HomeMy WebLinkAbout20220701 Ver 1_Re_ _External_ Re_ SAW-2021-02391 _ Stevens Chapel Road Phase 2 _ Smithfield _ Johnston County_ NC_20220613CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov>
Colleen
This is not a courtesy copy, the buffer authorization has been sent to the JC local program in Smithfield. This is the 2nd project I've not received a fee request email. I'll contact
Sheri now.
thanks
Wyatt
On Mon, Jun 13, 2022 at 9:58 AM Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> > wrote:
Hey Wyatt,
Is this one a Courtesy Copy to DWR or does it need a written 401? I skimmed the app very briefly, and it looks like Johnston County gets the buffer impacts.
I ask because this one is currently sitting On Hold as the 401 fee has not been paid.
Thanks!
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
3800 Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Wyatt Brown <brownenvgrp@gmail.com <mailto:brownenvgrp@gmail.com> >
Sent: Monday, May 23, 2022 4:06 PM
To: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil <mailto:Christopher.D.Hopper@usace.army.mil> >
Cc: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >
Subject: [External] Re: SAW-2021-02391 / Stevens Chapel Road Phase 2 / Smithfield / Johnston County, NC
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov>
Chris
I’m not in office right now, there was a Stevens Chapel Road direct to the north SAW-2021-01517, there was no impacts and wasn’t a PCN. We are for now calling this project Stevens Chapel
Road 2 for simplicity for my files, but to best of my knowledge they won’t connect with the earlier project. this phase will entrance from the highway. Hope your foot is healing well.
Thanks
Wyatt
Wyatt Brown, LSS, CPESC
Pres., Brown's Environmental Group, Inc.
(919) 524-5956
On May 23, 2022, at 3:34 PM, Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil <mailto:Christopher.D.Hopper@usace.army.mil> > wrote:
Hey Wyatt:
The project is titled Phase 2, but I have no actions in that area by the same name, and no development is apparent on Google Earth. Where is Phase 1?
Christopher D. Hopper
Regulatory Specialist
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
O: (919) 554-4884, Ext. 35
M: (919) 588-9153
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web
browser: https://regulatory.ops.usace.army.mil/customer-service-survey/ <https://urldefense.com/v3/__https:/regulatory.ops.usace.army.mil/customer-service-survey/__;!!HYmSToo!YAl3BmSie-PAoB1_dxNx7HF
VldzJSNrCMSQB6Hbhdtgy8rBh0fupoAsqXUnSDCXddq7hsyr-iOqkvYRPychTViXxFg$> . Thank you for taking the time to visit this site and complete the survey.
--
Wyatt Brown, LSS, CPESC
Brown's Environmental Group, Inc
919-524-5956