HomeMy WebLinkAbout20140022 Ver 2_Application_20141031� / ,.. 1
October 31, 2014
Virginia Mabry
Manager of Priority Projects Office
NCDOT — Transportation Program Management Unit
Mail Service Center 1595
Raleigh, NC 27699-1595
Reference: WBS Element No. 17BP.3.R.26
Division 3 — Express DB
Bridge No. 090016 8� 090020 over Honey Island Swamp
Brunswick County, North Carolina
Submittal No. S-168R3
Attention: Christy Huff
Dear Ms. Huff:
We are submitting herewith the revised permit for the subject project for your review and approval.
We are requesting a five day turn around due to the time sensitive nature of this project. Upon
approval of the permit package we will submit to the agencies, NCDWR and USACE for the final
approval and permit for construction. Included with this submittal are the following items:
• One (1) copy of the Permit drawings including the Permit Impact Summary Table,
• One (1) copy of the Individual Permit Letter & Application,
• One (1) copy of the response to comments,
• One (1) copy of the EC plans.
Please call if you have any questions.
Sincerely,
�,.�C�^' n.----
�eitl Skinner, P.E.
Director, Transportation
Enclosure BKS/abb
cc STW — Erick Frazier, Joey Knoll (Electronic)
NCDOT - Leilani Paugh, Chris Manley, Wayne Currie (Electronic),
NCDOT -Stoney Mathis (1 Copy mailed directly),
RK&K — JTP, BKS, MTM, DBP, THS, HTW, KWB, RHN, EMR, WKJ, File
M:\projects�2012\Div3_ExpressDB�P.dmin\Submittals\5-168R3 Permits l6_20\Div3ExDB_Cor_S-168R3.docx
Enqineers � Construction Manaqers � Pla�ners � Scientists
1) The pipe extension at @20+12 LT may need to have temporary excavation shown slightly
beyond the pipe extension itself as it seems likely that some digging may be in order in that area
to install the pipe. I suggest that the hand clearing impacts shown in that area are not sufficient
for the likely digging/construction efforts that need to occur and we should up the game with
respect to type of impacts to account for the needed work. Please revisit this. Temporary Fill
in Wetlands, impervious dikes, special stilling basins and construction sequence write up has
been added to the plans as you requested during our phone conversation on 10/29/2014.
2) Building on item 1 above, while the pipe at approx. Station 20+12 connects wetlands areas on
each side of the road, the pipe conveys flow from one side of the road to the other (east to
west), and in the vicinity of the pipe on either side the wetlands appear and act more as a
stream than they do a wetland (although the agencies have agreed to just count this part of the
wetland system and not break it out as a stream). Nonetheless, there was a good amount of
water flow during my Oct. 2, 2014 visit similar to that of a stream. I would say the “channel” is
about 1.5 to 2 feet deep of flowing water. In short, I think this is a more than what might
appear to be on the surface as an equilibrium pipe for wetlands. We need to consider the flow
thru this pipe in the methodologies for adding the pipe addition and working in this area. I
suggest that work in the dry may be in order to help ensure the prevention of turbidity and
offsite sediment loss. Building on this, I think that the silt fence shown across the “channel” on
the RT and the CFW across the “channel” on the LT on the erosion control drawings are not
appropriate measures considering the water flow in this “channel.” Upon completing the pipe
extension in the appropriate manner as suggested above (work in the dry perhaps), we could
then treat this section of the wetland as the “channel” area that it is and set up perimeter
measures much as we would adjacent to a stream. The EC plans have been revised to show a
construction sequence. The construction sequence includes the “work in the dry” language. If
there is no “dry” time the contractor is instructed to use a pump around operation to install the
pipe and head wall.
3) I question the need for mechanized clearing rather than hand clearing at Station 23+75 to 25+
LT and also at the area of Station 26+70 LT and also the area of 27+50 LT. If these impacts are
just for putting up the utility lines, could they all be hand clearing rather than mechanized
clearing. Even if wooded presently, if the work is only for putting up aerial lines, then it seems
that hand clearing could be appropriate and sufficient. If you change this, please change the
corresponding notations on the impact summary table. All mechanized clearing under the aerial
utilities has been changed to hand clearing. The impact table has been adjusted accordingly.
4) I assume that the reason there appear to be two fill line limits on the RT side of the project is
because one is for the true toe of fill and one is for the extent of sloughing. Is this correct? Yes.
