Loading...
HomeMy WebLinkAbout20140826 Ver 2_401 Application_20141114of wArFq PAID o� pG Office Use Only: r Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information f J /ARLEy 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit ❑Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: �w �';� or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes j9 No For the record ❑ Yes only for Corps Permit: ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: 712- MOMiSOIV FARM Rk 2b. County: 1'r CA c-I 2c. Nearest municipality / town: TrUU +Y�t P, P4 2d. Subdivision name: NIA 2e. NCDOT only, T.I.P. or state project no: K3 3. Owner Information NOV lu 14 3a. Name(s) on Recorded Deed: q O N P M A N T j& � A � 3b. Deed Book and Page No. 15ppK P {S 7q-7q 401 a BUFFER PERMITTING 3c. Responsible Party (for LLC if applicable): / �( 3d. Street address: 722- Mom say Rwi, W. 3e. City, state, zip: —r-r-o4W�A,'J /.,I C z g/ GG 3f. Telephone no.: 905- 56& -;-5LPq 3g. Fax no.: 3h. Email address: 4,nti u.c ,ors . �V Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different`from owner) 4a Applicant is ❑ Agent ❑ Other, specify- 5144Ne� ►'$ S DWilfe.� 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address S. Agent/Consultant Information (if applicable) 5a Name j Fj n' 5b Business name (if applicable) C -(�jG 5Tl�N>✓ is Re yew-i N LLC_ 5c Street address (15$ OAX 6A et- FA,—*, 5d City, state, zip Mo o rC8 V-i C o28 I t 5 5e Telephone no 5f Fax no- 70q - G�0-5�bq 5g 'Email address C be SCQ,LJA- 4 tai #JdS A �r Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification la Property identification no (tax PIN or parcel ID), Lf(oZQ 7 / 1 50 S _ 1 b Site coordinates (in decimal degrees) Latitude 35.6 331 Longitude -8'0.q181 (DD DDDDDD) ( -DD DDDDDD) 1c Property, size 3.7lZacres 2. SurfaceMaters 2a Name of nearest body of water (stream, river, etc )gto proposed project AKC 14 cr MAIf 2b Water Quality Classification of nearest receiving water 2c River basin map is available at http / /h2o enr state nc us /adman /maps/ C�Yf �UJ6A, •R;, e r 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time,of this application 3b List the'total'estimated acreage of all existingFwetlarids,on thetproperty Na we IrIANdC' 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property (i0 5A'+r� r+ 5 3d Explain the purpose of the proposed project I N9 5 �OV•e �idVC- 4v �YtvaA)f- eroS��1 3e Describe the overall project in detail, including the type,of equipment to be used ��' W,DrK W J It be aoAre' (� A'TCr q y %�r�L �1,5,�/�fq t 9►'� +Iw-k Page 3 of 11 PCN Form — Version 13 December 10, 2008 Version 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations,by the Corps or State been requested or obtained for this property / El Yes � No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type ❑ preliminary ❑ Final /V( A of determination was made 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company. Name (ifJknown) Other I' 4d If yes, hst,the,dates of the Corps jurisdictional determinations or State determinations and attach documentation 6. Project History 5a Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (mcluding4l prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions TW Atuq ACS 1a /'�� 3 ©0 o R Pe S [,JdR s -77 ee 6. Future Project Plans 6a- Is this a,phased project? El Yes No 6b If yes, explain Page 4 of 11 0 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams - tributaries Buffers ®-Open Waters ❑ Pond Construction 2. Wetland Impacts Alp W l/4g�S If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d. 2e 2f Wetland impact Type of jurisdiction number - Type.of impact, Type of wetland Forested (Corps - 404; 10 Area of Impact Permanent (P) or (if known) DWQ - non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ _ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑'T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ ,2g. Total wetland impacts 2h Comments 3. Stream Impacts �c 5�q �+. j M hR 5 If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted - 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps [-],INT ❑ DWQ S2 ❑ P ,❑ T ❑ PER ❑ Corps ❑'INT ❑ DWQ S3 ❑ P ❑ T ❑ PER [:]'Corps ❑ ,INT ❑ DWQ S4' ❑ P ❑ T ❑ PER ❑ Corps - - ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page'5,of 11 4. Open Water'Impacts If there are proposed impacts,to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivi ually list,all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact,(acres) Permanent (P) or Temporary 01 I,gJ P ❑ T IAI(e. l(ov -&&I STA,5% ; zA oil AKe- 103 %ut. ds . 02 ❑ P ❑ T 001 0 o 5lid+/�f/IaVC � 03 ❑P ❑T 04 ❑ P f❑ T 0. Total open water impacts 0.3 c*- 4g Comments S. Pond or Lake Construction If pond or lake,construction proposed, then com lete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream'lmpacts,(feet) Upland Pond ID Proposed use or purpose ' (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h is a dam high hazard permit required ❑ Yes ❑ No If yes, permit'ID no 51 Expected pond surface,area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete,the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. El Tar-Pamlico El Other Project is in which protected'basin? .�❑ /Neuse I� Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required 61 [A P'❑ T ^ NA ❑ �5q Ck.0 S I SAo�.Z Nos Aft �C B2 ❑ P'FIT 'Q Yes polsi ( W s B3 ❑ P ❑ T ❑ Yes ❑ No 6h Total buffer impacts & • 05 ' 61 Comments, A .J a ,die bg ]jar aCte:SS Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project b Specifically describe measures,taken to avoid,or minimize the proposed impacts,through construction techniques A � � LOO f-k 00f\8UC-4 ea 6(,c\ bo_n Sz_ -0 M,i Aim. ze �MP0.CtS fa by � f r Zone . Z� I 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U.S or Waters of the State? J@Yes ❑ No 2b If yes, mitigation is required by (check all that apply) DWQ Corps 2c If yes, which mitigation option will be used for this projects ❑, Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt.and letter) Type Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee °program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - ripanan wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation,requested' acres 4h Comments Page 7 of 11 PCN Form — Version 1, 3 December 10, 2008 Version S. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required; by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If Yes, you will have Wfill out'this entire.form — please contact'the State for more information 0 Yes [ANo 6b ;If yes, then identify the square feet of impact,to each zone of the riparian buffer that requires, mitigation Calculate,the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 312 for Catawba) Zone 2 15 6f Total buffer,mitigation required: 6g if buffer mitigation is required, discuss what type of mitigation is proposed (e g, payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 8 of 11 E. Stormwater, Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project'include or is it adjacent to protected ripanan buffers identified f �Q Yes [J No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse flow plan included? If no, explain why. El CH No Comments 2. Stormwater Management Plan 2a What is the overall,percent imperviousness of this project? % 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES'NOT require a Stormwater Management Plan, explain why S I`ar� I: n e s'�ab;1. zwa pan ally 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative -description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? [:]'DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government,Stormwater Review 3a_ In which local government's jurisdiction is this project? Tre-�,W