Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070319_Historical File_20100128
��'h NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Januaryy 28, 2010 Mr. Jon Vincent, Managing Hwy 421 Properties, LLC 1508 Military Cutoff Road, Wilmington, NC 28403 Division of Water Quality Coleen H. Sullins Director Member Suite 302 Subject: State Stormwater Management Permit No. SW8 070319 Wolseley, N.A. — U.S. Hwy 421 Project High Density Commercial Wet Pond and Infil. Trench Project New Hanover County Dear Mr. Vincent: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for Wolseley, N.A. — U.S. Hwy 421 Project on January 6, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 070319 dated January 28, 2010, for the construction of the subject project. This permit shall be effective from the date of issuance until August 8, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson, or me at (910) 796-7215. Sin rely, , &4z-_4 G eorgette Scott Stormwater Supervisor Division of Water Quality GDS/ KPJ: S:\WQS\S T ORMWA T ER\PERMI T \0703119MOD.jani0 cc: Jay Carmine, P.E., Coastal !_and Design New Hanover County Building Inspections Beth E. Wetherill, New Hanover County Engineering Division of Coastal Management Wilmington Regional Office Stormwater File Central Files Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 ' One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623.6748 North C arolina Internet: www.ncwaterquality.org ��,tur��l� An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit No. SW8 070319 STATE OF NORTH CAROLINA Jftlkllo nf% DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Jon Vincent & Hwy 421 Properties, LLC Wolseley, N.A. — U.S. Hwy 421 Project 3881 U.S. Highway 421 North, New Hanover County FOR THE construction, operation and maintenance of one (1) wet detention pond and one (1) infiltration trench in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on He with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 8, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.7 and 1.8 of this permit. The stormwater controls have been designed to handle the runoff from a total of 394,165 square feet of impervious area. The wet pond will treat 387,915 sf and the infiltration trench will treat 6,250 sf. 3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on paqe 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 240,185 sf to drain to the pond, which is included in the 387,915sf total impervious to drain to the pond. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 070319 [: 7. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft Offsite, ft2: b. Total Impervioul Surfaces, ft2: Onsite, ft Offsite, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: gg Permanent Pool Surface Areq, ft Fi. Permitted Storage Volume, ft i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hrdischarge rate, cfs: k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: 12.44 542,000 0 387,915 387,915 0 1.5 5.0 90% 14.5 36,203 61,308 16.0 0.62 3.0" 0 pipe 0.16 36,473 3/4 Cape Fear River / Cape Fear 15-25-1-9 "C; SW" 8. The following design criteria have been permitted for the infiltration trench system and must be provided and maintained at design condition. The infiltration trench has been designed to infiltrate the 10yr24hr storm event without discharging as calculated using one-half of the infiltration rate reported in the soils report. Therefore, no bypass or vegetated filter strip is required. The trench drains to the same receiving stream as the wet pond: a. Drainage Area, acres: Onsite, ft : Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft Offsite, ft2: C. Design Storm (10yr24hr), inches: d. Trench Length, feet: e. Trench Width, feet: f. Trench Depth, feet: g. Bottom Elevation, FMSL: h. Bottom Surface Area, ft *j. Perforated Pipe Diameter, in.: *k. Perforated Pipe Length, ft: s I. Permitted Storage Volume, ft M. Predevelopment 1 yr 24 hr peak flow, cfs: n. Type of Soil: o. Infiltration Rate from Soils Report, in/hr: P. Seasonal High Water Table, FMSL: q. Time to Draw Down 10yr24hr Event, hours 0.143 6,250 0 6,250 6,250 0 7.13 105.00 13.25 1.25 13.20 1,391 12 105 745 0.01 Medium Sand 24.0 (12" used for calc) 11.2 2.54 Page 3 of 8 State Stormwater Management Systems Permit No. SW8 070319 II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowinq and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the wet detention pond, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline.. d. The maximum horsepower for a fountain in this pond is 3/4 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the .Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access W. the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 070319 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 070319 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The riling of a request for a permit modification, revocation and re - issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 28th day of January 2010. NOEtTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION . UC�.f 17 Or Coleen JK Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems ' Permit No. SW8 070319 Wolseley. N.A. — U.S. Hwy 421 Project Stormwater Permit No. SW8 070319 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 070319 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 8 of 8 1 State of North Carolina impartment of Environment and Natural Resources. AUG 13 2009 Division of Water Quality By. STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original L GENERAL INFORMATION: 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): Hwy 421 Properties, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): McKinley D..Dull — Member (see authorization letter from Jon T. Vincent — Managing Member) 3. Mailing Address for person listed in item 2 above: 1508 .Military Cutoff Road, Suite 302 City: Wilmington State: North Carolina Zip: 28403 Phone: ( 910 ) 395 — 6036 Fax: ( 910 ) 395 — 6605 Email: pavery@mckinleybuildin.g.com 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wolseley, N.A. — U.S..Hwy 421 .Project 5. Location of Project (street address): 3881 U.S. Highway 421 North City: Wilmington County: New Hanover Zip: 28451 6. Directions to project (from nearest major intersection): ' On West side of U.S. Highway 421, approximately 0.8mi North of the intersection of the I-140 Wilmington' Bypass and U.S. Highway 421. 7. Latitude: 340 18' 00" N Longitude: 770 58' 40" W of project 8. Contact person who can answer questions about the project: Name: Walter "Pete" Avery Telephone Number: (91.0) 395 — 6036 Email: pavery@mckinleybuild.ing.com H. PERMIT INFORMATION: 1. Specify whether project is (check one): ❑ New ❑ Renewal ® Modification Form: SWU-101 Version 09.25.08 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 070319MOD and its issue date (if known) May 15, 2008 3. Specify the type of project (check one): ❑ Low Density 0 High Density ❑ Redevelop ❑ General Permit ❑ Universal SMP ❑ Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑ CAMA Major ❑ Sedimentation/Erosion Control ❑ 404/401 Permit ❑ NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated by one on -site infiltration trench for the warehouse dock pit and one conventional stormwater pond for the remainder of the BUA. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area: 13.8686 acres 4. Total Coastal Wetland Area: -0- acres 5. Total Property Area (3) —Total Coastal Wetlands Area (4) = Total Project Area**: 13.8686 acres 6. (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA): 65.25 % 7. How many drainage basins does the project have? 1 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each engineered ctnrmwater device Basin Information Draina *e Bassin #i (Pond) Drainaue Basin n2 (Trench) Receiving Stream Name Cape .Fear River Cape Fear River Receiving Stream Class & Index No. Q Sw; 15-25-1-9 C; Sw; 15-25-1.-9 Total Drainage Area (sf) 542,000 ftz 6,250 ftz On -Site Drainage Area (sf) 542,000 f' 6,250 ftz Off -Site Drainage Area (si) -0- -0- Existing Impervious* Area (sf) -0- -0- Proposed Impervious* Area (sf) 387,915 f 6,250 ftz % Impervious* Area (total) 71.57 % 100.00 % Impervious* Surface Area Drainage Basin 4-1 (Pond) Drainage Basin #2 (Trench) On-Site Buildings (st) 70,365 -0- — ~ On -Site Streets (sf) 5,815 fC -0- On-Site Parking (sf) 67,050 ft 6,250 If On -Site Sidewalks (sf) 4,500 W -0- Other On -Site (sf) [Future, Develop] 240,185 ft -0- Off -Site (st) -0- -0- Total (sf): 387,915 ftz 6,250 ftz r Impervious area is aejinea as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. wr��._� **Total project area shall be calculated based on the currentpolicy regarding inclus7 i the built upon area percentage calculation. JAN 0 6 2010 Form: SWU-101 Version 09.25.08 Page 2 of 4 BY: 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the e 'sting permit number SW8 070319MOD and its issue date (if known) May 15, 2008 3. Spe 'fy the type of project (check one): ❑ L Density ® High Density ❑ Redevelop ❑ General Permit ❑ Universal SMP ❑ Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer ice Center at 1-877-623-6748): ❑ CAMA Major ❑ Sedimentation/Erosion Control ❑ 404/401 Permit ❑ NPDES Stormwater III. PROJECT ORMATION 1. In the space provided low, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater gement for the project. Stormwater will be treate by one (1) on -site conventional stormwater Dond. 2. Stormwater runoff from this proje drains to the Cape Fear River basin. 3. Total Property Area: 13. 86 acres 4. Total Coastal Wetland Area: -0- acres 5. Total Property Area (3) — Total Coastal tlands Area (4) = Total Project Area**: 13.8686 acres 6. (Total Impervious Area / Total Project Area) 100 = Project Built Upon Area (BUA): 65.25 % 7. How many drainage basins does the project have 1 8. Complete the following information for each drainake area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area pravided in the same format as below. For high density projects, complete the table with one drainage area for each engineered stormwater device_ Basin Information Overall Pro`' _ ty Boundary Drainage Basin 41 Receiving Stream Name Cape Fear\River Cape Fear River Receiving Stream Class & Index No. Q Sw; 15-2--1-9 C. Sw; 15-25-1-9 Total Drainage Area (sf) 604,118 ftN 542,000 ft On -Site Drainage Area (sf) 604,118 ft2 542,000 fe Off -Site Drainage Area (sf) -0- , -0- Existing Impervious* Area (sf) -0- -0- Proposed Impervious* Area (sf) 394,165 fl , 387,915 fe % Impervious* Area (total) 65.25 % 71.57 % Impervious* Surface Area Overall Property Boundary Drainage Basin 41 On -Site Buildings (sf) 70,365 fe 701365 On -Site Streets (sf) -0- -0- On-Site Parking (sf) 73,300 If 67,050 On -Site Sidewalks (sf) 4,500 if 4,500 Other On -Site (sf) [Future Develop] 246,000 W 246,000 fe Off -Site (sf) -0- -0- Total (sf): 394,165 fe 387,915 W * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ** Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. Form: SWU-101 Version 09.25.08 Page 2 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 070319MOD and its issue date (if known) May 15, 2008 3. Specify the type of project (check one): ❑ Low Density ® High Density ❑ Redevelop ❑ General Permit ❑ Universal SUP ❑ Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑ CAMA Major ❑ Sedimentation/Erosion Control ❑ 404/401 Permit ❑ NPDES Stormwater in. PROJECT INFORMATION 1. In the space provided below, suinmarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater manageme`gt for the project. Stormwater will be treated b: on -site conventional stormwater 2. Stormwater runoff from this project drains' 3. Total Property Area: 13.8686 the Cape Fear River basin. 5. Total Property Area (3) — Total Coastal Wetlands acres 4. Total Coastal Wetland Area: -0- acres -ea (4) = Total Project Area**: 13.8686 acres 6. (Total Impervious Area / Total Project Area) X 100 = 7. How many drainage basins does the project have? Built Upon Area (BUA): 65.25 % 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area fnr each enuineered cnrmwater rlevirn Basin information Qvgall Pros qty Boundary Drainage Basin #1 Receiving Stream Name Cape Fear River Cape .Fear River Receiving Stream Class & Index No. Q Sw; 15-25-1-9 C; Sw; 15-25-1-9 Total Drainage Area (st) 604,118 ff2 542,000 ftz On -Site Drainage Area (sf) 604,118 W 542,000 tf Off -Site Drainage Area (sf) -0- -0- Existing Impervious* Area (sf) -0- -0- Proposed Impervious* Area (st) 394,165 fe 387,915 ft2 % Impervious* Area (total) 65.25 % 71.57 % Impervious* Surface Area Overall 11'ropem, Boundary inage Basin # I On -Site Buildings (sf) _ 70,365 70,365 W On -Site Streets (sf) 5,815 if 5"815 On -Site Parking (sf) 73,300 W 67,650 W On -Site Sidewalks (sf) 4,500 ft2 4,500 If Other Or. -Site (st) [Future Develop] 240,185 W 2405185 Off -Site (sf), -0- -0- Total (sf): 394,165 ft2 387,915 ft2 I Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ** Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. RECEIVED Form: SW-101 Version 09.25.08 Page 2 of 4 NOV 2 4 2009 9. How was the off -site impervious area listed above derived? There is no off -site drainage to this project. Projects in Union County: Contact the DWQ Central Office staff to check to see if your project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels, and future development prior to sale of any lots. If lot sizes vary significantly, a table listing each lot number, size, and the allowable built -upon area for each lost must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land , that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BNIP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SW401-Permeable Pavement Permeable Pavement Supplement Form SW401-Cistern Cistern Supplement Form: SVIU-101 Version 09.25.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. (Appropriate office may be found by locating project on the interacted online map at bgp://h2o.enr.state.nc.us/su/msi maps."bn Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (rf required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP _ • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR • Calculations and detailed narrative description of stormwater treatment /management • Copy of any applicable soils report • Three copies of plans and specifications, including: -Development/Project name -Engineer and firm -Legend -North Arrow -Scale -Revision number & date -Mean high water line -Dimensioned property / project boundary -Location map with named streets or NCSR numbers -Original contours, proposed contours, spot elevations, finished floor elevations -Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations -Drainage areas delineated -Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm): Coastal Land Design, PLLC Mailing Address: P.O. Box 1.172 City: Wilmington Phone: ( 910 ) 254 - 9333 Email: jcarmine@coastallanddesign.net VIII. APPLICANT'S CERTIFICATION State: North Carolina Zip: 28402 Fax: ( 910 ) 245 - 0502 I, (print or type name ofperson listed in GeneralIgformation, item 2) McKinley D. Dull certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be, f#orge"nd +at thq'Np r lect complies with the requirements of 15A NCAC 2H .1000. Signature: Date: S -1 O - G Form: SWU-101 Version 09.25.08 Page 4 of 4 State Stormwater Management Systems Permit No. SW8 070319 Wolseley. N.A. - U.S. Hwy 421 Project Stormwater Permit No. SW8 070319 New Hanover County Designer's Certification I, JJJY R, C'MmrNm , as a duly registered -PRoF6s,oNHL_ in the State of North Carolina, having been authorized to observe ( eriodicall / weekly/ full time) the construction of the project, 1NaLSI-2L^f, N. A. — Q. S . J+w Y 421 409W gcT (etfase- -_ (Project) for HWY 4zi PfZeP6erli3. LLc (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: 1 5i WND IS Si71.L 8'9JVC7 LM41-R&D As 4SeBjM&,.rj- govN MK Pfi6_5e-= ebnls772uC1)uN, Rlst?2 4/1LL &6 MojFreB7b PWMIM7 0 61MMALCOONSs ( Iz� M- THE L-am -6-naN OF PltasE-'n. (WIL) & ner%M WILL S6 RZtX4C0hb W1i6tiu ntE S)Tr )S Cc+rpi'UM. Signature Registr n Number ?f033196 Date ?_o- Prep L-2o)0 State Stormwater Management Systems Permit No. SW8 070319 Certification Requirements: Je.c 1. The drainage area to the system contains approximately the permitted acreage. sec- 2. The drainage area to the system contains no more than the permitted amount of built -upon area. uRc 3. All the built -upon area associated with the project is that the graded such runoff drains to the system. Jec- 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. J2c, 6. The outlet structure is located per the approved plans. 1. 7. Trash rack is provided on the outlet structure. JWc 8. All slopes are grassed with permanent vegetation. J2c 9. Vegetated slopes are no steeper than 3:1. 2c 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. Jac. 11. The permitted amounts of surface area and/or volume have been provided. —12. Required drawdown devices are correctly sized and located per the approved plans. 13. All required design depths are provided.. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. --16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections aaoq URcam. coastal. Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Wilmington, NC 28402 January 27, 2010 NCDENR — Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Attn: Kelly Johnson Phone:91.0-254-9333 Fax:910-254-0502 Re: Request for Additional Information (SW8 070319) Dear Ms. Johnson: Coastal Land Design, PLLC (CLD) has received and reviewed your Request for Additional Information dated January 26, 2009 pertaining to the Wolseley, N.A. — U.S. Hwy 421 Project stormwater application. For clarity, your comments are repeated in bold, and our responses are shown in normal font. 1) JB-3 to JB-4: Please add to the proposed piping system. There was a text error on in the labeling of JB-3 in the piping schedule. JB-4 connects to JB-3 in the plans, calculations, and models, but was listed as JB-4 connecting to JB-1 in the table. The text error has been changed to reflect JB-4 connecting to JB-3. Please refer the revised piping schedule on the revised Sheet SW-01 of the plans included with this response. 2) Drainage Area Map: Please add this to the plan. There actually is a line around the dock pit that indicates the separate drainage area. However, I do admit that the drawing is rather busy and it may not show up very clearly. I apologize for the crowded drawing. The linetype has been darkened to show up more distinctly on the plans. Please refer to the revised Sheet SW-01 included with this response. 3) Updating Calculations: Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. I have made considerable effort to identify areas of concern, however, because substantial changes are warranted please carefully review your resubmittal in order to ensure that all of the required items are submitted and correct. Please also note that any calculations in your resubmittal must be stamped. No changes are required to the submittal other than the revisions to Sheet SW-01. Sincerel / Jay R. Carmine, P.E. RECEIVED JAN 2 7 2010 Coastal Land Design, PLLC. P. O. Box 1172 Wilmington, NC 28402 Phone:910.254.9333 Fax:910.254.0502 To: NCDENR — Wilmington Regional Office i27 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: I Keliv .iofflnson. P.E. ❑ As Requested Sent via Mail ❑ For Your Files ❑ Sent via Courier REC'D JAN 2 7 2010 Transmittal Date: January 27, 2010 File: 650-04 Subject: Stock Building Supply (SW8 070319M1OD) Stormwater Modification Submittal ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No. Description 1 Original Response Letter to Request for Additional Information 2 Rev-3 Sheet SW-01of the Stormwater Construction Plans JAN 2 7 2010 REMARKS I Please contact our office if you have any questions or concerns. 650-04 Transmittal NCDENR-DWQ 012710.doex Ay �"A WNW North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary January 26, 2010 Mr. McKinley Dull Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 070319 Worsley, N.A. — U.S. Hwy 421 Project New Hanover County Dear Mr. Dull: The Wilmington Regional Office received a State Stormwater Management Permit Application for the project located at 3881 US Highway 421 North in Wilmington on January 6, 2010. The Division of Water Quality has conducted a preliminary review of that information and determined that the application is not complete. The following information is needed to continue the stormwater review: 1 J13-3 to JB-4: Please add to the proposed piping system table. 2. Drainage Area Map: Please add this to the plans. 3. Updating calculations: Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. I have made considerable effort to identify areas of concern, however, because substantial changes are warranted please carefully review your re - submittal in order to ensure that all of the required items are submitted and correct. Please also note that any calculations in your re -submittal must be stamped. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to February 2, 2010, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX 910-350-20041 Customer Service:1-877-623-6748 NorthCarolina Internet www.ncwaterquality.org An Equal opportunity l Afflrmadve Action Employer Aahw1i r� SW8 070319 January 26, 2010 new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.p.johnson@ncdenr.gov. Sincer ly, Kelly`Johnson Environmental Engineer GS/KJ: S:\WQS\STORMWATER\ADDINFO\2009\070319MOD.jan10 CC: Jay Carmine, PE, Coastal Land Design. PLLC Stormwater Permitting, WiRO files Page 2 of 2 Coastal Land Design, PLLC. P. O. Box 1172 Wilmington, NC 28402 Phone:910.254.9333 Fax:910.254.0502 To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Kelm• Johnson, P.E. RED JAN 0 6 2010 2L11 Transmittal Date: January 6, 2010 File: 650-04 Subject: Stock Building Supply (SW8 0703I9mbD) Stormwater Modification Submittal ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original Response Letter to Request for Additional Information 2 Copies Revised Sheet 2 of the Stormwater Management Permit Application Form (Revised Table 1II.8) 1 Original Infiltration Trench Supplement 1 Original Infiltration Trench Operation and Maintenance Agreement 1 Copy Revised Stormwater Narrative 1 Copy Infiltration Trench Capacity Design 1 Copy Soils Report for Infiltration Trench Addition 3 Copies Revised Construction Plans 1614 �-TUX JAN0201 BY: 650-04 Transmittal NCDF,NR-DWQ 010610.doex Coastal. Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Phone: 91.0-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 January 6, 2010 JAN 0 6 2010 NCDENR — Division of Water Quality BY: Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Attn: Kelly Johnson Re: Request for Additional Information (SW8 070319) Dear Ms. Johnson: Coastal Land Design, PLLC (CLD) has received and reviewed your Request for Additional Information dated December 11, 2009 pertaining to the Wolseley, N.A. — U.S. Hwy 421 Project stormwater application. For clarity, your comments are repeated in bold, and our responses are shown in normal font. 1) Impervious Area Treated: The overall property has 394,165sf of impervious area, and the pond is designed for 387,915sf of impervious area. The narrative indicates that 6,250sf of impervious from the dock pit does not drain to the pond, however all impervious area (including the loading dock) must drain to the pond. An infiltration trench has been designed, per your suggestion, to treat the runoff from the dock pit area. Please refer to Sheet SW-01 of the revised plan set included with this response. 2) Impervious Dimensions: Please show all known dimensions of impervious area not already shown on the plans (such as the loading dock). Additional supplemental dimensions have been added to the plans for your convenience. Please refer to the Sheet SW-01 of the revised plan set included with this response. 3) Updating Calculations: Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. I have made considerable effort to identify areas of concern, however, because substantial changes are warranted please carefully review your resubmittal in order to ensure that all of the required items are submitted and correct. Please also note that any calculations in your resubmittal must be stamped. Included with this response are Sheet SW-01 of the revised plan set, the revised stormwater narrative, the infiltration trench capacity design calculations, the infiltration trench supplement, the infiltration trench operation and maintenance agreement, the soils report performed by ECS Carolinas, LLP, and the two revised copies of Sheet 2 of the stormwater application. Sincerely, Jay R. Carmine, P.E. Stormwater Narrative For Wolseley, N.A. — U.S. Hwy 421 New Hanover County, North Carolina Prepared by: Coastal Land Design, PLLC Civil Engineering / Landscape Architecture I Construction Management P.O.Box 1172 Wihuington, NC 29402 Prepared for: Phone: 910-254-9333 Fax:910-254-0502 �01-(V iArI ./ EA4 Hwy 421 Properties, LLC .��.,�. «. • : �_.o 1508 Military Cutoff Road, Suite 302 4ilmington, NC 28403 op Project JAN 0 6 2010 January 4, 2010 BY:��— Narrative Proiect Description The Wolseley, N.A. — U.S. Hwy 421 Project is an approximately 13.9 acre proposed commercial development off of N.C. Highway 421 i.