Loading...
HomeMy WebLinkAbout20190331 Ver 2_ePCN Application_20221017 DW R mrlsloa of ware.Besourcrs Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?" Yes No Change only if needed. Pre-Filing Meeting Date Request was submitted on: 11/20/2020 BIMS#Assigned" Version#" 20190331 2 Is a payment required for this project?* No payment required Reviewing Office" Fee received Winston-Salem Regional Office-(336)776- Fee needed-send electronic notification 9800 Select Project Reviewer" Dave Wanucha:eads\djwanucha Information for Initial Review 1a.Name of project: Replacement of Bridge No.81 on SR 1926 over Deals Creek 1a.Who is the Primary Contact?" Amy Euliss 1 b.Primary Contact Email:" 1c.Primary Contact Phone:* aeuliss@ncdot.gov (336)747-7800 Date Submitted 10/17/2022 Nearest Body of Water Deals Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: Longitude: 35.743370 -80.462895 A. Processing Information County(or Counties)where the project is located: Rowan Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?" Yes No (NCDOT only)T.I.P.or state project number: WBS#(1) 17BP.9.R.76 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?" Yes No Please provide the date of the previous submission.* 10/11/2019 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project? Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT Division 9 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 375 Silas Creek Parkway Address Line 2 city State/Province/Region Winston Salem NC Postal/Zip Code Country 27106 USA 2e.Telephone Number: 2f.Fax Number: (336)747-7800 2g.Email Address:* aeuliss@ncdot.gov C. Project Information and Prior Project History 1.Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality I town: Salisbury 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 City State/Province/Region Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project: Deals Creek 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HUC in which the project is located. 030401030105 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing conditions include SR 1926(Hannah Ferry Road),undeveloped forest and the disturbed/maintained right-of-way. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past? Yes No Unknown If yes,please give the DWR Certification number or the Corps Action ID(exp.SAW-0000-00000). USACE Action ID SAW-2019-00473.DWR no.2019-0331 4f.List the total estimated acreage of all existing wetlands on the property: 2.44 4g.List the total estimated linear feet of all existing streams on the property: 329 4h.Explain the purpose of the proposed project: To remove Bridge#790081 and replace with a new,modern bridge structure. 41.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: Erosion and sedimentation control measures will be installed after the hand clearing of vegetation is conducted.Bridge replacement construction adjacent to the existing bridge using heavy equipment from the upland roadway approaches.Deck drains on the bridge do not discharge directly into the stream.Bridge demolition will occur after the bridge and new roadway approaches are completed.Demolition will include the removal of the bridge deck and removal of the abutments to the ground line to avoid utility impacts.Replacing the bridge on new alignment to the southeast(downstream)is required to:provide continued access to the end of the road because of the presence of a water main to the northwest(upstream);no detour route is available;and,this alignment also avoids impacts to the tributary to Deals Creek. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2019-00473 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Brandon Phillips Agency/Consultant Company: STV Engineers,Inc Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name 2e.Forested* 2f.Type of Jurisdicition]2g.Impact area* W1 roadway fill P Bottomland Hardwood Forest Wetlands C and D Yes Both 0.430 (acres) W2 excavation P Bottomland Hardwood Forest Wetland C Yes Both 0.030 (acres) W3 hand clearing T Bottomland Hardwood Forest Wetlands C and D Yes Both 0.180 ac es) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.180 0.460 2g.Total Wetland Impact 0.640 2i.Comments: Permanent impacts are associated with the roadway fill required for the new bridge approaches and the excavation needed for positive drainage and the requirement to have a zero net fill within the floodplain.Temporary impacts are associated with the hand clearing of vegetation. 3. Stream Impacts E 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width 3h.Impact (?) Jurisdiction* length* S7 construction and demo Temporary Dewatering Deals Creek Perennial Both LA.,ag. (feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 31.Total temporary stream impacts: 0 126 31.Total stream and ditch impacts: 126 3j.Comments: Temporary impacts are associated with the construction of the new bridge and the demolition of the existing bridge.No permanent impacts to the stream are proposed.Temporary impacts in acreage are equal to 0.08 acres. E. Impact Justification and Mitigation 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The proposed bridge span length was extended to avoid impacts to Deals Creek.Riprap protection at the bridge abutments is being placed outside of the jurisdictional stream boundary to avoid permanent impacts to Deals Creek. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices(BMPs)for Construction and Maintenance Activities will be employed.Demolition and construction methods from the roadway approaches will be used to minimize impacts. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2c.If yes,mitigation is required by(check all that apply): DWR Corps 2d.If yes,which mitigation option(s)will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. Yes No 4b.Stream mitigation requested: 4c.If using stream mitigation,what is the stream temperature: (linear feet) 4e.Riparian wetland mitigation requested: 4d.Buffer mitigation requested(DWR only): (acres) (square feet) 0.46 acres at a 2:1 ratio 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 4h.Comments 6. Buffer mitigation (State Regulated Riparian Buffer Rules)- required by DWR 6a.Will the project result in an impact within a protected riparian buffer that requires buffer mitigation?If yes,you must fill out this entire form-please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no,explain why: 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?" Yes No Comments: Stormwater runoff from the proposed bridge will be routed to deck drains that discharge over the floodplain of Deals Creek.Please see the attached Stormwater Management Plan for details on the minimization of water quality impacts. G. Supplementary Information v 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No Comments:* Bridge replacement project that will require the preparation of a Minimum Criteria Determination Checklist. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality? Yes No 3b.If you answered"no,"provide a short narrative description. Project involves the replacement of an existing bridge and is not anticipated to affect future development. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Asheville 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g.Does this project involve bridge maintenance or removal? Yes No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? Yes No If you answered"Yes"to 5g(1),did you discover any signs of bat use? Yes No Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NCNHP data and site specific surveys.See Supplemental Information attached under Miscellaneous for threatened and endangered species write-ups and biological conclusions. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* See attached"No Archaeological Survey Required Form'and"Historic Architecture and Landscapes No Survey Required Form." 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: NCDOT Hydraulics Unit Coordination with FEMA. 8c.What source(s)did you use to make the floodplain determination?* FEMA FIRM maps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document NCDWQ RPW B-UT to Deals Cr.pdf 72.86KB R76 DP 1 Wetland data sheet.pdf 411.47KB R76 DP 2 Wetland data sheet.pdf 398.65KB R76 upland data sheet.pdf 368.71 KB R76_Bridge81_Figure3_WatersMap.pdf 3.67MB 17BP.9.R.76 reapplication cover letter.pdf 204.04KB Bridge 76 MANLAA concurrence tricolored.pdf 255.89KB R.76_Permit_Plans_2019-03-01.pdf 2.33MB 17-05-0058_NoSurveyReq.pdf 4.73MB PA 17-05-0058 Rowan(NSR).pdf 7.46MB Tribal Coordination Br 81 Rowan.pdf 6AMB Bridge 81 on SR 1926.pdf 1.52MB SAW-2019-00473(signed NWP).pdf 1.81MB File must be PDF or KMZ Comments Additional Miscellaneous attachments include photographs of the site,a cover letter that includes information regarding the Threatened and Endangered Species that are listed in Rowan County,and a MANLAA request for the tricolored bat for submittal by the USACE to USFWS. Signature * By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Amy Euliss Signature 0�6_9s Date 10/17/2022