Loading...
HomeMy WebLinkAbout20141134 Ver 3_Roaring Branch Permit Application with plans_20221011 �r wN.vim"' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT McCRORY P. O.Box 25201,Raleigh,NC 27611-5202 TONY TATA GOVERNOR PHONE:919-733-2520 SECRETARY October 28, 2014 Mr. Andy Williams U. S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest,NC 27587 Subject: Nationwide Permit#14 SR 1339 (Roaring Branch Road) Ashe County,North Carolina Project Number: 11C.005148 (DWR Permit Fee: $570) Dear Mr. Williams: The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1339, Roaring Branch Road in Ashe County. Total project length is 0.76 miles. The narrow 13 foot wide travel way will be widened to 18 feet and then paved. Impervious surface area will increase by about 0.46 acres. This is very rocky terrain with springs emanating from the old cut in numerous locations. The stream crossing at station 1+22 is really the only one that looks like a traditional stream. The remaining wet pipes carry springs that enter the ditch line. This project will require the replacement of seven wet pipes as shown below: Stream Impacts: Station Existing Proposed Riprap Temporary Total Impacts Number Pipe Size Pipe Size Impacts ft. Dewaterin (ft.) at this Station 1+22 18"x 40' 24"x 65' 10 40 75 13+00 24"x 30' 24"x 40' 10 0 20 16+05 None 40'x 18" 10 0 50 27+39 18"x 40' 18"x 50' 10 0 20 28+07 18"x 40' 18"x 60' 10 0 30 29+50 Lt. 12"x 35' 18"x 40' 10 0 15 33+35 18"x 50' 18"x 65' 10 0 25 Permanent Fill/Riprap Impacts= 195 feet Temporary Dewatering Impacts= 40 feet Total project Impacts= 235 feet P.O.Box 250,N.WILKESBORO,NC 28659 PHONE (336)667-9111 FAX (336)667-4549 Mr.Andy Williams SR 1339,Roaring Branch Road,Ashe Page 2 October 28,2014 The replacement wet pipe at station 1+22 will require temporary dewatering. An impervious sandbag dike will be constructed upstream of the existing pipe to create a small pool. Clean water will temporarily be pumped around the construction area and will be discharged downstream. Any dirty water located inside of the construction area will be pumped into a silt bag if necessary. Once the new pipe is in place, the impervious dike will be removed and preconstruction streambed elevations will be restored. Due to the low flow nature at the remaining wet pipe locations, the remaining construction areas will be dried by dropping sand bags in the ditch line. If flow starts to overtop the bags we can turn on the pump briefly. The stream crossings all carry different UTs to Roaring Branch (Class: C; ORW). This project was reviewed for the presence of threatened and endangered species on February 26, 2014. This project will have no effect on any federally listed endangered plant or animal species. Historic compliance work has been completed and no surveys were required. The project impacts are not significant in nature and should not remove or degrade existing water quality uses. Stormwater will be routed through grass or rock lined ditches, depending on the ditch line slope. Pipe sizes used will be the minimum necessary to create a safe roadway. Wet pipes exceeding 6% grade will not be buried. