Loading...
HomeMy WebLinkAboutNCC223576_NOI Signed Certification_20221019Directions: Print this form, complete, scan and upload to the electronic NOL Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check If paying by check) at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor (Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN ACCEPTED AS COMPLETE, THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT (40 CFR 122.221 Per NC General Statute 143-215.68 (1), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document flied or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000), Under penalty of law, I certify that (check all boxes to indicate your agreement), am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit, ✓ The information submitted in this N01 is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. ✓ I will abide by all conditions of the NCG010000 General Pkita and the approved Erosion and Sediment Control Plan. �✓ If the approved Erosion and Sediment Control Plan is not compliant with Part It (Stormwater Pollution Prevention Plan) of the I CPP.1Q,1. 0 "G'm !gra [�QrmJt, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. [✓ 1 hereby request coverage under the (V'.001.D(30( Gnral i'rt[t and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Pro) ct Name (must match Ala): Kurz Coatings & Maintenance Buildings Specific Lot Numbers (must match A14) Permittee (must match BV: Kurz Transfer Products, LP Legally Responsible Person (must match 82 & B3): Thomas Hertlein Title of Legally Responsible_Person (must match 83b): CEO Name & Title of S'gned if Authorized Individual Differs from L ally Re-, onsible Person: Phone Nu b r;"Y 11 Responsible Person or Authorized Individual Date iMPORTANT OO E. wo or p� must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secret Pp, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section 8, Item (6) of the NCG010000 permit.