-i New Hanover County. The stormwater permit that this site is applying for is a modification to the previously approved stormwater permit SW8 070319MOD. That permit was issued on May 15, 2008. The land owners have changed and the layout of the development has changed slightly. This project will also be a high density stormwater project. The project will use a proposed on -site stormwater pond and an on -site infiltration trench to treat stormwater from this site. Stormwater will be collected by drop grates throughout the property and will be directed towards the pond through a piping system that is designed for the 25-year storm event; as per New Hanover County stormwater requirements. Some of the pond dimensions have be modified slightly from the previous permit for this land (SW8 070319MOD), and the overall drainage basin has been reduced and the impervious surface draining toward the proposed pond has been increased. The drainage basin has been reduced from 602,992sf to 542,000sf and the proposed impervious has been increased from 382,411sf to 387,915sf. A 5' wide berm has been added in between the main pond and forebay. The emergency spillway is located on the berm of the forebay and it has not moved from the previously permitted location. It was positioned in that location so the natural discharge point for the drainage basin would be maintained. The proposed stormwater pond is designed to meet both NCDENR's and New Hanover County's stormwater requirements. The proposed building will require the use of a four (4) foot below grade dock pit to facilitate level unloading and loading from delivery trucks into the building. The drainage area from this dock pit is 6,250sf. Previous designs had the dock pit discharging the site with without treatment. However, through conversations with the State, an infiltration trench has been designed to handle the drainage fi•om this area. It will be collected by a 12" slotted drain line in the dock pit and directed to the infiltration trench. The trench dimensions are 13.25ft wide, 105ft long, and 15" deep. This will allow a 12" perforated pipe and washed #57 stone to be wrapped in filter fabric and still remain 24" above the seasonal high water table. A junction box with a weir is set the downstream portion of the infiltration trench such that after the design storm volume is reached (743cf), the remainder of the drainage can outlet the system. The system is designed such that the 10yr-24hr storm can be infiltrated using half of the infiltration rate so no bypass, vegetated filter is required, or additional storage is required. The total amount of impervious surface for this project is 394,165sf which will consist of a building, parking lot, sidewalk, and an allocation for future development. Site Description The topography of this site is slightly rolling with mild slopes ranging from 0.5% to 1% and is heavily vegetated with a thick pine forest. The site ultimately drains to the Cape Fear River (15-25-1-9), a waterway classified as C:Sw. The elevations on this project range from 14 feet MSL to 18 feet. The majority of the soils, according to the Soil Survey of New Hanover County, are Lakeland sands and Leon sands. These soils have a soil hydrologic group of A and D respectively. This property is zoned IND-2. A seasonal high water table (SHWT) evaluation was performed by ECS Carolinas, LLP, at the main pond basin and the SHWT was determined to exist approximately 36 inches below grade. The existing grade at the boring location is approximately 16finsl, so the seasonal high water table is estimated to be at an elevation of 13.00fmsl. Please refer to the soil boring tests included with this submittal. This elevation is approximately 1.5 feet below the permanent pool elevation for the proposed pond. The permanent pool elevation was set by the hydraulics necessary to outlet the pond from the site. Setting the permanent pool elevation approximately at the SHWT elevation would mean that the permanent pool elevation was lower than the outlet for the site. Another seasonal high water table evaluation was performed by ECS Carolinas, LLP on December 18, 2009 and it was determined that the seasonal high water table at the infiltration trench was approximately 36" below grade. The existing grade has been surveyed and is at elevation 14.2, so the elevation of the SHWT is 11.2. Vince Lewis, of the State, verified this result on December 29, 2009. The infiltration test was performed at 12" depth which corresponds to the bottom of the proposed infiltration trench. The medium sand soils were determined to have an infiltration rate of 24in/hr; however, a rate of 12in/hr was used in the design calculations as per the bypass and vegetated filter policy for infiltration systems. Stormwater Treatment Storm sewers will be installed to route stormwater to the proposed stormwater pond. This site will be graded such that stormwater is directed towards inlet boxes where all drainage from impervious surfaces will be collected and get routed to the proposed stormwater pond. The proposed stormwater pond is designed according to NCDENR's and New Hanover County's stormwater requirements. Stormwater Pond Capacity Reauirements The permanent pool elevation for the pond is 14.50finsl and has a surface area of 36,203sf. The minimum surface area is 27,493sf The forebay is approximately 20% of the total volume for this pond. A three inch (3") draw -down orifice is designed to drain down the first 1.5" of runoff volume of 47,028cf in 3.4days. The minimum elevation of the riser is 15.66fms1, but in order to satisfy New Hanover County's pre -post requirement, the riser elevation is set at a higher elevation of 16.00fmsl. The volume stored between the riser elevation and the permanent pool is 61,308cf. The draw -down orifice was designed to also drain this volume within 4.4days. The emergency spillway elevation is at 17.5' and provides 1.5' of freeboard above the riser invert. NCDENR requires that the draw -down orifice discharge for a pond be less than the pre -development conditions for the I -yr storm event for the same drainage area. The drawdown rate through the orifice is 0.16cfs. The pre -development discharge for the 1-yr storm event for the basin is 0.62cfs. The top of the pond is 18.4' which was set more than 0.50' above the elevation of water in the stormwater pond during the 100-yr storm event. The width of the emergency spillway was designed to be 35' wide and that ensures that the 100-yr storm event can pass through the spillway without overtopping the pond in the event that the riser structure is not functioning. With the design conditions set as listed above, the conventional stormwater pond meets both NCDENR and New Hanover County's stormwater requirements. Infiltration Trench Capacity Requirements The infiltration trench will be 13.25ft wide, 105ft long, and 15" deep. This will allow a 12" perforated pipe and washed #57 stone to be wrapped in filter fabric and still remain 24" above the seasonal high water table. The total volume stored in this system is 745cf. The minimum storage volume is 743cf, which was determined from capturing the first 1.5" of runoff from the dock pit. The surface area of the infiltration trench is 1,391 sf and combined with the infiltration rate of 12in/hr, the exfiltration rate of the infiltration trench is approximately 0.39cfs. The 10yr-24hr runoff rate is estimated to be 0.041cfs. Since, the 10yr-241ir storm event can be infiltrated, this system does not incorporate the use of an off-line bypass or vegetated filter. The slot drain rim in the dock pit is set at elevation 14.65. The `downstream' junction box has overflow weir set at elevation 14.45 (below the slotted drain rim) which is also the top of the infiltration system. The entire storage volume is contained underneath that weir. For storm events greater than 1.5", the stormwater will drain over the weir and discharge from the site. Routing Requirements New Hanover County requires that the post -development site discharge for the 2-, 10-, and 25-year storm events are lower than the pre -development discharge for the same storm events. The pre -development discharge for this site for the 2-, 10-, and 25-year storm events are 1.6cfs, 13.1cfs, and 20.3cfs, respectively. The post -development discharge for the same three storm events are 1.5cfs, 11.9cfs, and 20.2cfs, respectively. Since the post -development discharge is not greater than the pre -development discharge for the 2-, 10- and 25-year storm events, this site meets New Hanover County's pre -post discharge requirement. Infiltration Trench Capacity Design New to Project: 01/04/10 SSA 1� ) i w ,SEAL r �. .24 r r JAN 0 6 2010 BY: Storage Volume Calculations Minimum Storage Requirement Drainage Area, A Minimum Runoff Amount, Pm Percent Impervious, Imp% Runoff Coefficient, Rv Minimum Storage Volume, Vm Height of System, Hs Length of System, Ls Width of System, Ws Surface Area of Trench, At Stone Void Space, ns Perforated Pipe Diameter, D Number of Pipes, Np Length of Perforated Pipe(s), Lp Pipe Cross -Sectional Area, Apipe Trench Cross -Sectional Area, Atrench Stone Cross -Sectional Area, Astone Total Storage Volume Provided, Vp Acre -In of Storage Provided, Vp-ai Drawdown Calculations Infiltration Rate of Underlying Soils, R Exfiltration Rate of System, Qx Time to Drain Through System, Tsys Seasonal High Water Table Elev, SHWT Infiltration Tank Invert, Bot Depth of Soil to SHWT, Ds Time to Drain Through Soil, Tsoil Total Time to Drain Provided Vol, Ttp " 6,250 [sf] Giver.: Dock Pit Drainage Area [in] Pm = NCDENR, Minimum Design Criteria r0.95742 Given: Only Dock Pit Drainage Rv = 0.05 + 0.009*(Imp%) [cf] V = (P)*(Rv)*(A) - (12in/ft) 1.25 [ft] Given: Total System Dimension 105 [ft] Given: Total System Dimension 13.25 [ft] Given: Total System Dimension 1,391 [sf] At = Ls * Ws 40 [%] Given: Washed #57 Stone 12 [in] Given: Plans u [each] Given: Plans 105 [ft] Given: Plans 0.79 [sf] Apipe = 0.25ir(D/12)' 16.6 [sf] Atrench = Hs * Ws 15.8 [sf] Astone = Atrench - Apipe ✓ [cf] Vp = (Ls)*((Astone)*(ns/100) + Apipe) 745 0.21 [ac-in] Vp-ai = Vp - 3,630cf/ac-in 12.0 [in/hr] 0.39 [cfs] 0.02 [days] 11.20 [finsl] 13.20 [finsl] 2.00 [ft] 0.08 [days] 0.11 [days] Given: 1/2 Soil Report Value of 24.0in/hr Qx = (Ai*R) _ (12in/ft*3,600sec/hr) Tsys = ( Vp / Qx) - 86,400sec/day Given: Plans Given: Plans Ds = Bot - SHWT Tsoil = (Ds / 24hr/day) _ (R/12in/hr) Tt = Tsys + Tsoil Determine Influent Rate into System Area = 6,250sf (Drainage Area #2) po = 7.13in 4hr (NOAA Atlas -14 Precipitation Estimate) 2 %Imp =100% (Percent Impervious) Rv = 0.05 + 0.009 * %Inip Rv = 0.05 + 0.009 * (100) Rv = 0.95 (Runoff Coefficient) Vol = (Pio-v,• )* (Rv)* (Area) 7.13in Vol = 24hr * (0.95)* (6,250sf ) 12hi f, t ✓Vol = 3,528 c�4hr (Runoff Volume) Qin = 3,528 cf * 24hr 24hr) (86,400sec) Qiii = 0.041cfs (Rate of Runoff Influent) Determine Exfiltration Rate of System Ls =105 ft (Length of System) Ws =13.25 ft (Width of System) Ai = (Ls) * (Ws) Ai = (105 ft)* (13.25 ft) Ai=1,391.25sf (Area of Infiltration) R =12.0 i�l,,, (Half of Infiltration Rate of Soils) Qx (Ai)* (R) } Qx = (1,391.25sf) * (12 Z12 laf•/* lhr )*(Ift) 3,600 sec 12in Qx = 0.39cfs (Exfiltration Rate of System) Store Difference of Rates NCDENR requested an evaluation of the system to determine if it could infiltrate an evenly distributed 10yr-24hr siorrn even[ in order io be exempt from ilie off-line bypass and vegetated filter requirement for the infiltration system. The evenly distributed runoff rate into the system was approximated to be 0.041cfs. The system is able to exfiltrate approximately 0.39cfs through the bottom surface. Since the exfiltration rate of the system is greater than the rate of influent as calculated above, this system can adequately handle the 10-yr storm event. ._.: (Ut "PECS CAROLINAS, LLP "Sqttng� the Standard fbr Sen - cAii OLIWAr. Geoff :t nccal • Constructi n Materials • Enviromriental Facilities December 18,2009 t J Highway 421 Properties, LLCRZC " 1NMD Wilmington, North Carolina 2W3 JAN t) 6 2010 ReWenm Report of IaMmtbn Evaluation Htftway 421 Site BY WPrrdngton, New Hanover County, North Cerolkw SOS Pr of No. 22.15468 Door Mr. Avery. ECS Carolkms, l.LP (ECS) recently conducted d an Infilftation mmivation for live prgmW starmwater best mar agernent practice (I MP) areasat the Hlghway 421 ate In 1A►ilrrr art, Now Harmer County, North Caroko. a . This lettm with attachments. is the report of our evaluations. �..;�,.I • air: �: l�* t i #.a_w: F ..•. `. P F -8 ^. (6 I► i.: r I v.' P P t # 'A : lit $ ' i " • - 9 =1 P Q P '1'C tl ti • OPN#. ;;.i .1 1 1 F 1 i - e a# F e The groundwater level ar)d the SHWT were admated at the borkg location below the Wdsting grade elevation. A summary of the hidings am as follows: ECS has conducted an trMrelion test utHWng a compact constant head perrneameter near the hand suger boring to estimate the infr7t etion rate for the subawface nobs. tnfit on are typically conducted at two feet above the St-WT. tf ttm ;SFFW is Wu then three feet, the tat are conducted at ten inches below the surface gyration. 7211 Arden Business Park, Suitta 201, Wilmingion, NC 28,111 T: 910-688•-9114 ° F: 910- 9666 ' wrm.ecalimited,c m FGS CanA1rcu, LLP • iC5 Fk,rk1a, LLC ' ECS lkinlJiS, LLu . C3 M4-At1a(4jc, LLC ` r CS SutAhea&iL LLC ' ECS Texos. LLP Report ©11aftafton Evalustf n H y 42180 WfhOrWM WwHanmer Coem #y, Ak)rM Ga rAv P€ject No. 2Z 1$M December 18, Field Test Results Below is a summary of the infiftiataon test resuft: #nfltraWn rates and SHWr may very within the proposed site due to changes in elevation and subsurface conditions. Closure 1tia activWes and evaluafw approaches used In this assessment aura caonslaW with those normally employed in assessments of this We. EC&s evaluation of site conditions has been based on our understanding of the project information and the data obtained during our Add acithfifies.. ,, ►► E s ►s k0 ► 0 '► a •�4` A s s fi o t E- w ,e ® •' f-f i'�+ 8 l i t t i i- • '.:►+ F' ✓�F: o R's #'. M ° s c-a w Respecwl. PC$ CAROUNAS.. LLP K. Brooks ball Kris J. Stamm Project Eager Principal CC: Jay Carmine RE -- Coastal Land Design, PLLC Attachments: Figure 1 - Test Location Plan Infikakin Evaluation 2 . •.. �.—'•.. s+M �-_. LTt:-.:::.,�:v�.--.��i:�Y::r.--CiT!✓:sRiS�41F>PTRS'S1�•�$�� • ' 4 y � �I. e + ,e [ t� t z7a) LP l 6 TEST LOCATION NghwW 421 Site Figure t--ie c Lam, man 1+Wkning:+ton, New Harm Co.,. KC � {� ,�� Provided by: CossW Land ECS Project No.224SM jO Resign, F .LC KB W 44iCt Liinld Infiltration Evaluation Highway 421 Site Wilmington, New Hanover County, North Carolinas ECS Project No. 22.1 a468 December 18, 2009 L cation th 1 0-14" 14"-36# 3$°-4:2" Spoil Qescriipon Tenlgray► fine to med. SAND !dray fins SAND Black silty SAND (Hardpan) Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Infiltration Rate. 24.0 inches per .hour Test was conducted at 12 inches below existing grade elevation Groundwater was encountered at 42 inches below the existing grade elution. DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent. Lewis@ncmail.net If there are more than 7 areas to be tested, attach a second sheet. State Soil Scientist Confirmation Visit date/time: Project Name: kXVS&Y1 k,N, U5 df Mgzl &2W,County:_ AI�LU tt uoye2 Street Address: 3$tI u. S, #a, #21 , kc�r� M#u, A1c Directions from the nearest intersection of two major roads: 69MkI,ylfiT al O S'O IWILAX AXIC7H 0&3 US MY( y21 Pt T 7T1.1± 1NTAWStr_7Zc4-v Or' V.S. Hke 4zi Atz 7nE 1=14o f3m%s >1 acre being disturbed? RYES ENO CAMA Major required? DYES XNO Consultant Name: T4Y CA+emjmE PF Phone: Aloe 2V4-9333 Consultant Firm Name: (10MML 64wu, P44C Bore Number 1 2 3 4 5 5 7 a) Existing Ground Elevation 1k•� — �j b) Proposed Bottom Elevation t , y c Difference a minus b apt- -�- d Add 2 ft. Min. Bore Depth) y.c e Hardpan Depth? --. Approx. Elev. Of SHWT 11. y Max. lowest bottom elev. 13 , ti h Infiltration Rate OK? * Q Confirmation of SHWT * '� For projects requiring more than 5 hand borings, manpower or equipment to conduct the excavation must be provided by the consultant. *State Soil Scientist Use ONLY /' Comments z&j/ Y-JUYe. Cb iNe- Sg4J Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin4r ench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the prr�nosed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 2H.1000, and assumes no liability should the systern fail'. S:\WQS\STORMWATER\FORMS\infiltration site visit Revised 3/08 0 0 > 0 M 0 idil SI CT)! a i 01 >� cA ff j FD 0 w . oc.� 1� rr r r ..j'" 1 �tl.`I tz I N { a ----—-----------— ------- I p rediminuy S.Pti.�Din Field s I r Not To Scale: (By Offi—) t z I G--if S 60.27-1,(Z7 W 527;04! z 4 -�5670-1719W 116.41' 1 0 p I r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary December 11, 2009 Mr. McKinley Dull Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 070319 Worsley, N.A. — U.S. Hwy 421 Project New Hanover County Dear Mr. Dull: The Wilmington Regional Office received a State Stormwater Management Permit Application for the project located at 3881 US Highway 421 North in Wilmington on November 24, 2009. The Division of Water Quality has conducted a preliminary review of that information and determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Tmpervious Area Treated: The overall property has 394,165sf of impervious area, and the pond is designed for 387,915sf of impervious area. The narrative indicates that 6,250sf of impervious from the dock pit does not drain to the pond, however all impervious area (including the loading dock) must drain to the pond. 2. Impervious Dimensions: Please show all known dimensions of impervious area not already shown on the plans (such as the loading dock). Updating calculations: Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. I have made considerable effort to identify areas of concern, however, because substantial changes are warranted please carefully review your re - submittal in order to ensure that all of the required items are submitted and correct. Please also note that any calculations in your re -submittal must be stamped. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 2, 2010, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910 796-72151 FAX: 910-350-20041 Customer Service: 1-877.623-6748 NorthCarohna Internet vmw.ncwaterqualiiy.org �R'tura«� An Equal OpportunitylAffirmaliveAdon Employer SW8 070319 December 11, 2009 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at k-elly.pjohnson@ncdenr.gov. Sincerely, Jy ohn n Environmental Engineer GS/KJ: S:\WQS\STORMWATER\ADDINFO\2009\070319MOD.dec09 CC: Jay Carmine, PE, Coastal Land Design. PLLC Stormwater Permitting, WiRO files Page 2 of 2 Johnson, Kelly From: Johnson, Kelly Sent: Friday, December 11, 2009 9:08 AM To: 'Jay Carmine' Cc: Lewis,Linda Subject: SW8 070319 Attachments: 070319.dec09.pdf Jay, There is still one issue with this application. The loading dock must drain to the pond, even if it has to be pumped. The attached letter will be mailed today. KJ *** My email has changed to kelly.p.iohnson@ncdenr.eov W2LLIiokmsow Kelly Johnson Environmental Engineer Division of Water Quality Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7345 Fax: 910.350.2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. qW ZAAD 1#a �05FOA.3SE Coastal Land Desim PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Wilmington, NC 28402 November 24, 2009 NCDENR — Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Attn: Kelly Johnson Phone:910-254-9333 Fax: 910-254-0502 Re: Request for Additional Information (SW8 070319) Dear Ms. Johnson: RECD NOV 2009. Coastal Land Design, PLLC (CLD) has received and reviewed your Request for Additional Information dated November 19, 2009 pertaining to the Wolseley, N.A. — U.S. Hwy 421 Project stormwater application. For clarity, your comments are repeated in bold, and our responses are shown in normal font. —. 1) Impervious Area Treated: The overall DroDerty has 394,165sf of impervious area, and the pond is designed for 387,915sf of impervious area. The narrative indicates that 6,250sf of impervious from the dock pit does not drain to the pond, however all impervious area must drain to the pond. That small area (6,250sf) is unfeasible to be captured and directed towards the pond. The previously submitted narrative goes into a little more detail as to why, but basically is it because that area is too low to be directed towards the pond. It would not be realistic or functional to raise the entire site enough to drain a 6,250sf dock pit into the pond. It is only about 1.5% of the total BUA. We accounted for it on all permit documentation as well as in the design of the site such that it could still meet New Hanover County's stringent pre- and post -discharge regulations. It does drain into a discharge swale that has 5:1 side slopes. There will be some stormwater treatment in the discharge swale. We feel that this small uncaptured impervious is comparable to driveway accesses that are unable to be captured on most other sites with the exception that we are providing some treatment. �2) Drainage Areas: Please clearly show the drainage area to the pond on the plan. The drainage area is clearly shown on Sheet SW-01 of the plans that were submitted to your office with the original submittal; the line type is indicated in the legend on the same sheet. vB) Subdivision: In your resubmittal please confirm that this project is not intended to be permitted as a subdivision for this modification. Previous permits for this site have been subdivisions, but it does not appear that will be the case for this modification. If the project is intended to be permitted as a subdivision, please show the lot lines on the plans, provide the sizes of the lot areas, the amounts of BUA per lot and submit deed restriction. It was not designed to be subdivided. 4) Drainage Easements: Please show all applicable easement widths. The stormwater pond easements are non -uniform, but otherwise are to scale. We are providing supplemental dimensions for your convenience. Details: Please provide details for sidewalk and parking. Details should included width, dimensions, and slopes. Supplemental sidewalk and parking details have been added to sheet SW-02 for your convenience. �6) Impervious Dimensions: Please show all known dimensions of impervious area on the plans. The previously provided impervious calculations have been checked and verified from our digital files. Supplemental dimensions have been added to the impervious areas for your convenience in verifying our results. ✓f) Permanent Pool: Please show dimensions of the length of each line and arc formed by the permanent pool. Typically, these dimensions are shown outside of the edge of the pond. Curve radii are also required information. The permanent pool of the pond is dimensioned on sheet SW-01 of the plans that were submitted to your office with the original submittal. Curve radii were not shown on the rectangular pond because they provide no substantial design information and were impractical to show. However, they are shown as a supplement on the revised drawings. Vegetated shelf: Please show the length on the plans. The vegetated shelf length is shown pond cross-section detail on Sheet SW-02 of the plans that were submitted to your office with the original submittal. Wet pond SHWT data: The soils report shows that the SHWT is 36" below the existing grade. The supplement shows that the SHWT is at 13.00fmsi. Please verify that the existing grade was at 16.00fmsl at the location of the boring when it was bored. The SHWT elevation, as per the application and the previously permitted project, is correct and consistent. Updating Calculations: Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. I have made considerable effort to identify areas of concern, however, because substantial changes are warranted please carefully review your resubmittal in order to ensure that all of the required items are submitted and correct. Please also note that any calculations in your resubmittal must be stamped. An A.B.C. access road for use by the Fire Department has been added along the western side of the propose building. The road is approximately 5,815sf of stone. That amount of impervious has been deducted from the future allocations such that the overall site impervious does not change. One additional drop grate is to be added to collect stormwater from the gravel access road. Please see the revised Collection System Design Calculations and Stormwater Pond Capacity Design calculations included with this response. Sincerely, Jay R. Carmine, P.E. Coastal Land Design, PLLC. P. O. Box 1172 Wilmington, NC 28402 Phone:910.254.9333 Fax:910.254.0502 To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Kelly Johnson ❑ As Requested ❑ Sent via Mail ❑ For Your Files ❑ Sent via Courier 3D Transmittal � -) 5 Date: November 24, 2009 File: 650-04 Subject: Stock Building Supply (SW8 070319MOD) Stormwater Modification Submittal ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No. Description 1 Original Response Letter to Request for Additional Information 2 Copies Revised Sheet 2 of the Stormwater Management Permit Application Form (Revised Table II1.8) 1 Copy Revised Collection System Design Calculations (Added Additional Drop Grate) 1 Copy Revised Stormwater Pond Design Calculations (Revised Impervious Breakdown) 3 Copies Revised Construction Plans REMARKS I Please contact our office if you have any questions or concerns. 650-04 Transmittal NCDENR-DWQ 112409.docx Collection System Design Calculations Added Drop Grate-18: 11/24/09 o , / o- or \ rn a g M m `Y' d Z N M 'ct m LO (D n m U` 0 h m LL er- U m v m J d m m p 0 p o U } } } LO CD W MH I-- N V 0 coI� com m m m m O m O p 0 I=L U LLLL U m } } } } } N o 0 0 O o O LO o LO (D (n o 0 0 0 0(D LOo LO (n i N 0.. N r -to M O n O O O O N -N- N M (`) O r 0 0o 0 m 0 m o O O lf) to O O N (n r cD (M (n O o O O 7 o O 0 O O O to N LO N (D N o M o O U� O c0 c0 h n I- I,- c0 n n I__ c0 Ih h h c0 00 00 00 n a' r a- r r r r r r r a-- a--- r r r r c- r r r y G N O (0 N (0 'cp c0 h O m r h r 'ch N N n O c0 O N n O N O h ao oo O V7 N �t M O N = w co to (O c0 h n h n I� (D n I- I` r- I- c0 ro c0 I` Lu r r r r r r r r r r r r r J = Q O O co r m N LO h n O O N (D N N h of n LO N N O LO N (0 (0 V n m m O N N M 0 O c0 c0 n r r r r r r r r r r O N ? O m O O m M v (0 co N N O (D O O O O O O N M v N LO M wN m O h O O N 0: N LO N O O M - - - - W h co o0 m r r -- -- -- -- - - - o 0 ! m a $ CO LO m O Cl Cl) tt (D W N N N n n O ao O N N M N O M ao m N O N 0 ^ ^ O r - - - - - - O ZI- 1- CC) OD Or r r— — — — r- N D. O o V (M M cM Cl) M CO M M C) Cl) M M fM M M Cl) (M M M O O O O O O O O Cl) M M M O O O O O O O Q. 'a co O O CD O CD O O O O O O O O O O O O r N C co co co c0 N N c0 (D at V `(t O v O v m w aD a0 a0 y.... IT'd' M M N N N r N r N r r r .2 r X m m rr 00 v, O (D O n. co v v rn O (D co cq 00 o m v m rn c0 M M (D m r co rn V (D m (D N m N m n O O a II M Cl) M eV N r r r eM O N O e- O r fM N r O O = Q_ M N to V' M N (ry N � OMo C3 m CD M W co 00 0_ N a) m O O m V O O V O O h co h o0 c0 N II (D (D V , r r r r r r y jd N Lq ah0 (CD (q (D ao ao O M M O O N M C.)O II O N Cl) LOM co co LO h d' r N N N h N (D O M N r r o0 O ((7 O (O (D V' cli r r U C � ^ C(D h m 0 r Cl) d' (D n r O r r r 0p 00 m O O cD (D n h n n h h 00 m oo m co n n n c0 m c0 >_ O w' C N It OD N O N � � d' M O V oo m N O m M O O n (D N O O O II � v1 r of ao n I� vi u7 (ri (ri � co co m (ri (ri (ri � o m E o O o 0 0 0 00 O O 0 0 0 0 0 0 0 0 00 n. 5 o o ui 6 6 6 o 6 ui 6 6 6 6 6 o 6 ui 6 6 (fi E U O O O O co(D CC)N co O 0M M O o O O O N K LO LO O m Cl) O O O N r O (D O ao co co V N r F- (D (D (D li M N r r r O r O O O 6 O O C O O m W N v O O to d' 0o m O N N r a O O O O N N N N r C O O O r O O O O O O O O O O O O O O O O CD O N O O O O O O O CD co m O O O O O O a0 N C O (� O O m m m m O n n n m m m m O m m W m O t ♦� V O O O O O O O O O O O O O O O O O O O O N 'o E O + w f.1 O DD N h 0 0 (D M O 00 M It N M N ` O m r r r h m M M st N O O O CO M O tt N r C C M N r r r O r O O O O O O O O O N Cl (D V v O O V' M co O O O v O M co M 0 N N N N M o a m O O O O m O O M M N O O (D O O N N N N r ((i O O O r o r Cl O O O O O O O O O O O O O (n co � C J co O r m M O O r m O N O O II co N m �0- m r r r .N- V ((D O 0)ccoo � O N (O c �co C C C C C M N LO (.0r ECO Y N J N M 't LO(D n co m— — N-- Cl) - co - m m N 0. Z T L: 0 � 4-- � � 4-- � 4-: � � � � � 4-- � m_z 0 O U U 0 0 U 0 0 0 0 0 0 0 0 0 O 0 0 L m C O O O O O O O O O O O O O O O O O O O O ❑Z- O O O O O O O O O O O O O O O O O O O O CD O p N (0 C G O O O O O O O O to LO O O N 00 V' CM O O r O O O O (O (O (D (O V' N 00 (D C6 O V' M 6 C7 C i 07 0 0 rC. O O O O Lo _ F- _ O V' v V' M Lo M O d' V 4 V' L N ++ O O O O I- LO O _ !