Loading...
HomeMy WebLinkAbout20140022 Ver 2_Approval Letter_20141031��p NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E Skvarla, III Governor Secretary November 13, 2014 Ms. Karen Fussell, P.E., Division Engineer NCDOT, Division 3 5501 Barbados Blvd. Castle Hayne, N.C. 28429 Subject: Modification to 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for proposed replacements of Bridge Nos. 16 and 20 on NC 211 over Honey Island Swamp in Brunswick County, State Project No. 17BP.3.R.26. NCDWR Project No. 20140022v.2 Dear Ms. Fussell: Attached hereto is a modification of Certification No. 3989 issued to The North Carolina Department of Transportation (NCDOT) dated April 21, 2014. If we can be of further assistance, do not hesitate to contact us. Sincerely,, l ewz/L)a�l Thomas A. Reeder, Director Division of Water Resources Attachments Electronic copy only distribution: Brad Shaver, US Army Corps of Engineers, Wilmington Field Office Stoney Mathis, Division 3 Environmental Officer Audrey Burnette, RK &K Engineers Gary Jordon, US Fish and Wildlife Service Travis Wilson, NC Wildlife Resources Commission Steve Sollod, NC Division of Coastal Management Beth Harmon, Ecosystem Enhancement Program NC Division of Water Resources Raleigh Central Office File Copy 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Phone: 919 - 807 -63001 Internet: www.ncdenr.gov An Equal opportunity 1 Affirmative Action Employer Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92 -500 and 95 -217 of the United States and subject to the North Carolina Division of Water Resources ( NCDWR) Regulations in 15 NCAC 2H .0500. This certification authorizes the NCDOT to impact 1.29 acres of jurisdictional wetlands, in Brunswick County. The project shall be constructed pursuant to the modification dated received October 31, 2014. The authorized impacts are as described below: Wetland Impacts in the Lumber River Basin (rivarian) Station Fill Fill Excavation Mechanized Hand Total (ac) (temporary) (ac) Clearing Clearing' Wetland (ac) (ac) (ac) Impact (ac) Original approved impacts at Sta. 20 +35 to 0.56 0 0 0.01 0.02 0.59 36 +50 Revised impacts with this approval at Sta. 0.56 <0.01 0 <0.01 0.28 0.84 19 +84 to 45 +00 Original approved impacts at Bridges 16 & 0 0 0 0.01 0.06 0.07 20. Revised impacts with this approval at Bridges 0 0 0 0.01 0.05 0.06 16 & 20. Original approved impacts at Sta. 21 +00 to 0.23 0 0 0.16 0 0.39 36+00. Revised impacts with this approval at Sta. 0.23 0 0 0.16 <0.01 0.39 21 +00 to 36 +00. Revised Total 0.79 <0.01 0 0.17 0.33 1.29 Total Revised Wetland Impact for Modification: 1.29 acres. The application provides adequate assurance that the discharge of fill material into the waters of the Lumber River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92 -500 and PL 95 -217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your modified application dated received October 31, 2014. All the authorized activities and conditions of certification associated with the original Water Quality Certification dated April 21, 2014 still apply except where superceded by this certification. Should your project change, you are required to notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non - discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition(s) of Certification: 1. This modification is applicable only to the additional proposed activities. All of the authorized activities and conditions of certification associated with the original Water Quality Certification dated April 21, 2014 still apply except where superseded by this certification. 2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be accomplished in strict compliance with the most recent version ofNCDOT's Best Management Practices for Construction and Maintenance Activities. 3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre- treated through site- appropriate means (grassed swales, pre- formed scour holes, vegetated buffers, etc.) before entering the stream. To meet the requirements of NCDOT's NPDES permit NCS0000250, please refer to the most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices Toolbox manual for approved measures. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management.Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and 5:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone: (919) -431 -3000, Facsimile: (919) -431 -3100 A copy of the petition must also be served on DENR as follows: C Mr. John Evans, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This the 13th day of October 2014 DIVISION OF WATER RESOURCES Thomas A. Reeder, Director Division of Water Resources WQC No. 3989 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: John E. Skvarla, III Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: [, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Phone: 919 - 807 -6300 \ Internet: www.ncdenr,gov An Equal Opportunity \ Affirmative Action Employer