Loading...
HomeMy WebLinkAboutSW3221004_O&M Agreement/Plan_20221012Operation & Maintenance Agreement Project Name: Mount Pleasant High School Synthetic Turf Field Project Project Location: 700 Walker Rd., Mount Pleasant NC 28124 Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & correspor Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: No User Defined SCM Present: No Low Density Present: Yes O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: flow o I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Brian Cone Title & Organization: Director of Architecture, Planning, and Construction Street address: 4401 Old Airport Rd City, state, zip: Concord NC 28026 Phone number(s): 704-260-5611 mail: brian.c ca r s.kl2.nc.us Signature: a'VL. Date: 1 % Z I M I r'la t A '��+Cr a Notary Public for the State of '�`t , � County of C-0 ocu(ry do hereby certify that �71rj( ,{fl [ ;n (J personally appeared before me this day of �11 �i�r T� and acknowledge the due execution of the /Opperations and aintenanq� fAgrgement . Witness my hand and official seal, 1 `4%1191 ill,#" ZA';� �0_ PUBLIC Sea! co M 'fill ►.. y commission expires STORM-EZ Version 1.5 8/ 10/2022 O&M Agreement Page 1 of 1 Low Den sityM aintenanos Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area wi II be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The veg etafed conveyance or vegetated receiving area W II be inspected quarterly. Records of operation and maintenance will be kept i n a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: Howto remediate the problem: Vegetation Vegetation is too short or too Maintain grassed vegetation such that the swale or vegetated area does not long. erode durirg the peak flow from the 10-year storm Trash/debris is present. Remove thetrash/debris. Areas of bare soil and/or erosive Regrade the soil if necessaryto remove the gully, and then re -sod (or plant Vegetated receiving areas wth other appropriate species) and water until established. Provide lime and g ul I ies have formed. a one-time fertilizer application. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device (if applicable) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damagge have occurred at the Repair the damage and improve the flow dissipation structure. outlet. The receiving water Discharges from the site are causing erosion or Contact the local ICDEO Regional Office. sedimentation in the receiving water.