� N N 00 N O N N N N M � $^. O O O O U0 I� O 'c. O V' V' r 7 O V' '7 V' V r ❑ ❑ O O O O O O O O r O O O O O O O O O O O C a to L U IR Qa) O O O O O O O O N 00 V' M O O r O O O O (fl (O (O O V N 00 coO Cl) O "T (M O M M M M L p . N 0 0 0 0 U') 1- o v IT 'gr M (n Cl) o 'c It It v = yL-+ O O O O I� Lc) O f- N N 00 N O N N N N M m CL O O O O U� n O O V: at r V r O V V V' V r N ... O O O O O O O O r O O O O O O O O O O O U7 C O O O O O O O O O O O O O O O O O O O Cl)O C O O O O O O O O O O O O O O O O O O =3 O O O O O O O O O O O O O O O O O O O O O U O O O O O O O O O O O O O O O O O O O O N — Q L 41 O O O O O O O O O O O O ClO CD O O O O Np x�'' O O O O O O O N N O N N N N N N N O N N N N N C N O O O O O O O O O O O O O O O O O = O O O O O O O O O O O O O O O O O O O O p O O O O O O O O O O O O O O O O O O O Oen C1 3 O O O O O O O O N O N O O O (N O N O N O N O (C) O N O (n O O O (n O (n O (n O (n O N O E C O O O O O O O O O O O O O O O O O O O O Z O C Y O O O O O O O O O O O O O O O O O O O O (n O O O O O O O O O O O O O O O O O O O O d 0 O O C7 N N O N N N N N N N 0 N N N CN N U C C W " C0 U (0 Cn (O ui (0 U C0 U (0 U m U (0 U m N C0 U N U m U C0 U N U (0 U C0 U N Cn w ui N U m U x ._ N O O O O O O O O O O O O O O O O O O O O 1" a+ O O O O O O O O O N O N O O O N O N O N O N O N O N O N O O O N O N O N O N O N O O m r C O O O O O Cl) O O O O O O O O O O O O O O II y J O O O O O V O O O O O O O O O O O O O O a L v 0 O 0 O r O O r r r r r O r CV Q M CJ O O O O O V (O N N 00 V 00 O LD LO (n (C) O C L N O Cl O O N n O n V' LO Cl) O n O O N V)(n (n O (0 O O O O CN N O O O O r O r O O O O O O (V N a+ O O O O O O O O O O O O O O O O O O O O N -J O O O O O O O O O O O O O O O O O O O O op C O O O O O O O O O O O O r O O O O O V 00 O 3 y C O O O O O O O O O O O O O O O O O O O O U O Cj 0 O CJ 0 0 0 0 0 C, It O V O O C7 O 0 V' 00 ai C 'C � 'C E 'C C a Q 2 2 2 = C9 C7 = c2 (2 c2 c2 (2 O = U' U U` N -��' ❑ ❑ ❑ ❑ ❑ ❑ U ❑ U ❑ ❑ ❑ ❑ ❑ E CL !A O O N to M O O CD O O O O O O O O O O O O C! v O O O M O O O O O O O O O O O O O O O O C O O 4 e- O O O O O O O O O O O O O O O O E p, N u l0 O O O O O O O co co CD O O LO V) (n LO N 00 (O LO f� N N O h N O O N CT N Cn N CD N Ql a)O N to (_D U v O O O O I� 6 O (V (V r V' O 0 O O r O O N II O O O O O O O O O O O O O O O O O O O O n v O O O O O O O O O O O O O O O O O Cl O O O N C (] O O O O O O O O O O O O O O O O O O O O y 0) OLO c II Q W O O N O co CD O (n (n N O N n O N N N N (D co :.i O O O (Y) O M O Lq Lq 00 LQ N O N O O (D CD CD 7C .U.. O C�l It CA C7 N N r V' C] CD O C] r r r r r (` O a 0 E u o ca i N o (n Z S N M 0 M ^ CC) m (N Cl) V' to O r co N m m m 0 m LL m c _71m O ❑ ❑ U LL U } } r } iL U) a� .o L f2 J Z r N Cl) It u7 co � 0o CD r � r N Z Stormwater Pond Capacity Design Revised Impervious Breakdown: 11/24/09 SEAL nil Wet Detention Basin Design Sheet Wolseley, N.A. - U.S. Hwy 421 Project - --Storwmater Pond #1 - - - Total Drainage Area, Ad = 11 542.000 I [sf] On -Site Buildings Impervious = On -Site Streets Impervious = On -Site Parking Impervious = On -Site Sidewalks Impervious = Other [Future -Parking] On -Site Impervious = Other [Future -Development] On -Site Impervious = Off -Site Impervious = Surface Area Calculations 70,365 5,815 67,050 4,500 107,605 132,580 11 0 [sfl [sfl [sf] [sf] [sfl [sf] [sf] Total Impervious Area, Ai = 1 387,915 [sf] Forbay Permanent Volume Forebay Contour Elevation Forebay Contour Area Incremental Volume Accumulative Volume fmsl1 [sq ftl rcu ft cu ft 6.00 2,149 Sediment Storage 7.00 2,644 0 0 8.00 3171 2,908 2,908 9.00 3,730� 3,451 6,358 10.00 1 4,321 4,026 10,384 11.00 4,633 15,016 12.00 --'�� - 5,599 5,272 -- -- 20,288 13.00 6,286 5,943 26,230 14.00 7,008 6,647 32,877 14.50 7,377 3,596 36,473 Main Pond Permanent Volume Main Pond Contour Elevation Main Pond Contour Area Incremental Volume Accumulative Volume rfrnsll fsqftl rcu. ftl rcu ft 6.00-11,548 Sediment Storage 7.00 13,023 0 0 8.00 14,571 13,797 13,797 9.00 16,190 15,381 29,178 10.00 l7 882 1 17,036 46,214 11.00 19,645 18,764 64,977 12.00 21480 20,563 85,540 13.00 23,388 22,434 107,974 14.00 14.50 25,367 24,378 132,351 28,826 13,548 145,899 Average Depth (d) = Accumulative Volume / Permanant Pool S.A. d (ft) = 182,373 = 5 ft 36,203 it Minimum Average Depth = 3ft < 5 ft < 7.5ft = Maximum Average Depth OK II Percent Impervious (Imp): Imp = EAi / Ad Imp = 387915 / 542000 Imp = F 71.57 [°/u] Sediment Removal Efficiency = 11 90 1 [%] SA/DA-Ratio-Deter-mination - - -- - -- — -- Higher Percentage = 80 SAIDA % Higher Depth = Lower Depth = 5.5 5 5.20 5.70 Lower Percentage = 70 SA/DA Higher Depth = Lower Depth = 5.5 5 4.50 5.00 Pond Shall Have an Average Depth of 5 ft and Be Designed to Remove 90% TSS SAIDA = 1 5.07 1 [%] Required Surface Area at Permanent Pool Elevation (14.5 ft) for Pond SAREQ_ _ (SA/DA)*Ad SAuQ. _ (5.07/100)*542000sf SAmQ. =1 27,493 [sf] Interpolation (Bi-Directional) l st - SAIDA @ Depth Interpolation SAIDA % SAIDA at Imp = 80%, d =5 ft SAIDA at Imp = 70%, d =5 ft 5.66 4.96 2nd - SAIDA @ Impervious Interpolation SAIDA % SAIDA Ratio at Imp=71.57% and d=5 ft 5.07 FE--- 5A Provided = 36,203 > 27,493 = SA Required OK Tem orary Storage Volume Calculations Minimum Required Volume (Simple Method by Tom Scheuler): Receiving water body name ........................... Cape Fear River Receiving water body classification ................. C;Sw Receiving water body location ....................... New Hanover Count, North Carolina First Flush Volume Required, P = 1.5 [in] Rv = 0.05 + 0.009 * ( Imp ) Rv = 0.05 + 0.009*(71.57) Rv = 1 0.694 Volume = P * Rv * Ad Volume= (1.5/12)*(0.694)*(542000sf) Volume= 1 47,028 1 [sf] Forebav: Storm Storage Volume Contour Elevation Contour Area Incremental Storage Accumlative Storage rfinsll rsf1c c 14.50 7,377 0 0 15.00 7,944 3,830 3,830 16.00 9.1.2.0 8,532 12,362 17.00 10.352 9,736 22,098 18.00 11,641 1 10,997 33,095 ':Main Pond: Storm Storage Volume Contour Elevation Contour Area Incremental Storage Accumlative Storage rfmsll rsqcrcfl 14.50 28,826 0 0 15.00 32,484 15,328 15,328 16.00 34,752 33,618 48,946 17.00 37,076 35,914 84,860 18.00 39455 1 38,266 123,125 Total Pond: Stnrm Stnraue Vnlume Contour Elevation Contour Area Incremental Storage Accumlative Storage -finsl-- ... .. s...... ........ ...............e._..... . . --c 14.50 36.203 0 0 15.00 40-428 19,158 19,158 16.00 43,872 42,150 61,308 17.00 47,428 45,650 106,958 18.00 51,096 49,262 1561220 18.40 53,150 20,849 177,069 Minimum Temporary Storage Volume ....................................... 47.028 [cf] Height of First Flush of Runoff ................................................ 1.161 IN Permanent Pool Elevation....................................................... 14.50 [ftnsl] Minimum Temporary Pool Elevation ......................................... 15.66 [fmsl] Designed Temporary Pool Elevation ......................................... 16.00 [fmsl] Surface Area at Temporary Pool Elevation .................................. 43,872 [sf] Designed Temporary Storage Volume ........................................ 61 308 [cf] FE--- Vol. Provided = 61,308 > 47,028 = Vol Required OK Forbay Sizing Calculations Total Permanent Volume= 1 182,373 (Forebay Volume + Main Pond Volume) Minimum Forbay Volume= (18%)*(Total Permanent Volume) Minimum Forbay Volume = (18%) * 182373c Minimum Forbay Volume = F 32,827 [ef] Maximum Forbay Volume= (22%)*(Total Permenant Volume) Maximum Forbay Volume= (22%) * 182373c Maximum Forbay Volume = 40,122 [cf] Min Vol = 32,827 Drawdown Orifice Sizing Calculations Orifice Diameter, D = 3.0 [in] Orifice Coefficient, Cd = 0.6 Ao = 0.25*a*W Ao = 0.78540*(3in/12in/ft)^2 Ao = 1 0.049 1 [sf] 36,473 Qoriftce = Cd*Ao*(2g*H°4x)o.50 Qoriftce =(0.6)*(0.049sf)*(64.4fpss*0.46ft)^0.5 Qoriftce = L 0.160 1 [cfs] 40,122 = Max Vol OK I-L,8= (DTPE- PPE -D/2)/3 H,,.s = ( 16ft - 14.5ft - 0.50*3in/l2in/ft) / 3 %,, = 0.46 [ft] tdd = Minimum Storage Volume / Qoriftce tdd = ( 47028cf / 0.16cfs ) / 86,400sec/day tdd= 3.4 [days] 2 days < 3.4 days < 5 days OK Time to Drawdown Minimum Volume tdd = Design Storage Volume / Qoriftce tdd = ( 61308cf / 0.16cfs) / 86,400sec/day tdd = 4.4 [days] 2 days < 4.4 days < 5 days OK Time to Drawdown Design Volume Emergency Outlet Weir Sizing Calculations 100-yr Post -Development Inflow Q = 80:1 7 1-[efs] See Hydrograph Routing Top of Pond = 18.4 11 [finsl] 100-yr Pond Elevation, PE = I 17.80 I [finsl] - See Hydrograph Routing Emergency Spillway Elevation, SE= 17.5 [fins]] - See Hydrograph Routing Emergency Spillway Length, L = 35 [ft] - See Hydrograph Routing Emergency Spillway Coefficient, Cw = 3.0 (Rip -Rap Lined) Emergency Spillway Side Slope, in = 3 [m:l] Spillway Roughness Coefficient, n = 0.076 (18" Rip Rap, 1-2ft depth) Minimum Weir Height, Hw = (Q / Cw*L )^(1/1.50) Minimum Weir Height, Hw= (80.1efs / 3*35ft 1/1.50) Minimum Weir Height, Hw = 1 0.83 1 [ft] Minimum Top of Pond w.r.t. Weir = SE+ Hw Minimum Top of Pond w.r.t. Weir = 17.5fmsl + 0.83ft Minimum Top of Pond w.r.t. Weir = F 18.33 j [fmsl] Minimum Top of Pond w.r.t. Elev. = PE+0.50ft Minimum Top of Pond w.r.t. Elev. = 17.8finsl + 0.50ft Minimum Top of Pond w.r.t. Elev. = F 18.30 j [fmsl] Minimum Top of Pond = Maximum of (0.59+100-yr Elev) or Minimum Weir Height Minimum Top of Pond = 1 18.33 1 [fins]] FE___ Minimum Top of Pond = 18.33 < 18.40 = Top of Pond OK Capacity Conveyance Factor, Kc = (B*d +m*d2)1.667 _ (B + 2*d*(l+In)O.IIf667 Capacity Conveyance Factor, Kc = (35*0.83 + 3*0.83^2)AI.667 - (35 + 2*0.83*(1+3^2)^0.50)^0.667 Capacity Conveyance Factor, Kc = 1 26.470 Mimimum Spillway Slope, Sm = 100*(Amax / (1.49*Kc/n))Z Mimimum Spillway Slope, Sin = 100* 80.1 / (1.49*26.47/0.076))^2 Mimimum Spillway Slope, Sin = 2.38 ION Designed Spillway Slope, Sd = 5.00 IIN Slope Provided = 5.00 > 2.38 =Min Slope OK Depth of Flow in Spillway Channel, D = 1 0.67 [ft] <-- Solver, with Rip Rap Annourment Velocity Conveyance Factor, Kv = ( (B*d + m*dZ) _ (B + 2*d*(l i1172)0.3))0.667 Velocity Conveyance Factor, Kv = 35*0.67 + 3*0.67^2) _ (35 + 2*0.67*(1+3^2)^0.50) )^0.667 Velocity Conveyance Factor, Kv = 1 0.736 Channel Velocity, Vel = (1.49*Kv / n)*Soso Channel Velocity, Vel = (1.49*0.736 / 0.076 *(5/100)^0.50 Channel Velocity, Vel = 1 3.2 [fps] Permissable Unit Shear Stress = 1 6.00 [lb/sf] Shear Stress, T = y*d*s Shear Stress, T = 62.4lb/cf)*(0.83ft)*(0.05ft/ft) Shear Stress, T = 1 2.6 Shear Stress Provided = 2.6 < 6.00 = Max Shear Stress OK IMP 25% Al�c x j AUG I 3 2009 BY: Stormwater Design Calculations For Wolseley, N.A. — U.S. Hwy 421 Project New Hanover County, North Carolina Prepared by: Coastal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O-Box 1172 Wilmington, NC 28402 Prepared for: Phonc: 910-254=9333 Fax: 910-254-0502 Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 July 6, 2009 Collection System Design E Ul Q W O O r- O N O c v E 0 It 0 0 uO cn G ❑ rn o dl Z 0 N M m (j O n (Or) 0 I- LL r (� M lr fD J m m M ❑ 0 m ❑ 0 m Cy UCN m } } } m m m m U O ❑ ❑ m ❑ ❑ ❑ LLLL U LL U m } j-. } } 00 > d W O' O O O O) O tD O tD to O 0 N tD tD tD 0 O O O O to to O O O N (D Oi T M 0 CO 0 0 LO to N N N M M E ri h Go 1: ri f: ri N h t: Go 0 6 tp Go 1 v i = 00 o 0) O 0) 0 tD C. UD 0 O o N to r to (M to tD o tD tt•) O tD o tD to M t0 tD o ❑ 0 0o vn n n h ap h n T n n O h N Go N co N 0o M co CL = N O m N co v Go n t(') m aT- N r- coO N O N Oh O N Nr d W T T � r- r h r n r: O r: r: n n GD r: Go Go m 0 T T T T J c� 2 C 0 00 co m N LO h O N N n h co �° r co T co r co r: r-: N 1-: I: 0 N r: O r: N n co n h rn O n N Go Cl) Gt) r T r T r T O) T � n f0 N 0) O O 0 M (D GO N N O w t0 O O O tD tD M N y _N W h M co N 0) TO TO r r -- - -- r N - - iN M GMO - - C r — T — O C C N tD co to O O O M '� fD O N N N h h t17 aD O N V N E (D 1: n h co O) 0 n 0) o r N - - r - - - - LO - coM r T' O Z W CL O c V' M M M C7 M M M M M m q co M M C 1 C) P7 Cl) M O tD O tl O O M co o W o 0 0 0 0 0 0 0 0 0 0 I 0 O 0 to 0 M 0 M 0 tD o to c tOD o co co co CC) VN' CN v M co N N N O N O N co O O 00 X co V O O (D tD n GO �' 0) O (U M O W 0I O M 4) O �' O N N O •O Cl) 0) tD O m O II C) Cl) (V N r T T M 0 N O T O r M (V r O .0 0• w M N (D sr _ M N M N co m _ (v7 OnD a N m m (n to Go Iq Go LL7 a0 n 11 O 0) (D M V' T r T M r r n GO Go GO N m OO O N tD O t'D (D tD co V co CD r M M W to N M ~ NV m co (D tD n 'd' T N N N 1- N to11 v V (m N M M O tD O M (D V' CM T V L 2 (D h 0) O r M st M n T p T r T O tp O) O r26 (� (O fo I: h ti r` n Go Gp Go Go Go r: r: n Go Go } H C N tt GO N tD LO N E -t CO st CR 0) N O O) M O O h 0 N tD O II v T T n to 0 M to 6 (O 6 d C • C O O O O O O O O O O O O O O O O O O O O .0 G) O- O O tD tD tD 0 O t0 10 tD tD tD tD (n 0 O tD t0 tD E 7 U O 0 tD u") tD tD tD co O m N) to tD co tD N N M W O (D M Cl) O O O O O X � 1- to m (D It M N r T N T r O .-: O 0 O 0 O O O O ORt0 O O O N O m O Q O O ot 0 UGON O O N N a) CO M M M O O O O Q( O < CO O O O O O O O G O m 0 O tj (D Oi O ri CD 0 0 N 0 N 0 N C) N co C N U O O O O tD Qf tD D) tD 0) LO O) O O co h to n 0) h LO 0) V) to to 0 O O N (O,) O O O O O Co O O 0 0 O O) 0 O) 0 0) O O O D) 0 O) p) + O Co 0 G) m i a0+ 0 v 10 T T T T T T _ V tD h O M O N Go n �t [F N (D M O M (D M O O O CO (D 4 N O 2 N n to co N r T T O O O O O O r9 0 . O N 0 N CQ Z` 0 O O tD (O 00 O O tD m v O M 0 M O N N N n'C O O ... O O co M N (D O co O O N N N N O O O r O O O O O O O O O O O O O (n co $ co Cl) tD N O N co t0 LO O O O) O O O V h O II J O) TO m r T � 4 V (D N (D m coN LO •N (D C C.O. C C C O _ j W r N M to (0O h O) M I-r m T LL U) m r LU 0 J T N M �t ti') fD h O O T .M- ems- .h- O O) iL Z m a La_Z O O O O O O O O O O O O O O O O O O C y c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ 'Z, 0 0 0 0 0 O O 0 0 0 0 o O 0 O 0 0 o O to O O N _y y O O O O to LO O N Iq l M O O O LO CO Lp (p CO C co 0 C) coO O O cli Pi t1i C6 O LO O O O O to t` O v M to co O IT v Or- O O O O ti Lo O h N N w N O N N N N N O O O 0 0 O 0 0 O 0 0 0 0 0 U O O O j to O .� O CD O t O N M O � O O f0 LO LO fp N .O O O O O co t O Cl) O �' M O O O O 6 ai to 6 v v th to o ri It It v v = m +L+ (b O O O CD O O O O f� Lo to 1, O O 0 w N O N N N N V' V r v r O V Iq v ' W O O O O O o O O O O O O O O O O O O y C O O O O O O O O O O O O O O O O O O O O C O O O O O O O O O O O O O O O O O 0 O O O O O O O O o O O O O O O O O O O r -_ Q O O O O O O O O O O N O N O O O O O O O O O O O O O >< N o 0 0 0 0 0 O 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 O 0 N 0 N 0 N N C � O o 0 0 C. 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 - v 0 o a _ 0 O 0 O 0 O 0 O 0 N 0 N 0 O 0 0 O o 0 0 0 0 O 0 0 0 m Cl o 0 0 0 o O o N 0 N o N O N 0 to 0 N 0 to 0 O 0 to 0 to 0 to 0 O 0 E3 c 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 Z o Y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O p 0 0 O o o O N N o N LV LV N N N fV O fV N fV N fC U C l6 tq LO fA N in f0 � La ui 16 cn lE ui l6 ui l6 N f6 cn 111 i/i LO tO m m m w tD W vi ui W fn c/i fq :� i/i . _ N O O O O O O O O O O O O O O O O O O O } O O O O O O O O O O O O O O O O O O O N 0 0 O O N fV O N N N N LV N N o N N N IV O O C r - J O 0 o O O co O O O O O O O O o 0 n n p 11 w O O O O O O y O O O O O O O O O O O -O ` O 0 o O r 0 O r r r O r r O N df C. O O N N CO e} Oo O O O Lo to O. ` U) O O O N ti st to M O t` O O to to to O ` IQ �, o O C. O N N 0 0 0 0 r O r Cl 0 o O 0 0 .«�. N df -� O O O O O O O O O O O O O O O O O O 0 o O O O O O O 0 O O O 0 O C. O O O O o �p C o O O O O O O O 0 0 ci r O r O O O o O co O U w C O O O O O O O O O O O O O O O O O O O _ •S O o O 0 0 0 0 0 0 C. O v 0 tF O O 0 C. O 0 t7D Q r E E (2 r C2 O) N + °' _ _ _ _ o q 0 0 o c2 o o U o U o` 0 0 o E d 'v o O N O O O O CD ClO O O O O O O O 0 O O O) µj O O O O O O O O O O O O O O O C r o o o O O o o O o O G G O C O E ,n O O O O co O O to O N 0 n N ti O N N N N a u v O O O O (O M O to to tb to N O N O 0 O O) D) Q uj O O O O I- O) Cl N N r c} O O O O r r r O N CY O O O O O O 0 O O O 0 O O ClO O O CD O � II O O O O O O O O Cl O O O O O O O O O O O N V O O O O O O O O O O O O O O O O O O OCDC N O C O O N .M- w O) O Lo O N O r N O N N N N O O) 0 t0 M O to to tp to N O N O O O O) O C LO 0 N N r tt O CD 0 O r r r - .m O 'p O E II ON U) N O d r N ton Z N M st O O h co a) 0 0' ~ 0-' N Cl)•V to LD r- O N m m m m C7 :� m r ~ m i r N C 0 U- V LL C.i } } } } iL In Lu (D C tJ ,J Z r N M O LO Il co O) O r L r c 0 r ILZ Stormwater Pond Capacity Design Wet Detention Basin Design Sheet Wolseley, N.A. - U.S. Hwy 421 Project Storwmater Pond # 1 Total Drainage Area, Ad = 542,000 [sf] On -Site Buildings Impervious = On -Site Streets Impervious = On -Site Parking Impervious = On -Site Sidewalks Impervious = Other [Future -Parking] On -Site Impervious = Other [Future -Development] On -Site Impervious = Off -Site Impervious = Surface Area Calculations 70,365 0 67,050 4,500 109,000 137,000 [- 0 [sf] [sf] [sf] [sf] [sf] [sf] [sf] Total Impervious Area, Ai = 1 387,915 [sf] Forbay Permanent Volume Forebay Contour Elevation Forebay Contour Area Incremental Volume Accumulative Volume [fmslj rsqftj rcu ft cu ft 6.00 2,149 Sediment Storage 7.00 11 2,644 0 0 8.00 11 3171 2,908 2,908 9.0 1 3,730 3,451 6,358 10.0 1 4,321 4,026 10,384 11.00 11 4.944 4,633 15,016 12.00 5,599 5,272 20,288 13.00 11 6,286 5,943 26,230 14.00 7,008 6,647 32,877 14.50 7,377 J1 3,596 36 473 Main Pond Permanent Volume Main Pond Contour Elevation Main Pond Contour Area Incremental Volume Accumulative Volume ffmsll 1sqftl rcu ft cu ft 6.00 11,548 Sediment Storage 7.00 13,023 0 0 8.00 14,571 13,797 13,797 9.00 16,190 15,381 29,178 10.00 17,882 17,036 46,214 11.00 11 19,645 18,764 64,977 12.00 11 21,480 20,563 85,540 13.00 11 23.388 22,434 107,974 14.00 11 25,367 24,378 132,351 14.50 11 28,826 13 548 145,899 Average Depth (d) = Accumulative Volume / Permenent Pool S.A. d (ft) = 182,373 = 5 ft 36,203 Minimum Average Depth = 3ft < 5 ft < 7.5ft = Maximum Average Depth OK Percent Impervious (Imp): Imp = rAi / Ad Imp = 387915 / 542000 Imp = 71.57 j [%] Sediment Removal Efficiency SA/DA Ratio Determination Higher Percentage = 80 SA/DA % Higher Depth = 5.5 5.20 Lower Depth = 5 5.70 Lower Percentage = 70 SA/DA % Higher Depth = 5.5 4.50 Lower Depth = 5 5.00 Pond Shall Have an Average Depth of 5 ft and Be Designed to Remove 90% TSS SA/DA = 1 5.07 [%] Required Surface Area at Permanent Pool Elevation (14.5 ft) for Pond SAREQ. _ (SA/DA)*Ad SAREQ. _ (5.07/100)*542000sf SAREQ. =1 27,493 1 [sf] Interpolation (Bi-Directional) 1 st - SA/DA @ Depth Interpolation SA/DA % SA/DA at Imp = 80%, d =5 ft SA/DA at Imp = 70%, d =5 ft 5.66 4.96 2nd - SA/DA rQ Impervious Interpolation SA/DA % SA/DA Ratio at Imp=71.57% and d=5 ft 5.07 11 SA Provided = 36,203 > 27,493 = SA Required OK ITemporary Storage Volume Calculations Minimum Required Volume (Simple Method by Tom Scheuler): Receiving water body name ........................... Ca Fear River Receiving water body classification ................. C;Sw Receiving water body location ....................... New Hanover Count North Carolina First Flush Volume Required, P = 1 1.5 [in] Rv = 0.05 + 0.009 * ( Imp ) Rv = 0.05 + 0.009* 71.57 Rv = 1 0.694 Volume = P * Rv * Ad Volume= 1.5/12 *(0.694)*(542000sf) Volume = 1 47,028 1 [sf] Fnrehav- Rtnrm Rtnraae Vnlnme Contour Elevation Contour Area Incremental Storage Accumlative Storage [finsll rsf1c 14.50 7,377 0 0 15.00 7,944 3,830 3,830 16.00 9120 8,532 12,362 17.00 11 10.352 9,736 22,098 18.00 11641 10,997 33,095 Main Pnnde Qtnrm Stnrnoe Vnhlme Contour Elevation Contour Area Incremental Storage Accumlative Storage ffmslj Isilc c 14.50 28,826 0 1. 0 15.00 32,484 15,328 15,328 16.00 34.752 33,618 48,946 17.00 37,076 35,914 84,860 18.00 39455 38,266 123,125 Tnt91 P-1- c.., .., Q-- a v,.i.. Contour Elevation Contour Area Incremental Storage Accumlative Storage ffffisll rsflc c 14.50 36,203 0 0 15.00 40,428 19,158 19,158 16.00 43,872 42,150 61,308 17.00 47,428 45,650 106,958 18.00 51,096 49,262 156,220 18.40 53,150 1 20,849 177,069 Minimum Temporary Storage Volume ....................................... 47,028 [cf] Height of First Flush of Runoff ................................................ 1.161 [ft] Permanent Pool Elevation....................................................... 14.50 [fmsl] Minimum Temporary Pool Elevation ......................................... 15.66 [fmsl] Designed Temporary Pool Elevation ......................................... 16.00 [fmsl] Surface Area at Temporary Pool Elevation .................................. 43,872 [sf] Designed Temporary Storage Volume ........................................ 61 308 [cf] I1 Vol. Provided = 61,308 > 47,028 = Vol Required OK II Forbay Sizing Calculations Total Permanent Volume= 1 182,373 (Forebay Volume +Main Pond Volume) Minimum Forbay Volume= (18%)*(Total Permanent Volume) Minimum Forbay Volume= 18% * 182373c Minimum Forbay Volume= 1 32,827 [cf] Maximum Forbay Volume= (22%)*(Total Permenant Volume) Maximum Forbay Volume = 221/o* 182373c Maximum Forbay Volume= 1 40,122 [cf] II Min Vol = 32,827 < 36,473 < 40,122 = Max Vol OK 11 Drawdown Orifice Sizing Calculations Orifice Diameter, D = 3.0 [in] Orifice Coefficient, Cd = IL0.6 Ao = 0.25*n*(Df Ao = 0.78540*(3in/12in/ftr2 Ao = 1 0.049 1 [sf] Qorifice= Cd*Ao*(2g*H,,.R)o.50 Qorifice =(0.6)*(0.049sf)*(64.4fpss*0.46ft)^0.5 Qorifice= 0.160 [cfs] 2 days < 3.4 days 0 Time to Drawdown Minimum Volume tdd = Design Storage Volume / Qorifice tdd = ( 61308cf / 0.16cfs) / 86,400sec/day tdd = 4.4 [days] 2 days < 4.4 days < Time to Drawdown Design Volume H,�B = (DTPE - PPE - D/2) / 3 H,R = ( 1611 - 14.5ft - 0.50*3in/12in/ft) / 3 H,,.R = 0.46 [ft] tad = Minimum Storage Volume / Qorifice tdd = ( 47028cf/ 0.16cfs ) / 86,400sec/day tdd =t 3.4 1 [days] 5 days OK 5 days OK Emer ency Outlet Weir Sizing Calculations 100-yr Post -Development Inflow, Q = 80.1 j [cfs] - See Hydrograph Routing Top of Pond = 18.4 j [fins]] 100-yr Pond Elevation, PE = 17.80 1 [fmsl] - See Hydrograph Routing Emergency Spillway Elevation, SE = 17.5 j [fmsl] - See Hydrograph Routing Emergency Spillway Length, L = 35 j [ft] - See Hydrograph Routing Emergency Spillway Coefficient, Cw = 3.0 j (Rip -Rap Lined) Emergency Spillway Side Slope, in = 3 j [m:l] Spillway Roughness Coefficient, n = 0.076 j (18" Rip Rap, 1-2ft depth) Minimum Weir Height, Hw = (Q / CNv*L )^(1/1.50) Minimum Weir Height, Hw= 80.Icfs / 3*35ft ^(1/1.50) Minimum Weir Height, Hw = 1 0.83 [ft] Minimum Top of Pond w.r.t. Weir = SE + Hw Minimum Top of Pond w.r.t. Weir = 17.Sfmsl + 0.83ft Minimum Top of Pond w.r.t. Weir = 18.33 j [fins]] Minimum Top of Pond w.r.t. Elev. = PE + 0.50ft Minimum Top of Pond w.r.t. Elev. = 17.8ftnsl + 0.5011 Minimum Top of Pond w.r.t. Elev. = F 18.30 j [fins!] Minimum Top of Pond = Maximum of 0.50+100-yr Elev) or Minimum Weir Height Minimum Top of Pond = 18.33 [fins(] Minimum Top of Pond = 18.33 < 18.40 Capacity Conveyance Factor, Ke= (B*d+m*d2)1'667 . (B+2*d*(l+m)o.50)a.667 Capacity Conveyance Factor, Ke = 35*0.83 + 3*0.83^2ri.667 _ (35 +2*0.83*(1+3^2)^0.50)^0.667 Capacity Conveyance Factor, Kc = 1 26.470 Mimimum Spillway Slope, Sin = 100*(Qmax / (1.49*Kc/n)) Mimimum Spillway Slope, Sm = 100*(80.1 / 1.49*26.47/0.076))^2 Mimimum Spillway Slope, Sin= 2.38 [%] Designed Spillway Slope, Sd = 5.00 1 [°/u] Slope Provided = 5.00 2.38 Depth of Flow in Spillway Channel, D = r 0.67 [ft] <-- Solver, with Rip Rap Armourment Velocity Conveyance Factor, Kv = ((B*d + m*dZ) + (B + 2*d*(I+mZ)o.$))'-"' Velocity Conveyance Factor, Kv = (35*0.67 + 3 *0.67^2) _ (35 + 2*0.67*(1+3^2)A0.50) y`0.667 Velocity Conveyance Factor, Kv = 1 0.736 Channel Velocity, Vel = (1.49*Kv / n)*So-so Channel Velocity, Vet = 1.49*0.736 / 0.076)*(5/100)^0.50 Channel Velocity, Vel = 3.2 [fps] Permissable Unit Shear Stress = 6.00 [lb/sf] Shear Stress, T = y*d*s Shear Stress, T = 62.4lb/c *(0.83fL)*(0.05ft/ft) Shear Stress, T = 2.6 = Top of Pond OK = Min Slope OK Shear Stress Provided = 2.6 < 6.00 = Max Shear Stress OK Stormwater Pond Routing Design Watershed Model Schematic HydraflowHydrographsbylntelisolvev9.2 1 2 Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.2 Hyd. No. 1 Pre -Development Out Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 12.440 ac Basin Slope = 0.7 % Tc method = KIRPICH Total precip. = 3.96 in Storm duration = 24 hrs - Uomposite (Area/CN) _ [(7.780 x 30) + (4.220 x 77) + (0.440 x 30)] / 12.440 Q (cfs) Tuesday, Jul 14, 2009 Peak discharge = 0.623 cfs Time to peak = 749 min Hyd. volume = 8,948 cuft Curve number = 46* Hydraulic length = 1100 ft Time of conc. (Tc) = 11.58 min Distribution = Type III Shape factor = 484 Pre -Development Out Hyd. No. 1 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 r 0.50 0.50 0.40 M 0.40 0.30 0.30 0.20 0.20 0.10 " 0.10 0.00 �....... ...,. d�..:._ . �„ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 v vv Hyd No. 1 Time (hrs) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Hydregraph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 12.450 ac Basin Slope = 0.3 % Tc method = KIRPICH Total precip. = 3.96 in Storm duration = 24 hrs Tuesday, Jul 14, 2009 Peak discharge = 21.29 cfs Time to peak = 732 min Hyd. volume = 88,363 cuft Curve number = 79* Hydraulic length = 1100 ft Time of conc. (Tc) = 16.04 min Distribution = Type III Shape factor = 484 * Composite (Area/CN) _ [(8.910 x 98) + (3.540 x 30)] / 12.450 Pond Influent Q (cfs) Hyd. No. 2 --1 Year Q (cfs) 24.00 24.00 20.00 20.00 K. 16.00 16.00 12.00 12.00 8.00 ... _ . _... � . 8.00 4. 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Return Period Recap Hydraflow Hydrographs by Intelisolve v9.2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- ------- 1.637 ------- 6.238 13.14 20.29 27.51 35.63 Pre -Development Out 2 SCS Runoff - - --•- - 26.28 ------ 38.74 50.49 60.85 70.24 80.13 Pond Influent 3 Reservoir 2 ----- 1.431 ------ 4.387 11.79 20.09 28.94 44.27 Pond Discharge 4 SCS Runoff ---------- 0.650 --- 0.841 1.016 1.169 1.308 1.454 Dock Pit Discharge 5 i Combine 3, 4 ....... 1.451 ---- 4.445 11.91 20.24 29.18 I 44.65 Post -Development Out LPrG j. file: 650-03 Pre -Post 070109-A.gpw Monday, Jul 6, 2009 Pond Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Pond No. 1 - Stormwater Pond Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 6.