HomeMy WebLinkAbout20141200 Ver 1_Application_20141118
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY ANTHONY J. TATA
GOVERNOR SECRETARY
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT & ENVIRONMENTAL ANALYSIS UNIT
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-707-6000
FAX: 919-212-5785
WEBSITE:NCDOT.GOV
LOCATION:
CENTURY CENTER, BUILDING B
1020 BIRCH RIDGE DRIVE
RALEIGH NC 27610
November 13, 2014
U. S. Army Corps of Engineers
Regulatory Field Office
3331 Heritage Trade Drive Suite 105
Wake Forest, NC 27587
ATTN: Mr. Andrew Williams
NCDOT Coordinator
Subject: Application for Section 404 Nationwide Permit 14 and Section 401
Water Quality Certification for the proposed Improvements to NC 268
(Elkin Highway) from NC 18 to SR 1966 (Airport Road) in Wilkes
County. Federal Project No. STP-0268(15), Division 11, TIP No. R-2603.
Debit $570 from WBS 34518.1.1.
Dear Sir:
The North Carolina Department of Transportation (NCDOT) proposes improvements to
NC 268 from NC 18 to SR 1966 (Airport Road) in Wilkes County. The proposed project
is approximately 3.6 miles in length, and includes upgrades to the existing multi-lane
section from NC 18 to the vicinity of Shaver Street, as well as widening from the existing
multi-lane section east of NC 18 to SR 1966. There will be 725 linear feet of permanent
stream impacts, 105 linear feet of bank stabilization and 0.03 acre of temporary stream
impacts. There will be 0.29 acre of permanent wetland impacts. Additionally, there will
be 0.01 acre of temporary wetland impacts from utility relocation. The cumulative
impacts to a jurisdictional feature will not exceed the Nationwide thresholds.
Please see enclosed copies of the Pre-Construction Notification (PCN), EEP acceptance
letter, Stormwater Management Plan, permit drawings, utility drawings and design plans.
A Notification of Jurisdictional Determination (JD) was received from the USACE, dated
June 17, 2008. A field re-verification visit was conducted on August 8, 2013 with Monte
Matthews of the U.S. Army Corps of Engineers (USACE) and Amy Euliss of the North
Carolina Division of Water Quality (DWR). This Nationwide 14 Permit application
includes a request for the renewal of the JD of the resources included in the R-2603
project area. An Environmental Assessment (EA) was completed in January 2011 and a
1
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Improvements to NC 268 (Elkin Highway) from NC 18 to SR 1966 (Airport Road)
2b. County: Wilkes
2c. Nearest municipality / town: Wilkesboro
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: R-2603
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6108
3g. Fax no.: (919) 212-5785
3h. Email address: ekcheely@ncdot.gov
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
2
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
3
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 36.28545 Longitude: - 81.318355
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 57 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to proposed
project: Long Creek, Mulberry Creek
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Yadkin-Pee Dee
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
Land use consists of about 45% forest land (including mixed pine-hardwood forest), 50% developed or disturbed land
(roadsides, utility corridors, commercial/industrial/residential areas) and 5% cultivated land (agricultural fields and pastures).
3b. List the total estimated acreage of all existing wetlands on the property:
0.79
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
~5,000
3d. Explain the purpose of the proposed project:
The purpose of the proposed action is to: Improve traffic flow and level of service, and reduce conflicts between through and
local traffic on NC 268 in the project area; and, provide infrastructure upgrades to the existing multi-lane section of NC 268
between NC 18 and Shaver Street.
3e. Describe the overall project in detail, including the type of equipment to be used:
The proposed project includes upgrades to the existing multi-lane section, from NC 18 to the vicinity of Shaver Street as well as
widening from the existing multi-lane section to SR 1966 (Airport Road). Upgrades would include improvements to the existing
roadway, such as resurfacing, replacement of drainage structures, and replacement of curb and gutter. The total length of the
proposed project is approximately 3.6 miles. Standard road building equipment, such as trucks, dozers and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments: Action ID 200801913
Yes No Unknown
JD expired 6/17/13 – field re-verified 8/8/13. DWR sent
verification letter 10/10/13.
4b. If the Corps made the jurisdictional determination, what type of
determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Brian Dustin/Erin Cheely
Agency/Consultant Company: Mulkey/NCDOT
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Monte Matthews of the USACE and Amy Euliss of DWR verified the streams and wetlands on 4/16/08 (with 404 and 401 written
verification) and 8/8/13 (with 401 written verification). Updated 404 JD is requested with this permit.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
4
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non-404, other)
2f.
Area of impact
(acres)
Site 5 P T Fill WC - Non-tidal
freshwater marsh
Yes
No
Corps
DWQ 0.13
Site 6 P T Fill WB - Non-tidal
freshwater marsh
Yes
No
Corps
DWQ 0.17
Site
UC1 P T
Utility
relocation
WB - Non-tidal
freshwater marsh
Yes
No
Corps
DWQ 0.10
2g. Total wetland impacts 0.29 Permanent
0.10 Temporary
2h. Comments:
UTILITY IMPACTS: Site UC1 on the attached Utility Impact Permit Drawings consists of temporary excavation and
hand clearing in order to relocate an overhead power line in this area. No mitigation is required for this temporary
activity.
Total wetland impacts are based on rounding, due to calculating totals with actual numbers to the thousandths.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
intermittent
(INT)?
3e.
Type of
jurisdiction
(Corps - 404, 10
DWQ – non-404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact length
(linear feet)
Site 1 P T Temp. (raise
headwall) S1 – Long Creek PER
INT
Corps
DWQ 16 37
(<0.01 ac)
Site 2 P T Culvert
replace/extend
S4 – UT to Long
Creek
PER
INT
Corps
DWQ 7 106
Site 2 P T Bank
stabilization
S4 – UT to Long
Creek
PER
INT
Corps
DWQ 7 20
Site 2 P T Culvert
replace/extend
S4 – UT to Long
Creek
PER
INT
Corps
DWQ 7 54
(0.01 ac)
Site 3 P T Pipe extension S10 – UT to Long
Creek
PER
INT
Corps
DWQ 4 80
Site 3 P T Bank
stabilization
S10 – UT to Long
Creek
PER
INT
Corps
DWQ 4 10
Site 3 P T Pipe extension S10 – UT to Long
Creek
PER
INT
Corps
DWQ 4 30
<0.01 ac)
Site 4 P T Pipe
replacement
S11 – UT to Long
Creek
PER
INT
Corps
DWQ 2 123
Site 4 P T Pipe
replacement
S11 – UT to Long
Creek
PER
INT
Corps
DWQ 2 20
(<0.01 ac)
5
Site 7 P T Pipe
replace/extend
S3A – UT to
Mulberry Creek
PER
INT
Corps
DWQ 3 120
Site 7 P T Rip rap in
channel
S3A – UT to
Mulberry Creek
PER
INT
Corps
DWQ 3 38
Site 7 P T Bank
Stabilization
S3A – UT to
Mulberry Creek
PER
INT
Corps
DWQ 3 10
Site 7 P T Pipe
replace/extend
S3A – UT to
Mulberry Creek
PER
INT
Corps
DWQ 3 35
(<0.01 ac)
Site 8 P T Pipe extension S3B – UT to
Mulberry Creek
PER
INT
Corps
DWQ 2 70
Site 8 P T Bank
stabilization
S3B – UT to
Mulberry Creek
PER
INT
Corps
DWQ 2 12
Site 8 P T Pipe extension S3B – UT to
Mulberry Creek
PER
INT
Corps
DWQ 2 20
(<0.01 ac)
Site 9A P T Temp.
disturbance
S3 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 8 30
(<0.01 ac)
Site 9B P T Temp.
disturbance
S3 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 8 20
(<0.01 ac)
Site 9C P T Temp.
disturbance
S3 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 8 12
(<0.01 ac)
Site 9D P T Temp.
disturbance
S3 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 8 38
(<0.01 ac)
Site 10 P T Pipe
replace/extend
S3 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 8 123
Site 10 P T Pipe
replace/extend
S3 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 8 68
(0.01 ac)
Site 11 P T Pipe extension S9 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 2 47
Site 11 P T Pipe extension S9 – UT to
Mulberry Creek
PER
INT
Corps
DWQ 2 59
(0.01 ac)
Site 12 P T Pipe
replacement
S12 – UT to Long
Creek
PER
INT
Corps
DWQ 2 18
Site 12 P T Bank
stabilization
S12 – UT to Long
Creek
PER
INT
Corps
DWQ 2 18
Site 12 P T Pipe
replacement
S12 – UT to Long
Creek
PER
INT
Corps
DWQ 2 27
(<0.01 ac)
Site 13 P T Bank
stabilization Mulberry Creek PER
INT
Corps
DWQ 60 35
Site 13 P T Temp.
Causeway Mulberry Creek PER
INT
Corps
DWQ 60 29
(<0.01 ac)
3h. Total stream and tributary impacts
830 Perm
479 Temp
(0.03 ac Temp)
3i. Comments:
Of the 830 total feet of permanent stream impact, 105 total feet are from bank stabilization. DWR does not require
mitigation for impacts to streams totaling less than150 feet. Therefore, stream mitigation required by the USACE =
725 linear feet, required by DWR = 168 linear feet.
Temporary impacts totals are based on rounding, due to some of the individual impacts being <0.01 acre.
6
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P) or
Temporary (T)
4b.
Name of
waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
O1 P T
O2 P T
O3 P T
O4 P T
4f. Total open water impacts 0 Permanent
0 Temporary
4g. Comments: No open waters.
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland (acres)
Flooded Filled Excavat
ed Flooded Fille
d
Excavate
d Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
7
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
Project is in which protected basin?
Neuse Tar-Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B1 P T Yes
No
B2 P T Yes
No
B3 P T Yes
No
6h. Total buffer impacts
6i. Comments: This project is not located within a protected buffer area.
8
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The new bridge over Mulberry Creek will span the creek. Bridge deck drainage will not be allowed to discharge directly
into the water. Heavy development in the area severely limits the viable options for treatment of runoff. However, where
there is sufficient space, preformed scour holes will be used to diffuse the concentrated flow from storm drain outlet pipes
into non-erosive sheet flow to surrounding water resources (see stormwater management plan for locations). The flow
from pipes draining towards jurisdictional streams will be controlled via rip rap at the outlet in order to prevent erosive
velocities.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices (BMPs) will be utilized during construction to attempt to reduce the stormwater impacts to
the receiving stream due to erosion and runoff.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
Mitigation for bank stabilization impacts is required by DWR,
but not required by USACE. Mitigation for streams with
permanent impacts <150’ not required by DWR. Therefore:
Total stream impacts requiring DWR mitigation = 168‘
Total stream impacts requiring USACE mitigation = 725‘
Both agencies require mitigation for the 0.29 acre wetland
impacts.
If no, explain:
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in-lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. Yes
4b. Stream mitigation requested: 725 linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): 0 square feet
4e. Riparian wetland mitigation requested: 0.29 acres
4f. Non-riparian wetland mitigation requested: 0 acres
4g. Coastal (tidal) wetland mitigation requested: 0 acres
9
4h. Comments: The NCDOT does not propose mitigation for the 105 linear feet of stream bank stabilization, the 0.03 acre of
temporary stream impacts from pipe extensions and replacements or the 0.1 acre of temporary wetland impacts from utility
relocation. These actions do not require permanent fill in the stream bed and, therefore, under Section 404 of the Clean
Water Act, do not constitute Loss of Waters of the U.S. and are not subject to compensatory mitigation. Furthermore, the
proposed bank stabilization activities are necessary to prevent erosion and sedimentation, i.e. preventing bank destabilization.
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
Yes No
1b. If yes, then is a diffuse flow plan included? If not, explain why.
Comments: If required from 1a, see attached buffer permit drawings. Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
2e. Who will be responsible for the review of the Stormwater Management Plan?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project? not applicable
3b. Which of the following locally-implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006-246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A
5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A
11
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments: Environmental Assessment (EA) approved January 2011 and Finding
of No Significant Impact (FONSI) approved February 2012
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after-the-fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes
No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
This project involves improving existing lanes as well as widening existing roadway.
A Community Impact Assessment and Qualitative Indirect and Cumulative Effects Assessment report was completed for
the proposed project in September 2008: Community Impact Assessment and Qualitative Indirect and Cumulative Effects
Assessment, NC 268 (Elkin Highway) Widening and Improvements from NC 18 to Airport Road (SR 1966).
The proposed project is not expected to cause substantial indirect and cumulative growth along the project corridor. The
project is not expected to influence population growth substantially beyond that which is forecasted.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
We
t
l
a
n
d
Im
p
a
c
t
/1
Po
n
d
Im
p
a
c
t
LF
A
c
r
e
a
g
e
L
F
A
c
r
e
a
g
e
A
c
r
e
a
g
e
A
c
r
e
a
g
e
LF
A
c
r
e
a
g
e
L
F
A
c
r
e
a
g
e
#1
1
L
o
n
g
Cr
e
e
k
(S
1
)
‐‐
‐
‐
37
<
0
.
0
1
‐‐
‐
‐
‐‐
‐
‐
37<0.01
#2
2
S
4
1
2
6
0
.
0
2
54
0
.
0
1
‐‐
‐‐
12
6
0
.
0
2
540.01
#3
3
S
1
0
8
0
<
0
.
0
1
3
0
<
0
.
0
1
‐‐
‐
‐
80
<
0
.
0
1
3
0
<
0
.
0
1
#4
4
S
1
1
1
2
3
0
.
0
1
20
<
0
.
0
1
‐‐
‐
‐
12
3
0
.
0
1
20<0.01
#5
5,
6,
UC
1
W
C
,
WB
‐‐
‐
‐
‐
‐
‐
‐
0.
2
9
‐‐
‐‐
0.29‐‐‐‐
#6
7
S
3
A
1
6
8
0
.
0
1
35
<
0
.
0
1
‐‐
‐‐
16
8
0
.
0
1
35<0.01
#7
8
S
3
B
8
2
0
.
0
1
2
0
<
0
.
0
1
‐‐
‐
‐
82
0
.
0
1
2
0
<
0
.
0
1
#8
9A
,
9B
,
9C
,
9D
S
3
‐‐
‐
‐
10
0
0
.
0
1
‐‐
‐
‐
‐‐
‐
‐
1000.01
#9
10
S
3
1
2
3
0
.
0
1
6
8
0
.
0
1
‐‐
‐
‐
12
3
0
.
0
1
6
8
0
.
0
1
#1
0
11
S
9
4
7
<
0
.
0
1
59
0
.
0
1
‐‐
‐‐
47
<
0
.
0
1
590.01
#1
1
12
S
1
2
3
6
<
0
.
0
1
2
7
<
0
.
0
1
‐‐
‐
‐
36
<
0
.
0
1
2
7
<
0
.
0
1
#1
2
13
M
u
l
b
e
r
r
y
Cr
e
e
k
3
5
<
0
.
0
1
29
<
0
.
0
1
‐‐
‐‐
35
<
0
.
0
1
29<0.01
1/
We
t
l
a
n
d
im
p
a
c
t
s
ar
e
pe
r
m
a
n
e
n
t
im
p
a
c
t
s
on
l
y
.
Th
e
y
do
no
t
in
c
l
u
d
e
't
e
m
p
o
r
a
r
y
ex
c
a
v
a
t
i
o
n
'
an
d
'h
a
n
d
‐cl
e
a
r
i
n
g
'
im
p
a
c
t
s
(w
h
i
c
h
ar
e
pa
r
t
of
Si
t
e
UC
1
)
.
TI
P
No
.
R‐26
0
3
NW
P
14
Cr
o
s
s
i
n
g
s
an
d
Im
p
a
c
t
Va
l
u
e
s
NW
P
14
Cr
o
s
s
i
n
g
s
Im
p
a
c
t
Si
t
e
#s
F
e
a
t
u
r
e
s
Im
p
a
c
t
e
d
St
r
e
a
m
Im
p
a
c
t
s
Pe
r
m
a
n
e
n
t
St
r
e
a
m
Im
p
a
c
t
s
Te
m
p
o
r
a
r
y
TO
T
A
L
IM
P
A
C
T
Pe
r
m
a
n
e
n
t
TOTAL IMPACT Temporary
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
S
e
p
t
e
m
b
e
r
2
0
1
1
)
R-
2
6
0
3
Co
u
n
t
y
(
i
e
s
)
:
Wi
l
k
e
s
Page 1of 3
Pr
o
j
e
c
t
T
y
p
e
:
D
a
t
e
:
Ph
o
n
e
:
Ph
o
n
e
:
Em
a
i
l
:
Em
a
i
l
:
Co
u
n
t
y
(
i
e
s
)
:
CA
M
A
C
o
u
n
t
y
?
De
s
i
g
n
/
F
u
t
u
r
e
:
Ex
i
s
t
i
n
g
:
Su
p
p
l
e
m
e
n
t
a
l
:
No
n
e
Pr
i
m
a
r
y
:
Mu
l
b
e
r
r
y
C
r
e
e
k
Ya
d
k
i
n
-
P
e
e
D
e
e
12
-
4
2
rw
e
a
d
o
n
@
m
a
e
c
.
c
o
m
5
l
a
n
e
w
i
t
h
c
u
r
b
a
n
d
g
u
t
t
e
r
;
4
l
a
n
e
d
i
v
i
de
d
w
i
t
h
r
a
i
s
e
d
m
e
d
i
a
n
a
n
d
o
u
t
s
i
d
e
c
u
r
b
a
n
d
gu
t
t
e
r
;
4
l
a
n
e
d
i
v
i
d
e
d
w
i
t
h
r
a
i
s
e
d
m
e
d
i
a
n
a
n
d
s
h
o
u
l
d
e
r
s
tw
o
l
a
n
e
h
i
g
h
w
a
y
w
i
t
h
n
o
r
m
a
l
c
r
o
w
n
NC
D
W
Q
S
t
r
e
a
m
I
n
d
e
x
N
o
.
:
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
NC
D
O
T
C
o
n
t
a
c
t
:
Pr
o
j
e
c
t
N
o
.
:
R-
2
6
0
3
Co
n
t
r
a
c
t
o
r
/
D
e
s
i
g
n
e
r
:
bz
e
r
m
a
n
@
n
c
d
o
t
.
g
o
v
Ge
n
e
r
a
l
P
r
o
j
e
c
t
I
n
f
o
r
m
a
t
i
o
n
Ad
d
r
e
s
s
:
1/7/2014
59
8
E
a
s
t
C
h
a
t
h
a
m
S
t
Ra
l
e
i
g
h
,
N
C
2
7
6
1
0
Ca
r
y
,
N
C
2
7
5
1
1
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
Bi
l
l
Z
e
r
m
a
n
,
P
E
Ro
a
d
w
a
y
W
i
d
e
n
i
n
g
ac.
Ge
n
e
r
a
l
P
r
o
j
e
c
t
N
a
r
r
a
t
i
v
e
:
Ty
p
i
c
a
l
C
r
o
s
s
S
e
c
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
:
Re
f
e
r
e
n
c
e
s
20,540
17
.
0
0
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
v
e
h
/
h
r
/
d
a
y
)
:
ac
.
Ot
h
e
r
S
t
r
e
a
m
C
l
a
s
s
i
f
i
c
a
t
i
o
n
:
MA
E
n
g
i
n
e
e
r
i
n
g
C
o
n
s
u
l
t
a
n
t
s
,
I
n
c
:
R
o
g
e
r
W
e
a
d
o
n
,
P
E
Ci
t
y
/
T
o
w
n
:
(9
1
9
)
2
9
7
-
0
2
2
0
10
2
0
B
i
r
c
h
R
i
d
g
e
D
r
Ad
d
r
e
s
s
:
No
r
t
h
W
i
l
k
e
s
b
o
r
o
,
N
C
(9
1
9
)
7
0
7
-
6
7
5
5
W
i
l
k
e
s
No
NC
D
W
Q
S
u
r
f
a
c
e
W
a
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
f
o
r
P
r
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
30
3
(
d
)
I
m
p
a
i
r
m
e
n
t
s
:
Ri
v
e
r
B
a
s
i
n
(
s
)
:
Pr
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
:
Cl
a
s
s
C
Bu
f
f
e
r
R
u
l
e
s
i
n
E
f
f
e
c
t
Pr
o
j
e
c
t
D
e
s
c
r
i
p
t
i
o
n
Su
r
r
o
u
n
d
i
n
g
L
a
n
d
U
s
e
:
Fi
r
s
t
h
a
l
f
o
f
p
r
o
j
e
c
t
i
s
u
r
b
a
n
i
n
d
u
s
t
r
i
a
l
a
n
d
l
a
s
t
h
a
l
f
o
f
p
r
o
j
e
c
t
i
s
r
u
r
a
l
w
o
o
d
e
d
w
i
t
h
p
a
s
t
u
r
e
l
a
n
d
s
3.
5
0
2
m
i
26
,
4
0
0
40
.
0
0
Pr
o
j
e
c
t
B
u
i
l
t
-
U
p
o
n
A
r
e
a
(
a
c
.
)
Pr
o
p
o
s
e
d
P
r
o
j
e
c
t
E
x
i
s
t
i
n
g
S
i
t
e
Pr
o
j
e
c
t
L
e
n
g
t
h
(
l
i
n
.
M
i
l
e
s
o
r
f
e
e
t
)
:
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
S
e
p
t
e
m
b
e
r
2
0
1
1
)
R-
2
6
0
3
Co
u
n
t
y
(
i
e
s
)
:
Wi
l
k
e
s
Page 2of 3
Sh
e
e
t
No
.
St
a
t
i
o
n
(F
r
o
m
/
T
o
)
Fe
a
t
u
r
e
Im
p
a
c
t
e
d
Wa
t
e
r
/
W
e
t
l
a
n
d
/
Bu
f
f
e
r
T
y
p
e
Re
c
e
i
v
i
n
g
S
u
r
f
a
c
e
Wa
t
e
r
N
a
m
e
NR
T
R
M
a
p
ID
NC
D
W
Q
S
t
r
e
a
m
In
d
e
x
NC
D
W
Q
S
u
r
f
a
c
e
Wa
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
30
3
(
d
)
Im
p
a
i
r
m
e
n
t
s
Ty
p
e
o
f
Im
p
a
c
t
Existing SCM
Y1
2
8
+
7
3
t
o
2
9
+
3
0
Y1
A
2
5
+
2
5
to
2
5
+
6
8
L
5
9
+
5
5
to
5
9
+
8
6
L
7
8
+
7
8
to
7
8
+
9
5
L
9
6
+
1
3
to
9
6
+
8
2
L
1
1
7
+
3
0
11
7
+
3
0
L
1
2
2
+
4
8
t
o
1
2
4
+
1
0
L
1
2
2
+
4
2
to
1
2
4
+
5
4
L
1
2
6
+
8
9
to
1
2
7
+
2
3
L
1
2
9
+
5
5
L
1
2
9
+
5
5
L
1
4
9
+
9
0
t
o
1
7
2
+
4
1
L
1
7
9
+
7
9
to
1
8
0
+
8
7
Mu
l
b
e
r
r
y
Cr
e
e
k
S3 S9WCWB
S3
A
S1
S1
2
S4
S1
0
S1
1
C C
Su
r
f
a
c
e
W
a
t
e
r
I
m
p
a
c
t
s
11
Lo
n
g
C
r
e
e
k
No
n
-
T
i
d
a
l
Fr
e
s
h
w
a
t
e
r
M
a
r
s
h
In
t
e
r
m
i
t
t
e
n
t
Pe
r
e
n
n
i
a
l
In
t
e
r
m
i
t
t
e
n
t
Mu
l
b
e
r
r
y
C
r
e
e
k
4
P
e
r
e
n
n
i
a
l
bi
o
l
o
g
i
c
a
l
im
p
a
i
r
m
e
n
t
St
r
e
a
m
N/A Fill
St
r
e
a
m
4
In
t
e
r
m
i
t
t
e
n
t
St
r
e
a
m
9
Pe
r
e
n
n
i
a
l
Si
n
c
e
S
1
(
L
o
n
g
C
r
e
e
k
)
i
s
a
n
o
t
e
d
a
s
3
0
3
(
d
)
i
m
p
a
i
r
e
d
s
t
r
e
a
m
,
s
t
a
n
d
a
r
d
t
r
e
a
t
m
e
n
t
o
p
t
i
o
n
s
w
e
r
e
i
n
v
e
s
t
i
g
a
t
e
d
b
u
t
i
t
w
a
s
d
e
t
e
r
m
i
n
e
d
th
a
t
t
h
e
r
e
w
a
s
n
o
t
a
d
e
q
u
a
t
e
s
p
a
c
e
t
o
a
c
c
o
m
m
o
d
a
t
e
a
n
y
v
i
a
b
l
e
tr
e
a
t
m
e
n
t
o
p
t
i
o
n
s
.
De
s
c
r
i
p
t
i
o
n
o
f
M
i
n
i
m
i
z
a
t
i
o
n
o
f
I
m
p
a
c
t
s
o
r
M
i
t
i
g
a
t
i
o
n
A
l
l
p
r
o
p
o
s
e
d
S
C
M
s
l
i
s
t
e
d
m
u
s
t
a
l
s
o
b
e
l
i
s
t
e
d
u
n
d
e
r
S
w
a
l
e
s
,
P
r
e
f
or
m
e
d
S
o
u
r
H
o
l
e
s
a
n
d
o
t
h
e
r
E
n
e
r
g
y
D
i
s
s
i
p
a
t
o
r
s
,
o
r
O
t
h
e
r
S
t
o
r
m
wa
t
e
r
C
o
n
t
r
o
l
M
e
a
s
u
r
e
s
.
12
-
4
2
Cl
e
a
r
i
n
g
S3
B
12
-
4
2
Proposed SCM N/A N/AN/A
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
Fill
12
Cu
l
v
e
r
t
12
-
4
2
-
9
12
-
4
2
12
-
4
2
-
9
Cu
l
v
e
r
t
12
-
4
2
161212
No
n
-
T
i
d
a
l
Fr
e
s
h
w
a
t
e
r
M
a
r
s
h
14
-
1
6
P
e
r
e
n
n
i
a
l
W
e
t
l
a
n
d
St
r
e
a
m
St
r
e
a
m
In
t
e
r
m
i
t
t
e
n
t
St
r
e
a
m
12
-
4
2
12
-
4
2
-
9
C
l
e
a
r
i
n
g
10
W
e
t
l
a
n
d
St
r
e
a
m
I
n
t
e
r
m
i
t
t
e
n
t
Cu
l
v
e
r
t
Cu
l
v
e
r
t
12
-
4
2
Cu
l
v
e
r
t
St
r
e
a
m
Cu
l
v
e
r
t
12
S
t
r
e
a
m
I
n
t
e
r
m
i
t
t
e
n
t
1
2
-
4
2
7
Cu
l
v
e
r
t
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
*
L
i
s
t
a
l
l
s
t
r
e
a
m
a
n
d
s
u
r
f
a
c
e
w
a
t
e
r
i
m
p
a
c
t
l
o
c
a
t
i
o
n
s
r
e
g
a
r
d
l
e
s
s
o
f
j
u
r
i
s
d
i
c
t
i
o
n
o
r
s
i
z
e
.
Pr
o
j
e
c
t
E
n
v
i
r
o
n
m
e
n
t
a
l
S
u
m
m
a
r
y
St
r
e
a
m
E
q
u
a
l
i
z
e
r
P
i
p
e
s
t
o
b
e
n
o
t
e
d
a
s
a
m
i
n
i
m
i
z
a
t
i
o
n
o
f
i
m
p
a
c
t
s
.
Re
f
e
r
e
n
c
e
s
PFSHPFSHN/A N/AN/A N/AN/A N/AN/A
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
S
e
p
t
e
m
b
e
r
2
0
1
1
)
R-
2
6
0
3
Co
u
n
t
y
(
i
e
s
)
:
Wi
l
k
e
s
Pa
g
e
3
o
f
3
Sh
e
e
t
No
.
S
t
a
t
i
o
n
En
e
r
g
y
D
i
s
s
i
p
a
t
o
r
Ty
p
e
R
i
p
r
a
p
T
y
p
e
Dr
a
i
n
a
g
e
A
r
e
a
(a
c
)
Q10 (cfs)V10 (fps)
Pi
p
e
1
5
1
.
2
>
2
.
0
Pi
p
e
1
5
3
.
4
>
2
.
0
*
R
e
f
e
r
t
o
t
h
e
N
C
D
O
T
B
e
s
t
M
a
n
a
g
e
m
en
t
P
r
a
c
t
i
c
e
s
T
o
o
l
b
o
x
,
V
e
r
s
i
o
n
1
(
M
a
r
c
h
2
0
0
8
)
,
NC
D
O
T
S
t
a
n
d
a
r
d
D
e
t
a
il
s
,
t
h
e
F
e
d
e
r
a
l
H
i
g
h
w
a
y
A
d
m
in
i
s
t
r
a
t
i
o
n
(
F
H
W
A
)
H
y
d
r
a
u
l
i
c
E
n
g
i
n
e
e
r
i
n
g
C
i
r
c
u
l
a
r
N
o
.
1
4
(
H
E
C
-
1
4
)
,
Th
i
r
d
E
d
i
t
i
o
n
,
H
y
d
r
a
u
l
i
c
D
e
s
i
g
n
o
f
E
n
e
r
g
y
D
i
s
s
i
p
a
t
o
r
s
f
o
r
Cu
l
v
e
r
t
s
a
n
d
C
h
a
n
n
e
l
s
(
J
u
l
y
2
0
0
6
)
,
a
s
a
p
p
l
i
c
a
b
l
e
,
f
o
r
d
e
s
i
g
n
g
u
i
d
a
n
c
e
a
n
d
c
r
i
t
e
r
i
a
.
11
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
0.
2
7
Cl
a
s
s
'
B
'
1.3
Pr
e
f
o
r
m
e
d
S
c
o
u
r
H
o
l
e
s
a
n
d
E
n
e
r
g
y
D
i
s
s
i
p
a
t
o
r
s
1.0> 2.0
0.
2
2
Pi
p
e
/
S
t
r
u
c
t
u
r
e
Di
m
e
n
s
i
o
n
s
(i
n
)
Pi
p
e
Co
n
v
e
y
a
n
c
e
S
t
r
u
c
t
u
r
e
15
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
PF
S
H
Cl
a
s
s
'
B
'
-L
-
1
1
6
+
3
5
> 2.0
15
Pi
p
e
11 13
-
L
-
1
3
6
+
0
0
P
F
S
H
12
-
L
-
1
2
1
+
0
6
-L
-
1
1
8
+
4
4
P
F
S
H
Pi
p
e
1
5
3
.
0
>
2
.
0
Pi
p
e
1
5
2
.
9
>
2
.
0
Cl
a
s
s
'
B
'
0
.
7
0
Cl
a
s
s
'
B
'
PF
S
H
0.
2
6
13
-
L
-
1
4
2
+
5
0
1
.
3
8
Cl
a
s
s
'
B
'
PF
S
H
Ad
d
i
t
i
o
n
a
l
C
o
m
m
e
n
t
s
Ha
v
e
m
i
n
i
m
u
m
d
e
s
i
g
n
c
r
i
t
e
r
i
a
,
a
s
p
r
e
s
e
n
t
e
d
i
n
t
h
e
N
C
D
O
T
B
e
s
t
M
a
n
a
g
e
m
e
n
t
P
r
a
c
t
i
c
e
s
T
o
o
l
b
o
x
(
2
0
0
8
)
,
N
C
D
O
T
S
t
a
n
d
a
r
d
D
e
t
a
i
l
s
,
o
r
F
H
WA
HE
C
-
1
4
(
J
u
l
y
2
0
0
6
)
,
b
e
e
n
m
e
t
a
n
d
v
e
r
i
f
i
e
d
,
a
s
a
p
p
l
i
c
a
b
l
e
?
I
f
N
o
,
p
r
ov
i
d
e
f
u
r
t
h
e
r
e
x
p
l
a
n
a
n
t
i
o
n
o
f
w
h
y
d
e
s
i
g
n
c
r
i
t
e
r
i
a
w
a
s
n
o
t
m
et.
12
-
L
-
1
2
1
+
0
0
P
F
S
H
C
l
a
s
s
'
B
'
0
.
6
8
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
YE
S
NO
25 50 10050
25 50 10050
5 10 20 10
D
=
=
=
=
=
=
%
ADT
ADT
% *
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
REGIONAL TIER
0
0
0
PROFILE (HORIZONTAL)
36001.1.2
36001.2.1
STP-0268(16)
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
See Sheet 1-A For Index of Sheets
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
li
c
s
\
P
E
R
M
IT
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
t
s
h
.
d
g
n
3
:
0
6
:
2
5
P
M
C
O
N
T
R
A
C
T
:
T
I
P
P
R
O
J
E
C
T
:
R
-
2
6
0
3
D
E
P
A
R
T
MEN
T
O
F TRAN SPORTA
T
IO
N
S
T
A TEOFNORT
H
CAR
O
LI
N
A
APRIL 16, 2013
MAY 19, 2015
RIGHT OF WAY DATE:
LETTING DATE:
DIVISION OF HIGHWAYS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
1000 Birch Ridge Dr., NC, 27610
Prepared for:
Prepared by:
(919) 297-0220
CARY, NORTH CAROLINA 27511
598 E. CHATHAM STREET, SUITE 137
MA ENGINEERING CONSULTANTS, INC.
BURKE EVANS, PE
2012 STANDARD SPECIFICATIONS
SIGNALS, STRUCTURES, AND SIGNING
TYPE OF WORK: GRADING, DRAINAGE, PAVING, CURB & GUTTER,
R-2603
LENGTH ROADWAY PROJECT R-2603 = 3.474 mi.
LENGTH STRUCTURE PROJECT R-2603 = 0.028 mi.
TOTAL LENGTH OF TIP PROJECT R-2603 = 3.502 mi.
LENGTH OF PROJECT BASED ON -L-
-L- POC STA 195+30.00
END TIP PROJECT R-2603
-L- POT STA 10+38.67
BEGIN TIP PROJECT R-2603
VICINITY MAP
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF NORTH WILKESBORO.
20,540
26,400
DHV 10
65
6T
N
AD
8
3
/9
5
M
U
L
B
E
R
R
Y
C
R
E
E
K
TO ELKIN
TO I-77
T
O
U
S
4
2
1
-L-
-L-
S
E
C
O
N
D
S
T.
N
C
1
8
SECOND ST.
NC 18 / 268
FINLEY AVE.
L
E
G
I
O
N
D
R
.
-
Y
7
-
S
R
1
9
7
9
FAIRPLAINS RD
-Y8- SR 1971
A
I
R
P
O
R
T
R
D
.
-
Y
1
8
-
S
R
1
9
6
6
RIVER LIBERTY G
RO
VE C
H
U
RC
H
RD
.
-Y18
- SR 2
3
3
3
RI
D
G
E
TO
P
R
D.
-
Y
19-
BEAU
M
O
N
T
PO
PLAR
ST.
-
Y17
-
SR
2
0
8
6
VISTA LAN
E
-Y16
- SR 2
0
9
0
W O
O
D
S ID
E D
R .
-Y 14 -
SKYVIEW
D
R.
-Y13
-
P
EBBLE
S
T.
-
Y10
-
S
R
19
8
1
A
R
O
N
C
A
L
L
R
D.
-
Y
1
1
-
S
R
1
9
8
3
FLINT HILL RD.-Y12- SR 2334
-L- STA 116+60.00
BEGIN BRIDGE
-L- STA 118+09.00
END BRIDGE
18
S
C
H
O
O
L
B
U
S
D
R.
-
Y3
-
TE
M
P
LE
S
T.
-
Y4
-
W
H
ITE
P
IN
E
S
T.
-
Y5
-
S
H
A
V
E
R
S
T
.
-
Y
6
-
QUEEN DR.
-Y15-
4
5
6
7
8 9
10
11
12
13 14
16
17
2
0
2
1
(T
O
P
)
15
NC 268
FLINT HILL RD.
-Y2- SR 2334
NORTH WILKESBORO CITY LIMITS
C
IT
Y
L
IM
IT
S
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
CITY LIMITS
NORTH WILKESBORO
CITY
LIMITS
NORTH
WILKESBORO
CITY LIMITS
NORTH WILKESBORO
CITY LIMITS
NORTH WILKESBORO
CITY LIMITS
NORTH WILKESBORO
15(BOT)
West D St
Statesville Rd
Statesville Rd
2418
2462
2328
WILKESBORO
Mulberry
Elkin Hwy2nd St
Sparta Rd
Elkin Hwy
Elkin Hwy
Elkin Hwy
C B D Loop
River St
River St
Statesville Rd
Statesville Rd
Elkin Hwy
Elkin Hwy
Elkin Hwy
W Main St
E Main St
Fairplains
Call
Airport
County
Wilkes
M
ul
b
err
y
Creek
RIVER
R
E
D
DIES
YADKIN
RIVER
YADKIN
RIVER
Cricket
Oakwoods
2340
BEGIN PROJECT
END PROJECT
1532
2333
2318
2333
1550
1535
1718
1703
1705
1536
K. S. HUTCHENS, PE
1957
1966
2334
1517
1517
1103
2461
2418
2340
2340 2355
WILKES COUNTY
FUNC CLASS = ***
ELKIN HWY.
*** MINOR ARTERIAL FROM BEGINNING OF PROJECT TO MULBERRY CREEK
MAJOR COLLECTOR FROM MULBERRY CREEK TO END OF PROJECT
** 40 MPH FROM BEGINNING OF PROJECT TO FAIRPLAINS RD.
50 MPH FROM FAIRPLAINS RD. TO END OF PROJECT
V **
PESTP-0268(15)
ROADWAY DESIGN UNIT
PROJECT ENGINEER
BRENDA MOORE, PE
NCDOT CONTACT:
S
ID
N
EY
A
VE.
-
Y9
-
NC 268
2015
DESIGN DATA
2035
ELKIN HWY.
NC 268
-Y1- / -Y1A-
OF NC 18 TO SR 1966 (AIRPORT ROAD)
NC 268 FROM MULTI-LANES EAST
CITY LIMITS
NORTH WILKESBORO
CITY LIMITS
NORTH WILKESBORO
CITY LIMITS
NORTH WILKESBORO
DUAL 4%
- UPGRADED SIGNAL
%
* TTST 2% +
115
115
16
16
18
268
18
268
268
268
18
421
421
421
421
BUS 421
BUS
R/W, UTILITIES
(LT)19
(RT)19
W
F
G
A
D
D
Y
R
D.
S
R
1
9
8
0
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 10SITE 8
SITE 7
SITE 6
SITE 5
SITE 4SITE 3
SITE 2
SITE 1
SITE 9
SITE 11
SITE 12
SITE 13
SHEET 1 OF 28
PERMIT DRAWING
SURFACE WATER
TEMP IMPACTS TO
SURFACE WATER
TEMP IMPACTS TO
SURFACE WATER
PERM IMPACTS TO
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
TS TS IMPACTS IN SURFACE WATER
DENOTES TEMPORARY S S SURFACE WATERDENOTES IMPACTS IN
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IN SURF WATER
PERM IMPACTS
IN SURF WATERTEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
WETLAND
DENOTES FILL IN
F F
FILL IN WETLANDS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATERPERM IMPACTS
IN SURF WATERTEMP IMPACTS
IN SURF WATERTEMP IMPACTS
IN SURF WATERTEMP IMPACTS
TS TS IMPACTS IN SURFACE WATERDENOTES TEMPORARY
TS TS IMPACTS IN SURFACE WATERDENOTES TEMPORARY S S SURFACE WATERDENOTES IMPACTS IN
IN SURF WATERTEMP IMPACTS
IN SURF WATERTEMP IMPACTS
IN SURF WATERPERM IMPACTS
IN SURF WATERPERM IMPACTS
SITE 1
SITE 1
SITE 2
SITE 3
SITE 3
SITE 4
SITE 8
SITE 7
SITE 5
SITE 6
SITE 10
SITE 11
IN SURF WATERPERM IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATERPERM IMPACTSIN SURF WATERTEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
SITE 12
S S SURFACE WATER
DENOTES IMPACTS IN
S S
SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 9A
IN SURF WATERPERM IMPACTS
SITE 13
SITE 9B SITE 9D
(55’ LONG FROM PIPE OUTLET)EXISTING RIP RAP IN CHANNEL STREAM NOTE:
IN SURF WATERTEMP IMPACTS
IN SURF WATERPERM IMPACTS
IN SURF WATERTEMP IMPACTS
S S SURFACE WATERDENOTES IMPACTS IN
TS TS IMPACTS IN SURFACE WATERDENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
SITE 11
SITE 9C
25
26
27
28
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
4
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 5
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
. 2
2
+
0
0
R-2603 4
SEE SHEET NO. 18
MATCH LINE -Y1- STA. 20+00
SHEET 2 OF 28
PERMIT DRAWING
2
0
20
2
5
2
5
20
15
-L--L-
-
Y2--Y 1 --Y1-
-Y1A-
N
AD
8
3
/ 9
5
-Y1A-
-Y1-
SURFACE WATER
TEMP IMPACTS TO
SURFACE WATER
TEMP IMPACTS TO
SURFACE WATER
PERM IMPACTS TO
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 1
SITE 1
SITE 12
S S SURFACE WATER
DENOTES IMPACTS IN
JC FAW
TRACTOR INC
JOHNSON OIL AND
ELLAGRENE BROWN
JAMES BROWN
R/W MON
EASEMENT
UTILITY
PERMANENT
PERMANENT DRAINAGE EASEMENT
15
20
127
128
135
137
S
S
HW
15" CMP
18
" RC
P
18
" R
C
P 24" CMP
C
B
CB
CB
15
" R
C
P
CB
15
" RC
P
CB
CB
12" C
M
P
12
" C MP
12
" C
MP
15
" C
MP
CB
CB
CB
12
"
C
M
P
CB
CB
15
"
R
C
P
18" RCP
18" RCP
C B
18" CMP
15
" C
MP
J
U
N
C
TIO
N
A
PPR
O
X.
15" CMP
CB
3
0"
CM
P
30" CMP 30" CMP
JUNCTIONAPPROX.
4
8
" CM
P
15" CMP 18" CMP
15
"
C
M
P
CB
CB CB
18" RCP
CB
DI
R
A
P
P
R
O
X.
1
5
"
C
M
P
CB
18"
C
M
P
18" RCP
CB
15" CMP
CBCB
CB
CB
15" CMP
CB
MON
R/W
RCP
12"
MON
R/W
MO
N
C
O
N
C
M
O
N
R
/W
M
O
N
R
/W
MON
CONC
CMP
18"
C
M
P
2
4
"
S
BSTS
CONC
CONC
BST
BST
CONC
BST
BST
BST
CONC
BST
CONC
CONC
BST
CONC
C
O
N
C
BST
CONC
DI
DI
DI
DI
CONC
WHITE ST 18" BST
BST
BST
CONC
B
S
T
S
NC 18
S
E
COND
S
T
BS
T
R
H
O
P
E
S
S
T
B
S
T
CONC
CAPS
VENT
S
B
S
T
BST
CONC
BST
CONC
BST
CONC
C
O
N
CCAPSVENT
BST
BST
C
O
N
C
BST
BST
BST
BST
CONC
S
S
SR 1525 E WAUGH BST
SR 1525 W WAUGH BST
B
S
T
BST
BST
BST
BST
BST
S
S
BST
BST
BST
BSTBST
CONC
CONC
CONC CONC CONC
C
O
N
C
CONC
CONC
CONC
CONC
C
O
N
C
C
O
N
C
C
O
N
C
BST
B
S
T
C
O
N
C
CB
B
S
T
CONC
CONC CONC
DI
CONC
CONC
CONC
CONC
4’x
6’
B
A
R
R
E
L
DI
A
T
M
CB
DI
DI
CB
DI
CB
CB
DI
DI
CAN
CAN
LADD FURNITURE INC
19
NC 268 ELKIN RD BST
F
LI
N
T
HIL
L
R
D
B
S
T
S
R
2
3
3
4
HOLDINGS LLC
J & L REAL ESTATE
126
INDUSTRIAL CENTERS LLC
136
EDWARD GREENE
124
INVESTORS 4100D LLC
FIRST STATES
125
ELLEN LACKEY
GARY LACKEY
18CARL BYRD
17
COMMUNITY ONE BANK
16
CONRAD REEVES
129
CONNARD LLC
130
131
MAROLYN PENDRY
DAVID PENDRY
MACK BROWN
WILLA BROWN
13
18" C
MP
CHARLES B. BUSH JR.
176
KAJAN LLC
14
MON
R/W
174.94’
+09.76
100.43’
+36.85
77.29’
+58.44
48.68’
+05.57
CHRISTOPHER ROBERTS
TIMBERLI ROBERTS
DUNCAN ELECTRIC CO
JOHN MCNEIL
DONNA MCNEIL
MON
R/W
18Z
NC 268
ELKIN RD BST
18Z
RAISE EXISTING HW
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
DI
DI
DI
CB
CB
15" RCP-III 15" RCP-III
15" RCP-III
15
"
RC
P
-
III
15" RCP-III
1
5
" R
C
P
-III
15" RCP-III
4
8
" RC
P
-III
2GI
1
8"
RCP-III 18" RCP-III 18" RCP-III
1
5"
R
C
P-III 24" RCP-III
3
0
"
RC
P-
III
3
0
"
2GI
-III RCP15"
1
5"
RC
P-III
15" RCP-III
15"
15" RCP-III CB
30" RCP-III
w/MH
JB
RCP-III
36"2GI
w/MH
JB
15"
TO EX. RCBC
TIE 24" RCP-III
3
0
"
CB
RETAIN
RETAIN
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
SEE DETAIL PR1
PLACE ON BANKS ONLY
CLASS ’I’ RIP RAP
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR1
MI
N.
2:
1
CHANNEL BANK
TIE TO EXISTING
EST. 26 TONS & 50 SY GEOTEXTILE
LINER TYPE - CLASS ’I’ RIP RAP
d= 3 Ft.
LENGTH = 18 FT.
-Y2- STA. 19+30 LT
Channel Bed
REMOVE
P
PLUG 18" @R/W
REMOVE 84’ OF EX. 18"
C
F
F
F
C
F
F
F
F
F
F
F
C
F
C
C
F
F
F
F
FF
F
F
F F
F
F F F
F
F
C
1
0
9
3
1093
10
9
4
1094
10
9
4
10
9
5
1095
10
9
5
10
9
6
10
9
6
1096
1
0
9
7
10
9
7
10
9
7
10
9
7
10
9
8
10
9
8
10
9
8
10
9
8
1
0
9
9
10
9
9
10
9
9
1
0
9
9
110
0
110
0
110
0
110
0
1101
110
1
1
1
0
1
110
1
1101
1101
110
2
1102
110
2
110
2
1
10
2
1102
110
3
1103
1103
1103
1103
110
3
1103
1104
1104
110
4
1104
1104
1104
110
4
110
4
1104
1105
1105
1105
1105
1105
110
5
110
5
110
5
110
5
1105
1105
1106
1106
110
6
110
6
1106
110
6
110
6
1106
1107
1107
1107
1107
110
7
1107
1108
1108
1108
1108
110
8
1109
1109
1109
110 9
110
9
1110
1110
1110
1110
1110
1111
1111
1111
1111
1111
1112
1112
1112
1112
1112
1113
1
1
1
3
1113
1113
1113
1114
1114
1114
1114
1114
1114
1115
111
5
1115
1115
1115
1116
1116
1116
1116
1116
1116
11161116
1117
1117
1117
1117
1117
1117
1118
1118
1118
1118
1118
1119
1119
1119
1119
1119
112
0
112
0
1120
1120
1120
1121
1121
112
1
1121
1121
1121
1121
112
1
1122
112
2
1122
1122
1122
1122
112
2
112
2
1122
1122
1123
112
3
112
3
1123
1123
1123
1123
1
1
2
4
112
4
1124
1124
1124
1124
1124
11241124
1
1
2
5
112
5
1125
112
5
1125
1125
112
5
1125
1
1
2
6
112
6
1126
1126
1126
1126
11261126
1126
1126
1126
112
7
112
7
1127
1127
1127
1127
1127
1127
112
7
1127
112
7
1127
112
7
1128
1
1
2
8
1128
1128
1128
1128
1128
1128
1128
112
81128
1128
1128
1128
1129
1129 1129
112
9
112
9
1129
1129
1129
1129
1129
1129
112
9
1129
1129
1129
1130
1130
113
0
113
0
113
0
1130
113
0
1130 1130
1130
1130
1130
1130 1130
1131
1131
1131
1131
1131
1131
1131
1131
1131
1131
1131
1131
113 1
1131
1131
1131
1131
1131
113
2
1132
1132
1132
113
2
1132 1132
1132
113
2
1132
1132
1132
113
2
1132
1132
1132
1132
1133
1133
113
3
113
3
113
3
113
3
1133
1133
113
3
1133
1133
1133
11331133
1133
113 3
1133
113
4
1134
113
4
1134
1134
1134
113 4
1134
1134
1134
1134
1134
1134
1134
1134
113
4
1134
1135
1135
1
1
3
5
1135
1135
1135
1135
1135
1135
1135
113
5
1135
1135
1135
1135
113
5
1136
113
6
1136
1136
1136
113 6
113 6
1136
1136
1136
1136
113
6
1136
1136
1136
113
6
1136
1137
1137
1137
1137
1137
1137
113
7
1137
1137
1137
113
7
1137
1137
1137
1137 1137
1137
1138
1138
1138
1138
1138
113
8
113
8
1138
1138
1138
113
8
1138
1138
113
8
1138
1138
1139
1139
113
9
1139
1139
113
9
113
9
1139
1139
1139
1139
1139
1139
1139
1139
1139
113
9
113
9
1140
1140
1
1
4
0
1140
1140
1140
114
0
1140
1140
1140
114
0
1140
1140
11
4
0
1140
1140
114
1
1141
1141
1141
1141
1141
1141
1141
1141
114
1
1141
1141
1141
1141
1141
1141
1141
114
2
1142
114
2
1142
1142
1142
114
2
1142
1142
114
2
1142
114
2
1142
1
1
4
3
1143
114
3
1143
1143
114 3
1143
1143
114
3
1143 1143
1143
11
4
4
1144
114
4
1144
1144
1144
1144
1144
114
4
1144
1144
1
1
4
5
1145
114
5
1145
114
5
114
5
1
1
4
5
1145
1145 114
5
1145
1145
1145
1145
114
6
1
14
6
1146
114
6
1146
1146
1146
114
6
1146
1146
1
1
4
6
1146
11461146
114
7
1147
114
7
1147
114
7
1147
1147
1147
1147
114
7
1147
1147
1147
114
8
1148
114
8
1148
114
8
1148
1148
1148
114
8
1148
1148
114
9
1149
114
9
1149
114
9
1149
114
9
1149
1149
114
9
114
9
1149
1149
115
0
1150
115
0
1150
1150
115
0
115
0
1150
1150
115
0
1150
1150
1
1
5
0
115
1
1151
115
1
1151
1151
115
1
1151
1151
1151
115
1
1151
1151
115
2
1152
115
2
1152
1152
1152
115
2
1152 115
2
1152
1152
1
1
5
3
1153
115
3
115
3
1153
1153
1153
1153 1153
1153
115
4
1154
115
4
115
4
1154
1154
1154
115
4
115
5
1155
115
5
1155
115
5
115
5
1155
115
5
115
6
1156
1156
115
6
115
6
1156
115
6
115
7
1157
1157
1157
115
7
115
7
115
7
115
8
1158
1158
1158
115
8
1158
1158
115
9
1159
1159
1159
115
9
1159
116
0
1160
116
0
1160
116
0
116
0
116
0
116
1
1161
1161
1161
116
1
1161
116
2
1162
1162
1162
1162
116
2
116
3
1163
116
3
1163
116
3
116
3
116
3
116
4
116
4
116
4
1164
1164
116
4
116
4
1
1
6
5
116
5
1
1
6
5
1165
1165
116
5
1165
116
6
116
6
116
6
116
6
116
6
116
6
116
6
116
6
116
7
116
7
116
7
116
7
116
7
1167
116
7
116
7
1
1
6
8
116
8
1168
116
8
116
8
116 8
1168
116
8
1169
116
9
116
9
1169
116
9
116
9
116
9
116
9
116
9
1169
116
9
1170
1170
117
0
117
0
117
0
117
0
117
0
1170
117
0
117
0
1170
117
0
117
0
1170
117
0
117
0
117
0
117
0
117
0
117
0
117
0
1170
1170
117
0
117
0
117
0
1171
117
1
1171
1171
1171
1171
1171
117
1
117
1
117
1
1171
1171
1171
1171
117
1
117
1
1171
1171
1171
1171
117
1
1171
1171
1171
117
2
1172
117
2
117
2
1172
1172
117
2
117
2
1172
1172
117
2
1172
1172
1172
117
2
117
2
1172
1
1
7
3
1173
11
7
3
117
3
1
1
7
3
117
3
117
3
1173
1173
1173
117
3
1173
1173
1173
1173
1174
117
4
1174
117
4
117
4
117
4
117
4
1174
1174
117
5
117
5
117
5
117
5
1175
1175
1175
1
17
6
1176
1176
1176
117
7
1177
1177
1
17
8
117
9
1
1
8
0
118
1
1182
1183
118
4
1185
R
EV
IS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
4
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 5
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 2
2
+
0
0
R-2603 4
SEE SHEET NO. 18
MATCH LINE -Y1- STA. 20+00
SHEET 3 OF 28
PERMIT DRAWING
2
0
20
2
5
2
5
20
15
-L--L-
-
Y2--Y 1 --Y1-
-Y1A-
N
AD
8
3
/ 9
5
-Y1A-
-Y1-
SURFACE WATER
TEMP IMPACTS TO
SURFACE WATER
TEMP IMPACTS TO
SURFACE WATER
PERM IMPACTS TO
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 1
SITE 1
SITE 12
S S SURFACE WATER
DENOTES IMPACTS IN
JC FAW
TRACTOR INC
JOHNSON OIL AND
ELLAGRENE BROWN
JAMES BROWN
R/W MON
EASEMENT
UTILITY
PERMANENT
PERMANENT DRAINAGE EASEMENT
15
20
127
128
135
137
S
S
HW
15" CMP
18
" R
CP
18
" R
C
P 24" CMP
CB
CB
CB
15
" RCP
C
B
15
" R
C
P
CB
CB
12" CM
P
12
" C
MP
12
" C
MP
15
" C
MP
CB
CB
CB
12
"
C
M
P
CB
CB
15
"
R
C
P
18" RCP
18" RCP
CB
18" CMP
15
" C
MP
JU
N
C
T
I
O
N
A
PPR
O
X.
15" CMP
CB
3
0"
CM
P
30" CMP 30" CMP
JUNCTIONAPPROX.
4
8
" CM
P
15" CMP 18" CMP
15
"
C
M
P
CB
CB CB
18" RCP
CB
DI
R
A
P
P
R
O
X.
1
5
"
C
M
P
CB
18"
C
M
P
18" RCP
CB
15" CMP
CB CB
CB
CB
15" CMP
CB
MON
R/W
RCP
12"
MON
R/W
MO
N
CO
N
C
M
O
N
R/W
M
O
N
R/W
MON
CONC
CMP
18"
C
M
P
2
4
"
S
BSTS
CONC
CONC
BST
BST
CONC
BST
BST
BST
CONC
BST
CONC
CONC
BST
CONC
C
O
N
C
BST
CONC
DI
DI
DI
DI
CONC
WHITE ST 18" BST
BST
BST
CONC
B
S
T
S
NC 18
S
E
COND
S
T
B
S
T
R
H
O
P
E
S
S
T
B
S
T
CONC
CAPS
VENT
S
BS
T
B
ST
CONC
BST
CONC
BST
CONC
C
O
N
CCAPSVENT
BST
BST
C
ON
C
BST
BST
BST
BST
CONC
S
S
SR 1525 E WAUGH BST
SR 1525 W WAUGH BST
B
S
T
BST
BST
BST
BST
BST
S
S
BST
BST
BST
BSTBST
CONC
CONC
CONC CONC CONC
C
O
N
C
CONC
CONC
CONC
CONC
C
O
N
C
C
O
N
C
C
O
N
C
BST
B
S
T
C
O
NC
CB
B
S
T
CONC
CONC CONC
DI
CONC
CONC
CONC
CONC
4’x
6’
B
A
R
R
E
L
DI
A
T
M
CB
DI
DI
CB
DI
CB
CB
DI
DI
CAN
CAN
LADD FURNITURE INC
19
NC 268 ELKIN RD BST
F
LI
N
T
HI
L
L
R
D
B
S
T
S
R
2
3
3
4
HOLDINGS LLC
J & L REAL ESTATE
126
INDUSTRIAL CENTERS LLC
136
EDWARD GREENE
124
INVESTORS 4100D LLC
FIRST STATES
125
ELLEN LACKEY
GARY LACKEY
18CARL BYRD
17
COMMUNITY ONE BANK
16
CONRAD REEVES
129
CONNARD LLC
130
131
MAROLYN PENDRY
DAVID PENDRY
MACK BROWN
WILLA BROWN
13
18" C
MP
CHARLES B. BUSH JR.
176
KAJAN LLC
14
MON
R/W
174.94’
+09.76
100.43’
+36.85
77.29’
+58.44
48.68’
+05.57
CHRISTOPHER ROBERTS
TIMBERLI ROBERTS
DUNCAN ELECTRIC CO
JOHN MCNEIL
DONNA MCNEIL
MON
R/W
18Z
NC 268
ELKIN RD BST
18Z
RAISE EXISTING HW
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
DI
DI
DI
CB
CB
15" RCP-III 15" RCP-III
15" RCP-III
15
"
RC
P
-
III
15" RCP-III
15
" RC
P
-III
15" RCP-III
4
8
" RC
P
-III
2GI
1
8"
RCP-III 18" RCP-III 18" RCP-III
1
5"
R
C
P-III 24" RCP-III
3
0
" RC
P-
III
3
0
"
2GI
-III RCP15"
15"
RC
P-III
15" RCP-III
15"
15" RCP-III CB
30" RCP-III
w/MH
JB
RCP-III
36"
2GI
w/MH
JB
15"
TO EX. RCBC
TIE 24" RCP-III
3
0
"
CB
RETAIN
RETAIN
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
SEE DETAIL PR1
PLACE ON BANKS ONLY
CLASS ’I’ RIP RAP
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR1
MI
N.
2:
1
CHANNEL BANK
TIE TO EXISTING
EST. 26 TONS & 50 SY GEOTEXTILE
LINER TYPE - CLASS ’I’ RIP RAP
d= 3 Ft.
LENGTH = 18 FT.
-Y2- STA. 19+30 LT
Channel Bed
REMOVE
P
PLUG 18" @R/W
REMOVE 84’ OF EX. 18"
C
F
F
F
C
F
F
F
F
F
F
F
C
F
C
C
F
F
F
F
FF
F
F
F F
F
F F F
F
F
C
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
1
1
:
5
1
:
4
0
A
M
-Y1-
NC 268
R-2603 29
1,110
1,120
1,130
1,140
1,150
1,160
1,170
1,180
1,190
1,200
1,110
1,120
1,130
1,140
1,150
1,160
1,170
1,180
12 13 14 15 16 17 18 19 20 21 22 23 24
1,060
1,070
1,080
1,090
1,100
1,110
1,120
1,130
1,140
1,150
1,080
1,090
1,100
1,110
1,120
1,130
1,140
1,150
1,160
1,170-Y1-
NC 268
1110
25 26 27 28 29 30 31 3224
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 4 OF 28
PERMIT DRAWING
(-
)3
.2932%
(-
)
7.
4994%
ELEV. 1185.40’
-Y1- STA. 15+00.00
BEGIN GRADE
PI = 17+45.00
EL = 1,177.33’
VC = 400’
K = 95
V = 50 mph
STA 15+75 AS DIRECTED BY THE ENGINEER
INCIDENTAL MILLING FROM -Y1- STA. 13+05.00 TO
(+)1.4108%
PI = 27+55.00
EL = 1,101.59’
VC = 520’
K = 58
V = 35 mph
EL. 1108.33’
-Y1- STA. 32+32.91
END GRADE
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1106.1
= 370
= 100(+)
= 50
= 280
= 1102.3
= 340
= 1104.7
= 290
-Y1- Sta. 29+00
EXISTING 4’ X 6’ BOX CULVERT
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
7
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R-2603 7
S
E
E
S
H
E
E
T
N
O.
8
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A.
6
4
+
0
0
S
E
E
S
H
E
E
T
NO. 6
MAT
CH
LINE
-
L-
S
T
A. 5
0
+
0
0
SHEET 5 OF 28
PERMIT DRAWING
5
0
5
5
6
0
5
0
-L-
-
Y7
-
N
A
D
8 3 / 9 5
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 2
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
JIMMY CHURCH
EASEMENT
DRAINAGE
PERMANENT
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H
W
I
LK
ESB
O
R
O
CIT
Y
LIM
I
T
S
NORTH WILKESBORO CITY LIMITS
NORTH WILKESBORO CITY LIMITS
39
141
18" CMP
18"
C
M
P
18
" CMP
18
" C
MP
HW
CMP15
"
BST
BST
S
OI
L
CONC
SOIL
BST
BST
GR
GR
GR
GR
CONC
BST
BST
CONC
BST
CONC
C
O
N
C C
ONC
BST
BST
B
S
T
BST
B
ST
CONC
CONC
CONC
BST
BST
B
S
T
CONC
S
R
19
7
9
LE
GION
D
R
B
S
T
BST
CONC
C
O
N
C
GR
CONC
CONC
CONC
BST
BST GR
M
T
L
M
T
L
MTL
S
CONC
D
I
CAN
12
" C
M
P
BST
4
"C
U
R
B
18
’
B
S
T
W
F
G
A
D
D
Y
R
D
S
R
19
8
0
20’ BST
SR 1971 FAIRPLAINS RD
NC 268 ELKIN RD BST
LESSIE BROWN
JAMES BROWN
40
TERRY BROWN
41
AKG INC
42
BRUSHY MOUNTAIN BAPTIST ASSOCIATION INC
43
DOUGLAS HINCHER
44
MICHEAL WARREN
138
RAYMOND BLEVINS
139
BLANCH GREGORY
140
142
LESSIE BROWN
JAMES BROWN45
GWYN KILBY 143
DENNIS WHITTINGTON
47
JAN KERLEY
DOUG KERLEY
145
S
A
R
A
H
PIE
R
C
E
C
U
R
L
E
Y
PIE
R
C
E
14
4
10
8
" C
M
P
24" CMP
8
4"
C
M
P
46
TERRY BROWN JR
EASEMENT
DRAINAGE
PERMANENT
HARVEY LEDFORD
WILLIAM R. LOWE
48
BILLY BLEVINS SR
49
C
M
P
10
8
"
WORKSHOP INC
VOCATIONAL
WILKES COUNTY
15" CMP15
" CM
P
15" CMP
C
MP
108"
97’
86’
+87
CB
CB
CB
CB
CB
CB
CB
CB
CB
DI
2GI
2GI
2GI
2GI 2GI
2GI
CB 15" RCP-III
15" RCP-III
15" RC
P-III
15"15"
15
"
RC
P
-
III
15
"
1
5
"
R
C
P
-
I
I
I
15" RCP-III 15" RCP-III
15"
15"
R
C
P-III
15" RCP-III
CB
CB
15" RCP-III
18" CSP
15" CSP
EST 85 CY
BACKFILL EXISTING CHANNEL
15" RCP-III
2GI
2GI
REMOVE
TO R/W
REMOVE
REMOVE
REMOVE
RETA
IN
REMOVE
15"
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
146 SY GEOTEXTILE
EST. 50 TONS
SEE DETAIL CC1
W/ CLASS II RIP RAP
PERMANENT CHANNEL CHANGE
78 SY GEOTEXTILE
SEE DETAIL TP1
EST. 61 TONS
TOE PROTECTION
15"
15" RCP-III
15" RCP-III
PLUG 18" @R/W
PHASING
DURING CULVERT
REMOVE 84" & 108" CMP
EST. 52 CY
w/ FLOWABLE FILL
FILL 108" CMP (22’)
EST. 295 CY
w/ FLOWABLE FILL
FILL 108" CMP (125’)
EST. 173 CY
w/ FLOWABLE FILL
FILL 7’x7’ RCBC (95’)
DI
15" CSP 15" RCP-III
DETAIL AA1
Ground
Natural
Ground
Natural
CLASS II RIP RAP AT OUTLET
B= varies 8 to 11 Ft.
2:12:
1
( Not to Scale)
BGeotextile
-L- STA. 59+57 (115’ to 135’ RT)
2:
1
d
D
( Not to Scale)
B
CHANNEL CHANGE
Ground
Natural
DETAIL CC1
Ground
Natural
Fill Slope
Proposed
GEOTEXTILE
Type of Liner= Class II Rip Rap
Backfill Exist. Channel
B= 5 Ft.
Max. d= 4 Ft.
Min. D= 4 Ft.
FROM -L- STA. 59+66 (273’ LT) TO -L- STA. 59+64 (232’ LT)
SEE DETAIL AA1
16 SY GEOTEXTILE
EST 9 TONS
PLACE ON BANKS ONLY
CLASS II RIP RAP
SEE DETAIL AA1
22 SY GEOTEXTILE
EST 13 TONS
PLACE ON BANKS ONLY
CLASS II RIP RAP
FF
C
F
F
F
C
F
C
C
F
F
C
F
C F
C
F
F
F
F
F
C
F
F
F
F
C
CC
10
4
5
10
4
6
10
4
6
10
4
7
10
4
7
10
4
8
10
4
8
10
4
9
10
4
9
10
5
0
1050
10
5
1
1051
1051
10
5
2
10
5
2
1052
10
5
3
10 5 3
1053
1054
10 54
10
54
10
5
5
1055
10
5
5
1056
1056
10
5
6
1056
1057
1057
10
5
7
1057
1058
1058
10
5
8
1058
10
59
1059
10
59
1059
10601060
10
6
0
10
6
0
1061
1061
106
1
10
6
1
1061
1061
1061
10
6
2
1062
1062
10
6
2
1062
1062
1062
1
0
6
3
1063
1063
1063
1063
10
6
3
10
6
4
1064
1064
1
0
6
4
1064
10
6
4
1
0
6
5
1065
1065
10
6
5
1065
10
6
5
10
6
6
1066
1066
10
6
6
1066
1066
10
6
7
1067
1067
10
6
7
1067
1067
10
6
7
10
6
8
1068
1068
10
6
8
1068
1068
1068
10
6
9
1069
1069
10
69
1069
1069
1069
1069
10
7
0
1070
1070
10
7
0
1070
1070
1070
1070
1070
1070
1071
1071
1071
1071
1071
1071
10
71
1071
1071
1071
1071
10 7 1
1072
1072
1072
1072
1072
1072
1072
1072
1072
1072
10
7
2
10
7
2
1073
1073
1073
1073
1073
1073
1073
1073
1073
10
7
3
10
73
1073
10
73
1074 1074
1074
1074
1074
1074
1074
10
7
4
1074
1074
1074
10
7
4
10
74
1074
1074
10
7
4
1
0
7
4
10
7
4
1074
10
7
4
1074
1075
1075
1075
10
7
5
10
7
5
10
7
5
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1075
1076
10
76
1076
1076
1076
1076
10
7
6
10
7
6
1076
1076
1076
10
7
6
1076
1076
1076
1077
10
7
7
1077
1077
1077
10
7
7
1077
1077
10
7
7
1
0
7
7
10
7
7
1077
10
7
7
1078
10
7
8
1078
1078
10
78
10
78
10
78
1078
10
7
8
1078
1078
1079
10
7
9
10
79
1079
10
7
9
1079
1079
1079
1
0
7
9
1079
10
8
0
10
8
0
1080
1080
10
8
0
1
0
8
0 1080
1080
1081
10
81
1081
1081
10
81
1081
10
81
1081
10
8
2
1082
1082
10
8
2
1082
1082
1082
10
8
3
1083
1083
1083
10
8
3
1083
10
8
4
1084
1084
10
8
4
10
8
4
1084
10
8
5
1085
1085
10
8
5
10
8
5
1085
10
8
6
10
8
6
1086
1086
10
8
6
1086
10
86
108
7
1087
1087
1087
10
8
7
1087
1087
1087
1088
1088
1088
1088
1088
10
8
8
10
88
1088
1088
1089
1089
1089
1089
1089
1089
10
8
9
1089
1089
1090
1090
1090
1090
1090
1090
10
9
0
1090
109
0
1090
1091
1091
1091
10
91
1091
10
91
1091
1091
1091
1091
1092
10
9
2
1092
10
9
2
1092
1092
1092
10
9
2
1092
1092 10
9
2
1093
1093
1093
1093
10
9
3
1093
1093
1093
10
9
3
1093
1093
10
9
3
1094
1094
1094
1094
1094
10
9
4
1094
10
94
1094
1094
1094
1094
1094
1094
1094
1094
1094
1095
1095
1095
10
9
5
1095
1095
1
0
9
5
1095
1095
1095
1095
1095
1095
1095
1095
10
9
5
1095
1095
1095
10
9
5
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
1096
10
9
6
1096
10
9
6
1096
1097
1097
1097
1097
1097
1097
10
9
7
10
9
7
1097
1097
1097
10
9
7
1098
1098
1098
1098
1098
1098
10
9
8
10
9
8
1098
1099
1099
10
99
1099
1099
1099
10
9
9
1099
1099
1099
1099
1099
1099
1100
1100
1100
110
0
1100
1100
110
0
110
0
1100 1100
1101
1101
110
1
1101
1101
1101
1101
1101
1101 1101
1101
1102
1102
1102
110
2
1102
1102
110
2
110
2
110
2
1102
1102
1102
1103
1103
1103
1103
1103
1103
1103
110
3
110
3
1103
1103
110
3
1104
1104
1104
1104
1104
1104
110
4
1104
1104
1104
1104
110
4
1105
1105
1105
110
5
1105 1105
110
5
1105
1105
1105
110
5
110
5
1106
110
6
1106
110
6
1106 1106
1106
1106
1106
1106
1106
110
6
1106
1107
1107
1107
110
7
1107
1107
110
7
1107
1107
1107
1107
1107
1107
110
7
1108
1108
1108
1108
1108
110
8
110
8
11
0
8
1108
110
8
1108
1108
1108
1109
1109
110
9
1109
110
9
110
9
1109
1109
1109
1110
1110
1110
1110
1110
1110
1110
1
1
1
0
1111
1111
1
1
11
1111
1111
1111
1111
1111
1
1
12
1112
1112
1
112
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
7
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R-2603 7
S
E
E
S
H
E
E
T
N
O.
8
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A.
6
4
+
0
0
S
E
E
S
H
E
E
T
NO. 6
MAT
CH
LINE
-
L-
S
T
A. 5
0
+
0
0
SHEET 6 OF 28
PERMIT DRAWING
5
0
5
5
6
0
5
0
-L-
-
Y7
-
-Y8-
N
A
D
8 3 / 9 5
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 2
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
JIMMY CHURCH
EASEMENT
DRAINAGE
PERMANENT
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H
W
I
LK
ESB
O
R
O
CIT
Y
LIM
I
T
S
NORTH WILKESBORO CITY LIMITS
NORTH WILKESBORO CITY LIMITS
39
141
18" CMP
18"
C
M
P
18
" CMP
18
" C
MP
HW
CMP15
"
BST
BST
S
OI
L
CONC
SOIL
BST
BST
GR
GR
GR
GR
CONC
BST
BST
CONC
BST
CONC
C
O
N
C C
ONC
BST
BST
B
S
T
BST
B
ST
CONC
CONC
CONC
BST
BST
B
S
T
CONC
S
R
19
7
9
LE
GION
D
R
B
S
T
BST
CONC
C
O
N
C
GR
CONC
CONC
CONC
BST
BST GR
M
T
L
M
T
L
MTL
S
CONC
D
I
CAN
12
" C
M
P
BST
4
"C
U
R
B
18
’
B
S
T
W
F
G
A
D
D
Y
R
D
S
R
19
8
0
20’ BST
SR 1971 FAIRPLAINS RD
NC 268 ELKIN RD BST
LESSIE BROWN
JAMES BROWN
40
TERRY BROWN
41
AKG INC
42
BRUSHY MOUNTAIN BAPTIST ASSOCIATION INC
43
DOUGLAS HINCHER
44
MICHEAL WARREN
138
RAYMOND BLEVINS
139
BLANCH GREGORY
140
142
LESSIE BROWN
JAMES BROWN45
GWYN KILBY 143
DENNIS WHITTINGTON
47
JAN KERLEY
DOUG KERLEY
145
S
A
R
A
H
PIE
R
C
E
C
U
R
L
E
Y
PIE
R
C
E
14
4
10
8
" C
M
P
24" CMP
8
4"
C
M
P
46
TERRY BROWN JR
EASEMENT
DRAINAGE
PERMANENT
HARVEY LEDFORD
WILLIAM R. LOWE
48
BILLY BLEVINS SR
49
C
M
P
10
8
"
WORKSHOP INC
VOCATIONAL
WILKES COUNTY
15" CMP15
" CM
P
15" CMP
C
MP
108"
97’
86’
+87
CB
CB
CB
CB
CB
CB
CB
CB
CB
DI
2GI
2GI
2GI
2GI 2GI
2GI
CB 15" RCP-III
15" RCP-III
15" RC
P-III
15"15"
15
"
RC
P
-
III
15
"
1
5
"
R
C
P
-
I
I
I
15" RCP-III 15" RCP-III
15"
15"
R
C
P-III
15" RCP-III
CB
CB
15" RCP-III
18" CSP
15" CSP
EST 85 CY
BACKFILL EXISTING CHANNEL
15" RCP-III
2GI
2GI
REMOVE
TO R/W
REMOVE
REMOVE
REMOVE
RETA
IN
REMOVE
15"
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
146 SY GEOTEXTILE
EST. 50 TONS
SEE DETAIL CC1
W/ CLASS II RIP RAP
PERMANENT CHANNEL CHANGE
78 SY GEOTEXTILE
SEE DETAIL TP1
EST. 61 TONS
TOE PROTECTION
15"
15" RCP-III
15" RCP-III
PLUG 18" @R/W
PHASING
DURING CULVERT
REMOVE 84" & 108" CMP
EST. 52 CY
w/ FLOWABLE FILL
FILL 108" CMP (22’)
EST. 295 CY
w/ FLOWABLE FILL
FILL 108" CMP (125’)
EST. 173 CY
w/ FLOWABLE FILL
FILL 7’x7’ RCBC (95’)
DI
15" CSP 15" RCP-III
DETAIL AA1
Ground
Natural
Ground
Natural
CLASS II RIP RAP AT OUTLET
B= varies 8 to 11 Ft.
2:12:
1
( Not to Scale)
BGeotextile
-L- STA. 59+57 (115’ to 135’ RT)
2:
1
d
D
( Not to Scale)
B
CHANNEL CHANGE
Ground
Natural
DETAIL CC1
Ground
Natural
Fill Slope
Proposed
GEOTEXTILE
Type of Liner= Class II Rip Rap
Backfill Exist. Channel
B= 5 Ft.
Max. d= 4 Ft.
Min. D= 4 Ft.
FROM -L- STA. 59+66 (273’ LT) TO -L- STA. 59+64 (232’ LT)
SEE DETAIL AA1
16 SY GEOTEXTILE
EST 9 TONS
PLACE ON BANKS ONLY
CLASS II RIP RAP
SEE DETAIL AA1
22 SY GEOTEXTILE
EST 13 TONS
PLACE ON BANKS ONLY
CLASS II RIP RAP
FF
C
F
F
F
C
F
C
C
F
F
C
F
C F
C
F
F
F
F
F
C
F
F
F
F
C
CC
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
1
1
:
5
9
:
5
7
A
M
38
50
-L-
NC 268
-L-
NC 268
R-2603 23
3736 39 40 41 42 43 44 45 46 47 48 49 50
51 52 53 54 55 56 57 58 59 60 61 62 63 64
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
1,130
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 7 OF 28
PERMIT DRAWING
PI = 37+00.00
EL = 1,086.11’
(-)4
.0270%
(-)1.4050%
VC = 430’
K = 164
V = 65 mph
(+)2.9400%
V = 50 mph
PI = 43+75.00
EL = 1,076.62’
VC = 420’
K = 97
ELEV. 1074.70’
8" SPIKE IN ROOT OF 16" POPLAR TREE
203.52’ RT.
-L- STA. 42+89.22
BM # 3
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1078.6
= 165
= 100(+)
= 50
= 120
= 1077.7
= 150
= 1078.3
= 145
-L- Sta. 44+02EXISTING 5’ X 6’ BOX CULVERT
(+)2.9400%
(-
)3
.2470%
(-)0.5700%
PI = 52+80.00
EL = 1,103.23’
VC = 840’
K = 136
V = 55 mph
PI = 60+95.00
EL = 1,076.77’
VC = 260’
K = 97
V = 50 mph
ELEV. 1075.36’
8" SPIKE IN ROOT OF 10" PINE TREE
180.12’ LT.
-L- STA. 60+50.08
BM # 4
IN
V
=1047.
64’
IN
V
=1044.
67’
18
"
C
M
P
-
C
P
P
IN
V
=
10
5
4
.
0
1’
IN
V
=
10
4
9
.
7
0
’
15" CMP18" RCP
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
9
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 10
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 9
2
+
0
0
R-2603 9
S
E
E
S
H
E
E
T
N
O
.
8
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
7
8
+
0
0
SHEET 8 OF 28
PERMIT DRAWING8
0 8
5
9
0
-L-
-Y9-
-Y10-
N
AD
8
3
/ 9
5
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 3
SITE 3
MARK BARE
KEN HAMBY
LUCY JOHNSON
LINDA ST CLAIR
W
H
IT
L
E
Y
D
IC
K
E
N
S
O
N
P
R
O
P
E
R
T
IE
S
L
L
C
DEBRA EVANS
BRUCE EVANS
DARLENE GRIT
DONALD GRIT
VEATRICE JOHNSON
DARRYL JOHNSON
DARRYL JOHNSONANNA WYATT
VERNON WYATT
FRANK JOHNSON
BILLY ELMORE
ROBERT GENTLE
RUSSELL TRIPLETT
NORTH WILKESBORO CITY LIMITS
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
NORTH
WILKESBORO
CITY
LIMITS
10
0
’ D
U
KE
P
O
WE
R
E
A
S
E
ME
NT
10
0
’ DU
KE
P
O
WE
R
E
AS
E
MENT
100’
1
6
’
I
N
G
R
E
S
S
E
G
R
E
S
S
E
A
S
E
M
E
N
T
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
146
2
4
"
C
M
P
24" CMP
JUCT
APPROX.
18" CMP
15" CMP
18" RCP
DI
DI
DI
v
v
v
v
1
B
A
R
R
E
L
L
4
’
x
3
’
NORTH WILKESBORO CITY LIMITS
C
M
P
2
4
"
C
M
P
3
0
"
GR
S
R
19
8
1
P
E
B
B
LE
S
T
18
’ B
S
T
SR 1982 GRYDER ST BST
B
S
T
BSTS
BST
RAP
RIP
GR
SS
BST
GR
BST
GR
DK
B
S
T
GR
G
R
BST
BST
B
S
T
K
A
T
I
E
L
N
B
S
T
DK
D
K
BST
GR
BST
S
72"CHLGR
C O N C GR
GR
GR
BST
BST
BST
B
S
T
S
GR
GR
C
O
N
C
CONC
CONC
GR
BSTDI
B
S
T
15" CMP
15" CMP15" CMP
15" CMP
15" CMP
CAN
MTL
G
R
15" CMP
NC 268 ELKIN RD 22’ BST
GUSTAVO VILLEGAS MENDOZA
RALPH HOUSTON ROYAL
LINDA ST CLAIR
177
178
179
B8
1072.
