Loading...
HomeMy WebLinkAbout20211588 Ver 1_Correspondence_20220323CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> Great. Thank you. Ian McMillan, PWS, GISP, CPM Sage Ecological Services, Inc. 919-608-3156 IMcMillan@SageEcological.com ________________________________ From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Wednesday, March 23, 2022 2:20 PM To: Ian McMillan <imcmillan@SAGEECOLOGICAL.COM>; Sean Clark <SClark@SAGEECOLOGICAL.COM> Cc: colleen.cohn@ncdenr.gov <colleen.cohn@ncdenr.gov> Subject: RE: 500 Rawls revised impact plans and text narrative Thanks! It would be 30 days tomorrow, since receiving the plans below. I wanted to make sure. I will keep the project open. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/ <https://urldefense.com/v3/__https://regulatory.ops.usace.army.mil/customer-service-survey/__;!!HYmSToo!LBn6oodb4qLHqZxsH4RybmyufL2ZFIhM7FhzVVexQc-gb6pF1lk7Qa2hc71SN6XP2JtL$> . Thank you for taking the time to visit this site and complete the survey. From: Ian McMillan <imcmillan@SAGEECOLOGICAL.COM> Sent: Wednesday, March 23, 2022 2:05 PM To: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil>; Sean Clark <SClark@SAGEECOLOGICAL.COM> Cc: colleen.cohn@ncdenr.gov Subject: [URL Verdict: Neutral][Non-DoD Source] Re: 500 Rawls revised impact plans and text narrative No, but these should be very close. I am waiting on the final, final plans. I will send them to you as soon as I get them. Ian McMillan, PWS, GISP, CPM Sage Ecological Services, Inc. 919-608-3156 IMcMillan@SageEcological.com <mailto:IMcMillan@SageEcological.com> ________________________________ From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> > Sent: Wednesday, March 23, 2022 1:18 PM To: Sean Clark <SClark@SAGEECOLOGICAL.COM <mailto:SClark@SAGEECOLOGICAL.COM> >; Ian McMillan <imcmillan@SAGEECOLOGICAL.COM <mailto:imcmillan@SAGEECOLOGICAL.COM> > Cc: colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> > Subject: FW: 500 Rawls revised impact plans and text narrative All, Is the attached the most recent and final impacts plans? I know onsite we discussed some possible temporary impacts. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/ <https://urldefense.com/v3/__https://regulatory.ops.usace.army.mil/customer-service-survey/__;!!HYmSToo!LBn6oodb4qLHqZxsH4RybmyufL2ZFIhM7FhzVVexQc-gb6pF1lk7Qa2hc71SN6XP2JtL$> . Thank you for taking the time to visit this site and complete the survey. From: Ian McMillan <imcmillan@SAGEECOLOGICAL.COM <mailto:imcmillan@SAGEECOLOGICAL.COM> > Sent: Wednesday, February 23, 2022 11:03 AM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> >; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> > Cc: Sean Clark <SClark@SAGEECOLOGICAL.COM <mailto:SClark@SAGEECOLOGICAL.COM> > Subject: [Non-DoD Source] 500 Rawls revised impact plans and text narrative Colleen and Lyle, attached are the revised impact plans and text narrative. Call with any questions. Thanks, Ian Ian McMillan, PWS, GISP, CPM Sage Ecological Services, Inc. 919-608-3156 IMcMillan@SageEcological.com <mailto:IMcMillan@SageEcological.com> am. <mailto:report.spam@nc.gov> Hi Colleen, 1. It is my understanding that the project engineers are still addressing the request for additional information submitted by the US Army Corps of Engineers via email on November 29th, 2021. Is this correct? If so, please provide a copy of the final response to the Division. [15A NCAC 02H .0502(c)] - Yes, they had to resubmit to City of Raleigh and get back to me when they have the revised maps. 2. Please provide additional information on how the two drainage conveyances listed as “Impact Area 2- Drainage - Deemed Allowable” fit under Item 9 of the buffer rules. [15A NCAC 02B .0714(9)] - I'll work on this. 3. The proposed road crossing in Impact Area 1 does not appear to be a perpendicular crossing of a stream or other surface water. Road impacts other than perpendicular crossings of streams and other surface waters require mitigation. Please provide additional information to demonstrate that this crossing is a perpendicular crossing or provide a statement of availability from a mitigation bank. [15A NCAC 02H .0714(11)] - Get back to you on this. 4. Has a stream/buffer determination been performed for this site by DWR? If so, please provide a copy of the Buffer Determination Letter. [15A NCAC 02H .0502(c)] - I am not finding that one was conducted, but I will circle back with the others and let you know. Thanks, Ian Ian McMillan, PWS, GISP, CPM Sage Ecological Services, Inc. 919-608-3156 IMcMillan@SageEcological.com <mailto:IMcMillan@SageEcological.com> ________________________________ From: Cohn, Colleen M <colleen.cohn@ncdenr.gov <mailto:colleen.cohn@ncdenr.gov> > Sent: Thursday, December 30, 2021 10:19 AM To: Ian McMillan <imcmillan@SAGEECOLOGICAL.COM <mailto:imcmillan@SAGEECOLOGICAL.COM> >; Sean Clark <SClark@SAGEECOLOGICAL.COM <mailto:SClark@SAGEECOLOGICAL.COM> > Cc: George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> <George.L.Phillips@usace.army.mil <mailto:George.L.Phillips@usace.army.mil> > Subject: 500 Rawls Drive DWR#20211588 Good morning! I am reviewing the above referenced project, and in order to complete the review, some additional information is required: 1. It is my understanding that the project engineers are still addressing the request for additional information submitted by the US Army Corps of Engineers via email on November 29th, 2021. Is this correct? If so, please provide a copy of the final response to the Division. [15A NCAC 02H .0502(c)] 2. Please provide additional information on how the two drainage conveyances listed as “Impact Area 2- Drainage - Deemed Allowable” fit under Item 9 of the buffer rules. [15A NCAC 02B .0714(9)] 3. The proposed road crossing in Impact Area 1 does not appear to be a perpendicular crossing of a stream or other surface water. Road impacts other than perpendicular crossings of streams and other surface waters require mitigation. Please provide additional information to demonstrate that this crossing is a perpendicular crossing or provide a statement of availability from a mitigation bank. [15A NCAC 02H .0714(11)] 4. Has a stream/buffer determination been performed for this site by DWR? If so, please provide a copy of the Buffer Determination Letter. [15A NCAC 02H .0502(c)] Thank you, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.