5) In consideration of item 4 above, why are there some locations where there appear to be three
lines that appear to show a fill limit. The referenced locations being 22+90 to 25+60 RT (location
one) and 27+35 to 27+70 RT (location two). Please clean this up if the lines closest to the
roadway could be removed. Please advise. At one time you needed the amount of permanent
forest conversion and the amount of shrubs that were being permanently impacted. This is the
reason for the 3 lines in some areas. Since we are not doing the on‐site mitigation this
distinction is not necessary and the separate hatching has been combined into one hatching.
6) Why is fill shown @ Station 21+00 to 21+20 RT? Is this for the sloughing effect? Yes.
7) If the outer fill line on the RT is the far extent of sloughing, do we need to have 5’ of mechanized
clearing beyond the sloughing line? I am just asking a question here and would like some
feedback. If the 5’ feet of mechanized clearing is justified, let’s keep it. If not, then let’s delete
it. I even ask the question because it seems that if sloughing is what is causing the outer impact,
then do we need clearing beyond that sloughing? Is the clearing currently proposed so that we
can go in and have room to repair the area that sloughs? Please advise. The clearing beyond
the sloughing is for access to place the fill back in the hole for sloughing. The construction
methods were carefully reviewed with the contractor and this is what they said they needed for
the undercut operations.
8) Do we need a smidge of mechanized clearing just off of the southern edge of the NE corner rip
rap abutment protection on the southern bridge in part of what is now shown as handclearing?
This question is perhaps validated when looking at the northern bridge where we have small
areas of mechanized clearing on both sides of the creek between the rip rap protection and
transitioning to the hand clearing. The tree line of the southern bridge does not extend past the
riprap like it does on the northern bridge. Tina looked at it and also believes that impacts as
shown are correct.
9) In the blow up circle associated with the southern bridge, you may want to delete the hatching
apparently associated with the pavement removal as it may lend itself to confusion, reference
26+70 LT within the blow up circle. Done.
10) We may want to also shade the triangle shaped area (currently not included in the shading)
from Station 35+15 to 35+90 LT to include it as part of the “Existing Impacts from Aerial
Utilities.” The shaded area as shown is correct. The shaded area follows the existing aerial
utilities.
11) Please show the pipes that connect the boxes to the PFSH at Station 34+00. Level turned on.
12) There is a crossline pipe shown at Station 36+50 on permit drawing 3 which is not shown on
permit drawing 5. Please make sure all drawings are consistent with what is proposed with
regard to the subject pipe and otherwise. If the subject crossline pipe is proposed, then first
could the pipe be slightly repositioned further ahead such as to avoid wetland impacts on the RT
side of the project which it would apparently have if positioned as currently shown on permit
drawing 3. If the pipe cannot be relocated to avoid impacts, then have the appropriate fill
impacts and clearing impacts been accounted for in consideration of the end of the pipe and rip
rap pad being placed in wetlands. Impacts do not appear to be accounted for at present in this
regard. Please account for appropriately on the drawing(s) as well as the impact table. Include
lead arrows and text or blow up on the drawing(s) as appropriate. This is a temporary pipe. The
pipe has been moved to be just outside of the wetlands. The pipe has been labeled as
temporary.
13) At Station 37 LT, there is a note referencing Special Cut Ditch, See Detail B. However, Detail B is
not included on permit drawings 3 and 5 as would be intended apparently. Please include Detail
B. Detail has been added.
14) Undercut is shown in the cross sections at Station 26+00. Is this intended? Is this necessary?
This is getting mighty close to the stream. What is the Station number for ending the undercut
nearest to the southern edge of the creek? The plans have been revised to show sheeting along
the toe of the riprap running parallel to the stream. The contractor is taking precautions so that
the stream banks will not cave‐in.
15) On the erosion control plans, it seems that there might not be a need for the perimeter erosion
control measures (silt fence, CFW) from station 28+50 to station 35+50 LT considering that there
should only be hand clearing within previously impacted areas for the utility lines. Please review
and see what you think in this regard. Fence line has been revised from sta. 30+00 to sta. 35+50
LT.
16) Section 5.0 of the cover letter references onsite mitigation; remove this reference. Done.
17) Section 6.0 of the cover letter: Should the first bullet point under Alternative 4 be “0.12 acres
less wetland impacts” rather than 0.14 ac. Changed to 0.15.
18) Section 11.1 of the letter, the last sentence needs to have the reference to restored wetland
area removed. 2nd bullet last sentence. The word restored has been deleted.
19) Revise impact table accordingly for any/all. Done.