92
B
9
1072.
32
B
10
1073.32B
13
1071.04*B
L3603
B
15
1073.20
B
19
1073.83
B
20
1073.83
B
21
1074.56
B
22
1075.83
B
24
1074.
59
B
27
1074.68
B
29
1076.17
B
30
1078.27
B
32
1078.36
B35
1078.
51
B
38
1080.48
B
41
1080.74
B
42
1080.33*EL3603
B
72
1067.89
B73
1068.
04
B
74
1068.17
B
81
1071.
83*BL
3603
B93
1060.98*B
L3405
B
94
1060.64
B95
1060.
59
B96
1059.
12
B97
1058.
91
B98
1057.24
B99
1057.23
B
1001059.71
B
101
1059.91
B
102
1061.16*EL
3405
B121
1046.72*B
L3604
B
1221067.98
B
123
1060.41*EL3603
B
157
1071.53
B158
1072.14
B
159
1071.15
B
160
1072.12
B166
1069.28
B
1721067.94
B1731066.
11
B
174
1067.68
B1821060.
46
B1841056.
10*E
L3604
B
187
1062.15
B
1881061.40
B
189
1062.81
B
191
1064.18
B
1921070.
92
B
193
1071.39
B
1941073.37
B195
1072.98
B
2041075.34
B2131078.
47*B
L3603
B
2211080.23
B
2251069.21
B2311069.
68
B
2331072.69*B
L3405
B
2341072.83*B
L3405
B
2351071.
71*EL3405
B2361076.
54
B2371076.51
B
2381076.41
B2391079.26
B
2401078.90
B2621082.
11
B2631080.94
B2641081.54
B
2651080.57
B2851077.56*B
L36031
B
2911080.91
B
2941082.76
B
3021079.64
B3051080.
62
B
3061080.71*EL36031
B3071069.31*B
L3405
B3081066.61
B3091065.
81
B
310
1065.18
B
311
1065.33
B
312
1065.28
B
313
1062.80
B314
1064.98
B
315
1066.05
B
319
1065.95
B
3221069.25*EL3405
B
3411061.
86
B
3451065.04*EL
3603
B
3511081.44
3701 A
X
LE
B
3971080.
65B
4001081.64
B
4011081.38
B
4531073.41
B
4761079.39
B
5461063.27*EL3604
REBEKAH DONNA YORK LIFE ESTATE
GARAGE
BLK
CONC
GR
48" CHL
GR
GR
SIDNEY AVE
GR
GR
CONC
LANDSCAPE
GR
PO
O
L
POOL
WD DECK
WD DECK
GR C
O
N
C
C
O
N
C
MON
CONC
GR
18
"
C
M
P
JASON SCOTT BROWN
ROGER & KAREN HAMBY
TRAVIS JAMES MATHIS
74
H
D
P
E
18
"
55
WILLIAM EUGENE HOLLAND
TP WILKES LLC
73
ESTATE HOLDING, LLC
J&S FAIR REAL
56
DONNA R. KEY
REEVES, JR.
FRED A.
PATRICIA BILLINGS
TYRE BILLINGS
56
18" RCP
85’
+31
164’
+80
85’
+67
180’
+05
DI
DI
2GI
CBCBCB
2GI
CB
CBCB
2GI
BDO
CB
CB
2GI
BDO
BDO
CBCB
JB w/MH
CB
2GI 2GI
2GI
28 SY GEOTEXTILE
EST. 11 TONS
CLASS ’B’ RIP RAP
1
5"
15
"
15" RCP-III
18" RCP-III
15" RCP-III
24"
RC
P-
III
24"
HW
SPECIAL CB
15
" RC
P-
III
15" RCP-III
15" RCP-III CBCB
CB
18" RCP-III 18" RCP-III
15" RCP-III
15" RCP-III
24" RCP-III 24" RCP-III 24" RCP-III 24" RCP-III
15
"
15"
1
5
"
15" RCP-III
15"15"
3
6
"
18" RCP-III 18" RCP-III
3
0
"
R
C
P
-
I
I
I
24" RCP-III
15
"
15" RCP-III
15
"
RC
P
-
III
18
"
RC
P
-
II
I
18" RCP-III
HW
4
8
"
R
C
P
-
I
I
I
TO 86+60 RT
FROM STA 86+00
EST. 51 SY
INSTALL PSRM
15" RCP-III
CB CB
15
"
15
"
BDO
2GI
1
5
"
R
C
P
-
I
I
I
CB
2GI
15"15" RCP-III
2GI
2GI
2GI
2GI 2GI
2GI
2GI
2GI
RETAIN RCBC
REMOVE
REMOVE REMOVE
REMOVE
REMOVE
24" CMP
REMOVE 26’+/-
TB JB w/MH
SPECIAL
RC
P-
III
4
8
"
CB
CB
CB
CB
CB CB
CB
18"
15"
w/ELBOWS
24"
15"
SEE DETAIL PR2
PLACE ON BANKS ONLY
CLASS ’I’ RIP RAP
15"
15"15"
24" RCP-III
15"
15"
RCP-III
15"
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR2
MI
N.
2:
1
EST. 26 TONS & 50 SY GEOTEXTILE
LINER TYPE - CLASS ’I’ RIP RAP
d= 4 Ft.
FT.
LENGTH = 10
Channel Bed
-L- STA. 78+80 RT
CHANNEL BANK
TIE TO EXISTING
REMOVE
REMOVE
RETAIN
F
CC
C
C
F
F
F
C
F
C
C
F
C
F
F C C
F
F C C
C
F
F
C
F
F
F
F
F F
1037
10
3
8
10
3
9104010
4
0
10
4
1
1041
10
41
10
4
2
1042
10
4
2
1042
10
4
3
10
43
10
4
3
1043
1043
1
0
4
3
10
4
4
10
4
4
1044
10
4
4
10
4
4
10
4
4
10
4
510
4
5
1045
10
4
5
10
4
5
1045
10
4
5
1045
10
4
6
10
4
6
1046
10
46
10
4
6
10
4
6
10
4
6
1046
10
4
6
1046
10
4
7
10
47
1047
10
4
7
10
4
7
10
4
7
10
4
7
1047
1047
10
4
8
10
4
8
1048
10
4
8
10
4
8
10 4 8
10
4
8
1048
1048
1048
10
4
8
10
4
9
10
4
9
1049
10
4
9
10
4
9
1049
10
49
10
4
9
10
4
9
10
49
1049
10
4
9
10
4
9
104
9
10
4
9
10
4
91049
1049
10
5
0
10
5
0
1050
10
5
0
10
5
0
1050
1050
10501050
10
5
0
10
5
0
1
0
5
0
1050
10
5
0
10
5
0
1050
1050
1050
1050 1050
1050 1050 1050
1050
1050
1050
1050
1050 1050
10
5
1
1051
10
5
1
10
5
1
10511051
1051
105110
5
1
1051
1051
1051
1051
10
5
1
10
5
1
10
5
1
1051
10
5
1
1051
1051
1051
1051
1051
1051
10
5
1
10
5
1
10
5
1
1051
1051
1051
1051
1051
1051
1051
10
5
2
1052
1052
1052
1052
1052
1052
1052
1052
1052
10
5
2
1052
1052
10
52
1052
1052
1052
10
5
2
1052
10
5
2
1052
1052
1052
10
5
2
10
5
2
1052
1052
1052
1052
1052
10
5
3
1053
1053
1053
10
5
3
1053
1053
1053
1053
1053
10
5
3
1053
1053
10
5
3
1053
1053
10 5 3
10
5
3
10
5
3
1053
1053
1053
1053
10
5
4
1054
1054
1054
1054
1054
1054
10541054
1054
1054
1054
1054
1054
10
5
4
1054
10
5
4
10
5
4
10
5
4
1054
1054
1054
10
54
10
5
4
1
0
5
5
1055
1055
1055
1055
1055
1055
10
5
5
1055
1055
1055
1055
1055
1055
10
5
5
1055
1055
10
5
5
1055
10
5
5
10
5
5
10
5
5
1055
10
5
6
10
5
6
10
5
6
1056
1056
1056
1056
1056
1056
1056
1056
1056
1056
1056
1056
1056
1056
10
5
6
10
5
6
1056
10
5
6
1056
1056
10
5
6
10
5
6
10
5
61056
10
5
6
10
5
7
1057
1057
105
7
1057
1057
1057
1057
10571057
1057
1057
1057
10
5
7
10
5
7
1057
10
5
7
1057
10
5
7
1057
1057
1057
1057
1057
10
5
7
1057
10
5
7
1057
10
5
7
1057
10
5
7
10
5
7
10
5
7 10
5
7
1057
1058
1058
1058
10
5
8
1058
1058
10
5
8
1058
1058
1
0
5
8
10
5
8
1058
1058
10
58
1058
1058
1058
1058
1058
1058
1058
1058
1058
1058
1058
10
5
8
10
5
8
1058
10
58
10
58
1058
1058
10
5
9
1059
1059
1059
10
5
9
1059
1059
1059
1059
1059
1059
1059
1059
10
5
9
1059
1059
10591059
1059
1059
10
5
9
10591059
10
59
1059 1059
1059
1059
1059
1059
1059
1059
1
0
6
0
1060
1060
10
6
0
1060
1060
1060
1060
1060
1060
1060
10
6
0
10
6
0
1060
1060
1060
1060
1060
10
6
0
10
6
0
1060 1060
1
0
6
0
1060
1060
1060
10
6
1
10
6
1
1061
10
6
1
1061
1061
1061
1061
1061
1061106110
6
1
1061
1061
1061
1061
10
6
1
10
6
1
1061
10
6
1
1061
10
6
1
1061
1061
1061
1061
10
6
2
1062
10
6
2
106
2
1062
10
6
21062
1062
1062
10
6
2
10
62
1062
1062
1062
1062
1062
10
6
2
1062
10
62
1062
10
6
2
1062
1062
10
6
2
1063
1063
1063
10
6
3
1063
1063
1
0
6
3
10
63
1063
1063
1063
1063
1063
1063
1063
1063
1063
10
6
3
10
6
3
1063
10
6
3
1063
10
6
3
1063
1063
10
6
3
106
4
10
641064
1064
1064
10
6
4
1064
1064
1064
1064
1064
1064
1064
1064
10
6
4
10
6
4
1064
10
6
4
1064
1064
10
6
4
1064
1064
106
4
10
6
5
10
6
5
1065
10
6
5
10651065
1065
1065
1065
1065
1065
1065
1065
10
6
5
10
6
5
1065
10
6
5
1065
1065
1065
1065
1065
10
6
6
10
6
6
1066
1066
10
66
1066
1066
106610
6
6
10
6
6
10
6
6
1066
1066
1066
1066
1066
10
6
6
10 6 6
1066
1066
1066
1066
1066
1066
10
6
6
10
6
6
1066
10
67
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
1067
10
6
8
10
6
8
1068
1068
1068
10
6
8
1068
1068
10
6
8
10
6
8
10
68
10
6
8
1068
1068
1068
106
8
1068
1068
10
6
8
1068
1068
1068
1068
1068
10
6
9
1069
1069
1069
1069
1069
10
69
1069
1069
10
6
9
10
6
9
1069
1069
1069
1069
106
9
1069
1069
10
6
9
1069
1069 1069
1069
1069
1069
10
7
0
1070
1070
1070
1070
10
7
0
1070
1070
10
7
0
1
0
7
0
1070
10
7
0
1070
1070
1070
1070
10
7
0 1070
1070
1070
1070
10
71
10
7
1
1071
1071
1071
1071
1071
10
7
1
1071
10
7
1
1071
1071
1071 1071
1071
1071
10
7
1
1071
1071
1071
1071
1072
1072
10
7
2
1072
1072
1072
1072
1072
1072
10
7
2
1072
1072
1072
1072
1072
10
7
2
1072
10
7
2
1072
1072
1072
1073
1073
1073
1073
10
7
3
1073
1073
1073
10
7
3
10
7
3
1073
1073
1073
1073
10
7
3
1073
10
73
10
7
3
1073
1073
1074
10
7
4
1074
1074
1074
10
74
10741074
10
74
10
7
4
10
74
1074
1074
1074
1074
10
7
4
1074
10
7
4
1074
1075
107
5
1075
1075
1075
1075
10
7
51075
107510
7
5
1
0
7
5
1075
1075
1075
1075
1075
1075
1075
1076
1076
1076
1076
1076
1076
1076
10
7
6
1076
1076
1076
1076
1076
1076
1
0
7
6
1077
10
7
7
1077
1077
10
7
7
1077
1077
10
7
7
1077
10
77
1077
1077
1077
1078
1078
1078
1078
1078
1078
1078
10
7
8
1078
10
78
1078
1078
1078
1079
1079
1079
1079
1079
10
7
9
1079
1079
1079
1079
1079
10
7
9
1080
10
80
10
8
0
1080
10
8
0
1080
10
80
1080
1080
1080
1081
10
8
1
1081
1081
108
1
1081
1081
1081
1082
1082
1082
1082
IN
V
=1047.
64’
IN
V
=1044.
67’
18
"
C
M
P
-
C
P
P
IN
V
=
10
5
4
.
0
1’
IN
V
=
10
4
9
.
7
0
’
15" CMP18" RCP
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
9
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 10
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 9
2
+
0
0
R-2603 9
S
E
E
S
H
E
E
T
N
O
.
8
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
7
8
+
0
0
SHEET 9 OF 28
PERMIT DRAWING8
0 8
5
9
0
-L-
-Y9-
-Y10-
N
AD
8
3
/ 9
5
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 3
SITE 3
MARK BARE
KEN HAMBY
LUCY JOHNSON
LINDA ST CLAIR
W
H
IT
L
E
Y
D
IC
K
E
N
S
O
N
P
R
O
P
E
R
T
IE
S
L
L
C
DEBRA EVANS
BRUCE EVANS
DARLENE GRIT
DONALD GRIT
VEATRICE JOHNSON
DARRYL JOHNSON
DARRYL JOHNSONANNA WYATT
VERNON WYATT
FRANK JOHNSON
BILLY ELMORE
ROBERT GENTLE
RUSSELL TRIPLETT
NORTH WILKESBORO CITY LIMITS
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
NORTH
WILKESBORO
CITY
LIMITS
10
0
’ D
U
KE
P
O
WE
R
E
A
S
E
ME
NT
10
0
’ DU
KE
P
O
WE
R
E
AS
E
MENT
100’
1
6
’
I
N
G
R
E
S
S
E
G
R
E
S
S
E
A
S
E
M
E
N
T
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
146
2
4
"
C
M
P
24" CMP
JUCT
APPROX.
18" CMP
15" CMP
18" RCP
DI
DI
DI
v
v
v
v
1
B
A
R
R
E
L
L
4
’
x
3
’
NORTH WILKESBORO CITY LIMITS
C
M
P
2
4
"
C
M
P
3
0
"
GR
S
R
19
8
1
P
E
B
B
LE
S
T
18
’ B
S
T
SR 1982 GRYDER ST BST
B
S
T
BSTS
BST
RAP
RIP
GR
SS
BST
GR
BST
GR
DK
B
S
T
GR
G
R
BST
BST
B
S
T
K
A
T
I
E
L
N
B
S
T
DK
D
K
BST
GR
BST
S
72"CHLGR
C O N C GR
GR
GR
BST
BST
BST
B
S
T
S
GR
GR
C
O
N
C
CONC
CONC
GR
BSTDI
B
S
T
15" CMP
15" CMP15" CMP
15" CMP
15" CMP
CAN
MTL
G
R
15" CMP
NC 268 ELKIN RD 22’ BST
GUSTAVO VILLEGAS MENDOZA
RALPH HOUSTON ROYAL
LINDA ST CLAIR
177
178
179
B8
1072.
92
B
9
1072.
32
B
10
1073.32B
13
1071.04*B
L3603
B
15
1073.20
B
19
1073.83
B
20
1073.83
B
21
1074.56
B
22
1075.83
B
24
1074.
59
B
27
1074.68
B
29
1076.17
B
30
1078.27
B
32
1078.36
B35
1078.
51
B
38
1080.48
B
41
1080.74
B
42
1080.33*EL3603
B
72
1067.89
B73
1068.
04
B
74
1068.17
B
81
1071.
83*BL
3603
B93
1060.98*B
L3405
B
94
1060.64
B95
1060.
59
B96
1059.
12
B97
1058.
91
B98
1057.24
B99
1057.23
B
1001059.71
B
101
1059.91
B
102
1061.16*EL
3405
B121
1046.72*B
L3604
B
1221067.98
B
123
1060.41*EL3603
B
157
1071.53
B158
1072.14
B
159
1071.15
B
160
1072.12
B166
1069.28
B
1721067.94
B1731066.
11
B
174
1067.68
B1821060.
46
B1841056.
10*E
L3604
B
187
1062.15
B
1881061.40
B
189
1062.81
B
191
1064.18
B
1921070.
92
B
193
1071.39
B
1941073.37
B195
1072.98
B
2041075.34
B2131078.
47*B
L3603
B
2211080.23
B
2251069.21
B2311069.
68
B
2331072.69*B
L3405
B
2341072.83*B
L3405
B
2351071.
71*EL3405
B2361076.
54
B2371076.51
B
2381076.41
B2391079.26
B
2401078.90
B2621082.
11
B2631080.94
B2641081.54
B
2651080.57
B2851077.56*B
L36031
B
2911080.91
B
2941082.76
B
3021079.64
B3051080.
62
B
3061080.71*EL36031
B3071069.31*B
L3405
B3081066.61
B3091065.
81
B
310
1065.18
B
311
1065.33
B
312
1065.28
B
313
1062.80
B314
1064.98
B
315
1066.05
B
319
1065.95
B
3221069.25*EL3405
B
3411061.
86
B
3451065.04*EL
3603
B
3511081.44
3701 A
X
LE
B
3971080.
65B
4001081.64
B
4011081.38
B
4531073.41
B
4761079.39
B
5461063.27*EL3604
REBEKAH DONNA YORK LIFE ESTATE
GARAGE
BLK
CONC
GR
48" CHL
GR
GR
SIDNEY AVE
GR
GR
CONC
LANDSCAPE
GR
PO
O
L
POOL
WD DECK
WD DECK
GR C
O
N
C
C
O
N
C
MON
CONC
GR
18
"
C
M
P
JASON SCOTT BROWN
ROGER & KAREN HAMBY
TRAVIS JAMES MATHIS
74
H
D
P
E
18
"
55
WILLIAM EUGENE HOLLAND
TP WILKES LLC
73
ESTATE HOLDING, LLC
J&S FAIR REAL
56
DONNA R. KEY
REEVES, JR.
FRED A.
PATRICIA BILLINGS
TYRE BILLINGS
56
18" RCP
85’
+31
164’
+80
85’
+67
180’
+05
DI
DI
2GI
CBCBCB
2GI
CB
CBCB
2GI
BDO
CB
CB
2GI
BDO
BDO
CBCB
JB w/MH
CB
2GI 2GI
2GI
28 SY GEOTEXTILE
EST. 11 TONS
CLASS ’B’ RIP RAP
1
5"
15
"
15" RCP-III
18" RCP-III
15" RCP-III
24"
RC
P-
III
24"
HW
SPECIAL CB
15
" RC
P-
III
15" RCP-III
15" RCP-III CBCB
CB
18" RCP-III 18" RCP-III
15" RCP-III
15" RCP-III
24" RCP-III 24" RCP-III 24" RCP-III 24" RCP-III
15
"
15"
1
5
"
15" RCP-III
15"15"
3
6
"
18" RCP-III 18" RCP-III
3
0
"
R
C
P
-
I
I
I
24" RCP-III
15
"
15" RCP-III
15
"
RC
P
-
III
18
"
RC
P
-
II
I
18" RCP-III
HW
4
8
"
R
C
P
-
I
I
I
TO 86+60 RT
FROM STA 86+00
EST. 51 SY
INSTALL PSRM
15" RCP-III
CB CB
15
"
15
"
BDO
2GI
1
5
"
R
C
P
-
I
I
I
CB
2GI
15"15" RCP-III
2GI
2GI
2GI
2GI 2GI
2GI
2GI
2GI
RETAIN RCBC
REMOVE
REMOVE REMOVE
REMOVE
REMOVE
24" CMP
REMOVE 26’+/-
TB JB w/MH
SPECIAL
RC
P-
III
4
8
"
CB
CB
CB
CB
CB CB
CB
18"
15"
w/ELBOWS
24"
15"
SEE DETAIL PR2
PLACE ON BANKS ONLY
CLASS ’I’ RIP RAP
15"
15"15"
24" RCP-III
15"
15"
RCP-III
15"
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR2
MI
N.
2:
1
EST. 26 TONS & 50 SY GEOTEXTILE
LINER TYPE - CLASS ’I’ RIP RAP
d= 4 Ft.
FT.
LENGTH = 10
Channel Bed
-L- STA. 78+80 RT
CHANNEL BANK
TIE TO EXISTING
REMOVE
REMOVE
RETAIN
F
CC
C
C
F
F
F
C
F
C
C
F
C
F
F C C
F
F C C
C
F
F
C
F
F
F
F
F F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
4
:
0
9
:
2
8
P
M
78
-L-
NC 268
-L-
NC 268
R-2603 24
64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
79 80 81 82 83 84 85 86 87 88 89 90 91 92
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,000
1,010
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,000
1,010
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,090
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 10 OF 28
PERMIT DRAWING
(-)0.5700%
(-)1.2922%
PI = 68+10.00
EL = 1,072.69’
VC = 1,050’
K = 1454
V = 80 mph
(-)1.2%
E
L
=
10
5
4
.
8
-
L-
S
T
A
.
7
4
+
8
5
R
T
B
E
G
IN
LA
TE
RA
L
V
D
ITC
H
E
L
=
10
4
7
.
2
4
’
-
L-
S
TA
.
7
6
+
5
0
R
T
LA
TE
RA
L
V
D
ITC
H
EL
=
10
4
6
.
6
4
’
-
L-
S
TA
.
7
7
+
0
0
RT
LA
TE
RA
L
V
D
ITC
H
EN
D
(-)4
.
5
8%
E
L
=
1
0
5
7
.
4
8
’
-
L-
S
TA
.
7
8
+
0
0
LT
E
N
D
LA
TE
RA
L
V
D
ITC
H
E
L
=
1
0
6
7
.
15
’
-
L-
S
TA
.
7
3
+
0
0
LT
B
E
G
IN
LA
TE
RA
L
V
D
ITC
H
(-)1.2%
(-)1.2922%
(+)0.3400%
PI = 85+60.00
EL = 1,050.08’
VC = 900’
K = 551
V = 80 mph
ELEV. 1055.75’
8" SPIKE IN ROOT OF 10" FORKED MAPLE
129.22’ RT.
-L- STA. 79+19.79
BM # 5
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1060.5
= 150
= 500(+)
= 50
= 49
= 1048.5
= 60
= 1049.5
= 49
-L- Sta. 78+90
TIED TO 42" RCP
EXISTING 3’ X 4’ BOX CULVERT
(-)1.5%
E
L
=
10
4
9
.
0
0
’
-
L-
S
T
A
.
8
6
+
5
0
R
T
B
E
G
IN
LA
TE
RA
L
V
D
ITC
H
E
L
=
10
4
7
.
8
0
’
-
L-
S
TA
.
8
7
+
3
0
R
T
E
N
D
LA
TE
R
A
L
V
D
ITC
H
1026.
56
1027.06
I
N
V
=1024.79’
18"
C
MP
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
0
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
.
11
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
10
5
+
0
0
S
E
E
S
H
E
E
T
N
O
. 9
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 9
2
+
0
0
R-2603 10
S
E
E
S
H
E
E
T
NO. 19
MAT
CH
LINE
-Y11- S
T
A. 2
0
+
00
SEE SHEET NO. 11
MATCH LINE -Y11- STA. 25+00
SHEET 11 OF 28
PERMIT DRAWING
9
5
10
0
10
5
-L-
-DRIVE3-
-
Y11-
N
AD
8
3
/ 9
5
10
5
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 4
IN SURF WATER
PERM IMPACTS
MARY HUTCHINSON
TAM HUTCHINSON
ALMEDA ELLER
WILLIAM ELLER
FRED REEVES
TP WILKES LLC
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
WI
L
K
E
S
B
O
R
O
C
I
T
Y
LI
MI
T
S
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
73
74
75
76
79
18" CMP
STEEL30"
BST
NC 268 ELKIN RD 22’ BST
GR
B
S
T
S
S
CONC
BST
S
CONCGR GR
GR
15"
CM
P
15" CMP
HUTCHINSONS LLC
78HUTCHINSONS LLC
DONNA R. KEY
FRED A. REEVES, JR.
DONNA R. KEY
REEVES, JR.
FRED A.
77
CONSTRUCTION CO INC
FRED REEVES
F34
1026.75
MRS ROBY SHUMATE
BST
GR
C
O
N
C
BDO
CB
JB w/MH
CB
CB CB15" RCP-III
15" RCP-III 15" RCP-III
CB CB
CB CB
2GI
CB
15" RCP-III
REMOVEREMOVE
EXISITING 18" CMP
REMOVE 6’+/- OF
15
"
RC
P
-
III
15
"
15" RCP-III
15" RCP-III
HW
CB
4OT
CB CB
CB
15" RCP-III
18" RCP-III 15"
10 SY GEOTEXTILE
EST. 3 TONS
CLASS ’B’ RIP RAP
15
"
RC
P-
III
1
5
"
R
C
P
-
I
I
I
1
5
"
REMOVE
15" RCP-IV
7 SY GEOTEXTILE EA.
EST. 2 TONS EA.
CLASS ’B’ RIP RAP
15"
RCP-III
15"
RETAIN
RETAIN
3
0
"
C
S
P
C
F
F
F
C
C
C F
CCC
F
CF
C
FF
C
C C
F
FF
F
F
F F
F
F
FF
F
F
F
F
F
F
F
F
1026
10
2
6
1027
1027
1028
1028
1028
1029
1029
1029
1029
1030
1030
10
3
0
1030
1030
1031
10311031
10
3
1
1031
1031
1031
1031
10
3
2
10
3
2
1032
10
3
2
1032
1032
1032
1033
1033
1033
10
3
3
1033
1033
1033
1033
10
3
4
1034
1034
10
3
4
1034
1034
10
34
1034
10
3
5
10
3
5
10
3
5
10
3
5
1035
103
5
1035
1035
1035
10
3
6
10361036
1036
1036
1036
103 6
1036 1036
10
3
7
10371037
10
3
7
1037
1037
1037
1037
1037
103
7
1
0
3
8
1038
1038
1038
10381038
1038
1038
1038
1038
1
0
3
9
10391039
10
3
9
10
3
9
1039
1039
10 3 9
1039
1039
1039
1039
1039
1
0
4
0
10401040
10
4
0
10
4
0
1040
1040
1040
10
4
0
1040
1040
1040
1040
1040
1
0
4
1
10411041
10
41
10
4
1
1041
1041
1041
1041
1041
1041
10
4
1
1041
10
4
2
104210421042
1
0
4
2
1042
1042
1042
10
42
1042
1042
1042
1042
1042
10
4
3
104310431043
10
4
3
10
43
1043
1043 1043
1043
1
0
4
3
1043
1043
1044
104410441044
1044
1044
1044
1044
1044
1044
1044
10
44
1044
1044
1045
104510451045
10
4
5
1045
1045
10
4
5
1045
1045
1045
1045
1045
1045
10
4
6
10461046
1046
10
4
6
10
4
6
1046
1046
1046
1046
10
4
6
1046
1046
1046
1046
1046
1046
1046
10
4
7
10471047
1047
1
0
4
7
10
4
7
1047
1047
1047
1047
1047
1047
1047
1047
1047
1047
1047
1047
10
4
8
1048
1048
1048
1048
10
4
8
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
10
48
1
0
4
8
1048
10481048
10
4
9
1049
1049
1049
1049
10
4
9
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
1049
10491049
1049
10
5
0
1050
1050
1050
10
5
0
10
5
0
1050
1050
1050
1050
1050
1050
1050
1050
1050
1050
10
50
1050
10
50
1050
1050
10
5
0
1050
10501050
1050
1050
1050
1050
10
5
1
1051
1051
10511051
10
5
1
1051
1051
1051
1051
10
5
1
1051
1051
1051
1051
1051
1051
1051
1051
10
5
1
10
5
1
1051
1051
10
5
1
1051
1051
10
5
1
1051
10
5
1
1051
1052
1052
10521052
1052
10
5
2
1052
1052
1052
1052
1052 1052
1052
10
5
2
1052
1052
1052
1052
10
5
2
1052
1052
1052
10521052
1052
1052
1052
1052
1052 1052
1052
1052
1052
1052
1052 1052
10
52
1052
1052
1052
1052
1052
1052
1052
10
5
2
10
53
1053
10531053
10
5
3
10
5
3
10
53
10
5
3
10
5
3
1053
1053
1053
1053
10
5
3
10
5
3
1053
10
5
3
1053
1053 1053 1053
1053
1053
1053
1053
1053
1053
1053
10
53
1053
1053
1053
1053
1053
1053
10
5
3
1053
1053
1053
1053
10
5
4
1054
1054
1054
10
5
4
1054
1054
1054
1054
1054
1054
1054
10
5
4
10
5
4
10
5
4
1054
1054
1054 1054
1054
1054
10
5
4
1054
1054
1054
1054
1054
1054
1
0
5
5
1055
1055
1055
10
5
5
1055
10
5
5
1055
1055
10551055
10
5
5
10
5
5
1055
10
5
5
10
5
5
1055
1055
1055
1055
1055
1
0
5
5
10
5
5
1055
1055
1055 1055
10
5
5
10
5
6
1056
1056
1056
10
5
6
1056
1056
1056
1056
1056
10561056
10
5
6
10
56
1056
1056
1056
1056
1056
1056
1056
1056
1
0
5
6
1056
1056
1056
1056
1056
1056
10
5
6
1057
1057
1057
1057
10
5
7
1057
1057
1057
10
5
7
1057
10571057
10
5
7
1057
1057
1057
1057
1057
1057
1057
1057
10
5
7
1057
10
5
7
1057
1057
1057
10
5
8
1058
1058
1058
10
5
8
10
58
10581058
1058
1058
1058
10
5
8
10
5
8
10
5
8
10
5
8
10
5
8
1058
1058
1058
10
5
8
10
5
8
1058
1058
1058
1058
1058
10
5
9
1059
1059
1059
10
5
9
1059
1059
1059
1059
1059
10
5
9
10
5
9
10
5
9
10
5
9
1059
1059
1059
1059
1059
10
5
9
1059
10
59 1059
1059
1059 1059
10
6
0
1060
1060
1060
10
6
0
1060
1060
1060
10601060
10
6
0
1060
1
0
6
0
1060
10
6
0
10
6
0
1060
1060
1060 1060
1060
1060 10
6
0
10
6
0
10
6
1
1061
1061
1061
1061
1061
1061
1061
1061
1061
10
6
1
1061
10
61
1061
1061
10
6
1
1061
1061
1061 1061
1061
1061
1062
1062
1062
1062
1062
1062
10621062
10621062
10
6
2
1062
10
6
2
1062
1062
1
0
6
2
10
6
2
10
6
2
106
2
1062
1062
1062
1063
1063
1063
10
6
3
1063
10
63
10
6
3
1063
10631063
10
6
3
1063
10 63
1063
10
6
3
1063
1063
1063
10
6
4
1064
1064
10
6
4
1064
1064
10
64
1064
1064
1064
10
6
4
10
6
4
10
6
4
10 6 4
1064
1064
10
6
5
1065
1065
10
6
5
1065
1065
1065
1065
10
6
5
10
6
5
1065
1065
1
0
6
5
10
6
6
1066
1066
10
6
6
1066
1066
1066
1066
1066
10
6
6
1066
1066
1066
1066
10
6
7
1067
1067
10
6
7
1067
10
6
7
10
6
7
1067
10
6
7
1067
1067
106
7
10
6
8
1068
1068
10
6
8
1068
1068
1068
10
6
8
10
6
8
1068
1068
1068
10
6
9
1069
1069
10
6
9
1069 1069
1069
10
6
9
1069
10
70
1070
1070
1070
10
7
0
1070
1070
10
7
0
1070
1071
1071
1071
1071
1071
1071
1071
1071
10
7
2
10
7
2
1072
1072 1072
10 7 2
1072
1072
1073
1073
107
3
1073
1073
1073 107310
7
4
1074
1074
1074
1075
1075
1075
10
75
1076
10
76
1076
10
7
6
10
77
1077
1077
1078
10
7
8
10
7
9
10801081
1026.
56
1027.06
I
N
V
=1024.79’
18"
C
MP
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
0
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
.
11
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
10
5
+
0
0
S
E
E
S
H
E
E
T
N
O
. 9
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 9
2
+
0
0
R-2603 10
S
E
E
S
H
E
E
T
NO. 19
MAT
CH
LINE
-Y11- S
T
A. 2
0
+
00
SEE SHEET NO. 11
MATCH LINE -Y11- STA. 25+00
SHEET 12 OF 28
PERMIT DRAWING
9
5
10
0
10
5
-L-
-DRIVE3-
-
Y11-
N
AD
8
3
/ 9
5
10
5
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 4
IN SURF WATER
PERM IMPACTS
MARY HUTCHINSON
TAM HUTCHINSON
ALMEDA ELLER
WILLIAM ELLER
FRED REEVES
TP WILKES LLC
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
WI
L
K
E
S
B
O
R
O
C
I
T
Y
LI
MI
T
S
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
73
74
75
76
79
18" CMP
STEEL30"
BST
NC 268 ELKIN RD 22’ BST
GR
B
S
T
S
S
CONC
BST
S
CONCGR GR
GR
15"
CM
P
15" CMP
HUTCHINSONS LLC
78HUTCHINSONS LLC
DONNA R. KEY
FRED A. REEVES, JR.
DONNA R. KEY
REEVES, JR.
FRED A.
77
CONSTRUCTION CO INC
FRED REEVES
F34
1026.75
MRS ROBY SHUMATE
BST
GR
C
O
N
C
BDO
CB
JB w/MH
CB
CB CB15" RCP-III
15" RCP-III 15" RCP-III
CB CB
CB CB
2GI
CB
15" RCP-III
REMOVEREMOVE
EXISITING 18" CMP
REMOVE 6’+/- OF
15
"
RC
P
-
III
15
"
15" RCP-III
15" RCP-III
HW
CB
4OT
CB CB
CB
15" RCP-III
18" RCP-III 15"
10 SY GEOTEXTILE
EST. 3 TONS
CLASS ’B’ RIP RAP
15
"
RC
P-
III
1
5
"
R
C
P
-
I
I
I
1
5
"
REMOVE
15" RCP-IV
7 SY GEOTEXTILE EA.
EST. 2 TONS EA.
CLASS ’B’ RIP RAP
15"
RCP-III
15"
RETAIN
RETAIN
3
0
"
C
S
P
C
F
F
F
C
C
C F
CCC
F
CF
C
FF
C
C C
F
FF
F
F
F F
F
F
FF
F
F
F
F
F
F
F
F
1026.
56
1027.06
1024.52
1030.
92
1025.62
1025.75
B
RID
G
E
C
O
LU
M
N
S
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
SHEET NO.PROJECT REFERENCE NO.
9
/
18
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
1
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 12
M
A
T
C
H
L
IN
E
-
L-
S
T
A
. 119
+
0
0
S
E
E
S
H
E
E
T
N
O
. 10
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 10
5
+
0
0
11R-2603
3
/13
/2
0
14
R/W
RE
VIS
IO
N
:
S
U
BD
IV
ID
E
D
P
A
RC
EL
7
8
IN
TO
P
A
RC
ELS
7
8
&
7
8
A
;
A
D
D
ED
P
RO
P
ERTY
O
W
N
ER
N
A
M
E
A
N
D
D
E
ED
R
E
F
E
RE
N
C
E
O
N
P
A
RC
E
L
7
8
A
.
-
M
A
E
R/W SHEET NOS.
9
/3
/2
0
13
R/W
RE
VIS
IO
N
:
REA
LIG
N
E
D
-
Y11-
TO
ITS
E
XIS
TIN
G
LO
C
A
TIO
N
O
N
P
A
RC
EL
7
8
.
-
KN
W
11 & 19
SHEET 13 OF 28
PERMIT DRAWING
110
115
10
5
TYPE-III
TYPE B-77
TYPE B-77
ATTENUATOR
TYPE-III
TYPE-III
-L-
III
TYPE
-
Y
1
2
-
15
-
Y12-
TYPE-III
TYPE-III
TYPE B-77TYPE B-77 ATTENUATORATTENUATOR
TYPE-III
TYPE-III
N
AD
8
3
/ 9
5
10
5
IN SURF WATER
PERM IMPACTS
SITE 13
S S SURFACE WATER
DENOTES IMPACTS IN
CAUSEWAY
TEMPORARY
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SURFACE WATERS
IMPACTS IN
TEMPORARY HUTCHINSONS LLC
R/W MON
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
200’
2
0
0
’
P
O
WE
R
E
A
S
E
M
E
N
T
B
R
E
M
C
O
-
D
B
6
4
5
P
G
6
8
1
B
R
E
M
C
O
-
D
B
6
4
5
P
G
6
8
1
2
0
0
’
P
O
W
E
R
E
A
S
E
M
E
N
T
78
HW
DI
15
"
C
M
P
15
"
R
C
P
15
"
R
C
P
CB
R
C
P
2
4
"
C
MP
18
"
MON
R/W
MTL
BST
BST
MTL
MTL
B
S
T
S
OIL
GR
S
OIL
S
S
GR
B
S
T
B
S
T
GR
C O N C
DI
DI
1
5
"
C
M
P
12
"
C
M
P
MULB
E
R
R
Y
C
R
E
E
K
MU
LB
E
R
R
Y
C
R
E
E
K
MARY HUTCHINSON
TAM HUTCHINSON
79
NC 268 ELKIN RD 22’ BST
46.29’
+28.40
63.81’
+17.69
BST
GR
HUTCHINSONS LLC
78
RCP
24"
78A
FRANK VERNON JOHNSON
HUTCHINSONS LLC
78
HUTCHINSONS LLC
78
HUTCHINSONS LLC
78
FOUND
F
O
U
N
D
CONC
15" R
CP CI
T
Y
LI
MI
T
S
NO
R
T
H
WI
L
KE
S
B
O
R
O
F
LI
N
T
HIL
L
R
D
S
R 2334 18’ BS
T
18
" C
MP
3
0
"
C
M
P
CB
BDO
30"
R
CP-III
TO DRAIN
GRADE CUT
3
6
"
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
2GI
2GI
2GI
BDO
30" RCP-III
15
"
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
Adj. 2GI
w/MH
JB
30"
R
CP-III
15
"
Q10 = 1 cfs
GRADE TO EL. 993
PSH SEE DETAIL P1
Q10 = 1 cfs
DETAIL P1
PSH SEE
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
(Rip Rap in
basin not shown
for clarity)
Pipe or Ditch
Outlet
Square Preformed
Scour Hole (PSH)
Seed with native
grasses at installation.
PREFORMED SCOUR HOLE
*NOT TO SCALE
NATURAL
GROUND
B
FI
LL
S
LOP
E
PSRM
2:12:
1
PIPE (d = 15" OR 18")
INFLOW
3/08
MIN. 1’ TUCK
D
DETAIL P1
NATURAL GROUND
AND FLUSH WITH
INSTALL LEVEL
W= 4’
D= 1’
B= 4’
FILTER FABRIC
RIPRAP WITH
LINER: CLASS B
18"
1
5
"
15"
1
2
"
1
2
"
3GI
18"
1
5
"
15
"
CB
2
4
"
R
C
P
-
I
I
I
24"
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
65 SY GEOTEXTILE
EST. 58 TONS
CLASS ’II’ RIP RAP
130 SY GEOTEXTILE
EST. 120 TONS
CLASS ’II’ RIP RAP
SEE STRUCTURE PLANS
60 SY GEOTEXTILE
EST. 55 TONS
CLASS ’II’ RIP RAP
SEE DETAIL EB1
60 SY GEOTEXTILE
EST. 55 TONS
CLASS ’II’ RIP RAP
2’
GEOTEXTILE
STREAM EMBANKMENT
RIP RAP AT BRIDGE BENT AND
( Not to Scale)
PROP. BRIDGE BENT
DETAIL EB1
Geotextile= 60 sy
Type of Liner= 55 TONS,CL II Rip-Rap
-L- STA. 117+65
2GI
RETAIN
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
30"
36" RCP-III
REMOVE
RETAIN
TO DRAIN
GRADE CUT
TO DRAIN
GRADE CUT
C
C
C
F
F
F
F
C
F
F C
F
C
C
F
F
C
C
FC
F
C
F F
C
C
CC C
C
C
F
F F
C
F
C
C
F
C
C
F
C
C
C
F
F
F
F
F
F
9
7
8
978
9
7
8
9
78
9
7
9
9
7
9979
9
7
9
979
9
7
9
9
79
9
7
9
9
7
9
9
7
9
9
7
9
9
8
0
9
8
0
9
8
0
9
8
0
980
9
8
0
9
8
0
9 8 0
9
8
0
9
8
0
9
8
1
9
8
1
981
9
81
9
8
1
9
8
1
981
9
8
1
9
8
1
9
8
1
981
9
8
2
9
8
2
982
9
82
9
8
2
982
9
8
2
9
8
2
9
8
2
9
8
2
9
8
2
98
2
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
9
8
3
983
9
8
4
9
8
4
984
9
8
4
9
8
4
9
8
4
9
8
4
9
8
4
984
9
8
4
984
9
8
5
9
8
5
985
9
8
5
985
9
8
5
9
8
5
9
8
5
9
8
5
986
9
8
6
986
986
9
8
6
9
8
6
9
8
6
9
8
6
9
8
6
9
8
6
986
9
8
7
9
8
7
987
987
987
987
9
8
7
9
8
7
9
8
7
987
987
988
9
8
8
988988
988
9
8
8
98
8
98
8
9
88
989
9
8
9
989
989
989
989
989
989
98
9
9
9
0
9
9
0
990
990
9
9
0
9
9
0
9
9
0
9
9
0
9
9
0
991
991
9
9
1
991
991
9
9
1
991
9
91
991
991
992
992 992
9
9
2
992
992
992
992
9
92
992
9
92
992
9
9
2
99
2
992
9929
9
3
993
993
9
9
3
993993
993
993
993
993
9
9
3
993
9
9
4
994 994
9
9
4
994
994
9
9
4
994
994
9
94
994
9
9
4
9949
9
5
995 995
9
9
5
995
9
9
5
9
9
5
995
995
995
996
996 996
9
9
6
996
9
9
6
9
9
6
996
9
9
6
996
9
9
6
99
7
997
997 997
9
9
7
997
9
9
7
997
997
9
9
7
997
997
9
9
8
998 998
9
9
8
998
998
998
9
9
8
99
8
998
998
998
998
998
998
9
99
999 999
999
999999
9
9
9
999
9
9
9
999
999
999
1000
1000
1000
10
0
0
1000
1000
1000
10
0
0
1000
1001
1001
1001
1001
1001
1001
1001
1001
1001
1002
1002
1002
1002
1002
10
0
2
1002
1003
1003
1003
1003
10
03
1003
1004
1004
1004
10
0
4
10
0
4
1005
1005
1005
10
0
5
1006
1006
1006
10
0
6
1007
1007
1007
10
0
7
1008
1008
1008
10
0
8
1009
1009
10
0
9
10
0
9
1009
1009
1009
10101010
10
10
10
10
10
10
1010
1011
1011
1011
1011
10
11
1011
1011
1012
1012
10
12
10
1
2
1012
1012
1013
1013
1013
1013
10
13
1013
10
13
10
13
1014
1014
1014
1014
1014
1014
10
14
1015
1015
10
15
1015
1015
1015
1015
1015
1015
1016
1016
1016
1016
1016
1016
1016
1016
1016
1016
1016
1017
1017
1017
1017
1017
1017
1017
10171017
1017
10
17
1017
1018
1018
10
18
1018
1018
1018
1018
1018
1018
1018
1018
1019
1019
10
19
1019
1019
1019
10
19
1019
1019
1019
1019
10
19
1020
1020
1020
1020
10201020
1020
1020
10
2
0
1020
1020
10
2
1
10
2
1
10
2
1
1021
1021
1021
102
1
1021
10
2
1
1021
10
2
1
10
2
1
1021
10
2
2
10
2
2
1022
1022
102
2
1022
1022
10
2
2
10
22
10
2
2
10
2
2
1023
10
2
3
10
2
3
1023
1023
102
3
10
23
1023 10
2
3
1023
1023
10
2
3
1023
10
2
4
10
2
4
10
24
1024
1024
1024
1 0 2 4 10
2
4
1024
1024
1024
1024
1024
10
2
5
10
2
5
1025
1025
10
2
5
1025
102510
2
5
1025
10
2
5
10
2
5
1025
1026
1026
1026
1026
10
2
6
1026
1026
1
0
2
6
1026
1026
10
2
6
10
2
6
1026
1026
1026
1027
1027
1027
10
2
7
1027
1027
10
2
7
10
2
7
1027
10
27
10
2
7
1
0
2
7
10
28
1028
1028
1028
10
2
8
1028
1
0
2
8
1028
1028
1028
1028
10
2
8
1028
10
28
1029
10
2
9
1029
1029
10
2
9
1029
1029
10
2
9
1029
1029
10
2
9
1030
10
3
0
1030
10
30
10
3
0
1030
1030
10
3
0
1030
10301
0
3
0
1031
1031
1031
1031
1031
10
3
1
10
31
1031
10
3
1
1031
10
3
1
1031
10
3
2
1032
1032
1032
1032
1032
1032
1032
1032
1032
10
3
2
1032
1033
10
3
3
10
33
10
3
3
1033
1033
1033
1033
1033
1033
10
3
3
103310341034
10
3
4
1034
1034
1034
1034
1034
1034
1034
1035
103510
3
5
1035
10
35
1035
1035
10
3
5
1035
1035
10
3
6
1036
1036
1036
1036
1036
1036
1036
1036
10
3
6
10
37
10
37
10
3
7
1037
1037
103
7
1037
1037
10
3
7
10 38
1038
10
3
8
10
38
1038
1038
1038
1038
1038
10
38
1039
10
3
9
10
3
9
1039
1039
1039
1039
1039
1039
1039
10
4
0
10
4
0
1
0
4
0
1040
10
4
0
1040
1040
10
4
0
1040
1
0
4
0
10
4
0
1040
1040
10
4
1
1041
1041
1041
1041
10
4
1
10
4
1
10
4
1
1041
10
41
1041
1042
10
42
10
4
2
1042
1042
10
42
10
4
2
1042
1042
10
4
2
10
4
3
1043
1043
10
4
3
1043
10
4
3
1043
10
43
1043
10
4
3
1044
1044
1044
1044
1044
1044
1044
10
4
4
10
4
4
10
4
4
1045
10
4
5
1
0
4
5
1045
1045
1
0
4
5
1045
10
4
5
10
4
5
1046
10
4
6
10
4
6
10
4
6
1046
1046
1046
10
46
10
4
7
1047
10
4
7
10
4
7
1047
1047
1047
10
4
7
1047
1048 10
4
8
10
4
8
10
4
8
1048
104
8
10
4
8
1048
1048
10
4
8
10
4
9
10
4
9
10
4
9
1
0
4
9
1049
10
4
9
10
4
9
1049
1049
1
0
5
0
105010
5
0
10
5
0
10
5
0
10
5
0
10
5
0
105
1
10
5
1
10
5
1
10
5
1
1051
10
5
1
10
5
1
10
5
2
10
5
2
10
5
2
10
5
2
1052
1052
10
5
2
10
5
3
10
5
3
10
5
3
10
5
3
1053
1053
10
54
1054
10
5
4
10
5
4
10
5
4
1054
10
5
5
1055
10
5
5
10
5
5
10
5
5
10
5
6
1056
10
5
6
10
5
6
10
5
6
10
5
7
1057
1057
1057
10
5
8
1058
1058
1058
1059
10
59
1059
1059
1060
1060
10
6
0
1
0
6
1
1061
10
6
1
10
6
2
1062
10
6
3
1063
10
6
4
1064
10
6
5
1026.
56
1027.06
1024.52
1030.
92
1025.62
1025.75
B
RID
G
E
C
O
LU
M
N
S
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
SHEET NO.PROJECT REFERENCE NO.
9
/
18
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
1
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 12
M
A
T
C
H
L
IN
E
-
L-
S
T
A
. 119
+
0
0
S
E
E
S
H
E
E
T
N
O
. 10
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 10
5
+
0
0
11R-2603
3
/13
/2
0
14
R/W
RE
VIS
IO
N
:
S
U
BD
IV
ID
E
D
P
A
RC
EL
7
8
IN
TO
P
A
RC
ELS
7
8
&
7
8
A
;
A
D
D
ED
P
RO
P
ERTY
O
W
N
ER
N
A
M
E
A
N
D
D
E
ED
R
E
F
E
RE
N
C
E
O
N
P
A
RC
E
L
7
8
A
.
-
M
A
E
R/W SHEET NOS.
9
/3
/2
0
13
R/W
RE
VIS
IO
N
:
REA
LIG
N
E
D
-
Y11-
TO
ITS
E
XIS
TIN
G
LO
C
A
TIO
N
O
N
P
A
RC
EL
7
8
.
-
KN
W
11 & 19
SHEET 14 OF 28
PERMIT DRAWING
110
115
10
5
TYPE-III
TYPE B-77
TYPE B-77
ATTENUATOR
TYPE-III
TYPE-III
-L-
III
TYPE
-
Y
1
2
-
15
-
Y12-
TYPE-III
TYPE-III
TYPE B-77TYPE B-77 ATTENUATORATTENUATOR
TYPE-III
TYPE-III
N
AD
8
3
/ 9
5
10
5
IN SURF WATER
PERM IMPACTS
SITE 13
S S SURFACE WATER
DENOTES IMPACTS IN
CAUSEWAY
TEMPORARY
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SURFACE WATERS
IMPACTS IN
TEMPORARY HUTCHINSONS LLC
R/W MON
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
200’
2
0
0
’
P
O
WE
R
E
A
S
E
M
E
N
T
B
R
E
M
C
O
-
D
B
6
4
5
P
G
6
8
1
B
R
E
M
C
O
-
D
B
6
4
5
P
G
6
8
1
2
0
0
’
P
O
W
E
R
E
A
S
E
M
E
N
T
78
HW
DI
15
"
C
M
P
15
"
R
C
P
15
"
R
C
P
CB
R
C
P
2
4
"
C
MP
18
"
MON
R/W
MTL
BST
BST
MTL
MTL
B
S
T
S
OIL
GR
S
OIL
S
S
GR
B
S
T
B
S
T
GR
C O N C
DI
DI
1
5
"
C
M
P
12
"
C
M
P
MULB
E
R
R
Y
C
R
E
E
K
MU
LB
E
R
R
Y
C
R
E
E
K
MARY HUTCHINSON
TAM HUTCHINSON
79
NC 268 ELKIN RD 22’ BST
46.29’
+28.40
63.81’
+17.69
BST
GR
HUTCHINSONS LLC
78
RCP
24"
78A
FRANK VERNON JOHNSON
HUTCHINSONS LLC
78
HUTCHINSONS LLC
78
HUTCHINSONS LLC
78
FOUND
F
O
U
N
D
CONC
15" R
CP CI
T
Y
LI
MI
T
S
NO
R
T
H
WI
L
KE
S
B
O
R
O
F
LI
N
T
HIL
L
R
D
S
R 2334 18’ BS
T
18
" C
MP
3
0
"
C
M
P
CB
BDO
30"
R
CP-III
TO DRAIN
GRADE CUT
3
6
"
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
2GI
2GI
2GI
BDO
30" RCP-III
15
"
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
Adj. 2GI
w/MH
JB
30"
R
CP-III
15
"
Q10 = 1 cfs
GRADE TO EL. 993
PSH SEE DETAIL P1
Q10 = 1 cfs
DETAIL P1
PSH SEE
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
(Rip Rap in
basin not shown
for clarity)
Pipe or Ditch
Outlet
Square Preformed
Scour Hole (PSH)
Seed with native
grasses at installation.
PREFORMED SCOUR HOLE
*NOT TO SCALE
NATURAL
GROUND
B
FI
LL
S
LOP
E
PSRM
2:12:
1
PIPE (d = 15" OR 18")
INFLOW
3/08
MIN. 1’ TUCK
D
DETAIL P1
NATURAL GROUND
AND FLUSH WITH
INSTALL LEVEL
W= 4’
D= 1’
B= 4’
FILTER FABRIC
RIPRAP WITH
LINER: CLASS B
18"
1
5
"
15"
1
2
"
1
2
"
3GI
18"
1
5
"
15
"
CB
2
4
"
R
C
P
-
I
I
I
24"
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
65 SY GEOTEXTILE
EST. 58 TONS
CLASS ’II’ RIP RAP
130 SY GEOTEXTILE
EST. 120 TONS
CLASS ’II’ RIP RAP
SEE STRUCTURE PLANS
60 SY GEOTEXTILE
EST. 55 TONS
CLASS ’II’ RIP RAP
SEE DETAIL EB1
60 SY GEOTEXTILE
EST. 55 TONS
CLASS ’II’ RIP RAP
2’
GEOTEXTILE
STREAM EMBANKMENT
RIP RAP AT BRIDGE BENT AND
( Not to Scale)
PROP. BRIDGE BENT
DETAIL EB1
Geotextile= 60 sy
Type of Liner= 55 TONS,CL II Rip-Rap
-L- STA. 117+65
2GI
RETAIN
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
30"
36" RCP-III
REMOVE
RETAIN
TO DRAIN
GRADE CUT
TO DRAIN
GRADE CUT
C
C
C
F
F
F
F
C
F
F C
F
C
C
F
F
C
C
FC
F
C
F F
C
C
CC C
C
C
F
F F
C
F
C
C
F
C
C
F
C
C
C
F
F
F
F
F
F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
1
1
:
5
8
:
4
6
A
M
-L-
NC 268
-L-
NC 268
R-2603 25
92
105
93 94 95 96 97 98 99 100 101 102 103 104 105
106 107 108 109 110 111 112 113 114 115 116 117 118 119
1,000
1,010
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,000
1,010
1,020
1,030
1,040
1,050
1,060
1,070
960
970
980
990
1,000
1,010
1,020
1,030
1,040
1,050
960
970
980
990
1,000
1,010
1,020
1,030
1,040
1,050
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 15 OF 28
PERMIT DRAWING
(+)0.3400%
(-)4
.7
2
8
4%
PI = 102+30.00
EL = 1,055.76’
VC = 770’
K = 152
V = 60 mph
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1050.5
= 46
= 100(+)
= 50
= 35
= 1049
= 42
= 1049.9
= 21
-L- Sta. 96+81
SKEW=87
36" CAAP
E
L
=
10
4
7
.
9
0
’
-
L-
S
TA
.
9
5
+
6
0
LT
B
E
G
IN
LA
TE
R
A
L
’
V
’
D
IT
C
H
E
L
=
10
4
7
.
17
’
-
L-
S
T
A
.
9
6
+
7
3
LT
E
N
D
LA
T
E
R
A
L
V
D
ITC
H
E
L
=
10
4
6
.
0
0
’
-
L-
S
T
A
.
9
6
+
7
8
LT
B
E
G
IN
LA
T
E
R
A
L
V
D
IT
C
H
(-)0.65%
(+)1.8%
E
L
=
10
5
0
.
4
5
’
-
L-
S
T
A
.
9
9
+
2
5
LT
B
E
G
IN
LA
TE
RA
L
’V
’
D
ITC
H
E
L
=
10
5
1.
3
5
’
-
L-
S
T
A
.
9
9
+
7
5
LT
E
N
D
LA
T
E
R
A
L
’V
’
D
ITC
H
E
L
=
10
4
8
.
6
6
’
-
L-
S
T
A
.
9
8
+
2
6
LT
E
N
D
LA
T
E
R
A
L
’V
’
D
ITC
H
(+)1.8%
(-)4
.7
2
8
4%
ELEV. 994.53’
TREE ON BANK OF MULBERRY CREEK
8" SPIKE IN ROOT OF 10" WALNUT
209.61’ LT.
-L- STA. 118+08.33
BM # 6
(-)0.3898%
V = 55 mph
PI = 113+77.70
EL = 1,001.49’
VC = 510’
K = 118
E
L
=
1
0
11.
5
1’
-
L-
S
TA
.
111
+
0
0
R
T
LA
TE
RA
L
B
A
S
E
D
ITC
H
B
E
G
IN
E
L
=
10
0
4
.
6
8
’
-
L-
S
T
A
.
111+
5
0
RT
LA
TER
A
L
B
A
S
E
D
ITC
H
E
L
=
10
3
0
.
2
0
’
-
L-
S
TA
.
10
7
+
0
0
RT
LA
T
E
R
A
L
B
A
S
E
D
ITC
H
B
E
G
IN
E
L
=
10
16
.
4
0
’
-
L-
S
TA
.
10
8
+
5
0
RT
LA
T
E
R
A
L
B
A
S
E
D
ITC
H
E
L
=
10
15
.
1
5
’
-
L-
S
T
A
.
10
9
+
0
0
RT
LA
TE
RA
L
B
A
S
E
D
ITC
H
E
L
=
10
14
.
7
5
’
-
L-
S
T
A
.
10
9
+
5
0
RT
LA
TE
RA
L
B
A
S
E
D
ITC
H
E
N
D
(-)4
.3%
(-)
9.
2%
(-)2
.5%
(-)0.8%(-)13.6
7
%
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1025.1
= 50
= 500(+)
= 50
= 30
= 1022.3
= 36
= 1022.8
= 18
-L- Sta. 108+06 LT
E
L
=
10
1
3
.
0
0
’
-
L-
S
TA
.
1
10
+
7
8
.
6
3
(114
)
R
T
B
E
G
IN
B
A
S
E
T
A
IL
D
ITC
H
E
L
=
10
0
4
.
6
8
’
-
L-
S
TA
.
111+
5
2
.
0
0
(6
5
.
6
5
)
R
T
E
N
D
B
A
S
E
TA
IL
D
ITC
H
108.25 LF @ 7.69%
SKEW=58
30" RCP
EL = 981.03’
-L- STA. 117+00 RT
LATERAL BASE DITCH
END
O-L- SKEW 90
TOTAL LENGTH = 150’
3 SPANS (1@40’, 1@65’, 1@45’)
CONCRETE GIRDER BRIDGE
PROPOSED 45" PRESTRESSED
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
= 6500
= 50
= 991.0
= 7500
= 100
= 991.76
= 13000
= 500(+)
= 998.3
(-
)
7.
18%
E
L
=
10
2
1.
0
0
’
-
L-
S
T
A
.
10
8
+
0
0
LT
E
N
D
LA
TER
A
L
’V
’
D
ITC
H
E
L
=
1
0
3
3
.
0
0
’
-
L-
S
TA
.
10
5
+
5
0
LT
B
E
G
IN
LA
TE
RA
L
’V
’
D
IT
C
H
(+)7.32%
E
L
=
10
18
.
0
0
’
-
L-
S
T
A
.
10
7
+
5
9
LT
LA
TE
RA
L
’V
’
D
ITC
H
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
2
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
.
13
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
13
3
+
0
0
12R-2603
S
E
E
S
H
E
E
T
N
O
.
11
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
119
+
0
0
SHEET 16 OF 28
PERMIT DRAWING
12
0 12
5
13
0
ATTENUATOR
-L-
-Y13-
N
AD
8
3
/ 9
5WETLAND
DENOTES FILL INFF
FILL IN WETLANDS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 8
SITE 7
SITE 5
SITE 6 IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
HUTCHINSONS LLC
LIFT BODIES INC
PHYLLIS WAGONER
CASWELL WAGONER
JAMES HUTCHINSON JR
80
78
83
84
HW
HW
RCP
36"
C
MP
18
"
C
M
P
18
"
1 B
AR
R
E
L
L
4
’x
5
’
MON
R/W
GR
CONC
C
O
N
C
BST BST
G
R
S
NC 268 ELKIN RD 22’ BST
G
R
GR
MTL
SKYVIEW RD.
EVELYN BLACKBURN
WILLIAM BLACKBURN
82
85
LEAH ZETTELMEIER
DIRK ZETTELMEIER
85
ASSOCIATION INC
BLUE RIDGE WATER
81
CBCB
10 SY GEOTEXTILE
EST. 3 TONS
CLASS ’B’ RIP RAP
15"
15
"
RC
P-
III
15" RCP-III
15" RCP-III
18
" RC
P-III
18
" RC
P-III
2GI
2GI
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
(Rip Rap in
basin not shown
for clarity)
Pipe or Ditch
Outlet
Square Preformed
Scour Hole (PSH)
Seed with native
grasses at installation.
PREFORMED SCOUR HOLE
*NOT TO SCALE
NATURAL
GROUND
B
FI
LL
S
LOP
E
PSRM
2:12:1
PIPE (d = 15" OR 18")
INFLOW
3/08
MIN. 1’ TUCK
D
DETAIL P1
NATURAL GROUND
AND FLUSH WITH
INSTALL LEVEL
W= 4’
D= 1’
B= 4’
FILTER FABRIC
RIPRAP WITH
LINER: CLASS B
Q10 = 2.9 cfs
DETAIL P1
PSH SEE
Q10 = 3 cfs
DETAIL P1
PSH SEE 15" RCP-III
2GI
2GI
2GI 2GI REMOVE
REMOVE
EXIST. RCBC
REMOVE
15"
15"
36" RCP-IV
2 @
3GI
SEE DETAIL PR3
PLACE ON BANKS ONLY
CLASS ’B’ RIP RAP
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR3
MI
N.
2:
1
CHANNEL BANK
TIE TO EXISTING
EST. 11 TONS & 28 SY GEOTEXTILE
LINER TYPE - CLASS ’B’ RIP RAP
d= 2 Ft.
LENGTH = 10 FT.
-L- STA. 126+96 RT
Channel Bed
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR4
MI
N.
2:
1
CHANNEL BANK
TIE TO EXISTING
EST. 3 TONS & 10 SY GEOTEXTILE
LINER TYPE - CLASS ’B’ RIP RAP
d= 1 Ft.
LENGTH = 10 FT.
-L- STA. 129+60 RT
Channel Bed
SEE DETAIL PR4
PLACE ON BANKS ONLY
CLASS ’B’ RIP RAP
C C
F
C
F
F
C
C
C
F F
F F
F
9
8
9
989
989
989
989
990
990
990
990
9
9
0
990
990
990
990
990
991
991991
991
991
991
991
991991
991
991
991
991 9
9
1
991
991
991
9
92
992
992
992
992
992
992
992
992
992
992
992
992
992
992
992
992
993
993
993
993
993
993
993
993 993
993
993
993
993
993
9
9
3
993
993
9
93
9
9
3
994
994
994
994
994
994
994
994
994
994
994
994
994
9
9
4
994
994
994
994
994
995
995
995
995
995
995995
995 995
995
995
995 995
9
9
5
9
9
5
9
9
5
995
995
995
995
9
9
5
9
9
5
995
996
996
996
996
996
996
996
996
996
996
996 996
996
9
9
6
99
6
9
9
6
996
9
96
996
996
996
996
996
996
996
996
996
996
996
996
9
96
996
996
997
99
7
997
997
997
997
997
997
997
997
997
997 997
997
9
9
7
997
997
997
997
997
997
997 997
997
99
7
997
997
997
9
9
7
997
997 997997997
9
97
997
997
998
998
998
998
998
998
998
998
998
998
998 998
998
998
998
998
998
998
998
998
998 998
998
998
998
998
9
9
8
998
998
998
9
98998
9 9 8
998
998
9
9
8
9
9
8
999
999
999
999
999
999
999 999 999
999
999
999
9
9
9
9
99
999
999 999
999
999999
999 999
999
9
9
9
999
999
999
999
999
9
99
999
1000
1000
1000 1000
1000
1000 1000
10
0
0
1000
1000
1000
1000
1000
10
0
0
10
0
0
1000 1000
1000
10
0
0
1000
1000
1000
1000
1
0
0
0
1001
1001
1001
1001
1001
10
0
1
1001
1001
1001
1001
1001
1001
10
0
1
1001
1001
10
01
1001
1001
10
0
1
1001
1001
1002
1002
1002
1002
1002
10
0
2
1002
1002
10
0
2
1002
1002
1002
10
02
1002
1002
1002
1002
1002
1002
1002
1003
1003
1003
1003 1003
1003
1003
10
0
3
1003
1003 1003
10
0
3
1003
1003 1003
1003
10
0
3
1003
1003
1003
10
0
3
1004
1004
1004 1004
1004
1004
10
0
4
1004
1004 10
0
4
10
0
4
1004
1004 1004
1004
10
0
4
10
0
4
1004
1004
10
0
4
1005
1005
10
0
5
10
0
5
1005
10
0
5
1005
1005
10
0
5
10
0
5
1005
1005
1005
10
0
5
10
0
5
1005
1006
1006
1006
1006
1006
100
6
1006
1006
1006
1006
1006
1006
10
0
6 1006
1007
1007
1007
1007
1007
1007
10
07
1007
1007
1007
1007 10 0 7
1008
10
0
8
1008
1008
1008
1008
1008 1008
10
0
81008 1008
1009
10
0
9
1009
1009
1009
1009
100
9
1009
1009
1009
1009
1010
1010
1010
1010
1010
1010
1010
10
10
10
10
1011
1011
1011
1011
10
11
1011
10
11
1011
1012
1012
1012
1012
1012
1012
1013
1013
1013
1013
10
13
1013
10
14
1014
1014
1014
1015
1015
1016
1016
1017
1017
1018
1018
1018
10
19
1019
10
2
0
10201021
1022
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
7
/
2
8
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
2
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
.
13
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
13
3
+
0
0
12R-2603
S
E
E
S
H
E
E
T
N
O
.
11
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
119
+
0
0
SHEET 17 OF 28
PERMIT DRAWING
12
0 12
5
13
0
ATTENUATOR
-L-
-Y13-
N
AD
8
3
/ 9
5WETLAND
DENOTES FILL INFF
FILL IN WETLANDS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 8
SITE 7
SITE 5
SITE 6 IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
HUTCHINSONS LLC
LIFT BODIES INC
PHYLLIS WAGONER
CASWELL WAGONER
JAMES HUTCHINSON JR
80
78
83
84
HW
HW
RCP
36"
C
MP
18
"
C
M
P
18
"
1 B
AR
R
E
L
L
4
’x
5
’
MON
R/W
GR
CONC
C
O
N
C
BST BST
G
R
S
NC 268 ELKIN RD 22’ BST
G
R
GR
MTL
SKYVIEW RD.
EVELYN BLACKBURN
WILLIAM BLACKBURN
82
85
LEAH ZETTELMEIER
DIRK ZETTELMEIER
85
ASSOCIATION INC
BLUE RIDGE WATER
81
CBCB
10 SY GEOTEXTILE
EST. 3 TONS
CLASS ’B’ RIP RAP
15"
15
"
RC
P-
III
15" RCP-III
15" RCP-III
18
" RC
P-III
18
" RC
P-III
2GI
2GI
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
(Rip Rap in
basin not shown
for clarity)
Pipe or Ditch
Outlet
Square Preformed
Scour Hole (PSH)
Seed with native
grasses at installation.
PREFORMED SCOUR HOLE
*NOT TO SCALE
NATURAL
GROUND
B
FI
LL
S
LOP
E
PSRM
2:12:1
PIPE (d = 15" OR 18")
INFLOW
3/08
MIN. 1’ TUCK
D
DETAIL P1
NATURAL GROUND
AND FLUSH WITH
INSTALL LEVEL
W= 4’
D= 1’
B= 4’
FILTER FABRIC
RIPRAP WITH
LINER: CLASS B
Q10 = 2.9 cfs
DETAIL P1
PSH SEE
Q10 = 3 cfs
DETAIL P1
PSH SEE 15" RCP-III
2GI
2GI
2GI 2GI REMOVE
REMOVE
EXIST. RCBC
REMOVE
15"
15"
36" RCP-IV
2 @
3GI
SEE DETAIL PR3
PLACE ON BANKS ONLY
CLASS ’B’ RIP RAP
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR3
MI
N.
2:
1
CHANNEL BANK
TIE TO EXISTING
EST. 11 TONS & 28 SY GEOTEXTILE
LINER TYPE - CLASS ’B’ RIP RAP
d= 2 Ft.
LENGTH = 10 FT.
-L- STA. 126+96 RT
Channel Bed
d
( Not to Scale)
Ground
Natural
GEOTEXTILE
Ground
Natural
VARIABLE
PIPE OUTLET RIP RAP
DETAIL PR4
MI
N.
2:
1
CHANNEL BANK
TIE TO EXISTING
EST. 3 TONS & 10 SY GEOTEXTILE
LINER TYPE - CLASS ’B’ RIP RAP
d= 1 Ft.
LENGTH = 10 FT.
-L- STA. 129+60 RT
Channel Bed
SEE DETAIL PR4
PLACE ON BANKS ONLY
CLASS ’B’ RIP RAP
C C
F
C
F
F
C
C
C
F F
F F
F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
1
1
:
5
6
:
3
0
A
M
-L-
NC 268
-L-
NC 268
R-2603 26
120119 121 122 123 124 125 126 127 128 129 130 131 132 133
133 134 135 136 137 138 139 140 141 142 143 144 145
960
970
980
990
1,000
1,010
1,020
1,030
1,040
1,050
960
970
980
990
1,000
1,010
1,020
1,030
970
980
990
1,000
1,010
1,020
1,030
1,040
1,050
1,060
970
980
990
1,000
1,010
1,020
1,030
1,040
1,050
1,060
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 18 OF 28
PERMIT DRAWING
(+)2.1550%
(-)0.3898%
V = 80 mph
PI = 125+82.60
EL = 996.79’
VC = 600’
K = 236
E
L
=
9
9
5
.
7
5
’
-
L-
S
TA
.
12
6
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
IT
C
H
W
/H
IN
G
E
B
E
G
IN
(+)4.53%
(-)0.48%
E
L
=
9
9
4
.
8
0
’
-
L-
S
TA
.
12
8
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
E
L
=
10
0
1.
6
0
’
-
L-
S
TA
.
12
9
+
5
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
E
N
D
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 997.7
= 58
= 100(+)
= 50
= 43
= 997.2
= 52
= 997.5
= 52
-L- Sta. 127+38 LT
SKEW=118
2-30" RCP
E
L
=
9
9
8
.
5
1’
-
L-
S
TA
.
12
8
+
3
7
.
7
0
(
8
8
.
9
5
)
LT
B
E
G
IN
B
A
S
E
TA
IL
D
ITC
H
E
L
=
9
9
4
.
8
0
’
-
L-
S
TA
.
12
8
+
0
0
(7
5
.
9
2
)
LT
E
N
D
B
A
S
E
TA
IL
D
IT
C
H
39.6 LF @ 9.37%
(+)2.1550%
(+)1.7123%
(+)2.5385%
(+)2.5385%
(+)1.9720%
(+)1.9720%
PI = 134+00.00
EL = 1,014.41’
VC = 530’
K = 1197
V = 80 mph
PI = 138+75.00
EL = 1,022.54’
VC = 250’
K = 303
V = 80 mph
PI = 142+00.00
EL = 1,030.79’
VC = 400’
K = 706
V = 80 mph
ELEV. 1027.66’
8" SPIKE IN ROOT OF 12" BEECH TREE
168.89’ RT.
-L- STA. 142+51.53
BM # 7
E
L
=
10
2
3
.
8
6
’
-
L-
S
T
A
.
14
0
+
5
0
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
IT
C
H
W
/H
IN
G
E
B
E
G
IN
(-)0.5%(+)5.22%
E
L
=
10
2
3
.
4
8
5
’
-
L-
S
TA
.
1
4
1+
2
5
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
ITC
H
W
/H
IN
G
E
E
L
=
10
2
7
.
4
0
’
-
L-
S
T
A
.
14
2
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
ITC
H
W
/H
IN
G
E
E
N
D
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
x
p
l
_
p
e
r
m
i
t
s
.
d
g
n
1
1
:
3
3
:
2
4
A
M
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
990 990
1000 1000
1010 1010
980 980
122+00.00
990 990
1000 1000
1010 1010
980 980
122+50.00
990 990
1000 1000
1010 1010
980 980
123+00.00
990 990
1000 1000
1010 1010
980 980
123+50.00
990 990
1000 1000
1010 1010
980 980
124+00.00
990 990
1000 1000
1010 1010
980 980
124+50.00
R-2603
-L-
5 10
SHEET 19 OF 28
PERMIT DRAWING
X-44
998.25 2:
1
2:1
2:
1
0.0200.020
998.50
2:
12:1
2:
1
0.0200.020
998.73
2:
12:1 2:
1
0.0200.020
998.802:1
2:
1
0.0200.020
998.81 2:
14:1 2:
1
0.0200.020
999.046:1
4
:1
0.0200.020
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
4
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 15
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 15
9
+
0
0
S
E
E
S
H
E
E
T
N
O
. 13
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 14
5
+
0
0
R-2603 14
SHEET 20 OF 28
PERMIT DRAWING
14
5
15
0
15
5
14
5
-L-
-Y16
-
-
Y1
5-
N
AD
83/ 95
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 9A
SITE 9B
SITE 9C
RAUL RIVAS
JULIE YOUNCE
CARL YOUNCE
BERTHA
M
ORA
F
ELI
P
E
M
ORA
P
ATRI
CI
A
TRI
CE
J
AM
ES
TRI
CE
RUTH
P
EA
RS
ON
GA
RY
P
EA
RS
ON
CHRI
S
TY
HA
LL
P
ATRI
CI
A
S
HEW
CHRI
S
S
HEW
NAN
CY J
OHNS
TO
N
VICTOR GARCIA
CHRISTOPHER WATSON
F C JOHNSON HEIRS
ALICE PREVETTE
ROYALE LAZENBY
NORT
H WIL
KE
S
B
O
R
O C
IT
Y L
IMIT
S
89
90
91
92
93
15
1
15
2
15
3
15
4
15
5
156
15
7
158
15" CMP
D
I
HW HW
v
v
C
M
P
18
"
C
MP
3
0
" 1 BARREL4’x3’
C
MP
15"
MO
N
CONC
R
C
P
15
"
S
SOIL
SOIL
SOIL
S
CONC
DK
G
R
GR
G
R
D
K
G
R
CONC
GR
C
ONC
D
K CONC
BS
T
S
R
2
0
90
VIS
T
A LANE
2
0
’B
S
T
DK
CONC
DK
C
ON
C
DK
DK
CONC
NC 268 ELKIN RD 21’ BST
DK
15" HDPE
15
" C
MP
F
LAGP
OLE
15
" P
L
AS
T
IC
EVELYN BLACKBURN
WILLIAM BLACKBURN
82
CD710
8
0.4
8
*
BL3
6
0
4
CD2
210
7
5.6
2
WOODS
QUEEN DR GR
WD TIMBERS & GR
PLAY HOUSE
SWING
CLEAN
OUT
3.
