HomeMy WebLinkAbout20221416 Ver 1_Request Memo U-5839 effects_20221012
TIP: U-5839
WBS: 50230.1.1
County(ies): Haywood
MEMORANDUM TO: Robert Joyner, HES Section Head
FROM: David Mchenry ,
SUBJECT: Request for Environmental Input
Your assistance is requested in providing environmental input for the project described below. Information concerning the
proposed project is provided to assist your staff in their investigations. If you are unable to meet the schedule shown below, please
let me know.
Request Types – see details below
Effects Assessment
Project Description
TIP: U-5839
WBS: 50230.1.1
County: Haywood
Let Date:
Project Description: US 276 (RUSS AVENUE) FROM US 23/74 TO US 23 BUSINESS (MAIN STREET) UPGRADE CORRIDOR
Schedule: Construction – FY
F.A. Project No.:
Document Type: State EA & FONSI
Funding: StateFederal
Design Information
Project Length: 1.10
Number of the Structure to be Replaced: 2
Existing Cross Section: Variable. 5, 4 and 2 lane undivided.
Proposed Cross Section: 4 with restricted movements.
Additional Design Information:
Input Requested
HES, Historic Architecture
Request Type: Effects Assessment
Date Needed: 05/29/2017
Notes: Attached are revised preliminary design plans that were modified due to historic properties. This plan
has undergone one review with local officials and will be reviewed again by officials and public at Dec 6, 2016
workshop.
Documentation provided:
Vicinity Map
Preliminary Design with Historic Properties Marked
TIP: U-5839
WBS: 50230.1.1
County(ies): Haywood
Effects Required