20) Finally, pertaining to EEP, who is responsible for submitting the request to EEP. You will need
the acceptance letter from EEP to go along with your application. I would be glad to draft and
submit the letter to EEP; please advise if you would like me to do so. I should be able to do so in
short order. Leilani Paugh or Chris Manley will handle this task.
Stoney 10/20/14
U
R
6
W
A
D
S
T
c
a
T
I
4
J
I
a
c
PAT MCCRO
GOVERNOR
U. S. Army C
Regulatory F
69 Darlingto
Wilmington,
Attn: Mr.
USA
Dear Sir:
Subject: Ap
Qu
Hon
app
The North C
construct Br
approximate
The purpose
Individual S
4345, this a
Jurisdictiona
If you have
aburnette@rk
cc list: Karen
Amand
Stoney
ORY
Corps of Eng
Field Office
on Ave.
NC 28403
Brad Shave
ACE NCDO
plication fo
uality Certif
ney Island S
plication also
Carolina Dep
ridge Nos.
ly 0.474 mil
e of this let
ection 401 W
application p
al Determina
any questio
kk.com.
Fussell, Division
da Glynn, Divisi
y Mathis, Divisio
S
DEPART
gineers
er
OT Division 3
r an Individ
fication for t
Swamp in Br
o includes th
partment of
16 and 20
les in length.
tter is to re
Water Quali
package inc
ation request
ons or need
n Engineer - NC
on Bridge Progr
on Environmenta
STATE OF N
TMENT O
Octobe
3 Coordinato
dual Section
the replacem
runswick Co
he Preliminar
f Transportat
on NC 211
.
equest appro
ty Certificat
cludes perm
form, USAC
additional in
Sincerely,
Audrey Bu
RK&K – P
CDOT
ram Manager - N
al Officer - NCD
NORTH CA
OF TRAN
er 30, 2014
or
n 404 Permi
ment of Bridg
ounty. WBS
ry Jurisdictio
tion (NCDO
1 over the
oval for a
tion. In add
it drawings
CE jurisdicti
nformation p
urnette
Project Engin
NCDOT
DOT
AROLINA
NSPORTA
it, and Indiv
ge Nos. 16 an
Element No
onal Determ
OT), Divisio
Honey Islan
Section 404
dition to this
, half size
ional forms,
please conta
neer
ATION
ANTHO
SE
vidual Secti
nd 20 on NC
o. 17BP.3.R
mination Req
on of Highw
nd Swamp.
4 Individual
s cover letter
roadway pl
, and NCDW
act me at (9
ONY J. TATA
CRETARY
ion 401 Wat
C 211 over
.26. This
quest Form.
ways, propos
The proje
l Permit, an
r and ENG F
lans, Prelim
WR stream fo
919) 878-956
ter
ses to
ect is
nd an
Form
minary
orms.
60 or
2
1.0 Purpose and Need
The purpose for this State Project No. 17BP.3.R.26 is to preserve the mobility and safety of the
traveling public by replacing the existing 59-year old structurally deficient bridges that can no longer
be addressed by maintenance activities. Bridge No. 16 is a 3-span timber bridge, 25.4 feet wide by
52.6 feet long. Bridge No. 20 is a 3-span timber bridge, 25.3 feet wide by 52.4 feet long. They span
Honey Island Swamp on paved NC 211. The underground telecommunication and fiber optic cables
will be relocated aerial onto the joint use power poles.
2.0 Project Description
The replacement structure for Bridge No. 16 will consist of a single span 45” concrete girder bridge
approximately 80 feet long and 34.25 feet wide. The replacement structure for Bridge No. 20 will
consist of a single span 45” concrete girder bridge approximately 85 feet long and 34.25 feet wide.
These bridge lengths are based on final design information and were set by hydraulic requirements.
The bridges will be of sufficient width to provide for two 12-foot lanes with offsets varying from 4.1
feet to 5.0 feet on Bridge No. 20 with 0.06 super elevations across the bridge and 4-foot offsets on
Bridge No. 16 on each side in normal crown. The low chord of each new structure will be at
approximately the same elevation as the existing low chord. The land use adjacent the swamp is
primarily forest and game land. The basin character is Coastal Plain Rural.
3.0 Summary of Impacts
Waters of the U.S.: Proposed permanent impacts to jurisdictional areas total 0.96 acres. The impacts
are as follows: 0.56 acres of fill in wetlands due to the roadway alignment, 0.23 acres of fill in the
wetlands due to sloughing during the undercut operations and 0.17 acres of mechanized clearing
from both the sloughing during the undercut operations.
