Loading...
HomeMy WebLinkAbout20141165 Ver 1_More Info Received_20141112Strickland, Bev From: Karoly, Cyndi Sent: Wednesday, November 12, 2014 12:00 PM To: Burdette, Jennifer a; Strickland, Bev Subject: Fwd: CAMA Major permit Phillip Carawan Woodard Road Attachments: image002.png; ATT00001.htm; DOC111214- 001.pdf, ATT00002.htm Sent from my iPad Begin forwarded message: From: "Tyson, Sherry" <sherry.tyson @ncdenr.gov> Date: November 12, 2014 at 11:57:54 AM EST To: " raleigh.w.bland @usace.army.mil" < raleigh .w.bland @usace.army.mil >, "Dunn, Maria T." <maria.dunn @ncwildlife.org >, "Luben, Dyk" <dvk.luben @ncdenr.gov >, "Dumpor, Samir" <samir.dumpor @ncdenr.gov >, "Owens, Charlan" <charlan.owens @ncdenr.gov >, " Karoly, Cyndi" <cyndi.karoly @ncdenr.gov >, "Scarbraugh, Anthony" <anthony.scarbraugh @ncdenr.gov> Subject: CAMA Major permit Phillip Carawan Woodard Road Please see attachment. When printing, I believe the printer did not pull the second page of the BIO to your package thanks so much. �'aiiYaYlYYl,z1[ikfl� "Wlil,� �.dl� l`,zISYlY Sii �1 �l✓`,71✓I ��� ✓I✓II✓.:�]7'I�:II�,. ✓;lr i r� .r f s z��� I 21 / 1 ✓ ,, ANTICIPATED IMPACTS The project will result in localized turbidity due the installation of the bulkhead, riprap shoreline stabilization, and riprap groins. The groins and riprap will convert 10,000sq ft and 6,170sq ft respectively of sound bottom to riprap. The bulkhead will replace 300sq ft of the canal bottom. The project will excavate 3,041sq ft of wetlands, 414sq ft of uplands, and 15,OOOsq ft of sound bottom (1,667 cubic yards). Kevin Hart- 5 November 2014 Washington Regional Office