l C&u j ❑ Phase II. 3b Which of the following locally- implemented stormwater management,programs ❑ NSW ❑ USMP apply (check all that - apply) ❑ Water Supply Watershed ❑ Other* 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ'Stormwater,Pro ram Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the•Stormwater Management Plan meefthe appropriate requirements? ❑ Yes ❑ No '5b 'Have all'ofthe 401 Unit submittal requirements been met? ❑ Yes '❑ No Page 9 of 11 PCN Form — Version 1 -3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the�project °require preparation of an environmental document pursuant to the regwrements,of the National, or State :❑ Yes ®'No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes ".to the above, has the document review beenxfinalized by the State Clearing House? (If so, attach' a copy of'the ,NEPA or SEPA final approval letter ) ❑ Yes Do No Comments. 2. Violations (DWQ Requirement) 2a Is the site,m violation of DWQ Wetland Rules (15A NCAC`2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface, Water or Wetland Standards„ ❑ Yes No or Riparian Buffer'Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes f? No 2c. 'if you answered "yes "`to one or both of the above questions, provide an explanation of theMolation(s)- 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result`m Yes No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the,above, submit ,a qualitative or quantitative cumulative impact °,analysis in accordance with the most recent DWQ policy Ifyou answered "no," provide a-short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will thWproject occur imor near amerea,with federally protected species or ❑Yes Is NO habitat? 5b Have you checked with the USFWS conceming Endangered'Species Act [] Yes ®No impacts? ❑ Raleigh 5c. If yes, indicate theMSFWS Field Office you have contacted. Asheville 5d What data sources,did you use to determine whether your site would impact Endangered Spectes�or Designated Critical Habitat 6. Essential Fish Habitat (Corp Requirement) 6a. Will this project occur in or near an area designated as'essenbal fish habitat? ❑ Yes to No 6b' What data sources did you use to'detertnne whether your scte would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Wdl;this project occur in or near awarea,thafthe state, federal +outribal govemments have designated,as having historic or cultural preservabon ❑ Yes No status (e.g , National Histonc ?rust designation or properties significant in North Carolina history and archaeology)? 7b_ What data sources did you use to determine whether your, site would Impact historic or archeological resources? 8. Flood Zone Designation (Corps,RequWment) Be Will this project occur in a FEMA -designated 100 -year floodplain? L❑ Yes No 8bAf yes, edam how project meets FEMA requirements ^ 8c What source(s) d0ouuiuse to make the ftoodplam determination? Applicant/Agen's'Pnnted Name tcanVA&q nature Date (I f ears sigria4ire R valid only d an authmizahon letter from the appkwd ��- - -- — — isQr°vitted 1 Page 11 of 11 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID 2014 -01986 County Iredell U S G S Quad NC- Troutman GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permitee Anthony & Maniie Earley Address 722 Morrison Farm Road Troutman, North Carolina 28166 Telephone Number 205 -566 -2549 Nearest Town Troutman Nearest Waterway Lake Norman River Basin/ HUC Catawba Coordinates 35.6331 -N, - 80.9281 -W Location description The project is located at 722 Morrison Farm Road, lot 128, on Lake Norman, Troutman, Iredell County, North Carolina. Description of projects area and activity This permittee is authorized to impact approximately 400 Ift of shoreline on Lake Norman during a bank stabilization project. 