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 6.00 1.00 7.00 2.00 8.00 3.00 9.00 4.00 10.00 5.00 11.00 6.00 12.00 7.00 13.00 8.00 14.00 8.50 14.50 9.00 15.00 10.00 16.00 11.00 17.00 12.00 18.00 12.40 18.40 Contour area (sgft) 13,697 15,667 17,742 19,920 22,203 24,589 27,079 29,674 32,375 36,203 40,428 43,872 47,428 51,096 53,150 Incr. Storage (cuft) 0 14,682 16,705 18,831 21,062 23,396 25,834 28,377 31,025 17,145 19,158 42,150 45,650 49,262 20,849 Total storage (cult) 0 14,682 31,387 50,218 71,279 94,675 120,509 148,886 179,910 197,055 216,212 258,362 304,012 353,274 374,123 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 36.00 3.00 0.00 0.00 Crest Len (ft) = 2.00 35.00 4.00 2.00 Span (in) 36.00 3.00 0.00 0.00 Crest El. (ft) = 16.50 17.50 16.80 16.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.00 3.33 3.33 Invert El. (ft) = 14.40 14.50 0.00 0.00 Weir Type = Rect Broad Rect Rect Length (ft) - 36.00 1.00 0.00 0.00 Multi -Stage = Yes No Yes Yes Slope (%) = 1.00 0.00 0.00 n/a N-Value = .011 .011 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfll.(In/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cis cfs cis cfs cfs 0.00 0 6.00 0.00 0.00 --- --- 0.00 0.00 0.00 0.00 -- - 0.000 1.00 14,682 7.00 0.00 0.00 --- 0.00 0.00 0.00 0.00 0.000 2.00 31,387 8.00 0.00 0.00 --- 0.00 0.00 0.00 0.00 -- 0.000 3.00 50,218 9.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 --- 0.000 4.00 71,279 10.00 0.00 0.00 - --- 0.00 0.00 0.00 0.00 --- --- 0.000 5.00 94,675 11.00 0.00 0.00 -- -- 0.00 0.00 0.00 0.00 --- 0.000 6.00 120,509 12.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 --- --- 0.000 7.00 148,886 13.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 --- --- 0.000 8.00 179,910 14.00 0.00 0.00 -- 0.00 0.00 0.00 0.00 --- 0.000 8.50 197,055 14.50 0.00 0.00 --- 0.00 0.00 0.00 0.00 --- --- 0.000 9.00 216,212 15.00 0.15 is 0.14 is --- 0.00 0.00 0.00 0.00 --- --- 0.145 10.00 258,362 16.00 0.29 is 0.28 is --- --- 0.00 0.00 0.00 0.00 --- --- 0.277 11.00 304,012 17.00 10.68 oc 0.27 is - 2.35 0.00 1.19 6.66 --- --- 10.48 12.00 353,274 18.00 32.88 oc 0.15 is --- --- 8.32 s 37.12 12.87 s 11.54 s --- -- 70.00 12.40 374,123 18.40 43.02 oc 0.15 is - 10.86 s 89.65 17.85 s 14.15 s --- - 132.67 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Pre -Development Out Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 2 yrs = 1 min = 12.440 ac = 0.7 % = KIRPICH = 4.50 in = 24 hrs * Composite (Area/CN) = [(7.780 x 30) + (4.220 x 77) + (0.440 x 30)] / 12.440 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 12.05 0.021 12.38 1.637 << 12.72 0.858 13.05 0.699 13.38 0.634 13.72 0.600 14.05 0.549 14.38 0.520 14.72 0.497 15.05 0.468 15.38 0.434 15.72 0.396 16.05 0.355 16.38 0.332 16.72 0.315 17.05 0.297 17.38 0.278 17.72 0.258 18.05 0.237 18.38 0.227 18.72 0.222 19.05 0.217 19.38 0.212 19.72 0.206 20.05 0.200 20.38 0.194 20.72 0.187 21.05 0.181 21.38 0.174 21.72 0.168 22.05 0.194 22.38 0.167 22.72 0.162 23.05 0.157 23.38 0.152 23.72 0.146 Time -- Outflow (hrs cfs) 24.05 0.128 End Monday, Jul 6, 2009 Peak discharge = 1.637 cfs Time to peak = 12.38 hrs Hyd. volume = 60,689 cuft Curve number = 46* Hydraulic length = 1100 ft Time of conc. (Tc) = 11.6 min Distribution = Type III Shape factor = 484 ( Printed values >= 1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Hydrograph "type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 2 yrs = 1 min = 12.450 ac = 0.3 % = KIRPICH = 4.50 in = 24 hrs * Composite (Area/CN) _ [(8.910 x 98) + (3.540 x 30)] / 12.450 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 9.45 0.268 21.45 0.530 9.78 0.391 21.78 0.506 10.12 0.533 22.12 0.602 10.45 0.737 22.45 0.500 10.78 0.999 22.78 0.483 11.12 1.317 23.12 0.465 11.45 2.044 23.45 0.448 11.78 5.166 23.78 0.430 12.12 23.20 24.12 0.328 12.45 14.24 12.78 5.114 ...End 13.12 3.538 13.45 2.959 13.78 2.631 14.12 2.297 14.45 2.088 14.78 1.926 15.12 1.760 15.45 1.592 15.78 1.421 16.12 1.251 16.45 1.150 16.78 1.075 17.12 1.000 17.45 0.924 17.78 0.848 18.12 0.772 18.45 0.735 18.78 0.713 19.12 0.690 19.45 0.668 19.78 0.645 20.12 0.622 20.45 0.599 20.78 0.576 21.12 0.553 Monday, Jul 6, 2009 Peak discharge = 26.28 cfs Time to peak = 12.20 hrs Hyd. volume = 209,773 cult Curve number = 79* Hydraulic length = 1100 ft Time of conc. (Tc) = 16.0 min Distribution = Type III Shape factor = 484 ( Printed values >= 1.00 % of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Hyd. No. 3 Pond Discharge Hydrograph type = Reservoir Peak discharge = 1.431 cfs Storm frequency = 2 yrs Time to peak = 15.77 hrs Time interval = 1 min Hyd. volume = 165,289 cuft Inflow hyd. No. = 2 - Pond Influent Reservoir name = Stormwater Pond Max. Elevation = 16.31 ft Max. Storage = 272,437 cuft Storage Indication method used. Wet pond routing start elevation = 14.50 ft. Hydrograph Discharge Table (Printed values >= 1.00% of Qp. Print interval =20) Time Inflow Elevation Civ A Civ B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.00 1.193 14.60 0.023 0.022 ---- ----- ----- ----- ----- ----- ----- 0.022 11.33 1.731 14.65 0.040 0.040 ----- ---- - ----- ----- ----- ----- 0.040 11.67 3.186 14.72 0.075 0.071 ----- ---- ----- ---- ----- ----- 0.071 12.00 12.82 14.93 0.134 0.130 ----- ----- ----- ----- ----- -- 0.130 12.33 20.99 15.56 0.231 0.229 ----- ----- ----- ----- ----- ---- 0.229 12.67 6.978 15.92 0.290 0.269 ----- ----- ----- ----- ---- ----- - 0.269 13.00 3.961 16.05 0.392 0.281 ----- ----- ----- ----- --• 0.101 ----- 0382 13.33 3.081 16.13 0.600 0.285 ----- ----- ----- ----- ----- 0.310 ----- 0.595 13.67 2.747 16.18 0.820 0.286 ----- ----- ----- ---- ----- 0.532 ----- 0.819 14.00 2.412 16.23 1.029 0.287 ----- ---- ----- ----- ----- 0.732 ---- 1.018 14.33 2.146 16.26 1.194 0.287 ----- ----- ----- ----- ----- 0.884 ----- 1.171 14.67 1.983 16.28 1.313 0.287 ----- ----- ----- ----- ----- 0.994 ----- 1.281 15.00 1.818 16.30 1.395 0.287 ----- ----- ----- ----- 1.070 1.357 15.33 1.651 16.30 1.447 0.287 ----- ---- ----- ----- ----- 1.120 ----- 1.407 15.67 1.481 16.31 1.470 0.287 ---- ---- ----- ----- ---- 1.142 ----- 1.430 16.00 1.309 16.31 1.465 0.287 •---- ----- ----- ----- ---- 1.137 ----- 1.424 16.33 1.177 16.30 1.437 0.287 ---- ----- ---- ----- ----- 1.109 ---- 1.397 16.67 1.101 16.30 1.401 0.287 ----- ----- ----- ---- ---- 1.075 ----- 1.363 17.00 1.026 16.29 1.362 0.287 ----- ----- ----- ----- ----- 1.039 ----- 1.326 17.33 0.951 16.28 1.317 0.287 ----- ----- ---- ----- ----- 0.997 1.284 17.67 0.875 16.27 1.267 0.287 ----- ---- ----- ----- ----- 0.951 ----- 1.238 18.00 0.798 16.26 1.214 0.287 ----- ----- ----- ---- ----- 0.902 ----- 1.189 18.33 0.744 16.25 1.157 0.287 ----- ----- ----- ----- ----- 0.850 ----- 1.137 18.67 0.721 16.24 1.103 0.287 ----- ----- ----- ----- ----- 0.800 ----- 1.087 19.00 0.698 16.23 1.053 0.287 ----- ----- ----- ----- ----- 0.754 ----- 1.040 19.33 0.676 16.22 1.006 0.287 ----- ----- ----- ----- ----- 0.710 ----- 0.997 19.67 0.653 16.21 0.962 0.287 ---- ----- ----- ----- ---- 0.669 ----- 0.956 20.00 0.630 16.21 0.920 0.286 ---- ---- ----- ----- ----- 0.631 ----- 0.917 20.33 0.607 16.20 0.881 0.286 ----- ----- ----- ----- ----- 0.594 ----- 0.881 20.67 0.584 16.19 0.854 0.286 ---- ----- ----- ----- ----- 0.567 ----- 0.853 21.00 0.561 16.19 0.827 0.286 ----- ----- ----- ----- ----- 0.540 ----- 0.826 21.33 0.538 16.18 0.801 0.286 ----- ----- ----- ----- ----- 0.513 ----- 0.799 21.67 0.515 16.17 0.775 0.286 ----- ----- ----- ----- ----- 0.487 ----- 0.773 22.00 0.491 16.17 0.749 0.286 ----- ----- ----- ----- ----- 0.461 ----- 0.747 22.33 0,568 16.16 0.734 0.286 ----- ----- ----- ----- ----- 0.446 ----- 0.732 22.67 0.489 16.16 0.713 0.286 -• ----- ----- ----- ----- 0.425 ----- 0.710 23.00 0.471 16.15 0.691 0.286 ----- ----- ----- ----- 0.402 ----- 0.688 23.33 0.454 16.14 0.670 0.286 ----- ----- ----- ----- ----- 0.381 ----- 0.666 23.67 0.436 16.14 0.649 0.285 ----- ----- ----- ----- ----- 0.359 ----- 0.645 24.00 0.418 16.13 0.628 0.285 ----- ----- ----- ----- ----- 0.338 ----- 0.624 Continues on next page... Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.33 0.037 16.12 0.591 0.285 ----- ----- ----- ----- ---- 0.301 ----- 0.586 24.67 0.000 16.11 0.536 0.285 ---- ----- ----- ----- ----- 0.245 ----- 0.530 25.00 0.000 16.10 0.493 0.285 ----- ----- ----- ----- ----- 0.201 ----- 0.486 25.33 0.000 16.08 0.466 0.284 ----- ----- ----- ----- ----- 0.175 ----- 0.459 25.67 0.000 16.07 0.442 0.283 ----- ---- ----- ----- ----- 0.151 ----- 0.433 26.00 0.000 16.06 0.418 0.282 ----- ----- ----- ----- ----- 0.127 ----- 0.409 26.33 0.000 16.05 0.396 0.281 ----- ----- ----- ----- ----- 0.105 ----- 0.386 26.67 0.000 16.04 0.375 0.280 ----- ----- ----- ----- ----- 0.085 ----- 0.365 27.00 0.000 16.03 0.356 0.280 ----- ----- ----- ----- ----- 0.065 ----- 0.344 27.33 0.000 16.02 0.337 0.279 ----- ----- ----- ----- ----- 0.046 ---- 0.325 27.67 0.000 16.01 0.319 0.278 ----- ----- ----- ----- ----- 0.029 ----- 0.307 28.00 0.000 16.01 0.303 0.278 ---- ----- ----- ----- ----- 0.012 ----- 0.290 28.33 0.000 16.00 0.290 0.277 ----- ----- ----- ----- ----- ---- ----- 0.277 28.67 0.000 15.99 0.290 0.276 ----- ----- ----- ---- ----- ---- ----- 0.276 29.00 0.000 15.98 0.290 0.275 ----- ----- ----- ----- ----- ---- ----- 0.275 29.33 0.000 15.97 0.290 0.275 ----- ----- ----- ---- ----- ---- ----- 0.275 29.67 0.000 15.97 0.290 0.274 ----- ---- ----- ----- ----- ---- ----- 0.274 30.00 0.000 15.96 0.290 0.273 ----- ----- ----- ----- ----- ----- ----- 0.273 30.33 0.000 15.95 0.290 0.272 ----- ---- ----- ----- ----- ----- ----- 0.272 30.67 0.000 15.94 0.290 0.271 ----- ----- ----- ----- - - - ----- ----- 0.271 31.00 0.000 15.94 0.290 0.271 ----- ----- ----- ---- ----- ----- 0.271 31.33 0.000 15.93 0.290 0.270 ---- ----- ---- ----- ---- ----- 0.270 31.67 0.000 15.92 0.290 0.269 -- ----- ----- ----- ----- ---- ----- 0.269 32.00 0.000 15.91 0.290 0.268 ----- ----- ----- ----- ----- ---- ----- 0.268 32.33 0.000 15.91 0.290 0.267 ----- ----- ---- ----- ----- ----- ---- 0.267 32.67 0.000 15.90 0.290 0.267 ----- ----- ----- ----- ----- ----- ----- 0.267 33.00 0.000 15.89 0.287 0.266 ----- ----- ----- ----- ----- ----- ----- 0.266 33.33 0.000 15.88 0.285 0.265 ----- ----- ---- ----- ----- ----- 0.265 33.67 0.000 15.88 0.282 0.264 ----- ----- ----- ----- ----- ----- ----- 0.264 34.00 0.000 15.87 0.280 0.263 ----- ----- ----- ---- ----- ----- ----- 0.263 34.33 0.000 15.86 0.277 0.263 ----- ----- ----- ----- ----- ----- ---- 0.263 34.67 0.000 15.85 0.275 0.262 ----- ----- ----- ----- ----- --- ----- 0.262 35.00 0.000 15.85 0.272 0.261 ----- ---- ----- ----- ----- ---- ----- 0.261 35.33 0.000 15.84 0.270 0.260 ---- ----- ----- ----- ---- ----- 0.260 35.67 0.000 15.83 0.267 0.259 ----- ---- ----- ----- ----- ---- ----- 0.259 36.00 0.000 15.82 0.265 0.259 ---- ----- ----- ----- ----- ----- ----- 0.259 36.33 0.000 15.82 0.263 0.258 ----- ----- ----- ----- ----- ---- ----- 0.258 36.67 0.000 15.81 0.260 0.257 ----- ----- ----- ----- ----- ----- ----- 0.257 37.00 0.000 15.80 0.258 0.256 ----- ----- ----- ----- ----- ----- ----- 0.256 37.33 0.000 15.79 0.258 0.255 ----- ----- ----- ----- ----- ----- ---- 0.255 37.67 0.000 15.79 0.258 0.255 ----- ----- ----- ----- ----- ----- ---- 0.255 38.00 0.000 15.78 0.258 0.254 ----- ----- ----- ----- ----- ----- ---- 0.254 38.33 0.000 15.77 0.258 0.253 ----- ----- ----- ----- ----- ----- ----- 0.253 38.67 0.000 15.76 0.258 0.252 ----- ----- ----- ----- ----- ----- ----- 0.252 39.00 0.000 15.76 0.258 0.251 ----- ----- ----- ----- ----- ----- ----- 0.251 39.33 0.000 15.75 0.258 0.251 ----- ----- ----- ----- ----- ----- ----- 0.251 39.67 0.000 15.74 0.258 0.250 ----- ----- ----- ----- ----- ----- ----- 0.250 40.00 0.000 15.74 0.258 0.249 ----- ----- ----- ----- ----- ----- ----- 0.249 40.33 0.000 15.73 0.258 0.248 ----- ----- ----- ----- ----- ----- ----- 0.248 40.67 0.000 15.72 0.258 0.247 ----- ----- ----- ----- ----- ----- ----- 0.247 41.00 0.000 15.72 0.258 0.247 ----- ----- ----- ----- ----- ----- ----- 0.247 41.33 0.000 15.71 0.258 0.246 ----- ----- ----- ----- ----- ----- ----- 0.246 41.67 0."u00 15.70 0.258 0.245 ----- ----- ----- ----- ----- ----- ----- 0.245 42.00 0.000 15.69 0.256 0.244 ----- ----- ----- ----- ----- ----- ----- 0.244 Continues on next page... Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D ExfII Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 42.33 0.000 15.69 0.254 0.244 ----- ----- ----- ----- ----- ----- ----- 0.244 42.67 0.000 15.68 0.253 0.243 ---- ----- ----- ----- ----- ----- ----- 0.243 43.00 0.000 15.67 0.251 0.242 ----- ---- ----- ----- ----- ----- ----- 0.242 43.33 0.000 15.67 0.249 0.241 ----- ----- ----- ----- ----- ----- ----- 0.241 43.67 0.000 15.66 0.248 0.240 ----- ----- ---- ----- ----- ----- ----- 0.240 44.00 0.000 15.65 0.246 0.240 ----- ----- ----- ----- ----- ----- ----- 0.240 44.33 0.000 15.65 0.244 0.239 ----- ----- ----- ----- ----- ---- ----- 0.239 44.67 0.000 15.64 0.243 0.238 ----- ----- ----- ----- ----- ----- ----- 0.238 45.00 0.000 15.63 0.241 0.237 ----- ----- ----- ---- ----- ----- ----- 0.237 45.33 0.000 15.63 0.240 0.236 ----- ---- ----- ----- ----- ----- ----- 0.236 45.67 0.000 15.62 0.238 0.236 ----- ----- ----- ----- ----- ---- ----- 0.236 46.00 0.000 15.61 0.236 0.235 ----- ----- ----- ----- ----- ----- ----- 0.235 46.33 0.000 15.61 0.235 0.234 ----- ---- ---- ----- ----- ---- ----- 0.234 46.67 0.000 15.60 0.233 0.233 ----- ---- ----- ----- ----- ----- ----- 0.233 47.00 0.000 15.59 0.233 0.232 ---- ----- ----- ----- ----- ----- ----- 0.232 47.33 0.000 15.59 0.233 0.232 ----- ----- ----- ----- ----- ----- ----- 0.232 47.67 0.000 15.58 0.232 0.231 ----- ----- ----- ---- ----- 0.231 48.00 0.000 15.57 0.232 0.230 ----- ------ ----- ----- ----- ----- ----- 0.230 ... End 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Dock Pit Discharge Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 0.650 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 3,619 cuft Drainage area = 0.143 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.0 min Total precip. = 4.50 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 4.50 0.007 16.83 0.015 4.83 0.007 17.17 0.014 5.17 0.008 17.50 0.013 5.50 0.008 17.83 0.011 5.83 0.008 18.17 0.011 6.17 0.009 18.50 0.010 6.50 0.010 18.83 0.010 6.83 0.011 19.17 0.010 7.17 0.013 19.50 0.009 7.50 0.014 19.83 0.009 7.83 0.015 20.17 0.009 8.17 0.017 20.50 0.008 8.50 0.019 20.83 0.008 8.83 0.022 21.17 0.008 9.17 0.024 21.50 0.007 9.50 0.027 21.83 0.007 9.83 0.030 22.17 0.008 10.17 0.033 22.50 0.007 10.50 0.038 22.83 0.007 10.83 0.044 11.17 0.053 ...End 11.50 0.074 11.83 0.229 12.17 0.404 12.50 0,123 12.83 0.064 13.17 0.047 13.50 0.042 13.83 0.037 14.17 0.032 14.50 0.029 14.83 0.027 15.17 0.024 15.50 0.022 15.83 0.019 16.17 0.017 16.50 0.016 ( Printed values >= 1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 5 Post -Development Out Monday, Jul 6, 2009 Hydrograph type = Combine Peak discharge = 1.451 cfs Storm frequency = 2 yrs Time to peak = 15.73 hrs Time interval = 1 min Hyd. volume = 168,909 cuft Inflow hyds. = 3, 4 Contrib. drain. area= 0.143 ac Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = (hrs) (cfs) (cfs) ( Printed values >= 1.00% of op. Print interval = 20) Outflow (cfs) 8.00 0.000 0.016 0.016 8.33 0.000 0.018 0.018 8.67 0.000 0.020 0.020 9.00 0.000 0.023 0.023 9.33 0.001 0.026 0.027 9.67 0.002 0.028 0.030 10.00 0.003 0.031 0.034 10.33 0.005 0.036 0.041 10.67 0.012 0.041 0.053 11.00 0.022 0.046 0.069 11.33 0.040 0.063 0.103 11.67 0.071 0.131 0.202 12.00 0.130 0.463 0.593 12.33 0.229 0.221 0.450 12.67 0.269 0.074 0.343 13.00 0.382 0.053 0.435 13.33 0.595 0.045 0.640 13.67 0.819 0.039 0.858 14.00 1.018 0.034 1.052 14.33 1.171 0.031 1.202 14.67 1.281 0.028 1.309 15.00 1.357 0.026 1.382 15.33 1.407 0.023 1.430 15.67 1.430 0.020 1.450 16.00 1.424 0.018 1.442 16.33 1.397 0.016 1.413 16.67 1.363 0.015 1.378 17.00 1.326 0.014 1.340 17.33 1.284 0.013 1.297 17.67 1.238 0.012 1.250 18.00 1.189 0.011 1.200 18.33 1.137 0.010 1.147 18.67 1.087 0.010 1.097 19.00 1.040 0.010 1.050 19.33 0.997 0.009 1.006 19.67 0.956 0.009 0.965 20.00 0.917 0.009 0.926 20.33 0.881 0.008 0.889 20.67 0.853 0.008 0.861 21.00 0.826 0.008 0.834 21.33 0.799 0.007 0.807 21.67 0.773 0.007 0.780 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 22.00 0.747 0.007 0.754 22.33 0.732 0.007 0.739 22.67 0.710 0.007 0.717 23.00 0.688 0.006 0.695 23.33 0.666 0.006 0.672 23.67 0.645 0.006 0.651 24.00 0.624 0.006 0.630 24.33 0.586 0.000 0.586 24.67 0.530 0.000 0.530 25.00 0.486 0.000 0.486 25.33 0.459 0.000 0.459 25.67 0.433 0.000 0.433 26.00 0.409 0.000 0.409 26.33 0.386 0.000 0.386 26.67 0.365 0.000 0.365 27.00 0.344 0.000 0.344 27.33 0.325 0.000 0.325 27.67 0.307 0.000 0.307 28.00 0.290 0.000 0.290 28.33 0.277 0.000 0.277 28.67 0.276 0.000 0.276 29.00 0.275 0.000 0.275 29.33 0.275 0.000 0.275 29.67 0.274 0.000 0.274 30.00 0.273 0.000 0.273 30.33 0.272 0.000 0.272 30.67 0.271 0.000 0.271 31.00 0.271 0.000 0.271 31.33 0.270 0.000 0.270 31.67 0.269 0.000 0.269 32.00 0.268 0.000 0.268 32.33 0.267 0.000 0.267 32.67 0.267 0.000 0.267 33.00 0.266 0.000 0.266 33.33 0.265 0.000 0.265 33.67 0.264 0.000 0.264 34.00 0.263 0.000 0.263 34.33 0.263 0.000 0.263 34.67 0.262 0.000 0.262 35.00 0.261 0.000 0.261 35.33 0.260 0.000 0.260 35.67 0.259 0.000 0.259 36.00 0.259 0.000 0.259 36.33 0.258 0.000 0.258 36.67 0.257 0.000 0.257 37.00 0.256 0.000 0.256 37.33 0.255 0.000 0.255 37.67 0.255 0.000 0.255 38.00 0.254 0.000 0.254 38.33 0.253 0.000 0.253 38.67 0.252 0.000 0.252 39.00 0.251 0.000 0.251 39.33 0.251 0.000 0.251 39.67 0.250 0.000 0.250 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 40.00 0.249 0.000 0.249 40.33 0.248 0.000 0.248 40.67 0.247 0.000 0.247 41.00 0.247 0.000 0.247 41.33 0.246 0.000 0.246 41.67 0.245 0.000 0.245 42.00 0.244 0.000 0.244 42.33 0.244 0.000 0.244 42.67 0.243 0.000 0.243 43.00 0.242 0.000 0.242 43.33 0.241 0.000 0.241 43.67 0.240 0.000 0.240 44.00 0.240 0.000 0.240 44.33 0.239 0.000 0.239 44.67 0.238 0.000 0.238 45.00 0.237 0.000 0.237 45.33 0.236 0.000 0.236 45.67 0.236 0.000 0.236 46.00 0.235 0.000 0.235 46.33 0.234 0.000 0.234 46.67 0.233 0.000 0.233 47.00 0.232 0.000 0.232 47.33 0.232 0.000 0.232 47.67 0.231 0.000 0.231 48.00 0.230 0.000 0.230 ... End Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Pre -Development Out Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 1 min = 12.440 ac = 0.7 % = KIRPICH = 7.00 in = 24 hrs * Composite (Area/CN) = [(7.780 x 30) + (4.220 x 77) + (0.440 x 30)] / 12.440 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.80 0.179 12.13 12.63 12.47 7.196 12.80 3.140 13.13 2.391 13.47 2.157 13.80 1.952 14.13 1.734 14.47 1.623 14.80 1.514 15.13 1.398 15.47 1.274 15.80 1.143 16.13 1.014 16.47 0.952 16.80 0.895 17.13 0.836 17.47 0.775 17.80 0.713 18.13 0.653 18.47 0.633 18.80 0.615 19.13 0.698 19.47 0.580 19.80 0.562 20.13 0.544 20.47 0.525 20.80 0.506 21.13 0.487 21.47 0.467 21.80 0.447 22.13 0.630 22.47 0.445 22.80 0.431 23.13 0.416 23.47 0.401 Time -- Outflow (hrs cfs) 23.80 0.385 24.13 0.180 End Monday, Jul 6, 2009 Peak discharge = 13.14 cfs Time to peak = 12.17 hrs Hyd. volume = 60,689 cult Curve number = 46* Hydraulic length = 1100 ft Time of conc. (Tc) = 11.6 min Distribution = Type III Shape factor = 484 ( Printed values >= 1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 50.49 cfs Storm frequency = 10 yrs Time to peak = 12.18 hrs Time interval = 1 min Hyd. volume = 209,773 cuft Drainage area = 12.450 ac Curve number = 79* Basin Slope = 0.3 % Hydraulic length = 1100 ft Tc method = KIRPICH Time of conc. (Tc) = 16.0 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(8.910 x 98) + (3.540 x 30)] / 12.450 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 8.43 0.509 20.43 1.024 8.77 0.685 20.77 0.984 9.10 0.891 21.10 0.944 9.43 1.127 21.43 0.904 9.77 1.392 21.77 0.864 10.10 1.685 22.10 0.996 10.43 2.116 22.43 0.868 10.77 2.656 22.77 0.822 11.10 3.276 23.10 0.791 11.43 4.747 23.43 0.761 11.77 10.64 23.77 0.731 12.10 42.90 24.10 0.594 12.43 27.56 12.77 9.443 ... End 13.10 6.358 13.43 5.236 13.77 4.640 14.10 4.038 14.43 3.650 14.77 3.358 15.10 3.064 15.43 2.767 15.77 2.467 16.10 2.169 16.43 1.986 16.77 1.855 17.10 1.724 17.43 1.592 17.7'l 1.460 18.10 1.329 18.43 1.261 18.77 1.221 19.10 1.182 19.43 1.143 19.77 1.103 20.10 1.063 ( Printed values >= 1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Hyd. No. 3 Pond Discharge Hydrograph type _ Reservoir Peak discharge = 11.79 cfs Storm frequency = 10 yrs Time to peak = 12.68 hrs Time interval = 1 min Hyd. volume = 165,289 cuft Inflow hyd. No. = 2 - Pond Influent Reservoir name = Stormwater Pond Max. Elevation = 17.05 ft Max. Storage = 306,371 cuft Storage Indication method used. Wet pond routing start elevation = 14.50 ft. Hydrograph Discharge Table (Printed values >= 1.00% of op. Print interval =20) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.00 3.071 14.89 0.127 0.121 ----- ----- ----- ----- ----- ----- ----- 0.121 11.33 4.190 14.99 0.150 0.143 ----- ----- ----- ----- ----- ----- ----- 0.143 11.67 7.228 15.14 0.177 0.169 ----- ----- ----- ---- ----- ----- ----- 0.169 12.00 26.27 15.55 0.230 0.227 ----- ----- -- ----- ----- ----- ----- 0.227 12.33 39.08 16.68 4.568 0.289 ----- ----- 0.520 ----- --• 3.742 ----- 4.551 12.67 12.50 17.05 11.96 0,266 ----- ----- 2.706 ----- 1.664 7.145 ----- 11.78 13.00 7.021 16.99 10.40 0.274 ----- ----- 2.283 ----- 1.109 6.556 ----- 10.22 13.33 5.430 16.91 8.255 0.282 ---- ----- 1.731 ----- 0.474 5.754 ----- 8.241 13.67 4.820 16.84 7.044 0.285 ---- ----- 1.346 ----- 0.180 5.158 ---- 6.969 14.00 4.216 16.79 6.150 0.287 ----- ----- 1.052 ---- ---- 4.692 ---- 6.031 14.33 3.740 16.75 5.459 0.288 ----- ----- 0.821 ---- ---- 4.291 ---- 5.400 14.67 3.446 16.71 4.860 0.289 ---- ---- 0.621 ----- ----- 3.944 ---- 4.853 15.00 3.153 16.67 4.453 0.289 ----- ----- 0.480 ----- --- 3.659 ----- 4.428 15.33 2.856 16.64 4.096 0.289 ----- ----- 0.356 ----- ----- 3.399 ----- 4.044 15.67 2.557 16.61 3.760 0.290 ----- ----- 0.239 ----- ----- 3.154 ----- 3.683 16.00 2.257 16.58 3.450 0.290 ---- ----- 0.164 ----- --- 2.931 ---- 3.385 16.33 2.026 16.55 3.146 0.290 ----- ----- 0.102 ----- 2.714 ----- 3.106 16.67 1.894 16.52 2.870 0.290 ---- ----- 0.046 ----- ----- 2.516 ----- 2.851 17.00 1.763 16.50 2.631 0.290 ---- ----- ----- ----- 2.341 ----- 2.630 17.33 1.632 16.48 2.491 0.289 ---- ----- ----- ----- 2.190 ----- 2.479 17.67 1.499 16.45 2.353 0.289 ----- ----- ----- ----- ---- 2.042 ----- 2.331 18.00 1.367 16.43 2.218 0.289 ----- ---- ----- ----- ----- 1.897 ----- 2.186 18.33 1.273 16.41 2.087 0.289 ---- ----- ----- ----- ---- 1.755 ----- 2.044 18.67 1.233 16.39 1.969 0.289 ---- ----- ----- ----- ---- 1.634 ----- 1.923 19.00 1.194 16.37 1.866 0.288 ----- ----- ----- ----- ----- 1.532 ----- 1.820 19.33 1.154 16.36 1.772 0.288 ----- ----- ----- ----- ---- 1,439 ----- 1.727 19.67 1.115 16.34 1.685 0.288 ----- ----- ----- ----- ----- 1.354 ----- 1.642 20.00 1.075 16.33 1.605 0.288 ----- ----- ----- ----- ----- 1.276 ----- 1.563 20.33 1.036 16.32 1.531 0.287 ----- ----- ----- ----- ----- 1.202 ----- 1.490 20.67 0.996 16.31 1.462 0.287 ----- ----- ----- ----- ----- 1.134 ---- 1.421 21.00 0.956 16.30 1.399 0.287 ----- ---- ----- ----- ----- 1.074 ----- 1.361 21.33 0.916 16.29 1.343 0.287 ----- ----- ----- ----- ----- 1.021 ----- 1.308 21.67 0.876 16.28 1,288 0.287 ----- ----- ----- ----- ----- 0.971 ----- 1.258 22.00 0.836 16.27 1.234 0.287 ----- ----- ----- ----- ----- 0.921 ----- 1.208 22.33 0.967 16.26 1.208 0.287 ----- ----- ----- ----- ----- 0.896 ----- 1.183 22.67 0.831 16.25 1.165 0.287 ----- ----- ----- ----- ----- 0.857 ----- 1.144 23.00 0.801 16.24 1.121 0.287 ----- ----- ----- ----- ----- 0.817 ----- 1.104 23.33 0.770 16.24 1.079 0.287 ----- ----- ----- ----- ----- 0.778 ----- 1.064 23.67 0.740 16.23 1.038 0.287 ----- ----- ----- ----- ----- 0.740 ----- 1.026 24.00 0.710 16.22 0.998 0.287 ----- ----- ----- ----- ----- 0.703 ----- 0.989 Continues on next page... Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.33 0.064 16.21 0.920 0.286 ----- ----- ----- ----- ---- 0.630 ----- 0.917 24.67 0.000 16.18 0.823 0.286 ---- ----- ----- ----- ----- 0.535 ---- 0.822 25.00 0.000 16.16 0.745 0.286 ----- ---- ----- ----- ----- 0.456 ----- 0.742 25.33 0.000 16.15 0.674 0.286 ----- ----- ----- ----- ---- 0.385 ----- 0.671 25.67 0.000 16.13 0.610 0.285 ----- ----- ----- ----- ----- 0.320 _---- 0.606 26.00 0.000 16.11 0.553 0.285 ----- ----- ----- ----- ----- 0.262 ---- 0.547 26.33 0.000 16.10 0.501 0.285 ----- ----- ----- ----- ----- 0.210 ----- 0.495 26.67 0.000 16.09 0.475 0.284 ----- --- - ----- ----- ----- 0.183 ----- 0.467 27.00 0.000 16.08 0.449 0.283 ----- ----- ----- ----- ----- 0.158 ----- 0.441 27.33 0.000 16.06 0.425 0.282 ----- ----- ----- ----- ----- 0.134 ----- 0.417 27.67 0.000 16.05 0.403 0.281 ----- ---- ----- ----- ----- 0.112 ----- 0.393 28.00 0.000 16.04 0.382 0.280 ----- --- ----- ----- ----- 0.091 ----- 0.371 28.33 0.000 16.03 0.362 0.280 ----- ----- ----- ----- ----- 0.071 ----- 0.351 28.67 0.000 16.02 0.343 0.279 ----- ----- ----- ----- ----- 0.052 ----- 0.331 29.00 0.000 16.02 0.325 0.278 ----- ----- ----- ----- ----- 0.034 ----- 0.313 29.33 0.000 16.01 0.308 0.278 ----- ---- ----- ----- ----- 0.017 ----- 0.295 29.67 0.000 16.00 0.292 0.277 ----- ----- ----- ----- ----- 0.002 ----- 0.279 30.00 0.000 15.99 0.290 0.276 ----- ----- ----- ---- ----- ----- ----- 0.276 30.33 0.000 15.99 0.290 0.276 ----- ----- ----- ----- ----- ---- ---- 0.276 30.67 0.000 15.98 0.290 0.275 ----- ----- ----- ----- ---- ----- ----- 0.275 31.00 0.000 15.97 0.290 0.274 ----- ----- ---- ----- ----- ---- ----- 0.274 31.33 0.000 15.96 0.290 0.273 ---- ----- ---- ----- ----- ----- ----- 0.273 31.67 0.000 15.95 0.290 0.272 ----- ----- ----- ----- ---- ----- ----- 0.272 32.00 0.000 15.95 0.290 0.272 ----- ---- ---- ----- ----- ----- ---- 0.272 32.33 0.000 15.94 0.290 0.271 --- ---- ----- ----- ----- ----- ----- 0.271 32.67 0.000 15.93 0.290 0.270 ---- ----- ----- ----- ----- ---- ----- 0.270 33.00 0.000 15.92 0.290 0.269 ----- ----- ----- ----- ----- ----- ---- 0.269. 