HomeMy WebLinkAbout20141165 Ver 1_More Info Received_20141112Strickland, Bev
From: Karoly, Cyndi
Sent: Wednesday, November 12, 2014 12:00 PM
To: Burdette, Jennifer a; Strickland, Bev
Subject: Fwd: CAMA Major permit Phillip Carawan Woodard Road
Attachments: image002.png; ATT00001.htm; DOC111214- 001.pdf, ATT00002.htm
Sent from my iPad
Begin forwarded message:
From: "Tyson, Sherry" <sherry.tyson @ncdenr.gov>
Date: November 12, 2014 at 11:57:54 AM EST
To: " raleigh.w.bland @usace.army.mil" < raleigh .w.bland @usace.army.mil >, "Dunn, Maria T."
<maria.dunn @ncwildlife.org >, "Luben, Dyk" <dvk.luben @ncdenr.gov >, "Dumpor, Samir"
<samir.dumpor @ncdenr.gov >, "Owens, Charlan" <charlan.owens @ncdenr.gov >, " Karoly, Cyndi"
<cyndi.karoly @ncdenr.gov >, "Scarbraugh, Anthony" <anthony.scarbraugh @ncdenr.gov>
Subject: CAMA Major permit Phillip Carawan Woodard Road
Please see attachment. When printing, I believe the printer did not pull the second page of the BIO to
your package thanks so much.
�'aiiYaYlYYl,z1[ikfl�
"Wlil,� �.dl� l`,zISYlY Sii �1 �l✓`,71✓I ��� ✓I✓II✓.:�]7'I�:II�,.
✓;lr i r� .r f s z��� I
21 /
1 ✓ ,,
ANTICIPATED IMPACTS
The project will result in localized turbidity due the installation of the bulkhead, riprap
shoreline stabilization, and riprap groins. The groins and riprap will convert 10,000sq ft and 6,170sq
ft respectively of sound bottom to riprap. The bulkhead will replace 300sq ft of the canal bottom.
The project will excavate 3,041sq ft of wetlands, 414sq ft of uplands, and 15,OOOsq ft of sound
bottom (1,667 cubic yards).
Kevin Hart-
5 November 2014
Washington Regional Office