HomeMy WebLinkAboutSW3221004_O&M Agreement/Plan_20221012Operation & Maintenance Agreement
Project Name: Mount Pleasant High School Synthetic Turf Field Project
Project Location: 700 Walker Rd., Mount Pleasant NC 28124
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & correspor
Infiltration Basin
Quantity:
Infiltration Trench
Quantity:
Bioretention Cell
Quantity:
Wet Pond
Quantity:
Stormwater Wetland
Quantity:
Permeable Pavement
Quantity:
Sand Filter
Quantity:
Rainwater Harvesting
Quantity:
Green Roof
Quantity:
Level Spreader - Filter Strip
Quantity:
Proprietary System
Quantity:
Treatment Swale
Quantity:
Dry Pond
Quantity:
Disconnected Impervious Surface
Present:
No
User Defined SCM
Present:
No
Low Density
Present:
Yes
O&M sheets will
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Type:
flow o
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party: Brian Cone
Title & Organization: Director of Architecture, Planning, and Construction
Street address: 4401 Old Airport Rd
City, state, zip: Concord NC 28026
Phone number(s): 704-260-5611
mail: brian.c ca r s.kl2.nc.us
Signature: a'VL. Date: 1 % Z
I M I r'la t A '��+Cr a Notary Public for the State of '�`t , �
County of C-0 ocu(ry do hereby certify that �71rj( ,{fl [ ;n (J
personally appeared before me this day of �11 �i�r T� and
acknowledge the due execution of the /Opperations and aintenanq� fAgrgement .
Witness my hand and official seal, 1
`4%1191 ill,#"
ZA';�
�0_
PUBLIC
Sea! co
M
'fill ►..
y commission expires
STORM-EZ
Version 1.5
8/ 10/2022
O&M Agreement Page 1 of 1
Low Den sityM aintenanos Requirements
Important maintenance procedures:
The drainage area to the vegetated conveyance or vegetated receiving area wi II be carefully managed to reduce the
sediment load to the vegetated conveyance or vegetated receiving area.
After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer
will not be applied to the vegetated receiving areas.
The veg etafed conveyance or vegetated receiving area W II be inspected quarterly. Records of operation and maintenance will be kept i n a
known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
Howto remediate the problem:
Vegetation
Vegetation is too short or too
Maintain grassed vegetation such that the swale or vegetated area does not
long.
erode durirg the peak flow from the 10-year storm
Trash/debris is present.
Remove thetrash/debris.
Areas of bare soil and/or erosive
Regrade the soil if necessaryto remove the gully, and then re -sod (or plant
Vegetated receiving areas
wth other appropriate species) and water until established. Provide lime and
g ul I ies have formed.
a one-time fertilizer application.
Clogging has occurred.
Clean out the outlet device. Dispose of the sediment off -site.
The outlet device (if
applicable)
The outlet device is damaged
Repair or replace the outlet device.
Erosion or other signs of
damagge have occurred at the
Repair the damage and improve the flow dissipation structure.
outlet.
The receiving water
Discharges from the site are
causing erosion or
Contact the local ICDEO Regional Office.
sedimentation in the receiving
water.