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Overall water quality in the area will be improved by paving the ABC travel lanes. All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map and a marked topography map. By copy of this electronic letter, it is requested that Mrs. Marla Chambers with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this electronic letter, it is requested that the Division of Water Resources, 401/Wetlands Unit, issue the appropriate permit for construction of this project. It is requested that any comments related to the 401 certification be electronically forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, Heath Slaughter C' Division Environmental Officer Mr.Andy Williams SR 1339,Roaring Branch Road,Ashe Page 3 October 28,2014 Enclosures cc: Marla Chambers,NCWRC Amy Chapman, Division of Water Resources Dave Wanucha, Division of Water Resources Mike Pettyjohn, PE, Division Engineer Doug Tetzlaff, District Engineer Randall Miles, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Zack Souther, Roadside Environmental Field Operations Technician v(D A.7�T c,, G Office Use Only: R } ` Corps action ID no. a DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information _ 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit El Section 10 Permit — — --� 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification—Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification—Express ❑ Riparian Buffer Authorization J 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes ® No ❑ Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation ® Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes ® No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: SR 1339, Roaring Branch Road 2b. County: Ashe 2c. Nearest municipality/town: Lansing 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state 11 C.005148 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC i f applicable): 3d. Street address: 801 Statesville Road 3e. City, state, zip: North Wilkesboro, NC 28659 3f. Telephone no.: 336-903-9202 3g. Fax no.: 336-667-4549 3h. Email address: hslaughter@ncdot.gov Page 1 of 10 PCN Form —Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑Agent ❑ Other, specify: 4b. Name: 4c. Busines s name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form —Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: 36.50351 Longitude: - 81.58953 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 4.6 acres 2. Surface Waters 2a. Name of nearest body of water(stream, river, etc.)to UTs to Roaring Branch proposed project: 2b. Water Quality Classification of nearest receiving water: C; ORW 2c. River basin: New 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Unpaved road in a rural area. 3b. List the total estimated acreage of all existing wetlands on the property: I 0 acres —� 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 360 linear feet 3d. Explain the purpose of the proposed project: j Upgrade roadway. 3e. Describe the overall project in detail, including the type of equipment to be used: See attached cover letter. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? El Yes ® No El Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to"help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form —Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑Wetlands ® Streams-tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. ]2—e- . 