3001ft of shoreline stabilization was authorized under RGP 198200030. Total shoreline to be stabilized is 7001ft. Applicable Law E Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization Regional General Permit Number or Nationwide Permit Number 13 SEE ATTACHED RGP or NWP GENERAL, REGIONAL, AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated October 14, 2014. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and /or appropriate legal,action. This verification will remain valid until the expiration date identified below unless the nationwide /regional authorization is modified, suspended or revoked If, prior to the expiration date identified below, the nationwide /regional permit authorization is reissued and/or modified, this verification will remain valid until the, expiration date identified below, provided it complies with all requirements of the modified nationwide /regional permit If the nationwide /regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide /regional permit, activities which have commenced (i e , are under construction) or are under contract to commence in reliance upon the nationwide /regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide /regional permit's expiration, modification or revocation, unless discretionary authority has been exercised,on a case -by -case basis to modify, suspend or revoke the authorization Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification You should contacvthe NC Division of Water Resources (telephone,919- 807 -6300) to determine,Section,40f requirements For activities occurring withm the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N C Division of Coastal Management This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits If there are any questions I g this erificario any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Ta ande t 828 -27 7 0, ext.,226 or t sha.l:alexander @usace.army.mil Corps Regulatory Offici Date November 7, 2014 sha Alexander Expiration Date of Verification March 18, 2017 2014 -01986 Determination ,of Jurisdiction: A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area This prelimmary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331) B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or,our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification C. ® There are waters of the US and/or,wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344) Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification D. ❑ The jurisdictional areas within the•above described project area have been identified under a previous action Please reference jurisdictional determination issued Action ID SAW- Basis for Determination: There are open waters located on4he property that,exhibit indicators of ordinary high watermarks The Open waters on the property are known as Lake Norman which is an impoundment on the Catawba River The Catawba River is located in the Santee watershed and eyentually drams to the Atlantic Ocean Specifically, the Catawba River joms the Santee - Cooper River in South Carolina before entering the Atlantic Ocean Is a Section 10 water acthe Mountain Island Lake Dam on Lake Wylie in Mecklenburg County This jurisdictional determination is valid for the impact areas only E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits -of Corps' Clean Water Act jurisdiction for the particular site identified in this request The delmeation/determination may not be,valid for the wetland conservation provisions of 'the Food Security Act of 1985 If you or your tenant are USDA Program participants, or,anticipate participation in USDA programs, you should request a certifiedwetland determination from the local office of the Natural Resources Conservation Service, prior to starting work F.' Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes, an approved jurisdictional determmation'for the above described, site If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331 Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this determination you must submit a completed RFA form to the following address US Army Corps of Engineers South Atlantic Division Attn. Jason Steele, Review,Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5437 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 3315, and thatat has been received by the Division,Office within 60 -days of'the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address within 60 of the issue date below * *It is not necessary to submit an RFA form to the Division Office if you do not object to the determmatiomm this correspondence ** 2014 -01986 Corps Regulatory Official Issue Date of JD November 7, 2014 Expiration Date of JD Five years from Issue Date The Wilmington District is committed,to providing the,highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located onlme at.http Hre ug latory usacesurvey cone/ Copy furnished Chip Bridges, CBS Stone & Recycling, LLC, 638 Oak Ridge Farm Hwy, Mooresville, NC 28115 Action ID Number: 2014 - 01,986 Permittee: Anthony & Manjie Earley Date Verification Issued: November 7, 2014 Project Manager: Tasha Alexander County: - Iredell Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: CESAW -RG -A 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 Please note that your permitted activity is subject .to a compliance, inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result-in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating -other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms` and condition of the said permit, and required mitigation was completed in accordance with the,permit conditions. Signature of Permittee Date Applicant Anthony & Manjie Earley File Number SAW-2014-0198 I Date: November 7, 2014 Attached is See Section below ❑ INITIAL PROFFERED, PERMIT (Standard Permit or Letter of ermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B HI PERMIT DENIAL C ® APPROVED JURISDICTIONAL DETERMINATION D F-11 PRELIMINARY JURISDICTIONAL DETERMINATION E SECT,ION'ITfieoRowin identifiesourri _ its andi'o tBoris°"rea din anadministrative -a eat of the abouedecision. �_ gig _I?P ° ; {T 'd itional n ormation may be°found at h p_l��www�usace: army :�n�iUlVhssions /Csiv�iWorkslL�e ulataryProgramandPeimi&&s_i_ = nor Co s re a atTons ati33 CI R)art=331. y, A: INITIAL PROFFERED PERMIT: You may accept or,object to the permit. • ACCEPT- If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and,conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit,should be issued as previously written. After evaluating your objections, the district,engineet-,will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you- received.a.Letter of Permission (LOP), yowmay,accept the LOP and your work is authorized Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the,Corps of Engineers Administrative Appeal Process by completing Section II 'of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within,60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may acceptor appeal the approved JD or provide new information. • ACCEPT. You do not need to notify the Corps to accept an approved JD. Failure to.notify the Corps within 60 days of the date of this notice, means that you accepnhe approved JD in its entirety, and waive all rights to appeal the approved JD • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal,Process by completing Section II of this form and sending the form to the district engineer. This form mustbe received by the division engineer within,60 days,of the,date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD The Preliminary JD is not appealable If you wish, you may request an approved JD (which maybe appealed), by contacting the,Corps district for further instruction. Also you may provide