rock 2. Project Identification 2a. Property Identification Number: PINs 9587-26-6690 and 9587-26-7755 2b. Property size: 15.09 2c. Project Address Street Address East of Volunteer Way Drive Address Line 2 City East Flat Rock Postal / Zip Code 28726 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Bat Fork and UTs Bat Fork 3b. Water Resources Classification of nearest receiving water: * C 3c. What river basin(s) is your project located in?* French Broad 3d. Please provide the 12-digit HUC in which the project is located. 06010105 - Upper French Broad 4. Project Description and History State / Province / Region North Carolina Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The property is developed residential and undeveloped wooded tracts.The land use in the vicinity of the property is residential, commercial, agricultural, and undeveloped forested tracts.The project site consists of an approximate 8-acre riparian corridor along Bat Fork from the bridge over Bat Fork on Old Spartanburg Road upstream for 1,800 If. Bat Fork has been historically ditched. The existing stream banks at the project site are incised, eroding, and undercut. The drainage area at the project site is approximately 1.83 square miles. See attached existing conditions photographs and USGS stream stats report. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). SAW-2011-01147 4f. List the total estimated acreage of all existing wetlands on the property: 0.076 4g. List the total estimated linear feet of all existing streams on the property: 2,092 4h. Explain the purpose of the proposed project: * The objectives of the restoration activities is to stabilize the stream bank and bed, establish a native riparian buffer, construct flood benches, and to prevent additional soil loss to downstream surface waters.The proposed stream restoration project will restore 1,792 If of Bat Fork, 247 If of three UTs of Bat Fork, and 0.076 acres of adjoining wetlands. This will improve the natural ecology of the stream and buffer. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The streams and wetlands will be restored using natural channel and bank design techniques. The work will provide a more sustainable riparian ecosystem with natural buffers. Channel dimension, pattern, and profile will be constructed to a tolerable morphology and held in place with multiple in -stream and bank structures. The channel will be stabilized with constructed riffles, boulder and/or log steps, boulder and/or log vanes, and an adjacent floodplain area. A native herbaceous and woody buffer will be planted in the riparian area to promote long-term stability, soil strength, and water quality benefits. Mature native trees along the stream bank will be preserved, when feasible. Disturbed and restored areas of the stream buffer will be replanted using a combination of native riparian seed mix, live stakes, and/or bare root seedlings. Work will be completed using tracked excavators and dump trucks by a qualified stream restoration contractor. Equipment will be well maintained, cleaned prior to mobilization, and checked daily for leaks of petroleum products. Fueling operations shall be performed in an area away from all surface waters. See attached plan sheets for additional details. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: A field survey of the project area was conducted to locate streams and wetlands. The purpose of the survey was to make an effective analysis of the presence of waters and wetlands within the project area in order determine proposed impacts to these aquatic features. Jennings Environmental is not requesting the Corps make a jurisdiction determination of the aquatic features in the project area. See the attached stream and wetland map. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2011-01147 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR The Corps issued JDs associated with past residential development on PIN 9587-26-6690. 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 2. Wetland Impacts Streams -tributaries Pond Construction Buffers 2a. Site #* (?) 2a1 Reason (?) 2b. Impact type*(') 2c. Type of W.* 2d. W. name 2e. Forested* 2f. Type of Jurisdicition* (?) 2g. Impact area* W1 Grading P NON-NCWAM TYPES W1 No Corps 0.057 (acres) W2 Grading P NON-NCWAM TYPES W2 No Corps 0.019 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.076 2g. Total Permanent Wetland Impact 0.076 2i. Comments: Wetlands W1 and W2 will be impacted in order to create floodplain benches. The final grades will allow Bat Fork to reconnect with its floodplain and will enhance wetland hydrology. The impacts will not result in a loss a waters. 