2f. Wetland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps-404, 10 Area of impact Permanent (P) or (if known) DWQ—non-404, other) (acres) Temporary T _ W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T El Yes [:1 Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑Yes ❑ Corps — -- -- ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps fi ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps-404, 10 stream length Permanent(P) or intermittent DWQ—non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ® P ® T Piping, Riprap & UT#1 to Roaring ® PER ® Corps 2 75 Dewatering Branch ❑ INT ® DWQ S2 ® P ❑ T Piping & Riprap UT#2 to Roaring ❑ PER ® Corps 1 20 Branch ® INT ® DWQ _ UT#3 to Roaring [:1 PER ❑ Corps —� 53 ® P ❑ T Piping & Riprap 1 50 Branch ® INT ❑ DWQ _ _ S4 ® P [:IT Piping & Riprap UT#4 to Roaring ® PER ❑ Corps 20 Branch ❑ INT ❑ DWQ S5 ® P ❑ T Piping & Riprap UT#5 to Roaring ® PER ❑ Corps 1 30 Branch ❑ INT ❑ DWQ S6 ® P ❑ T Piping & Riprap UT#6 to Roaring ® PER ❑ Corps 1 15 Branch ❑ INT ❑ DWQ 3h.Total stream and tributary impacts 3i. Comments: See next sheet for totals Page 4 of 10 PCN Form —Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑Wetlands ® Streams-tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps-404, 10 Area of impact Permanent(P) or (if known) DWQ—non-404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ _ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps-404, 10 stream length Permanent (P) or intermittent DWQ—non-404, width (linear Temporary (T) (INT)? other) (feet) feet) UT#7 to Roaring ® PER ® Corps S1 ® P ❑ T Piping, Riprap Branch El INT ® DWQ 1 25 S2 ❑ P ❑ T ❑ PER ® Corps ® INT ® DWQ 53 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ® PER ❑ Corps ❑ INT ❑ DWQ _ S5 ❑ P ❑ T ® PER ❑ Corps ❑ INT ❑ DWQ _ S6 ❑ P ❑ T ® PER ❑ Corps _ ❑ INT ❑ DWQ 3h. Total stream and tributary impacts _- 235 3i. Comments: 125 Pipe, 70 riprap, 40 dewatering Page 4 of 10 PCN Form —Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. i 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact(acres) Permanent(P) or Temporary T _ 01 ❑ P ❑ T 02 ❑ P ❑ T -__- 03 ❑ P ❑ T f 04 ❑ P ❑ T 4L Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. �5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose j (acres) number of pond - Flooded Filled Excavated Flooded Filled Excavated Flooded P1 5f. Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes ® No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar-Pamlico El Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 5d. be. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent(P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. B1 ❑ P ❑ T ❑ Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes -- - ----- ❑ No _ 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form -Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization _ 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The pipe lengths are the minimum needed to improve roadway. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All appropriate BMPs will be used during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ® Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes,mitigation is required by(check all that apply): ❑ DWQ ® Corps ❑ Mitigation bank 2c. If yes, which mitigat ion option will be used for this ® Payment to in-lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ®Yes 4b. Stream mitigation requested: 50 linear feet 4c. If using stream mitigation, stream temperature: ❑warm ❑ cool ®cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal)wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules)—required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form —Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: El Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Falls under DOT NPDES Permit El Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8of10 PCN Form—Version 1.3 December 10, 2008 Version F. Supplementary information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public(federal/state/local)funds or the ® Yes ❑ No use of public(federal/state) land? 1 b. If you answered "yes"to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act(NEPA/SEPA)? 