new information for further` consideration by the Corps to reevaluate the JD REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an-initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where, your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the,Corps may add new infonnation,or analyses to the record. However, you may provide additional information to clarify the location of information that,is already in the administrative If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact. also contact: District Engineer, Wilmington Regulatory Division, Attn.: Mr Jason Steele, Administrative Appeal Review Officer 151 Patton A_ venue CESAD -PDO Room 208 U S Army Corps of Engineers, South Atlantic Division Asheville, North Carolina 28806 60 Forsyth Street, Room IOM15 Tasha Alexander Atlanta, Georgia 30303 -8801 828- 271 -7980 Phone: (404) 562 -5137 RIGHT OF ENTRY Your signature below grants the right of entry to Corps of Engineers personnel, and any govermnent consultants, to conduct investigations of the project site during the course of the appeal process You will be provided a 15 day notice of anv site mvestiaation; and will have the ODDortunity to'narticioa`te in all site investigations Date: I Telephone number• llant or For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn.: Tasha Alexander, 69 Darlington.Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered,Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative, Appeal Officer„ CESAD -PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5137 DUKE POWER PAO BOX 006 MENT, EC12 -Q CHARLOTTE, NC 28201 -1006 pC 704 - 382 -1567 OR TOLL FREE 1- 800 -443 -5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA Please type or print and fill in all blanks. If information is not ap li indica blank. PLEASE SUBMIT APPLICATION AND APPROPRI TE I WOWER FILI I TO DUKE POWER, TO ABOVE ADDRESS. I. Applicant Information / NOV 13 2014 j A. Name V �dl✓ �� n�G� DENR - WATER 11 CES B. Mailing Address )0, 0, 44Q IrT�NG C. Telephone 2dL54� 2 7: J k: II. Location of Proposed Project Jn� U � u A. Lake L/� y 2014 B. Street Address D�5 C. County 4018BFFERPEROUTR D. City, Town, Community or Landmark E. Section Lot # 12 f Subdivision F. Directions to property by road �or� �_ 77,�,Xyr Y,2 64 ,f.igr 6&, /A - eAvTe Sim; G. Latitude and longitude for the project site 3 s, 3 3 I �j0 - `t' Z el H. Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude /longitude coordinates can be found on internet site, www.mapsonus.com. Directions: Don't register, click "Maps ", enter address, draw map, select "Map Clicking Will...", select "LaULong ", click map) Ill. Description of Project A. Length of wall o B. Material ✓� � .5 NL �p� Cr U-%A C. Distance from property line /shoreline �/j l�/ /•� Gx %st ►•�6 5 K ovLl�l/� IV. Intended Use of Project Area A. Private X B. Commercial i V. Applicant Signature -.:7 "I" Date PLEASE NOTE THE FOLLOWING: • A COPY OF THE COMPLETE APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTON AVENUE, ROOM 208, ASHEVILLE, NC 28801 -5006 • A COPY OF THE "DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE - CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO: NC DIVISION OF WATER QUALITY, ATTENTION: Cyndi W -1., OADVIRM 1 DI 11P_ 9994 1•DAO7'OCC 00 1 /11 OAI CJr_'LJ Mf1 07CAA OL nMC• 040.7924708 State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10 -2013 Shoreline Stabilization Application Form Four copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 I. Applicant Information 115A NCAC 02H .0502(a)] 1. Owner Information Name: Anthony & Marjie Earley Mailing Address: P.O. Box 180 Troutman, NC 28166 Telephone Number: 205- 566 -2549 Fax Number: 704 - 508 -1256 E -mail Address: anthony @amproductions.tv 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http: / /www.saw.usace.armv.mil/ Portals /59 /docs /reaulatory /reRdocs /Permits /SAMPLE AGENT AUTH ORIZATION FORM. df) must be attached if the Agent has signed this application form. Name: :/) /19elW1 c s Company Affiliation: C L Mailing Address: e. )�:'-;4rM �t�► - Avy,ewi (I Telephone Number: Fax Number: E -mail Address: fA) i AJW_- 4rG*A1 • Alf- Person to receive the Certification Approval: n 13r :dl CS II. Project Information [15A NCAC 02H .0502(a) & b ] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10 -2013 Page 1 of 4 La ke (At Full Pond /Normal Water Level) b'(0 w oeo c oQ Full Pond/ ©�> 0 C Normal_ Water Level c� f3 d Shoreline Lf o 0 $�-5 C(4- Yds Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10 -2013 Page 3 of 3 4 Mm7 b "y ..t V'. 0 6 M Y�OtL I a auui ntltd . 1M.1� Y.or .1 .ImFLL eaFls y[9un�lt9.lb� 1C76�a�O�l9�� i - ..ra 6.s ltme i GRAPHIC SCALE i P b a0 LOCATION YIP NOT TO SCALE I ( w rM 1 11-1 . 50 M. r6i p°m.n .9oXnir n.l.o 6�p� r b.s «. Aw .meram = x Ye 1sTaeal a K s9A»>MO �nupr a9 ®+v = jy� 61JC+ra:6p. i1 e � -nn elou e1198K «rp =n• 7�� ,�v? R nlwtlw. O.m a..omn m °•1 C rLOM StAM(EXT va a m mtr+ 1147 61e uwma a K 6AVLr wean' W 9ml X9690) A9a»f /LTA Id �y1X�w i 1wr m x 661 o In-04 mA .A !CK K t� CIOC"tm w 11 L(C�a 1160D «7Nb MU p61X.049 iYtr Q A.e, tm to ffi.PI 1; » K f li R ooRO.L tO MTIb x 4w O1rC1l AtG x ua. 9mml® n1r a,o m n ailao6m Mffi r+o as w�ina°a x 1waPO nerz9Pr ar lr 1wan.Xn _- - - t» iR U4ffi 0>ICOC YO� 9alam t loll iA n irmuC Ne9161o1 1 ane lllOpn 99a17o pI11Y0 ♦Oe9lelaL 1� hppl6llpAC»m6 t il8 O OY? t� 1 .OQ. ALL N.Oa leer oCN90 t lolR .mat. 1 9C (169r tae 1P1aCTttX.MY6AQ lC11aQ 1 t»e w.4N XaY6f6 1.Aa .aa Ow9atT 1 �g 60®1 & PAJCM 119 Ln6a9�7sosr M 1190 P'F. 60 Pp 1619-61-7696 /EWLSE 69741 LAM LOT 65] DAVIS C. MMCML D.E. 1141 M t011 PPI 4519 -71 -3016 LMCE LOT 657 PAL 17,PC. 56 DATE r_ .Olcm1 O.B. lm4 PG 193 P« 1639 - 71_1914 LANE LOT 656 P6 ,7 P0. 56 JOHN c ROM Dz 1111 ss 451 191 4679` -71 -495 61aCSr 69717 LAW 'LOT 655 COEAml! RXIMUMCM uc AREA _ 3772 ACRES DA 461 POL in SEtnw 17 LOT 116 REF OR° X4 CF- 17-X-1 P8 U P0. 65 C9a� «« rCle J I O m.XS f69O1 R1Pl aa6.o` / � amts am jl� am'�a6m WTID Y 24 Mif A PW 521 P& 610 PB. 1671112 59 27 PII. 17 PG. 111 i i NOIR 116.'OMl .R 1 - .a+6X9 T► 81D681afi \ 4& 2. 633 7 P6. 665 • \' P91 L On MOTS, 6 OK' 1 i 1 1 1 1 t 1 1 1 t •\ t �•1 1 t\ �t t I /xe r , .3 a � V t BOtl90 f m w ID t 08 629 PG 672 1 P01 16LOT 1 65.0 t LOT l �Io6C 41 P.6. 17 P6. 111 t 1�at g4-g4 TT X.Al e.. Aj.ML Ra�^41I1i7/sleei 3:�'I^� 1,041, C 16'16 >d a 2;: 04 .Atu law i i AH STALE OF NO CAROMA . `a,.uo. ... WEDEIl_1.01IP1Y � � • ..9y lr ra erwl.a .r..v 172.+1. 1..�.br �o.aF � � ;•��•�t�.;wRO <'��'' rn.... r .�4.+...we.awua6+9S.n.a@�.... -7 N...t aw r..xr :l D=83awDOW �,/ O�0111 s"a L U.rl.. 1waw trey .iMelltn Wrr rr•r_�-am tb s.a LAKE MORE 1 2_� s a •..b`• 1 b gam- 1.16 r M w ewr6 mr.s r tls a.. err 1 SEAL :r.geyr gr.�+Y+•mt.wwrwwtaa +Ad zt9. - E L -3703 1 l ->fl6f � •• 1191E 1 a "1le.uiaoA,.wara.9 mss trlm nwtmaalr6.t9 tma 1 -- - _AA Ap16.41aPulerm90 .AaS iI � �i ti..lEratr ./oaaa oRbon 064 fsca.CnMTA1Y i` - -� Inlae 1a7116A«m9X.aC Pt - - � " Tut x 9ae16 A m.Ma a.lar. NrWr v Y4 u L rA FOR SHEET S SEt SMMUS TRAC! 1285 -00 .� `1Jii �+ l.r.T/is� TAX IM 4619 -7t -1506 FOR SOt7RLS 6 O1LE R{I1R,70 D9tt 451 P4 9t PROPFiI'I OIR® BV _ wn X77' R OORM ILL SURVEY AND MAP PREPARED BY COAANS FORD DEVEW)WENT LAKE, 'NORMAN SURVEYING SECTION OL AWSL EOF LOT 128 `& ENGINEERING PLLC alltvE TABLE - ` �AVIDSON TOWN90P MWEL. COUNTY. N 6E0.6t Ingram Rope ��� oau Stotes.77ie, N Carol" 286 25 C1 ,4• 17°- _ Su1c ,- : w GATE a 9mvrr - OC106ER 1.17002 704 876 -4450 Fci 700 B76 -4457 w - 1 8001E T _ DATEIOF WAPPM OCTOBER SAM _ I UO 72.116166 I 9 MIO t 6 M t1aP RI ®ltl 4 1rOtO1R Ill[ aAI.OR 11AR 90or m► L P ll»nt W � ma tlall.0 .fir toeaMr la 16 o K s! 0, "'@q Pf rc.aaf a r C' F) 4191+660 Ducc n®sr CORP • r. w9 Pt LN2,Ap61191 O.Y Z1oIC0 .06 RLl IPOI e9. ,Y Ilar! 1Q[ /n 1aaR 7aNP' TO mlo� Yr m 164m % 61M10.1[ J f.aOPM116 tml DAVIS C. MMCML D.E. 1141 M t011 PPI 4519 -71 -3016 LMCE LOT 657 PAL 17,PC. 56 DATE r_ .Olcm1 O.B. lm4 PG 193 P« 1639 - 71_1914 LANE LOT 656 P6 ,7 P0. 