15’
DEEP
88
SHEILA & RONNIE CHURCH
ROBERT WYATT
94
18
" C
MP
P
A
VED
DIT
C
H
P
A
VE
D DIT
C
H
NORTH
WI
LKES
BO
RO
CI
TY
LI
MI
TS
P
A
VE
D DIT
C
H
89Z 90Z89Z90Z
2GI2GI2GI2GI
FS
BDO
FS
5 SY GEOTEXTILE
EST. 1 TONS
CLASS ’B’ RIP RAP
5 SY GEOTEXTILE
EST. 1 TONS
CLASS ’B’ RIP RAP
BDO
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
5 SY GEOTEXTILE
EST. 1 TONS
CLASS ’B’ RIP RAP
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
15" RCP-III
2GI
15
"
3
0
" RC
P-III
15"
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
15
"
15"
18" RCP-III
2
4
"
RC
P
-
I
I
I
FS
FS
54" RC
P-III
15"
3GI
15"
BERM DITCH
SEE RDWY STD. 240.01
-Y16- STA 12+50 to 13+90
BERM DITCH
SEE RDWY STD. 240.01
-L- STA 144+60 to 145+50
2GI
2GI
2GI
2GI
2GI 2GI
REMOVE RETAINREMOVE REMOVE
15
" RC
P-III
30"
15"15"15"15"
SPECIAL TB JB w/MH
REMOVE
C
F F
C
F
C
C C
F
C
C
C
F
F
F
F
C
C
C
10
26
1027
1027
10
2
7
1028
1028
1028
1029
1029
1029
1029
1029
1029
1029
1030
10
3
0
1030
10
30
1030
1030
1031
1031
1031
10
31
1031
1031
1032
10
3
2
10
3
2
1032
10
3
2
10
3
2
1032
1033
10
3
3
1033
1033
1033
10
3
3
1033
1033
10
33
1034
1034
1034
10
3
4
1034
10
3
4
10
3
4
1034
10
3
4
1035
1035 1035
1035 10
3
5
1035 1035
10
3
5
10
3
5
10
3
5
10361036
1036
1036
10
3
6
1036
1036
10
3
6
10
36
10
36
1036
1036
1036
10
3
6
10
3
6
1036
1037
1
0
3
7
1037
1037
1037
10
3
7
1037
1037
1037
1037
1037
10
3
7
1037
1037
1037
1038
1038
1038
10
3
8
1038
1038
1038
1038
10
3
8
1038
1038
1038
1038
1038
1038
10
38
10
3
8
1039
1039
1039
1039
1039
1039
1039 10
3
9
1039
1039
1039
10391039
1039
1039
1039
1040
1040
1040 1040
10
4
0
1040
1040
1040
1040
10
4
0
1040
10401040
1
0
4
0
1040
1041
1041
10
4
1
1041
1041
1041
1041 1041
10
4
1
1041 1041
10411041
10411041
1041
10
4
1
1041
10
4
1
1042
1042
1042
1042
1042
1042
1042 1042
10
4
2
10
4
2
1042
1042
10
42
10
4
2
1042
1042
1042
1042
1042
1042
1042
1043
1043
1043
1043
1043
1043 1043
10
4
3
1043
1043
1043
1043
1043
1043
10
4
3
1043
10
4
3
1043
1043
1043
10
4
3
1043
10
4
3
1044
1044
1044
10
4
4
1044
1044 1044
10
4
4
1044
1044
1044 1044
1044
10
44
10
4
4
10
4
4
10
4
4
1044
10
44
104
4
10
4
4
1044
10
44
1045
1045
1045
1045
1045
1045
1045 1045
1045
1045
1045 1045
10
4
5
1045
1045
10
4
5
1045
1045
1045
10451045
1045
1045
1045
10
4
5
1046
1046
1046
1046
10
4
6
1046
1046
1046
1046
1046
1046
1046
1046
1046
1046
10
4
6
1046
1046
1046
1046
1046
1046
1046
1046
10
4
6
1046
10
4
6
1047
1047
1047
10
47
1047
104
7
10
4
7
1047
1047
1047
1047
1047
1047
1047
1047
1047
10
4
7
1047
1047
1047
1047
1047
1047
10471047
1047
1047
10
48
10
4
8
1048
1048
10
4
8
1048
1048
10
4
8
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
1048
10
4
8
1049
10
49
10
4
9
1049 1049 1049
10
4
9
1049
10
4
9
1049
1049
1049
10
4
9
1049
1049
10
4
9
1049
1049
1049
10
4
9
1049
104
9
1049
10
4
9
1049
1049
10
4
9
1049
1050
1050
1050
1050
1050 10
5
0
1050
1050
1050
1050
1050
1050
1050
1050
10
50
1050
1050
1050
1050
1050
1050
1050
1050
1
0
5
0
1050
1050
1050
10
5
0
10
5
0
1051
1051
1051
1051
1051
1051
1051
105 1
10
51
1051
1051
1051
1051
1051
1051
1051
1051
10
51
1051
1051
1051
10
5
1
1051
1051
1051
1051
1051
10
5
1
1051
1052
1052
10
5
2
1052
1052
1052
1052
1052
10
5
2
10
5
2
1052
1052
1052
1052
1052
1052
10
5
2
10
52
1052
1052
1052
1052
1052
1052
1052
1052
1052
1052
1052
1052
1053
10
53
10
5
3
1053
1053
1053
1053
10
5
3
1
0
5
3
1053
10
5
3
1053
1053
1053
1053
1053
10
53
10
5
3
1053
1053
1053
1053
10
5
3
1053
10
5
3
1053
1053
10
5
3
1053
1054
1054
1054
1054
1054
1054
1054
10
54
1054
1054
1054
1054
1054
1054
1054
1054
10
5
4
10 5 4
1054 1054
1054
10
5
4
10
5
4
1054
1054
10
5
4
1054
10
5
4
1055
10
5
5
10
5
5
1055
1055
1055
1055
1
0
5
5
10
5
5
1055
1055
1055
1055
1055
1055
1055
1055
1055
10
5
5
1055
1055
10
5
5
10
5
5
1055
1056
1056
1056
10
56
10
5
6
1056
1056
1056
10
5
6
10
5
6
1056
10
5
6
10
5
6
1056
1056
1056 1056
10
5
6
1056
1056
1056
1056
1056
105
6
10
5
6
1057
1057
1057
10
5
7
10
5
7
1057
10571057
1057
10
5
7 10
5
7
10
5
7
10
5
7
10
5
7
1057
1057 1057
1057
1057
1057
1057 1057
1057
1057
10
57
1058
10
58
10
5
8
1058
1058
1058
1058
10
5
8
1058
1058
10
58
10
5
8
10
5
8
1058
1058 1058
1058
10
58
1058
1058
1058
1058
1058
10
5
9
1059
1059
1059 10
5
9
1059
1059
10
5
9
1059
1059
1059
1059
1059
1059
1059
1059
1059
10
5
9
1059
1059
1059
1059
1059
1059
1059
10
6
0
10
6
0
1060 1060
1060 10
60
10
6
0
1060 1060
1060
1060
1060
1060
10
6
0
10
6
0
1060
1060
1060
1060
1060
1060
10
6
0
1060
10
6
1
1061
1061 1061
1061
1061
1061
1061
1061
1061
1061
1061
10
61
1061
10
6
1
1061
1061
1061
10
6
1
1061
1061
1061
10
6
1
1062
1062
1062
1062
1062
1062
1062
1062
1062
1062
1062
1062
10
6
2
10
6
2
1062
1062
1062
1062
1062
1062
1062
1062
1062
10
6
2
1063
1063
1063
1063
1063
1063
1063
10
6
3
1063
1063
1063
1063
10 6 3 1063
1063
10
6
3
1063
1063
1063
10
6
3
10
6
3
1063
10
6
3
1063
10
6
3
10
6
4
1064
1064
1064
1064
1064
1064
1064
1064
1064
10 6 4
10 6 4 1064
1064
10
6
4
1064
1064
1064
10
6
4
10
6
4
1064
1064
1064
1065
1065
1065 106
5
1065
10
6
5
1065 1065
1065
1065
1065
10
6
5
1065
1065
1065
1065
1065
10
6
5
1065
1065
1066
1066
10
6
6 1066
1066
106
6
1066
1066
1066
1066
1066
10
6
6
1066
10
6
6
1066
1066
1066
10
6
6
1066
1066
1066
10
6
6
1066
1067
1067
1067
1067
1067
1067
10
67
1067 1067
10 6 7
1067
1067
1067
1067
10
6
7
1067
1067
10
6
7
10
67
1067
1067
10
6
7
1068
1068
1068
1068
1068
10
6
8
1068
1068
1068
1068
1068
1068
10
6
8
1068
1068
10
6
8
1068
1068
1068
1069
1069 1069
1069
1069
10
6
9
1069
1069
1069
1069
1069
1
0
6
9
1069
1069
10
6
9
10
6
9
1069
1069
1070
10
7
0
1070
1070
10
7
0
1070
1070
1070
1070
10 7 0
1070
10
7
0
1070
10 70
10
7
0
1070
1070
1070
1071
10
7
1
1071
1071
1071
1071
1071
10
7
1
1071
1071
1071
10
71
1071
1071
10
71
10
7
1
1071
107
1
1071
1072
1072
1072
1072
10
7
2
1072
1072
1072
1072
1072
10
7
2 1072
1
0
7
2
1072
1072
10
7
2
1072
1073
10
73
10
73
1073
1073
1073
1073
1073
1073
1073
1073
1073
10
7
3
1073
1073
1073
1073
1074
10
7
4
1074
10
7
4
1074
1074
1074
1074
1074
1074
10
7
4
1074
10
7
4
1074
10
74
10
7
4
1074
1074
1075
10
7
5
1075
1075
1075
1 0 7 5
1075
1075
1075
10
7
5
1075
10
7
5
1075
10
7
5
1075
10
7
5
1075
10
7
5
1076
10
7
6
1076
10
7
6
1076
1076 1076
1076
1076
10
7
6
10
7
6
10
76
1076
10
7
6
1076
1077
1077
1077
1077
1077
10 77
1077
10771077
10
7
7
1077
1077
10
7
7
1077
1077
10
77
1077
1078
1078
1078
1078
1078
1078
1078
1078
10
78
1078
1078
1078
1078
1078
1078
1079
1079
1079
1079
1079
10 79
10 7 9
1079
10
79
1079
107
9
10
8
0
1080
1080
1080
10
8
0
10
8
0
1080 10
8
0 1080
1080
1081
1081
1081
1081 1081
1081
10
81
1081
1082
1082
1082
1082 1082
10
8
2
1083
1083
1083
1083
10
8
4
1084
1084
10
8
5
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
4
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 15
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 15
9
+
0
0
S
E
E
S
H
E
E
T
N
O
. 13
M
A
T
C
H
L
IN
E
-
L
-
S
T
A
. 14
5
+
0
0
R-2603 14
SHEET 21 OF 28
PERMIT DRAWING
14
5
15
0
15
5
14
5
-L-
-Y16
-
-
Y1
5-
N
AD
83/ 95
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 9A
SITE 9B
SITE 9C
RAUL RIVAS
JULIE YOUNCE
CARL YOUNCE
BERTHA
M
ORA
F
ELI
P
E
M
ORA
P
ATRI
CI
A
TRI
CE
J
AM
ES
TRI
CE
RUTH
P
EA
RS
ON
GA
RY
P
EA
RS
ON
CHRI
S
TY
HA
LL
P
ATRI
CI
A
S
HEW
CHRI
S
S
HEW
NAN
CY J
OHNS
TO
N
VICTOR GARCIA
CHRISTOPHER WATSON
F C JOHNSON HEIRS
ALICE PREVETTE
ROYALE LAZENBY
NORT
H WIL
KE
S
B
O
R
O C
IT
Y L
IMIT
S
89
90
91
92
93
15
1
15
2
15
3
15
4
15
5
156
15
7
158
15" CMP
D
I
HW HW
v
v
C
M
P
18
"
C
MP
3
0
" 1 BARREL4’x3’
C
MP
15"
MO
N
CONC
R
C
P
15
"
S
SOIL
SOIL
SOIL
S
CONC
DK
G
R
GR
G
R
D
K
G
R
CONC
GR
C
ONC
D
K CONC
BS
T
S
R
2
0
90
VIS
T
A LANE
2
0
’B
S
T
DK
CONC
DK
C
ON
C
DK
DK
CONC
NC 268 ELKIN RD 21’ BST
DK
15" HDPE
15
" C
MP
F
LAGP
OLE
15
" P
L
AS
T
IC
EVELYN BLACKBURN
WILLIAM BLACKBURN
82
CD710
8
0.4
8
*
BL3
6
0
4
CD2
210
7
5.6
2
WOODS
QUEEN DR GR
WD TIMBERS & GR
PLAY HOUSE
SWING
CLEAN
OUT
3.
15’
DEEP
88
SHEILA & RONNIE CHURCH
ROBERT WYATT
94
18
" C
MP
P
A
VED
DIT
C
H
P
A
VE
D DIT
C
H
NORTH
WI
LKES
BO
RO
CI
TY
LI
MI
TS
P
A
VE
D DIT
C
H
89Z 90Z89Z90Z
2GI2GI2GI2GI
FS
BDO
FS
5 SY GEOTEXTILE
EST. 1 TONS
CLASS ’B’ RIP RAP
5 SY GEOTEXTILE
EST. 1 TONS
CLASS ’B’ RIP RAP
BDO
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
5 SY GEOTEXTILE
EST. 1 TONS
CLASS ’B’ RIP RAP
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
15" RCP-III
2GI
15
"
3
0
" RC
P-III
15"
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
15
"
15"
18" RCP-III
2
4
"
RC
P
-
I
I
I
FS
FS
54" RC
P-III
15"
3GI
15"
BERM DITCH
SEE RDWY STD. 240.01
-Y16- STA 12+50 to 13+90
BERM DITCH
SEE RDWY STD. 240.01
-L- STA 144+60 to 145+50
2GI
2GI
2GI
2GI
2GI 2GI
REMOVE RETAINREMOVE REMOVE
15
" RC
P-III
30"
15"15"15"15"
SPECIAL TB JB w/MH
REMOVE
C
F F
C
F
C
C C
F
C
C
C
F
F
F
F
C
C
C
18
" C
MP
15"
CM
P
INV=
118
2
.0
3
’
INV=117
2
.5
1’
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 16
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
. 17
3
+
0
0
S
E
E
S
H
E
E
T
N
O
. 14
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
. 15
9
+
0
0
15R-2603
THIS SHEET
MATCH LINE -Y17- STA. 16+00
T
H
I
S
S
H
E
E
T
M
A
T
C
H
L
I
N
E
-
Y
1
7
-
S
T
A.
1
6
+
0
0
SHEET 22 OF 28
PERMIT DRAWING
16
0
16
5
17
0
-L-
-
Y17
-
N
AD
83/ 95
IN SURF WATER
TEMP IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 10
SITE 9D
MARGIE WYATT
RICHARD HOLLOWAYROBERT WYATT
N O R T H W ILK E S B O R O C ITY L IM IT S
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
94
95
96
18
"
R
C
P
HW
HW
CMP
3
0
"
C
MP
18
"
S
NC 268 ELKIN RD 22’ BST
GR
GR
GR
B
ST
S
S
CB
DI
15" CMP18" CMP
P
AV
E
D
DIT
C
H
P
A
VE
D
DIT
C
H
MARGIE WYATT
95
S
R
2
0
8
6 BE
AUMONT
P
OP
LAR
S
T
19
’ B
S
T
F C JOHNSON HEIRS
92
GR
1 BARRE
L
4
’x
2
’
98
92
F C JOHNSON HEIRS
98
ALAN JOHNSON
97
PL=N
O
R
TH
WILK
ESB
O
R
O
C
ITY
LIM ITS
TO DRAIN
GRADE CUT
18"
HWFS
24 SY GEOTEXTILE
EST 10 TONS
CLASS ’B’ RIP RAP
18"18"
18"
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
TO DRAIN
GRADE CUT
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
18"
G
RADE TO
D
RAIN
15"
TO 17+50 RT EST. 100 SY
DITCH STATION 14+50
PLACE PSRM IN ROADWAY
10 SY GEOTEXTILE
EST. 3 TONS
CLASS ’B’ RIP RAP
15"
2
4
" RC
P-III
18"
48" RC
P-III
2GI
2GI
2GI
RETAIN
REMOVE REMOVE REMOVE REMOVEREMOVE
REMOVE DI
24" RCP-III
24" RCP-III
REMOVE EXIST. RCBC
81 SY GEOTEXTILE
EST 22 TONS CL B
SEE DETAIL TP1
TOE PROTECTION
1
5
-Y17-
N
A
D
8
3
/
9
5
MARGIE WYATT
BERNICE WALSHGARY WALSH
ALMEDA ELLER
WILLIAM ELLER
MARGIE WYATT
95
95
159
160
SR 2086 BEAUMONT POPLAR ST 19’ BST
S
O
I
L
S
O
IL
C
O
N
C
C
O
N
C
B
S
T
15" CMP
15" CMP
15"
CM
P
T
O
1
7
+
5
0
R
T
E
S
T.
1
0
0
S
Y
D
I
T
C
H
S
T
A
TI
O
N
1
4
+
5
0
P
L
A
C
E
P
S
R
M
I
N
R
O
A
D
W
A
Y
( Not to Scale)
LATERAL BASE DITCH
2:
1 D
B
b
d
2:1 1"/Ft.
FROM -Y17- STA. 11+15 TO STA. 13+00 LT
DETAIL LB1
b= 2Ft.
B= 2Ft.
Max. d= 1Ft.
Min. D= 1Ft.
Type of Liner= PSRM
Ground
Natural
Slope
Fill
TO DRAIN
GRADE
REMOVE
p
ip
e
c
u
v
e
s
a
n
d
o
u
le
t
is
t
h
e
d
r
iv
e
wa
y
h
o
m
e
o
w
n
e
r
s
t
a
t
e
s
t
h
a
t
t
h
e
28 SY GEOTEXTILE
EST 10 TONS
CLASS ’B’ RIP RAP
EST 200 SY PSRM
STATION 14+50 TO 17+50 RT
PLACE PSRM IN ROADWAY DITCH
F
C
C
C
C
F
C
F F
C C
C
C C
C
C
C
F
F C C
FC
F
C C
C
C
C
F
F
C
F
C
F
F
F
C
F C
C
1098
10
9
8
10
9
8
10
9
9
10
9
9
110
0
110
0
1
10
1
110
1
110
2
110
2
110
3
110
3
1104
1
1
0
4
110
4
1105
1
1
0
5
1106
1106
110
6
110
6
1107
1107
110
7
110
7
1108
1108
110
8
110
8
1109
1109
1
1
0
9
1109
1110
1110
1
1
1
0
1111
1111
1111
1112
111
2
1112
1112
1113
11
1
3
1113
1113
1
1
14
1114
1114
1114
1115
111
5
1115
1116
1116
1116
1117
1117
1117
1118
1118
1118
1119
1119
1119
1120
112
0
112
0
1121
1121
1121
1122
1122
1123
1123
1123
1124
1124
1124
1125
1125
1125
112
6
1126
1126
1127
1127
1127
1128
112
8
1128
1129
112
9
1129
1130
1
1
3
0
1130
1131
113
1
1131
1132
113
2
1132
1133
1133
113
3
1134
113
4
1134
113
5
1135
1136
1136
1136
113
7
1137
1137
1138
1138
1139
1139
1140
1140
1141
1141
1142
1142
114
3
1143
114
4
1144
114
51145114
6
1146
114
7
1147
114
8
1148
114
9
1149
115
0
1150
115
1
1151
115
2
1152
115
3
1153
115
4
1154
1
1
5
5
1155
115
6
1156
1157
115
7
1
1
5
8
115
8
115
9
115
9
116
0
116
0
116
1
116
1
116
2
116
2
116
3
116
3
116
4
116
4
1165
116
5
116
5
1166
116
6
1167
116
7
1168
116
8
1169
116
9
117
0
117
0
117
1
117
1
117
2
117
2
117
3
117
3
117
4
117
4
117
5
1
17
6
117
6
117
7
117
7
117
8
117
8
117
9
117
9
118
0
118
0
118
1
118
1
118
2
118
2
1183
118
3
1184
118
4
1185
118
5
118
6
118
6
1187
118
7
118
8
118
8
118
9
118
9
119
0
119
1
119
1
119
2
119
2
1193
119
3
1194
119
4
119
5
119
5
1196
119
6
119
7
119
7
119
7
119
8
119
8
119
8
1199
1199
120
0
1200
1201
1201
12
0
1
1202
12
0
3
1204
1205
1206
1207
12
0
8
1050
1051
1051
10
5
1
1052
1052
1052
10
5
2
1053
10
5
3
1053
1053
1053
1053
10
5
3
1054
1054
1054
10
5
4
1054
1054
10
5
4
10
5
4
10
5
4
1055 1055
1055
1055
1055
1055
1056
1056
1056
1056 1056
10
5
6
1057
1057
10
5
7
1057
1057 1057 1057
1058
1058
1058
1058 1058
10
5
8
10
5
8
1059
1059
1059
1059
1
0
5
9
1059
1059
106010
6
0
1060
1060
10
6
0
10
6
0 1060
1060
1061
1061
10
6
1
1061
1061
1061
1061
1062 1062
1062
1062
1062
1062
1062
1063
1063
106
3
10
6
3
10
6
3
1063
1063
10
6
3
1064
1064
1064
1064
1064 1064
1064
1064
1065
1065
1065
1065
10
6
5
1065
1065 1065
1065
1066
10
6
6
1066
1066
1066
1066
10 6 61066
10
6
6
1067
1067
1067
1067
1067
1067
1067
1067
10
67
1068
1068
1068
1068
10
6
8
10
6
8
1068
1068
1068
1068
1069
1069
1069
1069
1069
1069
1069
1069
1
0
6
9
10
6
9
1069
1070
1070
1070
1070
1070
10
7
0
1070
1070
1070
1070
1070
1071
10
71
1071
1071
1071
1071
1071
1071
10 7 1
10
7
1
1071
1072
1072
1072
1072
1072
10
7
2
1072
1072
10
7
2
1072
1072
1073
1073
1073
1073
10
7
3
1073
1073
10
7
3
1073
10
7
3
10
7
3
1073
1074
1074
1074 10 7 4
1074
1074
1074
1074
10
7
4
10
7
4 10
7
4
1074
1075
1075
1075
10
7
5
1075
1075
1075
1075
1075
10
7
5
1075
10
7
5
10
7
5
1076 1076
1076
10
7
6
1076
107
6
1076
1076
1076
1076
1076
1076
1076
1077
1077
1077
1077
1077
1077
1077
1077
1077
1077
1077
1077
1077
1078 1078
1078
1078
1078
1078
1078
1078
1078
1078
1078
1078
1079
1079
1079
1079
1079
1079
1079
1079
1079
1079
1079
1079
1079
1080
1080
1080
108
0
1080
10
8
0
1080
1080
1080
10
8
0
10
8
0
1080
1080
1081
1081
1081
1081
1081
1081
1081
1081
1081
1081
1081
1081
1082
1082
1082
1082
1082
1082
1082
1082
1082
1082
1082
1082
1082
1083
1083
1083
1083
1083
1083
1083
1083
10
8
3
1083
1083
10
8
3
1083
1083
10
8
3 1083
1084
1084
1084
1084
10
8
4
1084
1084
10
84
10
8
4
1084
1084
1084
1084
10
8
4
1084
10
8
4
10
8
4
1084
1085
1085
1085
1085
1085
10
85
10
85
1085
1085
10
85
1085
1085
1085
1085
10
8
5
1085
1085
1086
1086
1086
1086
1086
10
8
6
10
8
6
1086
1086
1086
10
8
6
1086
1086
10
8
6
10
8
61086
1086
10
8
7
1087
10
8
7
1087
1087
1087
1087
1087
1087
1087
1087
1087
10
8
7
1087
108710871087
1087
1088
10
8
8
1088
10
8
8
1088
1088
1088
1088
108
8
1088
10
8
8
10
8
8
10881088
1088
10
8
8
1088
1088
1088
1089
1089
1089
1089
1089
1089
1089
1089
1089
10
8
9
1089
10
8
9
1089
10891089
1089
1089
1089
1089 1090
1090
1090
1090
1090
1090
10
9
0
1090
1090
10
9
0
1090
10
9
0
1
0
9
0
1090
1090
10
9
0109010
9
1
10
9
1 1091
1091
1091
1091
1091
10
9
1
1091
1091
1091
1091
10 91
10
9
1
1091
1
0
9
1
1091
1092
1092
1092
1092
1092
1092
10
9
2
1092
10
9
2
10
9
2
1092
1092
1092
1092
1
0
9
2
1092
10
9
2
1093
1093
1093
1093
1093
10
93
1093
1093
1
0
9
3
10
9
3
1093
1093
1093
1093
1093
1093
10
9
3
10 94
1094
10
94
1094
1094
1094
1094
1094
1094
1094
1094
1094
1094
1094
10
9
4
1094
10
9
4
1095 1095
1095
1095
1095
1095
1095
1095
1095
1095
1095
10
9
5
1095
10
9
5
1095
10
9
5
1096 1096
1096
1096
1096
1096
1096
10
9
6
1096
1096
1096
10
9
6
10 9 6
10
9
6
1096
10
96
1097
1097
1097
1097
1097
109
7
1097
10
9
7
1097
10
9
7
1097
10
97
1097
10
97
1097
1097
1097
1098
1098
1098
1098
1098
1098
1098
1098
1098
1098
1098
1099
1099
109
9
10
99
10
9
9
1099
1099
10
9
9
1099
1099
10 9 9
1100
1100
1100
110
0
110
0 1100
1100
1100
110 0
1101
1101
1101
110
1
1101
1101
1101
1101
1102
1102
110
2
110
2
1102
1102
110
2
1103
1103
1103
1103
1103
110
3
1104
1104
110
4
110
4
1104
1104
110
5
1105
110
5
1105
1105
110
6
1106
1106
110
6
110
7
110
7
1107
11081108
18
" C
MP
15"
CM
P
INV=
118
2
.0
3
’
INV=117
2
.5
1’
RE
VIS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
S
E
E
S
H
E
E
T
N
O
. 16
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
. 17
3
+
0
0
S
E
E
S
H
E
E
T
N
O
. 14
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
. 15
9
+
0
0
15R-2603
THIS SHEET
MATCH LINE -Y17- STA. 16+00
T
H
I
S
S
H
E
E
T
M
A
T
C
H
L
I
N
E
-
Y
1
7
-
S
T
A.
1
6
+
0
0
SHEET 23 OF 28
PERMIT DRAWING
16
0
16
5
17
0
-L-
-
Y17
-
N
AD
83/ 95
IN SURF WATER
TEMP IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
PERM IMPACTS
SITE 10
SITE 9D
MARGIE WYATT
RICHARD HOLLOWAYROBERT WYATT
N O R T H W ILK E S B O R O C ITY L IM IT S
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
94
95
96
18
"
R
C
P
HW
HW
CMP
3
0
"
C
MP
18
"
S
NC 268 ELKIN RD 22’ BST
GR
GR
GR
B
ST
S
S
CB
DI
15" CMP18" CMP
P
AV
E
D
DIT
C
H
P
A
VE
D
DIT
C
H
MARGIE WYATT
95
S
R
2
0
8
6 BE
AUMONT
P
OP
LAR
S
T
19
’ B
S
T
F C JOHNSON HEIRS
92
GR
1 BARRE
L
4
’x
2
’
98
92
F C JOHNSON HEIRS
98
ALAN JOHNSON
97
PL=N
O
R
TH
WILK
ESB
O
R
O
C
ITY
LIM ITS
TO DRAIN
GRADE CUT
18"
HWFS
24 SY GEOTEXTILE
EST 10 TONS
CLASS ’B’ RIP RAP
18"18"
18"
21 SY GEOTEXTILE
EST. 8 TONS
CLASS ’B’ RIP RAP
TO DRAIN
GRADE CUT
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
18"
G
RADE TO
D
RAIN
15"
TO 17+50 RT EST. 100 SY
DITCH STATION 14+50
PLACE PSRM IN ROADWAY
10 SY GEOTEXTILE
EST. 3 TONS
CLASS ’B’ RIP RAP
15"
2
4
" RC
P-III
18"
48" RC
P-III
2GI
2GI
2GI
RETAIN
REMOVE REMOVE REMOVE REMOVEREMOVE
REMOVE DI
24" RCP-III
24" RCP-III
REMOVE EXIST. RCBC
81 SY GEOTEXTILE
EST 22 TONS CL B
SEE DETAIL TP1
TOE PROTECTION
1
5
-Y17-
N
A
D
8
3
/
9
5
MARGIE WYATT
BERNICE WALSHGARY WALSH
ALMEDA ELLER
WILLIAM ELLER
MARGIE WYATT
95
95
159
160
SR 2086 BEAUMONT POPLAR ST 19’ BST
S
O
I
L
S
O
IL
C
O
N
C
C
O
N
C
B
S
T
15" CMP
15" CMP
15"
CM
P
T
O
1
7
+
5
0
R
T
E
S
T.
1
0
0
S
Y
D
I
T
C
H
S
T
A
TI
O
N
1
4
+
5
0
P
L
A
C
E
P
S
R
M
I
N
R
O
A
D
W
A
Y
( Not to Scale)
LATERAL BASE DITCH
2:
1 D
B
b
d
2:1 1"/Ft.
FROM -Y17- STA. 11+15 TO STA. 13+00 LT
DETAIL LB1
b= 2Ft.
B= 2Ft.
Max. d= 1Ft.
Min. D= 1Ft.
Type of Liner= PSRM
Ground
Natural
Slope
Fill
TO DRAIN
GRADE
REMOVE
p
ip
e
c
u
v
e
s
a
n
d
o
u
le
t
is
t
h
e
d
r
iv
e
wa
y
h
o
m
e
o
w
n
e
r
s
t
a
t
e
s
t
h
a
t
t
h
e
28 SY GEOTEXTILE
EST 10 TONS
CLASS ’B’ RIP RAP
EST 200 SY PSRM
STATION 14+50 TO 17+50 RT
PLACE PSRM IN ROADWAY DITCH
F
C
C
C
C
F
C
F F
C C
C
C C
C
C
C
F
F C C
FC
F
C C
C
C
C
F
F
C
F
C
F
F
F
C
F C
C
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
1
1
:
5
7
:
5
1
A
M
-L-
NC 268
-L-
NC 268
R-2603 27
145
161160159
146 147 148 149 150 151 152 153 154 155 156 157 158 159
162 163 164 165 166 167 168 169 170 171 172 173
1,010
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,010
1,020
1,030
1,040
1,050
1,060
1,070
1,080
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
1,030
1,040
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 24 OF 28
PERMIT DRAWING
(+)1.9720%
(+)2.1058%
PI = 147+00.00
EL = 1,040.65’
VC = 600’
K = 4483
V = 80 mph
PI = 159+00.00
EL = 1,065.92’
VC = 560’
K = 4730
V = 80 mph
E
L
=
10
5
8
.
5
9
’
-
L-
S
T
A
.
15
7
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
IT
C
H
W
/H
IN
G
E
B
E
G
IN
(+)5.27%
E
L
=
10
5
2
.
0
0
’
-
L-
S
T
A
.
15
5
+
7
5
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
ITC
H
W
/H
IN
G
E
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1055.0
= 32
= 100(+)
= 50
= 25
= 1054.5
= 30
= 1054.9
= 20
-L- Sta. 155+27 LTE
L
=
10
3
1.
6
0
’
-
L-
S
TA
.
1
4
6
+
14
(
6
1)
RT
B
A
S
E
T
A
IL
D
ITC
H
E
L
=
1
0
3
1
.
6
0
’
-
L-
S
TA
.
14
6
+
15
.
3
5
(8
8
)
RT
B
A
S
E
TA
IL
D
IT
C
H
E
L
=
10
5
2
.
0
0
’
-
L-
S
TA
.
1
5
5
+
7
5
(
8
0
)
LT
B
E
G
IN
B
A
S
E
T
A
IL
D
ITC
H
EL = 1062.68’
-L- STA. 156+89 (124.66) LT
END BASE TAIL DITCH
EL = 1055.51’
-L- STA. 156+00 (113.5) LT
BASE TAIL DITCH
134 LF @ 8.0%
25 LF @ 1.2%
SKEW=120
30" RCP
E
L
=
10
5
4
.
3
9
’
-
L-
S
TA
.
15
5
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
IT
C
H
W
/H
IN
G
E
B
E
G
IN
(-)3.19%
(+)1.9874%
(+)1.9874%
(+)3.5896%
PI = 159+00.00
EL = 1,065.92’
VC = 560’
K = 4730
V = 80 mph
PI = 164+45.00
EL = 1,076.75’
VC = 530’
K = 331
V = 80 mph
ELEV. 1077.21’
8" SPIKE IN ROOT OF 10" WHITE OAK TREE
248.10’ RT.
-L- STA. 167+83.35
BM # 8
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1087.0
= 19
= 100(+)
= 50
= 17
= 1086.8
= 19
= 1087.0
= 5.2
-L- Sta. 168+00 LT
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1065.1
= 15
= 500(+)
= 50
= 11
= 1064.7
= 12
= 1064.8
= 3.4
-L- Sta. 160+00 LT
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1077.5
= 27
= 100(+)
= 50
= 17
= 1076.1
= 21
= 1076.6
= 13
-L- Sta. 165+00 LT
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1098.6
= 118
= 500(+)
= 50
= 34
= 1091.0
= 41
= 1091.3
= 32
-L- Sta. 171+35 LT
(+)4.32%
(+)2.6%
(+)4.22%
(-)0.84%
E
L
=
1
0
8
4
.
5
0
’
-
L-
S
TA
.
16
8
+
0
0
LT
S
P
EC
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
B
E
G
IN
E
L
=
10
9
5
.
0
4
’
-
L-
S
TA
.
17
0
+
5
0
LT
E
N
D
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
B
E
G
IN
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
E
L
=
10
9
7
.
15
’
-
L-
S
TA
.
1
7
1+
0
0
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
ITC
H
E
N
D
E
L
=
10
7
4
.
2
2
’
-
L-
S
TA
.
16
4
+
5
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
B
E
G
IN
EL
=
10
7
3
.
8
0
’
-
L-
S
TA
.
16
5
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
E
L
=
10
8
4
.
5
9
’
-
L-
S
TA
.
16
7
+
5
0
LT
S
P
E
C
IA
L
C
U
T
’V
’
D
IT
C
H
W
/H
IN
G
E
E
N
D
EL = 1063.00’
-L- STA. 160+00 LT
SPECIAL CUT ’V’ DITCH W/HINGE
BEGIN
E
L
=
10
7
0
.
7
9
’
-
L-
S
TA
.
1
6
3
+
0
0
LT
S
P
E
C
IA
L
C
U
T
’
V
’
D
ITC
H
W
/H
IN
G
E
E
N
D
E
L
=
10
8
8
.
5
0
’
-
L-
S
TA
.
17
0
+
10
LT
B
E
G
IN
B
A
S
E
T
A
IL
D
ITC
H
E
L
=
10
9
0
.
6
0
’
-
L-
S
TA
.
17
2
+
7
0
LT
E
N
D
B
A
S
E
TA
IL
D
IT
C
H
(+)3.5%
SKEW=92
24" RCP
SKEW=97.5
24" RCP
SKEW=111
24" RCP
TIED TO 48" RCP
EXISTING 2’ X 4’ BOX CULVERT
1
1
4
1.
3
1
11
4
1.
4
0
1
13
9.
9
5
11
3
9.
5
9
1
1
3
9.7
6
1
13
9.
8
1
1
14
0.
7
8
1
13
8.
9
2
1
13
8.
6
2
1
1
3
8.
0
6
11
3
7.
8
6
1
1
3
8.
6
6
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
6
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R-2603 16
S
E
E
S
H
E
E
T
N
O. 17
MAT
CH
LIN
E
-
L-
S
T
A. 18
7
+
0
0
S
E
E
S
H
E
E
T
N
O
.
15
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
17
3
+
0
0
SEE SHEET NO. 21MATCH LINE -Y18- STA. 35+00
SEE SHEET NO. 20MATCH LINE -Y18- STA. 27+00
SHEET 25 OF 28
PERMIT DRAWING
17
5
18
0
30
35
18
5
35
-L-
-L-
-
Y
18
-
-
Y
18
-
N
AD
8
3
/ 9
5
IN SURF WATERTEMP IMPACTS
SITE 11
(55’ LONG FROM PIPE OUTLET)
EXISTING RIP RAP IN CHANNEL
STREAM NOTE:
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 11
STEPHEN JARVIS
MARGARET JARVIS
BRUCE EVANS
DEBRA EVANS
THERMOGAS COMPANY
FERRELGAS, LP
F C JOHNSON HEIRS N
O
R
T
H
WIL
K
E
SB
O
R
O
C
IT
Y
L
IMIT
S
NORTH
WI
LKES
BORO
CI
TY
LI
MI
TS
NORTH WILKESBORO CITY LIMITS
98
100
101
102
103
165
EASEMENT
DRAINAGEPERMANENT
3
0
"
C
M
P
60" R
C
P
LOC. OF CULV
UNABLE TO OBTAIN
1 BARRE
L
4
’X4
’
NC 268 ELKIN RD 21’ BST
GR
S
S
S
G
A
S
T
A
N
K
G
A
S
T
A
N
K
GR
GR
GR
BST
SOIL
GR
B
ST
BST
C
O
N
C
BST
GR
GR
V
E
N
T
C
A
P
S
S
BST
1
8
"
C
M
P
15" CMP
18" HDPE
CAN
MTL
161B
NC 268 ELKIN RD 22’ BST
S
R
19
6
6
A
IR
P
OR
T
R
D
2
2
’
B
S
T
CURB
CONC
AAMA INVESTMENTS, LLC
AAMA INVESTMENTS, LLC
95
KELSEY ROYAL
167
EASEMENT
DRAINAGE
PERMANENT
S
R
2
3
3
3
2
4
’
B
S
T
R
I
V
E
R
LI
B
E
R
T
Y
G
R
O
V
E
C
H
U
R
C
H
R
D
105
T. CAMERON FINLEY
TAMELA FINLEY
104
18
" CM
P
R
A
L
P
H T
HO
MA
S
F
R
A
Z
IE
R
100A
99 P
L
=
NO
R
T
H WIL
KE
S
B
O
R
O
C
IT
Y
L
IMIT
S
99
GOTI, INC
JOHN LEWIS WYATT JR.
HW
6
0
"
R
C
P
-
I
I
I
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
18"
18"DI
CB
CB
15" RCP-III
CB
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
BDO
BDO
FS
FS
BDO
18"
15"
1
5
"
R
C
P
-
I
I
I
3GI
FS
15"
15
"
15
"
18"
15"
RCP-III
BDO
15" RCP-III
15"
1
5
"
15"
15" RCP-III
15" RCP-III
FS
24"
24"
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
RETAIN
REMOVE
REMOVE
REMOVE
SPECIAL TB JB w/MH
REMOVE
1
8
"
CF
F
C
C
F
C
CC
C F
F
F
C
C
F
F
C
C
C
C
F
F
C C
C
F
1098
1098
1099
110
0
11001100
110
1
1101
110
1
1101
110
2
1102
1102
1102
1103
1103
11031103
1103
110
4
1104
1104
1104
1104
1104
110
5
110
5
1105
1105
1105
1105
1106
1106
1106
110
6
11061106
1106
1106
1107
1107
1107
1107
110
7
1107
1107
1107
1107
1107
1108
110
8
1108
1108
1108
1108
1108
1108
1108
1109
1109
1109
1109
110
9
1109
11091109
1109
1109
1109
110
9
1110
1110
1110
1110
1110
1110
1110
1110
1110
1110
1111
1111
1111
1111
1
1
11
1111
1111
1111
1111
1111
1111
1111
1111
1112
1112
1112
1112
1112
1112
1112
1112
1112
1112
1112
1112
1112
1113
1113
1113
1113
1113
1113
1113
1113
1113
1113
1
1
13
1114
1114
1114
1114
1114
1114
1114
1114
1114
1114
1114
1115
1115
1115
1115
1115
1115
1115
1115
1115
1115
1
1
15
1115
1116
1116
1116
1116
1116
1116
1116
1116
1116
1116
1116
1116
1116
1116
1116
1117
1117
1117
1117
1117
1117
1117
1117
1117
1117
1117
1117
1117
1117
1118
1118
1118
1118
1118
1118
1118
1118
1118
1118
1118
1118
1118
1118
1119
1119
1119
1119
1119
1119
1119
1119
1119
1119
1119
1119
1119
11191120
1120
1120
1120
1120
1120
1
1
2
0
1120
1120
1120
1120
1
1
2
0
112
0
112
0
112
0
1121
112
1
1121
1121
1121
1121
112
1
1121
1121
1121
1121
112
1
112
1
112
1
1121
1121
1121
112
1
1122
1122
1122
1122
1122
1122
1122
112
2
1122
1122
1122
1122
1122
1122
1122
1122
1122
1122
1122
112
2
1123
1123
1123
1123
1123
112
3
1123
1123
1123
1123
1123
1123
1123
1123
1123
112
3
1123
1123
112
3
112
3
112
3
1124
1124
1124
112
4
1124
1124 1124
1124
1124
1124
1124
1124
1124
1124
1124
1124
1124
1124
1124
1124
112
4
112
4
112
4
1 1 2 5
1125
1125
1125
1125
1125
1125
1125
1125
11
2
5
1125
1125
112
5
112
5
112
5
1125 112
5
112
5
112
5
1125112
5
112
5
1126
1126
1126
1126
1126
1126 1126
1126 1126
1126
112
6
112
6
1126
1126
1126
1126
1126
1126
112
6
112
6
1
1
2
6
1126
1126
1127
1127
1127
112
7
112
7
112
7
1127
1127
1127
1127 1127
112
7
1127
1127
1127
1127
1127
1127
1127 1127
1127
112
7
112
7
112
8
112
8
112
8
1128
1128
112
8
1128
1128
112
8
1128
1128
1128
1128
1128
1128
112
8
1128
1128
1128
1128
1128
112
8
1128
112
9
112
9
112
9
1129
1129
1129
1129
1129
112
9
112
9
1129
112
9
1129
1129
1129
1129
1129
112
9
1129
1129
112
9
1129
1129
1130
1130
1130
113011301130
113
0
113
0
113
0
113
0
113
0
1130
1130
1130 1130
1130
1130
1130
113 0
1
1
3
0
1130
1130
1130
113
0
1131
1131
1131
1131
113
1
1131
113
1
1131
113
1
113
1
1131
113
1
113
1
1131
1131
1131
113
1 1131
1131
1
13
1
1132
1132
1132
1132
1132
1132
113
2
1132
113
2
113
2
113
2
113
2
1132
1132
1132
1132
1132
113
2
1133
1133
1133
1133
113
3
113
3
1133
1133
1133
11
3
3
1133 1133
1133
1133
1133
1133
1133
113
4
1134
1134
1134
1134
1134
113
4
113
4
113
4
113
4
113
4
1134
1134
113
4
1134
1135
1135
11351135
1135
1135
113
5
1135
113
5
1135
1135
1135
1135
1135
1136
113
6
11361136113
6
1136
1136
113
6
1136
113
6
113
6
1136
1136
1136
113
6
1136
1136
1137
113
7
1137
1137
1137
113
7
1137
113
7
113
7
1137
113
7
113
7
1137
1137
1137
1138
11381138
113
8
113
8
1138
1138
1138
113
8
113
8
1138
1138
1138
1139
1139
1139
1139
1139
1139
1139
1139
113
9
113
9
1139
1139
1140
1140
114
0
1140
114
0
114
0
1140
114
0
1140
1140
1141
1141
114
1
1141
114
1
1141
1141
114
1
114
1
114
1
1142
1142
1142
1142
114
2
114
2
114
2
1142
1142
1142
1143
1143
1143
1143
114
3
1143
114
3
1
1
4
3
1143
1144
1144
1144
114
4
114
4
1144
114
4
114
4
1144
114
4
1145
1145
114
5
114
5
1145
1145
114
6
114
6
114
6
1146
114
6
114
6
1147
1147
1
1
4
7
114
7
114
7
114
7
114
8
114
8
1148
1148
114
9
114
9
114
9
1149
115
0
115
0
1150
115
1
115
2
1
1
4
1.
3
1
11
4
1.
4
0
1
13
9.
9
5
11
3
9.
5
9
1
1
3
9.7
6
1
13
9.
8
1
1
14
0.
7
8
1
13
8.
9
2
1
13
8.
6
2
1
1
3
8.
0
6
11
3
7.
8
6
1
1
3
8.
6
6
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
6
/
2
0
14
_
u
s
e
r
n
a
m
e
_
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
-
2
6
0
3
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
6
_
c
o
n
.
d
g
n
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R-2603 16
S
E
E
S
H
E
E
T
N
O. 17
MAT
CH
LIN
E
-
L-
S
T
A. 18
7
+
0
0
S
E
E
S
H
E
E
T
N
O
.
15
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
17
3
+
0
0
SEE SHEET NO. 21MATCH LINE -Y18- STA. 35+00
SEE SHEET NO. 20MATCH LINE -Y18- STA. 27+00
SHEET 26 OF 28
PERMIT DRAWING
17
5
18
0
30
35
18
5
35
-L-
-L-
-
Y
18
-
-
Y
18
-
N
AD
8
3
/ 9
5
IN SURF WATERTEMP IMPACTS
SITE 11
(55’ LONG FROM PIPE OUTLET)
EXISTING RIP RAP IN CHANNEL
STREAM NOTE:
IN SURF WATER
TEMP IMPACTS
IN SURF WATER
PERM IMPACTS
IN SURF WATER
TEMP IMPACTS
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 11
STEPHEN JARVIS
MARGARET JARVIS
BRUCE EVANS
DEBRA EVANS
THERMOGAS COMPANY
FERRELGAS, LP
F C JOHNSON HEIRS N
O
R
T
H
WIL
K
E
SB
O
R
O
C
IT
Y
L
IMIT
S
NORTH
WI
LKES
BORO
CI
TY
LI
MI
TS
NORTH WILKESBORO CITY LIMITS
98
100
101
102
103
165
EASEMENT
DRAINAGEPERMANENT
3
0
"
C
M
P
60" R
C
P
LOC. OF CULV
UNABLE TO OBTAIN
1 BARRE
L
4
’X4
’
NC 268 ELKIN RD 21’ BST
GR
S
S
S
G
A
S
T
A
N
K
G
A
S
T
A
N
K
GR
GR
GR
BST
SOIL
GR
B
ST
BST
C
O
N
C
BST
GR
GR
V
E
N
T
C
A
P
S
S
BST
1
8
"
C
M
P
15" CMP
18" HDPE
CAN
MTL
161B
NC 268 ELKIN RD 22’ BST
S
R
19
6
6
A
IR
P
OR
T
R
D
2
2
’
B
S
T
CURB
CONC
AAMA INVESTMENTS, LLC
AAMA INVESTMENTS, LLC
95
KELSEY ROYAL
167
EASEMENT
DRAINAGE
PERMANENT
S
R
2
3
3
3
2
4
’
B
S
T
R
I
V
E
R
LI
B
E
R
T
Y
G
R
O
V
E
C
H
U
R
C
H
R
D
105
T. CAMERON FINLEY
TAMELA FINLEY
104
18
" CM
P
R
A
L
P
H T
HO
MA
S
F
R
A
Z
IE
R
100A
99 P
L
=
NO
R
T
H WIL
KE
S
B
O
R
O
C
IT
Y
L
IMIT
S
99
GOTI, INC
JOHN LEWIS WYATT JR.
HW
6
0
"
R
C
P
-
I
I
I
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
18"
18"DI
CB
CB
15" RCP-III
CB
7 SY GEOTEXTILE
EST. 2 TONS
CLASS ’B’ RIP RAP
BDO
BDO
FS
FS
BDO
18"
15"
1
5
"
R
C
P
-
I
I
I
3GI
FS
15"
15
"
15
"
18"
15"
RCP-III
BDO
15" RCP-III
15"
1
5
"
15"
15" RCP-III
15" RCP-III
FS
24"
24"
14 SY GEOTEXTILE
EST. 5 TONS
CLASS ’B’ RIP RAP
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
RETAIN
REMOVE
REMOVE
REMOVE
SPECIAL TB JB w/MH
REMOVE
1
8
"
CF
F
C
C
F
C
CC
C F
F
F
C
C
F
F
C
C
C
C
F
F
C C
C
F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
5
/
2
8
/
9
9 SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
7
/
2
8
/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
R
2
6
0
3
_
R
d
y
_
p
f
l
_
P
E
R
M
I
T
S
.
d
g
n
1
1
:
5
0
:
0
8
A
M
-L-
NC 268
-L-
NC 268
R-2603 28
173
187
174 175 176 177 178 179 180 181 182 183 184 185 186 187
188 189 190 191 192 193 194 195 196 197 198 199 200 201
1,080
1,090
1,100
1,110
1,120
1,130
1,140
1,150
1,160
1,170
1,080
1,090
1,100
1,110
1,120
1,130
1,140
1,150
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
1,130
1,140
1,050
1,060
1,070
1,080
1,090
1,100
1,110
1,120
1,130
1,140
EXISTING GROUND
PROPOSED GRADE
LEFT DITCH GRADE
RIGHT DITCH GRADE
SHEET 27 OF 28
PERMIT DRAWING
(+)3.5896%
(-
)3
.3992%
PI = 182+00.00
EL = 1,139.75’
VC = 920’
K = 132
V = 55 mph
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 1127.2
= 200
= 500(+)
= 50
= 38
= 1115.3
= 46
= 1115.6
= 36
-L- Sta. 180+78 LT
(+)0.5%
(-)3
.56%
E
L
=
1
12
4
.
4
0
’
-
L-
S
TA
.
18
5
+
5
0
LT
LA
TE
R
A
L
B
A
S
E
D
ITC
H
B
E
G
IN
E
L
=
112
6
.
5
6
’
-
L-
S
TA
.
1
8
1+
5
0
RT
S
P
E
C
IA
L
C
U
T
’
V
’
D
ITC
H
W
/H
IN
G
E
B
E
G
IN
E
L
=
1
12
6
.
8
1
’
-
L-
S
TA
.
18
2
+
0
0
R
T
S
P
E
C
IA
L
C
U
T
’V
’
D
ITC
H
W
/H
IN
G
E
TIED TO 60" RCP
EXISTING 4’ X 4’ BOX CULVERT
(-
)3
.3992%
EL. 1095.56’
-L- STA. 195+00.00
END GRADE
ELEV. 1111.70’
8" SPIKE IN ROOT OF 10" SUMACK TREE
231.92’ LT.
-L- STA. 193+25.61
BM # 9
EL
=
1115
.
5
0
’
-
L-
S
TA
.
1
8
8
+
0
0
LT
LA
TE
RA
L
B
A
S
E
D
IT
C
H
EN
D
STA 195+00 AS DIRECTED BY THE ENGINEER
INCIDENTAL MILLING FROM -L- STA. 192+75 TO
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
S
t
a
t
i
o
n
St
r
u
c
t
u
r
e
F
i
l
l
I
n
F
i
l
l
I
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
Si
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
1
Y1
2
8
+
7
3
t
o
2
9
+
3
0
7
2
"
R
C
P
<0
.
0
1
37
2
L
5
9
+
5
5
t
o
5
9
+
8
6
8'
x
8
'
R
C
B
C
0.
0
2
0
.
0
1
1
0
6
5
4
BA
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
<
0
.
0
1
20
3
L
7
8
+
7
8
t
o
7
8
+
9
5
48
"
R
C
P
<
0
.
0
1
<
0
.
0
1
8
0
3
0
BA
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
<
0
.
0
1
10
4
L
9
6
+
1
3
t
o
9
6
+
8
2
36
"
R
C
P
0.
0
1
<
0
.
0
1
1
2
3
2
0
5(
T
)
L
1
2
2
+
4
8
t
o
1
2
4
+
1
0
F
i
l
l
0.
1
3
6
L
1
2
2
+
4
2
t
o
1
2
4
+
5
4
F
i
l
l
0.
1
7
7
L
1
2
6
+
8
9
t
o
1
2
7
+
2
3
2
@
3
0
"
R
C
P
0.
0
1
<
0
.
0
1
1
2
0
3
5
Ri
p
R
a
p
i
n
c
h
a
n
n
e
l
<
0
.
0
1
38
BA
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
<
0
.
0
1
10
8
L
1
2
9
+
6
0
15
"
R
C
P
0.
0
1
<
0
.
0
1
7
0
2
0
BA
N
K
S
T
A
B
I
L
I
Z
A
T
I
O
N
12
9A
L
1
4
9
+
9
0
t
o
1
5
0
+
1
8
3
0
"
R
C
P
-
I
I
I
<0
.
0
1
30
9B
L
1
5
7
+
3
6
t
o
1
5
7
+
6
3
1
5
"
R
C
P
<0
.
0
1
20
9C
L
1
5
8
+
6
0
t
o
1
5
8
+
7
1
1
5
"
R
C
P
<0
.
0
1
12
9D
L
1
5
9
+
7
5
t
o
1
6
0
+
1
0
2
4
"
R
C
P
<0
.
0
1
38
10
L
1
7
0
+
7
3
t
o
1
7
2
+
4
1
4
8
"
R
C
P
0.
0
1
0
.
0
1
1
2
3
6
8
11
L
1
7
9
+
7
9
t
o
1
8
0
+
8
7
6
0
"
P
i
p
e
<
0
.
0
1
0
.
0
1
4
7
5
9
12
Y1
A
2
5
+
2
5
t
o
2
5
+
6
8
3
0
"
P
i
p
e
<
0
.
0
1
<
0
.
0
1
1
8
2
7
<
0
.
0
1
18
13
L
1
1
7
+
5
8
<
0
.
0
1
35
Ba
n
k
S
t
a
b
i
l
i
z
a
t
i
o
n
Ba
n
k
S
t
a
b
i
l
i
z
a
t
i
o
n
Ca
u
sew
a
y
<0
.
0
1
29
TO
T
A
L
S
:
0.
2
9
0.
0
6
0
.
0
3
8
3
0
4
7
9
NO
T
E
S
:
(T
)
I
n
d
i
c
a
t
e
s
T
o
t
a
l
T
a
k
e
SH
E
E
T
2
8
o
f
2
8
WE
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
WE
T
L
A
N
D
I
M
P
A
C
T
S
SU
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
NC
D
E
P
A
R
T
M
E
N
T
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
DIVISION OF HIGHWAYS WILKES COUNTY WBS - 36001.1.2 (R-2603)9/30/2014
Sheet 1 of 3
R‐2603 NES Narrative for Utility Impacts
There will be no impacts to environmentally sensitive areas from installation of any
underground utilities (i.e. water, sewer lines)…as per design consultant, any underground utility
crossing through wetlands or jurisdictional streams will be bored under these areas so that no
ground surface will be disturbed inside these areas.
There will be hand‐clearing for overhead power lines (15’ each side of power line) and
permanent excavation for one power pole installation as shown on the Utilities Sheet UC‐1
(reference roadway sheet UC‐12).
Te
m
p
.
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
-
L
-
S
t
a
t
i
o
n
S
t
r
u
c
t
u
r
e
F
i
l
l
I
n
F
i
l
l
I
n
i
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
S
i
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
UC
1
S
t
a
1
2
1
+
7
0
R
t
o
S
t
a
1
2
4
+
4
3
R
ov
e
r
h
e
a
d
p
o
w
e
r
l
i
n
e
-
h
a
n
d
c
l
e
a
r
15
'
e
a
c
h
s
i
d
e
o
f
p
o
w
e
r
l
i
n
e
0.
1
A
C
(4
3
0
0
S
Q
F
T
)
UC
1
S
t
a
1
2
3
+
7
4
R
in
s
t
a
l
l
p
o
w
e
r
p
o
l
e
<
0
.
0
1
(5
S
Q
F
T
)
<0
.
0
1
(1
0
S
Q
F
T
)
0.
1
A
C
(4
3
0
0
S
Q
F
T
)
SH
E
E
T
3
O
F
3
AT
N
R
e
v
i
s
e
d
3
/
3
1
/
0
5
(08-04-2014)
TO
T
A
L
S
:
NC
D
E
P
A
R
T
M
E
N
T
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
*
t
o
t
a
l
c
a
l
c
u
l
a
t
e
d
s
u
m
m
i
n
g
s
q
u
a
r
e
f
o
o
t
a
g
e
a
t
e
a
c
h
s
i
t
e
a
n
d
t
h
e
n
r
o
u
n
d
i
n
g
t
o
t
h
e
n
e
a
r
e
s
t
o
n
e
-
h
u
n
d
r
e
d
t
h
a
c
r
e
WILKES COUNTY WBS - 37044.1.1 (R-2603)DIVISION OF HIGHWAYS
U
T
I
L
I
T
Y
W
E
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
SU
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
WE
T
L
A
N
D
I
M
P
A
C
T
S
255010050255010050 51020 10 D ======%ADTADT% *
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
REGIONAL TIER 000PROFILE (HORIZONTAL)
3
6
0
0
1
.
1
.
2
3
6
0
0
1
.
2
.
1
S
T
P
-
0
2
6
8
(
1
6
)
P
R
O
J
E
C
T
L
E
N
G
T
H
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
SH
E
E
T
1
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
09/08/99
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-A For Index of Sheets17-M AR-2014 08:47R:\Roadw ay\Proj\R2603_Rdy_tsh.dgn$$$$USERNAME$$$$CONTRACT:TIP PROJECT:R-2603
DEPARTMENT
O
F
T
R
A
N
S
P
OR
T
A
T
ION
S
T
ATE
O
F
N
O
R
T
H
C
AROLINA
A
P
R
I
L
3
0
,
2
0
1
3
M
A
Y
1
9
,
2
0
1
5
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
(
9
1
9
)
2
9
7
-
0
2
2
0
C
A
R
Y
,
N
O
R
T
H
C
A
R
O
L
I
N
A
2
7
5
1
1
5
9
8
E
.
C
H
A
T
H
A
M
S
T
R
E
E
T
,
S
U
I
T
E
1
3
7
M
A
E
N
G
I
N
E
E
R
I
N
G
C
O
N
S
U
L
T
A
N
T
S
,
I
N
C
.
B
U
R
K
E
E
V
A
N
S
,
P
E
S
I
G
N
A
L
S
,
S
T
R
U
C
T
U
R
E
S
,
A
N
D
S
I
G
N
I
N
G
T
Y
P
E
O
F
W
O
R
K
:
G
R
A
D
I
N
G
,
D
R
A
I
N
A
G
E
,
P
A
V
I
N
G
,
C
U
R
B
&
G
U
T
T
E
R
,
R
-
2
6
0
3
L
E
N
G
T
H
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
R
-
2
6
0
3
=
3
.
4
7
4
m
i
.
L
E
N
G
T
H
S
T
R
U
C
T
U
R
E
P
R
O
J
E
C
T
R
-
2
6
0
3
=
0
.
0
2
8
m
i
.
T
O
T
A
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
R
-
2
6
0
3
=
3
.
5
0
2
m
i
.
L
E
N
G
T
H
O
F
P
R
O
J
E
C
T
B
A
S
E
D
O
N
-
L
-
-
L
-
P
O
C
S
T
A
1
9
5
+
3
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
R
-
2
6
0
3
-L- POT STA 10+38.67 BEGIN TIP PROJECT R-2603CLEARING ON THIS PROJECT SHALL BE PERFORMED TO TH
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
I
.
A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BO
U
N
D
A
R
I
E
S
O
F
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
.
20,54026,400DHV10656T
MULBERRY CREEK
T
O
E
L
K
I
N
T
O
I
-
7
7
TO US 421 -L-
-
L
-
SECO N D ST.N C 18SECOND ST.NC 18 / 268 FINLEY AVE.
LEG IO N DR.-Y7- SR 1979
F
A
I
R
P
L
A
I
N
S
R
D
-
Y
8
-
S
R
1
9
7
1
AIRPO RT RD.-Y18- SR 1966
R
IV
E
R
L
IB
E
R
T
Y
G
R
O
V
E
C
H
U
R
C
H
R
D
.
-Y
1
8
-
S
R
2
3
3
3
RID
G
E TO
P
RD
.
-Y19
-
BEAUMO NT
PO PLAR
ST.
-Y17- SR 2086
V
IS
T
A
L
A
N
E
-Y
1
6
-
S
R
2
0
9
0
W
O
O
D
SI
D
E
D
R.
-
Y14-
SK
Y
V
IEW
D
R
.
-Y
1
3
-
PEBBLE ST.
-Y10- SR 1981
AARO N CALL RD.
-Y11- SR 1983
FLINT HILL RD.-Y12- SR 2334
-
L
-
S
T
A
1
1
6
+
6
0
.
0
0
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
1
1
8
+
0
9
.
0
0
E
N
D
B
R
I
D
G
E
18 SCHO O L BUS DR.-Y3-TEM PLE ST.-Y4-W HITE PINE ST.-Y5-SHAVER ST.-Y6-
Q
U
E
E
N
D
R
.
-
Y
1
5
-
456
7
8
9
1
0
1
1
1
2
1
3
1
4
1
6
1
7
19
2
0
(TOP)
15
N
C
2
6
8
FLINT HILL RD.-Y2- SR 2334
NORTH WILKESBORO CITY LIMITS
CITY LIMITSNORTH WILKESBORO
C
I
T
Y
L
I
M
I
T
S
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
15
(
B
O
T
)
West D StStatesville Rd Statesville RdWILKESBORO .58.61.56.06.38.22.03.57.34.01.24.37.31.78.13.05.09 .07.62.35.08.01.03.14.05.09.12.06.14 .13.07.27 .41.09.01.06.16.12.26.03.16.04.29 .85 .23.05.18 .35.04.03.17 .07.27.22 .08.85.06.43.50 .08.31 .29 .05.07.25.331.12.77 .17.07.07 .16.03.33 .26.19.821.06 .19 .41.56.43.53 .67 .81 .06.15.03.221.42 1.88 .02.22.09.08.01 .08 .04 .10 .10 .16 .14 .39 .08 .57 .36.27.31.26.78 .42 .02 .02 .21.08.02 .23.26.88 .81.22.662.99.22.58 .42 MulberryElkin Hwy2nd St Sparta RdElkin Hwy Elkin Hwy Elkin HwyC B D LoopRiver StRiver StStatesville Rd Statesville Rd Elkin Hwy Elkin Hwy Elkin HwyW Main St E Main St .31FairplainsCall Airport CountyWilkesMulberryCreekRIVERREDDIESYADKINRIVERYADKINRIVERCricketOakwoodsS9122348525367707383C87769770BEGIN PROJECT END PROJECT
K
.
S
.
H
U
T
C
H
E
N
S
,
P
E
W
I
L
K
E
S
C
O
U
N
T
Y
FUNC CLASS = ***
E
L
K
I
N
H
W
Y.
*** MINOR ARTERIAL FROM BEGINNING OF PROJECT TO MULBE
R
R
Y
C
R
E
E
K
MAJOR COLLECTOR FROM MULBERRY CREEK TO END OF P
R
O
J
E
C
T
** 40 MPH FROM BEGINNING OF PROJECT TO FAIRPLAINS R
D
.
50 MPH FROM FAIRPLAINS RD. TO END OF PROJECTV**
P
E
S
T
P
-
0
2
6
8
(
1
5
)
R
O
A
D
W
A
Y
D
E
S
I
G
N
U
N
I
T
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
B
R
E
N
D
A
M
O
O
R
E
,
P
E
N
C
D
O
T
C
O
N
T
A
C
T
:
SIDNEY AVE.
-Y9-
NC 2682015DESIGN DATA2035 ELKIN HWY.NC 268 -Y1- / -Y1A-
O
F
N
C
1
8
T
O
S
R
1
9
6
6
(
A
I
R
P
O
R
T
R
O
A
D
)
N
C
2
6
8
F
R
O
M
M
U
L
T
I
-
L
A
N
E
S
E
A
S
T
DUAL 4%
-
U
P
G
R
A
D
E
D
S
I
G
N
A
L
%* TTST 2% +115115161618268 18268 268 268 18421421421421BUS421BUS
R
/
W
,
U
T
I
L
I
T
I
E
S
W F G ADDY RD .SR 1980
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
N
C
,
2
7
6
1
0
P
r
e
p
a
r
e
d
f
o
r
:
P
r
e
p
a
r
e
d
b
y
:
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
VICINITY MAP
N
A
D
8
3/
9
5
Rd.HardtackRd.HardrockDr. Ext.Foxtrough Jump Rd.Misty Way Dr.Grove Oakley RdN Lonnie Church RdCub Creek Falls RdOld Moravian Church RdBrown’s Temple CirSedgefield Brook LnCherry Dancy StJones Branch RdHaunted Mill RdE Edgewood Road 2376State LnReeves CircleChinquapin24182462 2328FairwoodDr Murdock Dr.Clifford Ln.Perry LaneClearwaterDriveDellaplane RdOld Nc Hwy 60N Lonnie Oakley Rd Robin Hill RdSpeedway Rd Clark RdFishing Creek RdSpeedway RdCicero Rd Zells RdSpeedway RdDan Call RdState Road 2441 Souther RdFishing Creek Rd Bear Hollow LnMount Sinai Rd Love RdFishing Creek Arbor Rd Moore Ridge Rd C C Wright School Rd Brinegar Rd Hunter RdFrog Ridge Rd Breeze Hill RdMimosa LnBeshears StGreen Circle Dr H Anderson Rd Camp Joe Harris Rd Broadway Tower Rd Bouchelle RdShiloh LnOld 60 Redding RdLincoln Heights RdOld US Hwy 421Oakwoods RdS Bridge StOakwoods Rd Curtis Bridge Rd New Brickyard Rd Curtis Bridge Rd Old Brickyard RdOld Highway 268Germantown Rd Yadkin St Laurelwood Dr Kerry Ln Congo RdZion Hill Church Rd Numa Church Rd Pads Rd ParsonsRoadCongo RdWinkler Mill Rd Union Methodist Church Rd Congo Rd Gate StBoone Trl Cricket Baptist Church Rd Spears RdSparrow LnCurtis Bridge Rd Friendship Cross St Boone TrlBoone Trl Summit AveWoodleafRoadDancy StMoravian Falls RdKnollwood Dr Old N C Hwy 18 SouthLineberry Rd Summerville Pl Westwood LnCountry Club Hills Dr Country Club Hills LnNora Oak Rd Brushy Mountain RdCountry Club Rd Fox Run Dr Jessie Reins Rd Oakwoods Ln Sleepy Ave West Rd W Edgewood Mill RdEdgewood Rd Dula RdNew RiverCenter RoadGreenhill Rd.S Park RdOld US Hwy 421 Brown Ridge RdArmory Rd Eastwood Dr Armory Rd Beech St River Liberty Grove Church Rd Flint Hill RdFlint Hill Rd Legion Dr Wf Gaddy RdFairplains RdDogwood Ln River Liberty Grove Church Rd W Hickory Hollar Rd Jarvis Acres RdLane’s Dr Liberty Dr Beaumont Poplar StAaron Call RdGryder St Pebble St Richardson RdFairplains RdEverette LnGrimes St Fairplains RdReynolds AveWatkins LnReynolds Ave Thomas St Mountain View RdGentry StOtis Brown DrHilltop Acres StHilltop Acres StFairplains School RdOliver Gant RdBermuda DrRidge StRoger St Gilreath Brook StRussell StSunset Ridgewood DrSunset DrDuncan St Osborne Sunset DrSumerset LnSunset Dr Sunset DrW Waugh StBrowns Waugh StN W Reservoir RdReddies-Osborne LnSunset Dr Suncrest Sunset Connector RdSycamore WayOak Crest Cir Welcome Home Church Rd Rolling Pine StRolling Faw St Suncrest Orchard RdAvery LnRessie McNeil LnLong StStaley LnProspect DrCricket Ivy LnN Cricket DrBenton LnS Cricket Dr Boone Trl Pegram LnBoone TrlWelcome Home Rd Oak Grove Church RdGaither RdBoone Trl PorterBeshears-Owens Ln Lankford-Pruitt Bros Rd Old Lankford RdWilliams RdSuncrest Orchard Rd Byrd Ridge Rd Dale Ridge StTindall DrTindall St Foster Rd Robin Lane RdByrd Ridge Rd Lynnbrook Dr Hillsdale DrMonticello DrLaurel Manor Ln Cartpath Rd Kyle St Wildwood DrWildwood Shady LnMulberry Pine StChickadee RdMulberry Pine St Mulberry Pine StNorthwood Hills RdBrown Berry Rd Owens St Baptist Home RdBaptist Home RdOak Grove Church Rd State Road 1549 Goddard Ln Windy Faw St Windy StWilkesboro Ave10th St.Autumn Place Ln Gordon RdLaurel Mountain Rd Mark Ln Caldwell Rd E Magnolia Rd Sandlewood CirVictoria CirE Magnolia Rd N Peachtree RdColony Dr Colony DrStonybrook Ct Edgewood RdCountry Club RdGreenfield Ln Fairview LnFoxtrough Dr Fishing Creek Arbor Rd Fishing Creek Rd Parks Ridge RdFishing Creek Rd Shew Ridge Mission RdOld 60 Lakeview Dr Old Nc Hwy 60Old Nc Hwy 60Walnut Grove Ln Pond View Dr Old Nc Hwy 60 Rock Quarry Rd Old Quarry Rd Rock Quarry Rd Riddle Rd Kemp RdVilla Heights Dr Woodhaven Rd Pumpkin Patch Rd Arbor Grove Church Rd Rock Creek Church Rd Dowell Ridge CirDowell Ridge Rd Dowell Ridge RdRock Creek Church RdRock Creek Church Rd Rock Creek RdStone Brewer RdAlexander DrElmore Rd Campbell Rd McCrary LnWalt Brewer Rd Bethany Ford RdTabernacle RdMountain View Rd Haymeadow Church Rd Holder St Mtn View VillageRhoades DrMountain View Rd Mulberry Creek RdJohn McGrady RdMcGrady Pine Ln Hunter Hills St Midlawn View StElledge Mill RdElso RdElledge Mill RdGwyn Hayes StJohn McGrady RdWilliam Harrold DrApple Tree LnBelle-Ridge St.Myers St.Belle Brook Ave.Whippoorwill Fankey Rd.FairmontDr.Robinhood RdForest RdDoncaster Dr Nottingham Dr Caudill Rd Canterbury LnMountain View RdCartpath RdLongbow RdRobinhood Rd Honeysuckle DrCharlie Brown RdCaudill Rd GraymilleSt.Vista Ln Airport Rd Morrisfield Ln Royal Rd Pennington Rd Airport Rd Wood Wallace Dr.Johnson RdEaston DrJohnson RdCloverleaf CirMartin RdKnotville Rd Rock Quarry Rd Rock Creek RdTwin Hill Rd Ruby StWatkins Ave Brinegar Hill Rd Crystal Dr.Walt Brewer RdAnderson St.Hunter Rd Speedway RdState Road 2439Poplar Grove Rd.Airport Rd N Johnson Rd Round Mtn TrlGilliam Rd Forest Oaks DrN Ridge Run StS Ridge Run Ln RichardsonLnChurch Rd Caudill RdBelle Ridge St.Baptist Home Rd RidgeRdWindy RidgeRdRdRidge Windy Rd ParkRuritan RdPark RuritanNelson LaneEdgewoodRoadGermantown Rd Little Berry Lane Tom ThumbGlove Rd Brushy Rd MountainSleepy Hollow Rd E Crysel Rd Winkler Mill RdMourn Rouge Rd Middle Brook DrMiddle Brook Dr Mulberry Mill RdMountain View RdBrookwood Acres DrSherwood Forest DrFairplains RdDamascus Church RdFishing Creek RdBirch St Holland St Robinson Rd River Liberty Grove Church RdRambling Woods Fairplains Church StDoughton StWelcome HomeRhyne Rd CricketClubhouse Rd Arbor Grove Church RdGreen Valley St W Crooked Bow RdButternut RdBreeze Hill Rd Winding Trails Dr Fleetwood LnAcorn Ave.PoplarCreek Dr.HiddenValley Apache Dr.CrestviewLn.Harmony Ln GardenTerraceSpainhourStreetAncientOaksDr.MountainDaleDr.Dr.Magnolia BriarCreekDriveEastridgeLn.Crestview Dr.MorrisonRd.Country Walk Dr.PineCreek Dr.BroookviewCir.Mile Run Rd.Beaver Dam Ln.2340 Camelia Ln.AirportAccessRd.1532233323182333 1550 1535 171817031705153619571966233415171517110324612418234023402355
Existin
g
E
d
g
e
o
f
P
a
v
e
m
e
n
t
Existin
g
C
u
r
b
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
Existin
g
M
e
t
a
l
G
u
a
r
d
r
a
i
l
Existin
g
C
a
b
l
e
G
u
i
d
e
r
a
i
l
Propos
e
d
G
u
a
r
d
r
a
i
l
Equali
t
y
S
y
m
b
o
l
Pavem
e
n
t
R
e
m
o
v
a
l
Baselin
e
C
o
n
t
r
o
l
P
o
i
n
t
RIGH
T
O
F
W
A
Y
:
Existin
g
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
Existin
g
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
Existin
g
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
CF
Existin
g
E
a
s
e
m
e
n
t
L
i
n
e
Propos
e
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
Propos
e
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
HYDROLOGY:Stream or Body of WaterHydro, Pool or ReservoirFlow ArrowDisappearing StreamSpring
;
zvWKProposed Lateral, Tail, Head DitchFalse Sump Propos
e
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
ROA
D
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R}T pQle]/b
H
-
F
r
a
m
e
P
o
l
e
O
O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
W
A
T
E
R
:
W
a
t
e
r
M
a
n
h
o
l
e
W
a
t
e
r
M
e
t
e
r
W
a
t
e
r
V
a
l
v
e
W
a
t
e
r
H
y
d
r
a
n
t
R
e
c
o
r
d
e
d
U
/
G
W
a
t
e
r
L
i
n
e
4IHa
T
V
:
T
V
S
a
t
e
l
l
i
t
e
D
i
s
h
T
V
P
e
d
e
s
t
a
l
T
V
T
o
w
e
r
U
/
G
T
V
C
a
b
l
e
H
a
n
d
H
o
l
e
R
e
c
o
r
d
e
d
U
/
G
T
V
C
a
b
l
e
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
(
S
.
U
.
E
.
*
)
r|I]
G
A
S
:
G
a
s
V
a
l
v
e
G
a
s
M
e
t
e
r
R
e
c
o
r
d
e
d
U
/
G
G
a
s
L
i
n
e
n c
S
A
N
I
T
A
R
Y
S
E
W
E
R
:
S
a
n
i
t
a
r
y
S
e
w
e
r
M
a
n
h
o
l
e
S
a
n
i
t
a
r
y
S
e
w
e
r
C
l
e
a
n
o
u
t
U
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
D
e
s
i
g
n
a
t
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
(
S
.
U
.
E
.
*
)
do
A
/
G
W
a
t
e
r
A
b
o
v
e
G
r
o
u
n
d
G
a
s
L
i
n
e
A
/
G
G
a
s
A
b
o
v
e
G
r
o
u
n
d
W
a
t
e
r
L
i
n
e
A
b
o
v
e
G
r
o
u
n
d
S
a
n
i
t
a
r
y
S
e
w
e
r
A
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
M
I
S
C
E
L
L
A
N
E
O
U
S
:
U
t
i
l
i
t
y
P
o
l
e
OFS3
U
t
i
l
i
t
y
P
o
l
e
w
i
t
h
B
a
s
e
U
t
i
l
i
t
y
L
o
c
a
t
e
d
O
b
j
e
c
t
U
t
i
l
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
B
o
x
U
t
i
l
i
t
y
U
n
k
n
o
w
n
U
/
G
L
i
n
e
?
C
O
N
C
C
O
N
C
W
W
v
v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m
U
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
A
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
BOUNDARIES AND PROPERTY:State LineCounty LineTownship LineCity LineReservation LineProperty LineExisting Iron PinProperty CornerProperty MonumentExisting Fence LineProposed Woven Wire FenceProposed Chain Link FenceProposed Barbed Wire Fence gF123Existing Wetland BoundaryProposed Wetland BoundaryExisting Endangered Animal BoundaryExisting Endangered Plant BoundaryBUILDINGS AND OTHER CULTURE:Area Outline Gas Pump Vent or U/G Tank CapChurchSchoolDamSignSmall Mine Well VMWWSxFoundationSBuildingyyVEGE
T
A
T
I
O
N
:
Single
T
r
e
e
XY
V
i
n
e
y
a
r
d
Single
S
h
r
u
b
HedgeWoods
L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
RAIL
R
O
A
D
S
:
Standa
r
d
G
a
u
g
e
RR Sig
n
a
l
M
i
l
e
p
o
s
t
SwitchRR Ab
a
n
d
o
n
e
d
RR Dis
m
a
n
t
l
e
d
S
FLOW
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
W
a
t
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
T
V
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
G
a
s
L
i
n
e
(
S
.
U
.
E
.
*
)
U
/
G
T
e
s
t
H
o
l
e
(
S
.
U
.
E
.
*
)
*S.U.E. = Subsurface Utility EngineeringWLBEIPBECM
C
O
N
C
H
W
C
B
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
Cemetery
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
Parcel / Sequence Number
E
A
A
T
U
R
E
n
d
o
f
I
n
f
o
r
m
a
t
i
o
n
E
.
O
.
I
.
Note: Not to Scale
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
-
B
R
-
2
6
0
3
A
b
a
n
d
o
n
e
d
A
c
c
o
r
d
i
n
g
t
o
U
t
i
l
i
t
y
R
e
c
o
r
d
s
WLBEABEPB
RW
RW
RW
CAET
D
E
P
D
E
P
U
E
SPPTTT
C
T
C
T
F
O
T
F
O
WWT
V
T
V
T
V
F
O
T
V
F
O
GG
S
S
F
S
S
F
S
S
?
U
T
L
Jurisdictional StreamJS 12/05/11Buffer Zone 1Buffer Zone 2 BZ 1BZ 2Wetland Propos
e
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
Propos
e
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
Propos
e
d
C
u
r
b
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
U
n
d
e
r
g
r
o
u
n
d
S
t
o
r
a
g
e
T
a
n
k
,
A
p
p
r
o
x
.
L
o
c
.
G
e
o
e
n
v
i
r
o
n
m
e
n
t
a
l
B
o
r
i
n
g
U
S
T
Known Soil Contamination: Area or SitePotential Soil Contamination: Area or Site Conc
r
e
t
e
o
r
G
r
a
n
i
t
e
R
/
W
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
CA
Conc
r
e
t
e
C
/
A
M
a
r
k
e
r
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
L
i
n
e
w
i
t
h
2
’
2’VAR 2:1 to 4:1VAR 2:1 to 4:1
V
A
R 2:1 to
4:1
V
A
R
2:1 to 4:1
6
"
GROUND ORIGINAL
G
R
O
U
N
D
O
R
I
G
I
N
A
L
5
’
-
0
"
4
’
-
0
"
D1 C1
S
E1 T TYP.6"
1
2
.
5
"
12.5"R1
D
1
E
1
R
1
C
1
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
UGRADE TO THIS LINE 0.02 0.02
0
.
0
2
0
.
0
2
TO 1
2
’
-
0
"
VAR
.
1
1
’
-
0
"
T
O
1
2
’
-
0
"
V
A
R
.
1
1
’
-
0
"
P
O
I
N
T
G
R
A
D
E
V
A
R
.
5
9
’
-
0
"
T
O
7
9
’
-
0
"
V
A
R
.
7
9
’
-
0
"
T
O
9
9
’
-
0
"
CL
V
A
R
.
1
1
’
-
0
"
T
O
2
3
’
-
0
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
17-MAR-2014 08:47R:\Roadway\Proj\R2603_Rdy_typ.dgn$$$$USERNAM E$$$$
P
A
V
E
M
E
N
T
D
E
S
I
G
N
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
R
-
2
6
0
3
-
L
-
,
-
Y
2
-
(
N
C
2
6
8
)
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
UU 2.5" MIN3" MIN 2.5" MIN3" MIN C1C1D1D1D2D2C2E2E23.0" MIN OVERLAYPOINTGRADE VARIABLE (LT OR RT){ PROPOSED{ EXISTINGFOR -L-, -Y1-, -Y1A-, & -Y2-DETAIL SHOWING METHOD OF WEDGING DETAIL W1U
U
2.
5
"
M
I
N
3"
M
I
N
2.5" MIN3" MIN
3
.
0
"
M
I
N
O
V
E
R
L
A
Y
POINT GRADE VARIABLE (LT OR RT
)
{ PROPOSED
{
E
X
I
S
T
I
N
G
DETAIL SHOWING M
E
T
H
O
D
O
F
W
E
D
G
I
N
G
-
Y
1
8
-
C3
C
4
D3E4D4
D
4
D
3
C
3
E
4
DET
A
I
L
W
2
U
U
C
2
P
O
I
N
T
G
R
A
D
E
V
A
R
I
A
B
L
E
(
L
T
O
R
R
T
)
{
P
R
O
P
O
S
E
D
{
E
X
I
S
T
I
N
G
3
.
0
"
M
I
N
O
V
E
R
L
A
Y
F
O
R
-
Y
7
-
,
-
Y
8
-
,
-
Y
1
0
-
,
-
Y
1
1
-
,
-
Y
1
2
-
,
-
Y
1
6
-
,
-
Y
1
7
-
,
-
Y
1
9
D
E
T
A
I
L
S
H
O
W
I
N
G
M
E
T
H
O
D
O
F
W
E
D
G
I
N
G
3"
M
I
N
3
"
M
I
N
E
4
E
4
C
3
C
3
D
E
T
A
I
L
W
3
W
1
W
1
T
O
1
4
’
-
0
"
*
V
A
R
.
1
1
’
-
0
"
TO 14’-0" *VAR. 0’-0"5’-0"4’-0"6"S**
*
*
S
I
D
E
W
A
L
K
O
N
L
E
F
T
S
I
D
E
F
R
O
M
-
L
-
S
T
A
.
4
8
+
1
6
.
3
6
T
O
5
7
+
0
0
.
0
0
*
1
4
’
O
U
T
S
I
D
E
L
A
N
E
S
T
O
A
C
C
O
M
M
O
D
A
T
E
B
I
C
Y
C
L
E
S
F
R
O
M
-
Y
2
-
S
T
A
.
1
4
+
6
5
.
0
0
T
O
1
7
+
1
4
.
5
8
F
R
O
M
-
L
-
S
T
A
.
2
5
+
0
0
.
0
0
T
O
5
7
+
0
0
.
0
0
F
R
O
M
-
L
-
S
T
A
.
1
0
+
3
8
.
6
7
T
O
1
4
+
6
5
.
0
0
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
:
1
4
’
-
0
"
w
/
G
R
1
0
’
-
0
"
14’-0" w/GR 10’-0"
2:1 M
A
X.
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
2:1 M
A
X.
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
V
A
R
I
E
S
V
A
R
I
E
S
0
.
0
2
D
R
I
V
E
W
A
Y
S
F
O
R
D
R
I
V
E
W
A
Y
S
0
.
0
2
-
-
-
C
D
E
P
T
H
P
A
V
E
M
E
N
T
TYPE
EX. DRIVEWAY
G
R
A
V
E
L
A
S
P
H
A
L
T
D
R
I
V
E
W
A
Y
D
E
S
I
G
N
P
R
O
P
O
S
E
D
-
-
A
C
O
N
C
R
E
T
E
A
6
"
6
"
J
8
"
T
O
B
E
P
A
V
E
D
W
I
T
H
A
S
P
H
A
L
T
.
*
*
C
J
A
O
R
I
N
L
I
K
E
M
A
T
E
R
I
A
L
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
.