1 c. If you answered "yes"to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes ® No 2c. If you answered "yes"to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes"to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form —Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? 5c. If yes, ind icate the USFWS Field Office you have contacted. ❑ Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS and visual observation 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? WRC will comment 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Project submitted to SHPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c.What source(s) did you use to make the floodplain determination? ncfloodmaps J. Heath Slaughterf 10/28/14 lea Applicant/Agent's Printed Name Applicant/Agent's Si ''ature Date (Agent's sVna t u r e is valid only if an authorization letter from the applicant is provide ..) — ------- — Page 10 of 10 PCN Form —Version 1.3 December 10, 2008 Version REVISED INMO14 PROTECT REFERENCE N0. SHEET N0, VICINITY MAP IICDO5148 1324 • 1354 M 1.07 8 1 SR 1339 ROARING BRANCH RD. i� EROSION CONRTOL PLANS 319 1324 9 1333 47 1334 These Erosion and Sediment Control Plans com�p1Yy with the resulations not forth by the 3 0 •6, 1390 NCa 10000 general construction permit effective August 3, 2011 issued by the North • 13 2 1332 Carolina Departmetn of Environment and Natural Resources Division of Water Quality. *02 13 a Ba et A 3 . + 1J� A 1 Se Din S7MI 1331 1339 1605.01 Temporary Silt Fence----------- Hem VIP-MIZ 16%.01 Special Sediment Control Fence---- 7\/VD T •9d, Mt. on 6 1622.01 Temporary Berms and Slope brains________- a 1630.02 Silt Basin Type B---------------® 1 3 1 7 SITE 1�1.05 Temporary Silt IDitch----------- Sao 1630.05 Temporary Diversion______________ io 1650.06 Special Stilling Basin 1652.05 Rock Inlet Sediment Trap Type C__---_ 13 �O 1340 1633.01 Temporary Rock Silt Check Type`A-------- �.+ Temporary Rock Silt Check Type`A with Matting and Polyacrylamide(PAM)_____-__ (///" Temporary Rock Silt Check Type-B____ • �'':( l 3 9 1 Wattle 1341 .52 .1345 Wattle with Polyacrylamide(PAM) 8 16U.02 Temporary Rock Sediment Dam Type-B_ 1317 1635.01 Rock Pipe Inlet Sediment Trap Type-A-__-___ PROJECT REFERENCE NO. SHEET NO, IICDO5148 1 3 CHURCH DRAINAGE AREA 21 ROAD DRAINAGE ONLY PROP.R/W �- t ' POND DO NOT-- ISTURB 1 PROP.R/W �3 l MONu. - �8" C DISSIPATOR PAD I 14' 5' X 10, / PROTECT BOTH SIDES OF CREEK - 43'. DRAINAGE AREA 1 x - m ROAD DRAINAGE ONLY U E 18"WATTLES EXCELSIOR MATTING IS TO BE SED INSTEAD OF STRAW MATTING NO RIP RAP SHOULD BE PLACED IN DRAINAGE AREA 2 3 x 9 x 3 4, CREEK BED OR BELOW THE HIGH 1.5 ACRES 1 Baffle WATER MARK UNLESS PERMITTF-D 2 ft. weir ID 2.11 PSRM IS REQUIRED FOR DITCH LINE FROM STA. 7+80 TO STA. 13+20 RT MATTING IS REQUIRED FOR DITCH LINE FROM STA. 1+90 TO STA. 7+80 RT LEVEL 3-A DESIGNER ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND CHRIS ABSHER (#137) MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS RIGHT OF WAY OF THE TIME CLEARING AND GRUBBING BEGINS. 