Loading...
HomeMy WebLinkAbout20141106 Ver 1_Craven 124 PCN pg5 Revised_20141120C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Tempora T W1 - Choose one Choose one Yes/No - �/2 - Choose one Choose one Yes/No - �/3 - Choose one Choose one Yes/No - �/4 - Choose one Choose one Yes/No - �/5 - Choose one Choose one Yes/No - �/6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 - Choose one - - S2 P Culvert Mills Branch PER Corps 5 59 S3 P Channel Improvments Mills Branch PER Corps 5 59 S4 T Culvert Mills Branch PER Corps 5 11 S5 T Culvert Mills Branch PER Corps 5 11 S6 - Choose one - - 3h. Total stream and tributary impacts 140 3i. Comments: S4 is temporary impact for S2; S5 is temporary impact for S3 Page 4 of 10 PCN Form — Version 1.4 January 2009