Loading...
HomeMy WebLinkAboutSW6220101_Design Calculations (Drawdown)_20221013Woodshire Subdivision Phase 7 Wet Pond Drawdown Time Temporary storage volume = Orifice #Idiameter= Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation -- Water elevation --- Driving head (H) _ Discharge (Q) _ Drawdown time = 59,232 cf 3.5 in 1 0.0668 sf 0 in 0 0.0000 sf 0.60 279.50 ft 282.09 ft 0.86 ft 0.2990 cfs 198131 s 55.0 hr 2_3 days 1070-POND 1 drawdown.xlsx Printed 10/13/2022