HomeMy WebLinkAbout20141108 Ver 1_Approval Letter_20141120Pat McCrory
Governor
November 20, 2014
Marshall Barlowe
3215 Auld Farm Road
Lenoir, North Carolina 28645
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION
Richard,Barlowe Stream Stabilization Project
Dear Mr. Barlowe:
John E Skvarla, III
Secretary
DWR # 14 -1108
Caldwell County
In accordance with your application dated 10/17/2014 and additional information received on 11/14/2014,
approval has been granted for the impacts listed in the table below. This approval requires you to follow the
conditions listed in the enclosed certification(s) or general permit and any additional conditions listed
below.
Project impacts are covered by the attached Water Quality General Certification Number 3885 and the
conditions listed below This certification is associated with the use of Nationwide Permit Number 27 once it is
issued to you by the U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply
with any other federal, state or local permits before proceeding with your project, including those required by
(but not limited to) Erosion and Sediment Control, Water Supply Watershed and Stormwater regulations.
IMPACTS APPROVED
The following impacts are hereby approved provided that all of the other specific and general conditions of the
Certification, General Permit and /or Buffer Rules are met. No other impacts are approved, including incidental
impacts.
Type of Impact
Amount Approved
Amount Approved
emporary
Temporary
Stream
1,607 (linear feet)
(linear feet)
Water Quality Regional Operations — Asheville Regional Office
2090 US Hwy 70, Swannanoa, NC 28778
Phone 828- 296-45001 FAX 828 - 299 -7043
Internet http //portal ncdenr org /web/wq/ws
An Equal Opportunity 1 Affirmative Action Employer
Richard Barlowe Stream Stabilization
November 20, 2014
Page 2 of 3
ADDITIONAL CONDITIONS
1. This approval is for the purpose and design described in your application. The plans and specifications
for this project are incorporated by reference as part of the Certification/Authorization. If you change
your project, you must notify the Division and you may be required to submit a new application package
with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval
letter and General Certification (s) /Permit/Authorization and is responsible for complying with all
conditions.
2. The designer or his designee shall supervise the installation of in- stream structures.
3. Natural fiber matting is recommended for streambank stabilization over plastic matting that can entrap
small animals.
4. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first
year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly
after storm events) and vegetation is successful. Any failures of structures, stream banks, or vegetation
may require future repairs or replacement, which requires coordination with the Asheville Regional
Office to ensure the stability and water quality of the stream and downstream waters.
This approval and its conditions are final and binding unless contested.
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written
petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within
sixty (60) calendar days.
A petition form may be obtained from the OAH at http: / /www.ncoah.com/ or by calling the OAH Clerk's
Office at (919) 431 -3000 for information. A petition is considered filed when the original and one (1) copy
along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through
Friday between 8:00am and 5:00pm, excluding official state holidays).
The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition
along with any applicable OAH filing fee is received by the OAH within five (5) business days following the
faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
If sending via delivery service (UPS,
FedEx, etc) -
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609 -6285
Richard Berlowe Stream Stabilization
November 20, 2014
Page 3 of 3
One (1) copy of the petition must also be served to DENR:
Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699 -1601
This letter completes the review of the Division under section 401 of the Clean Water Act as described in 15A
NCAC .0500. Please contact Ed Williams at 828 - 296 -4686 or ed.williamsgncdenr.gov if you have any
questions or concerns.
Sincerely,
G. Landon Davidson, P.G., Regional Supervisor
Water Quality Regional Operations
Asheville Regional Office
Enclosures: GC 3885
Certificate of Completion
cc: Jake Stokes, NRCS, Waynesville, NC
Will Faulkner, NRCS, Lenoir, NC
Tasha Alexander US ACOE (via email)
Andrea Leslie, NC Wildlife Resources Commission
NN'BSCP Unit - Central Office
DWR ARO 401 files
G \WR \WQ \Caldwell \401s\Non- DOT\Richard Barlowe Stream StabilizationWPRVL 401Richard BarloweBank Stabil 11 -20 -14 doc