33.33 0.000 15.92 0.290 0.268 ----- ----- =---- ----- ----- ---- 0.268 33.67 0.000 15.91 0.290 0.268 ----- ----- ----- ----- ----- ----- ----- 0.268 34.00 0.000 15.90 0.290 0.267 ----- ----- ----- ----- ----- ----- ----- 0.267 34.33 0.000 15.89 0.288 0.266 ----- ----- ----- ----- ----- ----- ----- 0.266 34.67 0.000 15.88 0.285 0.265 ----- ----- ----- ----- ----- ----- ----- 0.265 35.00 0.000 15.88 0.283 0.264 ----- ----- ---- ----- ----- ---- ----- 0.264 35.33 0.000 15.87 0.281 0.264 ----- ---- ----- ---- ----- ---- ----- 0.264 35.67 0.000 15.86 0.278 0.263 --- ----- ----- ----- ----- ----- ----- 0.263 36.00 0.000 15.85 0.276 0.262 ---- ----- ----- ----- ----- ----- ----- 0.262 36.33 0.000 15.85 0.273 0.261 ----- ----- ----- ----- ----- ----- ---- 0.261 36.67 0.000 15.84 0.271 0.260 - ----- ----- ----- ---- ----- ----- 0.260 37.00 0.000 15.83 0.268 0.260 ----- ----- ----- ----- ----- ----- ---- 0.260 37.33 0.000 15.83 0.266 0.259 ----- ----- ---- ----- ----- ----- ----- 0.259 37.67 0.000 15.82 0.263 0.258 ----- ----- ----- ----- ----- ----- ----- 0.258 38.00 0.000 15.81 0.261 0.257 ----- ----- ----- ---- ----- ----- ----- 0.257 38.33 0.000 15.80 0.259 0.257 ----- ----- ----- ----- ----- ----- ----- 0.257 38.67 0.000 15.80 0.258 0.256 ----- ----- ----- ----- ----- ----- ----- 0.256 39.00 0.000 15.79 0.258 0.255 ----- ----- ----- ----- ----- ----- ----- 0.255 39.33 0.000 15.78 0.258 0.254 •- --- ----- ----- ----- ----- ----- ----- 0.254 39.67 0.000 15.77 0.258 0.253 ----- ----- ----- ----- ----- ----- ----- 0.253 40.00 0.000 15.77 0.258 0.252 ----- ----- ----- ----- ----- ----- ----- 0.252 40.33 0.000 15.76 0.258 0.252 ----- ----- ----- ----- ----- ----- ----- 0.252 40.67 0.000 15.75 0.258 0.251 ----- ----- ----- ----- ----- ----- ----- 0.251 41.00 0.000 15.75 0.258 0.250 ----- ----- ----- ----- ----- ----- ----- 0.250 41.33 0.000 15.74 0.258 0.249 ----- ----- ----- ----- ----- ----- ----- 0.249 41.67 0.000 15.73 0.258 0.249 ----- ----- ----- ----- ----- ----- 0.249 42.00 0.000 15.72 0.258 0.248 ----- ----- ----- ----- ----- ----- ----- 0.248 Continues on next page... Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 42.33 0.000 15.72 0.258 0.247 ----- ----- ----- ---- ----- ----- ----- 0.247 42.67 0.000 15.71 0.258 0.246 ----- ----- ----- ---- ----- ----- ----- 0.246 43.00 0.000 15.70 0.258 0.245 ----- ----- ----- ----- ----- ----- ----- 0.245 43.33 0.000 15.70 0.257 0.245 ----- ----- ----- ----- ----- ----- ----- 0.245 43.67 0.000 15.69 0.255 0.244 ----- ----- ----- ----- ----- ----- ----- 0.244 44.00 0.000 15.68 0.253 0.243 ----- ----- ----- ----- ----- ----- ----- 0.243 44.33 0.000 15.68 0.252 0.242 ----- ----- ----- ----- ----- ----- ----- 0.242 44.67 0.000 15.67 0.250 0.241 ----- ----- ----- ----- ----- ----- ----- 0.241 45.00 0.000 15.66 0.248 0.241 ---- ----- ----- ----- ----- ----- ----- 0.241 45.33 0.000 15.65 0.247 0.240 ----- ----- ----- ----- ----- ----- ----- 0.240 45.67 0.000 15.65 0.245 0.239 ----- ----- ----- ----- ----- ----- ----- 0.239 46.00 0.000 15.64 0.243 0.238 ----- ----- ----- ----- ----- ----- ----- 0.238 46.33 0.000 15.63 0.242 0.237 ----- ----- ----- ----- ----- ----- ----- 0.237 46.67 0.000 15.63 0.240 0.237 ----- ----- ----- ----- ----- ----- ----- 0.237 47.00 0.000 15.62 0.238 0.236 ----- ----- ----- ----- ----- ----- ----- 0.236 47.33 0.000 15.61 0.237 0.235 ----- ---- ----- ----- ----- ---- ----- 0.235 47.67 0.000 15.61 0.235 0.234 ----- ----- ----- ----- ----- ----- ----- 0.234 48.00 0.000 15.60 0.234 0.233 ---- ----- ----- ----- ----- ----- ____ 0.233 ... End Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Dock Pit Discharge Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 1.016 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 3,619 cuft Drainage area = 0.143 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.0 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 3.77 0.010 16.10 0.027 4.10 0.011 16.43 0.025 4.43 0.012 16.77 0.023 4.77 0.012 17.10 0.022 5.10 0.013 17.43 0.020 5.43 0.014 17.77 0.018 5.77 0.014 18.10 0.017 6.10 0.015 18.43 0.016 6.43 0.017 18.77 0.016 6.77 0.019 19.10 0.015 7.10 0.021 19.43 0.015 7.43 0.022 19.77 0.014 7.77 0.024 20.10 0.013 8.10 0.026 20.43 0.013 8.43 0.030 20.77 0.012 8.77 0.034 21.10 0.012 9.10 0.038 21.43 0.011 9.43 0.042 21.77 0.011 9.77 0.046 22.10 0.017 10.10 0.051 22.43 0.011 10.43 0.059 22.77 0.010 10.77 0.067 11.10 0.078 ...End 11.43 0.109 11.77 0.297 12.10 0.963 12.43 0.253 12.77 0.105 13.10 0.076 13.43 0.067 13.77 0.059 14.10 0.051 14.43 0.047 14.77 0.043 15.10 0.039 15.43 0.035 15.77 0.031 ( Printed values >= 1.00% of op. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Hyd. No. 5 Post -Development Out Hydrograph type = Combine Peak discharge = 11.91 cfs Storm frequency = 10 yrs Time to peak = 12.68 hrs Time interval = 1 min Hyd. volume = 168,909 cuft Inflow hyds. = 3, 4 Contrib. drain. area= 0.143 ac Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = (hrs) (cfs) (cfs) ( Printed values - 1.00% or Qp. Print interval = 20) Outflow (cfs) 10.33 0.078 0.056 0.135 10.67 0.100 0.065 0.164 11.00 0.121 0.073 0.194 11.33 0.143 0.100 0.243 11.67 0.169 0.206 0.376 12.00 0.227 0.724 0.951 12.33 4.551 0.345 4.896 12.67 11.78 0.115 11.90 13.00 10.22 0.083 10.31 13.33 8.241 0.069 8.311 13.67 6.969 0.061 7.030 14.00 6.031 0.053 6.084 14.33 5.400 0.048 5.448 14.67 4.853 0.044 4.897 15.00 4.428 0.040 4.468 15.33 4.044 0.036 4.080 15.67 3.683 0.032 3.715 16.00 3.385 0.028 3.413 16.33 3.106 0.026 3.131 16.67 2.851 0.024 2.875 17.00 2.630 0.022 2.653 17.33 2.479 0.020 2.500 17.67 2.331 0.019 2.350 18.00 2.186 0.017 2.203 18.33 2.044 0.016 2.060 18.67 1.923 0.016 1.938 19.00 1.820 0.015 1.836 19.33 1.727 0.015 1.742 19.67 1.642 0.014 1.656 20.00 1.563 0.014 1.577 20.33 1.490 0.013 1.503 20.67 1.421 0.013 1.434 21.00 1.361 0.012 1.373 21.33 1.308 0.012 1.320 21.67 1.258 0.011 1.269 22.00 1.208 0.011 1.219 22.33 1.183 0.011 1.194 22.67 1.144 0.010 1.154 23.00 1.104 0.010 1.114 23.33 1.064 0.010 1.074 23.67 1.026 0.009 1.036 24.00 0.989 0.009 0.998 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 24.33 0.917 0.000 0.917 24.67 0.822 0.000 0.822 25.00 0.742 0.000 0.742 25.33 0.671 0.000 0.671 25.67 0.606 0.000 0.606 26.00 0.547 0.000 0.547 26.33 0.495 0.000 0.495 26.67 0.467 0.000 0.467 27.00 0.441 0.000 0.441 27.33 0.417 0.000 0.417 27.67 0.393 0.000 0.393 28.00 0.371 0.000 0.371 28.33 0.351 0.000 0.351 28.67 0.331 0.000 0.331 29.00 0.313 0.000 0.313 29.33 0.295 0.000 0.295 29.67 0.279 0.000 0.279 30.00 0.276 0.000 0.276 30.33 0.276 0.000 0.276 30.67 0.275 0.000 0.275 31.00 0.274 0.000 0.274 31.33 0.273 0.000 0.273 31.67 0.272 0.000 0.272 32.00 0.272 0.000 0.272 32.33 0.271 0.000 0.271 32.67 0.270 0.000 0.270 33.00 0.269 0.000 0.269 33.33 0.268 0.000 0.268 33.67 0.268 0.000 0.268 34.00 0.267 0.000 0.267 34.33 0.266 0.000 0.266 34.67 0.265 0.000 0.265 35.00 0.264 0.000 0.264 35.33 0.264 0.000 0.264 35.67 0.263 0.000 0.263 36.00 0.262 0.000 0.262 36.33 0.261 0.000 0.261 36.67 0.260 0.000 0.260 37.00 0.260 0.000 0.260 37.33 0.259 0.000 0.259 37.67 0.258 0.000 0.258 38.00 0.257 0.000 0.257 38.33 0.257 0.000 0.257 38.67 0.256 0.000 0.256 39.00 0.255 0.000 0.255 39.33 0.254 0.000 0.254 39.67 0.253 0.000 0.253 40.00 0.252 0.000 0.252 40.33 0.252 0.000 0.252 40.67 0.251 0.000 0.251 41.00 0.250 0.000 0.250 41.33 0.249 0,000 0.249 41.67 0.249 0.000 0.249 42.00 0.248 0.000 0.248 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 42.33 0.247 0.000 0.247 42.67 0.246 0.000 0.246 43.00 0.245 0.000 0.245 43.33 0.245 0.000 0.245 43.67 0.244 0.000 0.244 44.00 0.243 0.000 0.243 44.33 0.242 0.000 0.242 44.67 0.241 0.000 0.241 45.00 0.241 0.000 0.241 45.33 0.240 0.000 0.240 45.67 0.239 0.000 0.239 46.00 0.238 0.000 0.238 46.33 0.237 0.000 0.237 46.67 0.237 0.000 0.237 47.00 0.236 0.000 0.236 47.33 0.236 0.000 0.235 47.67 0.234 0.000 0.234 48.00 0.233 0.000 0.233 w�I Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Pre -Development Out Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 25 yrs = 1 min = 12.440 ac = 0.7 % = KIRPICH = 8.05 in = 24 hrs " Composite (Area/CN) = [(7.780 x 30) + (4.220 x 77) + (0.440 x 30)] / 12.440 Hydrograph Discharge Table Time -- Outflow (hrs cfs) 11.65 0.245 11.98 6.590 12.32 14.23 12.65 5.377 12.98 3.698 13.32 3.025 13.65 2.751 13.98 2.446 14.32 2.223 14.65 2.077 14.98 1.921 15.32 1.757 15.65 1.585 15.98 1.407 16.32 1.283 16.65 1.208 16.98 1.130 17.32 1.050 17.65 0.969 17.98 0.886 18.32 0.835 18.65 0.812 18.98 0.789 19.32 0.766 19.65 0.742 19.98 0.717 20.32 0.693 20.65 0.668 20.98 0.643 21.32 0.617 21.65 0.591 21.98 0.565 22.32 0.585 22.65 0.566 22.98 0.546 23.32 0.527 Time -- Outflow (hrs cfs) 23.65 0.507 23.98 0.487 End Monday, Jul 6, 2009 Peak discharge = 20.29 cfs Time to peak = 12.15 hrs Hyd. volume = 60,689 cuft Curve number = 46* Hydraulic length = 1100 ft Time of conc. (Tc) = 11.6 min Distribution = Type III Shape factor = 484 ( Printed values >=1.00 % of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 60.85 cfs Storm frequency = 25 yrs Time to peak = 12.18 hrs Time interval = 1 min Hyd. volume = 209,773 cuft Drainage area = 12.450 ac Curve number = 79* Basin Slope = 0.3 % Hydraulic length = 1100 ft Tc method = KIRPICH Time of conc. (Tc) = 16.0 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(8.910 x 98) + (3.540 x 30)] / 12.450 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 8.13 0.609 20.13 1.242 8.47 0.795 20.47 1.195 8.80 1.027 20.80 1.148 9.13 1.293 21.13 1.101 9.47 1.593 21.47 1.054 9.80 1.923 21.80 1.007 10.13 2.289 22.13 1.233 10.47 2.843 22.47 0.994 10.80 3.512 22.80 0.959 11.13 4.296 23.13 0.923 11.47 6.238 23.47 0.888 11.80 15.08 23.80 0.853 12.13 57.47 12.47 29.13 ...End 12.80 10.45 13.13 7.283 13.47 6.112 13.80 5.401 14.13 4.694 14.47 4.264 14.80 3.918 15.13 3.570 15.47 3.218 15.80 2.865 16.13 2.517 16.47 2.317 16.80 2.163 17.13 2.008 17.47 1.853 17.80 1.698 18.13 1.546 18.47 1.474 18.80 1.428 19.13 1.382 19.47 1 143.5 19.80 1.289 ( Printed values >=1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Hyd. No. 3 Pond Discharge Hydrograph type = Reservoir Peak discharge = 20.09 cfs Storm frequency = 25 yrs Time to peak = 12.58 hrs Time interval = 1 min Hyd. volume = 165,289 cuft Inflow hyd. No. = 2 - Pond Influent Reservoir name = Stormwater Pond Max. Elevation = 17.35 ft Max. Storage = 321,095 cuft Storage Indication method used. Wet pond routing start elevation = 14.50 ft. Hydrograph Discharge Table (Printed values >= 1.00% of Qp. Print interval =20) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.00 32.15 15.85 0.274 0.261 ----- ----- ----- ----- ----- ----- ----- 0.261 12.33 46.76 17.11 13.59 0.258 ----- -- 3.154 2.274 7.749 ----- 13.43 12.67 14.82 17.33 19.81 0.218 ----- ----- 5.000 ----- 5.157 9.279 ----- 19.65 13.00 8.302 17.16 15.17 0.248 ----- ----- 3.584 ---- 2.906 8.235 14.97 13.33 6.413 17.02 11.26 0.270 ----- ---- 2.515 ----- 1.407 6.882 --- 11.07 13.67 5.686 16.93 8.731 0.280 ----- - 1.853 0.615 5.932 ----- 8.680 14.00 4.969 16.86 7,312 0.285 --- ----- 1.434 ---- 0.242 5.296 ----- 7.257 14.33 4.405 16.80 6.338 0.287 ----- 1.114 ----- 0.014 4.797 6.212 14.67 4.057 16.76 5.677 0.288 ----- ----- 0.894 ----- ----- 4.418 5.599 15.00 3.709 16.72 5.108 0.288 ----- 0.704 ----- 4.088 ----- 5.080 15.33 3.359 16.69 4.643 0.289 ----- - 0.546 ----- ---- 3.797 ----- 4.632 15.67 3.006 16.65 4.279 0.289 ----- ----- 0.419 ----- ---- 3.532 ---- 4.241 16.00 2.652 16.62 3.924 0.290 ---- ----- 0.296 ----- ----- 3.274 - --- 3.859 16.33 2.380 16.59 3.588 0.290 ----- -- 0.192 ----- ----- 3.030 ---- 3.512 16.67 2.225 16.56 3.296 0.290 ---- ----- 0.133 ----- ----- 2.821 ----- 3.244 17.00 2.070 16.54 3.031 0.290 ----- 0.079 ----- ----- 2.632 ---- 3.000 17.33 1.915 16.51 2.788 0.290 ----- --- 0.029 ----- ----- 2.458 ----- 2.777 17.67 1.760 16.49 2.594 0.290 ----- ----- ---- ----- ----- 2.300 ----- 2.590 18.00 1.604 16.47 2.457 0.289 ----- ----- ---- ----- ----- 2.153 ----- 2.443 18.33 1.494 16.45 2.321 0.289 ----- ----- ---- ----- ----- 2.007 ----- 2.296 18.67 1.446 16.43 2.197 0.289 ----- ---- ----- ----- ----- 1.874 ----- 2.163 19.00 1.400 16.41 2.086 0.289 ----- ----- ----- ---- ----- 1.754 ----- 2.043 19.33 1.354 16.39 1.987 0.289 ----- ----- ----- ----- ----- 1.651 ---- 1.940 19.67 1.307 16.38 1.898 0.288 ----- ----- ----- ----- ----- 1.563 ----- 1.852 20.00 1.261 16.37 1.815 0.288 ----- ----- ----- ----- ----- 1.482 ----- 1.770 20.33 1.214 16.35 1.737 0.288 ----- ----- ----- ----- ----=- 1.405 ----- 1.693 20.67 1.167 16.34 1.664 0.288 ----- ----- ----- ----- ----- 1.333 ----- 1.620 21.00 1.120 16.33 1.594 0.288 ----- ----- ----- ----- ----- 1.264 ---- 1.552 21.33 1.073 16.32 1.527 0.287 ----- ----- ----- ----- ----- 1.199 ----- 1.486 21.67 1.026 16.31 1.464 0.287 ----- ----- ----- ----- ----- 1.136 ----- 1.423 22.00 0.979 16.30 1.404 0.287 ----- ---- ---- ----- ----- 1.078 ----- 1.365 22.33 1.132 16.29 1.380 0.287 ----- ----- ----- ----- ----- 1.055 ----- 1.342 22.67 0.973 16.28 1.335 0.287 ---- ----- ----- ----- ---- 1.015 ----- 1.302 23.00 0.938 16.28 1,289 0.287 ----- ----- ----- ----- ----- 0.972 ----- 1.259 23.33 0.902 16.27 1.244 0.287 ----- ----- ----- ---- ----- 0.930 ----- 1.217 23.67 0.867 16.26 1.200 0.287 ----- ----- ----- ----- ----- 0.889 ----- 1.176 24.00 0.831 16.25 1.156 0.287 ----- ----- ----- ----- ----- 0.849 ----- 1.136 24.33 0.075 16.23 1.068 0.287 ----- ----- ----- ----- ---- 0.767 ---- 1.054 24.67 0.000 16.21 0.929 0.286 ----- ---- ----- ----- ----- 0.639 ----- 0.925 25.00 0.000 16.19 0.828 0.286 ----- ----- ----- ----- ----- 0.541 ----- 0.827 Continues on next page... Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.33 0.000 16.17 0.749 0.286 ----- ---- ----- ----- ----- 0.461 ----- 0.747 25.67 0.000 16.15 0.678 0.286 ----- ----- ----- ----- ----- 0.389 ----- 0.675 26.00 0.000 16.13 0.614 0.285 ----- ----- ----- ----- ----- 0.324 ----- 0.610 26.33 0.000 16.11 0.556 0.285 ----- ----- ----- ---- ----- 0.266 ----- 0.551 26.67 0.000 16.10 0.504 0.285 ----- ----- ----- ----- ----- 0.213 ----- 0.497 27.00 0.000 16.09 0.476 0.284 ----- ----- ----- ----- ----- 0.185 0.469 27.33 0.000 16.08 0.451 0.283 ----- ---- ---- ----- ----- 0.160 ----- 0.443 27.67 0.000 16.06 0.427 0.282 ----- ----- ----- ----- ----- 0.136 ----- 0.418 28.00 0.000 16.05 0.404 0.281 ----- ----- ----- ----- ----- 0.113 ----- 0.395 28.33 0.000 16.04 0.383 0.281 ----- ----- ----- ----- ----- 0.092 ----- 0.373 28.67 0.000 16.03 0.363 0.280 ---- ----- ----- ----- ----- 0.072 ----- 0.352 29.00 0.000 16.03 0.344 0.279 ----- ----- ----- ----- ----- 0.053 ----- 0.332 29.33 0.000 16.02 0.326 0.278 ----- ----- ----- ----- ----- 0.035 ----- 0.314 29.67 0.000 16.01 0.309 0.278 ----- ----- ----- ----- ---- 0.018 ----- 0.296 30.00 0.000 16.00 0.293 0.277 ----- ----- ----- ----- 0.002 ----- 0.280 30.33 0.000 15.99 0.290 0.276 ----- ----- ----- ----- - ----- ----- 0.276 30.67 0.000 15.99 0.290 0.276 ----- ---- ----- ----- ----- ----- 0.276 31.00 0.000 15.98 0.290 0.275 ---- ----- ----- ----- ----- ---- 0.275 31.33 0.000 15.97 0.290 0.274 ----- ----- ----- ----- ----- ----- 0.274 31.67 0.000 15.96 0.290 0.273 ----- ----- ----- ----- ----- ----- --- 0.273 32.00 0.000 15.95 0.290 0.272 ----- ----- ----- ----- ---- ----- --- 0.272 32.33 0.000 15.95 0.290 0.272 ----- ----- ----- ----- ---- ---- 0.272 32.67 0.000 15.94 0.290 0.271 ----- ----- ----- ----- _____ ___ ----- 0.271 33.00 0.000 15.93 0.290 0.270 ----- ----- ----- ----- ----- ----- --- 0.270 33.33 0.000 15.92 0.290 0.269 ----- ---- ----- ----- ----- ---- ----- 0.269 33.67 0.000 15.92 0.290 0.268 ----- ----- ----- ----- ----- ----- ----- 0.268 34.00 0.000 15.91 0.290 0.268 ----- ----- ----- ---- ----- --- ----- 0.268 34.33 0.000 15.90 0.290 0.267 ----- ----- ----- ----- ----- ----- ----- 0.267 34.67 0.000 15.89 0.288 0.266 ----- ---- ----- ----- ---- ----- ----- 0.266 35.00 0.000 15.89 0.286 0.265 ----- ---- ----- ----- ----- ----- ----- 0.265 35.33 0.000 15.88 0.283 0.264 ----- ----- ----- ----- ----- ----- ----- 0.264 35.67 0.000 15.87 0.281 0.264 ----- ----- ----- ----- ----- ----- ----- 0.264 36.00 0.000 15.86 0.278 0.263 ----- ----- ----- ----- ----- ----- ----- 0.263 36.33 0.000 15.86 0.276 0.262 ----- ---- ----- ----- ----- ----- ----- 0.262 36.67 0.000 15.85 0.273 0.261 ----- ---- ----- ----- ----- ----- ----- 0.261 37.00 0.000 15.84 0.271 0.260 ----- ----- ----- ----- ---- ----- ----- 0.260 37.33 0.000 15.83 0.268 0.260 ----- ----- ----- ----- ----- ----- ----- 0.260 37.67 0.000 15.83 0.266 0.259 --- ----- ---- ----- ----- ----- ----- 0.259 38.00 0.000 15.82 0.264 0.258 ----- ----- ----- ----- ----- ---- ----- 0.258 38.33 0.000 15.81 0.261 0.257 -_--- ----- ----- ----- ----- ----- ----- 0.257 38.67 0.000 15.80 0.259 0.257 ----- ----- ----- ----- ----- ----- ----- 0.257 39.00 0.000 15.80 0.258 0.256 ----- ----- ----- ----- ----- ----- ----- 0.256 39.33 0.000 15.79 0.258 0.255 ----- ----- ----- ----- ----- ----- ----- 0.255 39.67 0.000 15.78 0.258 0.254 ----- ----- ----- ----- ----- ----- ----- 0.254 40.00 0.000 15.77 0.258 0.253 ----- ----- ----- ----- ----- ----- ----- 0.253 40.33 0.000 15.77 0.258 0.253 ----- ----- ----- ----- ----- ----- ----- 0.253 40.67 0.000 15.76 0.258 0.252 ----- ----- ----- ----- ----- ----- ----- 0.252 41.00 0.000 15.75 0.258 0.251 ----- ----- ----- ----- ----- ----- ----- 0.251 41.33 0.000 15.75 0.258 0.250 ----- ----- ----- ----- ----- --- ----- 0.250 41.67 0.000 15.74 0.258 0.249 ----- ----- ----- ----- ----- ----- ----- 0.249 42.00 0.000 15.73 0.258 0.249 ----- ---- ----- ----- ----- ----- ----- 0.249 42.33 0.000 15,72 0.258 0.248 ----- ----- ----- ----- ____ ----- ----- 0.248 42.67 0.000 15.72 0.258 0.247 ----- ----- ----- ----- ----- ----- ----- 0.247 43.00 0.000 15.71 0.258 0.246 ----- ----- ----- ----- ----- ----- ----- 0.246 Continues on next page... Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 43.33 0.000 15.70 0.258 0.245 ----- ----- ----- ----- ----- ----- ----- 0.245 43.67 0.000 15.70 0.257 0.245 ----- ----- ----- ----- ----- ----- ----- 0.245 44.00 0.000 15.69 0.255 0.244 ----- ----- ----- ----- ----- ----- ----- 0.244 44.33 0.000 15.68 0.253 0.243 ----- ----- ----- ----- ----- ----- ----- 0.243 44.67 0.000 15.68 0.252 0.242 ----- ----- ----- ----- ----- ----- ----- 0.242 45.00 0.000 15.67 0.250 0.241 ----- ----- ----- ----- ----- ----- ----- 0.241 45.33 0.000 15.66 0.248 0.241 ----- ----- ----- ----- ----- ---- ----- 0.241 45.67 0.000 15.66 0.247 0.240 ---- ----- ----- ----- ----- ----- ----- 0.240 46.00 0.000 15.65 0.245 0.239 ----- ----- ----- ----- ----- ----- ----- 0.239 46.33 0.000 15.64 0.243 0.238 ----- ----- ----- ----- ----- ---- ----- 0.238 46.67 0.000 15.63 0.242 0.237 ----- ----- ----- ----- ---- ----- ----- 0.237 47.00 0.000 15.63 0.240 0.237 ----- ----- ----- ----- ----- ----- ----- 0.237 47.33 0.000 15.62 0.239 0.236 ----- ----- ----- ----- ----- ---- ----- 0.236 47.67 0.000 15.61 0.237 0.235 ----- ----- ----- ----- ----- ----- ----- 0.235 48.00 0.000 15.61 0.235 0.234 ----- ----- ----- ----- ----- ----- ----- 0.234 ... End Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Dock Pit Discharge Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 1.169 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 3,619 cuft Drainage area = 0.143 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = USER Time of conc. (Tc) = 5.0 min Total precip. = 8.05 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 3.57 0.01 15.90 0.034 3.90 0.013 16.23 0.030 4.23 0.013 16.57 0.028 4.57 0.014 16.90 0.026 4.90 0.015 17.23 0.024 5.23 0.016 17.57 0.022 5.57 0.017 17.90 0.020 5.90 0.017 18.23 0.019 6.23 0.019 18.57 0.018 6.57 0.021 18.90 0.018 6.90 0.023 19.23 0.017 7.23 0.025 19.57 0.016 7.57 0.027 19.90 0.016 7.90 0.029 2n')'A 0,015 8.23 0.032 20.57 0.015 8.57 0.037 20.90 0.014 8.90 0.041 21.23 0.013 9.23 0.046 21.57 0.013 9.57 0.051 21.90 0.012 9.90 0.055 22.23 0.013 10.23 0.062 22.57 0.012 10.57 0.072 22.90 0.012 10.90 0.082 11.23 0.104 ...End 11.57 0.151 11.90 0.483 12.23 0.510 12.57 0.162 12.90 0.107 13.23 0.083 13.57 0.073 13.90 0.064 14.23 0.056 14.57 0.052 14.90 0.047 15.23 0.043 15.57 0.038 ( Printed values : 1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Hyd. No. 5 Post -Development Out Hydrograph type = Combine Peak discharge = 20.24 cfs Storm frequency = 25 yrs Time to peak = 12.58 hrs Time interval = 1 min Hyd. volume = 168,909 cuft Inflow hyds. = 3, 4 Contrib. drain. area= 0.143 ac Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = (hrs) (cfs) (eft) ( Printed values - 1.00% of Qp. Print interval = 20) Outflow (cfs) 10.67 0.130 0.075 0.205 11.00 0.151 0.084 0.235 11.33 0.172 0.115 0.287 11.67 0.200 0.238 0.438 12.00 0.261 0.833 1.094 12.33 13.43 0.396 13.83 12.67 19.65 0.132 19.79 13.00 14.97 0.096 15.07 13.33 11.07 0.080 11.15 13.67 8.680 0.070 8.751 14.00 7.257 0.061 7.318 14.33 6.212 0.055 6.267 14.67 5.599 0.050 5.649 15.00 5.080 0.046 5.125 15.33 4.632 0.041 4.673 15.67 4.241 0.037 4.277 16.00 3.859 0.032 3.891 16.33 3.512 0.030 3.542 16.67 3.244 0.028 3.271 17.00 3.000 0.026 3.026 17.33 2.777 0.024 2.800 17.67 2.590 0.022 2.611 18.00 2.443 0.020 2.462 18.33 2.296 0.019 2.315 18.67 2.163 0.018 2.181 19.00 2.043 0.017 2.060 19.33 1.940 0.017 1.956 19.67 1.852 0.016 1.868 20.00 1.770 0.016 1.785 20.33 1.693 0.015 1.708 20.67 1.620 0.014 1.635 21.00 1.552 0.014 1.566 21.33 1.486 0.013 1.499 21.67 1.423 0.013 1.436 22.00 1.365 0.012 1.377 22.33 1.342 0.013 1.355 22.67 1.302 0.012 1.314 23.00 1.259 0.012 1.271 23.33 1.217 0.011 1.228 23.67 1.176 0.011 1.187 24.00 1.136 0.010 1.146 24.33 1.054 0.000 1.054 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 24.67 0.925 0.000 0.925 25.00 0.827 0.000 0.827 25.33 0.747 0.000 0.747 25.67 0.675 0.000 0.675 26.00 0.610 0.000 0.610 26.33 0.551 0.000 0.551 26.67 0.497 0.000 0.497 27.00 0.469 0.000 0.469 27.33 0.443 0.000 0.443 27.67 0.418 0.000 0.418 28.00 0.395 0.000 0.395 28.33 0.373 0.000 0.373 28.67 0.352 0.000 0.352 29.00 0.332 0.000 0.332 29.33 0.314 0.000 0.314 29.67 0.296 0.000 0.296 30.00 0.280 0.000 0.280 30.33 0.276 0.000 0.276 30.67 0.276 0.000 0.276 31.00 0.275 0.000 0.275 31.33 0.274 0.000 0.274 31.67 0.273 0.000 0.273 32.00 0.272 0.000 0.272 32.33 0.272 0.000 0.272 32.67 0.271 0.000 0.271 33.00 0.270 0.000 0.270 33.33 0.269 0.000 0.269 33.67 0.268 0.000 0.268 34.00 0.268 0.000 0.268 34.33 0.267 0.000 0.267 34.67 0.266 0.000 0.266 35.00 0.265 0.000 0.265 35.33 0.264 0.000 0.264 35.67 0.264 0.000 0.264 36.00 0.263 0.000 0.263 36.33 0.262 0.000 0.262 36.67 0.261 0.000 0.261 37.00 0.260 0.000 0.260 37.33 0.260 0.000 0.260 37.67 0.259 0.000 0.259 38.00 0.258 0.000 0.258 38.33 0.257 0.000 0.257 38.67 0.257 0.000 0.257 39.00 0.256 0.000 0.256 39.33 0.255 0.000 0.255 39.67 0.254 0.000 0.254 40.00 0.253 0.000 0.253 40.33 0.253 0.000 0.253 40.67 0.252 0.000 0.252 41.00 0.251 0.000 0.251 41.33 0.250 0.000 0.250 41.67 0.249 0.000 0.249 42.00 0.249 0.000 0.249 42.33 0.248 0.000 0.248 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 42.67 0.247 0.000 0.247 43.00 0.246 0.000 0.246 43.33 0.245 0.000 0.245 43.67 0.245 0.000 0.245 44.00 0.244 0.000 0.244 44.33 0.243 0.000 0.243 44.67 0.242 0.000 0.242 45.00 0.241 0.000 0.241 45.33 0.241 0.000 0.241 45.67 0.240 0.000 0.240 46.00 0.239 0.000 0.239 46.33 0.238 0.000 0.238 46.67 0.237 0.000 0.237 47.00 0.237 0.000 0.237 47.33 0.236 0.000 0.236 47.67 0.235 0.000 0.235 48.00 0.234 0.000 0.234 ... End Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 1 Pre -Development Out Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 1 min = 12.440 ac = 0.7 % = KIRPICH = 10.00 in = 24 hrs * Composite (Area/CN) _ [(7.780 x 30) + (4.220 x 77) + (0.440 x 30)] / 12.440 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 11.22 0.374 23.22 0.767 11.55 1.235 23.55 0.739 11.88 7.847 23.88 0.710 12.22 31.98 12.55 11.92 End 12.88 6.196 13.22 4.738 13.55 4.289 13.88 3.819 14.22 3.392 14.55 3.162 14.88 2.924 15.22 2.675 15.55 2.418 15.88 2.152 16.22 1.921 16.55 1.806 16.88 1.689 17.22 1.571 17.55 1.451 17.88 1.329 18.22 1.228 18.55 1.193 18.88 1.158 19.22 1.123 19.55 1.087 19.88 1.051 20.22 1.015 20.55 0.978 20.88 0.941 21.22 0.904 21.55 0.866 21.88 0.828 22.22 1.034 22.55 0.824 22.88 0.796 Monday, Jul 6, 2009 Peak discharge = 35.63 cfs Time to peak = 12.15 hrs Hyd. volume = 60,689 cult Curve number = 46* Hydraulic length = 1100 ft Time of conc. (Tc) = 11.6 min Distribution = Type III Shane factor = 484 ( Printed values >=1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 2 Pond Influent Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 80.13 cfs Storm frequency = 100 yrs Time to peak = 12.18 hrs Time interval = 1 min Hyd. volume = 209,773 cuft Drainage area = 12.450 ac Curve number = 79* Basin Slope = 0.3 % Hydraulic length = 1100 ft Tc method = KIRPICH Time of conc. (Tc) = 16.0 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(8.910 x 98) + (3.540 x 30)] / 12.450 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 7.60 0.803 19.60 1.674 7.93 0.972 19.93 1.614 8.27 1.181 20.27 1.555 8.60 1.488 20.60 1.495 8.93 1.840 20.93 1.435 9.27 2.231 21.27 1.375 9.60 2.658 21.60 1.315 9.93 3.117 21.93 1.255 10.27 3.683 22.27 1.529 10.60 4.520 22.60. 1.244 10.93 5.442 22.93 1.199 11.27 6.928 23.27 1.154 11.60 10.46 23.60 1.109 11.93 32.79 23.93 1.064 12.27 72.15 12.60 24.18 ...End 12.93 11.37 13.27 8.493 13.60 7.469 13.93 6.546 14.27 5.737 14.60 5.273 14.93 4.826 15.27 4.377 15.60 3.925 15.93 3.472 16.27 3.081 16.60 2.874 16.93 2.676 17.27 2.478 17.60 2.280 17.93 2.081 18.27 1.917 18.60 1.852 18.93 1.793 19.27 1.733 ( Printed values >= 1.00 % of op. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Monday, Jul 6, 2009 Hyd. No. 3 Pond Discharge Hydrograph type = Reservoir Peak discharge = 44.27 cfs Storm frequency = 100 yrs Time to peak = 12.42 hrs Time interval = 1 min Hyd. volume = 165,289 cuft Inflow hyd. No. = 2 - Pond Influent Reservoir name = Stormwater Pond Max. Elevation = 17.80 ft Max. Storage = 343,285 cuft Storage Indication method used. Wet pond routing start elevation =14.50 ft. Hydrograph Discharge Table (Printed values >= 1.00% of Qp. Print interval =20) Time Inflow Elevation Clv A Clv B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.00 43.16 16.41 2.068 0.289 ----- ----- ----- ----- ----- 1.735 ----- 2.024 12.33 60.98 17.73 26.44 0.151 ----- ----- 6.700 11.82 9.679 9.911 ----- 38.26 12.67 19.10 17.64 25.52 0.163 ----- ----- 6.461 5.789 8.998 9.848 ----- 31.26 13.00 10.67 17.37 20.76 0.211 ----- ----- 5.306 ----- 5.740 9.431 ----- 20.69 13.33 8.227 17.16 15.22 0.248 ----- ----- 3.598 ----- 2.926 8.250 ----- 15.02 13.67 7.285 17.03 11.58 0.268 ----- ----- 2.603 ----- 1.525 7.003 ---- 11.40 14.00 6.360 16.95 9.296 0.278 ----- ----- 1.999 ---- 0.782 6.143 ----- 9.202 14.33 5.633 16.88 7.761 0.284 ----- ----- 1.582 ----- 0.348 5.525 ----- 7.738 14.67 5.184 16.83 6.890 0.286 ----- ----- 1.295 ----- 0.143 5.079 ----- 6.803 15.00 4.736 16.80 6.212 0.287 ----- ----- 1.072 ----- ----- 4.728 ----- 6.087 15.33 4.287 16.76 5.688 0.288 ----- ----- 0.897 ----- ----- 4.424 ----- 5.609 15.67 3.835 16.73 5.173 0.288 ---- ----- 0.725 ----- ---- 4.125 ----- 5.139 16.00 3.381 16.69 4.694 0.289 ---- ----- 0.564 ----- ----- 3.835 ----- 4.688 16.33 3.034 16.66 4.317 0.289 ---- ----- 0.433 ----- ----- 3.560 ---- 4.282 16.67 2.834 16.63 3.979 0.289 ----- ---- 0.315 ----- ----- 3.314 ----- 3.918 17.00 2.637 16.60 3.682 0.290 ----- ----- 0.212 ----- ----- 3.098 ----- 3.599 17.33 2.439 16.58 3.426 0.290 ----- ---- 0.159 ----- ----- 2.914 ----- 3.363 17.67 2.240 16.55 3.178 0.290 ----- ----- 0.109 ----- ----- 2.737 ----- 3.135 18.00 2.041 16.53 2.938 0.290 ---- ----- 0.060 ----- ----- 2.565 ----- 2.914 18.33 1.901 16.51 2.707 0.290 ----- ----- 0.013 ----- ----- 2.400 ----- 2.702 18.67 1.840 16.49 2.559 0.290 ----- ----- ----- ----- ----- 2.263 ----- 2.553 19.00 1.781 16.47 2.448 0.289 ----- ----- ----- ----- ----- 2.143 ----- 2.433 19.33 1.721 16.45 2.345 0.289 ----- ----- ---- ----- ----- 2.033 ----- 2.322 19.67 1.662 16.44 2.250 0.289 ----- ----- ----- ---- ----- 1.931 ----- 2.220 20.00 1.602 16.42 2.162 0.289 ----- ----- ----- ----- ----- 1.836 ----- 2.125 20.33 1.543 16.41 2.079 0.289 ----- ----- ----- ----- ----- 1.747 ----- 2.036 20.67 1.483 16.40 2.001 0.289 ----- ----- ----- ----- ----- 1.665 ----- 1.953 21.00 1.423 16.38 1.928 0.288 ----- ----- ----- ----- ----- 1.593 ----- 1.881 21.33 1.363 16.37 1.856 0.288 ----- ----- ----- ----- ----- 1.523 ----- 1.811 21.67 1.303 16.36 1.787 0.288 ----- ----- ----- ----- ----- 1.454 ----- 1.742 22.00 1.243 16.35 1.718 0.288 ----- ----- ----- ----- ---- 1.386 ----- 1.674 22.33 1.438 16.35 1.692 0.288 ----- ----- ----- ----- ----- 1.361 ----- 1.649 22.67 1.235 16.34 1.639 0.288 ----- ----- ----- ---- ----- 1.309 ----- 1.596 23.00 1.190 16.33 1.583 0.288 ----- ----- ----- ----- ----- 1.253 ----- 1.541 23.33 1.145 16.32 1.529 0.287 ---- ----- ----- ----- ----- 1.200 ---- 1.487 23.67 1.100 16.31 1.475 0.287 ----- ----- ----- ----- ----- 1.147 ----- 1.435 24.00 1.055 16.30 1.423 0.287 ----- ----- ---- ----- ----- 1.096 --- 1.383 24.33 0.095 16.28 1.319 0.287 ----- ----- ---- ----- ----- 0.999 ----- 1.286 24.67 0.000 -16.25 1.149 0.287 ----- ----- ----- ----- ----- 0.842 ----- 1.129 25.00 0.000 16.22 0,999 0.287 ----- ----- ----- ----- ----- 0.703 ----- 0.990 Continues on next page... N Pond Discharge Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.33 0.000 16.20 0.872 0.286 ----- ----- ----- ----- ----- 0.585 ----- 0.871 25.67 0.000 16.18 0.789 0.286 ----- ----- ----- ----- ----- 0.501 ----- 0.787 26.00 0.000 16.16 0.714 0.286 ----- ----- ----- ----- ----- 0.425 ----- 0.711 26.33 0.000 16.14 0.646 0.285 ----- ----- ----- ----- ----- 0.357 ----- 0.642 26.67 0.000 16.12 0.585 0.285 ----- ----- ----- ----- ----- 0.295 ----- 0.580 27.00 0.000 16.11 0.530 0.285 ----- ----- ----- ----- ----- 0.239 ----- 0.524 27.33 0.000 16.09 0.490 0.284 ----- ----- ----- ----- ----- 0.199 ----- 0.483 27.67 0.000 16.08 0.464 0.284 ---- ----- ----- ----- ----- 0.173 ----- 0.456 ... End Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 4 Dock Pit Discharge Monday, Jul 6, 2009 Hydrograph type = SCS Runoff Peak discharge = 1.454 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 3,619 cuft Drainage area = 0.143 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.0 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 3.28 0.015 15.62 0.046 3.62 0.016 15.95 0.041 3.95 0.017 16.28 0.037 4.28 0.018 16.62 0.035 4.62 0.019 16.95 0.032 4.95 0.020 17.28 0.030 5.28 0.020 17.62 0.027 5.62 0.021 17.95 0.025 5.95 0.022 18.28 0.023 6.28 0.024 18.62 0.023 6.62 0.027 18.95 0.022 6.95 0.029 19.28 0.021 7.28 0.032 19.62 0.020 7.62 0.034 19.95 0.020 7.95 0.037 20.28 0.019 8.28 0.041 20.62 0.018 8.62 0.047 20.95 0.017 8.95 0.053 21.28 0.017 9.28 0.058 21.62 0.016 9.62 0.064 21.95 0.015 9.95 0.070 22.28 0.016 10.28 0.080 22.62 0.015 10.62 0.091 10.95 0.103 ...End 11.28 0.136 11.62 0.234 11.95 0.718 12.28 0.558 12.62 0.175 12.95 0.126 13.28 0.101 13.62 0.089 13.95 0.077 14.28 0.069 14.62 0.064 14.95 0.058 15.28 0.052 ( Printed values >= 1.00% of Qp. Print interval = 20) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Hyd. No. 5 Post -Development Out Monday, Jul 6, 2009 Hydrograph type = Combine Peak discharge = 44.65 cfs Storm frequency = 100 yrs Time to peak = 12.42 hrs Time interval = 1 min Hyd. volume = 168,909 cuft Inflow hyds. = 3, 4 Contrib. drain. area= 0.143 ac Hydrograph Discharge Table ( Printed values - 1.00% of Qp. Print interval = 20) Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 11.67 0.252 0.296 0.547 12.00 2.024 1.036 3.059 12.33 38.26 0.493 38.75 12.67 31.26 0.164 31.42 13.00 20.69 0.119 20.81 13.33 15.02 0.099 15.12 13.67 11.40 0.087 11.49 14.00 9.202 0.075 9.278 14.33 7.738 0.068 7.807 14.67 6.803 0.063 6.866 15.00 6.087 0.057 6.144 15.33 5.609 0.051 5.660 15.67 5.139 0.046 5.185 16.00 4.688 0.040 4.728 16.33 4.282 0.037 4.318 16.67 3.918 0.034 3.952 17.00 3.599 0.032 3.631 17.33 3.363 0.029 3.392 17.67 3.135 0.027 3.162 18.00 2.914 0.024 2.939 18.33 2.702 0.023 2.725 18.67 2.553 0.022 2.575 19.00 2.433 0.022 2.454 19.33 2.322 0.021 2.343 19.67 2.220 0,020 2.240 20.00 2.125 0.019 2.144 20.33 2.036 0.019 2.054 20.67 1.953 0.018 1.971 21.00 1.881 0.017 1.899 21.33 1.811 0.017 1.827 21.67 1.742 0.016 1.758 22.00 1.674 0.015 1.689 22.33 1.649 0.016 1.665 22.67 1.596 0.015 1.611 23.00 1.541 0.014 1.555 23.33 1.487 0.014 1.501 23.67 1.435 0.013 1.448 24.00 1.383 0.013 1.396 24.33 1.286 0.000 1.286 24.67 1.129 0.000 1.129 25.00 0.990 0.000 0.990 25.33 0.871 0.000 0.871 Continues on next page... Post -Development Out Hydrograph Discharge Table Time Hyd. 3 + Hyd. 4 = Outflow (hrs) (cfs) (cfs) (cfs) 25.67 0.787 0.000 C.787 26.00 0.711 0.000 0.711 26.33 0.642 0.000 0.642 26.67 0.580 0.000 0.580 27.00 0.524 0.000 0.524 27.33 0.483 0.000 0.483 27.67 0.456 0.000 0.456 ...End Culvert Design Culvert-1 Design Worksheet (North Entrance) 1 - Total Drainage Area 2 - Total Impervious Drainage Area 3 - New Hanover County 25-year Intensity 4 - Rational C for Impervious 5 - Rational C for Pervious - Composite C for Drainage Basin 17 - 25-year Flow Culvert-2 Drainage Basin (South Entrance) 1 - Total Drainage Area 2 - Total Impervious Drainage Area 3 - New Hanover County 25-year Intensity 4 - Rational C for Impervious 5 - Rational C for Pervious 16 - Composite C for Drainage Basin - 25-year Flow 107.718 8.15 0.95 0.15 0.455 [sf] [sf] [in/hr7 9.17 [cfs] 134.751 8.15 0.95 0.15 0.449 [sf] [sf] [in/hr] 11.32 [cfs] Culvert Design Worksheet Inputs: 1 - Flow to Pipe(s) (QdeSlgn): 9.17 [cfs] 2 - Number of Pipes (Np): 1 [each] 3 - Flow Per Pipe (QdeS1gn,p1pJ: 9.17 [cfs] 4 - Pipe Length (L): 92 [ft] 5 - Pipe Invert In: 13.85 [finsl] 6 - Highway Surface Elevation at Pipe Crossing: 16.50 [finsl] 7 - Allowable Headwater Elevation (AHW): 16.00 [fmsl] AHW = Highway Surface Elevation EOP - .50' 8 - Headwater Depth (HW;): 2.15 [ft] HW = AHW - Pipe Invert In 9 - Expected Tailwater Elevation at Q100 (Zb): n/a [fmsl] 10 - Head Water Under Outlet Control (HWo): n/a [ft] HWo=AHW-Zb 11 - Coefficients: Orifice Coefficient (Cd) 0.65 Manning's Roughness 0.013 Aggregate Loss Coefficient (Ke) 1.2 Check for Inlet Control Conventional Orifice Equation: Q = CdA(2gh)'2 Can be Converted to Q = 0.0437*Cd*DZ*(HWi - D/24)irz in which Q = discharge (cfs) D = Pipe Diameter (in) HW; = Inlet Headwater Depth (ft) Cd = Coefficient of discharge Try D until Q* is tolerably close to Q (within a pipe size) n=o» Try D in) Q* (cfs) Pipe Remark 12 5 Too Small 15 8 Slightly Small 18 11 Too Large 24 18 Too Large Under Inlet Control, Pipe(s) Needs To Be: 18" RCP Check for Outlet Control Ditch is extremely flat and tailwater conditions cannot be determined. Thus, pipe size as showy, in Inlet Control is large enough to pass the required storm events without creating a large headwater. Culvert Design Worksheet 1 - Flow to Pipe(s) Mcsig„): 2 - Number of Pipes (Np): 3 - Flow Per Pipe (Qdes1gn,p1pJ: 4 - Pipe Length (L): 5 - Pipe Invert In: 6 - Highway Surface Elevation at Pipe Crossing: 7 - Allowable Headwater Elevation (AHW): AHW = Highway Surface Elevation EOP - .50' 8 - Headwater Depth (HW1): HW = AHW - Pipe Invert In 9 - Expected Tailwater Elevation at Q100 (Zb): 10 - Head Water Under Outlet Control (HWo): HWo = AHW - Zb 11 - Coefficients: Orifice Coefficient (Cd) Manning's Roughness Aggregate Loss Coefficient (Ke) Check for Inlet Control Conventional Orifice Equation: Q = CdA(2gh)v2 Can be Converted to 11.32 [cfs] I [each] 11.32 [cfs] 92 [ft] 13.32 [finsl] 16.50 [finsl] 16.00 [finsl] 2.68 [ft] n/a [fmsl] n/a [ft] 0.65 0.013 1.2 Q = 0.0437*Cd*DZ*(HW1- D/24)1"2 in which Q = discharge (cfs) D = Pipe Diameter (in) HW1= Inlet Headwater Depth (ft) Cd = Coefficient of discharge Try D until Q} is tolerably close to Q (within a pipe size) 0=11 42 Try D (in) Q* (cfs) Pine Remark 12 6 Too Small 15 9 Too Small 18 13 Slightly Large 24 21 Too Large Under Inlet Control, Pipe(s) Needs To Be: ii 18" RCP Check for Outlet Control Ditch is extremely flat and tailwater conditions cannot be determined. Thus, pipe size as shown in Inlet Control is large enough to pass the required storm events without creating a large headwater. Outlet Channel Design Outlet Channel Design Wolseley, N.A. - U.S. Hwy 421 Project Outlet Channel Capacity Design (Max Principal Spillway Barrel Flow) Max Channel Flow, Qmax = 11 27.55 [cfs] <-- See Hydrograph Routing Depth of Channel, d = 1.25 [ft] Bottom Width of Channel, B = [ft] Channel Roughness, n = 0.035 [earthern] Channel Side Slope, m = ! [m:l] Capacity Conveyance Factor, Kc = (B*d + m*d2)1.667 _ (B + 2*d*(1+m2)1.11)1.667 Capacity Conveyance Factor, Kc = 5*1.25 + 5*1.25^2)^1.667 = (5 + 2*1.25*(1+5^2)^0.50)^0.667 Capacity Conveyance Factor, Kc = 12.041 Mimimum Channel Slope, Sm = 100*(Qmax / (1.49*Kc/n))2 Mimimum Channel Slope, Sm= 100*(27.55 / (1.49*12.041/0.035))^2 Mimimum Channel Slope, Sm = 0.29 [%] Designed Channel Slope, Sd = 0.33 [%] Slope Provided = 0.33 > 0.29 = Slope Req'd OK Outlet Channel Velocity Design (Max Principal Spillway Barrel Flow) Depth of Flow in Spillway Channel, D = 1 1.2 [ft] <-- Solver Velocity Conveyance Factor, Kv = ( (B*d + m*d2) _ (B + 2*d*(I+m2)0"0) )a.667 Velocity Conveyance Factor, Kv = (5*1.21 + 5*1.21^2) _ (5 + 2*1.21*(1+5^2)^0.50))^0.667 Velocity Conveyance Factor, Kv = 1 0.841 Channel Velocity, Vet = (1.49*Kv / n)*So-so Channel Velocity, Vet = (1.49*0.841 / 0.035)*(0.33/100)^0.50 Channel Velocity, Vel = 2.1 [fps] Maximum Channel Velocity, Vmax = 2.5 [fps] Velocity Provided = 2.1 < 2.5 = Max Velocity OK Rip Rap Apron Design RIP RAP APRON DESIGN SHEET DATE: Juye, 2009 04:24 PM SHEET 1 OF 1 PROJECT: Wal5e4_v. N.A. -U.S. Hwy 421 Proied LD. NO.: DESIGN BY: JRC PROJECT NO.: 650-04 FEE: CHECKED BY. JBP DESCRIPTION: Rip Rap Apron at Principal Spilhvay Bartel LOCATION: New Hanmr county, North Carolina Rip Rap Zone Delineation 25 20 0 , I I 0 5 10 15 20 25 Do, Depth of Flow (ft.) Noter. 1. Use next hi9herzone forgrades �10%. 2. For pipe arch, arch, box ryhert, paced channel outlets, use Do=Cross sectional area of ou0d flow. Number of Culverts: 1 Design Velocity, Vd : 3.74 Mrs Flow, Q : 26.44 IL Pipe Diameter, Do: 3 tL Slope, Sap a- 0.01 MAI, Using NCDOT Rip Rap Apron Design: Use: Zone 2 L,: 9 ft. L2: 18 ft. W: 6.6 ft. W: 10.2 ft. CLASS W RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 89.1 ft3 275.4 ft ■ Design Point j 'Based upon L1 `Based upon L2 MINIMUM CLASS L1 STONE NCDOT RIP OF Coefficient LrCoeffident THICKNESS ZONE RAP CLASS STONE ft. fL n, 1 'A' FINE 3 4 12 2 .1 LIGHT 3 e 18 3 1 MEDIUM 4 e 24 4 1 HEAVY 4 8 36 5 2 HEAVY 5 10 38 8 2 HEAVY 5 10 38 7 Des' n is Beyond the Sco a o1This Method 71 L7=Length to Pro led Cuh rt L2 =Length to Prevent Scour Hob NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 30%SHALL WEIGH AT LEAST 80 LBS. EACH. NOMORE THAN 10% SHALL WEIGH P11--21.0 LESS THAN 15 LBS. EACH 80%SHALL WEIGH AT LEAST 80 LBS. EACH, NO MORE THAN 5% SHALLWEW LESS THAN 50 LBS. EACH EROSIO CONT KUL51UNh CLASS A 24r 10%TCP 6 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B I 15300 5-15" NO GRADATION SPECIFIED 0 RIP RAP APRON DESIGN SHEET DATE: July, 6, 2009 04:33 PM SHEET 1 OF 1 PROJECT. Walselev. N.A.-U.S. Hwy 421 Prolect I.D. NO.: DESIGN BY: JRC PROJECT NO.: 850-04 FILE: CHECKED BY: JBP DESCRIPTION: Rip Rap Apron for Dock Pit Line LOCATION: New Hanover County, North CaroS,e 25 20 w 15 O 10 v 5 0 Rip Rap Zone Delineation 0 5 10 15 20 25 Do, Depth of Flow (ft.) Notes: 1. Use nod highermne for grade..10%. 2. For pipe arch, arch, box cuhrert, paved channel outlets, use De --Cross sectional area of outlet Am. Number of Culverts: 1 Design Velocity, Vd : 3.18 It./s Flow, Q : 1.11 It. Pipe Diameter, Do: D.e7 ft. Slope, Saprori 0.0023 ILAt Using NCDOT Rip Rap Apron Design: Use: Zone 1 L,: 2.01 ft. 1-2: 2.66 ft. W: 6.0 ft. W. 6.0 ft. CLASS W RIP RAP USE MINIMUM 12" STONE THICKNESS TOTAL STONE VOLUME= 12.1 ft3 16.1 ft ■ Design Point *Based upon L, *Based upon L2 MINIMUM CLASS L, STONE NCDOT RIP OF Coefficient L, Coefficient THICKNESS ZONE RAP CLASS STONE fL ft. in, 1 'A' FINE 3 4 12 2 'B' LIGHT 3 6 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 38 5 2 HEAVY 6 10 38 6 2 HEAVY 5 10 38 7 DegonISB nd the Scope of Th®Method LI =Length to Protect Culvert L2 length to Prevent Scour Hob NAME WEIGHT SIZE I SPECIFICATIONS LBS RIP -RAP CLASS 1 5.200 30%SHALL WEIGH AT LEAST 60 LBS, EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 80%SHALL WEIGH AT LEAST 601.BS. EACH. NO MORE THAN 5%SHALL WEIGH LESS THAN 50 LBS. EACH bi ON CONTROL STONE CLASS A 2-0" 10%TOPS BOTTOM SIZES. NO GRADA ON SPECIFIED CLASB B 15-000 5.15" NO GRADATION SPECIFIED NEW HANOVER COUNTY Engineering Department 230 Government Center Drive • Suite 160 Wilmington, North Carolina 28403 TELEPHONE (910)-798-7139 Eax(910)798-7051 November 19, 2009 HWY 421 Properties, LLC 1508 Military Cutoff Road, Suite 302, Wilmington, North Carolina 28403 �J � Sys CERTIFIED Beth E. Wetherill, C.P.E.S.C. Soil Erosion Specialist RE: Notice of Violation of Land Disturbing Activity Grading Permit Numer: 17-08 revision # 1, Worsley North America located at 3881 US Highway 421 North Location/Description of Violation(s): This project has failed to conduct activity in accordance with the approved plan by clearing outside the approved limits of disturbance, failed to submit plan revisions, failed to install erosion control measures and stabilize the area cleared outside the limits of disturbance and failed to maintain the erosion control measures. Dear Mr. Jon Vincent: This letter constitutes a Notice of Violation of Section 23-237 (3),(4), Section 23- 241, Section 23-243 and Section 23-28 (b),(i),U) of the New Hanover County's Soil Erosion and Sedimentation Control Ordinance. Section 23-237. Mandatory standards for land disturbing activity. No land disturbing activity subject to the control of this Article shall be undertaken except in accordance with the following mandatory standards: (3) Ground cover. Whenever land disturbing activity that will disturb more than one acre is undertaken on a tract, the person conducting the land disturbing activity shall install such sedimentation and erosion control devises and practices as are sufficient to retain the sediment generated by the land disturbing activity within the boundaries of the tract during construction upon and development of said tract, and shall plant or otherwise provide a permanent ground cover sufficient to restrain erosion after completion of construction or development. Except as provided in section 23-238(b) (5), provisions for a ground cover sufficient to restrain erosion must be accomplished within 15 working days or 90 calendar days following completion of construction or development whichever period is shorter. (4) Prior plan approval. No person shall initiate any land disturbing activity that will disturb more than one acre on a tract unless 30 or more days prior to initiating the activity, an erosion and sedimentation control Plan must be both filed with and approved by the county. Once a plan has been approved, the land disturbing activity must be conducted in accordance . ith the plan and permit conditions. The county shall forward to the Director of the Division of Water Quality a copy of each erosion and sedimentation control plan for a land disturbing activity that involves the utilization of ditches for the purpose of dewatering or lowering the water table of the tract. (Code 1978, § 7-7; Ord. of 12-6-1999) Section 23-241. Access and haul roads. Temporary access and haul roads, other than public roads, constructed or used in connection with any land disturbing activity shall be considered a part of such activity. )Code 1978, §. 7-11) Section 23-243 Responsibility for maintenance During the development of a site, the person conducting the land disturbing activity shall install and/or maintain all temporary and permanent erosion and sedimentation control measures as required by the approved Plan, permit conditions or any provision of this Ordinance, the Act, or any other adopted pursuant to the Ordinance or the Act. After site development, the land owner or person in possession or control of the land shall install and/or maintain all necessary permanent erosion and sediment control measures, except those measures installed within a road or street right of way or easement accepted for maintenance by a governmental agency. Section 23-248 Erosion and sedimentation control plans (b) Persons conducting land disturbing activity on a tract which covers one or more areas shall file three copies of the erosion control plan with the county at least 30 days prior to beginning such activity and shall keep another copy of the approved plan and a posted copy of the permit at the job entrance, or on the job site before construction begins. No land disturbing activity is allowed until both the land disturbing permit and, if applicable, a County Stormwater ATC permit has been approved. After approving the Plan, if the county either upon review of such plan or inspection of the iob site, determines that a significant risk of accelerated erosion or offsite sedimentation exists or if design changes have been made to the original plan, the county will require a revised Plan. Pending the preparation of the revised plan, work shall cease or shall continue under conditions outlined by the approved plan and/or appropriate regulatory authority. (i) Applications for amendment of an erosion control plan in written and/or graphic form may be made at any time under the same conditions as the original application. Until such time as said amendment is approved by the county, the land disturbing activity shall not proceed except in accordance with the erosion control plan as originally approved. 6) Any person engaged in land disturbing activity who fails to file a Plan in accordance with the Ordinance or who conducts a land disturbing activity except in accordance with provisions of an approved Plan and/or the permit conditions shall be deemed in violation of this article. Section 23-250 Inspections and investigations (b) If through inspection it is determined that a person engaged in land disturbing activity has failed to comply with the Act, this Ordinance, or rules or orders adopted or issued pursuant to this Ordinance, or has failed to comply with an approved Plan or permit conditions, a notice of violation shall be served upon that person by registered or certified mail or other means reasonably calculated to give actual notice. The notice shall set forth the measures necessary to achieve compliance with the Plan, specify a reasonable time period within which such measures must be completed, and warn that failure to correct the violation within the time period will result in additional civil and criminal penalties for a continuing violation. However, no time period for compliance need be given for failure to submit an erosion control Plan for approval or for obstructing, hampering or interfering with an authorized representative while in the process of carrying out his official duties. If the person engaged in land disturbing activity fails to comply within the time specified, enforcement action shall be initiated. Section 23-251 Penalties (a) Civil penalties. (1) Any person who violates any of the provisions of this Ordinance, or rules or orders adopted or issued pursuant to this Ordinance, or order adopted or issued pursuant to this Ordinance or the Act by the commission, or who initiates or continues a land disturbing activity for which an erosion control Plan is required except in accordance with the terms, conditions, and provisions of an approved plan, shall be subject to a civil penalty. The maximum civil penalty for a violation is $5,000.00 per calendar day. A civil penalty may be assessed from the date of the violation. Each day of a continuing violation shall constitute a separate violation. The person alleged to be in violation will be notified of the violation by registered or certified mail, return receipt requested or other means reasonably calculated to give actual notice. The notice shall describe the violation with reasonable particularity, specify a reasonable time period within which the violation must be corrected, and warn that failure to correct the violation within the time period will result in the assessment of a civil penalty or other enforcement action. If, after the allotted time period has expired, the violator has not completed corrective action, a civil penalty may be assessed from the date of the notice of violation. However, no time period for compliance need be given for failure to submit an erosion control Plan for approval or for obstructing, hampering or interfering with an authorized representative while in the process of carrying out his official duties. (2) The County Manager or his designee shall determine the amount of the civil penalty to be assessed under this subsection and shad notify the person who is assessed the civil penalty of the amount of the penalty and the reason for assessing the penalty. In determining the amount of the penalty the County Manager or his designee shall consider the degree and extent of harm caused by the violation and the cost of rectifying the damage, the amount of money the violator saved by noncompliance, whether the violation was committed willfully, and the prior record of the violator in complying or failing to comply with this article and shall direct the violator to either pay the assessment or contest the assessment within 30 days after the receipt of the notice of assessment, by written demand for a hearing before the Board of County Commissioners. Notice of the assessment shall be by registered or certified mail or other means reasonably calculated to give actual notice. (b) Criminal Penalties. Any person who knowingly or willfully violates any provision of this article, or rule or order adopted or issued pursuant to this article, or who knowingly or willfully initiates or continues a land disturbing activity for which an erosion control plan is required except in accordance with terms, conditions, and provisions or an approved plan, shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $5,000.00 per calendar day. Section 23-252 Injunctive relief (a) Whenever the governing body has reasonable cause to believe that any person is violating or threatening to violate this article or any rule or order adopted or issued pursuant to this article, or any term, condition, or provision of an approved erosion control plan, it may, either before or after the institution of any other action or proceeding authorized by this article, institute a civil action in the name of the county, for injunctive relief to restrain the violation or threatened violation. The action shall be brought in the superior court of the county. (b) Upon determination by a court that an alleged violation is occurring or is threatened, it shall enter such orders or judgments as are necessary to abate the violation to ensure that restoration is performed, or to prevent the threatened violation. The institution of an action for injunctive relief under this section shall not relieve any party to such proceedings from any civil or criminal penalty prescribed for violations of this article. Section 23-253 Stop -work orders (a) The County may issue a stop -work order if they find that a land -disturbing activity is being conducted in violation of the Ordinance, the Act, or any rule adopted or order issued pursuant to the Act, that the violation is knowing and willful, and that either: (1) Off -site sedimentation has eliminated or severely degraded a use in a lake or natural watercourse or that such degradation is imminent. (2) Off -site sedimentation has caused severe damage to adjacent land or that such damage is imminent. (3) The land disturbing activity is being conducted without an approved plan. (b) The stop -work order shall be in writing and shall state what work is to be stopped and what measures are required to abate the violation. The order shall include a statement of the findings made by the County pursuant to subsection (a) of this section, and shall list the conditions under which work that has been stopped by the order may be resumed. The delivery of equipment and materials which does not contribute to the violation may continue while the stop -work order is in effect. A copy of this section shall be attached to the order. (c) The stop -work order shall be served by the sheriff of the county in which the land disturbing activity is being conducted or by some other person duly authorized by law to serve process as provided by G.S.1-A, Rule 4, and shall be served on a person at the site of the land disturbing activity who is in operational control of the land disturbing activity. The sheriff or other person duly authorized by law tp serve process shall post a copy of the stop -work order in a conspicuous place at the site of the land disturbing activity. The county shall also deliver a copy of the stop -work order to any person that they have reason to believe may be responsible for the violation. (d) The directives of a stop -work order become effective upon service of the order. Thereafter, any person notified of the stop -work order who violates any of the directives set out in the order may be assessed a civil penalty as provided in Sec.23- 251A. A stop -work order issued pursuant to this section may be issued for a period not to exceed five days. (e) The County Manager or his designee shall designate any employee or the Erosion Control Specialist to monitor compliance with the stop -work order. The name of the employee so designated shall be included in the stop -work order. The employee so designated, or the County Manager or his designee, shall rescind the stop -work order if all the violations for which the stop -work order are issued are corrected, no other violations have occurred, and all measures necessary to abate the violations have been