3. Stream Impacts 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* S1 Stream Restoration Permanent Other Bat Fork Perennial Corps 15 Average (feet) 1,792 (linear feet) S2 Stream Restoration Permanent Other UT1 Perennial Corps 3 Average (feet) 99 (linear feet) S3 Stream Restoration Permanent Other UT2 Perennial Corps 3 Average (feet) 47 (linear feet) S4 Stream Restoration Permanent Other UT3 Perennial Corps 3 Average (feet) 101 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 2,039 3i. Total stream and ditch impacts: 248 3j. Comments: E. Impact Justification and Mitigation 3i. Total temporary stream impacts: 0 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: As this project is an aquatic restoration project, it is impossible to completely avoid impacts to waters. However, considerations were made to minimize disturbance to the extent necessary to provide appropriate functional uplift to aquatic resources. lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Appropriately sized equipment will be utilized to minimize soil compaction and access grading. Scheduling and staging of equipment and materials will be timed to minimize time spent working in the active stream channel. Ground/soil disturbance will be minimized to the extent possible. Most of the new channel will be built offline from the existing channel and will be stabilized before turning the water into the new channel sections. Work will be conducted in several sections of existing channel and will utilize a pump or pipe around system in order divert flows away from active work areas. Also, construction impacts will be minimized by limiting in -channel work to low -flow conditions and working from the stream banks where possible. Graded stream banks will be stabilized by using a native seed mix, straw mulch, and biodegradable erosion control matting. Areas will be stabilized within 3 working days of bank grading completion. Following construction activities, the site will be planted with native riparian vegetation to establish a natural stream buffer. Erosion control matting that incorporates plastic mesh and/or plastic twine will not be used within stream channel(s) or along stream banks. Any discharge associated with the proposed impacts would consist of suitable clean fill material (no trash, asphalt, etc.). The fill material would also be free of pollutants in toxic amounts. Proper sediment and erosion control devices would be installed prior to and during construction. Downstream turbidity levels will likely increase during construction, but would subside upon completion of in -stream work. An erosion and sediment control plan will be submitted to NC DEMLR for review and approval prior to construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The project objective is to construct a more natural functioning stream reach to replace the degraded and unstable stream reach.The project will result in permanent impacts to waters, but these impacts will not result in a permanent loss of waters that require compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: The project is located in the French Broad Basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: Stream restoration project. No impervious area(s) are proposed as part of this project. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments:* Project is below thresholds for requiring an environmental document. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. Project will not result in change in site or adjacent land uses. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Jennings Environmental reviewed the latest versions of NC Natural Heritage Program data on element occurrences for listed species and USFWS online interactive mapping and species occurrence datasets (ipac, county species lists, etc.) to determine the likelihood for the presence of federally listed species and/or their critical in the project area. No listed federally endangered/threatened species were located in/near project site and no suitable habitat exists based upon information submitted to date, except for northern long-eared bat (Myotis septentrionalis) and gray bat (Myotis grisescens). The project is not located near any known occurrences of hibernacula or maternity roost sites for these listed bat species. No tree clearing/cutting or structure demolition will be conducted in the project area between April 15 and September 31 to minimize potential impacts to maternity roost trees and structures for these federally listed bat species. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Jennings Environmental has reviewed NCDCR maps and online data. There are no known historic resources identified in the project area. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: A no -rise certification has been submitted to Henderson County for review and approval. 8c. What source(s) did you use to make the floodplain determination?* NCFRIS Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 401 Pre -fling Meeting Request.pdf 5007 BAT FORK DODD MEADOWS STREAM RESTORATION PERMIT SET 2022-10-04.pdf Bat Fork Stream and Wetland Map 2022-10-4 Final.pdf Dodd Meadows - Bat Fork Restoration Soil Report.pdf Dodd Meadows Bat Fork Tax Parcel Maps.pdf Dodd Meadows -Bat Fork Restoration Agent Authorization.pdf Dodd Meadows -Bat Fork Restoration Photos.pdf StreamStats Dodd Meadows Bat Fork Creek.pdf File must be PDF or KMZ Comments Supporting Attachments: Agent Authorization Form Permit Design Drawings/Plans Existing Condition Photographs USGS StreamStats Soil Map Stream and Wetlands Map 401 Pre -filing Meeting Request Parcel Maps Signature By checking the box and signing below, I certify that: 101.28KB 9.1MB 1.37MB 1.08MB 5.63MB 27.1KB 1.8MB 327.33KB • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: David Brown Signature fLOff111 Date 10/12/2022