Loading...
HomeMy WebLinkAbout20221416 Ver 1_Request Memo U-5839 effects_20221012 TIP: U-5839 WBS: 50230.1.1 County(ies): Haywood MEMORANDUM TO: Robert Joyner, HES Section Head FROM: David Mchenry , SUBJECT: Request for Environmental Input Your assistance is requested in providing environmental input for the project described below. Information concerning the proposed project is provided to assist your staff in their investigations. If you are unable to meet the schedule shown below, please let me know. Request Types – see details below Effects Assessment Project Description TIP: U-5839 WBS: 50230.1.1 County: Haywood Let Date: Project Description: US 276 (RUSS AVENUE) FROM US 23/74 TO US 23 BUSINESS (MAIN STREET) UPGRADE CORRIDOR Schedule: Construction – FY F.A. Project No.: Document Type: State EA & FONSI Funding: StateFederal Design Information Project Length: 1.10 Number of the Structure to be Replaced: 2 Existing Cross Section: Variable. 5, 4 and 2 lane undivided. Proposed Cross Section: 4 with restricted movements. Additional Design Information: Input Requested HES, Historic Architecture Request Type: Effects Assessment Date Needed: 05/29/2017 Notes: Attached are revised preliminary design plans that were modified due to historic properties. This plan has undergone one review with local officials and will be reviewed again by officials and public at Dec 6, 2016 workshop. Documentation provided: Vicinity Map Preliminary Design with Historic Properties Marked TIP: U-5839 WBS: 50230.1.1 County(ies): Haywood Effects Required