Loading...
HomeMy WebLinkAboutSW6220506_Application Form_20221007IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The streets will have roadside ditches that will collect runoff that will be conveyed to one of three outlet swales. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW 1995 ® Ph II _ Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 84.15 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0.56 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:83.59 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the batiks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 =10.20 9. How many drainage areas does the project have?1 (For high density, count I for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Brachcoast Swam Stream Class * C Stream Index Number * 18-28-2-1 Total Drainage Area (so 3,642,052 On -site Drainage Area (sf) 3,642,052 Off -site Drainage Area (sf) Proposed Impervious Area** (so 1 371,310 Impervious Area** total 10.20 Impervious' Surface Area Drainage Area 1 Drainage Area _ Drainage Area _i Drainage Area On -site Buildings/Lots (so 220,000 On -site Streets (so 151,310 On -site Parking (so On -site Sidewalks (so Other on -site (sf) Future (so Off -site (sf) Existing BUA*** (sf) Total (sf): 371,310 * Stream Class and Index Number can be determined at: ltttp://portal.ncdenr.org web/wq(ps/csu/classi 'cations Form SWU-101 Version Oct. 31, 2013 Page 3 of 6