50 FEET HORIZONAL SCALE r= RY PROJECT REFERENCE NO. SHEET N0, 11CDO5148 1 4 LEVEL 3-A DESIGNER CHRIS ABSHER t#1371 RIGHT OF WAY 50 FEET HOUSE GRAB , R DISSIPA AD \ / BARN Cn 1 � rn LQ LLJ ai `R F Cn x9 x3 3 x 9 x 3 1 Baffle z DRAINAGE AREA 3 Z 2.3 ACRES 1 Baffle 2 ft. weir 2 ft. weir ID 4.R ID 3.11 DRAINAGE AREA 4 2.9 ACRES NO RIP RAP SHOULD BE PLACED IN CREEK BED OR BELOW THE HIGH WATER MARK UNLESS PERMITTED .,PSRM IS REQUIRED FOR1 DITCH LINE USE 18"WATTLES FROM STA, 7+60 TO STA. 13+20 RT ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS EXCELSIOR MATTING IS TO BE OF THE TIME CLEARING AND GRUBBING BEGINS. USED INSTEAD OF STRAW MATTING HORIZONAL SCALE i'= 50' PROJECT REFERENCE NO. SHEET N0, IICDO5148 5 LEVEL 3-A DESIGNER CHRIS ABSHER (0137) RIGHT OF WAY 50 FEET DRAINAGE AREA 21 ROAD DRAINAGE ONLY o, DO NOT DISTURB 1 6 Cmp DO NOT DISTURB �L _ - - - - - - - - - - - - - - - _ _ WAL HOUSE �Z _ ~4.6'---�' �'� DO NOT DISTURB T DRAINAGE AREA 5 DISSIPATOR PAD 2.9 AC RES 5 x IO• USE 18"WATTLES EXCELSIOR MATTING IS TO BE 3 x 10 x n USED INSTEAD OF STRAW MATTING1 2 Baffles rZ 2 ft. weir " NO RIP RAP SHOULD BE PLACED IN m ID 5.R 5A.R CREEK BED OR BELOW THE HIGH WATER MARK UNLESS PERMITTED PSRM IS REQUIRED FOR DITCH LINE RELOC Aj rn FROM STA. 7+80TO STA, 13+20 RT rn ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND rn MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS ~ OF THE TIME CLEARING AND GRUBBING BEGINS. 0) HORIZONAL SCALE P= 50' PROJECT REFERENCE NO, SHEET NO. IICDO5148 1 6 HODS D DRAINAGE AREA 21 DO NOT DISTURB STEPS ROAD DRAINAGE ONLY LO , - - - - - - s DO NOT DISTURB ------ Eo rri L B WET DITCH - - - - - ,P PLACE DITCH LINER i AS SOON AS POSSIB `""1G�� �R• a3� �� 3 x 10 x 2 Baffles DRAINAGE AREA 7 2 ft. Weir _ ID 7.11 7A.R Place Matting for Erosion Control 2.9 ACRES on Slope as Work Allows. Sta. 15+50 to Sta. 22+00 USE 18"WATTLES 6 EXCELSIOR MATTING IS TO BE USED INSTEAD OF STRAW MATTING NO RIP RAP SHOULD BE PLACED IN CREEK BED OR BELOW THE HIGH WATER MARK UNLESS PERMITTED RIP RAP IS REQUIRED FOR DITCH LINE FROM STA, 13+20TO STA.25+00 RT LEVEL 3-A DESIGNER ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND CHRIS ABSHER (4137) MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS RIGHT OF WAY OF THE TIME CLEARING AND GRUBBING BEGINS. 50 FEET HORIZONAL SCALE P= 50' PROJECT REFERENCE N0, SHEET N0, IIC.005148 1 7 DO NOT DISTURB Q0 DISSIPATOR PAD Z 5'X 10' W ~� �! LLJ -J U � Q � � FALSE SUMP - DO N'11 DISTURB E , DRAINAGE AREA 8 ` � \ DISStPoT�R PAD 2.9 ACRES `� 5'X 10' b USE 18"WATTLES Place Matting for Erosion Control EXCELSIOR MATTING IS TO BE on Slope as Work Allows. c� USED INSTEAD OF STRAW MATTING1 Sta. 15+50 to Sta. 22+00 NO RIP RAP SHOULD BE PLACED IN wocn CREEK BED OR BELOW THE HIGH FALSE SUMP WATERMARK UNLESS PERMITTED RIP RAP IS REQUIRED FOR DITCH LINE FROM STA.25+00 TO STA. 31+10 RT LEVEL 3-A DESIGNER ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND CHRIS ABSHER (#137) MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS RIGHT OF WAY OF THE TIME CLEARING AND GRUBBING BEGINS. 50 FEET HORIZONAL SCALE P= 50' PROJECT REFERENCE N07 SHEET N0, IICDO5148 1 8 LEVEL 3—A DESIGNER CHRIS ABSHER (*137) RIGHT OF WAY 50 FEET DO NOT DISTURB DRAINAGE AREA 21 ROAD DRAINAGE ONLY \ DO NOT DISTURB Uy LU \ c—� LQ IP .