D
R
I
V
E
W
A
Y
P
A
V
E
M
E
N
T
T
Y
P
E
T
O
B
E
R
E
P
L
A
C
E
D
G
R
A
V
E
L
D
R
I
V
E
W
A
Y
S
W
I
T
H
>
7
%
G
R
A
D
E
S
A
R
E
CL
P
O
I
N
T
G
R
A
D
E
C
5
J J
D4IN LAYERS NOT LESS THAN 2.5" IN DEPTH OR GREATER THAN 4" IN DEPTH
.
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER 1" DEPTH TO BE PLA
C
E
D
PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0
B
,
E2IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 5.5" IN DEPTH
.
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER 1" DEPTH TO BE PLA
C
E
D
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,C1AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD IN EACH OF TWO LAYERS.PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,C2PLACED IN LAYERS NOT LESS THAN 1.5" OR GREATER THAN 2" IN DEPTH.AT AN AVERAGE RATE OF 112 LBS. PER SQ. YARD PER 1" DEPTH, TO BE PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C,C4PLACED IN LAYERS NOT LESS THAN 1.5" OR GREATER THAN 2" IN DEPTH.AT AN AVERAGE RATE OF 112 LBS. PER SQ. YARD PER 1" DEPTH, TO BE PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,E1AT AN AVERAGE RATE OF 627 LBS. PER SQ. YARD.PROP. APPROX. 5.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
R
1
2
’
-
6
"
C
O
N
C
R
E
T
E
C
U
R
B
&
G
U
T
T
E
R
S
4
"
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
T
E
A
R
T
H
M
A
T
E
R
I
A
L
U
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
R
2
1
’
-
6
"
C
O
N
C
R
E
T
E
C
U
R
B
&
G
U
T
T
E
R
D1AT AN AVERAGE RATE OF 456 LBS. PER SQ. YARD.PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0C
,
D2IN LAYERS NOT LESS THAN 2.5" IN DEPTH OR GREATER THAN 4" IN DEPTH
.
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER 1" DEPTH TO BE PLA
C
E
D
PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0
C
,
D3AT AN AVERAGE RATE OF 285 LBS. PER SQ. YARD.PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19
.
0
B
,
P A V E M E
N
T
S
C
H
E
D
U
L
E
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
A
R
E
1
:
1
U
N
L
E
S
S
S
H
O
W
N
O
T
H
E
R
W
I
S
E
.
R
4
5
"
M
O
N
O
L
I
T
H
I
C
C
O
N
C
R
E
T
E
I
S
L
A
N
D
R
3
2
’
-
9
"
C
O
N
C
R
E
T
E
C
U
R
B
&
G
U
T
T
E
R
W
1
W
E
D
G
I
N
G
(
V
A
R
I
A
B
L
E
D
E
P
T
H
A
S
P
H
A
L
T
P
A
V
E
M
E
N
T
,
S
E
E
D
E
T
A
I
L
O
N
T
H
I
S
S
H
E
E
T
)
W
2
W
E
D
G
I
N
G
(
V
A
R
I
A
B
L
E
D
E
P
T
H
A
S
P
H
A
L
T
P
A
V
E
M
E
N
T
,
S
E
E
D
E
T
A
I
L
O
N
T
H
I
S
S
H
E
E
T
)
W
3
W
E
D
G
I
N
G
(
V
A
R
I
A
B
L
E
D
E
P
T
H
A
S
P
H
A
L
T
P
A
V
E
M
E
N
T
,
S
E
E
D
E
T
A
I
L
O
N
T
H
I
S
S
H
E
E
T
)
E5IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 5.5" IN DEPTH
.
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER 1" DEPTH TO BE PLA
C
E
D
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E4AT AN AVERAGE RATE OF 513 LBS. PER SQ. YARD.PROP. APPROX. 4.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E3AT AN AVERAGE RATE OF 456 LBS. PER SQ. YARD.PROP. APPROX. 4.0" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,C3AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD IN EACH OF TWO LAYERS.PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,C5AT AN AVERAGE RATE OF 224 LBS. PER SQ. YARD.PROP. APPROX. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
J
6
"
A
G
G
R
E
G
A
T
E
B
A
S
E
C
O
U
R
S
E
A6" PORTLAND CEMENT CONCRETE PAVEMENT.
17-MAR-2014 08:47R:\Roadway\Proj\R2603_Rdy_typ.dgn$$$$USERNAM E$$$$
P
A
V
E
M
E
N
T
D
E
S
I
G
N
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
-
A
R
-
2
6
0
3
2
’
2’6"VAR 2:1 to 4:1VAR 2:1 to 4:1
V
A
R
2:1 to
4:1
V
A
R 2:1 to 4:1
6
"
-
L
-
GROUND ORIGINAL
G
R
O
U
N
D
O
R
I
G
I
N
A
L
5
’
-
0
"
4
’
-
0
"
5’-0"4’-0"SD1C1
S
E1 T TYP.6"
1
2
.
5
"
12.5"R1
D
1
E
1
R
1
C
1
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
UGRADE TO THIS LINE 0.02 0.02
0
.
0
2
0
.
0
2
P
O
I
N
T
G
R
A
D
E
CL
12’-0"
1
2
’
-
0
"
2
3
’
-
0
"
0
.
0
2
0
.
0
2
T
Y
P
.
6
"
T
Y
P
.
9
"
T
Y
P
.
9
"
7
9
’
-
0
"
9
9
’
-
0
"
-
L
-
1
2
.
5
"
1
2
.
5
"
T
D
1
C
1
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
0.02
0
.
0
2
P
O
I
N
T
G
R
A
D
E
CL
12’-0"12’-0"
1
2
’
-
0
"
1
2
’
-
0
"
2
3
’
-
0
"
0
.
0
2
0
.
0
2
T
Y
P
.
6
"
T
Y
P
.
9
"
T
Y
P
.
9
"
8
7
’
-
0
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
11’-0" w/GR 8’-0"FDPS 4’-0"SLOPE VARIABLE FO R FILLSHINGE PO INTGROUNDORIGINAL6:1 30’-0"
FO R CUTS
HINGE PO INT
F
D
P
S
4
’
-
0
"
1
1
’
-
0
"
w
/
G
R
8
’
-
0
"
FO R CUTS
HINGE PO INT
6
:1
4
:
1
6
:
1
4
:
1
1
2
’
-
0
"
6
’
-
0
"
1
0
’
-
0
"
S
L
O
P
E
S
V
A
R
I
A
B
L
E
T
2:1
2:1
C1D1E1GRADE TO THIS LINE
T
T
T
E
1
C
1
D
1
E
1
1
2
.
5
"
-
L
-
U
0.0
2
0
.
0
2
TO 1
2
’
-
0
"
VAR.
1
0
’
-
6
"
T
O
1
2
’
-
0
"
V
A
R
.
1
0
’
-
8
"
P
O
I
N
T
G
R
A
D
E
CL
V
A
R
.
0
’
-
0
"
T
O
2
3
’
-
0
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
5
T 11’-0" w/GR 8’-0"FDPS 4’-0"SLOPE VARIABLE FO R FILLSHINGE PO INT6:1 30’-0"2:1
FO R CUTS
HINGE PO INT
F
D
P
S
4
’
-
0
"
1
1
’
-
0
"
w
/
G
R
8
’
-
0
"
FO R CUTS
HINGE PO INT
6
:1
4:
1
6
:
1
4:
1
1
2
’
-
0
"
6
’
-
0
"
1
0
’
-
0
"
S
L
O
P
E
S
V
A
R
I
A
B
L
E
T
2:1
C
1
D
1
1
2
.
5
"
E
1
C1D1E1
P
O
I
N
T
G
R
A
D
E
0
.
0
2
0
.
0
2
T
Y
P
.
6
"
T
Y
P
.
9
"
T
Y
P
.
9
"
T
T
2
3
’
-
0
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
5
A
-
L
-
CL
V
A
R
3
7
’
-
2
"
T
O
6
3
’
-
0
"
1
2
.
5
"
R
2
R
2
R
2
R
2
E
1
R
3
R
2
E
1
F
R
O
M
-
L
-
S
T
A
.
1
8
5
+
9
5
.
4
6
T
O
1
8
9
+
3
0
.
1
0
W
I
T
H
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
5
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
5
A
I
N
C
O
N
J
U
N
C
T
I
O
N
T
H
E
L
I
M
I
T
I
N
G
S
L
O
P
E
I
S
M
A
I
N
T
A
I
N
E
D
.
T
H
E
D
I
S
T
A
N
C
E
B
E
C
O
M
E
S
V
A
R
I
A
B
L
E
,
A
N
D
S
L
O
P
E
S
O
U
T
S
I
D
E
T
H
E
L
I
M
I
T
S
S
H
O
W
N
,
-
W
H
E
N
T
H
E
S
E
D
I
S
T
A
N
C
E
S
I
N
D
I
C
A
T
E
F
R
O
M
-
L
-
S
T
A
.
1
9
2
+
5
0
.
0
0
T
O
1
9
5
+
0
0
.
0
0
T
O
E
N
S
U
R
E
S
M
O
O
T
H
T
I
E
-
I
N
:
M
I
L
L
T
O
P
1
.
5
"
L
A
Y
E
R
O
F
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
N
O
T
E
:
F
R
O
M
-
L
-
S
T
A
.
1
8
5
+
9
5
.
4
6
T
O
1
9
5
+
0
0
.
0
0
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
5
:
GRADE TO TH
I
S
L
I
N
E
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
EOP USING PROPOSED SUPERELEVATION PROJECT GRADE POINT ELEVATION TO EOP USING PR
O
P
O
S
E
D
S
U
P
E
R
E
L
E
V
A
T
I
O
N
PROJECT GR
A
D
E
P
O
I
N
T
E
L
E
V
A
T
I
O
N
T
O
EOP USING P
R
O
P
O
S
E
D
S
U
P
E
R
E
L
E
V
A
T
I
O
N
PROJECT G
R
A
D
E
P
O
I
N
T
E
L
E
V
A
T
I
O
N
T
O
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W
1
W
1
W
1
S
E
E
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
.
R
I
G
H
T
S
I
D
E
O
F
T
H
E
P
R
O
P
O
S
E
D
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
,
T
H
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
F
R
O
M
T
H
E
L
E
F
T
T
O
N
O
T
E
:
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
L
O
C
A
T
I
O
N
V
A
R
I
E
S
W
I
T
H
I
N
F
R
O
M
-
L
-
S
T
A
.
1
1
8
+
0
9
+
/
-
(
E
N
D
B
R
I
D
G
E
)
T
O
1
2
8
+
7
5
.
0
0
F
R
O
M
-
L
-
S
T
A
.
1
1
3
+
0
0
.
0
0
T
O
1
1
6
+
6
0
+
/
-
(
B
E
G
I
N
B
R
I
D
G
E
)
S
E
C
T
I
O
N
I
N
L
I
E
U
O
F
W
E
D
G
I
N
G
&
W
I
D
E
N
I
N
G
:
N
E
W
P
A
V
E
M
E
N
T
O
N
B
O
T
H
S
I
D
E
S
O
F
T
H
E
T
Y
P
I
C
A
L
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
W
I
T
H
F
U
L
L
W
I
D
T
H
F
R
O
M
-
L
-
S
T
A
.
1
2
8
+
7
5
.
0
0
T
O
1
8
5
+
9
5
.
4
6
F
R
O
M
-
L
-
S
T
A
.
1
0
5
+
9
9
.
3
3
T
O
1
1
3
+
0
0
.
0
0
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
:
14’-0" *
1
4
’
-
0
"
*
*
1
4
’
O
U
T
S
I
D
E
L
A
N
E
S
T
O
A
C
C
O
M
M
O
D
A
T
E
B
I
C
Y
C
L
E
S
S
E
E
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
.
R
I
G
H
T
S
I
D
E
O
F
T
H
E
P
R
O
P
O
S
E
D
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
,
T
H
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
F
R
O
M
T
H
E
L
E
F
T
T
O
N
O
T
E
:
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
L
O
C
A
T
I
O
N
V
A
R
I
E
S
W
I
T
H
I
N
F
R
O
M
-
L
-
S
T
A
.
8
0
+
0
0
.
0
0
T
O
8
6
+
2
5
.
0
0
S
E
C
T
I
O
N
I
N
L
I
E
U
O
F
W
E
D
G
I
N
G
&
W
I
D
E
N
I
N
G
:
N
E
W
P
A
V
E
M
E
N
T
O
N
B
O
T
H
S
I
D
E
S
O
F
T
H
E
T
Y
P
I
C
A
L
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
W
I
T
H
F
U
L
L
W
I
D
T
H
F
R
O
M
-
L
-
S
T
A
.
8
6
+
2
5
.
0
0
T
O
1
0
5
+
9
9
.
3
3
F
R
O
M
-
L
-
S
T
A
.
5
7
+
0
0
.
0
0
T
O
8
0
+
0
0
.
0
0
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
:
14’-0" w/GR 10’-0"
1
4
’
-
0
"
w
/
G
R
1
0
’
-
0
"
R
3
O
R
R
3
O
R
R
3
O
R
(
P
R
E
L
I
M
.
P
A
V
E
M
E
N
T
D
E
S
I
G
N
)
S
4
"
S
I
D
E
W
A
L
K
T
E
A
R
T
H
M
A
T
E
R
I
A
L
U
E
X
I
S
T
.
P
A
V
E
M
E
N
T
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
1
:
1
C
4
V
A
R
.
S
9
.
5
B
D
1
4
"
I
1
9
.
0
C
D
2
V
A
R
.
I
1
9
.
0
C
D
4
V
A
R
.
I
1
9
.
0
B
D
3
2
.
5
"
I
1
9
.
0
B
E
2
V
A
R
.
B
2
5
.
0
C
E
1
5
.
5
"
B
2
5
.
0
C
R
1
2
’
-
6
"
C
&
G
R
4
I
S
L
A
N
D
5
"
M
O
N
O
.
C
O
N
C
.
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
R
2
1
’
-
6
"
C
&
G
C
2
V
A
R
.
S
9
.
5
C
E
3
4
"
B
2
5
.
0
B
R
3
2
’
-
9
"
C
&
G
W
1
W
E
D
G
I
N
G
W
2
W
E
D
G
I
N
G
W
3
W
E
D
G
I
N
G
E
4
4
.
5
"
B
2
5
.
0
B
E
5
V
A
R
.
B
2
5
.
0
B
J
6
"
A
B
C
C
3
3
"
S
9
.
5
B
C
5
2
"
S
9
.
5
B
C
1
3
"
S
9
.
5
C
A
6
"
C
O
N
C
R
E
T
E
17-MAR-2014 08:47R:\Roadway\Proj\R2603_Rdy_typ.dgn$$$$USERNAM E$$$$
P
A
V
E
M
E
N
T
D
E
S
I
G
N
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
-
B
R
-
2
6
0
3
2
’
2’6"VAR 2:1 to 4:1VAR 2:1 to 4:1
V
A
R 2:1 to 4:1
VA
R
2:1 to 4:1
6
"
GROUND ORIGINAL
G
R
O
U
N
D
O
R
I
G
I
N
A
L
1
0
’
-
0
"
10’-0"
5
’
-
0
"
4
’
-
0
"
D1 C1
S
E1 T TYP.6"
1
2
.
5
"
12.5"R1
D
1
E
1
R
1
C
1
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
GRADE TO THIS LINE 0.02
0
.
0
2
P
O
I
N
T
G
R
A
D
E
V
A
R
.
4
8
’
-
0
"
T
O
8
6
’
-
8
"
V
A
R
.
6
8
’
-
0
"
T
O
1
0
6
’
-
8
"
CL
-
Y
1
-
T
O
5
’
-
6
"
V
A
R
.
0
’
-
0
"
1
1
’
-
0
"
1
1
’
-
0
"
POINT GRADE CL-Y1A-11’-0"11’-0"
V
A
R
.
0
’
-
0
"
T
O
4
2
’
-
2
"
0.04
0
.
0
4
V
A
R
.
U
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
6
P
O
I
N
T
G
R
A
D
E
CL
-
Y
1
-
T
O
5
’
-
6
"
V
A
R
.
0
’
-
0
"
POINT GRADE CL-Y1A-
V
A
R
.
T
Y
P
.
6
"
T
Y
P
.
9
"
T
Y
P
.
9
"
0
.
0
2
0.02 TO 12’-0"VAR. 0’-0"
V
A
R
.
1
1
’
-
0
"
T
O
3
1
’
-
8
"
VAR. 5
’
-
6
"
T
O
4
2
’
-
2
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
6
A
10’-0"
1
0
’
-
0
"
0.04
F
R
O
M
-
Y
1
A
-
S
T
A
.
2
1
+
5
8
.
0
6
T
O
3
2
+
5
3
.
1
1
F
R
O
M
-
Y
1
-
S
T
A
.
1
5
+
6
1
.
5
4
T
O
3
2
+
3
2
.
9
1
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
6
:
F
R
O
M
-
Y
1
A
-
S
T
A
.
2
4
+
7
6
.
7
2
T
O
2
9
+
9
3
.
9
7
F
R
O
M
-
Y
1
-
S
T
A
.
2
4
+
7
2
.
8
7
T
O
2
9
+
7
3
.
7
7
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
6
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
6
A
I
N
C
O
N
J
U
N
C
T
I
O
N
W
I
T
H
U
R3
R
2
EOP USING PROPOSED
S
U
P
E
R
E
L
E
V
A
T
I
O
N
PROJECT GRADE PO
I
N
T
E
L
E
V
A
T
I
O
N
T
O
2
’
2’6"VAR 2:1 to 4:1VAR 2:1 to 4:1
V
A
R 2:1 to 4:1
VA
R
2:1 to 4:1
6
"
GROUND ORIGINAL
G
R
O
U
N
D
O
R
I
G
I
N
A
L
1
0
’
-
0
"
10’-0"
5
’
-
0
"
4
’
-
0
"
S
E1 T TYP.6"
1
2
.
5
"
D
1
R
1
C
1
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
GRADE TO THIS LI
N
E
0.02
0
.
0
2
0
.
0
2
0
.
0
2
P
O
I
N
T
G
R
A
D
E
CL
1
2
’
-
0
"
4
4
’
-
0
"
6
4
’
-
0
"
1
4
’
-
0
"
1
4
’
-
0
"
-
Y
2
-
(
F
L
I
N
T
H
I
L
L
R
D
.
)
R15.
5
"
E
1
F
R
O
M
-
Y
2
-
S
T
A
.
1
7
+
9
3
.
6
2
T
O
1
8
+
5
4
.
7
2
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
:
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
VAR. 2:1 TO 6:1 9’-0" w/GR 6’-0"
8
’
-
0
"
2:1
M
A
X.
4
:1
9
’
-
0
"
w
/
G
R
6
’
-
0
"
T
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
A
F
R
O
M
-
Y
2
-
S
T
A
.
1
8
+
5
4
.
7
2
T
O
1
9
+
3
0
.
0
0
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
A
I
N
C
O
N
J
U
N
C
T
I
O
N
W
I
T
H
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W1
W
1
W1
W
1
(
P
R
E
L
I
M
.
P
A
V
E
M
E
N
T
D
E
S
I
G
N
)
S
4
"
S
I
D
E
W
A
L
K
T
E
A
R
T
H
M
A
T
E
R
I
A
L
U
E
X
I
S
T
.
P
A
V
E
M
E
N
T
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
1
:
1
C
4
V
A
R
.
S
9
.
5
B
D
1
4
"
I
1
9
.
0
C
D
2
V
A
R
.
I
1
9
.
0
C
D
4
V
A
R
.
I
1
9
.
0
B
D
3
2
.
5
"
I
1
9
.
0
B
E
2
V
A
R
.
B
2
5
.
0
C
E
1
5
.
5
"
B
2
5
.
0
C
R
1
2
’
-
6
"
C
&
G
R
4
I
S
L
A
N
D
5
"
M
O
N
O
.
C
O
N
C
.
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
R
2
1
’
-
6
"
C
&
G
C
2
V
A
R
.
S
9
.
5
C
E
3
4
"
B
2
5
.
0
B
R
3
2
’
-
9
"
C
&
G
W
1
W
E
D
G
I
N
G
W
2
W
E
D
G
I
N
G
W
3
W
E
D
G
I
N
G
E
4
4
.
5
"
B
2
5
.
0
B
E
5
V
A
R
.
B
2
5
.
0
B
J
6
"
A
B
C
C
3
3
"
S
9
.
5
B
C
5
2
"
S
9
.
5
B
C
1
3
"
S
9
.
5
C
A
6
"
C
O
N
C
R
E
T
E
17-MAR-2014 08:47R:\Roadway\Proj\R2603_Rdy_typ.dgn$$$$USERNAM E$$$$
P
A
V
E
M
E
N
T
D
E
S
I
G
N
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
-
C
R
-
2
6
0
3
U
0
.
0
2
0
.
0
2
P
O
I
N
T
G
R
A
D
E
CL
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
8
8
’
-
0
"
E
3
T
2:1
M
A
X.
4
:1
7
"
w
/
G
R
7
’
-
0
"
2
’
-
0
"
w
/
G
R
7
’
-
0
"
2
’
-
0
"
E
3
T
VAR. 2:1 TO 6:
1
T
O
1
8
’
-
0
"
V
A
R
.
9
’
-
0
"
U
0
.
0
2
0
.
0
2
P
O
I
N
T
G
R
A
D
E
CL
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
9
8
’
-
0
"
E
3
T
7
"
2:1
M
A
X.
4
:1
7
"
E
3
T
VAR. 2:1 TO 6:1
-
Y
8
-
,
-
Y
1
1
-
,
-
Y
1
2
-
,
-
Y
1
7
-
9
’
-
0
"
w
/
G
R
6
’
-
0
"
9
’
-
0
"
w
/
G
R
6
’
-
0
"
C
3
C
3
C
3
C
3
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
TYPICAL LANE WIDTHS-Y- LINE-Y7--Y9--Y10--Y13--Y14--Y15--Y16--Y19-LANE WIDTH10’VAR.VAR.10’9’9’9’TYPICAL LANE WIDTHS-Y- LINE-Y8--Y12--Y17-LANE WIDTH11’10’11’-Y11-10’10’ & 15’
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W
3
W
3
T
O
1
8
’
-
0
"
V
A
R
.
9
’
-
0
"
7
"
V
A
R
.
1
4
’
-
2
"
T
O
1
8
’
-
1
0
"
T
O
1
1
’
-
0
"
V
A
R
.
1
0
’
-
0
"
T
O
1
1
’
-
0
"
V
A
R
.
1
0
’
-
0
"
V
A
R
.
1
7
’
-
1
1
"
T
O
2
0
’
-
2
"
-Y20-VAR.-Y4--Y3-VAR.VAR.
2
’
6
"
VAR 2:1 to 4:1VAR 2:1 to 4:1GROUNDORIGINALT
T
Y
P
.
6
"
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
0
.
0
2
R
1
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
8
A
-Y5--Y6-VAR.VAR.
F
R
O
M
-
Y
6
-
S
T
A
.
1
0
+
5
0
.
0
0
T
O
1
1
+
7
2
.
2
0
F
R
O
M
-
Y
5
-
S
T
A
.
1
0
+
0
0
.
0
0
T
O
1
0
+
7
2
.
4
6
W
I
T
H
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
8
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
8
A
I
N
C
O
N
J
U
N
C
T
I
O
N
10’-
0
"
*
*
V
A
R
I
E
S
2
’
-
0
"
T
O
1
0
’
-
0
"
F
O
R
-
Y
6
-
0
.
0
2
0
.
0
2
P
O
I
N
T
G
R
A
D
E
CL
2
’
-
0
"
E
3
T
7
"
2:1
M
A
X.
4
:1
7
"
E
3
T
VAR. 2:1 TO
6:
1
C
3
C
3
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
-
Y
9
D
E
T
-
,
-
Y
1
6
D
E
T
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
0
9
’
-
0
"
9
’
-
0
"
2
’
-
0
"
2
’
-
0
"
F
R
O
M
-
Y
1
6
D
E
T
-
S
T
A
.
1
2
+
3
2
.
5
6
T
O
1
7
+
4
2
.
3
0
F
R
O
M
-
Y
9
D
E
T
-
S
T
A
.
1
0
+
1
0
.
3
9
T
O
1
4
+
0
0
.
0
0
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
0
:
-
Y
3
-
,
-
Y
4
-
,
-
Y
5
-
,
-
Y
6
-
,
-
Y
7
-
,
-
Y
9
-
,
-
Y
1
0
-
,
-
Y
1
3
-
,
-
Y
1
4
-
,
-
Y
1
5
-
,
-
Y
1
6
-
,
-
Y
1
9
-
F
R
O
M
-
Y
1
9
-
S
T
A
.
1
0
+
1
5
.
3
0
T
O
1
2
+
5
0
.
0
0
F
R
O
M
-
Y
1
6
-
S
T
A
.
1
1
+
0
5
.
0
0
T
O
1
4
+
0
1
.
7
5
F
R
O
M
-
Y
1
5
-
S
T
A
.
1
0
+
1
0
.
0
0
T
O
1
1
+
6
1
.
6
1
F
R
O
M
-
Y
1
4
-
S
T
A
.
1
0
+
5
9
.
6
4
T
O
1
0
+
9
2
.
8
6
F
R
O
M
-
Y
1
3
-
S
T
A
.
1
0
+
7
2
.
5
1
T
O
1
1
+
1
5
.
2
2
F
R
O
M
-
Y
9
-
S
T
A
.
1
0
+
7
6
.
9
9
T
O
1
3
+
2
5
.
0
0
F
R
O
M
-
Y
7
-
S
T
A
.
1
2
+
0
0
.
1
4
T
O
1
3
+
6
4
.
3
5
F
R
O
M
-
Y
6
-
S
T
A
.
1
0
+
5
0
.
0
0
T
O
1
1
+
7
2
.
2
0
F
R
O
M
-
Y
4
-
S
T
A
.
1
0
+
0
0
.
0
0
T
O
1
0
+
7
2
.
5
0
N
E
W
P
A
V
E
M
E
N
T
I
N
L
I
E
U
O
F
W
E
D
G
I
N
G
&
W
I
D
E
N
I
N
G
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
8
W
I
T
H
F
U
L
L
W
I
D
T
H
F
R
O
M
-
Y
1
9
-
S
T
A
.
1
2
+
5
0
.
0
0
T
O
1
3
+
0
0
.
0
0
F
R
O
M
-
Y
1
9
-
S
T
A
.
1
2
+
5
0
.
0
0
T
O
1
3
+
0
0
.
0
0
F
R
O
M
-
Y
1
6
-
S
T
A
.
1
0
+
6
5
.
0
0
T
O
1
1
+
0
5
.
0
0
F
R
O
M
-
Y
1
0
-
S
T
A
.
1
1
+
5
6
.
4
9
T
O
1
2
+
2
4
.
4
1
F
R
O
M
-
Y
7
-
S
T
A
.
1
1
+
0
0
.
0
0
T
O
1
2
+
0
0
.
1
4
F
R
O
M
-
Y
5
-
S
T
A
.
1
0
+
0
0
.
0
0
T
O
1
0
+
7
2
.
4
6
F
R
O
M
-
Y
3
-
S
T
A
.
1
0
+
0
6
.
0
0
T
O
1
0
+
7
2
.
4
8
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
8
:
(
P
R
E
L
I
M
.
P
A
V
E
M
E
N
T
D
E
S
I
G
N
)
F
R
O
M
-
Y
1
7
-
S
T
A
.
1
4
+
1
5
.
0
0
T
O
1
7
+
8
9
.
7
3
F
R
O
M
-
Y
1
2
-
S
T
A
.
1
1
+
1
8
.
1
9
T
O
1
5
+
5
0
.
0
0
N
E
W
P
A
V
E
M
E
N
T
I
N
L
I
E
U
O
F
W
E
D
G
I
N
G
&
W
I
D
E
N
I
N
G
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
9
W
I
T
H
F
U
L
L
W
I
D
T
H
F
R
O
M
-
Y
1
7
-
S
T
A
.
1
1
+
1
5
.
0
0
T
O
1
4
+
1
5
.
0
0
F
R
O
M
-
Y
1
2
-
S
T
A
.
1
5
+
5
0
.
0
0
T
O
1
6
+
2
5
.
0
2
F
R
O
M
-
Y
1
1
-
S
T
A
.
1
2
+
4
8
.
3
5
T
O
1
3
+
5
9
.
1
9
F
R
O
M
-
Y
8
-
S
T
A
.
1
3
+
0
0
.
0
0
T
O
1
4
+
3
6
.
8
9
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
9
:
S
4
"
S
I
D
E
W
A
L
K
T
E
A
R
T
H
M
A
T
E
R
I
A
L
U
E
X
I
S
T
.
P
A
V
E
M
E
N
T
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
1
:
1
C
4
V
A
R
.
S
9
.
5
B
D
1
4
"
I
1
9
.
0
C
D
2
V
A
R
.
I
1
9
.
0
C
D
4
V
A
R
.
I
1
9
.
0
B
D
3
2
.
5
"
I
1
9
.
0
B
E
2
V
A
R
.
B
2
5
.
0
C
E
1
5
.
5
"
B
2
5
.
0
C
R
1
2
’
-
6
"
C
&
G
R
4
I
S
L
A
N
D
5
"
M
O
N
O
.
C
O
N
C
.
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
R
2
1
’
-
6
"
C
&
G
C
2
V
A
R
.
S
9
.
5
C
E
3
4
"
B
2
5
.
0
B
R
3
2
’
-
9
"
C
&
G
W
1
W
E
D
G
I
N
G
W
2
W
E
D
G
I
N
G
W
3
W
E
D
G
I
N
G
E
4
4
.
5
"
B
2
5
.
0
B
E
5
V
A
R
.
B
2
5
.
0
B
J
6
"
A
B
C
C
3
3
"
S
9
.
5
B
C
5
2
"
S
9
.
5
B
C
1
3
"
S
9
.
5
C
A
6
"
C
O
N
C
R
E
T
E
U 0.02
0
.
0
2
TO 12’-0"VAR. 10’-11"
T
O
1
2
’
-
0
"
V
A
R
.
1
1
’
-
3
"
P
O
I
N
T
G
R
A
D
E
CL
VAR
.
0
’
-
0
"
T
O
1
7
’
-
6
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
1
11’-0" w/GR 8’-0"SLOPE VARIABLE FO R FILLSHINGE PO INT6:1 30’-0"2:1
FO R CUTS
HINGE PO INT
F
D
P
S
4
’
-
0
"
1
1
’
-
0
"
w
/
G
R
8
’
-
0
"
FO R CUTS
HINGE PO INT
6
:1
4:
1
6
:
1
4:
1
1
2
’
-
0
"
6
’
-
0
"
1
0
’
-
0
"
S
L
O
P
E
S
V
A
R
I
A
B
L
E
2:1
E
3
E3POINTGRADE0.02
0
.
0
2
T
Y
P
.
6
"
T
Y
P
.
9
"
T
Y
P
.
9
"
1
7
’
-
6
"
CL
ER2
R
2
F
R
O
M
-
Y
1
8
-
S
T
A
.
2
3
+
1
6
.
2
5
T
O
2
7
+
3
1
.
6
7
W
I
T
H
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
1
1
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
1
A
I
N
C
O
N
J
U
N
C
T
I
O
N
-
Y
1
8
-
(
A
I
R
P
O
R
T
R
D
.
)
C3
C
3
D3
D
3
9.5"
9
.
5
"
T
T
T
H
E
L
I
M
I
T
I
N
G
S
L
O
P
E
I
S
M
A
I
N
T
A
I
N
E
D
.
T
H
E
D
I
S
T
A
N
C
E
B
E
C
O
M
E
S
V
A
R
I
A
B
L
E
,
A
N
D
S
L
O
P
E
S
O
U
T
S
I
D
E
T
H
E
L
I
M
I
T
S
S
H
O
W
N
,
-
W
H
E
N
T
H
E
S
E
D
I
S
T
A
N
C
E
S
I
N
D
I
C
A
T
E
T
O
1
2
’
-
0
"
V
A
R
.
0
’
-
0
"
V
A
R
1
9
’
-
3
"
T
O
4
0
’
-
9
"
VAR 18’-11" TO 28’-9"T
D
3
C
3
TO 1
7
’
-
6
"
VAR.
7
’
-
6
"
T
O
1
0
’
-
0
"
V
A
R
.
0
’
-
0
"
U
E
3
W
2
0
.
0
2
-
Y
1
8
-
(
A
I
R
P
O
R
T
R
D
.
)
GRADE TO THIS LINE
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
R
3
4
’
-
0
"
9
"
U
0
.
0
2
0.02
T
O
1
2
’
-
0
"
V
A
R
.
1
1
’
-
1
"
POINT GRADE
CL
V
A
R
.
0
’
-
0
"
T
O
1
7
’
-
6
"
1
1
’
-
0
"
w
/
G
R
8
’
-
0
"
11’-0" w/GR 8’-0"
E
4 C
3
D
3
9
.
5
"
9.5"T
T
VAR 20’-0" TO 23’-3"
R
4
4
’
-
0
"
9
"
-
Y
1
8
-
(
R
I
V
E
R
L
I
B
E
R
T
Y
G
R
O
V
E
C
H
U
R
C
H
R
D
.
)
FDPS 4’-0"VAR. 2:1 TO 6:1 12’-0"
2:1
M
A
X.
4
:1
V
A
R
2
0
’
-
0
"
T
O
3
4
’
-
3
"
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
D3 C3 EOP USING PROPOSED SUPERELEVATION PROJECT GRADE POINT ELEVATION TO17-MAR-2014 08:47R:\Roadway\Proj\R2603_Rdy_typ.dgn$$$$USERNAM E$$$$
P
A
V
E
M
E
N
T
D
E
S
I
G
N
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
2
-
D
R
-
2
6
0
3
GRADE TO THIS LINE
F
R
O
M
-
Y
1
8
-
S
T
A
.
4
0
+
7
5
.
0
0
T
O
4
2
+
4
0
.
0
0
E
N
S
U
R
E
S
M
O
O
T
H
T
I
E
-
I
N
:
M
I
L
L
T
O
P
1
.
5
"
L
A
Y
E
R
O
F
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
T
O
N
O
T
E
:
F
R
O
M
-
Y
1
8
-
S
T
A
.
3
1
+
1
7
.
2
5
T
O
3
7
+
1
2
.
8
6
N
E
W
P
A
V
E
M
E
N
T
I
N
L
I
E
U
O
F
W
E
D
G
I
N
G
&
W
I
D
E
N
I
N
G
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
2
W
I
T
H
F
U
L
L
W
I
D
T
H
F
R
O
M
-
Y
1
8
-
S
T
A
.
3
7
+
1
2
.
8
6
T
O
4
2
+
4
0
.
0
0
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
2
:
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
W2
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
1
A
F
R
O
M
-
Y
1
8
-
S
T
A
.
1
7
+
5
0
.
0
0
T
O
1
7
+
6
5
.
0
0
E
N
S
U
R
E
S
M
O
O
T
H
T
I
E
-
I
N
:
M
I
L
L
T
O
P
1
.
5
"
L
A
Y
E
R
O
F
E
X
I
S
T
I
N
G
P
A
V
E
M
E
N
T
T
O
N
O
T
E
:
F
R
O
M
-
Y
1
8
-
S
T
A
.
1
7
+
5
0
.
0
0
T
O
3
0
+
2
1
.
3
7
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
1
:
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
2
E4
T
O
1
4
’
-
3
"
V
A
R
.
0
’
-
0
"
TO 3’-3"VAR. 0’-0"W2
(
P
R
E
L
I
M
.
P
A
V
E
M
E
N
T
D
E
S
I
G
N
)
S
4
"
S
I
D
E
W
A
L
K
T
E
A
R
T
H
M
A
T
E
R
I
A
L
U
E
X
I
S
T
.
P
A
V
E
M
E
N
T
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
P
A
V
E
M
E
N
T
E
D
G
E
S
L
O
P
E
S
1
:
1
C
4
V
A
R
.
S
9
.
5
B
D
1
4
"
I
1
9
.
0
C
D
2
V
A
R
.
I
1
9
.
0
C
D
4
V
A
R
.
I
1
9
.
0
B
D
3
2
.
5
"
I
1
9
.
0
B
E
2
V
A
R
.
B
2
5
.
0
C
E
1
5
.
5
"
B
2
5
.
0
C
R
1
2
’
-
6
"
C
&
G
R
4
I
S
L
A
N
D
5
"
M
O
N
O
.
C
O
N
C
.
P
A
V
E
M
E
N
T
S
C
H
E
D
U
L
E
R
2
1
’
-
6
"
C
&
G
C
2
V
A
R
.
S
9
.
5
C
E
3
4
"
B
2
5
.
0
B
R
3
2
’
-
9
"
C
&
G
W
1
W
E
D
G
I
N
G
W
2
W
E
D
G
I
N
G
W
3
W
E
D
G
I
N
G
E
4
4
.
5
"
B
2
5
.
0
B
E
5
V
A
R
.
B
2
5
.
0
B
J
6
"
A
B
C
C
3
3
"
S
9
.
5
B
C
5
2
"
S
9
.
5
B
C
1
3
"
S
9
.
5
C
A
6
"
C
O
N
C
R
E
T
E
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-MAR-2014 08:47R:\Roadway\Proj\R-2603_Rdy_psh_2E.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
1
0
1
1
1
2
1
3
1
4
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
P
R
O
P
O
S
E
D
G
R
A
D
E
E
X
I
S
T
I
N
G
G
R
O
U
N
D
-
Y
9
D
E
T
-
-Y9DET
-
DETOUR SIDNEY AV
E
.
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
9
9
0
9
8
0
9
7
0
9
6
0
1
,
0
0
0
1
,
0
1
0
9
9
0
9
8
0
9
7
0
9
6
0
1
,
0
8
0
1
,
0
7
0
1
,
0
6
0
1
,
0
5
0
1
,
0
4
0
1
,
0
3
0
1
,
0
2
0
1
,
1
2
0
1
,
1
1
0
1
,
1
0
0
1
,
0
9
0
2
E
-
Y
9
D
E
T
-
P
C
S
t
a
.
1
2
+
2
6
.
6
3
-Y9DET- POT Sta. 14+27.95
-Y9DET- PT Sta. 12+99.09
P
I
S
t
a
1
2
+
7
0
.
8
9
DL
=
7
2
.
4
6
’
T
=
4
4
.
2
6
’
R
=
5
0
.
0
0
’
V
<
1
5
m
p
h
S
E
=
0
.
0
3
-
Y
9
D
E
T
-
-Y9DET- POT Sta. 10+00.00-Y9DET--Y9DET- POT 14+00.00 END CONSTRUCTION
(TYP.)
18’+
4
3
0
0
0
1
0
2
0
1
0
2
0 4
0 3 0 20 1 0 00 1 0070060 1(TYP.)18’+29.09 7.6’7.3’TAPER50’+95
0 4 0
3
0
2
0
1
0
0
0
1
0
2
(TYP.)
18’+
7
8
.
6
3
1
8
’
-L-25’R
2
5
’
R
-L- POT Sta. 86+95.00 -Y9DET- POT Sta. 10+23.50=
-
Y
9
D
E
T
-
P
O
T
1
0
+
1
0
.
3
9
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
8
5
’
7
0
’
+
4
0
8
5
’
7
0
’
+
0
0
1
0
0
’
+
3
5
7
8
’
7
5
’
7
0
’
+
2
0
7
8
’
7
5
’
7
0
’
+7
5
75’+8570’+6094’+50 107’96’70’+9770’+3581’70’+7388’+50110’+00105’+00 87’+5585’+00 95’+50 85’+7885’+60
1
0
0
’
8
5
’
7
0
’
+
9
6
8
5
’
+
6
5
9.34’+34 -Y9-25’+80 -Y9DET-
3
5
’
+
4
6
.
1
9
-
Y
9
D
E
T
-
3
2
’
+
6
2
-
Y
9
D
E
T
-
3
2
’
+
8
5
-
Y
9
D
E
T
-
22’+00 -Y9DET-25’+00 -Y9DET-15.17’+20 -Y9DET-
1
1
1
’
+
2
5
1
0
0
’
+
1
7
70’ RT +854.48’+20 -Y9DET-
8
5
’
+
2
5
8
5
’
7
5
’
7
0
’
+
3
5
(
-
)
3
.
4
8
4
4
%
(
-
)
3
.
8
0
0
0
%
(+)14.0000
%
(
-
)
0
.5
0
0
0
%
E
L
.
1
0
8
1
.
3
6
’
-
Y
9
D
E
T
-
S
T
A
.
1
4
+
0
0
.
0
0
E
N
D
G
R
A
D
E
E
L
E
V
.
1
0
5
0
.
3
1
’
-
Y
9
D
E
T
-
S
T
A
.
1
0
+
1
0
.
3
9
B
E
G
I
N
G
R
A
D
E
E
L
.
1
0
5
0
.
6
7
’
-
Y
9
D
E
T
-
S
T
A
.
1
0
+
0
0
.
0
0
P
I
=
1
3
+
0
5
.
0
0
E
L
=
1
,
0
8
1
.
8
3
’
V
C
=
1
9
0
’
K
=
1
3
V
=
2
5
m
p
h
P
I
=
1
0
+
6
5
.
0
0
E
L
=
1
,
0
4
8
.
2
3
’
V
C
=
1
0
0
’
K
=
6
V
=
S
T
O
P
C
O
N
D
I
T
I
O
N
F
F
F
F
C
CF
C
FFC
F
CCF NAD 83/ 95
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-MAR-2014 08:47R:\Roadway\Proj\R-2603_Rdy_psh_2F.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
1
2
1
3
1
4
1
5
1
6
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
P
R
O
P
O
S
E
D
G
R
A
D
E
E
X
I
S
T
I
N
G
G
R
O
U
N
D
-
Y
1
6
D
E
T
-
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
9
9
0
9
8
0
9
7
0
9
6
0
1
,
0
0
0
1
,
0
1
0
9
9
0
9
8
0
9
7
0
9
6
0
1
,
0
8
0
1
,
0
7
0
1
,
0
6
0
1
,
0
5
0
1
,
0
4
0
1
,
0
3
0
1
,
0
2
0
1
,
1
2
0
1
,
1
1
0
1
,
1
0
0
1
,
0
9
0
2
F
-Y16DE
T
-
DETOUR SR 2090
1
7
15-Y16DET- PC Sta. 14+38.41
-Y16DET- PT Sta.
1
7
+
4
3
.
9
7
-Y16DET- POT Sta. 17+53.72=-Y16DET- PT Sta. 11+77.31-L- POT Sta. 145+90.00 (30.10
’
R
T
)
-Y16- POT Sta. 9+17.45 -Y16DET- PC Sta. 11+17.45=020 2 0 2
P
I
S
t
a
1
1
+
4
7
.
4
2
DL
=
5
9
.
8
6
’
T
=
2
9
.
9
6
’
R
=
5
1
0
.
0
0
’
P
I
S
t
a
1
5
+
9
5
.
9
4
DL
=
3
0
5
.
5
6
’
T
=
1
5
7
.
5
2
’
R
=
5
1
0
.
0
0
’
V
<
1
5
m
p
h
V
<
1
5
m
p
h
S
E
=
0
.
0
2
S
E
=
0
.
0
2
-
Y
1
6
D
E
T
-
-Y16DET-1 8’
-
Y
1
6
D
E
T
-
P
O
C
1
1
+
3
8
.
3
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
-
L
-
-L- P
O
T
1
4
5
+
9
0
.
4
1
-Y16DET- POC
S
t
a
.
1
7
+
2
3
.
6
1
=
25’R25’R -Y16DET- POT 17+
4
2
.
3
0
END CONSTRUCTIO
N
-Y16- PO
T
Sta. 8+
00.00=
-Y
16D
E
T
- P
O
T
Sta. 10+
00.00
85’+5075’+7075’+7085’+5075’+7585’+00100’75’+00100’75’+30
9
0
’
7
5
’
+
9
0
9
0
’
7
5
’
+
2
0
8
5
’
7
2
.
3
3
’
+
3
5
29.49’+34 -Y16-
7
5
’
R
T
+
2
5
145’ LT +35 28.62’ RT +55 -Y16-25’ LT +64.66 -Y15-35’ RT +62.76 -Y15-50’+07.55 -Y16-115’ LT +35 31.61’ LT +81.82 -Y16-30.72’+55 -Y16-42’+75 -Y16-55’+50 -Y16-90’ RT +40 -Y16-45’28.98’+05 -Y16-43.38’+55.93 -Y15-
(-
)2
.10
0
0
%
P
I
=
1
4
+
3
5
.
0
0
E
L
=
1
,
0
7
3
.
5
3
’
V
C
=
2
5
0
’
K
=
1
6
P
I
=
1
6
+
5
0
.
0
0
E
L
=
1
,
0
3
6
.
3
9
’
(-)17.2731%
(
+
)
0
.
5
0
0
0
%
V
C
=
1
8
0
’
K
=
1
0
(
+
)
5
.
1
0
2
2
%
E
L
.
1
0
3
6
.
8
5
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
7
+
4
2
.
3
0
E
N
D
G
R
A
D
E
E
L
.
1
0
3
7
.
3
9
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
7
+
5
2
.
8
5
V
=
1
5
m
p
h
V
=
2
5
m
p
h
E
L
E
V
.
1
0
7
7
.
7
8
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
2
+
3
2
.
5
6
B
E
G
I
N
G
R
A
D
E
(
+
)
2
.
7
9
%
E
L
=
1
0
4
2
.
9
9
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
6
+
1
6
.
1
7
R
T
B
E
G
I
N
S
P
E
C
I
A
L
C
U
T
V
D
I
T
C
H
(
-
)
1
5
.
7
6
%
E
L
=
1
0
4
3
.
6
4
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
6
+
1
3
.
9
3
L
T
S
P
E
C
I
A
L
C
U
T
V
D
I
T
C
H
B
E
G
I
N
E
L
=
1
0
3
6
.
2
5
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
6
+
6
9
.
8
5
L
T
S
P
E
C
I
A
L
C
U
T
V
D
I
T
C
H
E
N
D
EL = 1036.52’
-Y16DET- STA. 17+23.02 LT
SPECIAL CUT BASE DITCH
BEG IN
(
+
)
0
.
5
1
%
(
-
)
1
3
.
2
2
%
E
L
=
1
0
3
5
.
9
0
’
-
Y
1
6
D
E
T
-
S
T
A
.
1
6
+
6
1
.
1
7
R
T
S
P
E
C
I
A
L
C
U
T
V
D
I
T
C
H
E
N
D
EL = 1036.97’
-Y16DET- STA. 16+99.46 RT
SPECIAL CUT V DITCH
BEG IN
FCFCC FCCC
N
A
D
8
3/
9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-MAR-2014 08:48R:\Roadway\Proj\R-2603_Rdy_psh_2G.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
-Y2- POT Sta. 1
9
+
8
8
.
8
2
E
X
A
C
T
L
O
C
A
T
I
O
N
S
.
R
E
F
E
R
T
O
T
H
E
P
A
V
E
M
E
N
T
M
A
R
K
I
N
G
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
O
F
C
R
S
Y
M
B
O
L
S
A
R
E
A
P
P
R
O
X
M
A
T
E
.
N
O
T
E
:
FLINT HILL RD. (-Y2-) INTERSECT
I
O
N
D
E
T
A
I
L
NC 268 (-Y1-/-Y1A-) ELKIN
R
D
.
/
SEE SHEET 4 FOR PLAN VIE
W
S
C
H
O
O
L
B
U
S
D
R
.
(
-
Y
3
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
5
F
O
R
P
L
A
N
V
I
E
W
-
L
-
P
O
T
S
t
a
.
2
7
+
6
6
.
2
7
-
Y
4
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
=
T
E
M
P
L
E
S
T
.
(
-
Y
4
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
5
F
O
R
P
L
A
N
V
I
E
W
-L- POT Sta. 22+35.35=
-Y1- PT Sta. 29+68.27
INTERSECTION D
E
T
A
I
L
S
2
G
-
L
-
P
O
T
S
t
a
.
2
7
+
6
6
.
2
7
-
Y
4
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
=
20
25 25 -Y2- POC Sta. 17+37.19-Y1A- PC Sta. 2
3
+
8
8
.
8
4
-Y1A- POC Sta. 24+48.58=-Y2- POC Sta. 17+71.19-Y1- POC Sta. 24+52.75=-Y1- POC Sta. 21+58.06 -Y1A- PT Sta. 21+58.06=-L- POT Sta. 15+02.33
-
Y
2
-
P
O
T
S
t
a
.
1
9
+
8
8
.
8
2
15-L- POT Sta. 14+65.00-Y2- POT Sta. 14+65.00
-
L
-
N
C
2
6
8
-L- NC 268
-
L
-
-Y2-
-Y1--Y1A-
C
R
CR -Y2- PC Sta. 15+02.33=CRCR CR CRCRCR CRCRCR-Y2-
P
T
Sta. 1
8
+
1
6.3
9
S
E
E
S
H
E
E
T
2
G
F
O
R
-
Y
1
-
/
-
Y
2
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
E
E
S
H
E
E
T
3
0
F
O
R
-
Y
1
A
-
&
-
Y
2
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
2
9
F
O
R
-
Y
1
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
2
F
O
R
-
L
-
P
R
O
F
I
L
E
5’R10’R50’R50’R
5
0
’
R
4.75’R7.5’R
F-F
2’R
1
0
0
’
R
71.25’R 2’-6"
C
&
G
5’ CONC. SIDEWALKEND 2’-6" C&G &-Y2- STA. 18+54.72
5
’ C
ON
C
. S
ID
E
WA
LK
E
N
D
2
’-
6
" C
&
G
&
-
Y2
-
S
T
A. 18
+
5
4
.7
2
END 5’ CONC. SIDEWALK-Y2- STA. 16+70.91(TYP.)20’
+35
2’RF-F20’13.75’F-F24.75’F-F 9.5’F-F48.75’R
37’+54.32
4.17’RPRO. MONO. CONC. ISLAND.CONC. ISLAND.PRO. MONO.
B
E
GIN
8
"x
18
" C
U
R
B
-
Y1-
S
T
A. 2
5
+
5
1.10
20’
20’
+80
18.4’
18.3’
+30
C-F 24’+41.12
L
-L-
-
Y
3
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-L- POT Sta. 22+35.35=
-Y1- PT Sta. 29+68.27
-
Y
1
A
-
-
Y
1
A
-
-
Y
1
-
-
Y
3
-
2
5
’
R
2
5
’
R
1
7
.
9
’
1
6
.
5
’
C
-
F
2
0
’
C
-
F
2
0
’
L
L
TAPER
38.25’
TAPER
37.16’
E
N
D
2
’
-
6
"
C
U
R
B
-
Y
3
-
S
T
A
.
1
0
+
4
4
.
2
9
E
N
D
2
’
-
6
"
C
U
R
B
-
Y
3
-
S
T
A
.
1
0
+
4
7
.
1
6
-
L
-
-
Y
4
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-Y1A POT Sta. 32+53.11 (5.50’ LT)
-
Y
4
-
3
4
’
F
-
F
2
5
’
R
2
5
’
R
1
6
.
6
’
1
5
.
2
’
TAPER
43.80’
E
N
D
2
’
-
6
"
C
U
R
B
-
Y
4
-
S
T
A
.
1
0
+
4
3
.
8
0
B
E
G
I
N
2
’
-
6
"
C
U
R
B
-
Y
4
-
S
T
A
.
1
0
+
4
3
.
8
1
-
L
-
N
A
D
8
3
/
9
5
N
A
D
8
3
/
9
5
N
A
D
8
3
/
9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-MAR-2014 08:48R:\Roadway\Proj\R-2603_Rdy_psh_2H.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
E
X
A
C
T
L
O
C
A
T
I
O
N
S
.
R
E
F
E
R
T
O
T
H
E
P
A
V
E
M
E
N
T
M
A
R
K
I
N
G
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
O
F
C
R
S
Y
M
B
O
L
S
A
R
E
A
P
P
R
O
X
M
A
T
E
.
N
O
T
E
:
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
2
H
WHITE PINE ST. (-Y5-) INTE
R
S
E
C
T
I
O
N
D
E
T
A
I
L
NC 268 (-L-) EL
K
I
N
R
D
.
/
SEE SHEET 6 FOR P
L
A
N
V
I
E
W
LEGION DR. (-Y7-) INTER
S
E
C
T
I
O
N
D
E
T
A
I
L
NC 268 (-L-) EL
K
I
N
R
D
.
/
SEE SHEET 7 FOR P
L
A
N
V
I
E
W
-
L
-
P
O
T
S
t
a
.
3
7
+
3
7
.
1
8
-
Y
5
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
=
S
H
A
V
E
R
S
T
.
(
-
Y
6
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
6
F
O
R
P
L
A
N
V
I
E
W
-
Y
6
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
L
-
P
O
T
S
t
a
.
4
7
+
9
6
.
0
7
-
Y
6
-
P
O
T
S
t
a
.
1
2
+
0
0
.
0
0
=
F
A
I
R
P
L
A
I
N
S
R
D
.
(
-
Y
8
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
7
F
O
R
P
L
A
N
V
I
E
W
EXACT LOCATIONS.REFER TO THE PAVEMENT MARKING PLANS FOR LOCATIONS OF CR SYMBOLS ARE APPROXMATE.NOTE:
E
X
A
C
T
L
O
C
A
T
I
O
N
S
.
R
E
F
E
R
T
O
T
H
E
P
A
V
E
M
E
N
T
M
A
R
K
I
N
G
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
O
F
C
R
S
Y
M
B
O
L
S
A
R
E
A
P
P
R
O
X
M
A
T
E
.
N
O
T
E
:
-
L
-
P
O
T
S
t
a
.
3
7
+
3
7
.
1
8
-
Y
5
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
=
-
Y
5
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-Y5-
C
R
C
R
C
R
2
5
’
R
25’R 15.5’16.1’15.6’14.8’+42.96+48.59
TAPER
48.59’
TAPER42.96’
B
E
G
I
N
2
’
-
6
"
C
U
R
B
-
Y
5
-
S
T
A
.
1
0
+
0
0
.
0
0
END 2’-6" CURB -Y5-STA. 10+42.96-
L
-
-
L
-
P
O
T
S
t
a
.
4
7
+
9
6
.
0
7
-
Y
6
-
P
O
T
S
t
a
.
1
2
+
0
0
.
0
0
=
-
Y
6
-
C
R
C
R
-
Y
6
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
3
6
’
F
-
F
5
0
’
R
5
0
’
R
1
5
.
9
’
15
.
9
’
TAPER
25’
B
E
G
I
N
2
’
-
6
"
C
U
R
B
-
Y
6
-
S
T
A
.
1
0
+
5
0
.
0
0
B
E
G
I
N
2
’
-
6
"
C
U
R
B
-
Y
6
-
S
T
A
.
1
1
+
0
5
.
8
8
B
E
G
I
N
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
Y
6
-
S
T
A
.
1
1
+
4
9
.
5
7
+
7
5
3
’
R
-
L
-
5050-Y7
-
P
T
S
t
a
. 14
+
16
.4
7
-Y7- PC Sta. 13+23.25
-Y7- PT Sta. 12+55.75
-Y7-
C
R
CR CRCRCRCR -Y6- POT Sta. 10+00.00POT Sta. 11+61.98 -DRIVE2-PT Sta. 10+98.33 -DRIVE2-PC Sta. 10+59.59 -DRIVE2--Y7- POC Sta. 13+73.85 POT Sta. 10+00.00=-DRIVE2-59’ F-F
1
0
’
1
0
’
7
.
7
’
7
.
5
’
10’
10’
15’
15’15’20’R20’R
TAPER
55.45’
25’R
15’
+27.77
+16.84
+59.75+51.57
22’R35’R 3’R4’R36.8’R12’12’20’20’
B
E
G
I
N
2
’
-
6
"
C
U
R
B
-
Y
8
-
S
T
A
.
1
4
+
2
0
.
3
8
B
E
G
I
N
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
Y
8
-
S
T
A
.
1
4
+
2
4
.
2
9
END 5’ CONC. SIDEWALK -Y8- STA. 14+20.52-L-
C
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
C
R
C
R
C
R
C
R
W
F
G
A
D
D
Y
R
D
.
-
Y
2
0
-
S
R
1
9
8
0
-
Y
8
-
P
C
C
S
t
a
.
1
1
+
7
4
.
0
5
F-F
28.75’+25
6
.
7
5
’
+
4
6
.
5
3
F-F
40.75’+00
6
.
7
5
’
+
4
2
.
2
4
EOT-F14.00’+42.24
4
0
’
R
5
0
’
R
2
’
R
2
’
R
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
P
R
O
P.
5
’
C
O
N
C.
S
I
D
E
W
A
L
K
6
2
+
1
9
.
5
1
-
6
2
+
4
2
.
2
4
T
O
2
’
-
9
"
C
&
G
T
R
A
N
S
I
T
I
O
N
1
’
-
6
"
C
&
G
1
0
0
’
T
A
P
E
R
1
0
0
’
T
A
P
E
R
2
4
’
8
X
1
8
C
U
R
B
5
0
’
R
1
0
0
’
R
5
’
R
8
7
.
3
9
+
4
9
.
1
4
3
4
’ F
-
F
+
75
.6
1
2
5
’
R
2
5
’
R
E
N
D
2
’
-
6
"
C
&
G
-
Y
8
-
S
T
A
.
1
3
+
6
4
.
2
5
E
N
D
2
’
-
6
"
C
&
G
-
Y
8
-
S
T
A
.
1
3
+
6
2
.
8
4
B
E
G
I
N
8
"
x
1
8
"
C
U
R
B
-
L
-
S
T
A
.
6
1
+
6
5
.
0
0
E
N
D
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
Y
8
-
S
T
A
.
1
4
+
0
4
.
3
2
B
E
G
I
N
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
Y
8
-
S
T
A
.
1
3
+
9
7
.
3
8
8.8’
13.4’
7
5
.6
1
’ TA
P
ER
+78.60
+10.17
-
L-
-
Y8-
N
A
D
8
3
/
9
5
N
A
D
8
3
/
9
5
N AD 83/ 95
NAD 83/ 95
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-MAR-2014 08:48R:\Roadway\Proj\R-2603_Rdy_psh_2I.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
EXACT LOCATIONS.REFER TO THE PAVEMENT MARKING PLANS FOR LOCATIONS OF CR SYMBOLS ARE APPROXMATE.NOTE:
2
I
PEBBLE ST. (-Y10-) INTERSECTION DETAIL NC 268 (-L-) ELKIN RD. /SEE SHEET 9 FOR PLAN VIEW SIDNEY AVE. (-Y9-) INTERSECTION DETAIL NC 268 (-L-) ELKIN RD. /SEE SHEET 9 FOR PLAN VIEWEXACT LOCATIONS.REFER TO THE PAVEMENT MARKING PLANS FOR LOCATIONS OF CR SYMBOLS ARE APPROXMATE.NOTE:
E
X
A
C
T
L
O
C
A
T
I
O
N
S
.
R
E
F
E
R
T
O
T
H
E
P
A
V
E
M
E
N
T
M
A
R
K
I
N
G
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
O
F
C
R
S
Y
M
B
O
L
S
A
R
E
A
P
P
R
O
X
M
A
T
E
.
N
O
T
E
:
-Y10- POT Sta. 10+00.00-L- POT Sta. 91+16.25 -Y10- POT Sta. 13+00.00=
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
F
L
I
N
T
H
I
L
L
R
D
.
(
-
Y
1
2
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
1
1
F
O
R
P
L
A
N
V
I
E
W
-
L
-
P
O
C
S
t
a
.
1
0
5
+
9
9
.
3
3
-
Y
1
2
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
-
D
R
I
V
E
3
-
-Y12-
-
L
-
A
A
R
O
N
C
A
L
L
R
D
.
(
-
Y
1
1
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
1
0
F
O
R
P
L
A
N
V
I
E
W
E
X
A
C
T
L
O
C
A
T
I
O
N
S
.
R
E
F
E
R
T
O
T
H
E
P
A
V
E
M
E
N
T
M
A
R
K
I
N
G
P
L
A
N
S
F
O
R
L
O
C
A
T
I
O
N
S
O
F
C
R
S
Y
M
B
O
L
S
A
R
E
A
P
P
R
O
X
M
A
T
E
.
N
O
T
E
:
-Y9- PT Sta. 13+07.25-Y9- POT Sta. 13+34.15 -Y9- PC Sta. 12+29.81 CAT-1 CAT-1 AT-1-Y9-CRCR10’10’11’11’35’R35’RTRANSITION50’AND 2’-6" C&G END 5’ CONC. SIDEWALK -Y9- STA. 10+76.66AND 2’-6" C&G BEGIN 5’ CONC. SI
D
E
W
A
L
K
-Y9- STA. 10+73.
1
3
+26.6610’10’4.5’8.9’(LT & RT)TAPER 95.19’1’-6" C&G2’-6" C&G 2’-6" C&G1’-6" C&G 14’14’12’12’F-F28.75’F-F28.75’21.5’F-F-L--Y10- POT Sta. 10+00.00-Y10-CRCRF-F28.75’F-F28.75’21.5’F-F 9.9’8.1’17’17’35’R35’R1’-6" C&G2’-6" C&G SIDEWALK PROP. 5’ CONC.2’-6" C&G1’-6" C&G 14’14’12’12’TAPER67.92’AND 2’-6" C&G END 5’ CONC. SIDEWALK -Y10- STA. 12+26.56AND 2’-6" C&G BEGIN 5’ CONC. SIDEWALK -Y10- STA. 12+24.41BEGIN 8"x18" CURB -L-STA. 91+50.76-L-
F-F
28.75’
F-F
40.75’
+00
C
A
T
-
1
-
L
-
P
R
OP
. 5
’
C
O
N
C
. S
ID
E
WA
LK
10
0
’
T
A
P
E
R
3
6
’
-Y11-
-
Y
1
1-
P
C
St
a.
1
0
+
2
9.
5
9
-
Y11-
P
T
S
ta
. 12
+
4
8
.3
5
C
R
C
R
-
Y
1
1
-
P
T
1
2
+
4
8
.
3
5
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
5
0
’
R
5
0
’
R
A
N
D
2
’
-
6
"
C
&
G
E
N
D
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
Y
1
1
-
S
T
A
.
1
3
+
0
2
.
2
3
A
N
D
2
’
-
6
"
C
&
G
B
E
G
I
N
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
Y
1
1
-
S
T
A
.
1
3
+
0
2
.
2
3
1
5
’
1
5
’
9
.
1
’
2
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
14’12’
1
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
14’12’
F-F
28.75’
F-F
28.75’21.5’
F-F
1
0
.
4
’
TAPER
53.89’
F-F
28.75’
F-F
40.75’
+00
10
0
’
T
A
P
E
R
C
R
6
.
7
5
’
+
6
2
.
7
9
6
.
7
5
’
+
3
8
.
4
1
F-F
28.75’
+25
EOP-F
24.75’
+00
12.75’
+93.35
EOT-F
2
7
’
R
5
0
’
R
5
0
’
R
2
’
R
2
’
R
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
P
R
O
P
.
5
’
C
O
N
C.
S
I
D
E
WA
L
K
4’ PS
10
0
’
T
A
P
E
R
10
0
’
T
A
P
E
R
C-F
51.50’
+60
L
16’
1 2’
12.75’
+64.49
1
0
’
1
0
’
2
5
’
R
4
8
.
6
4
+
8
0
.
8
4
A
N
D
2
’
-
6
"
C
&
G
E
N
D
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
L
-
S
T
A
.
1
0
5
+
2
8
.
2
6
A
N
D
2
’
-
6
"
C
&
G
E
N
D
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
-
L
-
S
T
A
.
1
0
5
+
8
1
.
9
6
4
’
P
S
4
’
P
S
C
O
N
C
.
I
S
L
A
N
D
P
R
O
.
M
O
N
O
.
+94.07
+99.77
-
L
-
5
0
’
R
NAD 83/ 95NAD
8
3
/
9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-MAR-2014 08:48R:\Roadway\Proj\R-2603_Rdy_psh_2J.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
2
J
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
VISTA LN. (-Y16-) INTERSECTION DETAIL NC 268 (-L-) ELKIN RD. /SEE SHEET 14 FOR PLAN VIEWBEAUMONT POPLAR ST. (-Y17-) INTERSECTION DETAIL NC 268 (-L-) ELKIN RD. /SEE SHEET 15 FOR PLAN VIEW
A
I
R
P
O
R
T
R
D
.
/
R
I
V
E
R
L
I
B
E
R
T
Y
G
R
O
V
E
C
H
U
R
C
H
R
D
.
(
-
Y
1
8
-
)
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
N
C
2
6
8
(
-
L
-
)
E
L
K
I
N
R
D
.
/
S
E
E
S
H
E
E
T
1
6
F
O
R
P
L
A
N
V
I
E
W
145
-
Y
1
6
-
P
T
S
t
a
.
1
4
+
6
2
.
4
8
145 -Y16-47.50’+90.39
12.75’
+93.35
6.75’+97.75 6.75’+93.35
EOT-FF-F
9.5’
10’10’27’R20’R 50’R 50’R2’R2’RCONC. ISLAND.PRO. MONO.
1
’
-
6
"
C
&
G
35.50 +02.44 46.82 +96.48
PS
4’
PS
4’
16’35.50 +9.02 +5.14+10.40 15’R 15’R4’ PS4’ PS+61.39+29.71 -L--Y16-165CAT-1 -Y17--L- STA 161+76 END SBG
12.75’
+33.24
13.16’+30.89 50’R50’R2’R 2’REOP-F24.75’+1812.75’+38.41 6.75’+33.246.75’+38.41
EOT-F
EOT-F F-F9.5’10’27’R20’RC
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
CONC. ISLAND.PRO. MONO.
+33.24
4’ PS
F-F
9.5’
35.50 +02.44 46.82 +36.37 100’ TAPER100’ TAPER 250’ T
A
P
E
R
8:1 TAPER 10’12.45’+43.13 +89.964’ PS+00.17+69.60 +02.05-L-
180
3
0
185
-
Y
1
8
-
P
T
S
t
a
.
3
0
+
2
3
.
4
4
-
Y
18
-
P
C
S
t
a
.
3
5
+
0
0
.
7
1 -
L
-
P
O
C
S
t
a
.
1
8
2
+
7
3
.
2
0
-
Y
1
8
-
P
O
T
S
t
a
.
3
0
+
6
9
.
3
1
=
C
A
T
-
1
A
T
-
1
-
L-
-Y18-
-Y18-
CAT-1
2
’
R
2
’
R
1’
R
1
’
R
5
0
’
R
5
0
’
R
5
0
’
R
5
0
’
R
6
.
7
5
’
+
3
8
.
4
1
6
.7
5
’
+
2
3
.3
0
12.75’
+24.20
EOT-F
14.00’
+23.30
E
O
P
-
F
3
6
.
7
5
’
+
6
5
12’
+24.20
EOP-F
24.75’
+23.30
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
2
’
-
9
"
C
&
G
1’
-
6
"
C
&
G
BEG. 2’-9" C&G
EOT-F
1
8
4
+
0
0
.
5
7
T
O
1
8
4
+
2
3
.
3
0
T
O
2
’
-
9
"
C
&
G
T
R
A
N
S
I
T
I
O
N
1
’
-
6
"
C
&
G
10
0
’ T
A
P
E
R
10
0
’
T
A
P
E
R
4
8
.
5
3
+
8
9
.
2
5
4
6
.
6
6
’
+
4
7
.
4
9
8
:
1
T
A
P
E
R
8:1 TAPER
16’
2
0
’
20’
+59.66
+87.84
E
O
P
-
F
5
0
’
R
E
O
P
-
F
12
.
7
5
’
+
8
0
.
7
6
3
6
.
7
5
’
+
6
1.
4
1
5
0
’
R
E
O
P
-
F
12
.
7
5
’
+
14
.
3
0
E
O
P
-
F
2
4
.
7
5
’
+
7
6
.
19
15
.
2
5
’
+
3
1.
6
7
NAD 83/ 95NAD 83/ 95
N
A
D
83/
95
N
A
D
83/
95
G
R
O
U
N
D
N
A
T
U
R
A
L
G
E
O
T
E
X
T
I
L
E
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
16-SEP-2014 16:04R:\Roadway\Proj\R-2603_Rdy_psh04.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 5
MATCH LINE -L- STA. 22+00
R
-
2
6
0
3
4
SEE SHEET NO. 18
MATCH LINE -Y1- STA. 20+00
03/13/2014 - R/W REVISIO N: ADDED 20’ DRIVE O N PARCEL 15. - M AE08/07/2013 - R/W REVISIO N: ADDED "DO NO T DISTURB" NO TE TO ATM O N PARCEL 18. - M AE PARCEL 135. - TLW09/16/2014 - R/W REVISIO N: REVISED CHANNELIZATIO N O N PARCELS 135 AND 137; REVISED TCE IN PARCELS 128 AND 137; ADDED A DRIVEW AY, REM O VED TCE AND ELIM INATED THE CLAIM O N PARCEL 136 AND CREATED PARCEL 18Z. - M AE09/02/2014 - R/W REVISIO N: CHANGED TCE TO PUE AND REVISED PDE O N PARCEL 15; REVISED PUE O N PARCELS 16 & 18; ADDED AUE O N PARCELS 19 & 136; REVISED PUE & TCE O N NO TES O N PARCEL 126. - M AE04/17/2014 - R/W REVISIO N: ADDED "DO NO T DISTURB" NO TE FO R THE VAULT O N PARCEL 19; REVISED SLO PE STAKES AND ADDED "TIE SS TO EX. CURB" AND "DO NO T DISTURB PARKING"8" PLASTIC8" VC8" VC8" VC8" VC8" VC8" V
C
8"
V
C
8
" V
C
8
"
V
C
D
IR
E
C
T
IO
N
8" VC
8" VC
8
"
V
C
8
"
V
C
8" STEEL
8" STEEL
DIRECTIO
N
B
M
2
N 5920’45" W
N
5
8
3
0
’
4
3
"
E
S 2521’50" E S 3259’00" WS 8124’32" E N 19 41’06" WS 7
0
1
8
’
5
4
"
W
S 19 41’06" E
S 8544’28" WN 04 18’20" WN 8332’42" E N 5506’15" EN 3453’45" WN 3453’45" WS 8450’23" WS 8450’23" WN 05 09’33" WS 8450’27" W
S 2601’38" E
S 4153’27" E
S 5608’08" E
S 4314’39" E
S 5228’58" E
S 3626’21" E
N 4315’16" W
N
4
5
4
0’3
1"
E
N
4
5
4
0’3
1"
E
N 17 14’19" W
S
7
4
5
4
’5
3
" W
N 18 53’50" W
S 3025’58"
W
N 18 53’50" W
N
84
51’13" W
99.84’
7
0
.
0
0
’
130.26’23.95’98.51’88.87’
1
6
0
.
0
0
’
103.40’
87.09’127.43’140.00’40.00’139.12’63.80’139.18’100.00’139.18’
33.06’
39.54’
59.00’
88.82’
86.11’
252.83’
135.96’
3
0
7.0
8’
17
4.9
6’
213.87’
6
.
1
6
’
17
4
.8
7
’
189.31’
198.70’
275.06’
162.71’
JC FAWTRACTOR INCJOHNSON OIL AND
E
L
L
A
G
R
E
N
E
B
R
O
W
N
J
A
M
E
S
B
R
O
W
N
DB 1025 PG 474DB 554 PG 451DB 866 PG 159
D
B
5
6
1
P
G
4
0
2
I
N
C
O
R
R
E
C
T
D
E
S
C
R
I
P
T
I
O
N
R/W MON
R
E
B
A
R
S
P
I
K
E
R
E
B
A
R
R
E
B
A
R
R
E
B
A
R
REBAR
REBAREIPEIP REBA
R
E
I
P
EASEMENT UTILITY PERMANENT PERMANENT DRAINAGE EASEMENT
20’
EXISTING R/W
EXISTING R/W
EXISTING R/
W
E
XIS
T
IN
G
R
/
W
EXISTING R/W
EXISTING R/W
EXISTING R/
W
EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/
W
EXISTING R/W
E
XIS
TI
N
G
R/
W
EXISTING R/W EXISTING R/WEXISTING R/W EXISTING R/W EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
100.00’
64.11’
100.00’
30’
1
5
2
0
127128
1
3
5
1
3
7
S
S
HW15" CMP 18" RCP 18" RCP24" CMPCBCB CB 15" RCP CB 15" RCP CB CB12" CMP 12" CMP 12" CMP15" CMP CB CB CB12" CMP CB CB15" RCP 18" RCP18" RCP
CB
18" C
MP
15" CMP
JU
N
C
T
IO
N
A
P
P
R
O
X
.
15"
C
MP
C
B30" C
MP
3
0"
C
M
P
3
0
" C
M
P
J
U
N
C
TI
O
N
A
P
P
R
O
X.
4
8
" C
MP
15
" C
MP
18" CMP
15" CMP
C
B
C
B
C
B
1
8
"
R
C
P
C
B
DIR APPROX.
15" CMP
C
B
18" CMP
18
"
R
C
P
C
B
15
"
C
M
P
C
B
C
B
C
B
C
B
1
5
"
C
M
P
CBMONR/WRCP12"MON R/W MONCONC MON R/W MON R/W MON CONC
C
M
P
1
8
"
CMP
24"
72"CHL&3SBW
L
TL
T
S
B
S
T
W/
L
T
S
C
O
N
C
C
O
N
C
B
S
T
B
S
T
7
2
"
C
H
L
W/
L
T
7
2
"
C
H
L72"CHL
C
O
N
C
B
S
T
S
72"CHL&3SBW
B
S
T
B
S
T
7
2
"C
H
L
&
3
S
B
W
7
2
"
C
H
L
&
3
S
B
W
7
2
"C
H
L
&
3
S
B
W
T
A
N
K
H
O
L
D
I
N
G
W
A
T
E
R
C
O
N
C
B
S
T
C
O
N
C
C
O
N
C
B
S
T
1
S
B
K
B
U
S
1
S
B
K
B
U
S
C
O
N
C
C
O
N
C
W
A
L
L
CONC
B
S
T
C
O
N
C
D
I
D
I
D
I
72"CHL&3SBW
7
2
"
C
H
L
&
3
S
B
W
D
I
C
O
N
C
WHITE ST 18" BST
B
S
T
B
S
T
1
S
B
K
B
U
S
CONC
LT
BST
N
C
2
6
8
E
LK
IN
R
D
B
S
T
S
NC 18 SECOND ST BSTRHOPES ST BST CONC CAPS VENTLTSBST BSTCONC1SBKBUS BST 1SBKBUSCONCBSTCONCCONCCAPSVENT LTLTBST
1
S
B
K
B
U
S
BST 1SBKBUSCONCBSTBST LT LT LTBSTBST 1SBKBUSCONCSS SR 1525 E WAUGH BSTSR 1525 W WAUGH BST BST BSTBSTBSTBSTBSTW/LT W/LTLTSLTS
B
S
T
B
S
T
B
S
T
BST
B
S
T
CONC CONC
C
O
N
C
C
O
N
C
C
O
N
C
CONCCONCCONCCONCCONC CONCCONCCONCLTLTW/LTBSTBST
W/
L
T
W
/
L
T
W
/
L
T
L
T
LT
7
2
"
C
H
L
&
3
S
B
W
CONC CBBST
C
O
N
C
C
O
N
C
CON
C
D
I
W/LTCONCCONC
C
O
N
C
C
O
N
C
4’x6’ BARREL
DI
ATM
C
B
D
I
D
I
C
B
D
I
C
B
C
B
DIDI
1SFBUS
1SBLKBUS 1SBKBUSCANCAN
72"CHL
4
8
"
B
L
K
W
A
L
L
7
2
"
C
H
L
&
3
S
B
W
O
N
3
6
"
B
L
K
W
A
L
L
1
S
M
B
U
S
1SMBUS
1
2
"
B
L
K
W
A
L
L
A
A
T
U
R
V
A
U
L
T
HH
E
O
I
TSTS
T
S
EOI
P
I
V
P
I
V
P
I
V
P
I
V
EOI
T
S
P
I
V
E
O
I
2"GALV 16"DI6"CI 16"DI 6"CI 2"GALV 4"PL4"PL4"PL 8"PVC8"PVC
8"P
VC
8
"
P
V
C
E
O
I
1
2
"
C
I
6"CI 6"CI12"DI 16"DI
8"CI
8
"
C
I
EOI
6"CI
4
"
P
L
6"PL
2"PL
2
"
P
L
1
2
"
C
I
8
"
C
I
6"P
L
6"PL
6"PL
6
"C
I
6"CI
8
"
C
I
P
I
V
2"PL
6"PL
2
V
A
U
L
T
S
12"CI
6"CI
12"DI
1
2
"
C
I
8
"
C
I
8"CI
L
A
D
D
F
U
R
N
I
T
U
R
E
I
N
C
D
B
5
9
9
P
G
5
2
1
1
9
NC 268 ELKIN RD BST
FLINT HILL RD BST
SR 2334
-
B
Y
2
-
3
8
-
B
Y
2
-
3
9
-
B
Y
1
-
3
5
-
B
L
-
1
0
H
O
L
D
I
N
G
S
L
L
C
J &
L
R
E
A
L
E
S
T
A
T
E
D
B
1
0
4
8
P
G
1
7
4
1
2
6
I
N
D
U
S
T
R
I
A
L
C
E
N
T
E
R
S
L
L
C
D
B
1
0
3
6
P
G
2
1
3
1
3
6
EDWARD GREENEDB 891 PG 219 DB 870 PG 79 124INVESTORS 4100D LLCDB 936 PG 244 FIRST STATES125
E
L
L
E
N
L
A
C
K
E
Y
G
A
R
Y
L
A
C
K
E
Y
D
B
6
0
2
P
G
5
4
9
1
8
C
A
R
L
B
Y
R
D
D
B
8
1
9
P
G
2
8
2
1
7
C
O
M
M
U
N
I
T
Y
O
N
E
B
A
N
K
D
B
9
5
2
P
G
3
9
9
1
6
CONRAD REEVESDB 827 PG 673 129CONNARD LLCDB 1104 PG 32 130131DB 930 PG 212 MAROLYN PENDRY DAVID PENDRY
M
A
C
K
B
R
O
W
N
W
I
L
L
A
B
R
O
W
N
D
B
8
0
7
P
G
2
7
8
1
3
1
8"
CM
P
C
H
A
R
L
E
S
B
.
B
U
S
H
J
R
.
D
B
1
1
2
8
P
G
3
5
2
1
7
6
EXISTING R/W
EXISTING R/W
K
A
J
A
N
L
L
C
N
O
D
E
E
D
R
E
F
E
R
E
N
C
E
P
B
9
P
G
4
0
7
1
4
ON 36"BLK WALL
72"CHL&3SBW
MON R/W
48.79’
+75.79
84.46’+39.06
51.20’
+12.86
50.10’+64.07
3
8
.9
3
’
+
2
5
.6
0
56.08’
+71.26
4
9
.
9
7
’
+
4
6
.
5
9
54.36’
+21.01
174.94’+09.76 100.43’+36.85 77.29’+58.4448.68’+05.57
C
H
R
I
S
T
O
P
H
E
R
R
O
B
E
R
T
S
T
I
M
B
E
R
L
I
R
O
B
E
R
T
S
D
B
8
6
8
P
G
3
8
5
D
U
N
C
A
N
E
L
E
C
T
R
I
C
C
O
D
B
5
3
6
P
G
2
6
I
N
C
O
M
P
L
E
T
E
D
E
S
C
R
I
P
T
I
O
N
J
O
H
N
M
C
N
E
I
L
D
O
N
N
A
M
C
N
E
I
L
D
B
7
7
1
P
G
4
2
5
MON R/W
1
8
Z
20
28’
2
4
’
20
25
25
P
I
S
t
a
2
5
+
8
9
.
