Loading...
HomeMy WebLinkAbout20210915 Ver 1_Compliance Evaluation Inspection_20221012Wetland Inspection Report Project Num: 20210915 Version: 1 Project Name: Reedy Fork Industrial - 5955 Summit Avenue, Browns County: Guilformmit Status: Issued Project Type: Industrial / Commercial / Business Region: Winston-Salem Location: Reedy Fork Industrial - 5955 Summit Avenue, Browns Summit Latitude: +36° 10' 48" SW Plan Location: Site Owner Name: SI Reedy Fork Inspection Date: 10/12/2022 Reason for Inspection: Follow-up Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Sue L Homewood Secondary Inspector(s): Title: Facility Compliance Status: El Compliant Not Compliant Program Areas: Standards/Sediment Question Areas: Unpemittable Activities Inspection Summary: Longitude: -79° 42' 00" Phone: Phone: 336-776-9694 page 1 Site Number: 20210915 Owner: Lacz, Dan Inspection Date: 10/12/2022 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Follow-up Unpermittable Activities Yes No NA NE # Note: This section should be completed only if the impact is unpermittable (eg. Sediment, draining wetlands, etc.). Is stream(s) free of unpermittable impacts? ❑ • ❑ ❑ Is wetland(s) free of unpermittable impacts? • ❑ ❑ ❑ Is open water(s) free of unpermittable impacts? ❑ ❑ • ❑ Are other standards being met (turbidity, pH, etc.) in all surface waters onsite? • ❑ ❑ ❑ Are surface waters on the site free of illegal discharges? • ❑ ❑ ❑ Comment: Inspected 3 sewer line crossings. At 2 of them the crossings are non -compliant and there are significant sediment deposits within downstream waters. See USACE email/notes for more details page 2 Wetland Inspection Report Project Num: 20210915 Version: 1 Project Name: Reedy Fork Industrial - 5955 Summit Avenue, Browns Summit County: Guilford Status: Issued Project Type: Industrial / Commercial / Business Region: Winston-Salem Location: Reedy Fork Industrial - 5955 Summit Avenue, Browns Summit Latitude: +36° 10' 48" SW Plan Location: Site Owner Name: SI Reedy Fork Inspection Date: 10/12/2022 Reason for Inspection: Follow-up Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Sue L Homewood Secondary Inspector(s): Title: Facility Compliance Status: El Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Longitude: -79° 42' 00" Phone: Phone: 336-776-9694 page 1 Site Number: 20210915 Owner: Lacz, Dan Inspection Date: 10/12/2022 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Follow-up Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Yes No NA NE ▪ • ❑ ❑•▪ • Comment: Inspected stream relocation: some pools insufficient depth, water piping under some riffles, embedded riprap not embedded and tie in to natural channel is steep slope with rock thrown on top. Inspected 3 sewer line crossings. 1 is acceptable, 1 appears to have banks that have completely collapsed into the channel, 1 is full of sediment caught behind 2 check dams. See USACE emails/notes for more details page 2