October 12, 2022
Mrs. Crystal Amschler
U. S. Army Corps of Engineers
NCDOT Regulatory Project Manager
151 Patton Avenue, Room 208
Asheville, NC 28801-2714
Subject: Nationwide Permit 3 Renewal for Polk County Bridge 29
State WBS# 41665.31)
■ SAW-2019-00862
■ DWR 2019-0668
Dear Mrs, ArnschIer:
J. ERic BOYETTE
SECRETARY
The North Carolina Department of Transportation (NCDOT) is requesting reauthorization of NW
3 for stream impacts that are necessary for replacement of Polk County Bridge 29 on NC Hwy 9
Polk County, NC. No work has been completed at this project. Due to budgetary constraints, this
project was "shelved" for a period of time and has now been re -authorized. Work is scheduled to
begin in March of 2023.
Section 7
Section 7 issues have not changed since the project was authorized.
Section 106
Section 106 issues have not changed since the project was authorized.
Please contact me at (828) 333-1188 if you have any questions or need additional information to
evaluate this request. Your prompt attention to this request is greatly appreciated.
Sincerely,
Kevin H Barnett
Division 14 Environmental Officer
Enclosures
cc: Ms. Amy Chapman, Division of Water Resources, DEQ, Raleigh
Ms. Kristie Lynn Carpenter, Division of Water Resources, DEQ, Raleigh
Mailing Address: Telephone: (828)586-2€41 Location:
NC DEPARTMENT Or, TRANSPORTATION Pas: (828)586-4043 NC DEPARTMENT OF TRANSPORTATION
Division 14 Custwner&;vice: 1-877-368-4968 Division 14
253 Webster Road 253 Webster Road
Sylva, North Carolina 28779 Webstte: www.nedot.gov Sylva, North Carolina 28779
Haywood Bridges 175 & 174 Page 2 October 12, 2022
Mr. Kevin Mitchell, Division of Water Resources, DEQ, Asheville
Mr. David G. McHenry, Western NCDOT Coordinator, NCWRC
Mr. Adam Dockery, NCDOT Division 14, Acting District 3 Resident Engineer