0
2
DL
=
3
8
3
.
9
6
’
T
=
2
0
0
.
1
8
’
R
=
5
5
0
.
0
0
’
-
Y
1
A
-
20
-L- POT Sta. 10+00.00
-
Y
1
A
-
P
C
S
t
a
.
2
3
+
8
8
.
8
4
LC-F
LC-F
2
0
’
R
2
0
’
R
2
0
’
R
2
0
’
R
LC-F
29.50’29.50’
+50.11
40.50’
+50.11
4
.
7
5
’
R
2
’
R
F-F
15’
+94.78
F-F
15’
+96.47
0 4
0 2
0 3
0 1
0 4
0 0
04
02
02
-
Y
2
-
P
O
T
S
t
a
.
1
9
+
8
8
.
8
2
03
15
-
Y
2
-
P
I
S
t
a
1
6
+
7
5
.
4
7
DL
=
3
1
4
.
0
6
’
T
=
1
7
3
.
1
4
’
R
=
3
0
0
.
0
0
’
0 2
0 1
0 00 102
02
01
00
01
02
03
0
4
05
0
6
0
6
05
0
4
03
02
02
01
01
00
0 7
0 60 5
0 4
03
02
036
014
0 4
-L- POT 10+38.67 BEGIN T.I.P. PROJECT R-2603
-
Y
2
-
P
O
T
1
9
+
3
0
.
0
0
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
P
I
S
t
a
2
3
+
2
8
.
4
7
DL
=
1
,
5
7
7
.
9
8
’
T
=
9
3
8
.
1
8
’
R
=
1
,
1
6
0
.
5
7
’
-
Y
1
-
V
=
4
0
m
p
h
S
E
=
0
.
0
4
V
=
4
0
m
p
h
S
E
=
0
.
0
4
18.4’
18.3’
20’
20’
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G2’-6" C&G
2’-6" C&G
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
1’
-
6
"
C
&
G
2
’
-
9
"
C
&
G
2’-
6"
C
&
G
8
X
1
8
C
U
R
B
-L-
-
L
-
-Y2-
-Y1-
-
Y
1-
-
Y
1
A
-
CRCR
C
R
C
R
5’ CONC. SIDEWALK BEGIN 2’-6" C&G &-L- STA. 10+25.08 BEGIN 2’-6" C&G -L- STA. 10+48.97
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
E
N
D
2
’
-
6
"
C
&
G
&
-
Y
2
-
S
T
A
.
1
8
+
5
4
.
7
2
5
0
’
(
T
Y
P
.
)
+00
+853
5
’
(
T
Y
P
.
)
(
T
Y
P
.
)
2
5
’
(TYP.)20’
+35
5
0
’
(
T
YP
.
)
+06.13
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
P
R
O
P
.
5
’
C
O
N
C.
S
I
D
E
W
A
L
K
50’R15’R20’R50’R
S
E
=
S
E
E
P
L
A
N
S
V
=
S
T
O
P
C
O
N
D
I
T
I
O
N
2
5
’
R
2
5
’
R
C
R
C
R
C
R
C
R
C
R
C
R
C
R
C
R
48’
28’
4
0
’
4
0
’
3
6
’
3
6
’
2
2
’
2
2
’
2
2
’
2
2
’
50’
C
R
C
R
2
4
’
-
Y
2-
P
T
Sta. 1
8
+
1
6.3
9
8
X
1
8
C
U
R
B
8
X
18
C
U
R
B
P
R
O.
M
O
N
O. C
O
NC. ISL
A
N
D.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
1
0
0
’
T
A
P
E
R
+80
11’+00
20’
A A
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
5
,
1
0
0
3
,
9
6
0
9
,
0
0
0
7
,
0
0
0
5
,
8
0
0
4
,
5
2
0
1
3
,
2
0
0
1
0
,
2
7
0
5
0
0
3
6
0
1
0
0
1
0
0
5
0
0
3
6
0
7
0
0
5
6
0
8
,
6
0
0
6
,
6
7
0
8
,
5
0
0
6
,
6
4
0
1
0
0
1
0
0
5
0
0
4
3
0
5
0
0
4
3
0
8
0
0
7
3
0
8
0
0
7
3
0
N
C
2
6
8
-
Y
1
-
S
R
2
3
3
4
-
Y
2
-
A
A
-
L
-
N
C
2
6
8
2
0
3
5
A
D
T
2
0
1
5
A
D
T
2
2
,
9
0
0
1
9
,
1
9
0
1
1
,
1
0
0
8
,
6
7
0
2
2
,
8
0
0
1
8
,
9
4
0
NC 18
5
,
5
0
0
4
,
2
1
0
5
,
6
0
0
4
,
4
6
0
-L- POT Sta. 15+02.33
-Y2- PC Sta. 15+02.33=
-
Y
2
-
P
O
C
S
t
a
.
1
7
+
7
1
.
1
9
-
Y
1
-
P
O
C
S
t
a
.
2
4
+
5
2
.
7
5
=
-L- POT Sta. 20+19.69 (5.50’ LT)
-Y1A- PT Sta. 27+72.80=
-L- POT Sta. 14+65.00
-Y2- POT Sta. 14+65.00
-Y1- POC Sta. 21+58.06
-Y1A- POT Sta. 21+58.06 LA=
-L- POT Sta. 22+35.35
-Y1- PT Sta. 29+68.27=
-
Y
2
-
P
O
C
S
t
a
.
1
7
+
3
7
.
1
9
-
Y
1
A
-
P
O
C
S
t
a
.
2
4
+
4
8
.
5
8
=
S
I
G
N
A
L
U
P
G
R
A
D
E
E
X
I
S
T
I
N
G
-
Y
1
A-
-
Y1-
EX. CURB TIE SS TO PARKING DISTURB DO NOT
S
E
E
S
H
E
E
T
2
B
-
3
F
O
R
-
Y
1
-
/
-
Y
2
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
E
E
S
H
E
E
T
2
9
F
O
R
-
Y
1
A
-
&
-
Y
2
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
2
8
F
O
R
-
Y
1
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
1
F
O
R
-
L
-
P
R
O
F
I
L
E
8
X
1
8
C
U
R
B
2
8
’
13’R
C
U
R
B
8
X
1
8
0.5’
+40
4.5’
+70
C
U
R
B
8
X
1
8
SIDEWALK PROP. 5’ CONC.
2.5’
+91.5
0.5’
+21.5
C
U
R
B
8
X
1
8
2
’-6" C
&G
R
A
I
S
E
E
X
I
S
T
I
N
G
H
W
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
D
I
D
I
D
I
C
B
C
B
15" RCP-III
1
5
"
R
C
P
-
I
I
I
15"
R
C
P-III
15" RCP-III
1
5
"
R
C
P
-
I
I
I
15
" RC
P-III
15"
R
C
P-III
4
8
" RC
P-III
2
G
I
S
E
E
D
E
T
A
I
L
B
C
3
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
3:1
2:1
S
P
E
C
I
A
L
B
A
C
K
O
F
C
U
R
B
C
U
T
D
I
T
C
H
(
N
O
T
T
O
S
C
A
L
E
)
D
E
P
T
H
=
1
’
D
E
T
A
I
L
B
C
3
F
R
O
M
-
Y
1
-
S
T
A
.
2
2
+
4
0
T
O
S
T
A
.
2
4
+
0
0
R
T
18" R
C
P-III
18" RCP-III
1
8
"
R
C
P
-
I
I
I
15" RCP-III
2
4
"
R
C
P
-
I
I
I
30" RCP-III
30"
2
G
I
-III R
CP
15"
15" RC
P-III
1
5
"
R
C
P-
III
0
4
1
5
0
4
1
6
0
4
1
2
0
4
1
1
0
4
1
0
0
4
0
9
0
4
0
8
0
4
0
7
0
4
2
7
0
4
0
5
0
4
0
6
0
4
2
4
0
4
0
4
0
4
0
3
0
4
2
3
0
4
0
2
0
4
0
1
0
4
2
5
0
4
2
0
0
4
2
1
0
4
2
2
0
4
1
9
0
4
2
6
15"
1
5
"
R
C
P
-
I
I
I
C
B
0
4
1
7
3
0
"
R
C
P
-
I
I
I
w
/
M
H
J
B
R
C
P
-
I
I
I
3
6
"
2
G
I
w
/
M
H
J
B
1
5
"
0
4
2
8
T
O
E
X
.
R
C
B
C
T
I
E
2
4
"
R
C
P
-
I
I
I
30"
C
B
0
4
2
9
R
E
T
A
I
N
R
E
T
A
I
N
RE
MO
VER
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
S
E
E
D
E
T
A
I
L
P
R
1
P
L
A
C
E
O
N
B
A
N
K
S
O
N
L
Y
C
L
A
S
S
’
I
’
R
I
P
R
A
P
d
(
N
o
t
t
o
S
c
a
l
e
)
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
V
A
R
I
A
B
L
E
P
I
P
E
O
U
T
L
E
T
R
I
P
R
A
P
D
E
T
A
I
L
P
R
1
MI
N. 2:1
M
IN
. 2:1
C
H
A
N
N
E
L
B
A
N
K
T
I
E
T
O
E
X
I
S
T
I
N
G
E
S
T
.
2
6
T
O
N
S
&
5
0
S
Y
G
E
O
T
E
X
T
I
L
E
L
I
N
E
R
T
Y
P
E
-
C
L
A
S
S
’
I
’
R
I
P
R
A
P
d
=
3
F
t
.
L
E
N
G
T
H
=
1
8
F
T
.
-
Y
2
-
S
T
A
.
1
9
+
3
0
L
T
C
h
a
n
n
e
l
B
e
d
0
4
1
8
R
E
M
O
V
E
P
L
U
G
1
8
"
@
R
/
W
R
E
M
O
V
E
8
4
’
O
F
E
X
.
1
8
"
7
0
’
+
4
5
8
6
’
+
5
0
8
5
’
+
0
0
70’+5056’+04.03 64’+80.3870’+10
6
4
’
5
7
’
+
3
5
S
I
G
N
D
I
S
T
U
R
B
D
O
N
O
T
6
1
’
-
Y
2
-
+
2
6
7
6
’
-
Y
2
-
+
4
3
6
8
.
5
’
-
Y
2
-
+
5
3
.
3
3
4
4
.
3
0
’
-
Y
1
A
-
+
0
0
.
9
6
5
1
.
2
9
’
+
9
6
.
0
5
-
Y
1
A
-
7
9
.
8
1
’
-
Y
1
A
-
+
7
3
.
6
2
6
7
.
6
0
’
-
Y
1
A
-
+
5
7
.
7
7
4
5
.
6
6
’
+
7
4
.
6
8
-
Y
1
A
-
2
8
.
1
5
’
+
4
0
-
Y
2
-
3
5
’
+
3
0
-
Y
2
-
5
6
’
+
3
4
.
0
4
-
Y
1
-
8
0
’
+
6
0
-
Y
1
-
1
0
0
’
+
6
0
-
Y
1
-
5
5
’
+
7
2
.
6
1
-
Y
2
-
8
9
’
+
3
0
-
Y
2
-
6
1
’
+
6
1
-
Y
2
-
3
1
.
7
6
’
+
3
5
-
Y
2
-
4
8
’
+
9
1
.
5
2
-
Y
2
-
6
5
’
+
3
2
-
Y
1
-
7
2
’
+
0
5
5
2
.
3
2
’
Y
2
+
3
9
4
9
.
5
6
+
9
3
.
6
3
-
Y
1
A
-
5
0
.
0
8
’
+
6
5
-
Y
1
A
-
8
9
.
0
8
’
+
8
8
-
Y
1
A
-
4
7
.
0
8
’
+
5
4
-
Y
1
A
-
2
9
.
7
0
’
+
7
1
.
2
6
-
Y
2
-
4
7
’
+
7
0
.
3
2
-
Y
2
-
D
I
S
T
U
R
B
D
O
N
O
T
5
4
.
2
7
’
-
Y
1
-
+
1
7
.
9
2
D
I
S
T
U
R
B
D
O
N
O
T
95’+59.80
5
8
’
+
3
0
5
7
’
+
5
5
4
8
.
7
7
’
+
0
5
6
4
’
+
0
5
2
0
0
.
4
0
’
+
5
6
.
2
9
2
1
4
.
1
5
’
+
8
2
.
9
4
6
1
.
9
9
’
+
1
4
.
2
3
-
Y
1
-
8
0
’
+
0
0
-
Y
1
-
8
0
’
-
Y
1
-
+
1
6
8
0
’
-
Y
1
-
+
0
0
7
0
.
6
2
’
-
Y
1
-
+
0
0
6
4
’
+
2
6
.
6
8
6
4
’
+
6
0
.
4
4
6
4
’
4
9
.
6
3
’
+
1
0
6
6
’
+
6
8
-
Y
1
A
-
6
3
’
+
7
6
.
3
6
-
Y
1
-
3
0
.
4
0
’
+
7
5
-
Y
2
-
4
3
.
1
5
’
+
5
0
-
Y
1
-
N
O
C
L
A
I
M
5
6
’
5
1
.
2
4
’
+
0
4
.
0
3
5
5
.
2
4
’
+
3
5
-
Y
2
-
5
6
.
6
3
’
+
8
9
.
7
5
-
Y
2
-
&
7
5
’
5
1
.
1
7
’
+
2
0
-
L
-
8
8
.
8
5
’
+
3
1
-
L
-
C
F
F
FC
F
F
F
F
F
F
F
C
F
C
C
F
F
F
F
F
F
F F
F
F
F
F
F
F
F
F
C
N
A
D
8
3
/ 9
5
G
R
O
U
N
D
N
A
T
U
R
A
L
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:44R:\Roadway\Proj\R-2603_Rdy_psh05.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 6
MATCH LINE -L- STA. 36+00
SEE SHEET NO. 4MATCH LINE -L- STA. 22+00
R
-
2
6
0
3
5
10/14/2014 - R/W REVISIO N: W IDENED 24’ DRIVE TO A 36’ DRIVE O N PARCEL 26. - M AE09/10/2014 - R/W REVISIO N: PRO PERTY O W NER NAM E REVISED O N PARCEL 23. - M AE& -L- 32+45 RT O N PARCELS 26 & 29. - M AE09/02/2014 - R/W REVISIO N: REVISED TCE O N PARCEL 25; ADDED AUE O N PARCELS 25 & 27; ADDED PUE O N PARCEL 26; ELIM INATED TCE O N PARCEL 27; REVISED TCE BETW EEN -L- 31+20 RT 8" VC
U
N
A
B
L
E
T
O
IN
V
E
R
T
M
H
P
A
V
E
D
O
V
E
R
8" VC
8
"
V
C
8
"
V
C
8
"
V
C
S
6
5
4
8
’
5
9
"
W
N
7
0
0
1
’
1
0
"
E
N 1958’50" WN 19 58’50" W
N 2402’19" W
N 19 18’17" W
N
7
0
4
2
’
2
0
"
E
N 8451’13" WN 8451’13" W
S
6
5
3
3
’
5
6
"
W
S
6
5
3
3
’
5
6
"
W
N 18 53’50" W
N 18 53’50" W
N 18 52’09" W
S
6
6
14
’
4
3
"
W
S 19 34’26" E
N 19 17’40" W
N 19 29’40" W
3
5
0
.
7
4
’
1
5
0
.
0
0
’
169.33’300.67’
590.00’
1
4
0
.
5
9
’
169.78’
168.93’
328.48’38.04’
2
16
.
0
9
’
19
8
.
5
6
’
418.53’
416.67’
400.26’
2
5
7
.
9
1’
381.92’
P
E
G
G
Y
D
A
Y
F
R
A
N
K
D
A
Y
S
U
N
C
R
E
S
T
A
S
S
O
C
I
A
T
E
S
L
L
C
O
P
A
L
H
A
M
B
Y
B
O
B
B
Y
H
A
M
B
Y
G
A
I
L
H
A
M
B
Y
J
O
E
H
A
M
B
Y
JOHN
S
O
N
O
I
L
A
N
D
T
R
A
C
T
O
R
I
N
C
N
A
N
C
Y
K
I
N
G
T
E
X
T
I
L
E
S
I
N
C
P
A
T
D
A
Y
J
A
M
E
S
D
A
Y
6
0
0
E
L
K
I
N
H
I
G
H
W
A
Y
L
L
C
FORESTER RENTALSLADD FURNITURE INC
D
B
1
0
8
4
P
G
2
D
B
1
0
3
2
P
G
2
4
2
D
B
9
9
6
P
G
1
8
1
D
B
5
2
0
P
G
4
9
7
D
B
5
5
1
P
G
1
1
0
2
D
B
1
0
8
4
P
G
3
D
B
3
9
0
P
G
6
0
D
B
1
0
5
0
P
G
2
4
2
D
B
9
3
2
P
G
7
6
NO DEED REFERENCEDB 599 PG 521REBAR
E
I
P
E
I
P
SPIKE EIP
R
E
B
A
R
R
E
B
A
R
S
P
I
K
E
353.99’
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
68’ DUKE POWER EASEMENTEXISTING R/W EXISTING R/W EXISTING R/W
EXISTING R/W
EXISTING R/W
D
B
9
6
4
P
G
4
8
D
B
1
1
1
0
P
G
2
8
9
68’68’ DUKE POWER EASEMENT 1921
2
2
2
3
2
4
2
5
2
6
2
7
2
8
2
9
S
CBCB24" CMP
C
B
24" CMP C
B
1
8
"
C
M
P
18" CMP
C
B
C
B
1
8
"
C
M
P
18" CMP CB
15" CMP
15" CMPCB15" CMPCB
C
B
1
8
"
C
M
P
18" CMP 15" CMPC
B
C
B
15" RCP
CMP24"
RCP18"
M
O
N
C
O
N
C
MON CON
C
B
S
T
72"CHL&3SBW
B
S
T
B
S
T
G
R
S
W
/
L
T
W
/
L
T
S
W
/
L
T
W
/
L
T
W
/
L
T
S
B
S
T
GR
G
R
B
S
T
B
S
T
L
T
P
O
L
E
F
L
A
G
4" BST CURB
4
"
B
S
T
C
U
R
B
4
"
B
S
T
C
U
R
B
4" BST CURB
4
"
B
S
T
C
U
R
B
B
S
T
4" BST CURB
L
T
TEMPLE ST BST
W
/
L
T
BST
1
S
B
K
B
U
S
S
S
BST
B
S
T
72"CHL&3SBWBSTW/L
T
G
R
G
1
S
B
L
K
B
U
S
G
R
BST BSTSSCHOOL BUS DR BSTBST72"CHL&3SBWBSTBST
W
/
L
T
N
C
2
6
8
E
L
K
I
N
R
D
B
S
T
4
"
B
S
T
C
U
R
B
B
S
T
B
S
T
B
S
T
B
S
T
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
CONCCONC CONCCONC
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
4" BST CURB
D
I
D
I
1
S
B
L
K
B
U
S
1
S
F
B
U
S
1
S
B
L
K
B
U
S
2
S
B
L
K
B
U
S
S
2
3
2
s
1
S
M
B
U
S
1
S
M
B
U
S
72"CHL&3SBW
T
VAULT
T
E
O
I
T
S
TS6"PL 8"CI 6"CI2"GALV
8
"
C
I
6
"
P
L
6"PL
4"PL
8"CI
8
"
C
I
SIZE
UNKNOWN
-
B
L
-
G
P
S
R
2
6
0
3
-
1
-BL-11
-
B
L
-
1
2
&3SBW72"CHL
CM
P
18
"
49.18’
+89.13
49.60’
+37.98
49.19’
+70.00
49.45’
+87.54
49.08’
+69.73
3
0
C
A
L
L
J
R
S
A
N
F
O
R
D
L
I
N
D
A
C
A
L
L
D
B
6
5
0
P
G
6
8
1
1
8
"
C
M
P
H
O
W
E
L
L
&
S
O
N
S
I
N
V
E
S
T
M
E
N
T
S
,
L
L
C
25
30
35
20’-Y3- POT Sta. 10+00.00-L- POT
S
t
a
.
2
3
+
5
7
.
7
8
-Y3- POT
S
t
a
.
1
1
+
0
0
.
0
0
=
-
Y
4
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
L
-
P
O
T
S
t
a
.
2
7
+
6
6
.
2
7
-
Y
4
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
=
F-F24.75’F-F59’ F-F
59’ F-F
4.13’R 20’R20’R
02 02
02 020 302 020 1
0
1
3
0
2
8
0
2
0
1
-Y3- POT 10+06.00 BEGIN CONSTRUCTION
-
Y
4
-
P
O
T
1
0
+
0
0
.
0
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
2’-6" C&G2’-6" C&G
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
C
A
T
-
1
8
X
1
8
C
U
R
B
8
X
1
8
C
U
R
B
8
X
1
8
C
U
R
B
-
L
-
-Y1A--Y1--Y3-
-
Y
4
-
50’ (TYP.)+53.0250’ (TYP.)+68.69 PROP. 5’ CONC. SIDEWALK
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
P
I
S
t
a
2
3
+
2
8
.
4
7
DL
=
1
,
5
7
7
.
9
8
’
T
=
9
3
8
.
1
8
’
R
=
1
,
1
6
0
.
5
7
’
-
Y
1
-
V
=
4
0
m
p
h
S
E
=
0
.
0
4
2
0
’
R
A
T
-
1
0110090100010001+30 +10(TYP.)25’
0
0
0
1
0
2
0
1
+
0
6
(TYP.)
20’
+
7
0
36’22’22’
3
0
’
3
6
’
3
6
’
2
6
’
3
2
’
3
0
’
3
0
’
26’F-F8.25’A A2035 ADT 2015 ADT 26,400 20,54026,200 20,410-L- NC 268 -Y3- SCHOOL BUS DRIVE300230100100400330
A
A
2
0
3
5
A
D
T
2
0
1
5
A
D
T
2
6
,
2
0
0
2
0
,
4
1
0
2
5
,
8
0
0
2
0
,
0
1
0
-
L
-
N
C
2
6
8
-
Y
4
-
T
E
M
P
L
E
S
T
.
8
0
0
6
6
0
6
0
0
5
3
0
2
0
0
1
3
0
-Y1A POT Sta. 3
2
+
5
3
.
1
1
(
5
.
5
0
’
L
T
)
L
B
-Y1- POT Sta. 3
2
+
3
2
.
9
1
L
B
-L- POT Sta. 2
5
+
0
0
.
0
0
=
-L- POT Sta. 22+35.35-Y1- PT Sta. 29+68.27=
S
E
E
S
H
E
E
T
2
B
-
3
F
O
R
-
Y
3
-
&
-
Y
4
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
S
E
E
S
H
E
E
T
3
0
F
O
R
-
Y
4
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
9
F
O
R
-
Y
3
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
1
F
O
R
-
L
-
P
R
O
F
I
L
E
3
6
’
1
0
’
R
C
B
C
B
C
BC
B
2
G
I
2
G
I
C
B
2GI
C
B
3GICBCBCBCBCBCB2GI
2
G
I
2
G
I
D
W
Y
.
D
I
S
E
E
D
E
T
A
I
L
B
C
1
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
S
E
E
D
E
T
A
I
L
B
C
1
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
3:1
2:1
S
P
E
C
I
A
L
B
A
C
K
O
F
C
U
R
B
C
U
T
D
I
T
C
H
(
N
O
T
T
O
S
C
A
L
E
)
F
R
O
M
-
L
-
S
T
A
.
2
8
+
0
0
T
O
S
T
A
.
2
8
+
7
5
L
T
F
R
O
M
-
L
-
S
T
A
.
2
9
+
2
0
T
O
S
T
A
.
3
0
+
7
5
L
T
F
R
O
M
-
L
-
S
T
A
.
3
4
+
0
0
T
O
S
T
A
.
3
6
+
9
5
L
T
D
E
P
T
H
=
1
’
D
E
T
A
I
L
B
C
1
2
G
I
15" RCP-III 30" RCP-III30"30" RCP-III 15"15" RCP-III 24" RCP-III15"15" RCP-III
1
8
"
R
C
P
-
I
I
I
1
8"
15"
12
"
15" RCP-III
15
" RC
P-III
1
5
"
R
C
P
-
I
I
I
15" RCP-III 24"
2
4
"
R
C
P
-
I
I
I
24"CBCB 30" RCP-III
0
5
2
4
0
5
2
5
0
5
2
3
0
5
2
1
0
5
2
2
0
5
1
3
0
5
1
5
0
5
1
6
0
5
1
4
0
5
1
2
0511
0
5
1
0
050905080507 05060505050405020503
0
5
2
0
0501 0519
15"
D
I
D
I
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
2
G
I
C
B 15"
0
5
1
8
15" RCP-III 30"0416
1
5
"
R
C
P
-
I
I
I
0
5
2
6
0
5
2
7
RE
T
A
I
N
R
E
T
A
I
N
R
E
T
A
I
N
R
E
T
A
I
N
REMOVEREMOVE
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
O
F
E
X
I
S
T
I
N
G
C
M
P
R
E
M
O
V
E
2
0
’
(
+
/
-
)
2
G
I
2GI
1
8
"
R
C
P
-
I
I
I
E
X
I
S
I
T
I
N
G
1
5
"
C
M
P
R
E
M
O
V
E
1
8
’
(
+
/
-
)
49.72’+16
5
8
’
+
3
5
7
7
’
+
5
0
7
2
’
+
0
0
9
2
’
+
4
5
5
1
’
+
8
0
51’+2650
’
+96
5
5
’
+
8
9
55’+1050.98’+65
6
5
’
4
9
.
0
5
’
+
2
0
6
6
’
5
8
’
4
9
.
2
1
’
+
8
0
66’60’ 49.21’+50 49.47’+95
6
2
’
+
1
0
7
0
’
+
5
0
5
8
’
+
2
0
23.31’+10 -Y3-4.12’+00 -Y3-7.91’+00 -Y3-28.80’+00 -Y3-
3
0
.
5
3
’
+
1
5
-
Y
4
-
2
6
.
2
1
’
+
0
8
-
Y
4
-
6
4
’
4
9
.
1
0
’
+
3
0
6
4
’
4
8
.
9
7
’
+
6
4
6
5
’
5
5
’
4
9
.
0
3
’
+
5
0
6
0
’
+
6
0
8
0
’
6
0
’
4
9
.
4
8
’
+
5
0
8
0
’
4
9
.
4
8
’
+
0
0
8
0
’
4
9
.
4
7
+
2
0
1
2
8
’
+
4
0
1
3
6
’
+
7
0
4
9
.
1
7
’
+
9
3
4
9
.
1
8
’
+
6
2
7
2
.
2
3
’
+
5
5
.
5
7
64’49.82’+1022.59’+35 -Y3-49.78’ +95
2
6
.
4
9
’
+
3
5
-
Y
4
-
4
9
.
9
2
’
+
2
5
3
0
.
0
9
’
+
3
5
-
Y
4
-
4
9
.
2
0
’
+
1
0
F
C
C
F
C
C
C
C
F
C
C
C
F
F
CFFC
F
C
F
F
F
FC
C
F
C
F
C
C
F
F
F
F
FFFFF
F
F
F
N
A
D
8
3
/
9
5
G
R
O
U
N
D
N
A
T
U
R
A
L
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:45R:\Roadway\Proj\R-2603_Rdy_psh06.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 7
MATCH LINE -L- STA. 50+00
SEE SHEET NO. 5MATCH LINE -L- STA. 36+00
R
-
2
6
0
3
6
REVISIO NS10/14/2014 - R/W REVISIO N: ADDED 24’ DRIVEW AY O N PARCEL 38. - M AE09/02/2014 - R/W REVISIO N: ADDED PUE O N PARCEL 31; ADDED PUE AND REVISED TCE O N PARCEL 35. - M AE06/06/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 31. - M AE03/13/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 34. - M AE8" VC8" VC8" VC8" V
C
8" VC
8
"
V
C
8
"
V
C
8
"
VC
8" VC
8
"
V
C
8
"
V
C
8
"
V
C
8" VC
8" VC
B
M
3
S 6549’34" W
N
6
6
0
0
’
0
0
"
E
N 7042’20" E S 2337’40" E
N 2353’57" W
S 19 34’26" ES 65
5
5
’
3
4
"
W
S
6
5
5
5
’
3
4
"
W
S 19 34’26" E
N
6
5
5
5
’
3
4
"
E
S 19 34’26" E
N 19 34’26" W
S
6
6
0
8
’
0
0
"
W
S 19 37’23" E S
7
0
3
4
’
3
4
"
W
S 2136’28" E
N 8
6
0
1’10
" E
N 19 37’47" WN 19 37’47" W
S
6
5
5
4
’
4
5
"
W
S
8
4
4
5
’2
7
" W
S 19 40’29" E
301.39’
5
0
.
0
8
’
100.00’
522.82’
330.04’3
0
1.
16
’
15
0
.
0
0
’
306.23’
13
2
.
4
1’
295.35’
285.76’
9
3
.
3
7
’
128.77’
4
9
.
9
2
’
330.82’
6
.
7
2
’
2
0
9
.19
’
150.26’
124.77’
116
.
8
2
’
6
0
.3
6
’
280.93’
H
O
O
V
E
R
H
A
Y
E
S
D
O
N
H
A
Y
E
S
D
A
N
N
Y
P
E
N
D
R
Y
S
U
N
C
R
E
S
T
A
S
S
O
C
I
A
T
E
S
L
L
C
T
R
J
O
H
N
S
O
N
C
R
J
O
H
N
S
O
N
CHEEKS
W
A
T
E
R
W
O
R
K
S
I
N
C
LINDA CALL SANFORD CALL JR
S
A
M
A
R
I
T
A
N
’
S
P
U
R
S
E
D
B
6
3
7
P
G
5
9
7
N
O
D
E
E
D
R
E
F
E
R
E
N
C
E
P
B
2
P
G
3
0
D
B
8
5
7
P
G
5
1
6
N
O
D
E
E
D
R
E
F
E
R
E
N
C
E
P
B
2
P
G
3
0
D
B
8
2
9
P
G
9
9
DB 650 PG 681
D
B
1
0
1
7
P
G
4
8
REBAR
R
E
B
A
R
REBAR
R
E
B
A
R
R
E
B
A
R
A
X
L
E
E
I
P
R
E
B
A
R
REBAREXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
EXISTING R/W
EXISTING R/WEXISTING R/W60.00’
100.00’
NORTH WILKESBORO CITY LIM ITS
20’ PRIVATE EASEMENT
30
3
1
3
2
3
3
3
4
3
5
3
6
3
7
3
8
3
0
"
CM
P
24" CMP
30" CMP
15" CMP
C
B
C
B
48" CMP CB DI 24" RCP42" CM P DI
C
B
C
B
C
B
C
B
1
5
"
C
M
P
C
B
C
B
C
B
30" CMP
24" CMP
18
" C
M
P
1
8
"
C
M
P
96" CMP
1
8
"
C
M
P
C
B
C
B
12" C
MP
L
O
C
.
O
F
C
U
L
V
U
N
A
B
L
E
T
O
O
B
T
A
I
N
C
B
C
B
CMP
15"
CMP84"CM
P
15"
1 BARREL5’X6’
CMP18"
B
S
T
C
O
N
C
W
/
L
T
S
F
L
A
G
P
O
L
E
C
O
N
C
S
B
S
T
SHAVERST DR BST
H
O
U
S
E
B
K
P
U
M
P
CONC
B
S
T
W
/
L
T
1
S
B
K
B
U
S
B
S
T
BST
B
S
T
F
O
U
N
D
C
O
N
C
B
S
T
B
S
T
C
O
N
C
B
S
T
BST
B
S
T
L
T
L
T
L
T
LTLT
9
6
"
C
H
L
96"CHL 96"CHL
96"CHL
L
T
L
T
S
C
O
N
C
GR
L
T
LTLTLT
L
T
W/LT CONC LT
C
O
N
C
BST
B
S
T
WHITE PINE ST BSTSSW/LTSBSTBST BST
B
S
T
W/LTW/LT S CONCCONC
C
O
N
C
C
O
N
C
S
CONC
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
C
O
N
C
18" CMPDI
D
I
D
I
1
S
B
L
K
B
U
S
1
S
B
L
K
B
U
S
1
S
B
L
K
B
U
S
1SBLKBUS1SBLKBUS
C
A
N
C
A
N
S
EOI
PIV
V
A
U
L
T
W W
P
I
V
8"CI8"CI 8"CI6"PL2"PL
8
"
C
I
8
"
C
I
8"CI
6"CI
6"CI
8
"
C
I
8
"
C
I
6
"
C
I
4"DI
8
"
A
C
UNKNOWNSIZE
E
O
I
M
E
T
E
R
M
A
S
T
E
R
3
9
D
B
8
7
2
P
G
4
0
3L
E
S
S
I
E
B
R
O
W
N
J
A
M
E
S
B
R
O
W
N
D
B
3
3
7
P
G
1
2
4
4
0
N
C
2
6
8
E
L
K
I
N
R
D
B
S
T
NC 268 ELKIN RD BST
-
B
Y
3
-
4
1
-
B
Y
4
-
4
5
-
B
L
-
G
P
S
R
2
6
0
3
-
2
-
B
L
-
1
3
C
MP
3
0
"
50.06’+37.57
50.10’
+87.34
45.37’
+97.32
49.65’
+62.07
49.97’
+25.07
R
I
T
E
S
H
K
U
M
A
R
D
.
P
A
R
E
L
D
B
1
1
1
3
P
G
5
2
C
B
C
B
W
O
R
K
S
H
O
P
I
N
C
V
O
C
A
T
I
O
N
A
L
WIL
K
E
S
C
O
U
N
T
Y
DB 551 PG 1102 DB 390 PG 60 27TEXTILES INC NANCY KING18" CMP CB DI
1
8
"
C
M
P
1
5
"
C
M
P
1
5
"
C
M
P
15" C
MP
-
B
Y
3
-
4
0
S
A
M
A
R
I
T
A
N
’
S
P
U
R
S
E
D
B
1
1
8
4
P
G
4
3
3
40
45
50
2
7
’
-L- POT Sta. 37+37.1
8
-Y5- POT Sta. 11+00.0
0
=
-Y5- POT Sta. 10+00.00
-
L
-
P
O
T
S
t
a
.
4
7
+
9
6
.
0
7
-
Y
6
-
P
O
T
S
t
a
.
1
2
+
0
0
.
0
0
=
3
7
’
50
59’ F-F
59’ F-F
2
5
’
R
2
5
’
R
2
5
’
R
2
5
’
R
02 02
02 02 032008 -Y5- POT 10+00.00 BEGIN CONSTRUCTION2’-6" C&G2’-6" C&G
2
’
-
6
"
C
&
G
2
’
-
6
"
C
&
G
8X18 CURB
8
X
1
8
C
U
R
B
8
X
1
8
C
U
R
B
8X18 CURB
8
X
1
8
C
U
R
B
-
L
-
-Y5-
-
Y
6
-
C
R
C
R
+14.75
PROP. 5’ CONC. SIDEWALK
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
030102020 2+60 +06
-
Y
6
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
Y
6
-
P
O
T
1
0
+
5
0
.
0
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
0
1
9
0
1
60
1
0
2
+
5
5
+
1
5
(TYP.)25’
0
0
0
1
0
2
30’36’36’
3
4
’
3
6
’
4
2
’
2
2
’
3
0
’
2
4
’
25’
8
X
1
8
C
U
R
B
P
O
T
St
a.
1
1
+
6
1.
9
8
-
D
R
I
V
E
2
-
P
T
St
a.
1
0
+
9
8.
3
3
-
D
R
I
V
E
2
-
P
C
St
a.
1
0
+
5
9.
5
9
-
D
R
I
V
E
2
-
CRCRCR
C
R
C
R
C
R
2
’
-
6
"
C
&
G
C
R
C
R
A A2035 ADT 2015 ADT25,100 19,310-L- NC 268 300 230 -Y5- WHITE PINE ST.25,800 20,010 1,300 1,1601,000 930
A
A
2035 ADT 2015 ADT
2
4
,
6
0
0
1
8
,
8
1
0
-
L
-
N
C
2
6
8
-Y
6
-
S
H
A
V
E
R
S
T
.
8
0
0
7
3
0
3
0
0
2
3
0
25,100 19,310
1
,
1
0
0
9
6
0
S
E
E
S
H
E
E
T
2
B
-
4
F
O
R
-
Y
5
-
&
-
Y
6
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
S
E
E
S
H
E
E
T
3
0
F
O
R
-
Y
5
-
&
-
Y
6
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
2
2
F
O
R
-
L
-
P
R
O
F
I
L
E
2
4
’
B
D
O
C
B
C
B
2
G
I
C
B
C
B
CB CB
2
G
I
2
G
I
C
B
C
B
C
B
2
G
I
2
G
I
C
B
C
B
JB w/MH CB CB 3GI
C
B
2
G
I
C
B
C
B
S
E
E
D
E
T
A
I
L
B
C
1
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
SEE DETAIL BC1 CURB CUT DITCH SPECIAL BACK OF
3:1
2:1
S
P
E
C
I
A
L
B
A
C
K
O
F
C
U
R
B
C
U
T
D
I
T
C
H
(
N
O
T
T
O
S
C
A
L
E
)
F
R
O
M
-
L
-
S
T
A
.
3
4
+
0
0
T
O
S
T
A
.
3
6
+
9
5
L
T
F
R
O
M
-
L
-
S
T
A
.
4
4
+
0
0
T
O
S
T
A
.
4
7
+
2
5
L
T
D
E
P
T
H
=
1
’
D
E
T
A
I
L
B
C
1
JB
w
/
M
H
SP
E
C
I
A
L
Co
n
v
.
D
I
T
O
H
W
2
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
8
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
3
G
I
2GI24" RCP-III24" RCP-III 15"48" RCP-III48" RCP-III
15"
15" RCP-III
1
5
"
R
C
P
-
I
I
I
15"
1
5
"
15"
15"15" RCP-III 15"
15"
1
5
"
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
1
8"
0
6
3
5
0
6
3
6
0
6
3
7
0
6
4
0
0
6
4
2
0
6
4
1
0
6
3
1
0
6
3
2
0
6
2
9
0
6
3
0
0
6
2
8
0
6
2
7
0
6
2
6
0
6
2
5
0
6
1
6
0
6
2
3
0
6
2
2
0
6
2
1
0
6
2
0
0
6
1
5
0
6
1
9
0
6
1
2
0
6
1
3
0
6
1
4
0606 0605 06040607060806020601
B
D
O
0
6
3
8
30"
15"
15"
3
0
" RC
P-
III
30" RCP-III
-
L
-
S
T
A
4
9
+
0
7
t
o
5
0
+
0
0
-
L
-
S
T
A
4
8
+
4
0
t
o
4
8
+
8
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
C
B
0
6
2
4
15
"
RC
P
-
I
I
I
0
6
3
9
0
6
4
3
060348" RCP-III 48" RCP-IIIRCP-III 48"
T
B
D
I
C
B
C
B
0
6
1
7
0
6
1
8
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
T
A
I
N
R
E
M
O
V
E
R
E
T
A
I
N
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
1
8
"
18
" RC
P-
III
HW
E
X
I
S
T
.
RA
I
S
E
&
1
2
"
R
C
P
R
E
M
O
V
E
D
I
1
5
"
R
C
P
-
I
I
I
30"
w
/
M
H
J
B
R
E
M
O
V
E
R
E
M
O
V
E
RETAIN RETAIN
RE
T
A
I
N
R
E
M
O
V
E
REMOVE REMOVE REMOVE EXISTING DI & PIPE (PIPE OULET UNKNOW
N
)
R
E
M
O
V
E
84" CMP48" CMP DI
D
I
D
I
1
5
"
R
C
P
-
I
I
I
3
0
"
R
C
P
-
I
I
I
R
C
P-III
3
0
"
REMOVE
O
F
E
X
.
3
0
"
R
E
M
O
V
E
6
’
8
8
’
5
6
’
4
9
.
9
5
’
+
4
0
6
5
’
+
0
0
6
0
’
4
5
.
8
5
’
+
1
5
5
7
’
+
2
5
6
0
’
4
5
.
6
5
’
+
6
5
6
0
’
4
4
.
9
5
’
+
1
5
5
6
’
+
5
5
7
5
’
+
0
0
6
1
’
5
6
’
4
9
.
7
7
’
+
1
5
6
1
’
5
6
’
4
9
.
7
9
’
+
3
6
6
0
’
5
6
’
4
9
.
7
0
’
+
2
0
6
0
’
5
6
’
4
9
.
6
7
’
+
9
0
5
6
’
+
1
5
5
6
’
+
8
5
5
0
.
7
2
’
+
4
3
7
0
’
4
6
.
9
8
’
+
7
0
7
0
’
4
6
.
5
3
’
+
0
2
7
0
’
4
9
.
0
2
’
+
3
5
5
7
’
+
9
7
7
0
’
5
7
’
4
9
.
0
3
’
+
6
4
58’+8050.22’+05 32.63’+14.9248.91’+35.11
4
9
.
7
4
’
+
7
2
5
6
’
5
0
’
+
3
5
5
2
’
4
0
.
9
9
’
+
4
0
-
Y
6
-
5
5
’
+
3
0
.
2
6
-
Y
6
-
3
1
.
4
6
’
+
8
5
-
Y
6
-
SIGN DISTURB DO NOT60’+87 27.64’+00 -Y5-
5
6
’
+
7
2
8
8
’
6
6
’
4
9
.
9
2
’
+
9
8
7
0
’
+
5
0
7
5
’
6
0
’
4
4
.
7
7
’
+
3
5
6
0
’
4
5
.
4
4
’
+
8
5
7
5
’
6
0
’
4
4
.
9
0
’
+
4
5
48.85’ +90 27.12’+30 -Y5-32.88’+30 -Y5-48.88’+85
3
1
.
5
8
’
+
1
5
-
Y
6
-
4
7
.
4
0
’
+
3
0
4
0
.
9
2
’
+
2
5
-
Y
6
-
4
9
.
0
9
’
+
5
5
4
8
.
8
6
’
+
3
5
7
8
’
4
8
.
5
9
’
+
5
5
7
8
’
4
8
.
3
8
’
+
7
0
F FCFC
C
F
F
C
CF
CFF
F
C
F
C
C
F
F
C
F
F
F
F
F
F
F
F CF
N
A
D
8
3
/
9
5
S
l
o
p
e
F
i
l
l
G
R
O
U
N
D
N
A
T
U
R
A
L
S
L
O
P
E
FI
L
L
G
E
O
T
E
X
T
I
L
E
G
e
o
t
e
x
t
i
l
e
G
r
o
u
n
d
N
a
t
u
r
a
l
F
i
l
l
S
l
o
p
e
P
r
o
p
o
s
e
d
G
E
O
T
E
X
T
I
L
E
B
a
c
k
f
i
l
l
E
x
i
s
t
.
C
h
a
n
n
e
l
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:45R:\Roadway\Proj\R-2603_Rdy_psh07.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
7
SEE SH EE T NO. 8
M ATCH LINE -L- STA. 64+00
SEE SHEET NO. 6MATCH LINE -L- STA. 50+00REVISIO NS10/14/2014 - R/W REVISIO N: REVISED EXISTING R/W LIM ITS, REM O VED PRO PO SED R/W , AND REVISED DUE O N PARCEL 43. -M AE PARCELS 39Z AND 47Z. - M AE09/02/2014 - R/W REVISIO N: ADDED PUE AND REVISED TCE O N PARCELS 39 & 143; REM O VED PDE, ADDED DUE, AND REVISED PUE O N PARCEL 44; REVISED PUE O N PARCEL 47 AND CREATED 03/13/2014 - R/W REVISIO N: CHANGED 24’ DRIVES TO 36’ DRIVES O N PARCELS 40 & 41; UPDATED PRO PERTY O W NER NAM ES AND DEED REFERENCES O N PARCELS 48 & 142. - M AE08/07/2013 - R/W REVISIO N: ADDED SEPTIC TANK AND LINES O N PARCEL 143. - KNW8" PLASTIC
8
" P
L
A
S
T
IC
8
"
P
L
A
S
T
IC
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
B
M
4
S 24
21’42"
W
S 7212’09" E
N
3
6
0
4
’
2
5
"
E
N 6759’35" W
N 6759’35" W
N 5701’09" EN 5701’09" EN 5640’32" E
S
5
7
2
3
’0
0
" W
S
5
7
2
3
’0
0
" WS
5
7
2
3
’0
0
" W
N 27 36’26" W
N
22
08
’26
" W
N
5
4
4
5
’3
1"
E
N 32 37’00" W
N 32 37’00" WN 32 37’00" W
N
5
7
2
3
’0
0
" E
S
5
7
2
5
’2
5
" W
N 23
02’25" E
N 5038’35" W
S 5034’16" E
N 8352’10" E N 7524’06" ES 7534’06" W N 7535’06" E N 8056’06" E S 20 42’54" ES 20 40’28" E
N 33 50’43" W
N
0
4
3
1’
5
4"
W
N
7
2
2
9
’4
6
" E
S
0
4
0
0’
5
2"
E
S
80
29’22" W
S
7
2
15
’12
" W
S
7
2
15
’12
" W
N
23 00
’18"
W
N
2300
’18" W
N
5
8
2
6
’4
0
" E
N 32 37’00" W N 32 37’00" W
110.00’
131.46’
2
0
8.
9
7
’
138.60’
110.40’
181.51’181.06’180.68’
17
8
.9
6
’
17
9
.2
8
’
17
7
.8
3
’
7
1.4
3
’
6.05’
56
.14
’
2
1
9
.
1
4
’
75.30’
75.30’
63.09’
19.81’
104.60’
17
5
.0
0
’
3
6
4
.9
8
’
108.64’
54.39’
92.20’
103.33’247.24’56.00’383.18’
1.44’
81.41’
3
9.
7
2’
6
3
.16
’
5
8.
9
9’
178.98’
12
2
.7
7
’
4
3
.8
6
’
264
.05
’
57
.81’
JIMMY CHURCHDB 675 PG 222AXLE
S
P
I
K
E
R
E
B
A
R
R
E
B
A
R
R
E
B
A
R
R
E
B
A
R
E
I
P
E
I
P
EIP EIP
S
P
I
K
E
N
A
I
L
191.97’
E
A
S
E
M
E
N
T
D
R
A
I
N
A
G
E
P
E
R
M
A
N
E
N
T
EXISTING R/W EXISTING R/WEXISTING R/W EXISTING R/WEXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
E
XISTIN
G
R/
W
E
XISTIN
G
R/
W
E
X
I
S
T
IN
G
R
/
W
E
X
I
S
T
I
N
G
R/
W
E
XI
S
T
I
N
G
R/
W100.00’
N
O
RT
H
WIL
KES
B
O
R
O
CIT
Y LI
MITS
NORTH WILKESBORO CITY LIMITSNORTH WILKESBORO CITY LIMITS
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
NORTH WILKESBORO CITY LIM
IT
S
39141
E
X
IS
T
ING
R
/
W
E
X
IS
T
IN
G
R
/
W
359.07’
18" C
MP
18
" C
MP
18" CMP 18" CMP HW CMP15"
W
/
L
T
W
/
L
T
W/
L
T
B
S
T
7
2
"
C
H
L
&
2
S
B
W
W/
L
T
B
S
T
SOIL
72"CHL&2SBW
48"CHL
48"C
HL
72"CHL
1
S
B
K
D
WD RAIL
C
O
N
C
SOIL
W
/
L
T
B
S
T
B
S
T
G
R
G
R
G
R
G
R
1
S
F
D
W
/
L
T
48"WD W ALL
C
O
N
C
1S
B
K
B
U
S
B
S
T
B
S
T
W/LT
C
O
N
C
W
/
L
T
B
S
T
C
ONC
72"CHL CONC
CONC
BST BSTSBST BSTBST1SBKBUSCONCCONC CONCBSTBST BSTCONC
SR 1979 LEGION DR BST
BST 2SBLKD12"WD12"WD36"CHLS1SBKD
CON
C
CONC
G
R
C
O
N
C
1SBKD
4
8
"C
O
N
C
WA
L
L
1SBKD
1
S
F
D
C
ON
C
C
O
N
C
60"CHL
1
S
B
K
D
B
S
T
B
S
T
G
R
MTLMTLMTL
L
T
W
/
L
T
S
C
O
N
C
7
2
"
C
H
L
&
2
S
B
W
S
DI
1
S
F
B
U
S
1
S
B
L
K
B
U
S
1
S
B
L
K
B
U
S
2
S
B
L
K
B
U
S
1SBLKBUS 1SFBUS CAN
12" CMP
3
6
"
B
K W
A
L
L
48"C
HL
72"C
HL
&3S
B
W
72"CHL&3SBW
S
B
S
T
S 4"CURBT
T
T
T
T
PIV
8
"
A
C
A
A
T
U
R
6"CI
8
"A
C
8"AC
6"AC
6"AC
6
"AC
6"
A
C
2"GALV
8
"
P
V
C
6"CI
8
"
A
C
8
"
A
C
6"AC
18’ BST W F GADDY RDSR 1980
20’ BST
SR 1971 F
AIRPLAINS R
D
N
C
2
6
8
E
LKIN
R
D
B
S
T
-
B
Y
4
-
4
2
-
B
Y
5
-
4
6
-
B
Y
5
-
4
7
-BY4-4
4
-
B
L
-
1
5
-
B
Y
5
-
4
8
-BL-14 LESSIE BROWN JAMES BROWNDB 337 PG 124 40TERRY BROWNDB 637 PG 332 41 AKG INCDB 743 PG 39 42
B
R
U
S
H
Y
M
O
U
N
T
A
I
N
B
A
P
T
I
S
T
A
S
S
O
C
I
A
T
I
O
N
I
N
C
D
B
9
0
8
P
G
1
5
9
4
3
D
O
U
G
L
A
S
H
I
N
C
H
E
R
D
B
5
7
4
P
G
3
9
4
4
4
MICHEAL WARRENDB 89 PG 90 138
R
A
Y
M
O
N
D
B
L
E
V
I
N
S
D
B
2
9
2
P
G
9
0
1
3
9
B
L
A
N
C
H
G
R
E
G
O
R
Y
D
B
5
8
0
P
G
6
6
8
1
4
0
1
4
2
-
B
Y
4
-
4
3
L
E
S
S
I
E
B
R
O
W
N
J
A
M
E
S
B
R
O
W
N
D
B
6
3
2
P
G
2
8
6
D
B
3
3
7
P
G
1
2
2
D
B
3
6
2
P
G
5
1
6
4
5
GWYN KILBYDB 1106 PG 461 143
D
E
N
N
I
S
W
H
I
T
T
I
N
G
T
O
N
D
B
1
0
4
5
P
G
1
6
2
4
7
J
A
N
K
E
R
L
E
Y
D
O
U
G
K
E
R
L
E
Y
D
B
1
0
0
9
P
G
3
7
5
1
4
5
SARAH PIERCE
CURLEY PIERCE
DB 559 PG 259
144
108" CMP
2
4
" C
M
P
84" CMP
4
6
T
E
R
R
Y
B
R
O
W
N
J
R
D
B
8
0
9
P
G
1
8
1
E
A
S
E
M
E
N
T
D
R
A
I
N
A
G
E
P
E
R
M
A
N
E
N
T
52.13’+77.30 18.28
’
+80.8
0
18
.4
7
’
+
0
6
.14
3
2
.5
0
’
+
9
6
.6
4
6
2
.
2
2
’
+
9
8
.
7
8
6
6.
8
1’
+
3
0
.
8
3
SEPTIC TANKSEPTIC LINES
H
A
R
V
E
Y
L
E
D
F
O
R
D
D
B
1
1
4
7
P
G
4
0
0
W
I
L
L
I
A
M
R
.
L
O
W
E
D
B
1
1
4
7
P
G
2
6
1
4
8
B
I
L
L
Y
B
L
E
V
I
N
S
S
R
D
B
1
0
7
2
P
G
1
8
1
D
B
9
3
6
P
G
3
4
3
D
B
1
0
1
3
P
G
3
8
4
9
7’x7’ RCBC
CMP
108"
WORKSHOP INC VOCATIONAL WILKES COUNTYDB 872 PG 403
15" CMP
15
" C
MP
1
5
"
C
M
P
CMP108"
39Z
4
7
Z
3.
2
2
’
9
7.
5
2
’
N
15
0
0
’0
8
" W
U
S
T
U
S
T
UST
U
S
T
U
S
T
U
S
T
U
S
T
50
55
60
50
F-F
28.75’
59’ F-F59’ F-F59’ F-F
F-F
28.75’
0100010 30 4 0 2
0 4
03
02
0 1
0 0
0 1
0 2
0 4
0 2
02
0 2
F-F
28.75’+25
-
Y7
-
P
OT
S
ta
. 10
+
0
0
.0
0
-Y7- PC Sta. 13+23.25-Y7- PT Sta. 12+55.75
-
Y7
-
P
C
S
ta
. 11+
5
5
.4
5
P
I
S
t
a
5
6
+
5
2
.
5
2
DL
=
8
8
6
.
8
9
’
T
=
4
5
4
.
4
4
’
R
=
1
,
6
5
0
.
0
0
’
V
=
5
0
m
p
h
S
E
=
0
.
0
4
-
L
-
0
0
3
0
4
8
0
4
0
0
0
1
0
2
0
2
0
3
0
1
0
0
01
02
0 20 1
-
Y
8
-
P
O
C
1
2
+
5
5
.
0
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
F-F
40.00’
F-F
40.75’+00
42.00’+57.15
F-F
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C.
I
S
L
A
N
D.
P
R
O.
M
O
N
O.
1’
-
6
"
C
&
G
1’
-
6
"
C
&
G
2
’-
9
"
C
&
G
1’-
6
"
C
&
G
2’-6" C&G 2’-6" C&G
2
’-
6
"
C
&
G
2
’-
6
"
C
&
G
C
A
T
-
1
8
X
1
8
C
U
R
B
-
L
-
-Y7-
-
Y8-
C
R
C
R
C
R
C
R
CR CR CRCRCRCR+14.7550’ (TYP.)
5
0
’ (
T
Y
P.)
+18.30
PROP. 5’ CONC. SIDEWALK PROP. 5’ CONC. SIDEWALK
P
R
O
P.
5
’
C
O
N
C.
S
I
D
E
W
A
L
K
6
2
+
1
9
.
5
1
-
6
2
+
4
2
.
2
4
T
O
2
’
-
9
"
C
&
G
T
R
A
N
S
I
T
I
O
N
1
’
-
6
"
C
&
G
-
Y
7
-
P
O
T
1
1
+
0
0
.
0
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
1
0
0
’
T
A
P
E
R
1
0
0
’
T
A
P
E
R
1
0
0
’
T
A
P
E
R
5
0
0
’ T
R
AN
S
IT
ION
P
I
S
t
a
1
3
+
7
9
.
9
2
DL
=
9
3
.
2
2
’
T
=
5
6
.
6
8
’
R
=
6
5
.
0
0
’
P
I
S
t
a
1
2
+
2
1
.
8
3
L
=
1
0
0
.
3
0
’
T
=
6
6
.
3
8
’
R
=
6
0
.
0
0
’
-
Y
7
-
V
=
S
T
O
P
C
O
N
D
I
T
I
O
N
S
E
=
0
.
0
2
S
E
=
0
.
0
2
V
<
1
5
m
p
h
D
14’14’12’12’
36’36’24’
2
4
’
2
4
’
2
4
’
3
0
’
2
4
’
3
0
’
2
4
’
4
0
’
8
X
1
8
C
U
R
B
8
X
1
8
C
U
R
B
POT Sta. 11+61.98 -DRIVE2-PT Sta. 10+98.33 -DRIVE2-PC Sta. 10+59.59 -DRIVE2-
-
Y
8
-
P
T
S
t
a
.
1
4
+
3
3
.
6
9
-
Y
8
-
P
C
C
S
t
a
.
1
1
+
7
4
.
0
5
-
Y
8
-
P
C
S
t
a
.
1
0
+
7
7
.
5
4
-
Y
8
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
02
02
02
-
Y
8
-
V
=
S
T
O
P
C
O
N
D
I
T
I
O
N
P
I
S
t
a
1
1
+
2
5
.
8
2
L
=
9
6
.
5
1
’
T
=
4
8
.
2
8
’
R
=
1
,
3
3
3
.
7
6
’
P
I
S
t
a
1
3
+
1
4
.
7
6
DL
=
2
5
9
.
6
4
’
T
=
1
4
0
.
7
0
’
R
=
2
7
1
.
5
5
’
S
E
=
S
E
E
P
L
A
N
S
D
S
I
D
E
W
A
L
K
P
R
O
P.
5
’
C
O
N
C.
(
W
W
)
F
E
N
C
E
B
E
G
I
N
(
W
W
)
F
E
N
C
E
E
N
D
+05
+05
+90
(T
YP.)15’
0
3 0
4
0
5
06 06
0
2
02
(T
Y
P
.)
3
0
’
+
4
0
G
R
A
U
3
5
0
T
L
-
3
24,600 18,810A A2035 ADT 2015 ADT 24,400 18,610-L- NC 268 200 200<100 <100 LEGION DR.-Y7- SR 1979200200
A A
2
3
,
3
0
0
1
7
,
8
0
0
-
L-
N
C
2
6
8
4
0
0
3
3
0
2
0
3
5
A
D
T
2
0
1
5
A
D
T
F
A
I
R
P
L
A
I
N
S
R
D
.
-
Y
8
-
S
R
1
9
7
1
2
4
,
4
0
0
1
8
,
6
1
0
1
,
9
0
0
1
,
4
7
0
1
,
5
0
0
1
,
1
4
0
1
0
0
1
0
0
1
0
0
1
0
0
A
A
<
1
0
0
<
1
0
0
1
,
8
0
0
1
,
3
7
0
W
F
G
A
D
D
Y
R
D
.
S
R
1
9
8
0
PI Sta 10+80.26DL = 38.74’T = 20.66’R = 45.00’-DRIVE2-
-
Y
8
-
P
O
T
S
t
a
.
1
4
+
8
9
.
0
5
-
L
-
P
T
S
t
a
.
6
0
+
8
4
.
9
7
=
-L- PC Sta. 51+98.08-L- POC Sta. 52+05.00 -Y7- POT Sta. 14+47.69=-Y7- PT Sta. 14+16.47 8X18 CURB 8X18 CURB 8X18 CURB
8
X
1
8
C
U
R
B
Sta. 13+73.85 -Y7- POC Sta. 10+00.00=-DRIVE2- POT
S
E
E
S
H
E
E
T
2
B
-
4
F
O
R
-
Y
7
-
&
-
Y
8
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
S
E
E
S
H
E
E
T
3
5
F
O
R
-
D
R
I
V
E
2
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
3
0
F
O
R
-
Y
7
-
&
-
Y
8
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
2
2
F
O
R
-
L
-
P
R
O
F
I
L
E
+00
F-F
21.5’
C
B
-
L
-
S
T
A
5
2
+
8
9
t
o
5
4
+
4
9
L
T
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
CB
C
B
C
B
C
B
C
B
C
B
C
B
C
B
D
I
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
2GI CB15" RCP-III 15" RCP-III 15" RCP-III
1
5
"
1
5
"
15" RCP-III
15"
15" RCP-III
15
"
RC
P-
III
1
5
"
R
C
P
-
I
I
I
15"15" RCP-III
15
"
R
C
P
-
I
I
I
0
7
3
1
0
7
3
0
0
7
1
9
0
7
2
0
0
7
1
5
0
7
2
1
0
7
2
2
0
7
1
6
0
7
0
9
0
7
1
0
0
7
1
1
0
7
0
8
0
7
0
7
0704 07020701
0
7
1
2
0
7
0
5
0
7
1
3
0
7
1
4
0706 0703 -L- STA 49+07 to 50+00 -L- STA 48+40 to 48+80 SEE RDWY STD. 240.01 BERM DITCH
0
7
2
7
0
7
2
8
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
(
N
o
t
t
o
S
c
a
l
e
)
D
2:1
2:1
b
1
"
/
F
t
.
F
R
O
M
-
Y
8
-
S
T
A
.
1
2
+
5
9
T
O
S
T
A
.
1
3
+
3
3
L
T
b
=
2
F
t
.
M
i
n
.
D
=
0
.
5
F
t
.
D
E
T
A
I
L
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
0
7
3
2
0
7
3
3
C
B
C
B
15" R
CP-III
1
8
"
C
S
P
1
5
"
C
S
P
E
S
T
8
5
C
Y
B
A
C
K
F
I
L
L
E
X
I
S
T
I
N
G
C
H
A
N
N
E
L
1
5
"
R
C
P
-
III
2GI2GI
E
S
T
3
2
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
REMOVETO R/W REMOVE
R
E
M
O
V
E
R
E
M
O
V
E
RETAIN
R
E
M
O
V
E
1
5
"
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
1
4
6
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
5
0
T
O
N
S
S
E
E
D
E
T
A
I
L
C
C
1
W
/
C
L
A
S
S
I
I
R
I
P
R
A
P
P
E
R
M
A
N
E
N
T
C
H
A
N
N
E
L
C
H
A
N
G
E
(
N
o
t
t
o
S
c
a
l
e
)
T
O
E
P
R
O
T
E
C
T
I
O
N
d
F
L
A
TT
E
R
2:1
O
R
F
R
O
M
S
T
A
.
5
7
+
7
0
T
O
S
T
A
.
5
9
+
4
5
R
T
D
E
T
A
I
L
T
P
1
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
d
=
1
F
t
.
1
5
"
1
5
"
R
C
P
-
III
1
5
"
R
C
P
-
III
PLUG 18" @R/W
P
H
A
S
I
N
G
D
U
R
I
N
G
C
U
L
V
E
R
T
R
E
M
O
V
E
8
4
"
&
1
0
8
"
C
M
P
E
S
T
.
5
2
C
Y
w
/
F
L
O
W
A
B
L
E
F
I
L
L
F
I
L
L
1
0
8
"
C
M
P
(
2
2
’
)
E
S
T
.
2
9
5
C
Y
w
/
F
L
O
W
A
B
L
E
F
I
L
L
F
I
L
L
1
0
8
"
C
M
P
(
1
2
5
’
)
E
S
T
.
1
7
3
C
Y
w
/
F
L
O
W
A
B
L
E
F
I
L
L
F
I
L
L
7
’
x
7
’
R
C
B
C
(
9
5
’
)
D
I
1
5
"
C
S
P
1
5
"
R
C
P
-
III
D
E
T
A
I
L
A
A
1
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
C
L
A
S
S
I
I
R
I
P
R
A
P
A
T
O
U
T
L
E
T
B
=
v
a
r
i
e
s
8
t
o
1
1
F
t
.
2:1
2:1
(
N
o
t
t
o
S
c
a
l
e
)
B
-
L
-
S
T
A
.
5
9
+
5
7
(
1
1
5
’
t
o
1
3
5
’
R
T
)
2:1
d
D
(
N
o
t
t
o
S
c
a
l
e
)
B
C
H
A
N
N
E
L
C
H
A
N
G
E
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
C
C
1
T
y
p
e
o
f
L
i
n
e
r
=
C
l
a
s
s
I
I
R
i
p
R
a
p
2:1
B
=
5
F
t
.
M
a
x
.
d
=
4
F
t
.
M
i
n
.
D
=
4
F
t
.
F
R
O
M
-
L
-
S
T
A
.
5
9
+
6
6
(
2
7
3
’
L
T
)
T
O
-
L
-
S
T
A
.
5
9
+
6
4
(
2
3
2
’
L
T
)
S
E
E
D
E
T
A
I
L
A
A
1
1
6
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
9
T
O
N
S
P
L
A
C
E
O
N
B
A
N
K
S
O
N
L
Y
C
L
A
S
S
I
I
R
I
P
R
A
P
S
E
E
D
E
T
A
I
L
A
A
1
2
2
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
1
3
T
O
N
S
P
L
A
C
E
O
N
B
A
N
K
S
O
N
L
Y
C
L
A
S
S
I
I
R
I
P
R
A
P
2
0
2
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
5
1
T
O
N
S
C
L
B
S
E
E
D
E
T
A
I
L
T
P
1
T
O
E
P
R
O
T
E
C
T
I
O
N
6
5
’
+
7
5
63’57.06’+90 58’+60
9
0
’
+
2
6
.
1
2
7
0
’
+
6
5
25’+3080’+9061’55.64’+50 35’+05 -Y7-
8
2
’
6
6
.
6
1
’
+
9
0
135’+8062.83’+1570’63’+05
8
5
’
+
2
5
.
5
2
1
3
0
’
+
4
5
1
2
7
’
+
0
1
8
5
’
+
4
5
2
8
7
’
+
8
9
2
9
5
’
+
4
0
2
5
0
’
+
1
5
8
5
’
+
0
0
6
8
.
9
5
’
+
7
0
8
9
.
6
4
’
+
5
0
1
8
0
’
+
2
5
6
7
.
5
1
’
+
6
4
.
3
4
8
2
.
4
5
’
+
6
8
.
0
8
1
5
8
’
+
8
6
9
0
.
1
1
’
+
3
5
.
4
3
1
6
8
’
+
4
3
2
0
5
’
+
6
0
2
0
0
’
+
8
0
8
3
.
7
6
’
+
2
2
.
4
4
6
8
.
9
7
’
+
1
8
.
6
2
1
3
9
.
5
5
’
+
8
5
7
7
’
7
0
’
6
3
’
+
0
5
6
3
’
+
0
5
7
7
’
7
0
’
6
3
’
+
4
0
129’+46 -Y7-145’+54 -Y7-85’-Y7- +57.45 105’+66.56 -Y7-60.93’+2580’+45
1
1
2
’
+
5
0
9
5
’
8
3
’
+
4
3
9
5
’
+
7
1
.
6
4
9
7
’
8
6
’
+
8
7
9
7
’
8
7
’
+
7
7
8
2
’
7
1
’
6
6
.
7
3
’
+
1
5
7
0
’
+
6
0
.
3
7
60.07’+7530’+73.19 -Y7-30’+23.25 -Y7-25’ +55.75 -Y7-25’+55.45 -Y7-25’ 18.27’+00 -Y7-
6
3
’
+
1
6
.
3
5
5
5
’
+
3
4
.
1
4
7
5
’
+
3
5
.
6
8
6
8
.
3
3
’
+
5
0
1
1
2
’
+
8
4
.
9
7
6
3
’
+
2
5
7
5
’
+
3
0
3
0
’
+
8
5
.
0
0
-
Y
8
-
3
0
’
+
8
4
.
4
5
-
Y
8
-
1
2
3
’
+
3
7
.
2
2
6
5
.
9
4
’
+
5
5
4
0
’
+
4
5
2
5
’
1
9
.
5
4
’
+
5
5
-
Y
8
-
7
5
’
6
5
’
6
2
.
0
9
’
+
7
5
F
F
C
F
F
F CFC
C
F
F
C
FC
F
C
F
F
F
F
F
C
F
F
F
F
CCC
N
AD 83/ 95
S
l
o
p
e
F
i
l
l
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:45R:\Roadway\Proj\R-2603_Rdy_psh08.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE
SHEET
NO
. 9
MATCH
L
INE
-L
-
STA
. 78+00
R
-
2
6
0
3
8
SEE SHEET NO. 7MATCH LINE -L- STA. 64+00REVISIO NS10/14/2014 - R/W REVISIO N: REVISED EXISTING R/W LIM ITS O N PARCEL 51. - M AE09/02/2014 - R/W REVISIO N: REVISED PUE O N PARCELS 50 & 52; ADDED PUE O N PARCELS 49, 54, 55A, & 55; REM O VED TCE O N PARCELS 55A & 55 AND CREATED PARCEL 54Z. - M AE06/06/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 51. - M AE REFERENCES O N PARCELS 54, 55, 55A, & 57. - M AE PARCELS 49 & 53 INTO O NE PARCEL DENO TED AS PARCEL 49; SUBDIVIDED PARCEL 55 INTO 55 & 55A, UPDATED PRO PERTY O W NER NAM ES AND DEED03/13/2014 - R/W REVISIO N: ADDED BUILDING EXTENSIO N, CHANGED 30’ DRIVES TO 36’ DRIVES AND ADDED A 36’ DRIVE O N PARCEL 49; ADDED A 20’ DRIVE O N PARCEL 52; CO M BINED8" PLASTIC 8" PLASTIC
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
8
" P
L
A
S
T
IC
8
" P
L
A
S
T
IC
N 3828’09" E
S 5052’24" E
S
28 42’56" E
S
28 27’57" E
N
5
4
3
6
’2
7
" E
N
28 42’16" W
N
3
8
4
2
’
5
2
"
E
N
3
8
2
4
’
2
8
"
E
S 8945’32" E
S
28 19’34" E
S
5
3
12
’2
8
" W
S 3630’42" W N 5150’18" WS 1111’54" WS 5210’44" WS 6640’35" W
S
5
0
3
4
’
3
9
"
W
N
2
1
4
3
’3
2
" W
N
2
5
4
5’4
2"
E
N 1501’47" E
N
11
4
3’
3
7" W
N
18
5
1’0
0
" W
N 8646’47" E
S
29 08’59" E
349.01’
180.47’
208
.17’
1.18’
299
.83’
112
.6
6
’
300
.92’
13
4
.
2
3
’
2
5
.
15
’
251.40’
389
.30’
2
0
1.
5
5
’
659.00’315.88’36.46’79.22’98.95’
1
2
1
.
6
2
’
7
3
0
.
7
4
’
30.29’
2
2
5.
8
1’
2
3
8.
4
6
’
111.66’
118
.37’
W
I
L
K
E
S
C
O
U
N
T
Y
F
A
R
M
B
U
R
E
A
U
I
N
C
B
I
L
L
Y
B
L
E
V
I
N
S
S
R
D
B
6
2
0
P
G
8
7
3
D
B
1
0
7
2
P
G
1
8
1
D
B
9
3
6
P
G
3
4
3
D
B
1
0
1
3
P
G
3
8
R
/
W
MO
N
E
I
P
R
E
B
A
R
EXISTING R/W
E
X
IS
T
IN
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
NORTH WILKESBORO CITY LIMITSNORTH WILKESBORO
C
I
T
Y
L
I
MI
T
S
N
O
R
T
H
WI
L
K
E
S
B
O
R
O
CI
T
Y
LI
MI
T
S
10
0’
D
U
K
E
PO
W
ER
E
A
SEM
E
N
T
385.00’
5
2
100.00’
E
X
IS
T
ING
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
24" HDPE
24" HDPE
18" CMP
18" CMP DIR 15" CMP15" CMP DIR 12" CMP15" CMP
D
I
D
I
DI DI
D
I
W
/
L
T
S
B
S
T
15
"C
MP
C
O
N
C
BST
W
/
L
T
W
/
L
T
GR
W
/
L
T
W
/
L
T
BST
B
S
T
1
S
B
K
B
U
S
W
/
L
T
S
G
R
WD
R
A
IL
C
O
N
C
B
S
T
C
O
N
C
72"CHL&3SBW
72"CHL CONC
B
S
T
W/LT
W
/
L
T
W/LT72"CHL72"CHL BSTW/LT
1
S
F
D
B
S
T
BSTBST72"CHL 2SBW
N
C
2
6
8
E
LKIN
R
D
2
2
’ B
S
T
S
GR
S
S
WD RAIL
BST
WD
R
A
IL
1SMTLBU
S
1SBLKBUS
1SBLKBUS
1SBLKBUS
12
" H
D
P
E
15
" C
M
P
1
5
"
C
M
P
1
5
"
C
M
P
S
T
8
"
A
C
A
A
T
U
R
8
"A
C
A
A
T
U
R
8"PVC
8
"P
V
C
8
"A
C
-BY5-46
-
B
L
-
1
6
-
B
L
-
1
7
BILLY BLEVINS SRDB 1072 PG 181DB 936 PG 343DB 1013 PG 38 49DENNIS WHITTINGTONDB 1045 PG 162 47BILLY BLEV
I
N
S
S
R
DB 1063 P
G
2
0
2
50
T
Y
R
E
B
I
L
L
I
N
G
S
P
A
T
R
I
C
I
A
B
I
L
L
I
N
G
S
D
B
6
1
1
P
G
1
3
3
5
6
5
4
5
5
S
I
L
T
P
O
N
D
32.21’+31.00
72
.48’
+10
.38
73
.15’
+72
.10
2
8
.7
4
’
+
4
6
.
8
6
4
9
C
A
R
L
M
.
B
Y
R
D
D
B
1
1
6
0
P
G
1
2
4
N
2832’32" W
297
.59’
5
5
A
B
IL
L
Y
R
A
Y
H
O
L
L
A
N
D
D
B
116
8
P
G
8
4
WIL
L
IA
M
E
U
G
E
N
E
H
O
L
L
A
N
D
D
B
117
6
P
G
18
3
5
7
T
R
A
V
I
S
J
A
M
E
S
M
A
T
H
I
S
D
B
1
1
3
6
P
G
2
6
5
12
" HDP
E
I
N
F
U
S
I
O
N
P
O
I
N
T
S
,
L
L
C
D
B
1
1
7
6
P
G
3
6
4
5
1
5
4
Z
65
70
75
-
L
-
P
I
S
t
a
7
3
+
8
5
.
6
0
DL
=
1
,
5
3
6
.
9
4
’
T
=
7
8
7
.
3
8
’
R
=
2
,
8
7
0
.
0
0
’
V
=
5
0
m
p
h
S
E
=
0
.
0
3
-L- PC Sta. 65+98.22 F-F
F
-F
28
.75
’
F
-F
30
.00
’
20
.25
’
F
-F
0
3
0
3
0102 00 01 020 2 030 20 3 30.00’+98.22
S
E
E
S
H
E
E
T
2
3
F
O
R
-
L
-
P
R
O
F
I
L
E
5
0
’
R
5
’
R
F-F
28.75’
+00
F-F42.00’
2
’
R
2
’
R
2
.
5
’
R
15
’
R
5
.
5
0
+
5
0
F
-
F
1
2
.
2
5
’
+
5
0
F
-
F
1
2
.
2
5
’
+
7
8
+75
F-F
30.00’
+29.75
1’-6" C&G
2
’
-
9
"
C
&
G
1’-
6
" C
&G
2
’-
9
" C&G
2’-6" C&G2’-6" C&G2’-6" C&G
2
’-
6
" C&G
2
’-
6
" C&G
G
R
A
U
3
5
0
T
L
-
3
8
X
1
8
C
U
R
B
-
L
-
2’-9" C&G50’ (TYP.)
+95.14 87.64
+31.54
6
.
7
5
+
4
5
.
0
4
PROP. 5’ CONC. SIDEWALK PROP. 5’ CONC. SIDEWALK
P
R
OP
. 5
’ CONC. S
ID
E
WALK
P
R
OP
. 5
’ CONC. S
IDE
WALK
14’14’12’12’12’
14’
14’12’
12’
36’
3
6
’
2
4
’
3
0
’
2
6
’
2
0
’
2
0
’
2
0
’
3
9
’
100’ TAPER 8X18 CURB 8X18 CURB
8
X
18
CU
R
B
8
X
18
C
UR
B
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
(
W
W
)
F
E
N
C
E
E
N
D
1
5
0
’
T
A
P
E
R
(
W
W
)
F
E
N
C
E
B
E
G
I
N
3
6
’
2
0
’
C
B
B
D
O
J
B
w
/
M
H
D
I
D
I
D
I
B
D
O
C
B
C
B
C
B
C
B
C
B
C
B
CBCBCBCBCB 2GI 2GI 2GI2GI
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
7 SY GEOTEXTILE EST. 2 TONS CLASS ’B’ RIP RAP
-
L
-
S
T
A
7
2
+
5
5
t
o
7
3
+
1
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
-
L
-
S
T
A
7
0
+
9
0
t
o
7
2
+
5
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
-
L
-
S
T
A
7
0
+
3
0
t
o
7
0
+
8
5
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
LATERAL ’V’ DITCH( Not to Scale)D 2:12:1 b1"/Ft.FROM -L- STA. 74+85 TO STA. 77+
0
0
R
T
FROM -L- STA. 73+10 TO STA. 78+0
0
L
T
b= 2 Ft.Min. D=0.5 F
t
.
DETAIL L1GroundNatural15"15"
24" RCP-III
2
4
" RC
P-III
2
4
"
RC
P
-
III
2
4
" RC
P-III
2
4
" RC
P-III
18
"
18
"
15" RCP-III
15"
15"
18" RCP-III 18" RCP-III
3
G
I
3
G
I
0807 0806080908100812
0
8
2
0
0
8
2
1
0
8
2
5
0
8
2
9
E
X
0
8
E
X
0
6
0
8
2
2
0811
0
8
2
6
0
8
2
7
0
8
3
1
0
8
2
8
0
8
3
3
0
8
4
2
0
8
3
6
0
8
3
7
0
8
3
5
0
8
4
4
0
8
4
5
0816 0815 08080805
0
8
3
0
0
8
3
4
0
8
1
9
0
8
3
2
0
8
4
1
18" RCP-III
1
8
"
R
C
P
-
I
I
I
1
5
"
080215" RCP-III 15" RCP-III EST 14 CY DDE SEE DETAIL T1 TAIL BASE DITCH
E
S
T
1
8
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
T
1
T
A
I
L
B
A
S
E
D
I
T
C
H
E
S
T
7
1
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
E
S
T
9
7
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
RET
A
I
N
RE
T
A
I
N
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
REMOVE
R
E
M
O
V
E
15" RCP-III 15"18" RCP-III RCP-III 15"RE
T
A
I
N
1
8
"
1
5
"
R
C
P
-
I
I
I
1
5
"
J
B
w
/
M
H
2
4
"
0
8
4
3
15" RCP-III CB
O
F
E
X
.
1
5
"
R
E
M
O
V
E
2
8
’
O
F
E
X
.
1
8
"
R
E
M
O
V
E
2
8
’
O
F
E
X
.
2
4
"
R
E
M
O
V
E
9
2
’
RCP-III
24"
2
4"
RC
P-III B
2:1
2:1
D
(
N
o
t
t
o
S
c
a
l
e
)
S
T
A
N
D
A
R
D
B
A
S
E
D
I
T
C
H
F
R
O
M
-
L
-
S
T
A
.
7
0
+
8
7
(
5
8
’
R
T
)
T
O
7
0
+
9
4
(
8
7
’
R
T
)
F
R
O
M
-
L
-
S
T
A
.
6
5
+
2
7
(
6
0
’
R
T
)
T
O
6
5
+
2
5
(
8
6
’
R
T
)
D
E
T
A
I
L
T
1
B
=
2
F
t
.
M
i
n
.
D
=
1
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
E
S
T
1
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
E
S
T
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
E
S
T
1
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
9
4
’
+
8
0
7
0
’
+
7
8
1
0
4
’
+
2
0
8
4
’
+
2
5
8
0
’
+
5
0
.
1
3
8
4
’
7
5
’
6
9
.
4
8
’
+
7
0
83’75’68.85’+5871’+0578’72’67.79’+3079’74’68.43’+7085’+98.22
8
5
’
+
7
9
.
2
5
100’85’70’+4585’+72131’+90 100’85’70’+10 85’+57137’+52
9
5
’
8
5
’
7
0
’
+
1
5
9
5
’
8
5
’
7
0
’
+
7
5
8
5
’
+
5
0
1
3
0
’
+
8
0
8
5
’
+
3
0
1
0
8
’
+
3
8
8
7
’
+
4
5
7
0
’
+
2
0
7
5
.
7
7
’
+
2
0
1
6
5
’
+
5
0
1
7
0
’
+
7
5
1
0
3
.