taken. The Erosion Control Specialist shall rescind a stop -work order that is issued in error. (fl The issuance of a stop -work order shall be a final agency decision subject to judicial review in the same manner as an order in a contested case pursuant to Article 4 of Chapter 150B of the General Statues. The petition for judicial review shall be filed in the Superior Court of the county in which the land -disturbing activity is conducted. (g) As used in the section, days are computed as provided in. G.S. IA-1, Rule 6. Except as otherwise provided, the County Manager or his designee may delegate any power or duty under this section to any person who has supervisory authority over the project. The County manager or his designee may delegate any power or duty to the Erosion Control Specialist. (h) The County shall file a cause of action to abate the violations which resulted in the issuance of the stop -work order within two business days of the service of the stop - work order. The cause of action shall include a motion for an ex parte temporary restraining order to abate the violation and to effect necessary remedial measures. The resident superior court judge or any judge assigned to hear the motion for the temporary restraining order shall hear and determine the motion within two days of the filing of the complaint. The Clerk of Superior Court shall accept complaints filed pursuant to this section without the payment of filing fees. ailing fees shall be paid to the Clerk of the Superior Court within 30 days of the filing of the complaint. Corrective measure(s) needed and Time to Comply: Immediately install erosion control measures to prevent offsite damages on the area cleared outside the approved limits of disturbance, stabilize the offsite area within 15 working days of 30 calendar days, whichever is shorter, within 3 days of receipt of this notice maintain the erosion control measures on the approved plan and within 20 working days submit revised plans with a copy of the deed and an offsite agreement allowing work to be done offsite. A civil penalty in the amount of 15000 has automatically been assessed for thei violation. If the deadlines for corrective measures are not met, an additional daily $5000 civil penalty will be assessed. Once the plans have been approved and the revised Land Disturbing Permit has been issued, you will have the opportunity to appeal this assessment. You can then contact Dave Weaver, Assistant County Manager with New Hanover County at (910) 798-7184 to request an appeal of this Notice of Violation. You can contact me, Beth Easley Wetherill New Hanover County's Erosion Control Specialist in the Engineering Department at 230 Government Center Drive, Suite 160, Wilmington, North Carolina 28403 or by calling (910) 798-7139, regarding the required compliance action. Sincerely, Beth Easley Wetherill Erosion Control Specialists New Hanover County Cc: Dave Weaver, Assistant County Manager Kemp Burpeau, NHC Deputy County Attorney Jim Iannucci, P.E., CFM, NHC County Engineer Mark Boyer, NHC Public Information Ann Hines, NHC Zoning Jo Casmer, NCDENR Water Quality NCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director November 19, 2009 Mr. McKinley Dull Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 070319 Worsley, N.A. — U.S. Hwy 421 Project New Hanover County Dear Mr. Dull: Resources Dee Freeman Secretary The Wilmington Regional Office received a State Stormwater Management Permit Application for the project located at 3881 US Highway 421 North in Wilmington on September 29, 2009. The Division of Water Quality has conducted a preliminary review of that information and determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Impervious Area Treated: The overall property has 394,165sf of impervious area, and the pond is designed for 387,915sf of impervious area. The narrative indicates that 6,250sf of impervious from the dock pit does not drain to the pond, however all impervious area must drain to the pond. 2. Drainage areas: Please clearly show the drainage area to the pond on the plans. 3. Subdivision: In your resubmittal please confirm that this project is not intended to be permitted as a subdivision for this modification. Previous permits for this site have been subdivisions, but it does not appear that that will be the case for this modification. If the project is intended to be permitted as a subdivision, please show the lot lines on the plans, provide the sizes of the lot areas, the amounts of BUA per lot, and submit deed restrictions. 4. Drainage easements: Please show all applicable easement widths. 5. Details: Please provide details for sidewalks and parking. Details should include width, dimensions, and slopes. 6. Impervious Dimensions: Please show all known dimensions of impervious area on the plans. 7. Permanent pool: Please show dimensions of the length of each line and arc formed by the permanent pool. Typically, these dimensions are shown outside of the edge of the pond. Curve radii are also required dimensions. 8. Vegetated shelf: Please show the length on the plans 9. Wet pond SHWT data: The soils report shows that the SHWT is 36" below the existing grade. The supplement shows that the SHWT is at 13.00fms1. Please verify that the existing grade was 16.00finsl at the location of the boring when it was bored. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX 910-350-20041 Customer Service:1-877-623-6748 NO�� Carohila, Internet: ;Nww.ncvra`uarquality.org �,tura" fy' An Fqual Opportunity 1 Affirmative Action Employer J SW8 070319MOD November 19, 2009 10. Updating calculations: Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. I have made considerable effort to identify areas of concern, however, because substantial changes are warranted please carefully review your re - submittal in order to ensure that all of the required items are submitted and correct. Please also note that any calculations in your re -submittal must be stamped. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to December 18, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. . The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.pjohnson@ncmail.net. Sincerely, Y11Yy son Environmental Engineer GS/KJ: S:\WQS\STORMWATERIADDINFO\2009\070319MOD.nov09 CC: Jay Carmine, PE, Coastal Land Design. PLLC Stormwater Permitting, WiRO files Page 2 of 2 Johnson, Kel From: Jay Carmine Ocarmine@coastallanddesign.net] Sent: Tuesday, September 29, 2009 9:52 AM To: Johnson, Kelly Subject: Ferguson (SW8 070319) 0103laq This email is as per our phone conversation this morning (8/29/09) regarding the property boundary bearing segment that was not the same on both permits. The actual line -work of the property boundary segment is correct, however, there was a text error in the segment information for the Wolseley project modification (SW8 070319). It is listed correctly in the 421 Industrial Park project as S60°27' 10" and incorrectly in the Wolseley project as S60°17'25". However, they are exactly the same line. We authorize the State to make a `by -hand' modification to the aforementioned property boundary segment text in the Wolseley project from S60°17'25" to S60027' 10". Thank you, and please feel free to contact this office should you have any further questions or concerns. Sincerely, Jay Carmine, P.E. Coastal Land Design, PLLC P.O. Box 1172 Wilmington, NC 28402 (910) 254 - 9333 x 1005 (910) 254 - 0502 Fax http://www.coastallanddesian.net NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 23, 2009 Mr. D. Dull McKinley, Member Highway 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 070319 New Hanover County Dear Mr. McKinley: The Wilmington Regional Office received a State Stormwater Management Permit Application for the project located at Highway 421 South in New Hanover County on August 13, 2009. The Division of Water Quality has conducted a preliminary review of that information and determined that the application is not complete. The following information is needed to continue the stormwater review: It appears that this project and SW8 050217 (421 Industrial). overlap. I have summarized the drainage area data in the attached file. Please make any corrections to the drainage area(s) and update the application, calculations and all other required paperwork items as appropriate. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 7, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned .or new originals must be provided. Copies are not acceptable. Wilmington Regional office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 Customer Service:1-877-623-6748 internet www.ncwaterqualky.org ONq Carohna AdAM711Y U An Equal Opportunity 1 Affirmative Action Employer SW8 070319 September 23, 2009 If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kelly.p.johnson@ncmail.net. 5Sincerek- Kelly Johnson Environmental Engineer GS/KJ: S:IWQSISTORMWATERIADDINFO120091070319.sep09 CC: Jeffrey Petroff, PE, Coastal Land Design (SW8 050217 Engineer) Jay Carmine, PE, Coastal Land Design (SW8 070319 Engineer) Stormwater Permitting, WiRO files Page 2 of 2 Locational Summary (Not to Scale) Proposed Locational Summary (Not to Scale) Current sn ~ pMp W 2 SZ9'Z8'Ab"E & F00 00(t swe 060217 421lndustriai Park S92 46'1&'E b32'47.32"E 3 r r b � SW8 070319 Ferguson. Distributors N29'29'40 W&33.58R N29 32'50"W a 973 &aft W 0 Johnson, Kelly From: Johnson, Kelly Sent: Monday, August 17, 2009 7:56 AM To: 'Jay Carmine' Subject: RE: SW8 070319, Ferguson Distributors Thanks, Jay. I will look at the 6,250sf issue more carefully once it is in the review stage. But, for now I will give it to our admin to be logged into the system. Kelly From: Jay Carmine[mailto:jcarmine@coastallanddesign.net] Sent: Thursday, August 13, 2009 3:38 PM To: Johnson, Kelly Subject: RE: SW8 070319, Ferguson Distributors Thank you for your pre -review of the Wolseley Project. Please see my responses to your questions shown below your comments. Please feel free to contact me should you have any further questions or concerns. Impervious area: All of the impervious area must be addressed for a high density permit. What is happening to the 6,250 sf of BUA not draining to the onsite pond? That small area (6,250sf) is unfeasible to be captured and directed towards the pond. The narrative goes into a little more detail as to why, but basically is it because that area is too low to be directed towards the pond. It would not be realistic or functional to raise the entire site enough to drain a 6,250sf dock pit into the pond. It is only about 1.5% of the total BUA. We accounted for it on all permit documentation as well as in the design of the site such that it could still meet New Hanover County's stringent pre- and post -discharge regulations. It does drain into a discharge swale that has 5:1 side slopcs. There will be some intrinsic treatment in the discharge swale. It is no different that the portions of driveway accesses that are unable to be captured on most sites. It is not the case for this site, however, because the existing road grades along NC Highway 421 allowed a high point at the property boundary. 2. Property area: The property area was 13.84ac, and it is now 13.8686ac? Is that correct, or is that a typo? The property area is 13.8686 acres as indicated in the current submittal you have in your office. LLC: Mr. Vincent signed a letter authorizing, "McKinley D. Dull, Member of Hwy 421 Properties, LLC" to sign. But, Mr. Dull is not shown to be a member on the LLC's annual report? Hwy 421 Properties, LLC is a manager -managed limited liability corporation. Mr. Dull is a member of that company, but in the NCDENR system he does not outright entitlement to sign on behalf of the company. However, Mr. Vincent, who is a manager of the company, and listed on the LLC's annual report, has given Mr. Dull (member) documented authorization for him to sign on behalf of Hwy 421 Properties, LLC. The original documentation is included in submittal package. This sort of signatory authorization isn't uncommon if signing officials are either silent investors or consistently unavailable. 4. PE Certification: Has this pond been built, or is it still in the planning stage? If it is built or partially built, we will need a PE Cert. The site has just started construction. At this point, I am not sure what could be certified, if anything. We are trying to get the modification to the pond shape permitted before the sediment basin needs to be converted into a stormwater pond. The only significant difference is the addition of the forebay weir which will allow for a more efficient and functional connection between the forebay and main pond. The remainder of the site remains essentially the same as permitted. Sincerely, Jay Carmine, P.E. Coastal Land Design, PLLC P.O. Box 1172 Wilmington, NC .=02 (910) 254 - 9333 x 1005 (910) 254 - 0502 Fax ho://www.coastallanddesim.net From: Johnson, Kelly [mailto:kelly.p.johnson@ncdenr.gov] Sent: Thursday, August 13, 2009 2:48 PM To: Jay Carmine Subject: SW8 070319, Ferguson Distributors Jay, We received the application for this project and I have the following questions for you: Impervious area: All of the impervious area must be addressed for a high density permit. What is happening to the 6,250 sf of BUA not draining to the onsite pond? 2. Property area: The property area was 13.84ac, and it is now 13.8686ac? Is that correct, or is that a typo? 3. LLC: Mr. Vincent signed a letter authorizing, "McKinley D. Dull, Member of Hwy 421 Properties, LLC" to sign. But, Mr. Dull is not shown to be a member on the LLC's annual report? 4. PE Certification: Has this pond been built, or is it still in the planning stage? If it is built or partially built, we will need a PE Cert. Thanks, KJ *** My email has changed to kellv.p.iohnson0ricdenr.eov K.eUd johwsow Kelly Johnson Environmental Engineer Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7345 Fax: 910.350.2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Johnson, Kelly From: Johnson, Kelly Sent: Thursday, August 13, 2009 1:02 PM To: 'jpetroff@coastallanddesign.net' Cc: 'jcarmine@coastallanddesign.net' Subject: Ferguson (SW8 070319) & 421 Industrial Park (SW8 050217) Jeff, Since talking with you about the 421 Industrial Park (SW8 050217), and the neighboring/related Ferguson Distributors (SW8 070319) project yesterday, I wanted to let you know that I have received a mod request from Ferguson today. (It is being designed by Jay Carmine, so you may already know about this.) But, Ferguson is going to reduce from a drainage area of 602,992sf to 542,000sf. it looks like Ferguson will be primarily (completely?) west of 421 Industrial, and so I am not sure if or how this will impact the 421 Industrial Park area. But, I wanted to ensure that you are aware of this change so that you can account for it appropriately. Thanks, Kelly *** My email has changed to kellv.Djohnson@ncdenr.eov KeLLW A III w, Kelly Johnson Environmental Engineer Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Office: 910.796.7345 Fax: 910.350.2004 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Coastal Land Design, PLLC. P. O. Box 1172 Wilmington, NC 28402 Phone:910.254.9333 Fax:910.254.0502 To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Stormwater Review Staff ❑ As Requested ❑ Sent via Mail ❑ For Your Files ❑ Sent via Courier 9: D6 Transmittal Date: August 13, 2009 File: 650-04 Subject: Stock Building Supply (SW8 070319MOD) Stormwater Modification Submittal ❑ For Distribution ® For your Review / Action / Approval Quantity Drawing No. Description 1 Check In the Amount of $505 (Check #10023) 1 Original Letter of Authorization for McKinley Dull to sign for Hwy 421 Properties, LLC 1 Original Stormwater Management Application 1 Copy Stormwater Management Application 1 Original Wet Detention Basin Operation and Maintenance Agreement Form 1 Original Wet Detention Basin Supplement 1 Copy Stormwater Narrative 1 Copy Stormwater Calculations 1 Copy Soils Report (Same as in SW8 070319MOD) 1 Copy Existing Stormwater Permit to be Modified (SW8 070319MOD) 1 Copy Hwy 421 Properties, LLC Annual Report 1 Copy Property Deed (Deed Book: 5312, Page: 2375) 1 Copy USGS Map of Property AUG 009 REMARKS I Please contact our office if you have any questions or concerns. ~'� The forms on the BUT website changed while the client had the forms for signature, so I included all of the supplemental information that the new application requests with this submittal. 650-04 Transmittal NCDENR-DWQ 071309.docx rMevex% io BY: AUG 13 2009 Stormwater Narrative For Wolseley, N.A. — U.S. Hwy 421 Project New Hanover County, North Carolina Prepared by: Coastal Land Design, PLLC Cij I Engineenng / Landscape Architecture / Construction Manage -,lent P.O.Box 1172 Wilmington, NC 28402 Prepared for: Phone: 910-254-93 33 Fax: 010-254-0502 Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 July 6, 2009 +titit# C kl*r'�'�'i E A! r Narrative Project Description The Wolseley, N.A. — U.S. Hwy 421 Project is an approximately 13.9 acre proposed commercial development off of N.C. Highway 421 in New Hanover County. The stormwater permit that this site is applying for is a modification to the previously approved stormwater permit SW8 070319MOD. That permit was issued on May 15, 2008. The land owners have changed and the layout of the development has changed slightly. This project will also be a high density stormwater project. The project will use a proposed on -site stormwater pond to treat stormwater from this site. Stormwater will be collected by drop grates throughout the property and will be directed towards the pond through a piping system that is designed for the 25-year storm event; as per New Hanover County stormwater requirements. Some of the pond dimensions have be modified slightly from the previous permit for this land (SW8 070319MOD), and the overall drainage basin has been reduced and the impervious surface draining toward the proposed pond has been increased. The drainage basin has been reduced from 602,992sf to 542,000sf and the proposed impervious has been increased from 382,411sf to 387,915s# A 5' wide berm has been added in between the main pond and forebay. The emergency spillway is locdtaad_r�aieberm of the forebay and it has not moved from the previously permitted location. It was positioned in that location q the natural discharge point for the drainage basin would be maintained. The proposed building will require the use ofa four (4) foot below grade dock pit to facilitate level unloading and loading from delivery trucks into the building. The drainage area from this dock pit is 6,250sf. That small amount of impervious is not able to be treated by the stormwater pond because of the rim elevation of the dock pit. The proposed permanent pool elevation is 14.50fmsl, and the dock pit grate invert is 14.50fmsl. If the dock pit pipe was connected to the collection system, the dock pit would end up having standing water in it at an elevation equal to that of the pond. During storm events the dock pit%could potentially have several feet of water in it due to the tailwater conditions caused by the proposed stormw er pond. For those reasons, the small amount of impervious from the dock pit will not be directed towards stormw ter pond. It will be collected by an 8" drain line and directed to the discharge channel for the proposed stormwater p nd. All other remaining impervious for this site is designi amount of impervious surface for this project is' 394,1 and an allocation for future development. The propbw New Hanover County's stormwater requirements, Site Description treated by the proposed stormwater pond. The total ich will consist of a building, parking lot, sidewalk, vater pond is designed to meet both NCDENR's and The topography of this site is slightly rolling with mild slopes ranging from 0.5% to 1% and is heavily vegetated with a thick pine forest. The site ultimately drains to the Cape Fear River (15-25-1-9), a waterway classified as C:Sw. The elevations on this project range from 14 feet MSL to 18 feet. The majority of the soils, according to the Soil Survey of New Hanover County, are Lakeland sands and Leon sands. These soils have a soil hydrologic group of A and D respectively. This property is zoned IND-2. A seasonal high water table (SHWT) evaluation was performed by ECS Carolinas, LLP, at the main pond basin and the SHWT was determined to exist approximately 36 inches below grade. The existing grade at the boring location is approximately 16finsl, so the seasonal high water table is estimated to be at an elevation of 13.00fmsl. Please refer to the soil boring tests included with this submittal. This elevation is approximately 1.5 feet below the permanent pool elevation for the proposed pond. The permanent pool elevation was set by the hydraulics necessary to outlet the pond from the site. Setting the permanent pool elevation approximately at the SHWT elevation would mean that the permanent pool elevation was lower than the outlet for the site. Stormwater Treatment Storm sewers will be installed to route stormwater to the proposed stormwater pond. This site will be graded such that stormwater is directed towards inlet boxes where all drainage from impervious surfaces will be collected and get routed to the proposed stormwater pond. The proposed stormwater pond is designed according to NCDENR's and New Hanover County's stormwater requirements. Canacitv Reauirements The permanent pool elevation for the pond is 14.50finsl and has a surface area of 36,203sf. The minimum surface area is 27,493sf. The forebay is approximately 20% of the total volume for this pond. A three inch (3") draw -down orifice is designed to drain down the first 1.5" of runoff volume of 47,028cf in 3.4days. The minimum elevation of the riser is 15.66fmsl, but in order to satisfy New Hanover County's pre -post requirement, the riser elevation is set at a higher elevation of 16.00fmsl. The volume stored between the riser elevation and the permanent pool is 61,308cf. The draw -down orifice was designed to also drain this volume within 4.4days. The emergency spillway elevation is at 17.5' and provides 1.5' of freeboard above the riser invert. NCDENR requires that the draw -down orifice discharge for a pond be less than the pre -development conditions for the 1-yr storm event for the same drainage area. The drawdown rate through the orifice is 0.16cfs. The pre -development discharge for the 1-yr storm event for the basin is 0.62cfs. The top of the pond is 18.4' which was set more than 0.50' above the elevation of water in the stormwater pond during the 100-yr storm event. The width of the emergency spillway was designed to be 35' wide and that ensures that the 100-yr storm event can pass through the spillway without overtopping the pond in the event that the riser structure is not functioning. With the design conditions set as listed above, the conventional stormwater pond meets both NCDENR and New Hanover County's stormwater requirements. Routine Requirements New Hanover County requires that the post -development site discharge for the 2-, 10-, and 25-year storm events are lower than the pre -development discharge for the same storm events. The pre -development discharge for this site for the 2-, 10-, and 25-year storm events are 1.6cfs, 13.lcfs, and 20.3cfs, respectively. The post -development discharge for the same three storm events are 1.5cfs, 11.9cfs, and 20.2cfs, respectively. Since the post -development discharge is not greater than the pre -development discharge for the 2-, 10- and 25-year storm events, this site meets New Hanover County's pre -post discharge requirement. HWY 421 PROPERTIES, LLC 1508 Military Cutoff Road Suite 302 Wilmington, NC 28403 (910) 256-0101 February 3, 2009 To Whom It May Concern: This letter is written to inform you that Jon T. Vincent, Managing Member of Hwy 421 Properties, LLC authorizes McKinley D. Dull, Member of Hwy 421 Properties, LLC to sign storm water management permit and all other development permit applications on behalf of the company. Please feel free to contact me if you have any questions regarding this letter. AUC, 2 2009 J`r'V/sIg c: Ken Dull GSFNC .. r STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I --P�lb - M_P' j A 15 a Notary Public of New Hanover County and State aforesaid, do hereby certify that Jon T. Vincent, personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. WITNESS my hand and notarial seal, this3_ day of �- 2009. -(AFFIX NOTARIAL SEAL) �._�1�� x, A�1'�1 n My Commission Expires: It _ X -IS C200812200546 ,.... , SOSID:0928943 LIMITED LIABILITY COMPANY Date Filed: 5/1/200810:19:00 AM Elaine F. Marshall ANNUAL REPORT North Carolina Secretary of State C200812200546 NAME OF LD IITED LIABILITY COMPANY. HWY 421 PROPERTIES, LLC GS ` �� 16 - STATE OF INCORPORATION: NC SECRETARY OF STATE L.L.C. ID NUMBER: 0928943 NATURE OF BUSINESS: a a-k CS L , �, REGISTERED AGENT: YINCENT, JON T. REGISTERED OFFICE MAILING ADDRESS: 1508 Military Cuto, f f Road, Suite 302 Wilmington, NC 28403 REGISTERED OFFICE STREET ADDRESS: 1508MilitaryCutoff Road, Suite 302 Wilmington, NC 28403 New Hanover County SIGNATURE OF THE NEW REGISTERED AGENT PRINCIPAL OFFICE TELEPHONE NUMBER: PRINCIPAL OFFICE MAILING ADDRESS: PRINCIPAL OFFICE STREET ADDRESS: Name: �oti • i V Title: �"- ,, 5ti m Address: 15aS M.1: 1Qry City: W; I ,, h,,, state:MG • 7010: R ni- Name: W,y.e,- Title: 4-,ffed, Address: Sie • City: 36Z State: / SIGNATURE CONsmurn CONSENT TO THE APPOINTMENT 9 ( 0 - Tsb-a)al 1508MilitaryCutaffRoad, Suite 302 Wibntngton, NC 28403 1508Military Cutq (Road, Suite 302 Wilmington, NC 28403 Name: Title: Address: City: Sta Zip: MUST BE COMPLETED BY ALL LIMITED LIABILITY COMPANIES BY A MANArmimEMBER DATE ,)N 1/INC&NI MAW61 i NCB- TYPE OR PRINT NAME TYPE OR PRINT Trnz PORT FEE: S200 MAIL, TO: SaaetM of Stets • Corporations Mvidw • Poet Oftloe Box 29525 • Raleigh, NC 27626.0525 11111iII11111 1111111111111111 1111111111iiiiIIIIiIII w•'p LIMITED LIABILITY COMPANY ANNUAL REPORT NAME OF LIlOUTED LIABILITY COMPANY: HWY 421 PROPERTIES, LLC GS �- -I0.' `(1- SECRETARY OF STATE L.I,.C.IDNUMBER: 0928943 NATURE OF BUSINESS: & C_k cS 1 rtk REGISTERED AGENT: YINCENT, JON T. SOSID: 0928943 Date Filed: 5/1/2008 10:19:00 AM Elaine F. Marshall North Carolina Secretary of State C200812200546 STATE OF INCORPORATION: NC REGISTERED OFFICE MAILING ADDRESS: 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 REGISTERED OFFICE STREET ADDRESS: 1508 Military Cutgrf Road, Suite 302 Wilmington, NC 28403 New Hanover County SIGNATURE OF THE NEW REGISTERED AGENT PRINCIPAL OFFICE TELEPHONE NUMBER: PRINCIPAL OFFICE MAILING ADDRESS: PRINCIPAL OFFICE STREET ADDRESS: Namc: V Ni Title:. ti,�j M Address: �Sfl9 Mtl; far. City: W; I,"!,s h, state: NG 70fa :e n f' Name: (,z r Title: G,-hjTgd, Acidness: s+e City: 3,6z State: . EC] IVE7 ]D AUG 13 2009 BY: SIGNATURE CONSTIT LYM CONSENT TO THE APPOINTMENT 910 - 75'(0-0)01 1508Military Cutoff Road, Suite 302 Wibnington, NC 28403 1508MilitaryCuto fRoad, Suite 302 Wilmington, NC 28403 Name: Title: CiAddt,esI Sta - zip: MUST BE COMPLETED BY ALL LIMITED LIABILITY COMPANIES BY A MANAGER/MEMBER DATE )l _( • U[NCANi MAW(�t NG- AV_'m65Z TYPE OR PRINT NAME TYPE OR PRINT TITLE MT FEE: $200 MAIL. TO: Seudwy of State - Corporations Division - Post Ofilm Box 29525 - RaWg% NC 27626-0525 (Excise Tax) $2550.00 i200602Mmmn FOR R MREB MISTER NC of DEEDS 20 013 12*3 i rn BK:5312 PG:2375-2379 FEE:$23.N K REV giW:$2,0-N 1%SR g 1 2wal Recording time, Book and Page Tax Parcel No. R03200-001-033-000, R03200-001-034-M and R03200-001-035-000 Prepared By and James A. MacDonald Return To: Allen, MacDonald & Davis, PLLC 1508 Military Cutoff Road, Suite 102 Wilmington, NC 28403 After recording mail to: HWY 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, North Carolina 28403 STATE OF NORTH CAROLINA WARRANTY DEED COUNTY OF NEW HANOVER THIS DEED, made this Stltlay, of May, 2008, by and between CAPE FEAR INVESTMENT & DEVELOPMENT, LLC, a North Carolina limited liability company, hereinafter called the Grantor, and HWY 421 PROPERTIES, LLC, a North Carolina limited liability company, hereinafter called the Grantee. