Loading...
HomeMy WebLinkAbout20071536 Ver 1_Buffer Determination Request_20070830August 28,2007 Director, Cindy Karoly DWQ Wetlands/401 Unit 23221 Crabtree Blvd. Raleigh , N.C.. 27604-2260 Dear Ms.Karoly o ~C~~~d~ D AUG 3'~ 2007 w~tw+os rJ+~ sTi~ Bw~CH ~ 7 - ~ 5 3 6 In response to the letter of August 24,2007 , I am requesting that a further study be done to verify the findings that Mrs. Lauren Witherspoon, Environmental Senior Specialist reported to me in her letter of August 23,2007. When we met at the site on August 16,2007, she indicated to me that she felt that the western portion did not show any ground water for at least 90 feet fron the eastern edge of the lot. However, there were a few `pot holes' that had standing water, and she assumed that there was some ground water drainage as there had been a relatively long drought. However, the water could have well collected the previous night when there was a verified storm with measurable waterfall in the area. Also the apartments to the east have a 48 inch drain pipe adjacent to our lot 3 that dumps storm water as well as sprinkler system water into the drain. My contention that although at one time there was a farm pond on the land that created a creek that flowed south, once the 19 acres were developed by Trammel Crow of Charlotte, the water became storm water from the complex , and no longer creates a true stream. The city of Raleigh also built the Lead Mine Extension thru our Iand.The road re-directed some storm water to the south. to fact, we have been the victim of someone else's construction projects and just a small amount of drainage is from our own land. Therefore, I request another visit to the site as Mrs. Witherspoon advised me to do if I disagreed with her findings.a second visit. Sincer ~ .~~ Cell -218-696 . y~ ~'~