2
3
’
+
5
6
1
3
0
’
+
7
3
7
0
’
+
5
6
7
7
.8
7
’
+
5
5
.2
9
8
3
’
7
5
’
68.9
4
’
+7
5
9
8
’
8
5
’
+
6
2
9
8
’
8
5
’
+
7
4
8
5
’
+
1
2
8
9
’
+
2
4
9
2
’
+
1
5
8
5
’
+
2
3
7
2
.
7
6
’
+
5
8
2
3
0
’
+
0
6
2
2
2
’
+
3
3
8
9
’
+
9
9
8
9
’
+
2
5
8
4
’
7
5
’
6
9
.
9
5
’
+
4
5
70’+98.22
7
0
.
5
4
’
+
3
0
1
1
7
’
+
2
5
1
2
7
’
+
2
5
1
1
0
’
+
8
0
7
2
.
7
3
’
+
1
0
F
F
F
C
F
F
F
F FF
C
F
C
F
N
A
D 83/ 95
G
R
O
U
N
D
N
A
T
U
R
A
L
S
l
o
p
e
F
i
l
l
GROUND NATURAL
G
E
O
T
E
X
T
I
L
E
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
09-OCT-2014 10:54R:\Roadway\Proj\R-2603_Rdy_psh09.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 10
MATCH LINE -L- STA. 92+00
R
-
2
6
0
3
9
SEE SHEET NO. 8MATCH LINE -L- STA. 78+00 REVISIO NS PRO PERTY O W NER NAM E O N PARCEL 74. - M AE3/13/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM ES AND DEED REFERENCES O N PARCELS 55, 57, 58, 66, & 71; ADDED 36’ DRIVE O N PARCEL 73; ADDED 36’ DRIVE AND CHANGED8/7/2013 - R/W REVISIO N: REVISED PRO PO SED R/W O N PARCEL 62 TO TAKE ENTIRE PARCEL. - M AE 6/6/2014 - R/W REVISIO N: ADDED A 16’ DRIVE O N PARCEL 71. - M AEREVISED TCE O N PARCEL 68; ADDED 75’ O FFSETS FO R STATIO N LABELS AT -L- 89+00 LT AND -L- 89+40 LT; REVISED PUE O N PARCEL 73 AND CREATED PARCELS 64Z, 68Z AND 73Z. - M AE& TCE BETW EEN -L- 81+65 LT & -L- 82+50 LT O N PARCEL 60; ADDED STATIO N AND O FFSET LABEL AT -L- 83+11, 107’ LEFT; REM O VED TCE AND ADDED PUE O N PARCEL 64; ADDED AUE AND 9/2/2014 - R/W REVISIO N: REM O VED TCE & PDE AND ADDED DUE BETW EEN -L- 78+70 LT & -L- 80+41 LT O N PARCELS 55 AND 59; ADDED PUE O N PARCEL 57; ADDED DUE AND REVISED PDE8" PLASTIC
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
BM5 N 4244’29" WS 10 45’47" E
S 2120’47" E
S 1112’12" E
S
7
0
4
7
’
4
8
"
W
N 20 26’28" W
N
7
0
1
6
’
1
7
"
E
N 19 43’43" WN 7016’17" E
N
7
0
1
2
’
1
1
"
E
N 15 19’31" W
S 6917’45" WN 7845’39" E
S
7
0
1
2
’
1
1
"
W
S 2120’53" E
N
8
6
0
9
’0
7
" E
N 2120’53" W
S
7
2
5
0
’3
4
" W
S 2212’12" E
N 2545’42" E N 15 53’21" WN 10 48’45" WS 7001’44" WS 7000’21" WN 19 55’01" W
N 19 54’46" W
S
7
0
1
8
’
3
4
"
W
S
7
0
1
8
’
2
4
"
W
N 3807’27" W
N 6228’30" W
N 3146’20" W
136.00’36.87’
72.79’
272.57’
338.99’
1
2
5
.
0
0
’
150.00’140.00’
2
1
8
.
5
6
’
39.09’
132.69’185.84’
1
4
1
.
5
0
’
45.31’
111.7
0
’
133.29’
4
9
.
0
3
’
107.06’
117.72’36.23’54.32’105.49’95.00’240.68’
100.65’
1
2
4
.
7
3
’
7
5
.
1
9
’
86.24’
103.21’
282.46’
M
A
R
K
B
A
R
E
K
E
N
H
A
M
B
Y
L
U
C
Y
J
O
H
N
S
O
N
L
I
N
D
A
S
T
C
L
A
I
R
WHITLEY DICKENSON PROPERTIES LLC
D
E
B
R
A
E
V
A
N
S
B
R
U
C
E
E
V
A
N
S
D
A
R
L
E
N
E
G
R
I
T
D
O
N
A
L
D
G
R
I
T
V
E
A
T
R
I
C
E
J
O
H
N
S
O
N
D
A
R
R
Y
L
J
O
H
N
S
O
N
D
A
R
R
Y
L
J
O
H
N
S
O
N
ANNA WYATT VERNON WYATTFRANK JOHNSONBILLY ELMORE
R
O
B
E
R
T
G
E
N
T
L
E
R
U
S
S
E
L
L
T
R
I
P
L
E
T
T
D
B
1
0
6
1
P
G
3
3
6
D
B
1
0
4
4
P
G
7
1
DB 1055 PG 393
D
B
6
6
3
P
G
2
7
5
D
B
6
3
8
P
G
5
3
6
D
B
1
0
1
3
P
G
9
2
D
B
6
7
2
P
G
1
9
6
DB 754 PG 258DB 637 PG 102DB 751 PG 671
D
B
6
2
8
P
G
4
9
3
D
B
9
4
6
P
G
4
8
D
B
7
0
1
P
G
6
2
9
CENTERLINE OF CREEK IS PROPERTY LINE
R
E
B
A
R
R
E
B
A
R
S
T
O
N
E
E
I
P
R
E
B
A
R
R
E
B
A
R
AXLE
E
I
P
E
I
P
REBAREIP EIPEIPSPIKEREBARREBAREIPEXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
EXISTING R/W
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
I
T
Y
L
IM
IT
S
NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H WIL
KE
S
B
O
R
O
C
IT
Y
L
IMIT
S
NORTH WILKESBORO CITY LIMITS100’ DUKE POWER EASEMENT 100’ DUKE POWER EASEMENT 100’
P
B
2
P
G
1
2
8
16’ INGRESS EGRESS EASEMENT
57 58 59 606162
6
3
6
4
6
5
6
6
6
7
6
8
6
9
7
0
7
1
7
2
1
4
6
30.15’
250.22’
224.69’
140.56’
26.86’
130.41’
132.17’
29.39’
29.98’
128.38’
40.00’
40.00’161.14’EXISTING R/W
24" CMP
2
4
"
C
M
P
J
U
C
T
A
P
P
R
O
X
.
18
" C
M
P
15" C
MP
1
8
"
R
C
P
D
I
D
I
D
I
v v v
v
1 BARRELL4’x3’NORTH WILKESBORO CITY LIMITS
CMP24"
CMP
30"
W
/
L
T
G
R
SR 1981 PEBBLE ST 18’ BST
72"CHL&3SBW
7
2
"
C
H
L
&
3
S
B
W
S
R
19
8
2
G
R
YD
E
R
S
T
B
S
T
BST
7
2
"
C
H
L
7
2
"
C
H
L
W
/
L
T
B
S
T
W
/
L
T
60"WW
S
B
S
T
R
A
P
R
I
P
G
R
S
S
W
/
L
T
B
S
T
7
2
"
C
H
L
&
3
S
B
W
7
2
"
C
H
L
&
3
S
B
W
1SFD
1SFD
G
R
1S
B
K
B
U
S
B
S
T
G
R
H
T
R
D
K
BST
G
R
GR
B
S
T
S
1
S
F
D
S
72"WD
7
2
"
W
D
B
S
T
BST
KATIE LN BST
1SFD
1
S
F
D
SD
K
DK
BST 72"CHL W/LTW/LT GRBST48"W D RAIL SW/LTW/LTW/LTHTRHTR72"CHL72"CHL72"CHL1SFDW/LT GRCONCGRGR GRBST BSTBSTSW/LT
W
/
L
T
BST S
P
L
A
S
T
I
C
R
A
I
L
GR
G
R
L
T
CONC
L
T
WD RAILCONC
C
O
N
C
GR
B
S
T
1SBLKBUS1SFBUSDIBSTS
1
S
B
L
K
B
U
S
L
T
S
S
1
S
B
L
K
B
U
S
L
T
1SBLKBUS1SFBUS1SBLKBUS1SFBUS
1
5
"
C
M
P
1
5
"
C
M
P
1
5
"
C
M
P
1
5
"
C
M
P
15" CMP CAN MTL
7
2
"C
H
L
&
3
S
B
W
GR
1
5
"
C
M
P
141
T
8"A
C
2"GALV
2
"G
A
L
V
8
"
A
C
8
"
A
C
2"GALV
2"PVC2"PVC 2"PVC 2"PVC 8"AC
8
"
A
C
N
C
2
6
8
E
L
K
I
N
R
D
2
2
’
B
S
T
-
B
Y
6
-
4
9
-
B
Y
6
-
5
0
-BL-18
-
B
L
-
1
9
D
B
4
8
3
P
G
4
7
7
281.66’
S3150’57"E
N
6
7
4
4
’
3
3
"
E
2
2
3
.
5
4
’
E
X
I
S
T
I
N
G
R
/
W
G
U
S
T
A
V
O
V
I
L
L
E
G
A
S
M
E
N
D
O
Z
A
D
B
1
0
8
4
P
G
2
6
1
R
A
L
P
H
H
O
U
S
T
O
N
R
O
Y
A
L
L
I
N
D
A
S
T
C
L
A
I
R
D
B
7
9
5
P
G
1
3
9
D
B
7
2
3
P
G
5
4
5
1
7
7
1
7
8
1
7
9
S 2648’04" E
214.33’
E
I
P
E
I
P
A
X
L
E
E
I
P
E
I
P
S 1938’35" E
131.86’
N 19 43’43" W 150.99’
S
85
25’58" E
314
.93
’
S 2103’55" E
158.47’
E
X
I
S
T
I
N
G
R
/
W
N 3015’45" W
301.26’
D
B
7
9
5
P
G
1
4
0
D
B
1
0
4
5
P
G
3
7
0
R
E
B
E
K
A
H
D
O
N
N
A
Y
O
R
K
L
IF
E
E
S
T
A
T
E
H
T
R
CARPORT
WD
1
S
F
D
V
A
C
A
N
T
S
G
A
R
A
G
E
B
L
K
C
O
N
C
G
R
4
8
"
C
H
L
HT
R
S
S
H
T
R
G
R
G
R
S
I
D
N
E
Y
A
V
E
H
T
R
C
A
R
P
O
R
T
M
T
L
G
R
G
R
SB
L
K
S
C
A
R
P
O
R
T
WD
H
T
R
C
O
N
C
L
A
N
D
S
C
A
P
E
H
T
R
G
R
P
L
A
Y
H
O
U
S
E
W
O
O
D
P
OOL
POOL
W
D
D
E
C
K
S
60" CHL
60" CHL
1SFD
WD
D
E
C
K
GRCONC
CONC
H
T
R
B
U
S
N 20 40’40" W257.69’
M
O
N
C
O
N
C
44.00’+95.6831.91’+26.6113.61’+06.27 3.21
’
+54.8
6
44.54’+95.22
3
.
3
0
’
+
3
0
.
2
9
43.35’
+87.10
3.42’+25.16
4
3
.
3
7
’
+
6
2
.
0
6
G
R
18" CMP
D
B
1
1
5
9
P
G
6
3
J
A
S
O
N
S
C
O
T
T
B
R
O
W
N
R
O
G
E
R
&
K
A
R
E
N
H
A
M
B
Y
D
B
1
1
6
5
P
G
4
6
3
TRAVIS JAMES MATHISDB 1136 PG 265 DB 1147 PG 465
7
4
HDPE
18"
55WILLIAM EUGENE HOLLANDDB 1176 PG 183
T
P
W
I
L
K
E
S
L
L
C
D
B
9
5
5
P
G
8
7
3
ESTATE HOLDING, LLC J&S FAIR REAL56
D
O
N
N
A
R
.
K
E
Y
R
E
E
V
E
S
,
J
R
.
F
R
E
D
A
.
D
B
2
2
4
P
G
7
8
D
B
1
5
2
P
G
2
0
6
D
B
1
3
5
P
G
5
7
D
B
5
2
6
P
G
7
6
5
W
I
L
L
-
1
2
E
1
3
0
PATRICIA BILLINGSTYRE BILLINGSDB 611 PG 133 56
1
8
"
R
C
P
6
8
Z
6
4
Z
7
3
Z
80
85
90
-L- PT Sta. 81+35.16-Y9- PC Sta. 12+29.81
-
Y10
-
P
O
T
S
t
a
. 10
+
0
0
.0
0
-
L
-
P
O
T
S
t
a
.
9
1
+
1
6
.
2
5
-
Y
1
0
-
P
O
T
S
t
a
.
1
3
+
0
0
.
0
0
=
-L- POC Sta. 81+15.36 -Y9- POT Sta. 10+00.00=F-F28.75’F-F30.00’20.25’F-F
F-F
28.75’
F-F
28.75’21.5’
F-F
0 20 2
0 3 0 302 0 20 30 3
0 1
0 0
0 1
0 2
0 2
010302030 20 30 40 4013
021
0
1
4
0
0
9
0
1
0
2
0
2
0
2
0
1
0
2
0
1
0
0
-
Y
9
-
P
O
T
1
3
+
2
5
.
0
0
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
4.5’
8.9’
10’10’1’-6" C&G 2’-9" C&G
1
’
-
6
"
C
&
G
2’-6" C&G2’-6" C&G
2
’
-
6
"
C
&
G
CAT-1 CAT-1 AT-1 8X18 CURB
8
X
1
8
C
U
R
B
8
X
1
8
C
U
R
B
8
X
1
8
C
U
R
B
-
L
-
-Y9-
-
Y
1
0
-
C
R
C
R
CRCR
F-F
30.00’
20.25’
F-F
F-F
28.75’21.5’
F-F
1
’
-
6
"
C
&
G
50’ (TYP.)50’ (TYP.)+35.16PROP. 5’ CONC. SIDEWALK
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
S
I
D
E
W
A
L
K
P
R
O
P
.
5
’
C
O
N
C
.
2
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
8
2
+
3
5
.
1
6
-
8
2
+
8
5
.
1
6
T
O
1
’
-
6
"
C
&
G
T
R
A
N
S
I
T
I
O
N
2
’
-
9
"
C
&
G
+60(TYP.)20’+80.58(TYP.)20’(TYP.)16.45’(LT & RT)TAPER 95.19’14’14’12’12’
14’14’12’12’
30’24’24
’
2
0
’
2
0
’
2
6
’
2
0
’
2
4
’
2
4
’
2
4
’
-
Y
1
0
-
P
O
T
1
1
+
5
6
.
4
9
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
0 2
+
8
0
+
7
0
+
1
0
(TYP,)
20’
3
6
’
3
6
’
Sta. 13+07.25-Y9- PT
Sta. 13+34.15
-Y9- POT
A
A
2
0
3
5
A
D
T
2
0
1
5
A
D
T
-
L
-
N
C
2
6
8
P
E
B
B
L
E
S
T
.
-
Y
1
0
-
S
R
1
9
8
1
2
3
,
3
0
0
1
7
,
8
0
0
2
3
,
3
0
0
1
7
,
8
0
0
<
1
0
0
<
1
0
0
<
1
0
0
<
1
0
0
<
1
0
0
<
1
0
0
-Y9-PI Sta 12+78.72DL = 77.43’T = 48.91’R = 50.00’V < 15 mphSE = 0.04 -L-PI Sta 73+85.60DL = 1,536.94’T = 787.38’R = 2,870.00’V = 50 mphSE = 0.03
A
A
2
0
3
5
A
D
T
2
0
1
5
A
D
T
-
L
-
N
C
2
6
8
-
Y
9
-
S
I
D
N
E
Y
A
V
E
.
<
1
0
0
<
1
0
0
<
1
0
0
<
1
0
0
2
3
,
3
0
0
1
7
,
8
0
0
2
3
,
3
0
0
1
7
,
8
0
0
<
1
0
0
<
1
0
0
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
1
6
’
S
E
E
S
H
E
E
T
2
B
-
5
F
O
R
-
Y
9
-
&
-
Y
1
0
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
S
E
E
S
H
E
E
T
3
1
F
O
R
-
Y
9
-
&
-
Y
1
0
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
2
3
F
O
R
-
L
-
P
R
O
F
I
L
E
D
I
D
I
2
G
I
C
B
C
B
C
B
2
G
I
C
B
C
B
C
B
2
G
I
B
D
O
C
BC
B
2
G
I
B
D
O
B
D
O
C
B
C
B
J
B
w
/
M
H
C
B
2
G
I
2
G
I
2
G
I
3:1
2:1
S
P
E
C
I
A
L
B
A
C
K
O
F
C
U
R
B
C
U
T
D
I
T
C
H
(
N
O
T
T
O
S
C
A
L
E
)
F
R
O
M
-
L
-
S
T
A
.
8
9
+
1
4
T
O
S
T
A
.
9
0
+
5
0
R
T
D
E
T
A
I
L
B
C
2
S
E
E
D
E
T
A
I
L
B
C
2
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
2
8
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
1
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
(
N
o
t
t
o
S
c
a
l
e
)
D
2:1
2:1
b
1
"
/
F
t
.
F
R
O
M
-
L
-
S
T
A
.
8
6
+
0
0
T
O
S
T
A
.
8
7
+
3
0
R
T
b
=
2
F
t
.
M
i
n
.
D
=
0
.
5
F
t
.
D
E
T
A
I
L
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
S
E
E
D
E
T
A
I
L
B
C
1
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
-
L
-
S
T
A
8
3
+
0
0
t
o
8
3
+
5
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
-
L
-
S
T
A
8
3
+
6
5
t
o
8
5
+
3
3
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
-
L
-
S
T
A
8
5
+
5
2
t
o
8
6
+
5
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
-
L
-
S
T
A
8
1
+
7
7
t
o
8
3
+
6
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
15"
1
5
"
1
5
"
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
15" RCP-III 24" RCP-III 24"HWSPECIAL CBCLEANOUT EST 4 CY EXSITING CULVERT
15"
RCP
-
III
15" RCP-III
1
5
"
R
C
P
-
I
I
I
C
B
C
B
C
B
1
8
"
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
2
4
"
R
C
P
-
I
I
I
2
4
"
R
C
P
-
I
I
I
2
4
"
R
C
P
-
I
I
I
2
4
"
R
C
P
-
I
I
I
15"
1
5
"
15"
1
5
"
R
C
P
-
I
I
I
15"15"
36"
1
8
"
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
30" RCP-III
2
4
"
R
C
P
-
I
I
I
15"
1
5
"
R
C
P
-
I
I
I
15" RCP-III 18" RCP-III 18" RCP-III
0
9
5
6
0
9
5
7
0
9
5
9
0
9
6
0
0
9
5
4
0
9
5
5
0
9
5
0
0
9
5
1
0
9
5
2
0
9
5
3
0
9
5
8
0
9
3
9
0
9
4
1
0
9
4
2
0
9
4
4
0
9
4
5
0
9
4
6
0
9
4
7
0
9
4
3
093709350936 0938 0905090609070915091309140916
0
9
0
9
0
9
1
0
09110912 090209010903
0
9
2
0
0
9
2
1
0
9
2
2
0
9
2
4
0
9
2
5
0
9
2
6
0
9
2
7
0
9
2
8
0
9
2
9
0
9
3
0
0
9
3
1
0
9
2
3
0
9
6
6
0
9
6
5
0
9
6
7
HW 48" RCP-III
T
O
8
6
+
6
0
R
T
F
R
O
M
S
T
A
8
6
+
0
0
E
S
T
5
2
S
Y
IN
S
T
A
L
L
P
S
R
M
15" RC
P
-
I
I
I
C
B
C
B
15"15"
B
D
O
2
G
I
15" RCP-III
0
9
6
3
C
B
2
G
I
1
5
"
1
5
"
R
C
P
-
I
I
I
0
9
6
8
0
9
6
4
2GI 2GI 2GI2GI2GI2GI
2
G
I
2
G
I
E
S
T
4
3
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
RETAIN RCBC
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
REMOVE
R
E
M
O
V
E
2
4
"
C
M
P
R
E
M
O
V
E
2
6
’
+
/
-
RCP-III48"CBCBCB CBCB
C
B
C
B
18"0917
1
5
"
w
/
E
L
B
O
W
S
2
4
"
1
5
"
SEE DETAIL PR2 PLACE ON BANKS ONLY CLASS ’I’ RIP RAP
18" CMP-CPP
3:12:1 SPECIAL BACK OF CURB CUT DITCH(NOT TO SCALE)FROM -L- STA. 91+19 TO STA. 93+50 RT FROM -L- STA. 90+50 TO STA. 90+65 RT FROM -L- STA. 84+80 TO STA. 85+80 LT FROM -L- STA. 83+80 TO STA. 84+50 LT FROM -L- STA. 82+00 TO STA. 83+50 LT DEPTH = 1’DETAIL BC1
1
5
"
1
5
"
1
5
"
2
4
"
R
C
P
-
I
I
I
1
5
"
1
5
"
R
C
P
-
I
I
I
1
5
"
1
5
"
C
M
P
18
"
R
C
P
R
E
M
O
V
E
R
E
M
O
V
E
R
E
T
A
I
N
S
E
E
D
E
T
A
I
L
B
C
1
C
U
R
B
C
U
T
D
I
T
C
H
S
P
E
C
I
A
L
B
A
C
K
O
F
JB w/MH SPECIAL
d
(
N
o
t
t
o
S
c
a
l
e
)
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
V
A
R
I
A
B
L
E
P
I
P
E
O
U
T
L
E
T
R
I
P
R
A
P
D
E
T
A
I
L
P
R
2
MI
N. 2:1
M
IN
. 2:1
E
S
T
.
3
0
T
O
N
S
&
6
0
S
Y
G
E
O
T
E
X
T
I
L
E
L
I
N
E
R
T
Y
P
E
-
C
L
A
S
S
’
I
’
R
I
P
R
A
P
d
=
4
F
t
.
F
T
.
L
E
N
G
T
H
=
1
0
C
h
a
n
n
e
l
B
e
d
-
L
-
S
T
A
.
7
8
+
8
0
R
T
C
H
A
N
N
E
L
B
A
N
K
T
I
E
T
O
E
X
I
S
T
I
N
G
1
0
0
’
+
3
5
7
8
’
7
5
’
7
0
’
+
2
0
7
8
’
7
5
’
7
0
’
+
7
5
7
5
’
+
8
5
7
0
’
+
6
0
7
8
’
7
0
’
+
6
5
9
4
’
+
5
0
7
0
’
+
3
5
8
1
’
7
0
’
+
7
3
92’+54
7
5
’
+
7
5
8
8
’
+
5
0
1
1
0
’
+
0
0
1
0
5
’
+
0
0
8
7
’
+
5
5
8
5
’
+
7
8
1
0
0
’
8
5
’
7
0
’
+
9
6
8
5
’
+
6
5
42’+36.22 -Y9-28’+76.06 -Y9-23’+00 -Y9-
9
.
3
4
’
+
3
4
-
Y
9
-
3
5
’
+
4
6
.
1
9
-
Y
9
D
E
T
-
3
2
’
+
6
2
-
Y
9
D
E
T
-
3
2
’
+
8
5
-
Y
9
D
E
T
-
2
2
’
+
0
0
-
Y
9
D
E
T
-
2
5
’
+
0
0
-
Y
9
D
E
T
-
1
5
.
1
7
’
+
2
0
-
Y
9
D
E
T
-
6
5
’
+
9
3
.
8
8
-
Y
1
0
-
1
5
.
1
7
’
+
4
5
-
Y
1
0
-
75.77’+20 85’+3970’+5677.87’+55.29118’+50 112’+7194.08’+76 96’+9889’76.55’+4077.66’+99.42 70’+00
8
5
’
+
0
0
7
0
’
+
9
5
1
1
1
’
+
2
5
1
0
0
’
+
1
7
4
.
4
8
’
+
2
0
-
Y
9
D
E
T
-
8
5
’
+
2
5
100’89’+54 99’93’72.82’+7093’86’+0585’78’70’+4185’78’+5086’78’+26
6
4
’
+
1
5
-
Y
9
-
8
9
.
3
3
’
+
9
3
9
0
’
+
6
4
.
1
8
5
7
’
+
2
6
-
Y
9
-
215.31’+70 -Y9-212’+67 -Y9-122’+52 -Y9-127’+50 -Y9-118’+48 -Y9-70.28’+46 -Y9-113’+50 -Y9-
9
6
’
+
5
9
.
8
2
2
5
’
+
8
0
-
Y
9
D
E
T
-
8
5
’
+
3
1
1
6
4
’
+
8
0
8
5
’
+
6
7
1
8
0
’
+
0
5
8
5
’
+
0
0
9
5
’
+
5
0
9
7
’
8
5
’
+
2
8
9
7
’
8
5
’
+
3
8
1
0
7
’
9
6
’
7
0
’
+
9
7
1
0
7
’
+
1
1
8
5
’
7
0
’
+
3
5
8
5
’
7
5
’
7
0
’
+
4
0
8
5
’
7
5
’
7
0
’
+
0
0
70’+88.9170’+35.1670’+6033.03’+85 -Y9-
1
4
.
6
1
’
+
2
5
-
Y
9
-
4
0
.
5
4
’
+
9
0
.
4
4
-
Y
9
-
4
2
.
4
4
’
+
9
7
.
5
2
-
Y
9
-
7
0
’
+
8
5
7
0
’
+
8
0
1
5
.
1
9
’
+
5
6
.
4
9
-
Y
1
0
-
1
5
’
&
2
0
’
+
4
5
.
0
0
-
Y
1
0
-
4
0
’
+
0
5
-
Y
1
0
-
FC
C
C C FFFC F
C
C
F
C
F
F
C
C
FFCC
C
F
F
C F
F
F
F
F
F
N
A
D
8
3
/
9
5
GROUND NATURALSlopeFillSlopeFillGeotextile REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:45R:\Roadway\Proj\R-2603_Rdy_psh10.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 11
MATCH LINE -L- STA. 105+00
SEE SHEET NO. 9MATCH LINE -L- STA. 92+00
R
-
2
6
0
3
1
0
10/14/2014 - R/W REVISIO N: REVISED TCE O N PARCEL 75 AND CREATED PARCEL 75Z. - KNW10/03/2014 - R/W REVISIO N: ADDED TCE FO R -DRIVE6- O N PARCELS 76, 77, 79, & 180; ADDED A ’DO NO T DISTURB STRUCTURES’ NO TE O N PARCEL 180. - M AE09/02/2014 - R/W REVISIO N: ADDED PUE AND REVISED TCE O N PARCEL 73; REVISED PUE & TCE O N PARCEL 77; ADDED PUE O N PARCEL 78 AND CREATED PARCEL 73Z. - M AE04/ 17/2014 - R/W REVISIO N: REPLACED DRIVEW AY W ITH 24’ CURB CUT AND ADJUSTED TCE O N PARCEL 73. - M AE DRIVE TO 36’ DRIVE O N PARCEL 77. - M AE03/ 13/2014 - R/W REVISIO N: ADDED 24’ DRIVE AND ADJUSTED TCE O N PARCEL 73; CHANGED 24’ DRIVE TO 36’ DRIVE AND CHANGED PRO PERTY O W NER NAM E O N PARCEL 74; CHANGED 20’09/03/2013 - R/W REVISIO N: REALIGNED -Y11- TO ITS EXISTING LO CATIO N O N PARCEL 78. - KNW8" PLASTIC
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
N
5
7
1
0
’
0
4
"
E
N
5
7
1
0
’
0
4
"
E
S 17 29’17" E
S 20 10’34" E
S
7
1
2
7
’18
"
W
S
0
0
5
2
’2
1" E
N 6129’46" W
N 6128’44" W
N 7410’22" W
S 7214’04" W
N 6129’06" W
N 7410’22" W
N
0
3
13
’0
7
"
W
S
7
8
3
3
’5
7
" W
7
5.
3
4
’
9
6
.
0
8
’
472.08’
96.91’
2
2
2
.
5
0
’
5
9
.
0
7
’
113.22’
203.93’
195.04’
145.00’
193.46’
181.35’
31.74
’
3
3
5
.13
’
M
A
R
Y
H
U
T
C
H
I
N
S
O
N
T
A
M
H
U
T
C
H
I
N
S
O
N
ALMEDA ELLER WILLIAM ELLER
F
R
E
D
R
E
E
V
E
S
TP WILKES LLC
D
B
7
3
4
P
G
5
4
2
DB 819 PG 515
D
B
8
0
2
P
G
6
3
6
DB 955 PG 8
R
E
B
A
R
R
E
B
A
R
R
E
B
A
R
E
I
P
E
I
P
E
I
P
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
N
O
R
T
H
WIL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
NORTH WILKESBORO CITY LIMITS
NORTH WILKESBORO CITY LIMITS213.09’
NORTH WILKESBORO CITY LIMITS
73 7475
7
6
7
9
15
7.
82’
40.00’
142.36’
517.28’
490.31’
18
" C
M
P
STEEL
30"
B
S
T
N
C
2
6
8
E
L
K
I
N
R
D
2
2
’
B
S
T
G
R
B
S
T
W
/
L
T
S
W/
L
TH
T
R
7
2
"
C
H
L
&
3
S
B
W
72"CHL&3SBWS
C
O
N
C
BSTS
72"CHL 3SBW
72"WW 72"WWCONCGRGR SSGRW/LT
W
/
L
T
LT 1SBLKBUS1SFBUS15" CMP 15" CMP
11
2
T
T
T
T
T
6"AC
8
"
A
C
6
"
A
C
6
"
A
C
C
A
B
I
N
E
T
REPEATERTELE
H
U
T
C
H
I
N
S
O
N
S
L
L
C
D
B
7
3
4
P
G
5
4
1
-
B
Y
7
-
5
4
-
B
L
-
2
0
43.64’+07.24
3
.
9
7
’
+
2
6
.
7
8
7
8
H
U
T
C
H
I
N
S
O
N
S
L
L
C
D
B
7
3
4
P
G
5
4
1
7
8
DONNA R. KEY FRED A. REEVES, JR.DB 224 PG 78DB 135 PG 57 DB 152 PG 206DB 526 PG 765WILL-12E 130DONNA R. KEY REEVES, JR.FRED A.
D
B
8
8
1
P
G
5
8
5
7
7
C
O
N
S
T
R
U
C
T
I
O
N
C
O
I
N
C
F
R
E
D
R
E
E
V
E
S
-
B
Y
7
-
5
3
SR 1983 18’ BSTAARON CALL RD
REBAR
-
B
L
-
G
P
S
R
2
6
0
3
-
3
-
B
Y
8
-
5
5
H
TR
B
S
T
GR
S
S
S
S
G
CONC
1
8
0
D
O
N
N
A
R
E
E
V
E
S
K
E
Y
K
A
R
E
N
W
.
R
E
E
V
E
S
F
R
E
D
A
.
R
E
E
V
E
S
,
J
R
.
1
2
E
1
3
0
0
9
E
2
5
0
D
B
1
3
5
P
G
0
5
7
73Z
7
7
7
7
75Z 95
100
-L- POT Sta. 91+16.25 -Y10- POT Sta. 13+00.00=
-L- PC Sta. 101+87.26
PI Sta 105+12.30DL = 649.84’T = 325.03’-L-R = 10,000.00’SE = NC V = 50 mph
105
F-F
28.75’
F-F28.75’F-F28.75’21.5’F-F
F-F
28.75’
+25
0 2
12.75’
+93.35
EOT-F
0 20 2
F-F
40.75’
+00
1’-6" C&G 1’-6" C&G
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
2’-6" C&G2’-6" C&G 8X18 CURB
-
L
-
PROP. 5’ CONC. SIDEWALK PROP. 5’ CONC. SIDEWALK
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
P
R
O
P
.
5
’
C
O
N
C
.
S
I
D
E
W
A
L
K
10
0
’
T
A
P
E
R
10
0
’
T
A
P
E
R
14’14’12’12’
14’14’12’12’12’
36’24’8X18 CURB
F-F
40.75’
+10
-Y11-
-
Y
1
1-
P
O
T
St
a.
1
0
+
0
0.
0
0
-
Y
1
1-
P
C
St
a.
1
0
+
2
9.
5
9
-
Y11-
P
T
S
ta
. 12
+
4
8
.3
5
-
L
-
P
O
T
S
t
a
.
9
8
+
6
8
.
5
6
-
Y
1
1
-
P
O
T
S
t
a
.
1
3
+
9
6
.
7
9
=
C
R
C
R
-
Y
1
1
-
P
T
1
2
+
4
8
.
3
5
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
0
1
3
0
1
+
5
5
+
7
5
0
3
0
0
0
1
+
9
5
+
4
0
0
1
+
2
0
0
2
0
2
PI Sta 11+40.06L = 218.76’T = 110.47’R = 636.62’-Y11-V = STOP CONDITIONSE = SEE PLANS D24’TL-3 GRAU 350
2
’
-
6
"
C
&
G
0 2
A
A
2
0
3
5
A
D
T
2
0
1
5
A
D
T
-
L
-
N
C
2
6
8
4
0
0
2
6
0
2
3
,
3
0
0
1
7
,
8
0
0
-
Y
1
1
-
S
R
1
9
8
3
A
A
R
O
N
C
A
L
L
R
D
.
2
2
,
2
0
0
1
6
,
8
4
0
1
,
6
0
0
1
,
2
5
0
1
,
2
0
0
9
9
0
105
S
E
E
S
H
E
E
T
2
B
-
5
F
O
R
-
Y
1
1
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
E
E
S
H
E
E
T
3
1
F
O
R
-
Y
1
1
-
&
-
D
R
I
V
E
6
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
2
4
F
O
R
-
L
-
P
R
O
F
I
L
E
C
A
T
-
1
10
’
10
’
-
L
-
P
O
T
S
t
a
.
9
8
+
5
6
.
0
0
-
D
R
I
V
E
6
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
D
R
I
V
E
6
-
P
C
S
t
a
.
1
0
+
5
3
.
7
0
-
D
R
I
V
E
6
-
P
T
S
t
a
.
1
1
+
1
2
.
9
8
-
D
R
I
V
E
6
-
P
C
S
t
a
.
1
1
+
6
5
.
2
8
-
D
R
I
V
E
6
-
P
T
S
t
a
.
1
2
+
6
6
.
1
8
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
-
D
R
I
V
E
6
-
P
O
T
S
t
a
.
1
3
+
3
3
.
6
0
-
D
R
I
V
E
6
-
P
O
T
S
t
a
.
1
3
+
5
0
.
0
0
-
D
R
I
V
E
3
-
P
R
C
S
t
a
.
1
1
+
3
5
.
9
3
-
D
R
I
V
E
3
-
P
C
C
S
t
a
.
1
2
+
8
6
.
9
6
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
-
D
R
I
V
E
3
-
P
T
S
t
a
.
1
3
+
4
8
.
5
2
-
D
R
I
V
E
3
-
P
O
T
S
t
a
.
1
3
+
5
9
.
8
5
-
D
R
I
V
E
3
-
P
I
S
t
a
1
2
+
1
2
.
0
2
DL
=
1
5
1
.
0
3
’
T
=
7
6
.
0
9
’
R
=
5
0
0
.
0
0
’
P
I
S
t
a
1
3
+
2
2
.
3
2
DL
=
6
1
.
5
6
’
T
=
3
5
.
3
7
’
R
=
5
0
.
0
0
’
-
D
R
I
V
E
3
-
-
D
R
I
V
E
6
-
P
I
S
t
a
1
2
+
2
6
.
3
7
DL
=
1
0
0
.
8
9
’
T
=
6
1
.
0
9
’
R
=
7
1
.
0
0
’
R
=
9
6
.
0
0
’
T
=
3
0
.
6
2
’
L
=
5
9
.
2
8
’
P
I
S
t
a
1
0
+
8
4
.
3
2
D
12’
B
D
O
C
B
J
B
w
/
M
H
C
B
C
B
C
B
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
15
"
RC
P
-
III
-
L
-
S
T
A
1
0
1
+
5
0
t
o
1
0
3
+
6
5
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
CB
C
B
CB
C
B
2GICB15" RCP-III
R
E
M
O
V
E
R
E
M
O
V
E
EXISITING 18" CMP REMOVE 6’+/- OF SEE DETAIL BC1 SPECIAL BACK OF CURB CUT DITCH 3:12:1 SPECIAL BACK OF CURB CUT DITCH(NOT TO SCALE)FROM -L- STA. 90+50 TO STA. 93+50 RT DEPTH = 1’DETAIL BC1 15" RCP-III 15"15" RCP-III 15" RCP-III
H
W
C
B
4
O
T
1
0
2
0
1
0
2
4
1
0
2
1
1
0
2
7
1
0
2
6
1
0
2
5
100910111
0
1
2
1
0
1
3
1
0
1
4
1
0
1
5
1
0
1
6
100510061010
-
L
-
S
T
A
1
0
3
+
7
2
t
o
1
0
5
+
4
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
1
0
1
8
1
0
2
3
CBCB
C
B
1
0
1
9
1
5
"
R
C
P
-
I
I
I
18
"
RC
P-
III
15"
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
LATERAL ’V’ DITCH( Not to Scale)D2:12:1 b1"/Ft.FROM -L- STA. 99+25 TO STA. 99+75 LT FROM -L- STA. 96+78 TO STA. 98+26 LT FROM -L- STA. 95+60 TO STA. 96+73 LT b= 2 Ft.Min. D=0.5 Ft.DETAIL L1GroundNatural 102215" RCP-III
15" RCP-III
15" 1028
1
0
1
7
EST 81 CY DDE SEE DETAIL L1 LATERAL ’V’ DITCH
E
S
T
1
9
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
E
S
T
1
2
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
REMOVE
1
5
"
R
C
P
-
I
V
7 SY
G
E
O
T
E
X
T
I
L
E
E
A
.
EST
.
2
T
O
N
S
E
A
.
CLA
S
S
’
B
’
R
I
P
R
A
P
1
5
"
RCP-III 15"
R
E
T
A
I
N
RETAIN
18" CMP
30" CSP
LATERAL ’V’ DITCH( Not to Scale)2:12:1Dbd1"/Ft.FROM -DRIVE6- STA. 10+75 TO STA. 12+60 LT FROM -Y11- STA. 12+60 TO STA. 13+30 LT Type of Liner= CLASS ’B’ Rip-Rapb= 2 Ft.Max. d=1 Ft.Min. D=1.2 Ft.DETAIL LR1GroundNatural
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
18" RCP-III
1
0
2
9
7
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
8
T
O
N
S
C
L
B
E
S
T
1
2
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
R
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
1
8
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
6
5
T
O
N
S
C
L
B
E
S
T
8
3
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
R
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
8
5
’
+
5
0
110’+00
7
5
’
+
5
0
7
5
’
+
0
0
85’+4085’+90
1
0
5
’
9
5
’
8
5
’
7
0
’
+
4
0
8
5
’
+
6
5
65’ +93.88 -Y10-
9
9
.
1
1
’
+
0
0
T
R
E
E
S
D
I
S
T
U
R
B
D
O
N
O
T
1
1
1
’
+
6
8
8
1
.
8
9
’
+
7
1
1
0
8
’
+
6
0
8
4
.
2
5
’
+
7
9
75’ 65’ 60’+70 75’65’60’+40
8
0
.
6
0
’
+
2
1
3
4
’
+
0
0
-
D
RI
V
E3
-
1
5
’
+
5
5
-
D
R
I
V
E
3
-
1
2
’
+
5
5
-
D
R
I
V
E
3
-
1
5
’
+
2
5
-
D
R
I
V
E
3
-
2
0
’
+
0
0
-
D
R
I
V
E
3
-
2
0
’
+
7
5
-
D
R
I
V
E
3
-
110’+2597’85’+9997’85’+09
3
0
’
+
4
2
-
Y
1
1
-
60’+00 40’+05-Y10-
3
0
’
+
8
5
.
0
0
6
0
’
+
0
5
.
0
0
3
0
’
+
7
0
.
0
0
7
0
’
+
4
5
.
0
0
7
0
’
+
8
7
.
2
6
7
0
’
+
0
0
7
0
’
+
8
7
.
2
6
7
0
’
+
7
5
8
0
’
+
2
4
.
9
1
1
2
0
’
8
5
’
7
0
’
+
0
5
1
2
0
’
1
1
0
’
8
5
’
7
0
’
+
5
5
8
5
’
&
9
7
’
-
L
-
+
0
9
8
5
’
&
9
7
’
-
L
-
+
2
1
5
5
’
-
D
R
I
V
E
6
-
+
0
0
8
5
’
+
1
6
6
0
’
+
5
8
-
D
R
I
V
E
6
-
2
0
’
+
3
5
-
D
R
I
V
E
6
-
2
0
’
-
D
R
I
V
E
6
-
+
3
5
2
1
’
-
D
R
I
V
E
-
+
0
8
4
0
’
-
D
R
I
V
E
6
-
+
0
6
3
8
’
+
6
3
-
D
R
I
V
E
6
-
4
6
’
+
5
0
-
D
R
I
V
E
-
7
0
’
+
5
0
S
T
R
U
C
T
U
R
E
S
D
O
N
O
T
D
I
S
T
U
R
B
80’60’+5580’65’+15CF
F
FC
C
C
F
C
C
C
F
C
F
C
F
F
C
CC
C
F
F
F
F
F
F
F
F
FF
F
F
F
F
F
F
F
F
N
A
D
8
3
/
9
5
M
I
N
.
1
’
T
U
C
K
N
A
T
U
R
A
L
G
R
O
U
N
D
A
N
D
F
L
U
S
H
W
I
T
H
IN
S
T
A
L
L
L
E
V
E
L
S
l
o
p
e
F
i
l
l
G
E
O
T
E
X
T
I
L
E
S
l
o
p
e
F
i
l
l
G
e
o
t
e
x
t
i
l
e
S
l
o
p
e
F
i
l
l
G
E
O
T
E
X
T
I
L
E
G
e
o
t
e
x
t
i
l
e
2
’
G
E
O
T
E
X
T
I
L
E
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
09-OCT-2014 10:54R:\Roadway\Proj\R-2603_Rdy_psh11.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 12
MATCH LINE -L- STA. 119+00
SEE SHEET NO. 10MATCH LINE -L- STA. 105+00
1
1
R
-
2
6
0
3
3/13/2014 R/W REVISIO N: SUBDIVIDED PARCEL 78 INTO PARCELS 78 & 78A; ADDED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 78A. - M AE
R
/
W
S
H
E
E
T
N
O
S
.
9/3/2013 R/W REVISIO N: REALIGNED -Y11- TO ITS EXISTING LO CATIO N O N PARCEL 78. - KNW
1
1
&
1
9
9/2/2014 R/W REVISIO N: ADDED PUE, REVISED TDE AND REM O VED TCE O N PARCEL 78; ADDED PUE, REVISED TCE, AND ADDED ’DO NO DISTURB STRUCTURE’ NO TE O N PARCEL 78A. - M AE8" PLASTIC
8
"
P
L
A
S
T
IC
8
" P
L
A
S
T
IC
8
"
P
L
A
S
T
I
C
8
" P
L
A
S
T
IC
8" STEEL
8
"
S
T
E
E
L
N 2138’20" W
250.96’
HUTCHINSONS LLCDB 734 PG 541R/W MON226.23’EXISTING R/W EXISTING R/W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’
NORTH WILKESBORO CITY LIMITS
NORTH WILKESBORO CITY LIMITS
2
0
0
’
200’ POWER EASEMENT
BREMCO - DB 645 PG 681
BREMCO - DB 645 PG 681 200’ POWER EASEMENT
78HW
D
I
15" CMP
15" RCP
15" RCP
C
B
RCP24"
CMP
18"
M
O
N
R
/
W
M
T
L
C
O
N
C
B
S
T
B
S
T
M
T
L
M
T
L
BST
1SBKBUS
SO
IL
GR
W
/
L
T
SOILSSGRBSTBSTCONCGR
C
O
N
C
LT
D
I
D
I
15" CMP12" CMP
MULBERRY CREEK
MULBERRY CREEK
9697
T
T
T
TT T 6"AC6"AC6"PVC6"PVCT 2"PVC 2"PVC6"PVC6"AC
6
"
P
V
C
6"AC
8
"
P
V
C
6"PVC
METER MASTERMARY HUTCHINSONTAM HUTCHINSONDB 734 PG 542 79
N
C
2
6
8
E
L
K
IN
R
D
2
2
’
B
S
T
-BY8-56
-
B
L
-
G
P
S
R
2
6
0
3
-
4
72.75’+92.82
88.43’
+35.90
46.29’+28.40
6
3
.
8
1
’
+
1
7
.
6
9
BST GR
H
U
T
C
H
IN
S
O
N
S
L
L
C
D
B
7
3
4
P
G
5
4
1
7
8
R
C
P
2
4
"
N 1938’24" W
535.16’
S 7718’53" E
175.43’
S 4544’40" E
74.15’
S 2643’23" E
50.12’
S 2010’30" E
301.37’
7
8
A
F
R
A
N
K
V
E
R
N
O
N
J
O
H
N
S
O
N
D
B
1
1
3
5
P
G
6
6
P
B
9
P
G
5
3
7
H
U
T
C
H
I
N
S
O
N
S
L
L
C
D
B
7
3
4
P
G
5
4
1
7
8
DB 734 PG 541 HUTCHINSONS LLC 78
H
U
T
C
H
I
N
S
O
N
S
L
L
C
D
B
7
3
4
P
G
5
4
1
7
8
FOUND
FOUND
EXISTING R/W EXISTING R/W CONC1SFBUS15" RCPW/LT S
CITY LIM
ITS
N
O
RTH WILKESBO
RO
FLINT HILL RDSR 2334 18’ BST 18" CMP30" CMP -BL-GPS R2603-3 EXISTING R/W
110
115
-L- PRC Sta. 108+37.10
-L- PT Sta. 114+67.98
105
EOP-F
24.75’
+10
24.75’
+10
EOP-F
0 2
0 2
0 2 0 2
24’24’
EOP-F36.75’+64.49 CONC. ISLAND.PRO. MONO.
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
T
Y
P
E
-
I
I
I
TYP
E
B-
7
7
TYP
E
B-
7
7
A
TTEN
U
A
TO
R
C
A
T
-
1
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
+55
0 2
+15
EX.)
(MATCH
0166
EX.)
(MATCH
0168
-
L
-
4’ PS
10
0
’
T
A
P
E
R
100’ TAPER
3
0
’
3
8
’
8
:
1
T
A
P
E
R
-
L
-
S
T
A
1
1
6
+
3
5
.
8
3
B
E
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
-
L
-
S
T
A
1
1
6
+
6
0
.
0
0
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
1
1
8
+
3
4
.
1
7
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
-
L
-
S
T
A
1
1
8
+
1
0
.
0
0
E
N
D
B
R
I
D
G
E
I
I
I
T
Y
P
E
1
6
’
-Y12--Y12- PC
St
a.
1
3
+
0
2.
1
5
15-Y12-
-Y12- PC Sta. 17+22.32
-Y12- PT Sta. 16+25.02-Y12- PT Sta. 18+97.52
CR50’ TAPER 10’10’0399.0’9.0’024 0403(TYP.)25’04 20’16’16’0410’10’0410’10’04 +00+85+20 -L- POC Sta. 105+99.33 -Y12- POT Sta. 10+00.00=
2
0
’
R
A
T
-
1
2
0
3
5
A
D
T
2
0
1
5
A
D
T
-
L
-
N
C
2
6
8
2
3
,
3
0
0
1
7
,
8
0
0
F
L
I
N
T
H
I
L
L
R
D
.
-
Y
1
2
-
S
R
2
3
3
4
4
0
0
3
3
0
1
0
0
1
0
0
A
A
2
2
,
2
0
0
1
6
,
8
4
0
5
0
0
4
3
0
V = 40 mphSE = 0.04 PI Sta 14+65.34DL = 322.86’T = 163.19’R = 900.00’-Y12-PI Sta 18+10.20DL = 175.20’T = 87.88’R = 900.00’-Y12- PT 16+25.02 END CONSTRUCTION
EOP-F
0 2 0 2
24’24’
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
T
Y
P
E
B
-
7
7
T
Y
P
E
B
-
7
7
G
R
A
U
3
5
0
T
L
-
3
A
T
T
E
N
U
A
T
O
R
A
T
T
E
N
U
A
T
O
R
-
L
-
S
T
A
.
1
1
6
+
6
0
.
0
0
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
1
1
8
+
1
0
.
0
0
E
N
D
B
R
I
D
G
E
B
R
I
D
G
E
-
R
O
A
D
W
A
Y
R
E
L
A
T
I
O
N
S
H
I
P
S
K
E
T
C
H
24’8’3’
F-F
35’
3’24’
(EXIST)
F-F
33.8’
6.8’
+36.69
6.8’
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
EX.)
(MATCH
0168
0 2
+15
0 2
+55
EX.)
(MATCH
0166
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
-L-PI Sta 111+52.64DL = 630.88’T = 315.54’R = 10,000.00’SE = NC V = 50 mph PI Sta 105+12.30DL = 649.84’T = 325.03’R = 10,000.00’SE = NC V = 50 mph105
S
E
E
S
H
E
E
T
2
B
-
5
F
O
R
-
Y
1
2
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
E
E
S
H
E
E
T
3
2
F
O
R
-
Y
1
2
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
4
F
O
R
-
L
-
P
R
O
F
I
L
E
-DRIVE3-PI Sta 10+83.25DL = 108.07’T = 55.39’R = 200.00’-DRIVE3--Y12- POT Sta. 11+25.0
0
-DRIVE3- POT Sta. 10
+
0
0
.
0
0
=
-DRIVE3- PC Sta. 10+
2
7
.
8
6
12’
-
L
-
S
T
A
1
1
3
+
9
6
B
E
G
I
N
S
B
G
-
L
-
S
T
A
1
1
3
+
8
0
L
T
B
E
G
I
N
S
B
G
CBBDO30" RCP-III
T
O
D
R
A
I
N
G
R
A
D
E
C
U
T
3
6
"
2
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
8
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
2
G
I
2
G
I
2
G
I
B
D
O
3
0
"
R
C
P
-
I
I
I
15"
2
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
8
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
A
d
j
.
2
G
I
w/MH JB 30" RCP-III
-
L-
S
TA
110
+
0
0
to
111+
5
0
S
EE
RD
W
Y
S
TD
. 2
4
0
.0
1
BERM
D
ITC
H
15"
Q
1
0
=
1
c
f
s
G
R
A
D
E
T
O
E
L
.
9
9
3
P
S
H
S
E
E
D
E
T
A
I
L
P
1
1
1
0
9
1
1
1
7
1
1
2
0
1
1
2
1
1
1
1
8
1108110311021101
1
1
1
1
1
1
1
0
1
1
2
4
1
1
2
3
1
1
2
5
Q
1
0
=
1
c
f
s
D
E
T
A
I
L
P
1
P
S
H
S
E
E
A
A
W
P
L
A
N
V
I
E
W
S
E
C
T
I
O
N
A
-
A
(
4
’
m
i
n
t
y
p
.
)
P
e
r
m
a
n
e
n
t
S
o
i
l
R
e
i
n
f
o
r
c
e
m
e
n
t
m
a
t
t
i
n
g
(
P
S
R
M
)
(
R
i
p
R
a
p
i
n
b
a
s
i
n
n
o
t
s
h
o
w
n
f
o
r
c
l
a
r
i
t
y
)
P
i
p
e
o
r
D
i
t
c
h
O
u
t
l
e
t
S
q
u
a
r
e
P
r
e
f
o
r
m
e
d
S
c
o
u
r
H
o
l
e
(
P
S
H
)
S
e
e
d
w
i
t
h
n
a
t
i
v
e
g
r
a
s
s
e
s
a
t
i
n
s
t
a
l
l
a
t
i
o
n
.
P
R
E
F
O
R
M
E
D
S
C
O
U
R
H
O
L
E
*
N
O
T
T
O
S
C
A
L
E
N
A
T
U
R
A
L
G
R
O
U
N
D
B
FILL SLO
PE
PS
R
M
2:1
2:1
P
I
P
E
(
d
=
1
5
"
O
R
1
8
"
)
IN
F
L
O
W
3
/
0
8
D D
E
T
A
I
L
P
1
W
=
4
’
D
=
1
’
B
=
4
’
FI
L
T
E
R
F
A
B
R
I
C
R
I
P
R
A
P
W
I
T
H
L
I
N
E
R
:
C
L
A
S
S
B
-
L
-
S
T
A
1
1
8
+
3
9
R
T
6
5
’
-
L
-
S
T
A
1
1
6
+
3
8
L
T
7
8
’
18"15" 15" 12"12"11043GI18"15"
1
5
"
(
N
o
t
t
o
S
c
a
l
e
)
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
2:1
DB
b
d
2:1
1
"
/
F
t
.
F
R
O
M
-
L
-
S
T
A
.
1
0
8
+
5
0
T
O
S
T
A
.
1
0
9
+
5
0
R
T
D
E
T
A
I
L
L
B
4
b
=
2
F
t
.
B
=
4
F
t
.
M
a
x
.
d
=
0
.
5
F
t
.
M
i
n
.
D
=
0
.
5
F
t
.
*
W
h
e
n
B
i
s
<
6
.
0
’
T
y
p
e
o
f
L
i
n
e
r
=
C
l
a
s
s
’
B
’
R
i
p
-
R
a
p
G
r
o
u
n
d
N
a
t
u
r
a
l
CB24" RCP-III 24"14 SY GEOTEXTILE EST. 5 TONS CLASS ’B’ RIP RAP
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
(
N
o
t
t
o
S
c
a
l
e
)
2:1
2:1
D
b
d
1
"
/
F
t
.
F
R
O
M
-
L
-
S
T
A
.
1
0
5
+
5
0
T
O
S
T
A
.
1
0
8
+
0
0
L
T
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
b
=
2
F
t
.
M
a
x
.
d
=
1
F
t
.
M
i
n
.
D
=
1
.
2
F
t
.
D
E
T
A
I
L
L
R
1
G
r
o
u
n
d
N
a
t
u
r
a
l
1105 110611131114111511161107
1
1
1
2
1
1
1
9
2
G
I
R
E
T
A
I
N
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
REMOVE REMOVEREMOVE
3
0
"
B
R
ID
G
E
C
O
L
U
MN
S
3
6
"
R
C
P
-
I
I
I
REMOVERETAINTO DRAIN GRADE CUT TO DRAIN GRADE CUT 153 SY GEOTEX
T
I
L
E
EST. 53 TONS
C
L
B
EST 62 CY D
D
E
SEE DETAIL
L
4
LATERAL BASE D
I
T
C
H
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
C
L
A
S
S
’
I
I
’
R
I
P
R
A
P
1
3
3
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
4
5
T
O
N
S
C
L
B
E
S
T
4
5
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
T
B
4
T
A
I
L
B
A
S
E
D
I
T
C
H
(
N
o
t
t
o
S
c
a
l
e
)
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
2:1
DB
b
d
2:1
1
"
/
F
t
.
F
R
O
M
-
L
-
S
T
A
.
1
1
3
+
7
7
T
O
S
T
A
.
1
1
7
+
0
0
R
T
F
R
O
M
-
L
-
S
T
A
.
1
1
1
+
8
6
T
O
S
T
A
.
1
1
3
+
2
6
R
T
F
R
O
M
-
L
-
S
T
A
.
1
1
1
+
0
0
T
O
S
T
A
.
1
1
1
+
5
0
R
T
F
R
O
M
-
L
-
S
T
A
.
1
0
7
+
3
5
T
O
S
T
A
.
1
0
8
+
5
0
R
T
D
E
T
A
I
L
L
4
b
=
2
F
t
.
B
=
2
F
t
.
M
a
x
.
d
=
1
.
5
F
t
.
M
i
n
.
D
=
1
F
t
.
*
W
h
e
n
B
i
s
<
6
.
0
’
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
G
r
o
u
n
d
N
a
t
u
r
a
l
6
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
3
T
O
N
S
C
L
B
E
S
T
8
5
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
4
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
1
8
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
6
4
T
O
N
S
C
L
B
E
S
T
7
3
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
4
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
4
3
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
4
9
T
O
N
S
C
L
B
E
S
T
1
1
7
1
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
4
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
2:1
2:1
D
(
N
o
t
t
o
S
c
a
l
e
)
S
T
A
N
D
A
R
D
B
A
S
E
D
I
T
C
H
B
d
FRO
M
-
L
-
S
T
A
.
1
1
0
+
7
9
(
1
1
4
’
R
T
)
T
O
1
1
1
+
5
0
(
6
5
’
R
T
)
D
E
T
A
I
L
T
B
4
B
=
4
F
t
.
M
a
x
.
d
=
1
F
t
.
M
i
n
.
D
=
1
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
*
W
h
e
n
B
i
s
<
6
.
0
’
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
1
0
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
4
T
O
N
S
C
L
B
E
S
T
2
2
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
B
4
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
D
E
T
A
I
L
E
B
1
C
L
A
S
S
’
I
I
’
R
I
P
R
A
P
S
T
R
E
A
M
E
M
B
A
N
K
M
E
N
T
R
I
P
R
A
P
A
T
B
R
I
D
G
E
B
E
N
T
A
N
D
(
N
o
t
t
o
S
c
a
l
e
)
P
R
O
P
.
B
R
I
D
G
E
B
E
N
T
D
E
T
A
I
L
E
B
1
G
e
o
t
e
x
t
i
l
e
=
E
S
T
.
6
0
S
Y
E
a
c
h
B
e
n
t
T
y
p
e
o
f
L
i
n
e
r
=
E
S
T
.
5
5
T
O
N
S
,
C
L
I
I
R
i
p
-
R
a
p
E
a
c
h
B
e
n
t
-
L
-
S
T
A
.
1
1
7
+
6
5
-
L
-
S
T
A
.
1
1
7
+
0
3
250 SY GEOTEXTILE EST. 63 TONS CL B EST 117 CY DDE SEE DETAIL LR1 LATERAL ’V’ DITCH100’ RT +37.10
1
4
5
’
+
8
0
1
2
2
’
+
0
0
9
0
.
9
8
’
+
6
5
1
0
5
’
8
8
.
5
2
’
+
1
5
1
0
5
’
8
8
.
4
7
’
+
6
0
8
9
.
7
1
’
+
3
5
1
2
7
’
+
9
2
8
8
.
7
4
’
+
4
2
8
9
.
3
6
’
+
6
2
1
3
2
’
+
5
0
8
0
’
R
T
+
0
0
1
2
0
’
R
T
+
5
0
35’ LT +02.15 -Y12-37.32’+60 -Y12-110’ LT +37.10109.39’ L
T
+38.3
5
52’+00 -Y12-27.19’ LT +50 -Y12-33.05’+90 -Y12-35’ LT +35 -Y12-95’+28.8934’+00 -DRIVE3-28’+83.82 -DRIVE3-40’ LT +25 -Y12-48’+22.17 -Y12-90’ RT +00
1
1
9
’
1
1
0
’
+
7
5
1
1
7
.
4
6
’
+
5
0
1
1
5
’
+
2
9
.
4
9
1
1
5
’
+
0
0
1
2
7
’
+
0
6
1
1
5
’
+
1
3
1
2
2
’
+
1
6
1
0
0
’
R
T
+
6
7
.
9
8
1
1
4
’
+
8
7
.
5
0
1
1
3
’
+
0
0
S
T
R
U
C
T
U
R
E
D
O
N
O
T
D
I
S
T
U
R
B
80’+24.91
1
1
8
.
7
2
’
+
4
0
1
2
5
’
+
3
5
1
1
5
’
1
1
0
’
+
2
9
1
3
2
’
1
1
3
.
5
7
’
+
7
0
CCCFFFF CF
F
C
F
C
C
F
F
C
C
F
C
F
C
F
F
C CCCCCCFFFC FCCFC
C
C C
C
F
F
F
F
F
F
N
A
D
8
3
/
9
5
Slope Ditch FrontGeotextileMIN. 1’ TUCK NATURAL GROUND AND FLUSH WITH INSTALL LEVELGEOTEXTILEGEOTEXTILE REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
13-SEP-2014 11:10R:\Roadway\Proj\R-2603_Rdy_psh12.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 13
MATCH LINE -L- STA. 133+00
1
2
R
-
2
6
0
3
SEE SHEET NO. 11MATCH LINE -L- STA. 119+003/13/2014 - R/W REVISIO N: CHANGED 26’ DRIVE TO 36’ DRIVE O N PARCEL 84. - M AE PARCEL 82Z. - M AE9/2/2014 - R/W REVISIO N: ADDED PUE, CHANGED PDE TO DUE, AND REVISED TCE O N PARCELS 78 & 82; ADDED STATIO N AND O FFSET LABEL AT -L- 132+53, 87.93’ RT AND CREATED8" PLASTIC8" PLA
S
T
IC
8
"
P
L
A
S
T
IC
8
"
P
L
A
S
T
IC
S
0
2
4
8
’13
" W
N
0
2
5
4
’3
3
"
E
S
0
2
5
6
’
3
7
"
W
S
6
9
3
9
’
1
6
"
W
S
7
2
0
6
’
3
8
"
W
N
7656’08" W
2
5.
0
8
’
8
9
9.
6
6
’
2
5
.
0
2
’
2
4
.
9
6
’
3
9
5
.
9
9
’
177.77’
HUTCHINSONS
L
L
C
L
I
F
T
B
O
D
I
E
S
I
N
C
P
H
Y
L
L
I
S
W
A
G
O
N
E
R
C
A
S
W
E
L
L
W
A
G
O
N
E
R
JAMES HUTCHINSON JRDB 734 PG 5
4
1
D
B
6
1
8
P
G
4
4
7
D
B
9
6
7
P
G
4
2
7
DB 1101 PG 270
E
I
P
E
I
P
R
E
B
A
R
R
E
B
A
R
R
E
B
A
R
N
A
I
L
EXISTING R/W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
2
0
’
E
X
I
S
T
I
N
G
R/
W
P
E
R
N
C
D
O
T
R/
W
A
B
S
T
R
A
C
T
20’ EXISTING R/
W
PER NCDOT R/
W ABSTRACT
8078
8
3
8
4
1796
.11’
19
0
6
.5
2
’
372.55’
7.90’3
1.
8
1’
3
1.
9
4
’
125’
H
W
H
W
R
C
P
3
6
"
CMP
18"
CMP
18"
1
B
A
R
R
E
L
L
4’
x5’
M
O
N
R
/
W
GR
C
O
N
C
CONC
B
S
T
B
S
T
GR
W
/
L
T
7
2
"
C
H
L
&
3
S
B
W
7
2
"C
H
L
&
3
S
B
W
72" CHL&3SBW
72"CHL&3SBW
S
N
C
2
6
8
E
L
K
I
N
R
D
2
2
’
B
S
T
GR
GR
MTL
1
S
M
T
L
B
U
S
S
T
A
P
U
M
P
W
A
T
E
R
TT
T
T
T
T
T
2
"PVC
6"PVC
6
"
P
V
C
6
"
P
V
C
6
"
P
V
C
6"CI
6"CI
8"PVC6"PVC
2"PVC
2 REPEATERSTELE
AATUR
SKYVIE
W RD.
-BL-21
-
B
L
-
2
2
-
B
L
-
2
3
E
V
E
L
Y
N
B
L
A
C
K
B
U
R
N
W
I
L
L
I
A
M
B
L
A
C
K
B
U
R
N
D
B
9
8
5
P
G
1
0
0
8
2
27.42’+31.29
3
4
.4
5
’
+
3
3
.5
9
8
5
L
E
A
H
Z
E
T
T
E
L
M
E
I
E
R
D
I
R
K
Z
E
T
T
E
L
M
E
I
E
R
D
B
1
0
4
3
P
G
1
4
0
8
5
A
S
S
O
C
I
A
T
I
O
N
I
N
C
B
L
U
E
R
I
D
G
E
W
A
T
E
R
D
B
5
3
7
P
G
5
6
7
8
1
8
2
Z
120
125
130
P
I
S
t
a
1
1
+
5
6
.
3
4
DL
=
1
0
6
.
1
8
’
T
=
5
4
.
3
7
’
R
=
2
0
0
.
0
0
’
-L- PC Sta. 120+71.22
-L- PRC Sta. 129+80.77
-
L
-
P
I
S
t
a
1
2
5
+
2
6
.
2
1
L
=
9
0
9
.
5
4
’
T
=
4
5
4
.
9
9
’
R
=
1
2
,
0
0
0
.
0
0
’
S
E
=
N
C
V
=
5
0
m
p
h
P
I
S
t
a
1
3
5
+
1
5
.
6
8
DL
=
1
,
0
6
2
.
9
2
’
T
=
5
3
4
.
9
2
’
R
=
3
,
8
2
0
.
0
0
’
V
=
5
0
m
p
h
S
E
=
0
.
0
3
D
-Y
13- PT Sta. 12+08.15
-Y
13- PO
T Sta. 12+09.15
-
L
-
P
O
C
S
t
a
.
1
2
6
+
0
9
.
0
8
-
Y
1
3
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
24.75’EOP-F 24.75’EOP-F21.5’F-F
26.00’
EOP-F
24.75’
EOP-F
20.25’
F-F
0 2 0 2
0 2 0 2
0 1
0 0
0 1
0 3 0 3
0 3 0 3
0 2 0 2
-
Y
1
3
-
P
O
C
1
1
+
1
5
.
2
2
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
S
E
E
S
H
E
E
T
3
2
F
O
R
-
Y
1
3
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
7
F
O
R
-
L
-
P
R
O
F
I
L
E
-
Y
1
3
-
1’-6" C&G 1’-6" C&G
2
’
-
9
"
C
&
G
1
’
-
6
"
C
&
G
ATTENUATOR
C
A
T
-
1
G
RA
U
3
5
0
TL-
3
G
R
A
U
3
5
0
T
L
-
3
-
L
-
-
Y
1
3
-
1’-
6
" C
&
G
2
’-
9
" C
&
G
5
0
’ (T
YP
.)
5
0
’
1
2
8
+
3
0
.
7
7
-
1
2
8
+
8
0
.
7
7
T
O
2
’
-
9
"
C
&
G
T
R
A
N
S
I
T
I
O
N
1
’
-
6
"
C
&
G
3
5
’
R
3
5
’
R
2
0
’
3
6
’
1
6
’
PS
8’
PS
4’
8
:1 T
AP
E
R
8
:
1
T
A
P
E
R
8
:1 T
AP
E
R
-
Y
1
3
-
P
C
S
t
a
.
1
1
+
0
1
.
9
7
-
L
-
S
T
A
1
2
4
+
7
5
E
N
D
S
B
G
2
0
3
5
A
D
T
2
0
1
5
A
D
T
A
A
-
L
-
N
C
2
6
8
<
1
0
0
<
1
0
0
<
1
0
0
<
1
0
0
2
2
,
2
0
0
1
6
,
8
4
0
<
1
0
0
<
1
0
0
2
2
,
2
0
0
1
6
,
8
4
0
-
Y
1
3
-
S
K
Y
V
I
E
W
D
R
.
-
L
-
S
T
A
1
2
4
+
2
9
E
N
D
S
B
G
SEE SHEET 2B-5 FOR -Y12- INTERSECTION DETAILSEE SHEET 32 FOR -Y12- PROFILESEE SHEET 24 FOR -L- PROFILE
C
B
C
B
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
1
5
"
15" RCP-III
15" RCP-III 15" RCP-III
1
8
" RC
P
-III
18
"
RC
P
-III
2GI2GI
S
E
E
D
E
T
A
I
L
S
6
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
S
E
E
D
E
T
A
I
L
S
6
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
DFlatter4:1 or ( Not to Scale)SPECIAL CUT DITCH w/HINGE6.0’4:1 VARIABLEFROM STA. 126+00 TO STA. 129+00 LT DETAIL S6Min. D=1 Ft.Ground Natural2:12:1D ( Not to Scale)STANDARD BASE DITCHBdFROM -L- STA. 128+00 TO STA. 128+37 LT DETAIL T3B= 2 Ft.Max. d= 0.7 Ft.Min. D= 1 Ft.Ground NaturalGroundNatural*When B is < 6.0’Type of Liner= CLASS ’B’ Rip-RapAAW PLAN VIEWSECTION A-A (4’min typ.)Permanent Soil Reinforcement matting (PSRM) (Rip Rap in basin not shown for clarity)Pipe or Ditch OutletSquare Preformed Scour Hole (PSH)Seed with native grasses at installation.PREFORMED SCOUR HOLE*NOT TO SCALENATURALGROUNDBFILL SLOPEPSRM2:12:1 PIPE (d = 15" OR 18")INFLOW3/08 D DETAIL P1W= 4’D= 1’B= 4’FILTER FABRIC RIPRAP WITH LINER: CLASS B-L- STA 121+00 RT 70’-L- STA 121+00 LT 65’Q10 = 2.9 cfs DETAIL P1 PSH SEE Q10 = 3 cfs DETAIL P1 PSH SEE
1
2
1
3
1
2
1
5
1
2
1
6
1
2
1
2
12031202
1
2
0
1
1
2
0
4
12051206
1
2
1
7
1
2
1
8
15" RCP-III 1
2
0
8
2
G
I
2
G
I
2
G
I
2
G
I
R
E
M
O
V
E
R
E
M
O
V
E
E
X
I
S
T
.
R
C
B
C
R
E
M
O
V
E
15"15"
3
6
"
R
C
P
-
I
V
2
@
3
G
I
1
3
0
5
S
E
E
D
E
T
A
I
L
P
R
3
P
L
A
C
E
O
N
B
A
N
K
S
O
N
L
Y
C
L
A
S
S
’
B
’
R
I
P
R
A
P
d ( Not to Scale)GroundNaturalGroundNaturalVARIABLE PIPE OUTLET RIP RAP DETAIL PR3MIN. 2:1MIN. 2:1CHANNEL BANK TIE TO EXISTING EST. 11 TONS & 28 SY GEOTEXTILE LINER TYPE - CLASS ’B’ RIP RAP d= 2 Ft. LENGTH = 10 FT.-L- STA. 126+96 RT Channel Bedd( Not to Scale)GroundNaturalGroundNaturalVARIABLE PIPE OUTLET RIP RAP DETAIL PR4MIN. 2:1MIN. 2:1CHANNEL BANK TIE TO EXISTING EST. 3 TONS & 10 SY GEOTEXTILE LINER TYPE - CLASS ’B’ RIP RAP d= 1 Ft. LENGTH = 10 FT.-L- STA. 129+60 RT Channel Bed
S
E
E
D
E
T
A
I
L
P
R
4
P
L
A
C
E
O
N
B
A
N
K
S
O
N
L
Y
C
L
A
S
S
’
B
’
R
I
P
R
A
P
2
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
3
3
C
Y
D
D
E
E
S
T.
3
2
TO
N
S
C
L
B
RIP
RA
P
S
E
E
D
E
T
A
I
L
T
3
T
A
I
L
B
A
S
E
D
I
T
C
H
7
5
’
L
T
+
8
0
.
7
7
9
7
.
1
3
’
L
T
+
4
9
.
6
5
1
2
5
’
+
8
8
9
8
.
0
3
’
+
0
0
1
1
1
’
+
0
0
8
9
.
1
5
’
+
8
5
1
0
0
’
+
8
0
.
7
7
1
1
5
’
+
0
0
8
0
’
R
T
+
8
0
.
7
7
1
0
3
’
+
9
5
8
8
’
7
5
’
+
7
5
8
8
’
7
5
’
+
3
0
1
0
0
’
L
T
+
1
5
7
5
’
R
T
+
5
0
7
5
’
L
T
+
5
5
97’+30 80’ RT +71.2297’80’+75 97’80’+25
9
6
’
+
0
1
.
5
1
9
6
.
5
3
’
+
7
6
1
2
5
’
+
2
5
9
7
’
+
2
1
.
7
6
9
7
.
3
3
’
+
4
4
1
0
7
’
+
7
0
1
0
7
’
1
0
0
’
8
0
’
+
4
0
1
0
7
’
1
0
0
’
+
5
8
1
0
7
’
9
8
’
+
2
6
9
2
’
+
5
0
1
1
2
’
9
7
.
1
6
’
+
2
5
1
0
3
’
+
6
0
7
5
’
+
8
0
8
7
.
9
3
’
+
5
3
CCFCF
F
C
C
C
F
F
F
F
F
N
AD
8
3
/ 9
5
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
MIN. 1’ TUCK NATURAL GROUND AND FLUSH WITH INSTALL LEVEL
C
P
r
o
p
o
s
e
d
D
i
t
c
h
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
13-SEP-2014 12:02R:\Roadway\Proj\R-2603_Rdy_psh13.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 14
MATCH LINE -L- STA. 145+00
SEE SHEET NO. 12MATCH LINE -L- STA. 133+00
R
-
2
6
0
3
1
3
09/16/2014 - R/W REVISIO N: REVISED PRO PO SED R/W AND PUE O N PARCELS 86 & 87. - TLW09/02/2014 - R/W REVISIO N: ADDED PUE AND TCE O N PARCELS 85 & 86; ADDED PUE O N PARCELS 87 & 88. - M AE03/ 13/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 88. - M AE
8
" P
L
A
S
T
IC
8
" P
L
A
S
T
IC
8
"
P
L
A
S
T
I
C
B
M
7
S
0
9
2
2
’
4
1"
E
16
2.
0
6
’
J
A
C
K
R
A
N
D
L
E
Q
U
E
E
N
S
H
E
L
I
A
Q
U
E
E
N
N
U
N
N
T
R
A
V
I
S
Q
U
E
E
N
R
A
L
P
H
F
R
A
Z
I
E
R
DIRK ZETTELM
E
I
E
R
LEAH ZETTELM
E
I
E
R
D
B
9
1
2
P
G
5
3
4
D
B
8
3
2
P
G
5
1
4
DB 1043 PG 14
0
E
I
P
E
I
P
EIPEXISTING R/W
E
XIS
T
ING
R
/
W
E
XIS
T
IN
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
N
O
R
T
H W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
3
0
’
W
I
D
E
P
R
I
V
A
T
E
E
A
S
E
M
E
N
T
2
0’
E
XI
S
TI
N
G
R/
W
16’ EXISTING R/W
PER NCDOT R/W ABSTRACT
1
6
’
E
XI
S
T
I
N
G
R/
W
P
E
R
N
C
D
O
T
R/
W
A
B
S
T
R
A
C
T
P
E
R
N
C
D
O
T
R/
W
A
B
S
T
R
A
C
T
PER NCDOT R/W ABSTRACT
20’ EXISTING R/W
85
8
6
8
7
8
8
40.00’
14
2
4.
3
5
’
2
8
.
3
3
’
15
7
8.
11’
2
8.
5
6
’
16
6
8.
0
0’
24.73’
40.00’
H
W
H
W
v
v
R
C
P
3
6
"
CMP
18"
CM
P
18
"
GR GR
GR
GR
GR
GR
GR
H
T
R
D
K
D
K
D
K
D
K
H
T
R
HTR
HTR
HTR
HTR
H
T
R
DK
D
K
DK
DK
S
W
O
O
D
SI
D
E
D
R
GR
GR
FLA
G
PO
LE
C
M
P 60"
DK
S
D
K
15
" H
D
P
E
7
4
7
5
7
6
TT
T
T
T
6
"P
V
C
6
"
P
V
C
N
C
2
6
8
E
L
K
I
N
R
D
2
2
’
B
S
T
Q
UE
E
N
D
R
G
R
-
B
L
-
2
4
E
V
E
L
Y
N
B
L
A
C
K
B
U
R
N
W
I
L
L
I
A
M
B
L
A
C
K
B
U
R
N
D
B
9
8
5
P
G
1
0
0
8
2
EVELYN BLACKBURN WILLIAM BLACKBURNDB 985 PG 100 82
3
7.
4
6
’
+
38.
6
0
8
.
4
5
’
+
4
3
.
7
1
S
H
E
I
L
A
&
R
O
N
N
I
E
C
H
U
R
C
H
D
B
9
0
0
P
G
1
1
5
135
140
145
-L- PT Sta. 140+43.69
-L-PI Sta 135+15.68DL = 1,062.92’T = 534.92’R = 3,820.00’V = 50 mphSE = 0.03
P
I
S
t
a
1
0
+
6
7
.
3
0
DL
=
5
3
.
1
6
’
T
=
2
7
.
6
0
’
R
=
8
0
.
0
0
’
-
Y
1
4
-
-Y14- POT Sta. 11+12.64
-Y14- PT Sta. 10+92.86
-
L
-
P
O
C
S
t
a
.
1
3
8
+
0
0
.
0
0
-
Y
1
4
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
-Y14- PC Sta. 10+39.70
145
EOP-F
26.00’EOP-F 24.75’EOP-F20.25’F-F
EOP-F
36.75’
+43.69
12.75’
+97.75
EOT-F
24.75’
EOP-F
20.25’
F-F
26.00’
F-F
9.5’
0 20 2
0 30 3
0 1
0 1
0 20 2
0 0
0 3 0 3
0 2 0 2
-
Y
1
4
-
P
T
1
0
+
9
2
.
8
6
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
12’
2’-9" C&G 1’-6" C&G
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
-
L-
-
Y
1
4
-
2
’
-
9
"
C
&
G
5
0
’
(
T
Y
P
.
)
+43.69
1
4
1
+
3
3
.
1
5
-
1
4
1
+
4
3
.
6
9
T
O
1
’
-
6
"
C
&
G
T
R
A
N
S
I
T
I
O
N
2
’
-
9
"
C
&
G
10
0
’
T
A
P
E
R
3
5
’
R
3
5
’
R
C
A
T
-
1
PS
4’
PS
4’
PS4’PS8’
+87.48
4’ PS
-
D
R
I
V
E
4
-
-DRIVE4- PC Sta. 10+54.03
-
D
R
I
V
E
4
-
P
T
S
t
a
.
1
0
+
9
8
.
4
8
-L- POC Sta. 136+00.00 -DRIVE4- POT Sta. 10+00.00=
-
D
R
I
V
E
4
-
P
O
C
1
4
+
0
0
.
0
0
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
6’6’
A
A
2
0
3
5
A
D
T
2
0
1
5
A
D
T
-
L
-
N
C
2
6
8
<
1
0
0
<
1
0
0
<
1
0
0
<
1
0
0
2
2
,
2
0
0
1
6
,
8
4
0
<
1
0
0
<
1
0
0
2
2
,
2
0
0
1
6
,
8
4
0
-
Y
1
4
-
W
O
O
D
S
I
D
E
D
R
.
D
R
I
V
E
W
A
Y
R
A
D
I
I
A
R
E
1
0
’
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
-
D
R
I
V
E
4
-
P
C
S
t
a
.
1
2
+
3
9
.
6
1
-
D
R
I
V
E
4
-
P
O
T
S
t
a
.
1
4
+
4
9
.
9
2
-
D
R
I
V
E
4
-
P
T
S
t
a
.
1
4
+
2
0
.
5
4
-
D
R
I
V
E
4
-
P
T
S
t
a
.
1
3
+
0
0
.
4
9
-
D
R
I
V
E
4
-
P
C
S
t
a
.
1
3
+
6
0
.
7
0
-
D
R
I
V
E
4
-
P
I
S
t
a
1
0
+
7
9
.
8
2
DL
=
4
4
.
