Loading...
HomeMy WebLinkAboutSWA000170_Email_20221017 Farkas, Jim J From:Farkas, Jim J Sent:Monday, October 17, 2022 1:31 PM To:biz@b4vinvestments.com Cc:Kate Underwood; Khan, Zahid; tmlove@cabarruscounty.us; Morgan, Marc P Subject:RE: SWA000170 Mount Pleasant Rd. Residential Subdivision Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete, Stormwater Management Permit Authorization to Construct (ATC) Application for the subject project on October 4, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding ATC Permit No. SWA000170, dated October 17, 2022, for the construction of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, Stephanie Reutter, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Build 4 Value LLC Attn: Stephanie Reutter, Owner Manager PO Box 1764 Concord, NC 28026 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Reminder: Please be aware that per 15A NCAC 02H .1044(2), the Erosion & Sediment Control (E&SC) permit for this site cannot be closed out until the as-built stormwater plans for this project are approved by our office. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 1 From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, October 4, 2022 1:29 PM To: biz@b4vinvestments.com; Kate Underwood <kateunderwood@cesicgs.com> Cc: Khan, Zahid <zahid.khan@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SWA000170 Mount Pleasant Rd. Residential Subdivision Good afternoon, We received your post-construction stormwater permit Authorization to Construct (ATC) application for the above mentioned project on 10/4/2022. Reviews under the fast track permitting process generally take 30 calendar days. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SWA000170 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 2