Loading...
HomeMy WebLinkAbout20211588 Ver 1_More Information Received_20211230CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> Hi Colleen, 1. It is my understanding that the project engineers are still addressing the request for additional information submitted by the US Army Corps of Engineers via email on November 29th, 2021. Is this correct? If so, please provide a copy of the final response to the Division. [15A NCAC 02H .0502(c)] - Yes, they had to resubmit to City of Raleigh and get back to me when they have the revised maps. 2. Please provide additional information on how the two drainage conveyances listed as “Impact Area 2- Drainage - Deemed Allowable” fit under Item 9 of the buffer rules. [15A NCAC 02B .0714(9)] - I'll work on this. 3. The proposed road crossing in Impact Area 1 does not appear to be a perpendicular crossing of a stream or other surface water. Road impacts other than perpendicular crossings of streams and other surface waters require mitigation. Please provide additional information to demonstrate that this crossing is a perpendicular crossing or provide a statement of availability from a mitigation bank. [15A NCAC 02H .0714(11)] - Get back to you on this. 4. Has a stream/buffer determination been performed for this site by DWR? If so, please provide a copy of the Buffer Determination Letter. [15A NCAC 02H .0502(c)] - I am not finding that one was conducted, but I will circle back with the others and let you know. Thanks, Ian Ian McMillan, PWS, GISP, CPM Sage Ecological Services, Inc. 919-608-3156 IMcMillan@SageEcological.com ________________________________ From: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Sent: Thursday, December 30, 2021 10:19 AM To: Ian McMillan <imcmillan@SAGEECOLOGICAL.COM>; Sean Clark <SClark@SAGEECOLOGICAL.COM> Cc: George.L.Phillips@usace.army.mil <George.L.Phillips@usace.army.mil> Subject: 500 Rawls Drive DWR#20211588 Good morning! I am reviewing the above referenced project, and in order to complete the review, some additional information is required: 1. It is my understanding that the project engineers are still addressing the request for additional information submitted by the US Army Corps of Engineers via email on November 29th, 2021. Is this correct? If so, please provide a copy of the final response to the Division. [15A NCAC 02H .0502(c)] 2. Please provide additional information on how the two drainage conveyances listed as “Impact Area 2- Drainage - Deemed Allowable” fit under Item 9 of the buffer rules. [15A NCAC 02B .0714(9)] 3. The proposed road crossing in Impact Area 1 does not appear to be a perpendicular crossing of a stream or other surface water. Road impacts other than perpendicular crossings of streams and other surface waters require mitigation. Please provide additional information to demonstrate that this crossing is a perpendicular crossing or provide a statement of availability from a mitigation bank. [15A NCAC 02H .0714(11)] 4. Has a stream/buffer determination been performed for this site by DWR? If so, please provide a copy of the Buffer Determination Letter. [15A NCAC 02H .0502(c)] Thank you, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.