4
6
’
T
=
2
5
.
7
9
’
R
=
3
5
.
0
0
’
P
I
S
t
a
1
2
+
7
0
.
0
8
DL
=
6
0
.
8
8
’
T
=
3
0
.
4
8
’
R
=
5
0
0
.
0
0
’
P
I
S
t
a
1
3
+
9
4
.
7
9
DL
=
5
9
.
8
4
’
T
=
3
4
.
0
9
’
R
=
5
0
.
0
0
’
-
D
R
I
V
E
5
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
-
D
R
I
V
E
5
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
D
R
I
V
E
4
-
P
O
C
S
t
a
.
1
2
+
9
4
.
6
9
=
-
D
R
I
V
E
5
-
P
O
T
1
0
+
7
5
.
0
0
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
S
E
E
S
H
E
E
T
3
5
F
O
R
-
D
R
I
V
E
4
-
&
-
D
R
I
V
E
5
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
3
2
F
O
R
-
Y
1
4
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
5
F
O
R
-
L
-
P
R
O
F
I
L
E
6
’
6
’
-DRIVE5-
G
R
A
U
3
5
0
T
L
-
2
T
L
-
2
G
R
A
U
3
5
0
1
2
’
B
E
R
M
D
I
T
C
H
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
-
L
-
S
T
A
1
4
1
+
0
0
t
o
1
4
2
+
7
5
C
B
C
B
F
S
F
S
F
S
FS
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
15" RCP-III
18"
1
5
"
15" RCP-III
18"
15" RCP-III
3GI
D
Flatter
4:1 or
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
w
/
H
I
N
G
E
6
.
0
’
4:1
VARIABLE
F
R
O
M
S
T
A
.
1
4
0
+
5
0
T
O
S
T
A
.
1
4
2
+
0
0
L
T
D
E
T
A
I
L
S
6
M
i
n
.
D
=
1
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
S
E
E
D
E
T
A
I
L
S
6
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
AAW PLAN VIEWSECTION A-A (4’min typ.)Permanent Soil Reinforcement matting (PSRM) (Rip Rap in basin not shown for clarity)Pipe or Ditch OutletSquare Preformed Scour Hole (PSH)Seed with native grasses at installation.PREFORMED SCOUR HOLE*NOT TO SCALENATURALGROUNDBFILL SLOPEPSRM2:12:1 PIPE (d = 15" OR 18")INFLOW3/08 D DETAIL P1W= 4’D= 1’B= 4’FILTER FABRIC RIPRAP WITH LINER: CLASS B-L- STA 142+50 RT 65’-L- STA 136+00 LT 70’
15"
18
"
RCP
-
III
Q10 = 1.2
c
f
s
GRADE TO
E
L
.
1
0
1
1
PSH SEE DE
T
A
I
L
P
1
Q
1
0
=
2
.
3
c
f
s
E
S
T
.
E
X
.
5
C
.
Y
.
G
R
A
D
E
T
O
E
L
.
1
0
2
5
P
S
H
S
E
E
D
E
T
A
I
L
P
1
13051304
1
3
0
3
1
3
0
2
1
3
0
1
1
3
0
6
1
3
0
7
1
3
1
0
1
3
0
9
1
3
0
8
1
3
1
1
1
3
1
2
1
3
1
3
1
3
1
4
B
D
O
B
D
O
B
E
R
M
D
I
T
C
H
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
-
L
-
S
T
A
1
4
3
+
0
0
t
o
1
4
4
+
5
0
B
E
R
M
D
I
T
C
H
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
-
L
-
S
T
A
1
4
4
+
6
0
t
o
1
4
5
+
5
0
15"
B
E
R
M
D
I
T
C
H
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
-
Y
1
6
-
S
T
A
1
2
+
5
0
t
o
1
3
+
9
0
B
E
R
M
D
I
T
C
H
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
-
L
-
S
T
A
1
4
4
+
6
0
t
o
1
4
5
+
5
0
2GI
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
R
E
M
O
V
E
R
E
M
O
V
E
2
G
I
1
3
1
6
1
5
"
L
S
e
t
c
.
G
I
10:1
2
0
:1
(
N
o
t
t
o
S
c
a
l
e
)
F
A
L
S
E
S
U
M
P
2
.
0
’
S
T
A
.
-
L
-
1
4
2
+
2
5
S
T
A
.
-
L
-
1
3
8
+
2
5
S
T
A
.
-
L
-
1
4
0
+
2
5
S
T
A
.
-
L
-
1
3
4
+
2
5
S
T
A
.
-
L
-
1
3
6
+
2
5
D
E
T
A
I
L
F
T
r
a
f
f
i
c
F
l
o
w
O
u
t
s
i
d
e
D
i
t
c
h
1.0’ M ax
0.5’ M in.
S
=
D
i
t
c
h
S
l
o
p
e
1
5
"
2
G
I
1
3
1
5
15"
90’75’+75
9
5
’
7
5
’
+
7
0
9
5
’
7
5
’
+
0
0
7
5
’
R
T
+
4
3
.
6
9
8
5
’
+
5
0
7
5
’
+
7
0
7
5
’
+
2
5
7
5
’
+
6
0
1
0
0
’
+
9
0
9
0
’
7
5
’
+
2
0
100’+22 75’+22
7
5
’
+
7
8
1
1
8
’
+
0
5
1
0
0
’
7
5
’
+
2
5
1
1
7
’
+
8
2
7
8
’
+
9
0
1
0
0
’
7
5
’
+
7
5
140’ LT +50
1
6
7
’
+
0
7
1
9
5
’
+
1
7
2
0
5
’
+
8
9
1
6
8
’
+
7
5
130’94.20’+09118’+40
1
7
2
’
1
6
0
’
+
7
3
1
7
2
’
1
6
2
’
+
8
5
1
5
5
’
L
T
+
0
0
1
7
4
.
3
4
’
+
9
0
1
7
6
.
1
0
’
+
5
8
2
1
7
’
+
5
0
2
2
2
’
+
1
5
1
7
7
’
+
4
0
1
3
0
’
L
T
+
4
3
.
6
9
1
4
6
.
0
7
’
L
T
+
5
0
.
0
0
1
7
1
.
8
2
’
+
3
0
&
1
7
0
’
L
T
1
3
8
.
1
8
’
L
T
+
4
0
.
0
0
F CF
F
C
F
F
F
F
C
N
A
D
8
3/
9
5
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
Slope Ditch Front
G
e
o
t
e
x
t
i
l
e
C Proposed Ditch Sl
o
p
e
Di
t
c
h
Fr
o
n
t
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
02-SEP-2014 09:03R:\Roadway\Proj\R-2603_Rdy_psh14.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 15
MATCH LINE -L- STA. 159+00
SEE SHEET NO. 13MATCH LINE -L- STA. 145+00
R
-
2
6
0
3
1
4
3/13/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 88. - M AE8/7/2013 - R/W REVISIO N: ADDED A W O O DEN PLAYHO USE AND SW ING O N PARCEL 90. - KNW 9/2/2014 - R/W REVISIO N: ADDED PUE O N PARCELS 88, 89, 90, & 92; CHANGED PDE TO DUE O N PARCEL 92 AND CREATED PARCELS 89Z AND 90Z. - M AE8" PLASTIC
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
N 8547’19" EN 8547’19" EN 8342’41" E
S 85
47’19" W
S 8547’19" W
N 7100’19" E S 8547’19" WS 8537’49" W S 09 22’41" E S 09 22’41" E S 09 22’41" E
N
0
1
0
4’
2
1"
E
N
0
1
0
7’
5
1"
E
N
0
1
0
2’
1
9"
E
N 0102’19" EN 0102’19" E 144.63’134.87’124.38’
151.65’
141.87’124.23’131.76’119.83’139.72’119.43’110.26’
1
0
0.
5
4’
1
0
5.
5
3’
1
1
0.
3
3’
130.21’157.06’RAUL RIVAS JULIE YOUNCE CARL YOUNCE BERTHA MORA FELIPE MORA PATRICIA TRICE JAMES TRICE RUTH PEARSON GARY PEARSON
C
H
R
IS
T
Y
H
A
L
L
P
A
T
R
IC
IA
S
H
E
W
C
H
R
IS
S
H
E
W
N
A
N
C
Y
JO
H
N
S
T
O
N
VICTOR GARCIACHRISTOPHER WATSON
F
C
J
O
H
N
S
O
N
H
E
I
R
S
A
L
I
C
E
P
R
E
V
E
T
T
E
ROYALE LAZE
N
B
Y
DB 902 PG 406 DB 885 PG 82 DB 885 PG 85 DB 800 PG 398 DB 965 PG 248
D
B
902 P
G
300
D
B
710 P
G
848
D
B
523 P
G
340
DB 980 PG 129DB 786 PG 372
N
O
D
E
E
D
I
N
S
U
F
F
I
C
I
E
N
T
D
E
S
C
R
I
P
T
I
O
N
M
A
P
P
E
D
B
Y
G
I
S
D
B
1
0
9
7
P
G
1
6
3
DB 688 PG 4
1
3
REBARREBARREBAR REBAR EIP REBAR REBAR REBAR
R
E
B
A
R
R
E
B
A
R
EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
60.00’60.00’NORTH WILKESBORO CITY LIMITS899091
9
2
9
3
151
152
153
154 155156157158
773
.27’
1386
.63’
853.36’15" CMP DI
H
W
H
W
vvCMP18"
CMP
30"
1 BARREL
4’x3’
CMP 15"MONCONCRCP15"
S
S
O
I
L
S
OI
L
S
O
I
L
S
CONCDK 1SFD S S72" WD 72" WD1SFDGRGR GR HTRDKGRS1SFD 1SBKDCONCGR48" CHLCONC 48" CHL 1SBKDDKCONCBLK WALL W/LTBSTSR 2090 VISTA LANE 20’BST 1SFD1SFD DK
S
S
S
CONC 48" WD RAIL72" WD
7
2"
W
D
72" WD W/LT DKCONC1SBKDDKDKCONC
N
C
2
6
8
E
L
K
I
N
R
D
2
1
’
B
S
T
DK15" HDPE 15" CMPFLAGPOLE15" PLASTICT
T
6"PVC 2"PVC 2"PVC
6
"
P
V
C
6
"
P
V
C
R
E
P
E
A
T
E
R
T
E
L
E
6"PVC-BY9-60 -BY9-59 -BL-25
-
B
L
-
2
6
EVELYN BLACKBURN WILLIAM BLACKBURNDB 985 PG 100 82
1SFD
W
O
O
D
S
QUEEN DR GR24.94’+30.53
50
.22’
+05
.14
29.99’
+
29.35
28.71’+41.9031.37’+69.3028.29’+61.63WD TIMBERS & GRPLAY HOUSESWING CLEAN OUT 3.15’ DEEP 88 SHEILA & RONNIE CHURCHDB 900 PG 115
R
O
B
E
R
T
W
Y
A
T
T
D
B
8
3
6
P
G
2
1
0
D
B
6
5
8
P
G
1
7
9
4
D
B
7
6
1
P
G
5
8
5
18" CMP
PAVED DITCH PAVED DITCH NORTH WILKESBORO CITY LIMITSPAVED DITCH145
150
155
P
I
S
t
a
1
3
+
7
3
.
9
4
DL
=
1
8
0
.
6
6
’
T
=
9
2
.
1
2
’
R
=
3
7
5
.
0
0
’
-
Y
1
6
-
-
L
-
P
O
T
S
t
a
.
1
4
6
+
4
5
.
3
5
-
Y
1
6
-
P
O
T
S
t
a
.
1
5
+
0
0
.
0
0
=
-Y16- PT Sta. 14+
6
2
.
4
8
-Y1
6
-
P
C
S
t
a
.
1
2
+
8
1
.
8
2
145
EOP-F
EOP-F
24.75’
EOP-F
21.5’
F-F
24.75’
EOP-F
21.5’
F-F
24.75’
+43.35
36.75’
+43.35
EOP-F
12.75’+93.35EOT-FEOT-F
EOP-F
36.75’
+88.41
24.75’
+88.41
4’ PS 4’ PS
24.75’
EOP-F
4’ PS
9.5’
F-F
F-F9.5’
F-F
9.5’
0 2
0 2 0 2
024010001020202010001020 20 1000001010202
-
Y
1
6
-
P
O
T
1
0
+
6
5
.
0
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
S
E
=
0
.
0
2
V
=
S
T
O
P
C
O
N
D
I
T
I
O
N
10’10’9.4’9.4’CONC. ISLAND.PRO. MONO. 1’-6" C&G1’-6" C&G
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
G
R
A
U
3
5
0
T
L
-
3
-
L
-
-Y16-TAPER35’(TYP.)20’+15
10
0
’
T
A
P
E
R
10
0
’
T
A
P
E
R
100’ TAPER PS4’PS4’
8
:1 T
AP
E
R
16’16’+87.484’ PS02 15’R15’R -Y15- POT Sta. 11+75.00
-
Y
1
6
-
P
O
T
S
t
a
.
1
2
+
0
0
.
0
0
-
Y
1
5
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
11 10 09 08 07 06 05 04(TYP.)15’+9515’R 15’R 9’9’+7 0 +75+85+95 -Y15- POT 11+64.69 END CONSTRUCTION
-
L
-
S
T
A
1
5
1
+
2
4
B
E
G
I
N
S
B
G
-Y15-
A
A
2
0
3
5
A
D
T
2
0
1
5
A
D
T
-
L
-
N
C
2
6
8
V
I
S
T
A
L
A
N
E
-
Y
1
6
-
S
R
2
0
9
0
2
2
,
2
0
0
1
6
,
8
4
0
2
2
,
0
0
0
1
6
,
6
4
0
2
0
0
2
0
0
<
1
0
0
<
1
0
0
2
0
0
2
0
0
S
E
E
S
H
E
E
T
2
B
-
6
F
O
R
-
Y
1
6
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
E
E
S
H
E
E
T
3
3
F
O
R
-
Y
1
6
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
3
2
F
O
R
-
Y
1
5
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
6
F
O
R
-
L
-
P
R
O
F
I
L
E
2
G
I
2
G
I
2
G
I
2
G
I
F
S
S
E
E
D
E
T
A
I
L
S
6
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
S
E
E
D
E
T
A
I
L
S
3
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
SEE DETAIL S2 SPECIAL CUT DITCH BDO
F
S
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
B
D
O
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
2
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
8
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
1
5
"
R
C
P
-
I
I
I
2
G
I
15"
3
0
" R
C
P
-III
D
Flatter
4:1 or
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
w
/
H
I
N
G
E
6
.
0
’
4:1
VARIABLE
F
R
O
M
S
T
A
.
1
5
5
+
0
0
T
O
S
T
A
.
1
5
5
+
7
5
L
T
D
E
T
A
I
L
S
6
M
i
n
.
D
=
1
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
DFlatter4:1 or( Not to Scale)SPECIAL CUT DITCH w/HINGE6.0’4:1 VARIABLEFROM -L- STA. 155+75 TO STA. 157+00 LT DETAIL S3GroundNaturaldMax. d=0.9 Ft.Min. D=0.9 Ft.Type of Liner= PSRM
2:1
2:1
D
(
N
o
t
t
o
S
c
a
l
e
)
S
T
A
N
D
A
R
D
B
A
S
E
D
I
T
C
H
B
d
F
R
O
M
-
L
-
S
T
A
.
1
5
5
+
7
5
T
O
S
T
A
.
1
5
6
+
8
9
L
T
D
E
T
A
I
L
T
3
B
=
2
F
t
.
M
a
x
.
d
=
0
.
7
F
t
.
M
i
n
.
D
=
1
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
*
W
h
e
n
B
i
s
<
6
.
0
’
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
1
5
"
14 SY GEOTEXTILE EST. 5 TONS CLASS ’B’ RIP RAPB2:12:1D ( Not to Scale)STANDARD BASE DITCHSTA. -L- 146+15 RT DETAIL T1B=2 Ft.Min. D=1 Ft.Ground NaturalGroundNatural 15"15"18" RCP-III 24" RCP-III FS FSLSetc.GI 10:120:1 ( Not to Scale)FALSE SUMP2.0’STA. -Y16- 13+68 STA. -L- 154+50 STA. -L- 149+25 STA. -L- 147+75 DETAIL FTraffic Flow Outside Ditch 1.0’ M ax0.5’ Min.S=Ditch Slope
5
4"
RC
P-III
14041405140614071408
1
4
2
7
1
4
1
0
1
4
1
1
1
4
1
2
1
4
1
3
1
4
1
4
1
4
2
1
1
4
1
6
1
4
1
7
1
4
1
8
1
4
1
9
1
4
2
2
1
4
2
4
1
4
2
6
1
4
2
5
15"14033GI 140114022:1DFlatter4:1 ord( Not to Scale)SPECIAL CUT DITCHFROM -Y16- STA. 11+33 TO STA. 11+73 RT FROM -Y16- STA. 11+50 TO STA. 13+00 LT Ground Natural DETAIL S2Type of Liner= PSRMMax d=0.4
F
t
.
Min. D=0.5
F
t
.
1415 140915" BERM DITCHSEE RDWY STD. 240.01-Y16- STA 12+50 to 13+90BERM DITCHSEE RDWY STD. 240.01-L- STA 144+60 to 145+502GI2GI2GI 2GI
2
G
I
2
G
I
EST 24 CY DDE SEE DETAIL T1 TAIL DITCH EST 11 CY DDE SEE DETAIL L1 LATERAL ’V’ DITCH
R
E
M
O
V
E
R
E
T
A
I
N
REMOVE
R
E
M
O
V
E
15" RCP-III
3
0
"
1
5
"
1
5
"
1
5
"
1
5
"
8
9
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
1
8
3
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
T
3
E
S
T
.
1
0
8
T
O
N
S
T
A
I
L
B
A
S
E
D
I
T
C
H
S
P
E
C
I
A
L
T
B
J
B
w
/
M
H
REMOVE75’+7085’+5075’+7585’+00100’75’+00100’75’+30
9
0
’
7
5
’
+
9
0
9
0
’
7
5
’
+
2
0
8
5
’
6
4
.
3
3
’
+
6
5
8
5
’
7
2
.
3
3
’
+
3
5
9
5
’
6
5
’
+
3
5
9
5
’
6
5
’
+
7
0
8
8
’
6
0
’
+
6
3
9
0
’
6
0
’
+
6
0
9
0
’
6
0
’
+
9
0
29.49’+34 -Y16-
8
8
’
+
3
2
6
0
’
+
2
5
5
5
’
R
T
+
0
0
6
5
’
R
T
+
5
0
28.62’ RT +55 -Y16-25’ LT +64.66 -Y15-35’ RT +62.76 -Y15-115’ LT +35 31.61’ LT +81.82 -Y16-30.72’+55 -Y16-42’+75 -Y16-90’ RT +40 -Y16-43.38’+55.93 -Y15-160’+44.58 145’ LT +35 55’-Y16- +50 31.37’+69.03 -Y16-51’+68.87 -Y16-80’+13 -Y16-50’+07.55 -Y16-
1
3
1
’
+
3
4
1
3
7
’
+
8
6
1
1
5
’
+
7
0
1
3
8
’
1
3
1
’
1
1
5
’
+
0
0
45’28.98’+05 -Y16-
1
3
0
’
+
3
5
7
5
’
R
T
+
2
5
6
5
’
R
T
+
0
0
6
0
’
R
T
+
0
0
89Z90ZCFF
CF
C
C
C
F
C CC F FFFCCC
N
A
D
8
3/
9
5
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
Slope Fill
G
R
O
U
N
D
N
A
T
U
R
A
L
S
L
O
P
E
FI
L
L
G
E
O
T
E
X
T
I
L
E
Slope Ditch Front Slope FillSlope FillREVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
02-SEP-2014 09:03R:\Roadway\Proj\R-2603_Rdy_psh15.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 16
MATCH LINE -L- STA. 173+00
SEE SHEET NO. 14MATCH LINE -L- STA. 159+00
1
5
R
-
2
6
0
3
T
H
IS
S
H
E
E
T
M
AT
C
H
LIN
E
-
Y17
-
S
T
A
. 16
+
0
0
THIS SHEET
MATCH LINE -Y17- STA. 16+00
3/13/2014 - R/W REVISIO N: UPDATED PRO PERTY LINE O N PARCEL 97; UPDATED PRO PERTY O W NER NAM E, DEED REFERENCE, AND PRO PERTY LINE O N PACEL 99. - M AE7/21/2014 - R/W REVISIO N: REVISED PRO PO SED R/W AND TCE O N PARCELS 97 & 99. - KNW ADDED STATIO N AND O FFSET LABEL AT -L- 169+80, 70’ RT. - M AE9/2/2014 - R/W REVISIO N: REM O VED TCE AND ADDED PUE O N PARCEL 92; ADDED PUE AND REVISED TCE O N PARCEL 94; ADDED PUE AND CHANGED PDE TO PUE O N PARCELS 95 & 98;
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
8
"
P
L
A
S
T
I
C
B
M
8
S 8509’18" E
S 8544’35" E
N 28 23’36" W
N
17 55
’20" W
N 1841’08" E
110.53’
1231.06’
49.95’
35
.34
’
94.81’
M
A
R
G
IE
W
Y
A
T
T
R
I
C
H
A
R
D
H
O
L
L
O
W
A
Y
R
O
B
E
R
T
W
Y
A
T
T
D
B
7
6
1 P
G
5
8
5
D
B
8
9
2
P
G
9
8
D
B
8
3
6
P
G
2
1
0
REBAREXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
EX
IST
ING
R
/W
E
X
I
S
T
I
N
G
R
/
W
N
O
R
T
H
WIL
KES
B
O
R
O
CIT
Y
LI
MITS
NORTH WILKESBORO CITY LIMITS
LI
NE
AS P
E
R
GIS
D
B
6
5
8
P
G
1
7
D
B
6
5
8
P
G
17
9
4
9
5
9
6
93.36’
147.33’
40.00’
40.00’
362.94’
218.51’
18" RCP
HW
H
W
CM
P
3
0
"
CM
P
18
"
S
N
C
2
6
8
E
L
K
I
N
R
D
2
2
’
B
S
T
W
/
L
T
1
S
M
B
U
S
G
R
W
/
L
T
GR
G
R
W
/
L
T
BS
T
S
S
W
/
L
T
C
B
S
D
I
1
S
B
L
K
B
U
S
1
5
"
C
M
P
18" CMP
PAVED
D
ITCH
PAVED
D
ITCH
T
T
T
T
T
T
T
6"PVC 6"PVC
6
"
P
V
C
6
"
P
V
C
6
"
A
C
6"PVC MARGIE WYATTDB 761 PG 585DB 658 PG 17 95
SR
2
0
86
BEAUMONT
POPLAR
ST
19
’ B
ST
-BY
1
0
-
6
2
-BL
-
2
7
-
B
L
-
2
8
F C JOHNSON HEIRSNO DEEDINSUFFICIENT DESCRIPTIONMAPPED BY GIS 92
G
R
1
B
A
R
R
E
L
4’
x2’
49.34’
+08.66
1
1
.
7
8
’
+
3
2
.
5
5
9
8
9
2
M
A
P
P
E
D
B
Y
G
I
S
I
N
S
U
F
F
I
C
I
E
N
T
D
E
S
C
R
I
P
T
I
O
N
F
C
J
O
H
N
S
O
N
H
E
I
R
S
9
8
D
B
7
6
1
P
G
5
8
5
A
L
A
N
J
O
H
N
S
O
N
D
B
7
6
9
P
G
4
2
0
D
B
2
0
9
P
G
2
0
0
9
7
E
IP
N
0
3
3
2’18"
E
2
17.5
7’
N
0
3
3
2’18"
E
3
7.6
4’
S
5
8
3
5
’
4
6
"
W
8
7
.
2
2
’
S
5
8
3
5
’
4
6
"
W
1
5
6
.
8
3
’
P
L
=
NO
R
T
H
WI
L
KE
S
B
O
R
O
CI
T
Y
LI
MI
T
S
U
S
T
160
165
170
-L- POT Sta. 163+7
6
.
6
2
-Y17- POT Sta. 18+
9
3
.
5
6
=
EOP-F
24.75’
EOP-F
24.75’
EOP-F
21.5’
F-F
24.75’
+83.24
EOP-F
36.75’
+02.52
12.75’
+33.24
EOP-F
36.75’
+83.24
EOP-F24.75’+1812.75’+38.41
EOT-F
EOT-FEOP-FEOP-F 24.75’EOP-FF-F 4’ PS36.75’9.5’F-FF-F9.5’
F-F
9.5’
4’ PS4’ PS
0 2 0 2
0 2 0 2
0
2
0
2
0
1
0
0
0
1
0
2
1
0
’
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
1’-6" C&G1’-6" C&G
1
’
-
6
"
C
&
G
1
’
-
6
"
C
&
G
CAT-1
-
L
-
-Y17-
CONC. IS
L
A
N
D
.
PRO. MO
N
O
.
+33.24
4’ PS
F-F
9.5’
10
0
’
T
A
P
E
R
10
0
’
T
A
P
E
R
100’ TAPE
R
2
5
0
’ T
A
P
E
R
1
6
’
2
4
’
3
6
’
2
4
’
3
6
’
C
A
T
-
1
A
T
-
1
8:1 TAPERPS4’
+
3
0
1
0
’
+
5
0
-L- STA 161+76 END SBGA A2035 ADT 2015 ADT-L- NC 26821,700 16,340 700 560200130500430 BEAUMONT POPLAR ST.-Y17- SR 208622,000 16,640
S
E
E
S
H
E
E
T
2
B
-
6
F
O
R
-
Y
1
7
-
I
N
T
E
R
S
E
C
T
I
O
N
D
E
T
A
I
L
S
E
E
S
H
E
E
T
3
3
F
O
R
-
Y
1
7
-
P
R
O
F
I
L
E
S
E
E
S
H
E
E
T
2
6
F
O
R
-
L
-
P
R
O
F
I
L
E
T
O
D
R
A
I
N
G
R
A
D
E
C
U
T
1
8
"
H
W
F
S
28 SY GEOTEXTILE EST 10 TONS CLASS ’B’ RIP RAP
1
8
"
1
8
"
1
8
"
2
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
8
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
TO DRAIN GRADE CUT14 SY GEOTEXTILE EST. 5 TONS CLASS ’B’ RIP RAP
1
8
"
GRADE
TO
DRA
IN
SEE DETAIL S6 SPECIAL CUT DITCH
D
Flatter
4:1 or
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
w
/
H
I
N
G
E
6
.
0
’
4:1
VARIABLE
F
R
O
M
S
T
A
.
1
6
0
+
0
0
T
O
S
T
A
.
1
6
3
+
0
0
L
T
D
E
T
A
I
L
S
6
M
i
n
.
D
=
1
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
1
5
"
D
Flatter
4:1 or
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
w
/
H
I
N
G
E
6
.
0
’
4:1
VARIABLE
F
R
O
M
S
T
A
.
1
6
8
+
0
0
T
O
S
T
A
.
1
7
0
+
5
0
L
T
F
R
O
M
S
T
A
.
1
6
5
+
0
0
T
O
S
T
A
.
1
6
7
+
5
0
L
T
D
E
T
A
I
L
S
3
G
r
o
u
n
d
N
a
t
u
r
a
l
d
M
a
x
.
d
=
0
.
9
F
t
.
M
i
n
.
D
=
0
.
9
F
t
.
T
y
p
e
o
f
L
i
n
e
r
=
P
S
R
M
TO 17+50 RT EST. 100 SY DITCH STATION 14+50 PLACE PSRM IN ROADWAY
W
/
P
S
R
M
S
E
E
D
E
T
A
I
L
S
3
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
W
/
P
S
R
M
S
E
E
D
E
T
A
I
L
S
3
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
2:1
D
Flatter
4:1 or
d
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
F
R
O
M
S
T
A
.
1
7
0
+
5
0
T
O
S
T
A
.
1
7
1
+
0
0
L
T
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
S
2
T
y
p
e
o
f
L
i
n
e
r
=
P
S
R
M
M
a
x
d
=
0
.
9
F
t
.
M
i
n
.
D
=
0
.
9
F
t
.
LATERAL ’V’ DITCH( Not to Scale)D 2:12:1 b1"/Ft.FROM -Y17- STA. 15+50 TO STA. 16+00 LT b= 2 Ft.Min. D=0.5 Ft.DETAIL L1GroundNatural
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
15"
2
4
" R
C
P
-III
18"
B
2:1
2:1
D
(
N
o
t
t
o
S
c
a
l
e
)
S
T
A
N
D
A
R
D
B
A
S
E
D
I
T
C
H
FROM S
T
A
.
1
7
2
+
1
6
T
O
S
T
A
.
1
7
2
+
7
0
L
T
D
E
T
A
I
L
T
1
B=2 Ft.Min. D=1 Ft.Ground Natural
G
r
o
u
n
d
N
a
t
u
r
a
l
W
/
P
S
R
M
S
E
E
D
E
T
A
I
L
S
2
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
1501
1
5
0
2
1
5
0
3
1
5
0
4
1
5
0
5
1
5
0
6
1
5
0
7
1
5
0
8
1
5
0
9
1
5
1
0
1
5
1
1
1
5
1
2
1
5
1
3
1
5
1
4
4
8"
RC
P-III (
N
o
t
t
o
S
c
a
l
e
)
T
O
E
P
R
O
T
E
C
T
I
O
N
d
FL
A
T
TE
R
2:1
O
R
F
R
O
M
S
T
A
.
1
7
1
+
5
0
T
O
S
T
A
.
1
7
2
+
0
0
L
T
D
E
T
A
I
L
T
P
1
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
d
=
1
.
5
F
t
.
2
G
I
2
G
I
2
G
I
1
6
0
7
E
S
T
2
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
T
B
3
T
A
I
L
B
A
S
E
D
I
T
C
H
E
S
T
3
1
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
T
1
T
A
I
L
D
I
T
C
H
R
E
T
A
I
N
REM
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
REMOVE
R
E
M
O
V
E
D
I
2
4
"
R
C
P
-
I
I
I
24" RCP-III
B
2:1
2:1
D
(
N
o
t
t
o
S
c
a
l
e
)
S
T
A
N
D
A
R
D
B
A
S
E
D
I
T
C
H
F
R
O
M
S
T
A
.
1
7
0
+
8
7
T
O
S
T
A
.
1
7
1
+
0
6
R
T
D
E
T
A
I
L
T
3
B
=
3
F
t
.
M
i
n
.
D
=
2
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
G
r
o
u
n
d
N
a
t
u
r
a
l
4
1
S
Y
G
E
O
T
E
X
T
I
L
E
T
O
E
P
R
O
T
E
C
T
I
O
N
18" CMP
R
E
M
O
V
E
E
X
I
S
T
.
R
C
B
C
85’60’+7585’61’+10
9
5
’
6
0
’
+
0
0
9
5
’
8
2
’
6
0
’
+
6
0
7
0
’
+
2
0
1
1
0
’
+
2
5
7
0
’
+
4
0
8
0
’
+
7
0
8
0
’
+
5
0
7
0
’
+
2
0
1
1
5
’
+
6
5
96’+36 70’+27
7
0
’
+
5
0
1
2
0
’
+
9
5
70’ RT +00 60’ RT +00
9
0
’
+
0
5
9
0
’
7
0
’
+
6
0
7
0
’
R
T
+
7
5
.
9
3
7
0
’
+
5
5
132’+50 115’ LT +62.72
5
9
.
5
6
’
+
5
0
-
Y
1
7
-
6
0
’
L
T
+
6
5
-
Y
1
7
-
8
0
’
+
7
5
8
0
’
+
9
5
9
5
’
+
8
2
.
1
4
9
5
’
+
0
0
8
0
’
L
T
+
0
0
70’+0270’+1396’+0493’ +94
7
0
’
+
8
0
9
5
’
+
2
5
S 60 58’53" W
S 66 47’13" W
266.95’
249.35’
M
A
R
G
I
E
W
Y
A
T
T
BERNICE WALSHGARY WALSH
A
L
M
E
D
A
E
L
L
E
R
W
IL
L
IA
M
E
L
L
E
R
M
A
R
G
I
E
W
Y
A
T
T
D
B
7
6
1
P
G
5
8
5
DB 702 PG 282
D
B
6
6
2
P
G
5
4
3
D
B
7
0
4
P
G
6
17
D
B
7
6
1
P
G
5
8
5
REBAR
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING
R
/
W
EXISTING R/W
60.00’
LINE AS PER GISLINE AS PER GIS
D
B
6
5
8
P
G
1
7
D
B
6
5
8
P
G
1
7
9
5
9
5
159
1
6
0
SR 2086 BE
A
U
M
O
N
T
P
O
P
L
A
R
S
T
1
9
’
B
S
T
SOIL
SOIL
CONC
CONC
W
/
L
T
CONC W ALL
CONC WALL
BST
1
5
"
C
M
P
15" CMP
15" C
MP
T
T
T
6
"
P
V
C
6"PVC -BY10-61
15
-Y17- PT Sta. 14+20.60
-Y17- PC Sta. 12+31.31
-Y17- POT Sta. 10+00.00
02
024
013
02
01
00
01
0 2
0 4
0 3
0 4
0 3
0 2
01
00
01
02 02
-
Y
1
7
-
P
I
S
t
a
1
3
+
2
6
.
3
0
DL
=
1
8
9
.
3
0
’
T
=
9
5
.
0
0
’
R
=
9
0
0
.
0
0
’
-Y17- POT 11+1
5
.
0
0
BEGIN CONSTRUC
T
I
O
N
S
E
E
S
H
E
E
T
3
4
F
O
R
-
Y
1
7
-
P
R
O
F
I
L
E
V
=
4
0
m
p
h
S
E
=
0
.
0
4
10’10’
9.3’
9.8’
-
Y
1
7
-
(
T
Y
P
.
)
2
0
’
+17.98
T
A
P
E
R
2
5
’
10’10’
+57.98
+13.93
E
S
T.
1
0
0
S
Y
S
TA
TIO
N
14
+
5
0
TO
17
+
5
0
RT
P
LA
C
E
P
S
RM
I
N
RO
A
D
W
A
Y
D
ITC
H
TO 17+50 RT EST. 100 SY
DITCH STATIO N 14+50
PLACE PSRM IN RO ADW AY
2:1DFlatter4:1 ord( Not to Scale)SPECIAL CUT DITCHFROM -Y17- STA. 13+00 TO STA. 15+50 LT Ground Natural DETAIL S2Type of Liner= PSRMMax d=0.5 Ft.Min. D=1 Ft.
S
E
E
D
E
T
A
I
L
S
2
W
/
P
S
R
M
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
LATERAL ’V’ DITCH( Not to Scale)D 2:14:1 b1"/Ft.FROM -Y17- STA. 15+50 TO STA. 16+00 LT b= 2 Ft.Min. D=0.5 Ft.DETAIL L1GroundNatural( Not to Scale)LATERAL BASE DITCH2:1DB bd2:11"/Ft.FROM -Y17- STA. 11+15 TO STA. 13+00 LT DETAIL LB1b= 2Ft.B= 2Ft.Max. d= 1Ft.Min. D= 1Ft.Type of Liner= PSRM Ground Natural
T
O
D
R
A
I
N
G
R
A
D
E
E
S
T
5
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
E
S
T
1
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
B
1
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
R
E
M
O
V
E
15" C
MP
2
8
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
1
0
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
5
0
’
L
T
+
2
0
.
6
0
-
Y
1
7
-
3
0
.
6
3
’
L
T
+
5
0
-
Y
1
7
-
4
6
.
8
3
’
+
0
4
7
6
’
+
6
8
8
1
’
+
8
2
9
2
’
+
8
2
9
2
’
+
6
8
F
C
C
C
CFCFFC
C
C
C
C
C
C
C
F
F
C
C
F
C
F
C
C
C
C
C
F
F
C
F
C
FF
F
C
F
C
C
N
A
D
8
3/
9
5
N
A
D
8
3
/ 9
5
Slope FillC Proposed Ditch Slope Ditch Front
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
16-SEP-2014 16:04R:\Roadway\Proj\R-2603_Rdy_psh16.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
R
-
2
6
0
3
1
6
SEE SHEET NO. 17
MATCH LINE -L- STA. 187+00
SEE SHEET NO. 15MATCH LINE -L- STA. 173+00
S
E
E
S
H
E
E
T
N
O
.
2
0
M
A
T
C
H
L
I
N
E
-
Y
18
-
S
T
A
.
3
5
+
0
0
S
E
E
S
H
E
E
T
N
O
.
19
M
A
T
C
H
L
I
N
E
-
Y18
-
S
T
A
.
2
7
+
0
0
REVISIO NSPARCELS 99, 100, 100A, & 101. - M AE03/ 13/2014 - R/W REVISIO N: UPDATED PRO PERTY LINE O N PARCEL 99; SUBDIVIDED PARCEL 100 INTO PARCELS 100 & 100A; UPDATED PRO PERTY O W NER NAM ES AND DEED REFERENCES O N AND DEED REFERENCE O N PARCEL 161B. - TLW09/16/2014 - R/W REVISIO N: FLATTENED THE SLO PES FRO M -L- (LT) 176+88 TO 179+70 O N PARCEL 101; SUBDIVIDED PARCEL 161 INTO 161 & 161B; PRO VIDED PRO PERTY O W NER INFO TCE O N PARCEL 104; REM O VED PUE O N PARCEL 161; ADDED PUE O N PARCEL 165. - M AE09/02/2014 - R/W REVISIO N: REVISED PUE O N PARCELS 98 & 102; ADDED DUE AND REVISED PDE O N PARCEL 100; ADDED PUE AND REM O VED TCE O N PARCEL 103; ADDED PUE AND REVISED STATIO NS & O FFSETS NEAR -Y18- 34+50 O N PARCEL 100. - KNW07/21/2014 - R/W REVISIO N: REM O VED PRO PO SED R/W & TCE O N PARCEL 99; CO RRECTED SHEET TO SHO W PREVIO USLY REVISED PRO PERTY LINES O N PARCELS 99 & 100A AND TCE W ITH 06/06/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E O N PARCEL 167. - M AE8" PLASTIC
8
"
P
L
A
S
T
IC
8
"
P
L
A
S
T
I
C
8
" P
L
A
S
T
IC
8" PLASTICDIRECTION
8
"
P
L
A
S
T
IC
S
T
U
B
S
0
4
2
5
’
5
3
"
E
S
8
2
2
6
’3
6
" W
S
8
2
2
6
’3
6
" W
N 4705’49" W
N 4705’49" W
S
5
1
10
’
17
"
W
N 3846’25" W
S
7
0
4
1’2
5
" W
S 89
57’23" E
S 2815’13" E
S 89
57’23" E
S 8747’34" E
N
0
4
2
5’
5
2"
E
N
6
4
19
’19
" E
2
2
8.
11’
16
8
.2
9
’
2
6
3
.5
0
’
287.06’
62.33’
2
3
0
.
6
9
’
57.03’
15
.15
’
129.48’
194.98’
249.02’
15.14’
3
7
8.
3
3’
3
5
2
.
7
6
’
S
T
E
P
H
E
N
J
A
R
V
I
S
M
A
R
G
A
R
E
T
J
A
R
V
I
S
B
R
U
C
E
E
V
A
N
S
D
E
B
R
A
E
V
A
N
S
T
H
E
R
M
O
G
A
S
C
O
M
P
A
N
Y
F
E
R
R
E
L
G
A
S
,
L
P
F C JOHNSON HEIRS
D
B
8
0
1
P
G
3
4
9
D
B
8
3
0
P
G
1
3
1
D
B
5
3
3
P
G
6
9
3
D
B
7
8
5
P
G
3
3
2
INSUFFICIENT DESCRIPTIONMAPPED BY GIS
R
E
B
A
R
E
I
P
REBAR
E
I
P
E
X
I
S
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W
EXISTING R/W
E
X
IS
T
ING
R
/
W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W
EXISTING R/W
4
0
.
0
0
’
6
0
’
N
O
R
TH
WI
LK
ES
B
O
R
O
CI
T
Y
LI
MI
T
S
N
O
R
T
H
WIL
K
E
SB
O
R
O
C
IT
Y
L
IM
IT
S
N
O
R
T
H
WI
L
K
E
S
B
O
R
O
C
I
T
Y
L
I
M
I
T
S
LINE AS PER G
IS
98
1
0
0
1
0
1
1
0
2
10
3
1
6
5
EXISTING R/W 30.92’
E
X
IS
T
I
N
G
R
/
W
100’
E
A
S
E
M
E
N
T
D
R
A
I
N
A
G
E
P
E
R
M
A
N
E
N
T
D
B
7
8
5
P
G
3
3
3
30" CMP
6
0"
RCP
L
O
C
.
O
F
C
U
L
V
U
N
A
B
L
E
T
O
O
B
T
A
I
N
APPROX LOCATION
6" PLASTIC
S
1
B
A
R
R
E
L
4’
X
4’
PLASTIC
8"
N
6
4
19
’
19
"
E
R
O
C
K
WA
L
L
C
O
N
C
N
C
2
6
8
E
LK
IN
R
D
2
1’ B
S
T
G
R
S SS
GAS TANK
GAS TANK
W
D
W
A
L
L
1
S
M
T
L
B
72" CHL
7
2
" CH
L
G
R
G
RG
R
B
S
T
S
O
I
L
G
S
G
R
BSTBSTCONCBSTGRW/LTGRVENT CAPS
W/LT
S
1SMTLBUS
B
S
T
1S
F
B
U
S
18" CMP
15" CMP18" HDPECANMTL T
T
T
T
T
6"AC
6"AC
6
"
A
C
6
"
A
C
6"AC
6"AC
6
"A
C
6"AC
6"PL
6"PL
C
A
B
I
N
E
T
S
T
E
L
E
6
"
A
C
1
6
1
B
N
C
2
6
8
E
L
K
I
N
R
D
2
2
’
B
S
T
SR 1966
AIRPORT RD 22’ BST
-
B
Y
1
1
-
6
5
-
B
Y
1
2
-
6
6
-
B
L
-
3
0
-
B
L
-
2
9
-
B
Y
1
2
-
6
7
CURBCONC
24.74’
+90.99
6
.
6
9
’
+
9
0
.
8
6
6
5
.5
2
’
+
3
6
.4
5
70.83’+00.41
A
A
M
A
I
N
V
E
S
T
M
E
N
T
S
,
L
L
C
D
B
1
1
2
3
P
G
3
2
8
A
A
M
A
I
N
V
E
S
T
M
E
N
T
S
,
L
L
C
D
B
1
1
2
3
P
G
3
2
8
95
K
E
L
S
E
Y
R
O
Y
A
L
D
B
7
8
4
P
G
4
2
7
1
6
7
E
A
S
E
M
E
N
T
D
R
A
I
N
A
G
E
P
E
R
M
A
N
E
N
T
SR 2333 24’ BST
RIVER LIBERTY GROVE CHURCH RD
1
0
5
T
.
C
A
M
E
R
O
N
F
I
N
L
E
Y
T
A
M
E
L
A
F
I
N
L
E
Y
D
B
8
1
8
P
G
4
0
2
1
0
4
LINE AS PER GIS
18
" C
MP
REBARDB 832 PG 514RALPH THOMAS FRAZIER100A99EIPEIPS 5835’46" W156.83’N 03 32’18" E95.68’N 03 32’18" E217.93’N 03 28’48" E242.38’PL=NORTH WILKESBORO CITY LIMITS99GOTI, INCDB 1173 PG 42
D
B
3
8
0
P
G
1
4
2
J
O
H
N
L
E
W
I
S
W
Y
A
T
T
J
R
.
U
S
T
U
S
T
175
180
3
0
3
5
185
-L- PC Sta. 178+84.93
-
Y
1
8
-
P
T
S
t
a
.
3
0
+
2
3
.
4
4
-
Y
18
-
P
C
S
t
a
.
3
5
+
0
0
.
7
1
3
5
EOP-F24.75’EOP-F 24.75’EOP-F21.5’F-F
EOP-F
EOP-F
-
L
-
P
O
C
S
t
a
.
1
8
2
+
7
3
.
2
0
-
Y
1
8
-
P
O
T
S
t
a
.
3
0
+
6
9
.
3
1
=
EOP-F
24.75’+7536.75’+75
36.75’
+75
48.75’
+75
12.75’
+24.20
EOT-F
14.00’
+23.30
EOP-F
E
O
P
-
F
3
6
.
7
5
’
+
6
5
4’ PS4’ PS F-F9.5’
F-F
24.75’
EOP-F
0 2 0 20 2 0 2
0 1
0 1
0 2
02
03 0 3
033033
0
2
0
2
0
1
0
1
0
0
0
1
0
1
0
0
0
1
0
2
0
3
0
4
12’
+24.20
EOP-F
24.75’
+23.30
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
C
O
N
C
.
I
S
L
A
N
D
.
P
R
O
.
M
O
N
O
.
1’-6" C&G1’-6" C&G
2
’
-
9
"
C
&
G
1’
-
6
"
C
&
G
1’-
6
" C
&
G
2
’-
9
" C
&G
C
A
T
-
1
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
-
L
-
-
L-
-Y18-
-Y18-
1’
-
6
"
C
&
G
8.25’
SEE SHEET 34 FOR -Y18- PROFILE
5
0
’
(
T
YP
.
)
+24.93
BEG. 2’-9" C&G
EOT-F
2
’
-
9
"
C
&
G
1
7
7
+
2
4
.
9
3
T
O
1
7
7
+
7
4
.
9
3
T
O
2
’
-
9
"
C
&
G
T
R
A
N
S
I
T
I
O
N
1
’
-
6
"
C
&
G
1
8
4
+
0
0
.
5
7
T
O
1
8
4
+
2
3
.
3
0
T
O
2
’
-
9
"
C
&
G
T
R
A
N
S
I
T
I
O
N
1
’
-
6
"
C
&
G
(TYP.)
50’
10
0
’ T
A
P
E
R
1
00
’
T
A
P
E
R
100’ TAPER
2
0
0
’
T
A
P
E
R
-L-V = 50 mphSE = 0.04 PI Sta 184+05.55DL = 1,033.68’T = 520.63’R = 3,500.00’PI Sta 23+45.64DL = 1,357.19’T = 679.38’R = 11,500.00’-Y18-V = 50 mphSE = NC16’
30’
38’37’
CAT-1
PS
4’
PS
4’
8
:
1
T
A
P
E
R
8
:1 T
AP
E
R
8:1 TAPER
00
16’
20’
(TYP.)50’
+
0
0
.
7
1
+
8
0
+
5
0
.
7
1
286.41’ UNIFORM TAPER
+
14
.
3
0
A A2035 ADT 2015 ADT -L- NC 26821,700 16,340600390A A14,100 10,890 8,500 6,640-Y18- SR 2333 AIRPORT RD.-Y18- SR 19663,700 2,410 6,800 5,2301,100 8902,500 1,500
+80.00
50.00’
SIGNAL UPGRADE EXISTINGSEE SHEET 2B-6 FOR -Y18- INTERSEC
T
I
O
N
D
E
T
A
I
L
SEE SHEET 34 FOR -Y18- PROFILE SEE SHEET 27 FOR -L- PROFILE
H
W
60" RCP-III
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
18"18"
D
I
C
B
C
B
1
5
"
R
C
P
-
I
I
I
C
B
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
B
D
O
B
D
O
-
L
-
S
T
A
1
8
4
+
0
0
t
o
1
8
5
+
4
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
-
L
-
S
T
A
1
8
5
+
5
5
t
o
1
8
5
+
9
5
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
( Not to Scale)2:12:1DB b LATERAL BASE DITCH1"/Ft.FROM STA. 185+50 TO STA. 188+00 LT DETAIL L3b=2 Ft.B=2 Ft.Min. D=1 Ft.Ground Natural
F
S
F
S
B
D
O
18"18"
1
5
"
15" RCP-III
3
G
I
F
S
15
"
1
5
"
15"
18
"
15
" RC
P-III
-
L
-
S
T
A
1
8
6
+
0
5
t
o
1
8
7
+
5
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
S
E
E
D
E
T
A
I
L
S
1
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
-
Y
1
8
-
S
T
A
2
6
+
3
3
t
o
2
9
+
0
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
B
D
O
1
6
0
8
1
6
0
2
1
6
0
3
1
6
0
4
1605
1
6
0
6
1607
1
6
1
1
1
6
1
0
1
6
0
9
1
6
1
2
1
6
1
3
1
6
1
4
1
6
1
5
1
6
1
7
1
6
1
8
1
6
1
9
1601
1
6
1
6
1
6
2
3
1
6
2
5
1
5
"
R
C
P
-
I
I
I
1
6
2
0
1
6
2
1
1
5
"
15"
1
5
"
1
5
"
RC
P
-
I
II
15
"
RC
P-
III
F
S
2
4
"
2
4
"
1
4
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
5
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
2GI
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
E
S
T
1
8
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
3
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
R
E
T
A
I
N
R
E
M
O
V
E
R
E
M
O
V
E
REMOVE1513
1
6
2
6
1
6
2
7
S
P
E
C
I
A
L
T
B
J
B
w
/
M
H
L Setc.GI 10:120:1 ( Not to Scale)FALSE SUMP2.0’STA. -L- 186+25 STA. -L- 178+25 STA. -L- 184+25 DETAIL FTraffic Flow Outside Ditch 1.0’ M ax0.5’ M in.S=Ditch Slope Flatter4:1 orD2:1 ( Not to Scale)SPECIAL CUT DITCHFROM -Y18 STA. 31+50 TO STA. 31+61 RT FROM L STA. 181+50 TO STA. 182+50 RT FROM -Y18 STA. 29+50 TO STA. 30+00 LT DETAIL S1Min. D= 1 Ft.Ground NaturalREMOVE
8
0
’
L
T
+
8
4
.
9
3
80.12’+74 95’+0090’+50
8
0
.
1
2
’
+
7
5
8
0
.
1
4
’
+
4
5
9
5
.
1
4
’
+
0
0
9
5
’
+
7
9
.
1
6
1
0
7
.
5
9
’
+
2
0
.
8
0
T
E
L
E
.
C
A
B
I
N
E
T
S
S
T
R
U
C
T
U
R
E
O
R
D
O
N
O
T
D
I
S
T
U
R
B
9
5
’
+
8
5
.
1
0
1
3
5
’
+
2
6
1
2
0
’
+
2
5
8
5
’
L
T
+
7
0
8
0
’
L
T
+
5
0
-
Y
1
8
-
7
0
’
L
T
6
5
’
+
5
0
-
Y
1
8
-
7
0
’
L
T
6
5
’
+
9
0
-
Y
1
8
-
7
0
’
L
T
+
5
0
-
Y
1
8
-
1
0
3
’
+
0
5
-
Y
1
8
-
5
5
’
+
3
5
7
7
.
6
2
’
+
1
9
.
6
1
1
0
8
.
9
1
’
+
7
9
.
5
5
7
8
.
9
2
’
+
7
8
.
7
2
5
5
’
+
8
5
-
Y
1
8
-
7
5
’
5
5
’
+
5
0
-
Y
1
8
-
7
5
’
+
7
5
-
Y
1
8
-
5
5
’
+
2
8
.
4
0
-
Y
1
8
-
1
0
9
.
1
8
’
+
0
7
.
4
4
-
Y
1
8
-
1
3
0
.
9
0
’
+
6
5
.
2
7
-
Y
1
8
-
70’ RT+75.93 80’+9595’+82.14108’+8795’+7595’+00
1
0
8
’
9
6
.
2
4
’
+
9
2
1
0
8
’
9
6
.
6
1
’
+
0
2
1
0
0
.
8
2
’
+
8
2
.
8
9
8
5
’
L
T
+
5
0
1
0
2
’
+
4
3
.
9
4
9
6
’
+
6
0
1
0
9
’
+
6
1
9
6
’
+
4
8
1
1
0
’
+
5
0
110
’
10
1’
+
4
0
1
0
5
’
1
0
0
’
7
1
.
9
8
’
+
7
5
5
5
’
R
T
+
9
8
.
0
8
-
Y
1
8
-
6
1
.
1
5
’
+
7
5
-
Y
1
8
-
6
2
.
4
8
’
+
7
0
-
Y
1
8
-
1
0
2
.
9
0
’
+
3
0
1
1
0
’
+
6
8
1
1
0
’
R
T
+
5
1
.
3
0
8
2
.
1
9
’
+
1
4
-
Y
1
8
-
8
0
.
8
4
’
+
6
6
-
Y
1
8
-
110
’
10
1’
+
5
2
6
0
’
+
1
0
.
7
7
-
Y
1
8
-
C
FF
C
C
F
C
CC
C
F
F
F
C
C
F
F
C
C
C
C
FF
CC
C
F
N
A
D
83/
95
S
l
o
p
e
F
i
l
l
C Proposed Ditch
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:45R:\Roadway\Proj\R-2603_Rdy_psh17.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
SEE SHEET NO. 16MATCH LINE -L- STA. 187+00
R
-
2
6
0
3
1
7
SEE SHEET NO. 20 MATCH LINE REVISIO NS10/14/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 107. - M AE REVISED PDE AND ADDED DUE O N PARCEL 111 AND CREATED PARCEL 108Z. - M AE09/02/2014 - R/W REVISIO N: ADDED PUE AND REM O VED TCE O N PARCEL 103; ADDED PUE AND REVISED TCE O N PARCEL 106; ADDED PUE AND CHANGED PDE TO DUE O N PARCEL 108; 06/06/2014 - R/W REVISIO N: CHANGED 105’ DRIVE TO TW O 36’ DRIVES O N PARCEL 109. - M AE
B
M
9
N 8
7
5
7
’0
6
" W
N 4705’49" W S 1149’12" E
N 4102’32" W
N
7
5
16
’4
7
"
E
S 15 09’19" E
N
6
0
1
9
’
2
6
"
E
N 2615’37" W
N 2615’37" W
S 2615’37" E S 1901’44" ES 1926’06" E
S 1149’40" E
S 1215’28" E
N 5440’3
5
"
E
N 5507’11" EN 5505’36" E
2
3
6
.5
0
’
201.02’
212.50’
3
12
.
3
2
’
256.77’
3
3
9.
8
5
’
190.33’
9.71’
828.25’44.12’315.10’
183.50’
435.34’54.44’163.55’186.81’T. CAMERON FINLEYTAMELA FINLEY
D
O
N
H
A
Y
E
S
K
Y
L
E
B
R
I
N
E
G
A
R
T. CAMERON FINLEYTAMELA FINLEY
J
O
H
N
C
H
U
R
C
H
N
A
N
C
Y
C
H
U
R
C
H
D
B
6
3
7
P
G
7
7
9
D
B
1
0
4
9
P
G
2
8
5
D
B
5
5
3
P
G
4
7
4
DB 818 PG 402
D
B
5
0
7
P
G
3
0
7
D
E
E
D
D
O
E
S
N
O
T
C
L
O
S
E
M
A
P
P
E
D
B
Y
G
I
S
174.38’
REBAR REBAR
R
E
B
A
R
E
I
P
R
E
B
A
R
R
E
B
A
R
REBAR
REBAR
R
E
B
A
R
REBAR REBAREXISTING R/WEXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
IS
T
IN
G
R
/
W
DB 678 PG 538NORTH WILKESBORO CITY LIMITS
N
O
R
T
H
W
IL
K
E
S
B
O
R
O
C
IT
Y
L
IM
IT
S
LINE AS PER GIS
NORTH WILKESBORO CITY LIMITS
105 106
1
0
8
1
0
9
1
1
0
1
1
1
1
1
2
HW
2
4
"
C
M
P
18"
C
M
P
2
4
"
C
M
P
18" CMP
1
5
"
C
M
P
1
5
"
C
M
P
18" CMPHW
D
I
12" CMP
D
I
D
I
N
C
2
6
8
E
L
K
I
N
R
D
2
1
’
B
S
T
S
4
8
"
C
H
L
7
2
"
W
D
48" CHL
G
R
S
GR
S
1
S
B
K
4
8
"
C
H
L
4
8
"
C
H
L
W
/
L
T
W
/
L
T
B
S
T
S
SOILL
T
48"CHL
48"CHL
SOIL
C
O
N
C
F
L
A
G
P
O
L
E
W
/
L
T
HTR
J
U
C
T
I
O
N
A
N
D
A
P
P
R
O
X
.
L
O
C
A
T
IO
N
D
I
D
I
CMP 15"
20’BST
C
O
N
C
R
I
P
R
A
P
T
6
"
A
C
T
T
T
S
6"AC6"PVC
4"PL
REPEATERS3 TELE
6
"
A
C
T -BL-31
-
B
L
-
3
2
-
B
L
-
3
3
33.18’+49.54
56.19’
+18.27
50.37’+89.87
57.35’+98.85
103STEPHEN JARVISMARGARET JARVISDB 801 PG 349DB 830 PG 131SAMARITAN’S PURSEDB 1100 PG 146 166
1
5
"
C
M
P
CONC
H
A
R
V
E
S
T
T
I
M
E
F
E
L
L
O
W
S
H
I
P
D
B
8
4
0
P
G
1
1
9
D
B
9
6
8
P
G
2
7
5
F
I
R
E
D
E
P
A
R
T
M
E
N
T
,
I
N
C
K
N
O
T
V
I
L
L
E
V
O
L
U
N
T
E
E
R
1
1
2
10
7
RENFR
O
J
R
.
CARL
B
.
PG 2
7
4
DB 11
9
4
1
0
8
Z
190
195
200
-
L
-
V
=
5
0
m
p
h
S
E
=
0
.
0
4
P
I
S
t
a
1
8
4
+
0
5
.
5
5
DL
=
1
,
0
3
3
.
6
8
’
T
=
5
2
0
.
6
3
’
R
=
3
,
5
0
0
.
0
0
’
P
I
S
t
a
1
9
3
+
6
1
.
1
6
DL
=
8
8
4
.
9
2
’
T
=
4
4
2
.
5
5
’
R
=
1
7
,
6
5
0
.
0
0
’
P
I
S
t
a
2
0
0
+
4
8
.
9
3
DL
=
4
8
9
.
7
4
’
T
=
2
4
5
.
4
1
’
R
=
3
,
0
1
7
.
5
5
’
-L- PRC Sta. 189+18.60
-L- PCC Sta. 198+03.53
EOT-F14.00’+80EOP-F24.71’EOP-F24.75’24.75’EOP-F 20.25’F-F033 0330 3 0 30201020001
0 20 2
10.6’10.5’
02
022033
02
03
-
L
-
P
O
C
1
9
5
+
3
0
.
0
0
E
N
D
T
.
I
.
P
.
P
R
O
J
E
C
T
R
-
2
6
0
3
S
E
E
S
H
E
E
T
2
7
F
O
R
-
L
-
P
R
O
F
I
L
E
10.75’R1’-6" C&G 2’-9" C&G
-
L
-
9.50’R 50’ (TYP.)+78.60
+85
+90
T
A
P
E
R
5
0
’
100’ TAPER
2
2
’
4
0
’
3
6
’
PS4’
2
0
’
1 1’
16’
1
6
’
PS
4’
+18.60
12’12’
+18.60+18.60
T
R
A
N
S
IT
IO
N
S
(LT
. &
R
T
.)
5
7
5
’ LAN
E
S
H
IF
T
TRANSITION (RT. E
OP
)
300’ LANE DROP 11.5’11.5’
+50 12’12’
+35
PS
4’
TRANSITION (LT. EOP)538.60’ LANE ADDITION (2 LANES)215’ RT. TURN TAPER
3
6
’
2
’
-
6
"
C
&
G
D
R
I
V
E
W
A
Y
R
A
D
I
I
A
R
E
1
0
’
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
2’-9" C&GEND SEE DETAIL L3 LATERAL ’V’ DITCH
2
4
"
24"
R
CP-III
CBCB15" RCP-III
2
4
"
2
4
"
R
E
M
O
V
E
BDOBDO
4
G
I
BDO-L- STA 187+60 to 190+40 SEE RDWY STD. 240.01 BERM DITCH FS
(
N
o
t
t
o
S
c
a
l
e
)
2:1
2:1
DB
b
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
1
"
/
F
t
.
FROM STA
.
1
8
5
+
5
0
T
O
S
T
A
.
1
8
8
+
0
0
L
T
D
E
T
A
I
L
L
3
b
=
2
F
t
.
B
=
2
F
t
.
M
i
n
.
D
=
1
F
t
.
Ground Natural15"18" RCP-III 24" RCP-III
3
0
"
3
0
"
3
0
"
3
0
"
3
0
"
30"30" RCP-III30" RCP-III18"30"
B
D
O
-
L
-
S
T
A
1
9
2
+
0
0
t
o
1
9
2
+
9
5
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
2
G
I
15"FS
F
S
L Setc.GI 10:120:1 ( Not to Scale)FALSE SUMP2.0’STA. -L- 190+88 LT STA. -L- 189+63 LT STA. -L- 186+25 RT DETAIL FTraffic Flow Outside Ditch 1.0’ M ax0.5’ M in.S=Ditch Slope17011702170317041705170617071708
1
7
0
9
1
7
1
0
1
7
1
1
1712 1713
1
7
1
4
1
7
1
5
1
7
1
6
1
7
1
7
1
7
1
8
1
7
1
9
1
7
2
0
15"
2
2
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
1
T
O
N
S
C
L
A
S
S
’
I
’
R
I
P
R
A
P
-L- STA 186+05 to 187+50 SEE RDWY STD. 240.01 BERM DITCH 2GI 2GI2GI
2
G
I
2
G
I
2GI
2
G
I
w
/
M
H
T
B
J
B
2
G
I
R
E
T
A
I
N
REMOVE
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
1
8
"
1721
15" CMP
18
"
R
C
P
2
4
"
C
M
P
D
I
24"
R
C
P
-
I
I
I
12" CMP
O
F
2
E
X
.
1
2
"
R
E
M
O
V
E
8
’
E
A
.
N
O
T
O
P
E
N
C
O
N
C
R
E
T
E
,
C
O
U
L
D
P
O
S
S
I
B
L
E
J
B
O
F
E
X
.
3
0
"
R
E
M
O
V
E
3
8
’
R
E
T
A
I
N
C
B
1
7
2
1
2
4
"
85’ LT +18.60110’ RT +18.60110’ RT +62.11
5
7
.
3
9
’
R
T
+
6
5
.
0
6
9
0
’
+
6
3
.
2
3
7
0
’
+
0
0
6
0
’
+
0
0
5
1
.
4
7
’
+
5
5
4
9
.
3
1
’
L
T
+
5
0
6
0
’
+
5
0
110’101’+40114’98.62’+90111’94’+15111’94’+05
9
0
’
+
1
2
110’101’+52
9
5
’
+
2
2
7
0
’
4
9
.
5
0
’
+
7
0
8
0
’
4
9
.
9
4
’
+
3
0
4
9
.
6
5
’
+
8
8
7
3
’
+
8
5
1
0
9
’
+
8
0
110’93.97’+30FFCC
C
C
F
C
F
F
C
C
C
C
NAD
8
3
/ 9
5
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
02-SEP-2014 09:04R:\Roadway\Proj\R-2603_Rdy_psh18.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
E
E
S
H
E
E
T
N
O.
4
M
A
T
C
H
L
IN
E
-
Y
1-
S
T
A.
2
0
+
0
0
R
-
2
6
0
3
1
8
9/2/2014 - R/W REVISIO N: ADDED PUE O N PARCEL 13. - M AE
S
75 44
’02"
E
S
14
5
5
’5
6
" W
N 83 32’42" E
N 8332’42" E
S 6402’35" W
S 7625’37" W
S
0
9
4
5
’3
9
" W
N
78 21’56" W
S 6620’01" W
S 6334’43" W S 2646’20" EN 6533’40" ES 6412’17" WN 2551’46" WN 2551’46" W
N 5
3
5
5’3
7"
W
N 3545’06" E
S 84 06’15" E
N 5103’55" E
N 3656’45" E
S 53
41’0
9"
E
S 2620’22" E
N 6322’25" E
N 6408’14" ES 6402’08" W
S
1
9
4
1’
4
7
"
E
S
19
4
8’
5
7
"
E
S 3438’03" E N 7606’58" E
N 5
3
5
5’3
7"
W
19
.70’
101.20
’
3
0
.2
3
’
21.64’
109.88’96.14’
99.44’
46.57’
7
4
.5
4
’
96
.97’
89.34’
53.29’99.16’98.32’67.28’60.09’59.91’
6
2.8
9’
77.73’
46.45’
136.50’
23.59’
83.47’
365.31’79.42’
29.64’249.48’
5
2.
0
8’
6
5.
5
3’
85.73’
203.00’
199.61’
R/
W
M
O
N
EIPEIPEIPREBARREBAREIPREBAREIP
E
I
P
E
I
P
R
E
B
A
R
N
A
I
L
R
E
B
A
R
R
E
B
A
R
EIP
E
I
P
R
E
B
A
R
R
E
B
A
R
NA
IL
E
X
IS
T
ING R
/W
E
XIS
T
IN
G
R
/W
E
X
IS
T
IN
G
R
/
W
EX
ISTIN
G
R/W
E
XIS
TI
N
G
R/
W
EXISTING R/W EXISTING R/WEXISTING R/W EXISTING R/WEXISTING R/W
EXISTING R/W
E
XISTIN
G R/
W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W
R/W LINE AS PER GISSCB18" CMP 18" CMP 18" CMP
18" RCP 18" RCP
18
"
R
C
P
C
B
C
B
C
B
24" RCP
LOC.APPROX.LOC.APPROX.
18
"
R
C
P
1
8
"
R
C
P
C
B
15
" C
M
P
C
B
15"
C
M
P
18" RCP
18" RCP
CB
L
T
L
T
B
S
T
B
S
T
S
L
T
L
T
LT
S
NC 2
6
8
E
LKIN R
D
B
S
T
B
S
T
B
S
T
L
T
L
T
BLK WALL
W
/
L
T
B
S
T
B
S
T
C
O
N
C
C
O
N
C
V
E
N
T
C
A
P
S
S
CAPS
VENT
SL
T
S
W
/
L
T
B
S
T
B
S
T
1
S
B
K
B
U
S
B
S
T
B
S
T
B
S
T
CONC
CON
C
C
ONC
C
ONC
CONC
C
ONC
CON
C
L
T C
B
C
O
N
C
C
O
N
C
L
T
S 1SFD 1SFD
S
BSTROCK
W
A
L
L
BSTBSTBST1SBKBUS REYNOLDS RD BST O ST BSTBSTCONCW/LTNC 18 / NC 268 BST
GR
B
S
T
G
R
SLT W/LT GRLT
L
T
C
B
CONC DICONC CONC CONCCONCCONC
C
O
N
C
C
O
N
C
CONC
CONC
CONC
C
O
N
C
4
8
" C
O
N
C
C
U
R
B
C
B
C
B
ATM
1
S
M
T
L
B
U
S
CBCB
DI
W/
L
T
1
S
B
L
K
B
U
S
1SFBUS
C
A
N
M
T
L
C
A
N
M
T
L
S
1
S
M
B
U
S
C
E
M
E
T
E
R
Y
EOI
EOI
E
O
I
E
O
I
T
S
EOI 8"CI2"GALV2"GALVEOIEOI
8
"
C
I
8"CI8"CI 8"CI 12"CI
12
"
CI
6
"
CI
6"CI
6"CI
6"CI
6"PL
6
"
P
L
6"CI
16"DI1
2
"
CI
16"DI
6"CI
EOI4"PL
16"DI
16
"
DI
16"DI
12"CI
UNKNO
WN SIZE
M
A
C
K
B
R
O
W
N
W
I
L
L
A
B
R
O
W
N
D
B
8
0
7
P
G
2
7
8
1
3
N
C 18 SE
C
O
N
D ST
BST
-
B
L
-
9
-
B
L
-
8
-
B
Y
1
-
3
7
DB 930 PG 212
MAROLYN PENDRY
MOTOR CO INC YADKIN VALLEYDB 660 PG 945DB 671 PG 984INCORRECT DESCRIPTION 2
N
O
R
T
H
W
I
L
K
E
S
B
O
R
O
B
P
O
E
D
B
3
0
1
P
G
1
5
0
I
N
C
O
R
R
E
C
T
D
E
S
C
R
I
P
T
I
O
N
1
3
3
W
O
R
T
H
W
I
N
E
B
A
R
G
E
R
D
B
6
7
5
P
G
3
1
4
D
B
4
7
9
P
G
2
4
7
8
FIRST BAPTI
S
T
C
H
U
R
C
H
C
E
M
E
T
A
R
Y
DB 1
0
8
0
P
G
2
6
5
7
GARY BESHEARSDB 1010 PG 78 6 GARLAND STONEDB 859 PG 158 5134WALTE
R
S
T
O
N
E
LAURET
T
A
S
T
O
N
E
DB 93
1
P
G
3
3
DESCR
I
P
T
I
O
N
INCOR
R
E
C
T
ROXIE COLBURN RICHARD COLBURNDB 1027 PG 197 4
D
B
8
3
4
P
G
2
6
2
M
C
D
O
N
A
L
D
S
R
E
A
L
E
S
T
A
T
E
C
O
M
P
A
N
Y
1
2
E
A
C
I
N
V
E
S
T
M
E
N
T
S
L
L
C
D
B
1
0
6
1
P
G
2
1
0
1
0
K
A
J
A
N
L
L
C
N
O
D
E
E
D
R
E
F
E
R
E
N
C
E
P
B
9
P
G
4
0
7
9
W
H
I
T
E
R
E
A
L
P
R
O
P
E
R
T
Y
D
B
8
0
1
P
G
9
1
1
1
5
1.7
2’
+
8
6.90
49
.69
’
+48
.37
4
9
.4
9
’
+
8
8
.2
0
5
7
.2
6
’
+
12
.16
34.16’+89.76
53.56’+64.43 33.51’
+66.6
8
31.09’+02.57
1
4
K
A
J
A
N
L
L
C
N
O
D
E
E
D
R
E
F
E
R
E
N
C
E
P
B
9
P
G
4
0
7
-
B
Y
1
-
3
6
UST
15
2
0
-Y1-PI Sta 12+86.70DL = 207.26’T = 103.67’R = 2,900.00’PI
S
t
a
2
3
+
2
8
.
4
7
DL =
1
,
5
7
7
.
9
8
’
T =
9
3
8
.
1
8
’
R =
1
,
1
6
0
.
5
7
’
2
0
-Y1- POT Sta. 10+00.00
-Y1- PC Sta. 11+83.03
-Y1- PCC Sta. 13+90.29
0 4
046 046
0
4
-Y1- POC 13+05
.
0
0
BEGIN CONSTRUC
T
I
O
N
V
=
4
0
m
p
h
SE
=
0
.
0
4
24’ C-F
24’ C-F L
L
2
’-
6
" C
&G
2
’-
6
" C
&
G
2
’-6
" C
&G
2
’-
6
" C
&G
8
X
1
8
C
U
R
B
-
Y1-
+20
P
R
OP
. 5
’ CONC. S
IDE
WALK
4
2
’
3
0
’
4
7
’
2
7
’
4
8
’
C
R
C
R
C
R
C
R
LL 32.9’ C-F22.9’ C-F
+50
+62
S
E
E
S
H
E
E
T
2
8
F
O
R
-
Y
1
-
P
R
O
F
I
L
E
S
I
G
N
A
L
U
P
G
R
A
D
E
E
X
I
S
T
I
N
G
J
B
w
/
M
H
C
B
A
d
j
.
C
B
C
B
5
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
1
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
15"
R
C
P-III
1
8
0
1
1
8
0
2
1
8
0
3
1
8
0
4
R
E
T
A
I
N
0
4
2
0
REM
O
VE
RC
P-
III
15
"
O
F EX. 15
"
REM
O
VE 4
2
’
6
4
’
+
6
2
.
2
6
-
Y
1
-
5
5
’
+
7
5
-
Y
1
-
4
9
.
2
6
’
+
3
0
-
Y
1
-
6
3
’
4
9
.
6
9
’
+
5
0
-
Y
1
-
6
3
’
4
9
.
7
2
’
+
6
0
-
Y
1
-
F
C
F
F
F
F
F
F
F
F
F
F
F
F
N
A
D
8
3
/
9
5
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
14-OCT-2014 10:45R:\Roadway\Proj\R-2603_Rdy_psh19.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
1
9
R
-
2
6
0
3
SEE SHEET NO. 16
MATCH LINE -Y18- STA. 27+00 2
0
REVISIO NS10/14/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E O N PARCEL 163. - M AE09/10/2014 - R/W REVISIO N: O RIGINAL PARCEL 161 SPLIT INTO 161, 161A, & 161B, AND BO TH NEW PARCELS HAVE NEW PRO PERTY O W NER NAM ES AND DEED INFO . - M AE09/02/2014 - R/W REVISIO N: REM O VED PUE AND CHANGED DUE TO PDE O N PARCEL 161. - M AE03/13/2014 - R/W REVISIO N: SUBDIVIDED PARCEL 163 INTO PARCELS 163 & 163A W ITH PRO PERTY O W NER NAM ES AND DEED REFERENCES. - KNW
S
0
7
3
6
’5
3
" E
S 0736’53" E
N
8
7
5
4’
0
6"
W
N
0130’50" E
S 64 07’46" W
S 64 07’46" W
S
85
44’
10 " W
S
2
6
2
5
’2
0
" E
S
8
7
4
3’
0
3"
E
S
8
7
4
0’
1
0"
E
N 64 19’19" E
4
0
9
.7
1’
480.78’
4
2
6.
12’
250.77’
19.83’
339.55’
135.
31’
3
7
7
.9
1’
5
0.
7
1’
9
9.
9
9’
9.26’
7.54’
H
&
E
M
O
T
O
R
S
I
N
C
J
A
M
E
S
J
O
N
E
S
VERNON WYATTANNA WYATT
D
B
7
2
1
P
G
8
9
1
D
B
1
0
5
9
P
G
7
9
D
B
8
6
5
P
G
1
5
7
D
B
8
5
0
P
G
4
7
4
DB 1062 PG 14
REBAR
R
E
B
A
R
E
I
P
REBAR
REBAR
REBAR
E
X
I
S
T
I
N
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W EXISTING R/W EXISTING R/W
40.00’
40.00’
9
9.
5
2’
202.19’161
1
6
2
1
6
4
18" CM PCB
18
" C
MP
v
v
v
vv
CMP
24"
N 64 19’19" E
C
M
P
1
2
"
CM P24"
BST
W/LT
BST
S
O
I
L
S
OIL
S
OIL
B
S
T
BST
S
O
IL
1SFD
SOIL
BST
W/LT
CONC
GR GRRAPRIPSS CONCCONC
S
4
8
"C
H
L
48"CHL
4
8
"C
H
L
72"CHL 72"CHL
D
I
LT
15
" C
M
P
1
5
"
C
M
P
1SFBUS 1SFBUS
T
T
6"AC
6
"
A
C
6
"
A
C
T
S
6"PL
6
"
P
L
6
"
P
L
A
I
R
P
O
R
T
R
D
2
2
’
B
S
T
S
R
1
9
6
6
-BY11-63
-
B
Y
11-
6
4
13.35’
+92.97
6.69’
+90.86
D
B
3
8
0
P
G
1
4
2
1
6
1
B
15
" C
M
P
1
6
3
L
Y
N
N
E
C
A
U
D
I
L
L
D
B
1
0
8
5
P
G
1
1
9
D
B
1
0
8
5
P
G
1
1
8
16
3
A
349.77’
S 64 08’04" W
2
7
0
.5
1’
S
2
6
5
5
’3
2
" E
9
7
.6
6
’
S
2
6
4
7
’3
4
" E
184.04’S 48 37’03" W
S
12
17
’5
3
" E
17
.6
8
’
180.87’
S 53 35’53" W
S 64 08’04" W
N 59 53’07" E
565.21’
J
O
H
N
L
E
W
I
S
W
Y
A
T
T
J
R
.
1
6
1
A
O
T
H
O
B
R
I
A
N
W
Y
A
T
T
D
B
1
1
6
9
P
G
7
0
N 59 53’07" E433.56’
L
Y
N
N
E
C
A
U
D
I
L
L
A
V
E
R
Y
C
A
U
D
I
L
L
15
20
25
-Y18- PRC Sta. 16+66.26
24.75’
+65
EOP-F
12.75’
+25
EOP-F 1 6’
F-F
24.75’
+00
EOP-F
12’
+87.50
12’
+87.50
8’ PS
16’
F-F
EOP-F
12.75’
0295
003
02 01
02
11.2’
10.9’
12’12’
C
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
-
Y18
-
V = 60 mp
h
SE = NC -Y18-PI Sta 13+38.13DL = 665.26’T = 337.13’R = 1,665.00’PI Sta 23+4
5
.
6
4
DL = 1,357.19
’
T = 679.38
’
R = 11,500.
0
0
’
-Y18- POC 17+50.00 BEGIN CONSTRUCTION
S
E
E
S
H
E
E
T
3
4
F
O
R
-
Y
1
8
-
P
R
O
F
I
L
E
4’ PS
T
AP
E
R
5
0
’
(T
YP
.)
5
0
’
EOP-F
12.75’
+25
L
T
.
&
R
T
.
4
3
7
.5
’ T
R
A
N
S
IT
IO
N
17
5
’ T
AP
E
R
PS
4’
PS
4’
2
0
’
2
2
’
2
0
’
3
0
’
8
:1 T
AP
E
R
8
:
1
T
A
P
E
R
1
6
’
N
A
D
83/ 95
F
S
1
8
"
1
4
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
5
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
1
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
7
T
O
N
S
C
L
A
S
S
’
I
’
R
I
P
R
A
P
2:1
D
Flatter
4:1 or
d
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
F
R
O
M
-
Y
1
8
-
S
T
A
.
1
7
+
0
0
T
O
S
T
A
.
1
8
+
0
0
L
T
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
S
2
T
y
p
e
o
f
L
i
n
e
r
=
P
S
R
M
M
a
x
d
=
1
F
t
.
M
i
n
.
D
=
1
F
t
.
D
Flatter
4:1 or
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
w
/
H
I
N
G
E
6
.
0
’
4:1
VARIABLE
F
R
O
M
-
Y
1
8
-
S
T
A
.
2
2
+
5
0
T
O
S
T
A
.
2
5
+
7
0
L
T
F
R
O
M
-
Y
1
8
-
S
T
A
.
1
8
+
0
0
T
O
S
T
A
.
2
1
+
0
0
L
T
D
E
T
A
I
L
S
3
G
r
o
u
n
d
N
a
t
u
r
a
l
d
M
a
x
.
d
=
0
.
9
F
t
.
M
i
n
.
D
=
0
.
9
F
t
.
T
y
p
e
o
f
L
i
n
e
r
=
P
S
R
M
-
Y
1
8
-
S
T
A
2
6
+
3
8
t
o
2
9
+
0
0
S
E
E
R
D
W
Y
S
T
D
.
2
4
0
.
0
1
B
E
R
M
D
I
T
C
H
2
0
0
2
2
0
0
3
2
0
0
5
2
0
0
4
RCP-III
24"
1
8
"
R
E
T
A
I
N
R
E
T
A
I
N
RETAIN RETAIN RETAIN
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
2
0
0
1
RCP-III
30"
1
8
"
24" CPP
15" CMP15" CMP DI18" CPP15" CMPDI18" CPP 15" CPP
E
S
T
4
5
S
Y
P
S
R
M
S
E
E
D
E
T
A
I
L
S
2
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
E
S
T
3
0
0
S
Y
P
S
R
M
S
E
E
D
E
T
A
I
L
S
3
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
E
S
T
3
2
0
S
Y
P
S
R
M
S
E
E
D
E
T
A
I
L
S
3
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
35
’
20.13
’
+9
0
4
7
.