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH: THAT said Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, have granted, bargained, sold and conveyed and by these presents does hereby grant, bargain, sell and convey unto the said Grantee, their heirs, successors and assigns, in fee simple, all that certain lot or parcel of land situated in New Hanover County, North Carolina, and more particularly described as follows: BEING ALL OF THAT PROPERTY SHOWN ON EXHIBIT "A" WHICH IS HERETO ATTACHED AND INCORPORATED BY REFERENCE. Together with all and singular the tenements, hereditaments and appurtenances thereunto belonging, or in anywise appertaining. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, and has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, except 2008 ad valorem taxes, ordinances and municipal building code restrictions, if any, and those matters set forth in the attached Exhibit B, and that Grantor will WARRANT and DEFEND the title against the lawful claims of all persons whomsoever except for exceptions herein stated. IN WITNESS WHEREOF, the Grantor has caused this instrument to be signed by its duly authorized manager, the day and year first above written. CAPE FEAR INVESTMENT & DEVELOPMENT, LLC, a North Carolina limited liability company BY: E ROBE T E. HUCKAB Member BY: V., ' Y M. STOKLEY, SR., Member STATE OFN" ORTH CAROLINA COUNTY �OF NEW'HANOVER I cerhfrthdt'lb&following person personally appeared before me this day, acknowledging to me that its vMtieaprily signed the foregoing document for the purpose stated therein and in the capacity indicaIWA1 �ERT E. HUCKABEE, III, Member of CAPE FEAR INVESTMENT & DEVEU.0PD R; LLC, a North Carolina limited liability company [CHECK ONE] i F (i) I have pt rscitt4lMdiWedge of the identity of the principal; or ❑ (ii) I have seen satisfactory evidence of the Anna l's identity by a current state or federal identification, with the principal's photograph; -in fe flow of a r may a , 2008. r yfr ary Pub c Signature Lynn R. Ward Notary Public's Printed Name My Commission Expires: 5-18-08 STATE OF NORTH CAROLINA COUNTY OF NEW HANOVER I certify that the following person personally appeared before me this day, acknowledging to me that he voluntarily signed the foregoing document for the purpose stated therein and in the. capacity indicated: JEFFREY M. STOKLEY, SR., Member of CAPE FEAR INVESTMENT & DEVELOPMENT, LLC, a North Carolina limited liability company [CHECK ONE] 13 (i) I have personal knowledge of the identity of the principal; or ❑ (ii) I have seen satisfactory evidence of the principal's identity by a current state or federal identification, with the principal's photograph, in the form of a e: X" 8 , 2008* Cotary blic z atu*e (Official Seal of Notary) Lynn R. Ward Notary Public's Printed Name My Commission Expires: 5-18-08 EXHIBIT "A" BEING all of Tract "B", consisting of 7 acres, Tract "C", consisting of 5 acres, and Tract "D", consisting of 5 acres, as the same are shown on a man entitled "INVISTA S.A-R.L. DIVISION TRACTS "A", "B", "C", "D", on plat prepared by Michael Underwood and Associates, P.A. dated September, 2004, and recorded in Map Book 46, at Page 325 of the New Hanover County Registry (the "Property'). EXHIBIT "B" 1. Various rights of way granted to Carolina Power and Light Company recorded in Book 528, at Page 73; Book 560, at page 253; Book 628, at Page 651; Book 814, at Page 160; Book 953, at Page 766; Book 1023, at Page 336; Book 1142, at Page 56, and Book 1187, at Page 991 of the New Hanover County Registry. 2. Easement to City of Wilmington recorded in Book 1699, at Page 1272 of the New Hanover County Registry. 3. Easement to the Lower Cape Fear Water & Sewer Authorityrecorded in Book 1147, at Page 243 of the New Hanover County Registry. 4. Easement as shown on the map recorded in Map Book 8, at Page 90 of the New Hanover County Registry. Z 0 0 v m 2 7.5 Quad: SoWia, Nr 1989. USGS 1 arc -second NEG, 1 meter verticaf preasicrt S 1 bak IOM FET U 5m :iA6 KOM WGSB4 7715740- 10 Tt m T SL� ECS CAROLINAS, LLP CAROMmAn GeotedWmwdCoush-actionMoudgbgEuvironmentW-FacMtjes Mr. Jay Care, P.L. -V.-y 12, 2008 Coastal Land Design, M-Le P.O. Box 1172 AUG 1 3 2009 Wflmbgkmo North Carolina 28402 ft Seasonal Mo Water Level Estimation Forgason Distdibutors WilmfiWn, North Carolina ECS Project No. 22.14M Dew Mr, Carmine., RCS Carolinas, LLP (ECS) recently conducted an estimation of the Seasonal High Water Level (SHWL) for the proposed wet pond area at the Ferguson Distributors Site in Wilmington, North Carolina, This 10ftM with attach rents, is the report of our estimation, FMd Ted On May 12, 2008 BCS met with Mr. Jay Camino with Coastal 14vid Design in order to locate the requested boring location. ECS then conducted an exploration of the subsurkee sod conditions at one requested location shown an the attubod Site Diagram The purpose of this expkmigm was to estimate the SHWL of the in -place mils for the proposed wet pond areas. we explored the A*&Ujm soil condtions by advandn one hand auger bot-mg into the anaing ground surface at the requested boring location. We vkuaUy classified the submrface, soils and obftmed representative samples of owh soil type encountered. The a1twhod M% died provides a summary of the submrfeco conditions oncountowd at each hand uW boring location. The SHWL was estimated at the boring location below the ematIng grade elavabojL Bolow Is a ffinnniffy of each boring looeflom ilocatim SHWL I — 36 inches The SHWL may vary wid& the proposed site due to changes in subsurface conditions and elevation. If you bave any questiow rogarding this report; please contact its at (910) 696-9114. R=TwtMy, ECS CAROLINAS, LLP It Brooks Wall Staff Geologist AftachmenU: Site DiagnuWSHWL sheet I Walid M, Sobb, P. E. Principal En&eer 721. i 09—ft B k1sin ft-A- -Park Y -50e 201 - V*111ming M NC 28411 - 19101, 686-911.4 - Fax (9 10) 696-96 6 6 - VnMecalimite,�1 com Ash0v1HF- NC - ChadOft- NC - Greensboro, NC - Grewvdle, SC - Raleigh. NC - Swausbarm NC VAInwipm NC * testing services only Season High Water Level Estimation Ferguson Distributors Wilmington, North Carolina ECS Project No. 22.14056 May 111, 4005 cation Depth Soil Description 1 0-12" Grey fine SAND 12"-36" Tan fine SAND Seasonal High Water Table was estimated to be at 36 inches below the existing grade elevation. Mastec Pond Repairs Subject: Mastec Pond Repairs From: "Pete Avery" <PAvery@mckinleybuilding.com> Date: Thu, 5 Mar 2009 10:52:37 -0500 To: "Jay Carmine" <jcarmine@coastallanddesign.net> CC: "Christine Nelson" <Christine.Nel.son@ncrnail.net> Jay, The sod is being laid on reworked swale this morning. Other repairs are also being made. You should be able to visit the site later today or in the morning for an inspection and hopefully prepare the needed certification as well, assuming the work has been done per the way the State says it should. Thanks, Walter Pete Avery Vice President -Administration McKinley Building Corporation 3807 Peachtree Avenue - Suite 200 Wilmington, NC 28403 910-395-6036 (T) 910-395-6606 (F) Pavery0mckinleybulid ino.com 1 Of 1 3/6/2009 10:20 AM RE: Stock Building Supply - modification to SW8 070319 Subject: RE: Stock Building Supply - modification to SW8 070319 From: "Pete Avery" <PAvery@mckinleybuilding.com> Date: Wed, 4 Mar 2009 10:51:58 -0500 To: "Christine Nelson" <Christine.Nelson@ncmail.net> CC: <jpetroff@coastallanddesgin.net>, "Jay Carmine"<jcarmine@coastallanddesign.net>, "ion vincent" <jtvincent@bizec.rr.com>, "ken dull' <kdull@mckinleybuilding.com>, "Robert Huckabee" <ruckabee@southlandamusements.com>, "Jeffrey stokley" <jstokleyl@ec.rr.com> Ms. Neslon, The work on the pond repairs and changes to bring the pond into compliance with the approved permit began yesterday. I expect to sod the grass swales by tomorrow or Friday —waiting on sod order. I think it would safe for the State to do a final inspection next Tuesday, and feel free of course to visit the site any time to check on the progress. I am relying on Jeff Pertroff of Coastal Land Design to provide any certifications you need. I want to thank you and Ms. Scott for allowing us to move forward with our project's permit based on our commitment to make pond repairs. As with nearly every project I do, time is of the essence and the State's concession in this matter is greatly appreciated and a huge help. We will work diligently to make sure the pond repairs are completed to the State's satisfaction. Have a good day, Regards, Pete Avery HWY 421 Properties, LLC From: Christine Nelson [mailto: Christine. Nelson@ncmail.net] Sent: Wednesday, March 04, 2009 10:20 AM To: Jay Carmine Cc: Georgette Scott; jpetroff@coastallanddesign.net; Pete Avery; Angela Hammers; David.w.cox@ncmail.net; Janet Russell Subject: Re: Stock Building Supply - modification to SW8 070319 Jay, DENR has received a copy of your letter dated March 2, 2009 to Cape Fear Investment and Development, LLC regarding the Notice of Inspection issued for 421 Industrial Park. DENR has found your letter detailing the plan of action and schedule to bring the pond associated with 421 Industrial Park into compliance to be acceptable. Please be aware that DENR inspectors will be conducting follow up inspections to ensure that the work is being completed as scheduled. The application for modifying SW8 070319 to direct runoff offsite to the 421 Industrial Park pond can now be submitted into the Stormwater Permitting program, however the permit cannot be issued until_ the pond is in compliance (Items 1-3 and 5 of the Notice of Inspection letter). If you wish to submit the modification through the Express process, please contact Janet Russell to schedule a submittal meeting. Christine Georgette Scott wrote: 1 of 2 3/4/2009 11:52 AM RE: Stock Building Supply - modification to SW8 070319 Subject: RE: Stock Building Supply - modification to SW8 070319 From: "JAY" <jcarmine@coastallanddesign.net> Date: Wed, 4 Mar 2009 10:51:55 -0500 To: "'Christine Nelson"' <Christine.Nelson@ncmail.net> Christine; Thank you. We have contacted Janet Russell to set up a re -submittal date for this project. Please let me know if you have any further questions or concerns. Have a nice day. Sincerely, Jay Carmine, P.E. Coastal Land Design, PLLC P.O. Box 1172 Wilmington, NC 28402 (910) 254 - 9333 x 1005 (910) 254 - 0502 Fax http://www.coastallanddesian.net From: Christine Nelson [mailto:Christine.Nelson@ncmail.net] Sent: Wednesday, March 04, 2009 10:20 AM To: Jay Carmine Cc: Georgette Scott; jpetroff@coastalianddesign.net; pavery@mckinleybuilding.com; Angela Hammers; David.w.cox@ncmail.net; Janet Russell Subject: Re: Stock Building Supply - modification to SW8 070319 Jay, DENR has received a copy of your letter dated March 2, 2009 to Cape Fear Investment and Development, LLC regarding the Notice of Inspection issued for 421 Industrial Park. DENR has found your letter detailing the plan of action and schedule to bring the pond associated with 421 Industrial Park into compliance to be acceptable. Please be aware that DENR inspectors will be conducting follow up inspections to ensure that the work is being completed as scheduled. The application for modifying SW8 070319 to direct runoff offsite to the 421 Industrial Park pond can now be submitted into the Stormwater Permitting program, however the permit cannot be issued until the pond is in compliance (Items 1-3 and 5 of the Notice of Inspection letter). If you wish to submit the modification through the Express process, please contact Janet Russell to schedule a submittal meeting. Christine Georgette Scott wrote: Gentlemen, This e-mail is to re -cap our meeting this morning on the compliance status of 421 Indusirial Park (SW8 050217) in connection with the application to modify the Stock Building Supply permit (SW8 070319) to direct runoff offsite to the 421 Industrial Park pond. A Notice of Inspection (NOI) was issued on February 19, 2009 indicating that 421 Industrial Park was out of compliance with its stormwater permit. Jeff Petroff, Coastal Land Design, indicated that 14WY 421 Properties; LLQ the applicant for the Stock Building Supply project; was willing to perform the required pond maintenance and submit a PE 1 of 2 3/4/2009 11:52 AM Re: Stock Building Supply - modification to SW8 070319 Subject: Re: Stock Building Supply - modification to SW8 070319 From: Christine Nelson <Christine.Nelson@ncmail.net> Date: Wed, 04 Mar 2009 10:20:14 -0500 To: Jay Carmine<jcarmine(acoastallanddesign.net> CC: Georgette Scott <Georgette.Scott@ncmail.net>, jpetroff@coastallanddesign.net; pavery@mckiunleybuilding.com, Angela Hammers <Angela.Hammers@ncmail.net>, David.w.cox@ncmail.net, Janet Russell <Janet.Russell@ncmail.net> Jay, DENR has received a copy of your letter dated March 2, 2009 to Cape Fear Investment and Development, LLC regarding the Notice of Inspection issued for 421 Industrial Park. DENR has found your letter detailing the plan of action and schedule to bring the pond associated with 421 Industrial Park into compliance to be acceptable. Please be aware that DENR inspectors will be conducting follow up inspections to ensure that the work is being completed as scheduled. The application for modifying SW8 070319 to direct runoff offsite to the 421 Industrial Park pond can now be submitted into the Stormwater Permitting program, however the permit cannot be issued until the pond is in compliance (Items 1-3 and 5 of the Notice of Inspection letter). If you wish to submit the modification through the Express process, please contact Janet Russell to schedule a submittal meeting. Christine Georgette Scott wrote: Gentlemen, This e-mail is to re -cap our meeting this morning on the compliance status of 421 Industrial Park (SW8 050217) in connection with the application to modify the Stock Building Supply permit (SW8 070319) to direct runoff offsite to the 421 Industrial Park pond. A Notice of Inspection (NOI) was issued on February 19, 2009 indicating that 421 Industrial Park was out of compliance with its stormwater permit. Jeff Petroff, Coastal Land Design, indicated that HWY 421 Properties, LLC; the applicant for the Stock Building Supply project; was willing to perform the required pond maintenance and submit a PE certification (Items 1-3 and 5 of the NOI) on behalf of Cape Fear Investment & Development, LLC; the permittee for 421 Industrial Park. Based on your agreement above, DWQ has agreed to accept a phased approach to bringing SW8 050217 into compliance. This will allow the permit modification for Stock Building Supply to be accepted by DWQ upon receipt of a written schedule for completion of Items 1-3, 5 AND, a permit to be issued once phase 1 is complete and in compliance. Tile initial phase of compliance will be to bring the Bond into compliance and submit a PE certification (items 1-3 and 5 of the NOt). The second phase of compliance will be to address item #4 of the NOI and to either submit a plan revision or modification of the permit to address the construction on lots in areas identified in the permit as future development as well as the sale of some of these lots. In order to move forward with the first phase of compliance, a letter detailing the plan of action and 3/4/2009 10:20 AM Coastal Land Design, PLLC. P. O. Box 1172 Wilmington, NC 28402 Phone:910.254.9333 Fax:910.254.0502 To: NCDENR — Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 (910) 796 — 7215 Attn: Christine Nclsoi-, WCO MAR 0 2 2009 Transmittal Date: March 2, 2009 File: 650-04 Subject: Stock Building Supply Express Stormwater Submittal ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier ' Quantity Drawing No. Description 1 Copy Notice of Inspection Letter to Cape Fear Investment and Development, LLC REMARKS I Please contact our office if you have any questions or concerns. CC: File gn, PLLC Si ed Jay R. Carmine, P.E. 650-04 Transmittal NCDENR-DWQ 030209.docx coastal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.n.13ox 1172 Wilmington, NC 28402 March 2, 2009 Phone: 910-254-9333 Fax:910-254-0502 Cape Fear Investment and Development, LLC 1611 Castle Hayne Road; Building B Wilmington, NC 28401 Attn: Jeffrey Stokely Re: Notice of Inspection (NOI) for 421 Industrial Park — NCDENR Stormwater Project No.: SW8 050217 Dear Mr. Stokely: Coastal Land Design, PLLC (CLD) is the engineering firm currently designing and permitting the "Stock Supply Building" for Hwy 421 Properties, LLC adjacent to your 421 Industrial Park. Per Stormwater Permit # SW8 050217, our project has an offsite allocation to your pond that we plan to utilize. However, due to the recent Notice of Inspection (NOI) dated 2/19/09 on your property, we are unable to proceed with our project until the deficiencies declared in the NOI are addressed. On Thursday, February 26, 2009, Jeff Petroff, P.E. of CLD and I met with Christine Nelson (Project Reviewer) and Georgette Scott (Stormwater Supervisor) of NCDENR- DWQ regarding the aforementioned NOI. The NOI states that there are five (5) deficiencies that must be resolved. Items #1, #2, #3, and #5 are in regards to construction and maintenance issues with the stormwater pond on your site. Item #4 is related to the submittal of a plan revision, or modification, to NCDENR that represents the current condition and ownership of the site. As per our meeting with NCDENR, they have allowed the deficiencies in your permit to be viewed as two separate tiers; the first tier involving the site deficiencies and the second tier involving the permitting revisions. Although addressing all these items are ultimately your responsibility, through an agreement between yourself and our client (Hwy 421 Properties, LLC), our client will have items #1, #2, #3, and #5 of the NOI corrected in the field. By correcting the items in the first tier of the NOI, your pond that is currently out of compliance will be brought back into compliance and match the original specifications of the permitted plans. This will allow our project to utilize our offsite allocation in your stormwater pond. Item #4 of the NOI is still your responsibility to address before a Notice of Violation and possible civil penalties are issued. From our meeting with NCDENR, we recommend that your course of action for resolving the deficiency of item #4 is to submit a plan revision to the State designating each lot as "Off -Site". Because the lots were sold and are no longer owned by Cape Fear Investment and Development, LLC, each lot will also have to submit for individual off - site permits. Our firm is available to address these issues on your behalf if you wish to contract with us separately. Please see the summary below addressing the recent NOI: 1) Installation of a grassed swale at the west side of the pond as approved in the plan, instead of gravel. The gravel in the swale along the west side of the pond will be removed and the swale will be properly stabilized with grass. This will be completed by Wednesday, March 11, 2009. 2) Pond slope repair, accumulated sediment removal & swale maintenance. The slopes of the pond that have been eroded will be repaired, the accumulated sediment in the stormwater pond will be removed, and the swales will be properly re-established. This will be completed by Wednesday, March 11, 2009. 3) Swale maintenance per approved permit and signed O&M Agreement. The swale will be properly re-established. This will be completed by Wednesday, March 11, 2009. 4) Submittal of a plan revision or modification. Please see the previous paragraph before this section. 5) Submittal of clarification on the designer's certificate deviations dated on March 14, 2006. The designer's certification that was completed by David Bowman, P.E. is not in agreement with what was installed and noted in the NOI. After the pond has been brought back into compliance, we will certify that the modifications have been made, and we will address the discrepancies with David Bowman, P.E. 's certification and the inspection report. This will be completed by within two days after the State accepts the required maintenance on the existing pond per the N01. We are also copying NCDENR as per their request on this letter. We anticipate that with your cooperation and active response to NCDENR's NOI that this matter can be resolved in a timely and efficient manner. If you have any questions or conurtents relating to this NOI, please feel free to contact me. Sincerely, Jay R. Carmine, P.E. Coastal Land Design, PLLC RE: ,Stock Building Supply -modification to SW8 070319 Subject: RE: Stock Building Supply - modification to SW8 070319 From: Georgette Scott <Georgette.Scott@ncmail.net> Date: Thu, 26 Feb 2009 15:01:44 -0500 To: Jay Carmine<jcarmine@coastallanddesign.net>, jpetroff@coastallanddesign.net, pavery@mckinleybuilding.com, Christine Nelson <Christine.Nelson@ncmail.net> CC: Angela Hammers <Angela.Hammers@ncmail.net>, David.w.cox@ncmail.net Gentlemen, This e-mail is to re -cap our meeting this morning on the compliance status of 421 Industrial Park (SW8 050217) in connection with the application to modify the Stock Building Supply permit (SW8 070319) to direct runoff offsite to the 421 Industrial Park pond. A Notice of Inspection (NOI) was issued on February 19, 2009 indicating that 421 Industrial Park was out of compliance with its stormwater permit. Jeff Petroff, Coastal Land Design, indicated that HWY 421 Properties, LLC; the applicant for the Stock Building Supply project; was willing to perform the required pond maintenance and submit a PE certification (Items 1-3 and 5 of the NOI) on behalf of Cape Fear Investment & Development, LLC; the permittee for 421 Industrial Park. Based on your agreement above, DWQ has agreed to accept a phased approach to bringing SW8 050217 into compliance. This will allow the permit modification for Stock Building Supply to be accepted by DWQ upon receipt of a written schedule for completion of Items 1-3, 5 AND, a permit to be issued once phase 1 is complete and in compliance. The initial phase of compliance will be to bring the pond into compliance and submit a PE certification (items 1-3 and 5 of the NOI). The second phase of compliance will be to address item #4 of the NOI and to either submit a plan revision or modification of the permit to address the construction on lots in areas identified in the permit as future development as well as the sale of some of these lots. In order to move forward with the first phase of compliance, a letter detailing the plan of action and schedule necessary to address items 1-3 and 5 in the NOI and bring the pond into compliance must be submitted and approved by DWQ. Upon approval of this initial plan of action, the application for modifying SW8 070319 can be submitted into the program. The schedule included in this initial plan of action must have the pond in compliance prior to the permit being issued. DWQ inspectors will periodically conduct site visits to check the compliance with this schedule and with the permitted plan. In order for the permit for the Stock Building Supply to be issued the offsite pond must be in compliance. Please be advised that this letter from Coastal Land Design/HWY 421 Properties, LLC, for the initial phase of compliance, is not a substitute for the plan of action requested from Cape Fear Investment & Development, LLC. It is Cape Fear Investment & Development, LLC's responsibility to provide a plan of action prior to March 20,2009 that outlines how all the violations in the NOI will be addressed. Their plan must include phase 1 (items 1-3,5) and phase 2 (item 4). It is important that you work with Cape Fear Investment & Development, LLC to insure your letter/schedule for compliance is included as phase 1 in their plan of action that they will submit to our office. Georgette Scott WIRO Stormwater Supervisor 1 of 2 2/26/2009 3:56 PM RE: Stock Building Supply - modification to SW8 070319 "E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties." 2 of 2 2/26/2009 3:56 PM Stock Building Supply - modification to SW8 070319 Subject: Stock Building Supply - modification to SW8 070319 From: Christine Nelson <Christine.Nelson@ncmail.net> Date: Tue, 24 Feb 2009 14:37:02 -0500 To: Jay Carmine<jcarmine@coastallanddesign.net>, pavery@mckinleybuilding.com CC: Janet Russell <Janet.Russell@ncmail.net> Z50a 17 Gentlemen, I talked with Georgette Scott, Stormwater Supervisor for the Wilmington regional office, regarding the scenario of your proposed project to get further clarification on the extent of compliance needed prior to submitting this modification. In order to accept the application for the proposed permit modification to drain runoff from your site off -site into the 421 Industrial Park pond, the compliance issues identified in the Notice of Inspection need to be addressed, including items 4 and 5, prior to submittal. If you still wish to submit with the Express program once the concerns have been taken care of, please contact Janet to schedule a new submittal meeting . Let me know if I can be of further assistance. Christine Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 of 1 2/24/2009 2:37 PM