• J \ \ V DISS TOR PAD ti DRAINAGE AREA 2.9 ACRES x 12 x 2 Baffles ` j DO NOT DISTURB � 2 ft. weir �g �70 ID 9.11, 9A.R USE 18"WATTLES 9121•11 WET DITCH ` PLACE DITCH LINER ' Place Class 8 Rip Rap Around Inlet of Pipes AS SOON AS POSSIBLE � 18 Cross Lineine Pi EXCELSIOR MATTING IS TO BE Place Matting for Erosion Control \ USED INSTEAD OF STRAW MATTING on Slope as Work Allows. NO RIP RAP SHOULD BE PLACED IN Sta. 25+00 to Sta. 31+3 0 CREEK BED OR BELOW THE HIGH WATER MARK UNLESS PERMITTED RIP RAP FROMSA REQUIRED TA. + LINE DRAINAGE AREA 10 ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND 2.9 ACRES FALSE SUMP MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS OF THE TIME CLEARING AND GRUBBING BEGINS. HORIZONAL SCALE P= 50' PROJECT REFERENCE No.77T7777. 11C.005198 1 9 3 x 9 x 3 DRAT GE AREA 21 DRAINAGE AREA 22 1 Baffle DRAINAGE ONLY ROAD DRAINAGE ONLY 2 ft. weir ID 221, DO NOT DISTURB 22A.L 6 o , F CAR CO SHIED Lu a01 .-- _ FALSE SUMP D RAI NAG E AREA 13 FALSE SUMP WET DITCH 2.9 ACRES PLACE DITCH LINER Place Matting for Erosion Control DRAINAGE AREA 11 AS SOON AS POSSIBLE on Slope as Work Allows. Sta. 25+00 to Sta. 31+30 2' 2.9 ACRES DRAINAGE AREA 12 2.9 ACRES RIP RAP IS REQUIRED FOR DITCH LINE IUSE 18"WATTLES rn FROM STA,30+00 TO STA, 37+80 LT RIP RAP IS REQUIRED FOR DITCH LINE HATCHED AREA INDICATES rrnTi FROM STA.31+10 TO STA.40+00 RT EXCELSIOR MATTING IS TO BE TROUT BUFFER USED INSTEAD OF STRAW MATTING �z LEVEL 3-A DESIGNER rTl ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND CHRIS ABSHER ('157) r`n MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS FNO RIP RAP SHOULD BE PLACED IN RIGHT OF WAY `I OF THE TIME CLEARING AND GRUBBING BEGINS. CREEK BED OR BELOW THE HIGH 50 FEET 0 HORIZONAL SCALE r= 5a PROJECT REFERENCE NO, SHEET NO, IICDO5146 /0 cs i DRAINAGE AREA 24 / ROAD DRAINAGE ONLY f DO NOT DISTURB DRAINAGE AREA 23 ROAD DRAINAGE ONLY 4 W 3 x11x3a ' � z 2 Baffles M x 0 x 3 cn �2 ft. weir - 2 Baffles `���� %' �g� W D 231, 23A. 2 ft. weir D 15.R 15A. W ' - Z DRAINAGE AREA 15 2.9 ACRES USE 18"WATTLES Q - - F EXCELSIOR MATTING IS TO BE ' USED INSTEAD OF STRAW MATTING NO RIP RAP SHOULD BE PLACED IN CREEK BED OR BELOW THE HIGH WATER MARK UNLESS PERMITTED x 12 x 3 2 Baffles RIP RAP IS REQUIRED FOR DITCH LINE FROM STA.31+10 TO STA.40+00 RT 2 ft. weir D 14.R, 14A. RIP RAP IS REQUIRED FOR DITCH LINE L.14B.R FROM STA.30+00 TO STA.3780 LT rn ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND rn MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS rn DRAINAGE AREA 14 OF THE TIME CLEARING AND GRUBBING BEGINS. (r) 2.9 ACRES LEVEL 3-A DESIGNER zr_ CHRIS ABSHER (1137) h RIGHT OF WAY 50 FEET HORIZONAL SCALE I"= 50` PROJECT REFERENCE N0, 3HEEf N0, I1C.005148 U BARN �\ 3 x 9 x 3 \\ 1 Baffle 3 x 13 x3 2 ft. weir 2 Baffles D 241 24A. ��J 2 ft. weir 24B.L P J \ ID 25.1. MONU/W �•\ J , \ BARN \ \ ' \ \ DVOT DISTURB PRO \ \ RA \ wLij Lu 3 x 10 x 3 \ \ a� W 2 Baffles \ z a 2 ft. weir \ \ ' D 16.R 16A. \ NO RIP RAP SHOULD BE PLACED I EXCELSIOR MATTING IS TO BE WATER MARK UNLESS ERMITTED CREEK BED OR BELOW THE HIGH USED INSTEAD OF STRAW MATTING RIP RAP IS REQUIRED FOR DITCH LINE USE 18"WATTLES FROM STA. 31+10 TO STA.40+00 RT HATCHED AREA INDICATES PSRM IS REQUIRED FOR DITCH LINE TROUT BUFFER FROM STA. 37+80 TO STA.40+00 LT LEVEL 3-A DESIGNER DRAINAGE AREA lb CHRIS ABSHER ('137) 2.9 ACRES ALL SECTIONS ARE UNDER THE 30 DAY DESIGN AND RIGHT DE WAY MUST BE PERMANENTLY STABILIZED WITHIN 30 DAYS 50 FEET OF THE TIME CLEARING AND GRUBBING BEGINS, HORIZONAL SCALE P= 50`