HomeMy WebLinkAboutNCC223554_ESC Approval Submitted_20221014Doc J. Envelope ID: 6F7EDF3D-6DCA 44AE-9043-F760C8D20E85
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
July 22, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Niblock Homes, LLC
Attention: William Niblock, Authorized Signer
759 Concord Parkway N, Suite 20
Concord, North Carolina 28027
RE: Project Name: Brighton Park Subdivision
Project ID: CABAR-2022-070
County: Cabarrus
City: Concord Location: Highway 73, Mount Pleasant
River Basin: Yadkin -Pee -Dee
Stream Classification: Other
Acres Approved: 77.0
Submitted By: Latham -Walters Engineering, Inc.
Date Received by LQS: July 12, 2022
Plan Type: Revised
Dear Mr. Niblock:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129,
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the�$160 annual permit fee. After the fee is processed, you will
receive the COC via email As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCGO ov/NCGO L Please direct questions about
the eNOI form to the Stomiwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.. .
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documbntation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
QX North Carolina Department of Environmental Quality . DiAsion of Energy, Mineral and Resources -
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
704.663.1699
on�aam w e,�rmma,mi awury
DocuSign Envelope ID: 6F7EDF3D-6DCA-44AE-9043-F760C8D20E85
Letter of Approval with Modifications
Niblock Homes, LLC
July 22, 2022
Page 2 of 3
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it
is determined that the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation -Pollution Control Act of M73 (North Carolina General Statute 113A-51 through
66), this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also
apply to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
EDocuSIgned by, A'A
42CFABFC6BBC459...
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality -Section -
Enclosures: Certificate of.Approvall'".
Modifications Required for Approval
NCGO1 Fact Sheet
c: Latham -Walters Engineering, Inc.
Attention: Carlos Ruano
16507-A Northcross Drive
Huntersville, North Carolina 28078
D North Carolina Department of Environmental Quality DiA'sion of Energy, Mineral and Resources
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
na�rtw anar
704,663.1699
DocuSign Envelope ID: 6F7EDF3D-6DCA-44AE-9043-F760C8D20E85
Letter of Approval with Modifications
Niblock Homes, LLC
July 22, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Brighton Park Subdivision
Project ID: CABAR-2022-070
County: Cabarrus
Reviewed by: Kenny S. Llywelyn
1. Clearly Identify on one of the phases the lot development plan. Make a note or comment in
the sequence expressing that all measures are to be installed and maintained during lot
development phase.
2. Ensure all diversions have positive drainage to the basins. Some diversions may need to be
extended in the field to ensure drainage flows do not bypass a basin.
%D_E i, North Carolina Department of Environmental Quality Divksion of Energy, Mineral and Resources
Mooresville Reginal Office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
704.663.1699