Loading...
HomeMy WebLinkAbout20190668 Ver 2_Polk29.reauthorization_20221018STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNo€t October 12, 2022 Mrs. Crystal Amschler U. S. Army Corps of Engineers NCDOT Regulatory Project Manager 151 Patton Avenue, Room 208 Asheville, NC 28801-2714 Subject: Nationwide Permit 3 Renewal for Polk County Bridge 29 State WBS# 41665.31) ■ SAW-2019-00862 ■ DWR 2019-0668 Dear Mrs, ArnschIer: J. ERic BOYETTE SECRETARY The North Carolina Department of Transportation (NCDOT) is requesting reauthorization of NW 3 for stream impacts that are necessary for replacement of Polk County Bridge 29 on NC Hwy 9 Polk County, NC. No work has been completed at this project. Due to budgetary constraints, this project was "shelved" for a period of time and has now been re -authorized. Work is scheduled to begin in March of 2023. Section 7 Section 7 issues have not changed since the project was authorized. Section 106 Section 106 issues have not changed since the project was authorized. Please contact me at (828) 333-1188 if you have any questions or need additional information to evaluate this request. Your prompt attention to this request is greatly appreciated. Sincerely, Kevin H Barnett Division 14 Environmental Officer Enclosures cc: Ms. Amy Chapman, Division of Water Resources, DEQ, Raleigh Ms. Kristie Lynn Carpenter, Division of Water Resources, DEQ, Raleigh Mailing Address: Telephone: (828)586-2€41 Location: NC DEPARTMENT Or, TRANSPORTATION Pas: (828)586-4043 NC DEPARTMENT OF TRANSPORTATION Division 14 Custwner&;vice: 1-877-368-4968 Division 14 253 Webster Road 253 Webster Road Sylva, North Carolina 28779 Webstte: www.nedot.gov Sylva, North Carolina 28779 Haywood Bridges 175 & 174 Page 2 October 12, 2022 Mr. Kevin Mitchell, Division of Water Resources, DEQ, Asheville Mr. David G. McHenry, Western NCDOT Coordinator, NCWRC Mr. Adam Dockery, NCDOT Division 14, Acting District 3 Resident Engineer