0
8
’
+
7
0
-
Y
1
8
-
6
0
’
+
0
0
-
Y
1
8
-
5
7
.
9
2
’
+
8
0
-
Y
1
8
-
8
5
’
+
0
0
-
Y
1
8
-
1
2
2
’
+
9
5
-
Y
1
8
-
1
2
6
’
+
2
5
-
Y
1
8
-
9
0
’
+
5
0
-
Y
1
8
-
8
0
’
+
5
0
-
Y
1
8
-
9
0
’
+
4
0
-
Y
1
8
-
9
0
’
+
7
5
-
Y
1
8
-
8
5
’
+
0
0
-
Y
1
8
-
1
2
7
’
+
5
8
-
Y
1
8
-
1
2
7
’
+
9
0
-
Y
1
8
-
1
0
0
’
+
4
5
-
Y
1
8
-
8
5
’
7
0
’
+
8
0
-
Y
1
8
-
8
5
’
7
0
’
+
5
0
-
Y
1
8
-
8
0
’
+
7
5
-
Y
1
8
-
7
8
.
8
4
’
6
3
.
7
9
+
2
5
-
Y
1
8
-
7
6
.
8
8
’
6
1
.
8
3
+
0
0
-
Y
1
8
-
3
1
.
6
9
’
+
5
0
-
Y
1
8
-
19.
8
9
’
+22.
1
9
-Y
1
8
-
8
0
’
+
7
5
7
0
’
+
0
5
6
5
.
1
3
’
+
6
0
4
5
’
L
T
3
5
’
2
0
.
0
2
’
L
T
+
5
0
-
Y
1
8
-
4
0
’
R
T
1
7
.
9
8
+
5
0
-
Y
1
8
-
8
0
’
L
T
+
5
0
-
Y
1
8
-
C
F
F
C
C
F
F
C
F
S
l
o
p
e
F
i
l
l
G
e
o
t
e
x
t
i
l
e
S
l
o
p
e
F
i
l
l
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
02-SEP-2014 09:04R:\Roadway\Proj\R-2603_Rdy_psh20.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
2
0
SEE SHEET NO. 16 MATCH LINE -Y18- STA. 35+00
R
-
2
6
0
3
3/13/2014 - R/W REVISIO N: ELIM INATED TCE TO PRO PERTY LINE O N PARCEL 165; UPDATED PRO PERTY O W NER NAM E AND DEED REFERENCE O N PARCEL 169. - M AE
2
1
SEE SHEET NO. 17 MATCH LINE 6/6/2014 - R/W REVISIO N: UPDATED PRO PERTY O W NER NAM E O N PARCEL 167. - M AE PARCEL 168. - M AE4/17/2014 - R/W REVISIO N: EXTENDED -DRIVE1-, ADDED 30’ CO NCRETE DRIVE, AND ADDED PRO PO SED R/W O N PARCEL 166; ADDED TCE AND A "DRIVEW AY TO BE REM O VED" NO TE O NAND REVISED TCE O N PARCEL 169. - M AE9/2/2014 - R/W REVISIO N: ADDED PUE O N PARCEL 165; ADDED PUE & DUE AND REVISED PDE & TCE O N PARCEL 168; ADDED STATIO N AND O FFSET LABEL AT -Y19- 10+64, 47’ RT; ADDED PUE
S 8125’13" W
S
0
4
2
5
’
5
3
"
E
S
0
6
3
8
’
4
6
"
E
N 8121’14" E
S
0
6
4
1’
4
6
"
E
S
1
7
5
6
’
4
9
"
E
N 85 57’03" W
S 8125’13" W
N 5111’29" E S 1206’46" ES 3853’16" EN 5110’38" E
N 85 51’25" E
S
0
4
0
8
’
3
5
"
E
S 85 58’52" W
S
0
4
0
8
’
3
5
"
E
N
0
4
1
4
’
2
4
"
W
S
0
4
0
8
’
3
7
"
E
S
0
4
0
8
’
3
7
"
E
S
0
4
0
8
’
3
7
"
E
S 85 51’23" W
S 85 51’23" W
S 85 11’46" EN
12
0
5
’
2
2
"
W
N
0
4
0
8
’
2
1
"
W
S 85 51’39" W
268.74’
2
2
0
.
8
1
’
2
2
4
.
4
3
’
177.19’
5
0
.
1
2
’
4
6
4.
5
4
’
346.01’
187.96’
186.81’242.70’85.51’36.62’228.14’
205.14’
1
1
0
.
0
0
’
201.21’
1
1
0
.
0
0
’
1
1
0
.
2
2
’
8
3
.
6
7
’
3
3
.
9
8
’
1
1
7
.
6
5
’
200.00’
199.97’
321.68’
12
8
.
4
9
’
7
2
.
7
5
’
199.87’
T
H
O
M
A
S
A
I
K
E
N
G
A
R
Y
T
E
A
G
U
E
C
H
R
I
S
T
I
N
A
T
E
A
G
U
E
S
T
E
V
E
N
S
H
U
M
A
T
E
P
A
T
R
I
C
I
A
S
H
U
M
A
T
E
K
E
I
T
H
M
A
T
H
I
S
R
O
S
E
M
A
R
Y
M
A
T
H
I
S
R
E
G
G
I
E
K
W
O
O
D
T
H
O
M
A
S
A
I
K
E
N
SAMARITAN’S PURSE
L
I
B
E
R
T
Y
G
R
O
V
E
B
A
P
T
I
S
T
C
H
U
R
C
H
I
N
C
K
E
L
S
E
Y
R
O
Y
A
L
D
B
7
4
0
P
G
5
7
D
B
9
1
0
P
G
4
6
3
D
B
7
0
7
P
G
4
0
3
D
B
6
6
0
P
G
5
4
0
D
B
7
7
0
P
G
2
5
6
D
B
7
0
7
P
G
7
7
7
D
B
7
4
0
P
G
5
9
D
B
7
4
0
P
G
5
9
DB 1100 PG 146
D
B
7
6
3
P
G
3
9
2
D
B
7
8
4
P
G
4
2
7
EIPREBAR
EIP R
E
B
A
R
REBAR
R
E
B
A
R
REBAR
R
E
B
A
R
R
E
B
A
R
EIP
REBARREBARREBARREBAR
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
EXISTING R/W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
EXISTING R/W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60’
53.00’
5
0
.
0
0
’
53.00’
4
5
.0
0
’
45.00’
NORTH W ILKESBORO CITY LIMITS
NORTH W ILKESBORO CITY LIMITS
L
IN
E
A
S
P
E
R
G
IS
281.25’
1
6
7
1
6
9
1
7
0
1
7
1
1
7
2
1
7
3
1
7
4
1
7
5
15" RCP
A
P
P
R
O
X
L
O
C
A
T
I
O
N
A
P
P
R
O
X
L
O
C
A
T
I
O
N
6
"
P
L
A
S
T
I
C
6
"
P
L
A
S
T
I
C
C
M
P 18"
GR BST GR CONC
CONC
GR
BST
BST
CONC
C
O
N
C
1S
B
KD
CONC
1
S
F
D
GR
GR
GR
BST
BAPTIST CHURCH
LIBERTY GROVE C
O
N
C
B
S
T
GR
C
O
N
C
W
/
L
T
D
K
D
K
SS
W
/
L
T
C
O
N
C
S
R
2
3
3
3
R
I
V
E
R
L
I
B
E
R
T
Y
G
R
O
V
E
C
H
U
R
C
H
R
D
2
4
’
B
S
T
C
O
N
C
15" CMP
1
S
F
D
CEMETERY
T
T
T
6"PVC
T
T
CT
CT
6"PVC
6"PVC
6"AC
6
"
A
C
6
"
A
C
6
"
A
C
6
"
A
C
6"PL6
"
P
L
6
"
P
L
6
"
P
L
4"PL6"PL
-
B
Y
1
3
-
7
2
-
B
Y
13
-
7
1
-BY12-70
-BY 12-67
-
B
Y
1
2
-
6
8
-
B
Y
1
2
-
6
9
RIDGE TOP RD 17’ BST
KIRK WALKERKIMBERLY WALK
E
R
DB 1005 PG 2
9
16887.55’+48.6833.84’+28.70 88.63’+99.67
29.35’+77.79
30.80’
+04.63
30.78’
+22.24
B
R
I
T
O
D
U
R
A
N
D
B
1
1
7
2
P
G
4
3
KELSEY RO YAL
DB 784 PG 427 165 165FERRELGAS, LPDB 785 PG 333 166
1
7
0
166 SAM ARITAN’S PURSEDB 1100 PG 146
1
5
"
C
M
P
1
5
"
C
M
P
1
5
"
C
M
P
35
40
-Y18- PC Sta. 35+00.71
-Y18- PT Sta. 39+18.74
-Y18- POT Sta. 43+70.61
-Y19- PT Sta. 12+81.73-Y19- PC
S
t
a
. 11+
7
9
.8
4
3505
06
0 6
0 5
0 3
0 2
01
00
02
016
04
0
14
0
0
5
0
1
0
1
0
0
0
2
0
1
0
2
0
3
0
4 0
3
0
2
0
1
0
0
0
1
0
2
0
2
0
1
0
0
0
1 0
2
0
3
12.0’
8
.8
’
8
.6
’
9
’
9
’
9
’
9
’
-
Y
1
8
-
-
Y
1
9
-
-
Y
1
9
-
P
I
S
t
a
1
2
+
3
0
.
9
4
DL
=
1
0
1
.
8
9
’
T
=
5
1
.
1
0
’
R
=
5
3
3
.
0
0
’
-
Y
1
8
-
P
I
S
t
a
3
7
+
1
4
.
2
2
DL
=
4
1
8
.
0
3
’
T
=
2
1
3
.
5
2
’
R
=
8
3
3
.
0
0
’
V
=
5
0
m
p
h
S
E
=
0
.
0
6
V
=
2
5
m
p
h
S
E
=
0
.
0
3
-
Y
1
9
-
P
O
T
1
3
+
0
0
.
0
0
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
-
Y
1
8
-
P
O
T
4
2
+
4
0
.
0
0
B
E
G
I
N
C
O
N
S
T
R
U
C
T
I
O
N
-
Y
1
8
-
P
O
C
S
t
a
.
3
7
+
6
4
.
8
2
-
Y
1
9
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
T
A
P
E
R
4
0
’
12’
11.1’
TAPER
18
.27’
(TYP.)
15’
+
6
4
.
8
4
(
T
Y
P
.
)
1
5
’
+
3
0
-DRIVE1 - P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-D
R
I
V
E
1
-
P
C
S
t
a
.
1
0
+
2
8
.
9
0
-
D
R
I
V
E
1
-
P
T
S
t
a
.
1
1
+
2
1
.
2
1
16’
1
6
’
1
6
’
3
0
’
1
6
’
PI Sta 10+75.18DL = 92.31’T = 46.29’R = 500.00’-DRIVE1-
S
E
E
S
H
E
E
T
3
5
F
O
R
-
Y
1
9
-
&
-
D
R
I
V
E
1
-
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
3
4
F
O
R
-
Y
1
8
-
P
R
O
F
I
L
E
-Y19- POT Sta. 13+90.00
12’
01
+15
01
005
016
00
+
2
5
(
T
Y
P
.
)
5
0
’
+68.74
+00.71
20.75’
15.25’
+60
15.25’20.75’
04
15
8
.
7
4
’
T
A
P
E
R
4
4
0
’
T
A
P
E
R
N
A
D
8
3
/ 9
5
-
Y
1
8
-
P
O
C
S
t
a
.
3
5
+
6
1
.
1
6
-
D
R
I
V
E
1
-
P
O
T
S
t
a
.
1
1
+
5
5
.
7
0
=
30’
D
R
I
V
E
W
A
Y
R
A
D
I
I
A
R
E
1
0
’
U
N
L
E
S
S
N
O
T
E
D
O
T
H
E
R
W
I
S
E
B
E
R
E
M
O
V
E
D
D
R
I
V
E
W
A
Y
T
O
1
0
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
3
T
O
N
S
C
L
A
S
S
’
B
’
R
I
P
R
A
P
18" RCP-III
1
5
"
1
5
"
1
5
"
15"
1
5
"
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
(
N
o
t
t
o
S
c
a
l
e
)
2:1
2:1
D
b
d
1
"
/
F
t
.
F
R
O
M
-
Y
1
9
-
S
T
A
.
1
0
+
5
0
T
O
S
T
A
.
1
3
+
0
0
R
T
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
’
B
’
R
i
p
-
R
a
p
b
=
2
F
t
.
M
a
x
.
d
=
1
F
t
.
M
i
n
.
D
=
1
F
t
.
D
E
T
A
I
L
L
2
G
r
o
u
n
d
N
a
t
u
r
a
l
210
2
2101
2
1
0
3
2
1
0
4
2
1
0
6
2
1
0
5
2
1
0
7
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
(
N
o
t
t
o
S
c
a
l
e
)
D
2:1
2:1
b
1
"
/
F
t
.
F
R
O
M
-
Y
1
8
-
S
T
A
.
3
9
+
0
0
T
O
S
T
A
.
3
8
+
1
0
L
T
F
R
O
M
-
Y
1
9
-
S
T
A
.
1
1
+
0
0
T
O
S
T
A
.
1
2
+
5
0
L
T
b
=
2
F
t
.
M
i
n
.
D
=
0
.
5
F
t
.
D
E
T
A
I
L
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
E
S
T
1
7
5
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
1
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
E
S
T
2
4
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
S
L
1
S
P
E
C
I
A
L
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
R
E
M
O
V
E
R
E
M
O
V
E
R
E
M
O
V
E
REMOVE
R
E
M
O
V
E
1
1
1
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
1
5
0
C
Y
D
D
E
S
E
E
D
E
T
A
I
L
L
2
E
S
T
8
8
T
O
N
S
W
/
C
L
A
S
S
B
R
I
P
R
A
P
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
RCP-III15"5
5
’
R
T
+0
0
.
7
1
-
Y
1
8
-
5
5
’
+
7
5
-
Y
1
8
-
6
0
’
+
2
5
-
Y
1
8
-
5
5
’
+
9
0
-
Y
1
8
-
5
5
’
+
3
0
-
Y
1
8
-
7
0
’
+
4
0
-
Y
1
8
-
4
7
’
+
0
0
-
Y
1
9
-
2
9
’
+
5
6
-
Y
1
9
-
4
5
’
+
0
9
-
Y
1
9
-
3
1
.
7
8
’
-
Y
1
9
-
+
5
7
4
4
’
+
5
6
-
Y
1
9
-
1
2
.
8
7
’
+
4
6
-
Y
1
9
-
2
5
.
8
5
’
+
8
5
6
4
’
+
1
5
-
Y
1
9
-
2
1
.
2
9
’
+
0
5
-
Y
1
9
-
1
1
3
’
+
1
2
9
5
’
+
7
0
5
6
’
+
5
4
-
Y
1
9
-
2
6
.
6
9
’
+
1
3
-
Y
1
9
-
2
0
.
7
3
’
R
T
+
6
5
-
Y
1
9
-
3
0
.
6
9
’
L
T
+
2
5
-
Y
1
8
-
4
5
’
R
T
+
1
8
.
7
4
-
Y
1
8
-
4
0
’
L
T
+
1
8
.
7
4
-
Y
1
8
-
4
0
’
L
T
+
0
0
.
0
0
-
Y
1
8
-
2
2
.
5
1
’
R
T
+
0
0
-
Y
1
8
-
4
0
’
L
T
+
3
0
-
Y
1
8
-
4
0
’
+
7
0
-
Y
1
8
-
4
5
’
R
T
+
2
0
.
0
0
-
Y
1
8
-
55’+85-Y18-
5
5
’
R
T
+
7
5
-
Y
1
8
-
6
3
’
5
4
.
9
4
’
+
0
0
-
Y
1
8
-
7
0
’
+
6
0
-
Y
1
8
-
6
3
.
9
6
’
+
6
6
-
Y
1
8
-
6
4
’
5
5
’
+
5
9
-
Y
1
8
-
4
1
’
2
4
.
4
9
’
-
Y
1
9
-
+
9
0
7
5
.
5
5
’
+
4
7
-
Y
1
8
-
3
7
’
-
Y
1
9
-
+
4
4
.
2
0
94’+80.62 -Y18-102’+28.37 -Y18-
4
7
’
+
6
4
-
Y
1
9
-
1
0
6
’
+
4
7
-
Y
1
8
-
86.53’ +35.98 -Y18-25.78’ +00.00 -DRIVE1-24.23’ +00.00 -DRIVE1-86.65
’
+81.97 -Y18
-
F
F
C
C
C
C
F
C
F
F
FF C
C
F
F
F
C
F
FCFCCF
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$1011
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
22232425
2
6
2
7
2
8
2
9
3
0
3
1
3
2
3
3
3
4
3
5
3
6
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
1,090 1,100 1,110 1,120 1,130 1,140 1,150 1,160 1,170
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
R
-
2
6
0
3
2
1
1,060 1,070 1,080 1,090 1,100 1,110 1,120 1,130 1,140 1,150
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1,180
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(-)2.5500%PI = 11+55
.
0
0
EL = 1,169
.
0
0
’
VC = 180’K = 35V = 35 mp
h
ELEV. 1171.96’-L- STA. 10+38.67 BEGIN GRADE
E
L
.
1
1
4
5
.
0
2
’
-
L
-
S
T
A
.
1
4
+
6
5
.
0
0
E
N
D
G
R
A
D
E
(-)7
.7
3
5
0
%
(-)7
.2
2
0
0
%
(-)7
.4
6
9
1%
(-
)5
.8
4
0
0
%
E
L
.
1
1
4
1
.
8
4
’
-
L
-
S
T
A
.
1
5
+
0
2
.
3
3
B
E
G
I
N
G
R
A
D
E
P
I
=
1
6
+
0
0
.
0
0
E
L
=
1
,
1
3
4
.
7
9
’
V
C
=
1
5
0
’
K
=
6
0
2
V
=
8
0
m
p
h
P
I
=
1
8
+
0
0
.
0
0
E
L
=
1
,
1
1
9
.
8
5
’
V
C
=
1
5
0
’
K
=
9
2
V
=
4
5
m
p
h
E
L
E
V
.
1
1
0
5
.
4
5
’
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
0
"
P
O
P
L
A
R
T
R
E
E
2
4
3
.
7
8
’
R
T
.
-
L
-
S
T
A
.
2
1
+
7
2
.
3
2
B
M
#
2
E
L
.
1
1
1
3
.
5
4
’
-
L
-
S
T
A
.
1
9
+
0
8
.
0
5
E
N
D
G
R
A
D
E
(
S
E
E
S
H
E
E
T
3
0
F
O
R
-
Y
1
A
-
G
R
A
D
E
)
STA 10+65 AS DIREC
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
INCIDENTAL MILLING
F
R
O
M
-
L
-
S
T
A
.
1
0
+
3
8
.
6
7
T
O
P
I
=
2
9
+
8
0
.
0
0
E
L
=
1
,
1
1
5
.
1
0
’
(
+
)
1.
4
10
4
%
(-
)4
.0
2
7
0
%
V
C
=
5
2
0
’
K
=
9
6
V
=
5
0
m
p
h
ELEV. 1108.33’-L- STA. 25+00.00 BEGIN GRADE(SEE SHEET 30 FOR -Y1A- GRADE)(SEE SHEET 29 FOR -Y1- GRADE)
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$3850
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
R
-
2
6
0
3
2
2
373639
4
0
4
1
4
2
4
3
4
4
4
5
4
6
4
7
4
8
4
9
5
0
515253
5
4
5
5
5
6
5
7
5
8
5
9
6
0
6
1
6
2
6
3
6
4
1,040 1,050 1,060 1,070 1,080 1,090 1,100 1,110 1,120 1,130
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1,030 1,040 1,050 1,060 1,070 1,080 1,090 1,100 1,110 1,120
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
PI = 37+00.00EL = 1,086.11’(-)4.0270%
(-
)1.4
0
5
0
%
VC = 430’K = 164V = 65 mph
(
+
)
2
.
9
4
0
0
%
V
=
5
0
m
p
h
P
I
=
4
3
+
7
5
.
0
0
E
L
=
1
,
0
7
6
.
6
2
’
V
C
=
4
2
0
’
K
=
9
7
E
L
E
V
.
1
0
7
4
.
7
0
’
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
6
"
P
O
P
L
A
R
T
R
E
E
2
0
3
.
5
2
’
R
T
.
-
L
-
S
T
A
.
4
2
+
8
9
.
2
2
B
M
#
3
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
1
0
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
1
0
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
0
7
8
.
6
=
1
6
5
=
1
0
0
(
+
)
=
5
0
=
1
2
0
=
1
0
7
7
.
7
=
1
5
0
=
1
0
7
8
.
3
=
1
4
5
-
L
-
S
t
a
.
4
4
+
0
2
E
X
I
S
T
I
N
G
5
’
X
6
’
B
O
X
C
U
L
V
E
R
T
(+)2.9400%
(-
)3
.2
4
7
0
%
(-
)0
.5
7
0
0
%
PI = 52+80.00EL = 1,103.23’VC = 840’K = 136V = 55 mph
P
I
=
6
0
+
9
5
.
0
0
E
L
=
1
,
0
7
6
.
7
7
’
V
C
=
2
6
0
’
K
=
9
7
V
=
5
0
m
p
h
E
L
E
V
.
1
0
7
5
.
3
6
’
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
0
"
P
I
N
E
T
R
E
E
1
8
0
.
1
2
’
L
T
.
-
L
-
S
T
A
.
6
0
+
5
0
.
0
8
B
M
#
4
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$78
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
R
-
2
6
0
3
2
3
64656667
6
8
6
9
7
0
7
1
7
2
7
3
7
4
7
5
7
6
7
7
7
8
798081
8
2
8
3
8
4
8
5
8
6
8
7
8
8
8
9
9
0
9
1
9
2
1,020 1,030 1,040 1,050 1,060 1,070 1,080 1,090 1,100 1,110
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1,000 1,010 1,020 1,030 1,040 1,050 1,060 1,070 1,080 1,090
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(-)0.5700%
(-
)1.2
9
2
2
%
P
I
=
6
8
+
1
0
.
0
0
E
L
=
1
,
0
7
2
.
6
9
’
V
C
=
1
,
0
5
0
’
K
=
1
4
5
4
V
=
8
0
m
p
h
(-
)1.2
%
EL = 1054.8
-L- STA. 74+85 RT
BEGIN LATERAL V DITCH
EL = 1047.24’
-L- STA. 76+50 RT
LATERAL V DITCH
EL = 1046.64’
-L- STA. 77+00 RT
LATERAL V DITCH
END
(-)4
.5
8
%
EL = 1057.48’
-L- STA. 78+00 LT
END LATERAL V DITCH
EL = 1067.15’
-L- STA. 73+00 LT
BEGIN LATERAL V DITCH
(-
)1.2
%
(-)1.2922%
(
+
)
0
.
3
4
0
0
%
P
I
=
8
5
+
6
0
.
0
0
E
L
=
1
,
0
5
0
.
0
8
’
V
C
=
9
0
0
’
K
=
5
5
1
V
=
8
0
m
p
h
ELEV. 1055.75’8" SPIKE IN ROOT OF 10" FORKED MAPLE 129.22’ RT.-L- STA. 79+19.79 BM # 5DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAULIC DATAACYRSYRSCFSCFSCFSFTFTFT= 1060.5 = 150 = 500(+)= 50= 49= 1048.5= 60= 1049.5 = 49 -L- Sta. 78+90 TIED TO 42" RCP EXISTING 3’ X 4’ BOX CULVERT
(-
)1.5
%
EL = 1049.00’
-L- STA. 86+50 RT
BEGIN LATERAL V DITCH
EL = 1047.80’
-L- STA. 87+30 RT
END LATERAL V DITCH
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
R
-
2
6
0
3
2
4
921059394
9
5
9
6
9
7
9
8
9
9
1
0
0
1
0
1
1
0
2
1
0
3
1
0
4
1
0
5
106107108
1
0
9
1
1
0
1
1
1
1
1
2
1
1
3
1
1
4
1
1
5
1
1
6
1
1
7
1
1
8
1
1
9
1,000 1,010 1,020 1,030 1,040 1,050 1,060 1,070 1,080 1,090
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
960 970 980 990 1,000 1,010 1,020 1,030 1,040 1,050
9
6
0
9
7
0
9
8
0
9
9
0
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(
+
)
0
.3
4
0
0
%
(-
)4
.7
2
8
4
%
P
I
=
1
0
2
+
3
0
.
0
0
E
L
=
1
,
0
5
5
.
7
6
’
V
C
=
7
7
0
’
K
=
1
5
2
V
=
6
0
m
p
h
DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAULIC DATA
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
= 1050.5 = 46 = 100(+)= 50= 35= 1049= 42= 1049.9 = 21 -L- Sta. 96+81
S
K
E
W
=
8
7
3
6
"
C
A
A
P
EL = 1047.90’
-L- STA. 95+60 LT
BEGIN LATERAL ’V’ DITCH
EL = 1047.17’
-L- STA. 96+73 LT
END LATERAL V DITCH
EL = 1046.00’
-L- STA. 96+78 LT
BEGIN LATERAL V DITCH
(-
)0
.6
5
%
(
+
)
1
.
8
%
EL = 1050.45’
-L- STA. 99+25 LT
BEGIN LATERAL ’V’ DITCH
EL = 1051.35’
-L- STA. 99+75 LT
END LATERAL ’V’ DITCH
EL = 1048.66’
-L- STA. 98+26 LT
END LATERAL ’V’ DITCH
(
+
)
1
.
8
%
(-)4.7284%
E
L
E
V
.
9
9
4
.
5
3
’
T
R
E
E
O
N
B
A
N
K
O
F
M
U
L
B
E
R
R
Y
C
R
E
E
K
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
0
"
W
A
L
N
U
T
2
0
9
.
6
1
’
L
T
.
-
L
-
S
T
A
.
1
1
8
+
0
8
.
3
3
B
M
#
6
(-
)0
.3
8
9
8
%
V
=
5
5
m
p
h
P
I
=
1
1
3
+
7
7
.
7
0
E
L
=
1
,
0
0
1
.
4
9
’
V
C
=
5
1
0
’
K
=
1
1
8
EL = 1011.51’
-L- STA. 111+00 RT
LATERAL BASE DITCH
BEG IN
EL = 1004.68’
-L- STA. 111+50 RT
LATERAL BASE DITCH
EL = 1030.20’-L- STA. 107+00 RTLATERAL BASE DITCHBEGINEL = 1016.40’-L- STA. 108+50 RTLATERAL BASE DITCH
EL = 1015.15’
-L- STA. 109+00 RT
LATERAL BASE DITCH
EL = 1014.75’
-L- STA. 109+50 RT
LATERAL BASE DITCH
END
(-
)4
.3
%
(-)9.2%(-)2.5%
(-
)0
.8
%
(-)13.67%
DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAULIC DATAACYRSYRSCFSCFSCFSFTFTFT= 1025.1 = 50 = 500(+)= 50 = 30 = 1022.3 = 36 = 1022.8 = 18 -L- Sta. 108+06 LT
EL = 1013.00’
-L- STA. 110+78.63 (114) RT
BEGIN BASE TAIL DITCH
EL = 1004.68’
-L- STA. 111+52.00 (65.65) RT
EN D BASE TAIL DITCH
1
0
8
.
2
5
L
F
@
7
.
6
9
%
SKEW=58 30" RCP
E
L
=
9
8
1
.
0
3
’
-
L
-
S
T
A
.
1
1
7
+
0
0
R
T
L
A
T
E
R
A
L
B
A
S
E
D
I
T
C
H
E
N
D
O
-
L
-
S
K
E
W
9
0
T
O
T
A
L
L
E
N
G
T
H
=
1
5
0
’
3
S
P
A
N
S
(
1
@
4
0
’
,
1
@
6
5
’
,
1
@
4
5
’
)
C
O
N
C
R
E
T
E
G
I
R
D
E
R
B
R
I
D
G
E
P
R
O
P
O
S
E
D
4
5
"
P
R
E
S
T
R
E
S
S
E
D
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
B
R
I
D
G
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
=
6
5
0
0
=
5
0
=
9
9
1
.
0
=
7
5
0
0
=
1
0
0
=
9
9
1
.
7
6
=
1
3
0
0
0
=
5
0
0
(
+
)
=
9
9
8
.
3
(-)7.18%EL = 1021.00’-L- STA. 108+00 LTEND LATERAL ’V’ DITCHEL = 1033.00’-L- STA. 105+50 LTBEGIN LATERAL ’V’ DITCH (+)7.32%EL = 1018.00’-L- STA. 107+59 LTLATERAL ’V’ DITCH
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
R
-
2
6
0
3
2
5
120119121122
1
2
3
1
2
4
1
2
5
1
2
6
1
2
7
1
2
8
1
2
9
1
3
0
1
3
1
1
3
2
1
3
3
133134
1
3
5
1
3
6
1
3
7
1
3
8
1
3
9
1
4
0
1
4
1
1
4
2
1
4
3
1
4
4
1
4
5
960 970 980 990 1,000 1,010 1,020 1,030 1,040 1,050
9
6
0
9
7
0
9
8
0
9
9
0
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
970 980 990 1,000 1,010 1,020 1,030 1,040 1,050 1,060
9
7
0
9
8
0
9
9
0
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(
+
)
2
.
15
5
0
%
(-)0.3898%
V
=
8
0
m
p
h
P
I
=
1
2
5
+
8
2
.
6
0
E
L
=
9
9
6
.
7
9
’
V
C
=
6
0
0
’
K
=
2
3
6
EL = 995.75’
-L- STA. 126+00 LT
SPECIAL CUT ’V’ DITCH W /HINGE
BEGIN
(
+
)
4.
5
3
%
(-
)0
.
4
8
%
EL = 994.80’
-L- STA. 128+00 LT
SPECIAL CUT ’V’ DITCH W /HINGE
EL = 1001.60’
-L- STA. 129+50 LT
SPECIAL CUT ’V’ DITCH W /HINGE
END
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
1
0
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
1
0
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
9
9
7
.
7
=
5
8
=
1
0
0
(
+
)
=
5
0
=
4
3
=
9
9
7
.
2
=
5
2
=
9
9
7
.
5
=
5
2
-
L
-
S
t
a
.
1
2
7
+
3
8
L
T
S
K
E
W
=
1
1
8
2
-
3
0
"
R
C
P
EL = 998.51’
-L- STA. 128+37.70 (88.95) LT
BEGIN BASE TAIL DITCH
EL = 994.80’
-L- STA. 128+00 (75.92) LT
EN D BASE TAIL DITCH
3
9
.
6
L
F
@
9
.
3
7
%
(+)2.1550%
(
+
)
1.
7
12
3
%
(
+
)
2
.
5
3
8
5
%
(
+
)
2
.
5
3
8
5
%
(
+
)
1.
9
7
2
0
%
(
+
)
1.
9
7
2
0
%
PI = 134+00.00EL = 1,014.41’VC = 530’K = 1197V = 80 mph
P
I
=
1
3
8
+
7
5
.
0
0
E
L
=
1
,
0
2
2
.
5
4
’
V
C
=
2
5
0
’
K
=
3
0
3
V
=
8
0
m
p
h
P
I
=
1
4
2
+
0
0
.
0
0
E
L
=
1
,
0
3
0
.
7
9
’
V
C
=
4
0
0
’
K
=
7
0
6
V
=
8
0
m
p
h
E
L
E
V
.
1
0
2
7
.
6
6
’
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
2
"
B
E
E
C
H
T
R
E
E
1
6
8
.
8
9
’
R
T
.
-
L
-
S
T
A
.
1
4
2
+
5
1
.
5
3
B
M
#
7
EL = 1023.86’
-L- STA. 140+50 LT
SPECIAL CUT ’V’ DITCH W /HIN GE
BEGIN
(-
)0
.5
%
(
+
)
5
.
2
2
%
EL = 1023.485’
-L- STA. 141+25 LT
SPECIAL CUT ’V’ DITCH W /HING E
EL = 1027.40’
-L- STA. 142+00 LT
SPECIAL CUT ’V’ DITCH W /HIN GE
END
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
R
-
2
6
0
3
2
6
145161160159146147148
1
4
9
1
5
0
1
5
1
1
5
2
1
5
3
1
5
4
1
5
5
1
5
6
1
5
7
1
5
8
1
5
9
162
1
6
3
1
6
4
1
6
5
1
6
6
1
6
7
1
6
8
1
6
9
1
7
0
1
7
1
1
7
2
1
7
3
1,010 1,020 1,030 1,040 1,050 1,060 1,070 1,080 1,090 1,100
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1,030 1,040 1,050 1,060 1,070 1,080 1,090 1,100 1,110 1,120
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(+)1.9720%
(
+
)
2
.
10
5
8
%
PI = 147+00.00EL = 1,040.65’VC = 600’K = 4483V = 80 mph
P
I
=
1
5
9
+
0
0
.
0
0
E
L
=
1
,
0
6
5
.
9
2
’
V
C
=
5
6
0
’
K
=
4
7
3
0
V
=
8
0
m
p
h
EL = 1058.59’
-L- STA. 157+00 LT
SPECIAL CUT ’V’ DITCH W /HINGE
BEGIN
(
+
)
5.
2
7
%
EL = 1052.00’
-L- STA. 155+75 LT
SPECIAL CUT ’V’ DITCH W /HING E
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
1
0
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
1
0
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
0
5
5
.
0
=
3
2
=
1
0
0
(
+
)
=
5
0
=
2
5
=
1
0
5
4
.
5
=
3
0
=
1
0
5
4
.
9
=
2
0
-
L
-
S
t
a
.
1
5
5
+
2
7
L
T
EL = 1031.60’-L- STA. 146+14 (61) RTBASE TAIL DITCHEL = 1031.60’-L- STA. 146+15.35 (88) RTBASE TAIL DITCH
EL = 1052.00’
-L- STA. 155+75 (80) LT
BEGIN BASE TAIL DITCH
E
L
=
1
0
6
2
.
6
8
’
-
L
-
S
T
A
.
1
5
6
+
8
9
(
1
2
4
.
6
6
)
L
T
E
N
D
B
A
S
E
T
A
I
L
D
I
T
C
H
E
L
=
1
0
5
5
.
5
1
’
-
L
-
S
T
A
.
1
5
6
+
0
0
(
1
1
3
.
5
)
L
T
B
A
S
E
T
A
I
L
D
I
T
C
H
1
3
4
L
F
@
8
.
0
%
25 LF @ 1.2%
S
K
E
W
=
1
2
0
3
0
"
R
C
P
EL = 1054.39’
-L- STA. 155+00 LT
SPECIAL CUT ’V’ DITCH W /HINGE
BEGIN
(-
)3
.19
%
(
+
)
1.
9
8
7
4
%
(+)1.9874%
(
+
)
3
.
5
8
9
6
%
PI = 159+00.00EL = 1,065.92’VC = 560’K = 4730V = 80 mph
P
I
=
1
6
4
+
4
5
.
0
0
E
L
=
1
,
0
7
6
.
7
5
’
V
C
=
5
3
0
’
K
=
3
3
1
V
=
8
0
m
p
h
E
L
E
V
.
1
0
7
7
.
2
1
’
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
0
"
W
H
I
T
E
O
A
K
T
R
E
E
2
4
8
.
1
0
’
R
T
.
-
L
-
S
T
A
.
1
6
7
+
8
3
.
3
5
B
M
#
8
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
1
0
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
1
0
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
0
8
7
.
0
=
1
9
=
1
0
0
(
+
)
=
5
0
=
1
7
=
1
0
8
6
.
8
=
1
9
=
1
0
8
7
.
0
=
5
.
2
-
L
-
S
t
a
.
1
6
8
+
0
0
L
T
DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAULIC DATAACYRSYRSCFSCFSCFSFTFTFT= 1065.1 = 15 = 500(+)= 50 = 11 = 1064.7 = 12 = 1064.8 = 3.4 -L- Sta. 160+00 LTDRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATIO
N
100 YEAR DISCHARGE100 YEAR HW ELEVAT
I
O
N
OVERTOPPING FREQUE
N
C
Y
OVERTOPPING DISCHA
R
G
E
OVERTOPPING ELEVAT
I
O
N
PIPE HYDRA
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
0
7
7
.
5
=
2
7
=
1
0
0
(
+
)
=
5
0
=
1
7
=
1
0
7
6
.
1
=
2
1
=
1
0
7
6
.
6
=
1
3
-L- Sta
.
1
6
5
+
0
0
L
T
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
1
0
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
1
0
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
0
9
8
.
6
=
1
1
8
=
5
0
0
(
+
)
=
5
0
=
3
4
=
1
0
9
1
.
0
=
4
1
=
1
0
9
1
.
3
=
3
2
-
L
-
S
t
a
.
1
7
1
+
3
5
L
T
(
+
)
4
.
3
2
%
(+)2.6%
(
+
)
4
.
2
2
%
(-
)0
.8
4
%
EL = 1084.50’
-L- STA. 168+00 LT
SPECIAL CUT ’V’ DITCH W /HINGE
BEG IN
EL = 1095.04’
-L- STA. 170+50 LT
END SPECIAL CUT ’V’ DITCH W /HINGE
BEGIN SPECIAL CUT ’V’ DITCH
EL = 1097.15’
-L- STA. 171+00 LT
SPECIAL CUT ’V’ DITCH
END
EL = 1074.22’
-L- STA. 164+50 LT
SPECIAL CUT ’V’ DITCH W /HINGE
BEGIN
EL = 1073.80’
-L- STA. 165+00 LT
SPECIAL CUT ’V’ DITCH W /HINGE
EL = 1084.59’
-L- STA. 167+50 LT
SPECIAL CUT ’V’ DITCH W /HIN GE
END
EL = 1063.00’-L- STA. 160+00 LT SPECIAL CUT ’V’ DITCH W/HINGE BEGIN
EL = 1070.79’
-L- STA. 163+00 LT
SPECIAL CUT ’V’ DITCH W /HING E
END
EL = 1088.50’
-L- STA. 170+10 LT
BEGIN BASE TAIL DITCH
EL = 1090.60’
-L- STA. 172+70 LT
EN D BASE TAIL DITCH
(
+
)
3
.
5
%
SKEW=92 24" RCP
S
K
E
W
=
9
7
.
5
2
4
"
R
C
P
S
K
E
W
=
1
1
1
2
4
"
R
C
P
T
I
E
D
T
O
4
8
"
R
C
P
E
X
I
S
T
I
N
G
2
’
X
4
’
B
O
X
C
U
L
V
E
R
T
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
L
-
N
C
2
6
8
-
L
-
N
C
2
6
8
R
-
2
6
0
3
2
7
173187174175176
1
7
7
1
7
8
1
7
9
1
8
0
1
8
1
1
8
2
1
8
3
1
8
4
1
8
5
1
8
6
1
8
7
188189190
1
9
1
1
9
2
1
9
3
1
9
4
1
9
5
1
9
6
1
9
7
1
9
8
1
9
9
2
0
0
2
0
1
1,080 1,090 1,100 1,110 1,120 1,130 1,140 1,150 1,160 1,170
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1,050 1,060 1,070 1,080 1,090 1,100 1,110 1,120 1,130 1,140
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(+)3.5896%
(-
)3
.3
9
9
2
%
P
I
=
1
8
2
+
0
0
.
0
0
E
L
=
1
,
1
3
9
.
7
5
’
V
C
=
9
2
0
’
K
=
1
3
2
V
=
5
5
m
p
h
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
10
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
10
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
1
2
7
.
2
=
2
0
0
=
5
0
0
(
+
)
=
5
0
=
3
8
=
1
1
1
5
.
3
=
4
6
=
1
1
1
5
.
6
=
3
6
-
L
-
S
t
a
.
1
8
0
+
7
8
L
T
(
+
)
0
.
5
%
(-
)3
.5
6
%
EL = 1124.40’
-L- STA. 185+50 LT
LATERAL BASE DITCH
BEGIN
EL = 1126.56’
-L- STA. 181+50 RT
SPECIAL CUT ’V’ DITCH W /HINGE
BEG IN
EL = 1126.81’
-L- STA. 182+00 RT
SPECIAL CUT ’V’ DITCH W /HINGE
T
I
E
D
T
O
6
0
"
R
C
P
E
X
I
S
T
I
N
G
4
’
X
4
’
B
O
X
C
U
L
V
E
R
T
(-)3.3992%
E
L
.
1
0
9
5
.
5
6
’
-
L
-
S
T
A
.
1
9
5
+
0
0
.
0
0
E
N
D
G
R
A
D
E
E
L
E
V
.
1
1
1
1
.
7
0
’
8
"
S
P
I
K
E
I
N
R
O
O
T
O
F
1
0
"
S
U
M
A
C
K
T
R
E
E
2
3
1
.
9
2
’
L
T
.
-
L
-
S
T
A
.
1
9
3
+
2
5
.
6
1
B
M
#
9
EL = 1115.50’-L- STA. 188+00 LTLATERAL BASE DITCHEND
S
T
A
1
9
5
+
0
0
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
I
N
C
I
D
E
N
T
A
L
M
I
L
L
I
N
G
F
R
O
M
-
L
-
S
T
A
.
1
9
2
+
7
5
T
O
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
Y
1
-
N
C
2
6
8
R
-
2
6
0
3
2
8
1,110 1,120 1,130 1,140 1,150 1,160 1,170 1,180 1,190 1,200
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
1
,
1
8
0
1213
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
2
3
2
4
1,060 1,070 1,080 1,090 1,100 1,110 1,120 1,130 1,140 1,150
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
-
Y
1
-
N
C
2
6
8
1110252627
2
8
2
9
3
0
3
1
3
2
24
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(-
)3
.2
9
3
2
%
(-)7
.4
9
9
4
%
ELEV. 1185.40’-Y1- STA. 15+00.
0
0
BEGIN GRADE
P
I
=
1
7
+
4
5
.
0
0
E
L
=
1
,
1
7
7
.
3
3
’
V
C
=
4
0
0
’
K
=
9
5
V
=
5
0
m
p
h
S
T
A
1
5
+
7
5
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
I
N
C
I
D
E
N
T
A
L
M
I
L
L
I
N
G
F
R
O
M
-
Y
1
-
S
T
A
.
1
3
+
0
5
.
0
0
T
O
(
+
)
1.
4
10
8
%
PI = 27+55
.
0
0
EL = 1,101.5
9
’
VC = 520’K = 58V = 35 mp
h
E
L
.
1
1
0
8
.
3
3
’
-
Y
1
-
S
T
A
.
3
2
+
3
2
.
9
1
E
N
D
G
R
A
D
E
DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAULIC DATAACYRSYRSCFSCFSCFSFTFTFT= 1106.1 = 370 = 100(+)= 50= 280= 1102.3= 340= 1104.7 = 290 -Y1- Sta. 29+00
E
X
I
S
T
I
N
G
4
’
X
6
’
B
O
X
C
U
L
V
E
R
T
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
N
C
2
6
8
R
-
2
6
0
3
2
9
1,140 1,150 1,16022
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
15
-
Y
1
A
-
23
2
4
2
5
2
6
2
7
2
8
2
9
3
0
3
1
3
2
1,1301,1201,1101,100
1
,
1
4
0
1
,
1
3
0
1
,
1
2
0
1
,
1
1
0
1
,
1
0
0
16
1
7
1
8
1
9
1
,
1
8
0
S
C
H
O
O
L
B
U
S
D
R
.
-
Y
3
-
-Y
2
-
SR
2
3
3
4
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
0
8
0
1
,
0
7
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
0
8
0
1
,
0
7
0
1
,
1
6
0
1,0901,0801,070
1
,
0
9
0
1
,
0
8
0
1
,
0
7
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
1,1501,090 1,100 1,110 1,120 1,130 1,140 1,160 1,170 1,180
1
0
1
1
(-)7.4313%
(-
)6
.3
6
0
8
%
(
+
)
1.
4
10
8
%
P
I
=
2
8
+
2
5
.
0
0
E
L
=
1
,
1
0
2
.
2
0
’
V
C
=
4
3
0
’
K
=
5
5
V
=
3
5
m
p
h
PI = 23+20.00EL = 1,134.32’VC = 260’K = 243V = 80 mph ELEV. 1146.36’-Y1A- STA. 21+58.06 BEGIN GRADE
E
L
.
1
1
0
8
.
2
4
’
-
Y
1
A
-
S
T
A
.
3
2
+
5
3
.
1
1
E
N
D
G
R
A
D
E
DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAUL
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
1
3
6
.
6
=
1
0
0
=
5
0
0
(
+
)
=
5
0
=
3
3
=
1
1
2
5
.
0
=
3
9
=
1
1
2
5
.
5
=
1
2
-Y1A- Sta. 2
3
+
0
6
SKEW=34 30" RCP(-)7.7350%(-)6.6400%
(-
)5
.0
0
0
0
%
(
+)
8.3
9
0
4
%
PI = 15+65.00EL = 1,137.28’VC = 200’K = 183V = 70 mph
P
I
=
1
8
+
6
0
.
6
9
E
L
=
1
,
1
1
9
.
7
0
’
V
C
=
1
3
4
’
K
=
1
0
V
=
1
5
m
p
h
ELEV. 1145.02’-Y2- STA. 14+65.00 BEGIN GRADE
E
L
.
1
1
2
5
.
5
1
’
-
Y
2
-
S
T
A
.
1
9
+
3
0
.
0
0
E
N
D
G
R
A
D
E
E
L
E
V
.
1
1
2
3
.
0
5
’
-
Y
2
-
S
T
A
.
1
7
+
9
3
.
6
2
B
E
G
I
N
G
R
A
D
E
E
L
.
1
1
2
7
.
3
5
’
-
Y
2
-
S
T
A
.
1
7
+
1
4
.
5
8
E
N
D
G
R
A
D
E
(
-
)
5
.
3
9
4
6
%
(
-
)
5
.
5
2
9
4
%
(-)5.3
5
1
6
%
-Y2- STA. = 17+71.19
EL = 1,124.26’
-Y2- STA. = 17+37.19
EL = 1,126.14’
STA
1
9
+
3
0
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
INCI
D
E
N
T
A
L
M
I
L
L
I
N
G
F
R
O
M
-
Y
2
-
S
T
A
.
1
9
+
1
5
.
0
0
T
O
(
-
)
3
.
4
0
0
0
%
(
+
)
2
.
0
0
0
0
%
(
+
)
2
.
0
7
1
2
%
P
I
=
1
0
+
4
3
.
3
2
E
L
=
1
,
1
0
5
.
1
8
’
V
C
=
5
8
’
K
=
1
0
V
=
1
5
m
p
h
E
L
.
1
1
0
5
.
7
6
’
-
Y
3
-
S
T
A
.
1
0
+
7
2
.
4
8
E
N
D
G
R
A
D
E
E
L
.
1
1
0
6
.
3
3
’
-
Y
3
-
S
T
A
.
1
1
+
0
0
.
0
0
E
L
E
V
.
1
1
0
6
.
4
5
’
-
Y
3
-
S
T
A
.
1
0
+
0
6
.
0
0
B
E
G
I
N
G
R
A
D
E
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
R
-
2
6
0
3
3
0
-Y7-1011
1
0
1
1
1
0
1
1
10 1,060 1,070 1,080 1,090 1,100 1,110 1,120 1,130 1,140 1,150
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
-
Y
8
-
S
R
1
9
7
1
1,070 1,080 1,090 1,100 1,110
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1,120 1,130 1,140 1,150
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
-Y4-TEMPLE ST.
-
Y
5
-
W
H
I
T
E
P
I
N
E
S
T
.
-
Y
6
-
S
H
A
V
E
R
S
T
.
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
0
0
1
,
1
1
0
SR 1979
1
0
1
1
1
2
1
3
1
4
111213
1
4
1
,
1
6
0
1,160
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
4
0
1
,
1
5
0
1
,
1
2
0
1
,
1
3
0
1
,
0
6
0
1
,
0
5
0
1
,
0
6
0
1
,
0
5
0
1
,
0
3
0
1
,
0
2
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
1
2
1
,
0
2
0
1
,
0
3
0
(-)3.8500%(+)1.8000%(+)2.0364%ELEV. 1112.09’-Y4- STA. 10+00.00 BEGIN GRADEEL. 1111.42’-Y4- STA. 10+72.50 END GRADE PI = 10+35.00EL = 1,110.74’VC = 70’K = 12V = 15 mphEL. 1111.98’-Y4- STA. 11+00.0
0
(
-
)
1
.
1
0
0
0
%
(
+
)
1
.
5
2
5
2
%
(
+
)
1
.
8
5
1
9
%
E
L
.
1
0
8
6
.
5
5
’
-
Y
5
-
S
T
A
.
1
1
+
0
0
.
0
0
P
I
=
1
0
+
3
5
.
0
0
E
L
=
1
,
0
8
5
.
4
7
’
V
C
=
7
0
’
K
=
2
7
V
=
2
5
m
p
h
E
L
E
V
.
1
0
8
5
.
8
5
’
-
Y
5
-
S
T
A
.
1
0
+
0
0
.
0
0
B
E
G
I
N
G
R
A
D
E
E
L
.
1
0
8
6
.
0
4
’
-
Y
5
-
S
T
A
.
1
0
+
7
2
.
4
6
E
N
D
G
R
A
D
E
E
L
E
V
.
1
0
9
4
.
5
6
’
-
Y
6
-
S
T
A
.
1
0
+
5
0
.
0
0
B
E
G
I
N
G
R
A
D
E
V
C
=
6
4
’
K
=
1
4
V
=
1
5
m
p
h
E
L
.
1
0
8
8
.
3
3
’
-
Y
6
-
S
T
A
.
1
1
+
7
2
.
2
0
E
N
D
G
R
A
D
E
E
L
.
1
0
8
9
.
0
0
’
-
Y
6
-
S
T
A
.
1
2
+
0
0
.
0
0
P
I
=
1
0
+
7
8
.
0
0
E
L
=
1
,
0
9
3
.
4
4
’
(
-
)
4
.
0
0
0
0
%
(
-
)
7
.
0
9
8
0
%
P
I
=
1
1
+
3
8
.
0
0
E
L
=
1
,
0
8
9
.
1
9
’
(
-
)
2
.
5
0
0
0
%
(
+
)
2
.
4
1
0
1
%
V
C
=
5
6
’
K
=
1
8
V
=
2
5
m
p
h
(+)9.3036%(-)12.0000%(+)1.0000%(+)2.7
8
8
8
%
PI = 13+55.0
0
EL = 1,095.
2
2
’
VC = 130’K = 10V = 15 mph PI = 11+82.50EL = 1,115.92’VC = 140’K = 7V = 20 mphELEV. 1108.24’-Y7- STA. 11+00.00 BEGIN GRADE EL. 1095.87’-Y7- STA. 14+2
0
.
0
8
END GRADEEL. 1096.6
4
’
-Y7- STA.
1
4
+
4
7
.
6
9
E
L
E
V
.
1
0
7
4
.
1
3
’
-
Y
8
-
S
T
A
.
1
3
+
0
0
.
0
0
B
E
G
I
N
G
R
A
D
E
(
+
)
1.
6
3
7
6
%
E
L
.
1
0
7
6
.
3
7
’
-
Y
8
-
S
T
A
.
1
4
+
3
6
.
8
9
E
N
D
G
R
A
D
E
E
L
.
1
0
7
7
.
6
3
’
S
T
A
.
1
4
+
8
9
.
0
5
-
Y
8
-
(
+
)
1
.
9
0
%
EL = 1071.71’
-Y8- STA. 13+50 LT
BEGIN STANDARD ’V’ DITCH
EL = 1070.00’
-Y8- STA. 12+60 LT
END STAN DARD ’V’ DITCH
(
+
)
2
.
4
15
7
%
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
R
-
2
6
0
3
3
1
101112
1
3
1,040 1,050 1,060 1,070 1,080 1,090-Y9-SIDNEY AV
E
.
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
-
Y
1
0
-
S
R
1
9
6
1
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
8
0
1
0
1
1
1
2
1
3
1011 -Y11-SR 1983
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
0
7
0
1
,
0
9
0
1
,
0
5
0
1
,
0
4
0
1
,
0
3
0
1
,
0
2
0
1
,
0
1
0
1
,
0
0
0
9
9
0
1
,
1
2
0
1,060 1,070 1,080 1,090 1,100 1,1101,0501,0401,0301,0201,0101,000990 1,120
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
1213
-
D
R
I
V
E
6
-
1
0
1
1
1
2
1
3
1
,
0
6
0
1
,
0
5
0
1
,
0
4
0
1
,
0
3
0
1
,
0
2
0
1
,
0
1
0
1
,
0
0
0
9
9
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
9
8
0
1
,
0
6
0
1
,
0
5
0
1
,
0
4
0
1
,
0
3
0
1
,
0
2
0
1
,
0
1
0
1
,
0
0
0
9
9
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
9
8
0
(+)2.0000%(
+
)
5.
3
4
3
5
%
(-)2.3721%PI = 10+80.00EL = 1,055.78’VC = 80’K = 24V = 20 mphELEV. 1054.93’-Y9- STA. 10+37.52 BEGIN GRADE
E
L
.
1
0
6
8
.
8
7
’
-
Y
9
-
S
T
A
.
1
3
+
2
5
.
0
0
E
N
D
G
R
A
D
E
EL. 1055.82’-Y9- STA. 10+00.00
(-)7
.4
8
0
0
%
(
-
)
2
.
0
0
0
0
%
(
+
)
1
.
9
9
9
5
%
E
L
E
V
.
1
0
5
6
.
9
8
’
-
Y
1
0
-
S
T
A
.
1
1
+
5
6
.
4
9
B
E
G
I
N
G
R
A
D
E
E
L
.
1
0
5
1
.
2
2
’
-
Y
1
0
-
S
T
A
.
1
2
+
6
2
.
4
9
E
N
D
G
R
A
D
E
E
L
.
1
0
5
1
.
9
7
’
-
Y
1
0
-
S
T
A
.
1
3
+
0
0
.
0
0
P
I
=
1
2
+
2
3
.
0
0
E
L
=
1
,
0
5
2
.
0
1
’
V
C
=
7
8
’
K
=
1
4
V
=
1
5
m
p
h
PI =
1
3
+
4
0
.
0
0
EL
=
1
,
0
5
3
.
5
7
’
(-)4.8800%(
+
)
1
.
0
0
0
0
%
(
+
)
2
.
0
0
0
0
%
ELEV. 1058.04’-Y11- STA. 12+48.35 BEGIN GRADE STA 13+4
0
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
INCIDENT
A
L
M
I
L
L
I
N
G
F
R
O
M
-
Y
1
1
-
S
T
A
.
1
2
+
4
8
.
3
5
T
O
K =
5
VC
=
3
0
’
V =
S
T
O
P
C
O
N
D
I
T
I
O
N
E
L
.
1
0
5
3
.
7
6
’
-
Y
1
1
-
S
T
A
.
1
3
+
5
9
.
1
9
E
N
D
G
R
A
D
E
E
L
.
1
0
5
4
.
5
1
’
-
Y
1
1
-
S
T
A
.
1
3
+
9
6
.
7
9
(-)6.5%EL = 1055.00’-Y11- STA. 12+60 LTBEGIN LATERAL ’V’ DITCHEL = 1050.45’-Y11- STA. 13+30 LTEND LATERAL ’V’ DITCH
P
I
=
1
0
+
6
0
.
0
0
E
L
=
1
,
0
5
2
.
1
6
’
P
I
=
1
2
+
6
5
.
0
0
E
L
=
1
,
0
3
3
.
7
1
’
(-)9.0000%
(
+
)
0
.
7
3
0
0
%
V
C
=
4
5
’
K
=
2
2
E
L
.
1
,
0
5
4
.
4
8
’
-
D
R
I
V
E
6
-
S
T
A
.
1
0
+
0
0
.
0
0
E
L
E
V
.
1
,
0
5
3
.
7
3
’
-
D
R
I
V
E
6
-
S
T
A
.
1
0
+
3
7
.
5
0
B
E
G
I
N
G
R
A
D
E
V
C
=
8
0
’
K
=
8
E
L
.
1
,
0
3
4
.
2
1
’
-
D
R
I
V
E
6
-
S
T
A
.
1
3
+
3
3
.
6
0
E
N
D
G
R
A
D
E
(
-
)
2
.
0
0
0
0
%
(
-
)
7
.
0
0
0
0
%
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
R
-
2
6
0
3
3
2
1
0
-
Y
1
2
-
S
R
2
3
3
4
1,000 1,010 1,020 1,030 1,040 1,050 1,060 1,070990 1,080
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
9
9
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
9
9
0
9
8
0
1
,
0
4
0
1
,
0
5
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
0
6
0
1
,
0
7
0
-
Y
1
4
-
W
O
O
D
S
I
D
E
D
R
.
-
Y
1
5
-
Q
U
E
E
N
D
R
.
-Y13- 950 960 970 980 990 1,000 1,010 1,020 1,030 1,040
1
,
1
0
0
1
,
1
1
0
1211
1
0
1
1
1
0
1
1
10 95
0
96
0
97
0
98
0
99
0
1,00
0
1,01
0
1,02
0
1,03
0
1,04
0
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
9
9
0
9
8
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
1
,
1
2
0
1
,
1
3
0
1
,
1
2
0
1
,
1
3
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
1
2
(
-
)
2
.
0
0
0
0
%
P
I
=
1
3
+
7
5
.
0
0
E
L
=
1
,
0
4
9
.
4
8
’
(
+
)
5.
0
0
0
0
%
(-
)4
.5
15
7
%
V
C
=
2
9
0
’
K
=
3
0
V
=
3
5
m
p
h
(-)2.8
4
9
0
%
P
I
=
1
1
+
0
0
.
0
0
E
L
=
1
,
0
3
5
.
7
3
’
V
C
=
1
0
0
’
K
=
1
4
V
=
1
5
m
p
h
ELEV. 1036.75’-Y12- STA. 10+49.
1
4
BEGIN GRADEELEV. 1038.15’-Y12- STA. 10+00
.
0
0
E
L
.
1
0
3
8
.
1
9
’
-
Y
1
2
-
S
T
A
.
1
6
+
2
5
.
0
2
E
N
D
G
R
A
D
E
S
T
A
1
6
+
2
5
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
I
N
C
I
D
E
N
T
A
L
M
I
L
L
I
N
G
F
R
O
M
-
Y
1
2
-
S
T
A
.
1
6
+
0
0
T
O
ELEV. 998.24’-Y13- STA. 10+35.50 BEGIN GRADEEL. 998.95’-Y13- STA. 10+00.00EL. 995.00’-Y13- STA. 11+15.22 END GRADE (-)2.0000%(-)4.0690%
(
+
)
3
.
0
0
0
0
%
E
L
E
V
.
1
0
2
2
.
3
6
’
-
Y
1
4
-
S
T
A
.
1
0
+
3
5
.
5
0
B
E
G
I
N
G
R
A
D
E
E
L
.
1
0
2
1
.
7
6
’
-
Y
1
4
-
S
T
A
.
1
1
+
0
2
.
0
0
E
N
D
G
R
A
D
E
E
L
.
1
0
2
1
.
3
0
’
-
Y
1
4
-
S
T
A
.
1
0
+
0
0
.
0
0
P
I
=
1
0
+
8
0
.
8
5
E
L
=
1
,
0
2
1
.
6
3
’
V
C
=
4
2
’
K
=
1
9
V
=
2
0
m
p
h
(
+
)
0
.
6
0
0
1
%
(
-
)
1
.
6
1
9
8
%
(
-
)
2
.
0
0
0
0
%
(
+
)
3
.
0
0
0
0
%
P
I
=
1
0
+
4
5
.
0
0
E
L
=
1
,
0
7
0
.
3
8
’
(+)16.0000
%
V
C
=
7
0
’
K
=
5
P
I
=
1
1
+
3
6
.
0
0
E
L
=
1
,
0
8
4
.
9
4
’
(
-
)
2
.
0
1
8
4
%
E
L
.
1
0
6
9
.
5
3
’
-
Y
1
5
-
S
T
A
.
1
0
+
0
0
.
0
0
E
L
E
V
.
1
0
6
9
.
3
3
’
-
Y
1
5
-
S
T
A
.
1
0
+
1
0
.
0
0
B
E
G
I
N
G
R
A
D
E
V
C
=
5
0
’
K
=
3
E
L
.
1
0
8
4
.
4
2
’
-
Y
1
5
-
S
T
A
.
1
1
+
6
1
.
6
1
E
N
D
G
R
A
D
E
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
-
2
6
0
3
3
3
-
Y
1
6
-
S
R
2
0
9
0
10111213 1,100 1,110 1,120 1,130 1,140 1,150 1,160 1,170 1,180 1,190
1
4
1
5
1
6
1
7
1
8
-
Y
1
7
-
S
R
2
0
8
6
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1,060 1,070 1,080 1,090
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
1
0
1
1
1
2
1
3
1
4
1
5
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
1
,
1
4
0
1
,
1
5
0
1,200
1,210 1,220 1,230 1,240 1,250 1,260
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
1
,
1
8
0
1
,
1
9
0
1
,
2
0
0
1
,
2
1
0
1
,
2
2
0
1
,
2
3
0
1
,
2
4
0
1
,
2
5
0
1
,
2
6
0
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(-
)0
.9
0
0
0
%
(-)15.0000%
(-
)3
.0
0
0
0
%
(
+
)
2
.
0
0
0
0
%
P
I
=
1
1
+
5
7
.
2
1
E
L
=
1
,
0
7
6
.
6
8
’
V
C
=
1
7
0
’
K
=
1
2
V
=
2
5
m
p
h
P
I
=
1
4
+
0
0
.
0
0
E
L
=
1
,
0
4
0
.
2
6
’
V
C
=
1
0
0
’
K
=
8
V
=
1
0
m
p
h
E
L
E
V
.
1
0
7
7
.
5
1
’
-
Y
1
6
-
S
T
A
.
1
0
+
6
5
.
0
0
B
E
G
I
N
G
R
A
D
E
E
L
.
1
0
3
9
.
6
4
’
-
Y
1
6
-
S
T
A
.
1
5
+
0
0
.
0
0
E
L
.
1
0
3
8
.
6
9
’
-
Y
1
6
-
S
T
A
.
1
4
+
5
2
.
5
0
E
N
D
G
R
A
D
E
(-)12.65%
EL = 1071.88’
-Y16- STA. 11+50 LT
SPECIAL CUT ’V’ DITCH
BEGIN
EL = 1152.91’
-Y16- STA. 13+00 LT
SPECIAL CUT ’V’ DITCH
END
S
T
A
1
1
+
0
5
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
I
N
C
I
D
E
N
T
A
L
M
I
L
L
I
N
G
F
R
O
M
-
Y
1
6
-
S
T
A
.
1
0
+
6
5
T
O
EL = 1073.88’
-Y16- STA. 11+00 RT
END SPECIAL LATERAL ’V’ DITCH
BEGIN SPECIAL CUT ’V’ DITCH W ITH HINGE
EL = 1069’
-Y16- STA. 11+75 RT
END SPECIAL CUT ’V’ DITCH W ITH HINGE
(
-
)
6
.
5
0
%
(
-
)
6
.
5
0
%
EL = 1076.15’
-Y16- STA. 10+65 RT
BEGIN SPECIAL LATERAL ’V’ DITCH
(-)15.0000%(-)12.8990%
(-)14.7300%
(-
)2
.0
0
0
0
%
(
+
)
1.
7
6
14
%
P
I
=
1
5
+
0
0
.
0
0
E
L
=
1
,
1
1
7
.
7
0
’
V
C
=
3
0
0
’
K
=
1
6
4
V
=
6
0
m
p
h
P
I
=
1
7
+
8
0
.
0
0
E
L
=
1
,
0
7
6
.
4
6
’
V
C
=
1
3
0
’
K
=
1
0
V
=
1
5
m
p
h
PI = 11+95.00EL = 1,157.04’VC = 140’K = 67V = 40 mph ELEV. 1169.04’-Y17- STA. 11+15.00 BEGIN GRADE
E
L
.
1
0
7
5
.
1
4
’
-
Y
1
7
-
S
T
A
.
1
8
+
4
5
.
8
7
E
N
D
G
R
A
D
E
E
L
.
1
0
7
5
.
9
8
’
-
Y
1
7
-
S
T
A
.
1
8
+
9
3
.
5
6
(-)21.5%
(-)8
.2
3
%
(-)14.44%
(-)17.55%(-)14.75%(-)14.44%EL = 1167.70’-Y17- STA. 11+15 LTBEGIN LATERAL ’V’ DITCHEL = 1161.56’-Y17- STA. 11+50 LTLATERAL ’V’ DITCHEL = 1154.18’-Y17- STA. 12+00 LTLATERAL ’V’ DITCHEL = 1139.74’-Y17- STA. 13+00 LTBEGIN SPECIAL CUT ’V’ DITCHEND LATERAL ’V’ DITCH
EL = 1110.863’
-Y17- STA. 15+00 LT
END SPECIAL CUT ’V’ DITCH
BEGIN LATERAL ’V’ DITCH
EL = 1100.113’
-Y17- STA. 15+50 LT
EL = 1096.00’
-Y17- STA. 16+00 LT
END LATERAL ’V’ DITCH
STA 11+55 AS DIRECTED BY THE ENGINE
E
R
INCIDENTAL MILLING FROM -Y17- STA. 11+1
5
T
O
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
R
-
2
6
0
3
3
4
-
Y
1
8
-
S
R
1
9
6
6
1,110 1,120 1,130 1,140 1,150 1,160 1,170 1,180 1,190
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
1
,
1
8
0
1,20015161718
1
9
2
0
2
1
2
2
2
3
2
4
2
5
2
6
2
7
29303132
3
3
3
4
3
5
1,100 1,110 1,120 1,130 1,140 1,150 1,160 1,170 1,180 1,190
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
1
,
1
8
0
1
,
1
9
0
-
Y
1
8
-
S
R
1
9
6
6
2
8
2
9
3
6
3
7
3
8
3
9
4
0
4
1
4
2
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
(-
)2
.9
9
0
4
%
P
I
=
1
9
+
3
5
.
0
0
E
L
=
1
,
1
6
4
.
5
4
’
V
C
=
3
7
0
’
K
=
2
5
9
V
=
6
5
m
p
h
P
I
=
2
8
+
0
0
.
0
0
E
L
=
1
,
1
3
8
.
6
7
’
V
C
=
4
4
0
’
K
=
8
6
2
V
=
8
0
m
p
h
ELEV. 1172.71’-Y18- STA. 17+50.00 BEGIN GRADE
(-
)2
.4
8
0
0
%
(-)4.4
2
0
0
%
(-
)4
.14
%
(-
)3
.7
6
%
DRAIN
A
G
E
A
R
E
A
DESIG
N
F
R
E
Q
U
E
N
C
Y
DESIG
N
D
I
S
C
H
A
R
G
E
DESIG
N
H
W
E
L
E
V
A
T
I
O
N
100 YE
A
R
D
I
S
C
H
A
R
G
E
100 YE
A
R
H
W
E
L
E
V
A
T
I
O
N
OVERT
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
OVERT
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
OVERT
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
1
5
8
.
5
=
2
3
=
1
0
0
=
2
5
=
2
0
=
1
1
5
8
.
1
=
2
3
=
1
1
5
8
.
5
=
6
.
6
-
Y
1
8
-
S
t
a
.
2
1
+
0
0
L
T
D
R
A
I
N
A
G
E
A
R
E
A
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
1
0
0
Y
E
A
R
D
I
S
C
H
A
R
G
E
1
0
0
Y
E
A
R
H
W
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
P
I
P
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
A
C
Y
R
S
Y
R
S
C
F
S
C
F
S
C
F
S
F
T
F
T
F
T
=
1
1
4
4
.
1
=
4
0
=
5
0
0
(
+
)
=
5
0
=
2
7
=
1
1
4
3
.
0
=
2
9
=
1
1
4
3
.
1
=
9
.
1
-
Y
1
8
-
S
t
a
.
2
5
+
7
0
L
T
(-)7.12%
E
L
=
1
1
4
0
.
3
0
’
-
Y
1
8
-
S
T
A
.
2
5
+
7
0
L
T
E
N
D
S
P
E
C
I
A
L
C
U
T
’
V
’
D
I
T
C
H
W
/
H
I
N
G
E
EL = 1152.33’
-Y18- STA. 22+50 LT
BEG IN SPECIAL CUT ’V’ DITCH W /HINGE
EL = 1155.50’
-Y18- STA. 21+00 LT
END SPECIAL CUT ’V’ DITCH W /HINGE
EL = 1167.92’-Y18- STA. 18+00 LTBEGIN SPECIAL CUT ’V’ DITCH W /HING EEND SPECIAL CUT ’V’ DITCHEL = 1175.04’-Y18- STA. 17+00 LTBEGIN SPECIAL CUT ’V’ DITCH
S
K
E
W
=
8
3
2
4
"
R
C
P
S
K
E
W
=
9
1
3
0
"
R
C
P
STA 18+50 A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
INCIDENTAL
M
I
L
L
I
N
G
F
R
O
M
-
Y
1
8
-
S
T
A
.
1
7
+
5
0
T
O
(-)2.4800%(-)3.0000%
(
+
)
5.
5
1
0
0
%
(-)3.3375%(-)3.3375%PI = 31+80.00EL = 1,128.10’VC = 125’K = 15V = 15 mph
P
I
=
3
7
+
2
5
.
0
0
E
L
=
1
,
1
5
8
.
1
3
’
V
C
=
3
9
0
’
K
=
1
7
1
V
=
6
0
m
p
h
V
=
4
5
m
p
h
E
L
.
1
1
6
8
.
5
0
’
-
Y
1
8
-
S
T
A
.
4
2
+
4
0
.
0
0
E
N
D
G
R
A
D
E
EL = 1,131.58’ELEV. 1129.98’-Y18- STA. 31+17.25 BEGIN GRADE-Y18- STA. = 30+69.31 EL. 1133.18’-Y18- STA. 30+21.37 END GRADE
(
+
)
9.
3
%
(+)0.5%EL = 1127.022’-Y18- STA. 31+50 RTSPECIAL CUT ’V’ DITCHEL = 1127.08’-Y18- STA. 31+61.57 RTSPECIAL CUT ’V’ DITCHEND
S
T
A
4
2
+
4
0
A
S
D
I
R
E
C
T
E
D
B
Y
T
H
E
E
N
G
I
N
E
E
R
I
N
C
I
D
E
N
T
A
L
M
I
L
L
I
N
G
F
R
O
M
-
Y
1
8
-
S
T
A
.
4
0
+
7
5
T
O
P
I
=
4
1
+
0
0
.
0
0
E
L
=
1
,
1
7
0
.
2
3
’
(
+
)
3
.
2
2
6
4
%
(-
)1.2
3
2
4
%
V
C
=
2
8
0
’
K
=
6
3
EL = 1161.66’
-Y18- STA. 39+00 LT
BEGIN LATERAL ’V’ DITCH
EL = 1152.17’
-Y18- STA. 38+10 LT
END LATERAL ’V’ DITCH
EL = 1157.00’
-Y18- STA. 38+50 LT
LATERAL ’V’ DITCH
(+)10.17
%
R
-
2
6
0
3
3
5
1
0
1
1
1
2
1
3
1,020 1,030 1,040 1,050 1,060 1,070 1,080 1,090 1,1001,010 1,020 1,030 1,040 1,050 1,060 1,070 1,080 -Y19-RIDGE TOP RD.
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
24-SEP-2014 17:09R:\Roadway\Proj\R2603_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
D
R
I
V
E
1
-
-
D
R
I
V
E
2
-
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
1
,
1
8
0
1
,
1
9
0
1
,
2
0
0
1
,
2
1
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
0
1
1
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1011 1,010 1,020 1,030 1,040 1,050 1,060 1,0701213 1,080 1,090 1,100 1011
E
X
I
S
T
I
N
G
G
R
O
U
N
D
P
R
O
P
O
S
E
D
G
R
A
D
E
L
E
F
T
D
I
T
C
H
G
R
A
D
E
R
I
G
H
T
D
I
T
C
H
G
R
A
D
E
1
,
1
6
0
-DRIVE3-
-
D
R
I
V
E
4
-
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
0
1
1
1
2
1
3
1
4
1
,
1
3
0
1
,
1
4
0
1
,
1
5
0
1
,
1
6
0
1
,
1
7
0
1
,
1
8
0
1
,
1
9
0
1
,
2
0
0
1
,
2
1
0
1
,
1
2
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
1
3
0
1
,
1
4
0
1
,
0
0
0
1
,
0
1
0
1
,
0
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
-
D
R
I
V
E
5
-
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
,
0
3
0
1
,
0
4
0
1
,
0
5
0
1
,
0
6
0
1
,
0
7
0
1
,
0
8
0
1
,
0
9
0
1
,
1
0
0
1
,
1
1
0
1
,
1
2
0
1
0
1
1
(-)12.0000%(+)6.6909%(+)2.0000%K
=
1
0
V
=
1
5
m
p
h
ELEV. 1159.73’-Y19- STA. 10+15.30 BEGIN GRADEELEV. 1158.71’-Y19- STA. 10+00.00 EL. 11
3
8
.
3
2
’
-Y19-
S
T
A
.
1
3
+
0
0
.
0
0
END G
R
A
D
E
K = 4V = 15 mph(-)5
.0
%
(-)10.17%
(-)7
.4
2
%
DRAINAGE AREADESIGN FREQUENCYDESIGN DISCHARGEDESIGN HW ELEVATION100 YEAR DISCHARGE100 YEAR HW ELEVATIONOVERTOPPING FREQUENCYOVERTOPPING DISCHARGEOVERTOPPING ELEVATION PIPE HYDRAULIC DATAACYRSYRSCFSCFSCFSFTFTFT= 1138.4 = 17 = 500(+)= 25 = 4.9 = 1134.5 = 5 = 1135.8 = 1.5 -Y19- Sta. 13+15 RTEL = 1152.17’-Y19- STA. 10+50 RTBEGIN LATERAL ’V’ DITCHEL = 1142.00’-Y19- STA. 11+50 RTLATERAL ’V’ DITCHEL = 1146.50’-Y19- STA. 11+00 LTBEGIN LATERAL ’V’ DITCH
EL = 1135.00’
-Y19- STA. 12+50 LT
END LATERAL ’V’ DITCH
EL = 1134.50’
-Y19- STA. 13+00 RT
END LATERAL ’V’ DITCH
S
K
E
W
=
1
1
3
.
3
1
8
"
R
C
P
(
-
)
0
.
3
0
%
STA 13+00 AS DIRECTED BY THE EN
G
I
N
E
E
R
INCIDENTAL MILLING FROM -Y19- ST
A
.
1
2
+
7
5
T
O
PI = 10+50.00EL = 1,160.43’PI
=
1
2
+
3
2
.
5
3
EL
=
1
,
1
3
8
.
5
2
’
VC
=
1
2
0
’
VC = 60’
E
L
.
1
1
4
9
.
0
7
’
-
D
R
I
V
E
1
-
S
T
A
.
1
1
+
5
5
.
7
0
E
L
E
V
.
1
1
5
2
.
4
8
’
-
D
R
I
V
E
1
-
S
T
A
.
1
0
+
2
0
.
0
0
B
E
G
I
N
G
R
A
D
E
(
-
)
5
.
1
8
1
5
%
E
L
.
1
1
4
9
.
8
6
’
-
D
R
I
V
E
1
-
S
T
A
.
1
1
+
4
0
.
4
5
E
N
D
G
R
A
D
E
P
I
=
1
0
+
7
5
.
0
0
E
L
=
1
,
1
5
4
.
1
3
’
(
+
)
3
.
0
0
0
0
%
(-)6
.5
2
0
0
%
V
C
=
1
0
0
’
K
=
1
1
(+)15.0000
%
(
+
)
0
.
5
0
0
0
%
E
L
.
1
0
9
6
.
4
7
’
-
D
R
I
V
E
2
-
S
T
A
.
1
0
+
0
0
.
0
0
E
L
E
V
.
1
0
9
6
.
1
7
’
-
D
R
I
V
E
2
-
S
T
A
.
1
0
+
1
5
.
0
0
B
E
G
I
N
G
R
A
D
E
P
I
=
1
0
+
3
0
.
0
0
E
L
=
1
,
0
9
6
.
6
2
’
K
=
2
.
5
V
C
=
3
0
’
E
L
.
1
1
0
6
.
4
1
’
-
D
R
I
V
E
2
-
S
T
A
.
1
1
+
4
3
E
N
D
G
R
A
D
E
P
I
=
1
0
+
9
3
.
6
5
E
L
=
1
,
1
0
6
.
1
7
’
K
=
3
V
C
=
5
0
’
(
+
)
3
.
0
0
0
0
%
(
-
)
2
.
0
0
0
0
%
(+)4.0000%(+)6.8000%PI = 12+85.00EL = 1,061.44’PI = 13+40.0
0
EL = 1,067.6
0
’
(+)11.2000
%
(+)4.8000%EL. 1037.20’-DRIVE3- STA. 10+00.00ELEV. 1037.64’-DRIVE3- STA. 10+11.01 BEGIN GRADEEL. 1068.00’-DRIVE3- STA. 13+48.5
2
END GRADE K = 14K = 3VC = 17’VC = 60’(+)9.0000%PI = 10+40.00EL = 1,039.99’PI = 11+93.02K = 41K = 74 VC = 56’EL = 1,055.18’(+)9.7575%VC = 120’
P
I
=
1
0
+
7
0
.
0
0
E
L
=
1
,
0
1
5
.
7
1
’
(+)17.4930%E
L
.
1
,
0
6
0
.
3
7
’
-
D
R
I
V
E
4
-
S
T
A
.
1
4
+
0
0
.
0
0
E
N
D
G
R
A
D
E
E
L
.
1
0
1
7
.
8
1
’
-
D
R
I
V
E
4
-
S
T
A
.
1
0
+
0
0
.
0
0
E
L
E
V
.
1
0
1
6
.
7
5
’
-
D
R
I
V
E
4
-
S
T
A
.
1
0
+
3
5
.
5
0
B
E
G
I
N
G
R
A
D
E
K
=
3
V
C
=
6
1
’
(
-
)
3
.
0
0
0
0
%
(
-
)
3
.
0
0
0
0
%
P
I
=
1
2
+
6
5
.
0
0
E
L
=
1
,
0
4
9
.
8
2
’
V
C
=
8
0
’
P
I
=
1
3
+
5
0
.
0
0
E
L
=
1
,
0
5
5
.
7
7
’
(
+
)
7.
0
0
0
0
%
(
+)9.2
0
3
5
%
V
C
=
7
0
’
K
=
7
K
=
3
1
(
+
)
4
.
3
2
0
0
%
(
+
)
7
.
0
0
0
0
%
P
I
=
1
0
+
1
5
.
0
0
E
L
=
1
,
0
5
2
.
5
6
’
(+)2 0 .0 0 0 0 %
P
I
=
1
0
+
6
7
.
0
0
E
L
=
1
,
0
6
2
.
9
6
’
(
+
)
9
.
4
4
8
5
%
E
L
.
1
0
5
1
.
6
8
’
-
D
R
I
V
E
5
-
S
T
A
.
1
0
+
0
0
.
0
0
E
L
E
V
.
1
0
5
1
.
9
5
’
-
D
R
I
V
E
5
-
S
T
A
.
1
0
+
0
6
.
2
5
B
E
G
I
N
G
R
A
D
E
E
L
.
1
,
0
6
3
.
7
2
’
-
D
R
I
V
E
5
-
S
T
A
.
1
0
+
7
5
.
0
0
E
N
D
G
R
A
D
E
V
C
=
1
6
’
K
=
2
V
C
=
1
7
’
K
=
1