56 JOHN c ROM Dz 1111 ss 451 191 4679` -71 -495 61aCSr 69717 LAW 'LOT 655 COEAml! RXIMUMCM uc AREA _ 3772 ACRES DA 461 POL in SEtnw 17 LOT 116 REF OR° X4 CF- 17-X-1 P8 U P0. 65 C9a� «« rCle J I O m.XS f69O1 R1Pl aa6.o` / � amts am jl� am'�a6m WTID Y 24 Mif A PW 521 P& 610 PB. 1671112 59 27 PII. 17 PG. 111 i i NOIR 116.'OMl .R 1 - .a+6X9 T► 81D681afi \ 4& 2. 633 7 P6. 665 • \' P91 L On MOTS, 6 OK' 1 i 1 1 1 1 t 1 1 1 t •\ t �•1 1 t\ �t t I /xe r , .3 a � V t BOtl90 f m w ID t 08 629 PG 672 1 P01 16LOT 1 65.0 t LOT l �Io6C 41 P.6. 17 P6. 111 t 1�at g4-g4 TT X.Al e.. Aj.ML Ra�^41I1i7/sleei 3:�'I^� 1,041, C 16'16 >d a 2;: 04 .Atu law i i AH STALE OF NO CAROMA . `a,.uo. ... WEDEIl_1.01IP1Y � � • ..9y lr ra erwl.a .r..v 172.+1. 1..�.br �o.aF � � ;•��•�t�.;wRO <'��'' rn.... r .�4.+...we.awua6+9S.n.a@�.... -7 N...t aw r..xr :l D=83awDOW �,/ O�0111 s"a L U.rl.. 1waw trey .iMelltn Wrr rr•r_�-am tb s.a LAKE MORE 1 2_� s a •..b`• 1 b gam- 1.16 r M w ewr6 mr.s r tls a.. err 1 SEAL :r.geyr gr.�+Y+•mt.wwrwwtaa +Ad zt9. - E L -3703 1 l ->fl6f � •• 1191E 1 a "1le.uiaoA,.wara.9 mss trlm nwtmaalr6.t9 tma 1 -- - _AA Ap16.41aPulerm90 .AaS iI � �i ti..lEratr ./oaaa oRbon 064 fsca.CnMTA1Y i` - -� Inlae 1a7116A«m9X.aC Pt - - � " Tut x 9ae16 A m.Ma a.lar. NrWr v Y4 u L rA FOR SHEET S SEt SMMUS TRAC! 1285 -00 .� `1Jii �+ l.r.T/is� TAX IM 4619 -7t -1506 FOR SOt7RLS 6 O1LE R{I1R,70 D9tt 451 P4 9t PROPFiI'I OIR® BV _ wn X77' R OORM ILL SURVEY AND MAP PREPARED BY COAANS FORD DEVEW)WENT LAKE, 'NORMAN SURVEYING SECTION OL AWSL EOF LOT 128 `& ENGINEERING PLLC alltvE TABLE - ` �AVIDSON TOWN90P MWEL. COUNTY. N 6E0.6t Ingram Rope ��� oau Stotes.77ie, N Carol" 286 25 C1 ,4• 17°- _ Su1c ,- : w GATE a 9mvrr - OC106ER 1.17002 704 876 -4450 Fci 700 B76 -4457 w - 1 8001E T _ DATEIOF WAPPM OCTOBER SAM _ I DUKE ENERGY DIRECTIONS BY ROAD Lake Use Permit Applicants and contractors: Ease of locating the proposed project site can have a big impact on permit processing °time. Please complete this form and return in along with your completed permittapplication,to: Duke Energy C/O Lake Services – EC12Q P :O Box 1006 Charlotte, NC 28201 -1006 1- 800 -443 -5193 and select Option 5 Applicant's Name:—Anthony Earley' f: Street Address (at Lake) _ 722 Morrison Farm Rd Lake Name: Norman _ I - ' j` Subdivision Name: Cowans Ford Development Lot -128 Tax Parcel ID (if known 4629711508 City: Troutman . County Iredell State: NC ZIP: 28166 Latitude: 35.6331 Longitude: 80.9281 Telephone: 205 -566 -2549 D'o'rections`(rdin major road or highway): 1177 North to EXIT 42 – Weston Hwy 21/115 – turn left on Perth Rd – right on State Park,Rd turn Left on Morrison Farm Rd DesciptiverStructures (s) on Property (i.e. brick garage, white fence, mobile home, etc.): Vacant lot 'V "? 722 Morrison Farm Rd - Google Maps 722 Morrison Farm Rd 7rGUtm2r., NC 28766 DMOGns Save Er.GiUe 1F.;; area Search nearby pizza shrimp lastioodreslaurenls e F �c fiG Qe oe Page 1 of 1 wp data 07014 Google 700 ft https: / /www.google.com/maps /place/ 722 +Morrison +Farm +Rd, +Troutman, +NC +28166/ @... 7/29/2014 t4 1371 co t t� o 7 P a � I,raMwdamFwmRd G e � v a y /ti1y C 7371 �,eC e¢ f�l wp data 07014 Google 700 ft https: / /www.google.com/maps /place/ 722 +Morrison +Farm +Rd, +Troutman, +NC +28166/ @... 7/29/2014 MapCard - Print your custom map Page 1 of 1 „c;V . —*j w Wit Romp } _ .�\ • ', al iS� _ ,; � 1 • ; ,� , , it >/✓ �' 1.� ---�r , '--t IV 1, ��t �+ 1 � v fji ` ` �� � / ,,t {/ *py• 4 N o 0.5 Mi 0 2000 Ft http:/ /map- pass.mytopo.com /maps /print_local.asp ?print =l &scale= 5.00 &layer= DRG &lat 7/29/2014