Proposed temporary impacts to jurisdictional areas total 0.33 acres. There will be less than 0.01 acres
of temporary fill in wetlands due to the construction of the 48” pipe extension at station 20+12 lt.
There will be hand clearing under the bridges and under the aerial utilities during relocation.
However, 0.10 acres of the proposed hand clearing lies within the already cleared area under the
existing aerial utilities. All underground and aerial utilities in conflict with the proposed
construction will be relocated prior to construction.
4.0 Summary of Mitigation
The proposed construction of Bridge Nos. 16 and 20 over Honey Island Swamp will permanently
impact 0.96 acres of jurisdictional riparian wetlands that will require mitigation.
3
5.0 Project Schedule
Construction phasing of this project will begin with utility relocations then bridge replacement. The
existing bridge will remain in service during the construction of the replacement bridges. Permit
drawings are attached. The Construction Date is January 1, 2015.
6.0 SEPA documentation
Information included in this introduction letter, along with attachments is intended to supply
documentation necessary to meet the requirements of the State Environmental Policy Act. Bridge
Nos. 16 and 20 are located on NC 211. NC 211 is used for through traffic which connects US 17
and US 74, for a total of 24 miles, which takes approximately 26 minutes. A total of four
alternatives were studied for replacing Bridge Nos. 16 and 20 in Brunswick County. These
alternatives are described as follows:
No-Build Alternative
Alternate 1 - Replace both bridges on existing alignment,
Alternate 2 - Replace Bridge No. 20 on new alignment while replacing Bridge No. 16 on
existing alignment using an on-site detour,
Alternate 3 - Replacing both bridges on new alignment to the east of existing roadway, and
Alternate 4 - Replacing both bridges on new alignment to the west of existing roadway.
No-Build Alternative
This alternative is not feasible due to the bridges being classified as structurally deficient with
sufficiency ratings of 4 (Bridge 16) and 5 (Bridge 20) out 100. Not replacing the bridges will cause
safety and mobility issues to the traveling public.
Alternate 1
NCDOT Guidelines for Evaluation of Offsite Detours for Bridge Replacement Projects considers
multiple project variables beginning with the additional time traveled by the average road user
resulting from the offsite detour. The eastern loop for the offsite detour for this project would
include continuing on US 17 to NC 87 to US 74. The detour for the average road user would result
in approximately 18 miles additional travel which results in approximately 20 minutes additional
travel time. Up to 6-month duration of construction is expected on this project.
Based on the Guidelines, the criteria above indicate that a delay of 20 minutes for the average road
user over a 6 month period is unacceptable. Brunswick County Emergency Services has also
indicated that an offsite detour is unacceptable. While project costs and environmental impacts will
be higher, maintenance of traffic onsite during construction is mandatory. NCDOT Division 3
concurs in these recommendations.
4
Alternate 2
This alternative maintains existing traffic “on-site” and was initially supported by NCDOT as the
best alternative to be implemented. However, after further study of the existing soils, it was
determined that significant undercut would be required through adjacent wetlands resulting in
permanent impacts not only along the new location alignment but also on the alignment for the
temporary detour. Significant undercut and permanent impacts along a temporary facility was
deemed “not feasible” which led to the study of Alternatives 3 and 4 which locates the roadway on
new location adjacent to the existing bridges. Permanent wetland impacts for this alternative are 1.1
ac.
Alternative 3
This alternative maintains existing traffic “on-site” and replaces both Bridge Nos. 16 and 20 on new
alignment just east of existing roadway. The new alignment in the area of Bridge No. 20 is identical
to Alternative 2. Permanent wetland impacts for this alternative are 0.96 ac.
Alternative 4
This alternative maintains existing traffic “on-site” and replaces both Bridge Nos. 16 and 20 are on
new alignment just west of existing roadway. The alignment for this alternative is approximately
180’ longer than Alternative 3 due to connection to existing alignment on the inside of a horizontal
curve to the south. Permanent wetland impacts for this alternative are 1.11 ac.
Alternatives 3 and Alternative 4 are very similar alignments and have very similar impacts to the
environment. However, Alternative 3 was chosen as the Least Environmentally Damaging
Practicable Alternative (LEDPA) because of the following:
• 0.15 ac. less wetland impacts,
• 180’ shorter project length,
• Less required undercut, and
• Less utility impacts.
6.1 Independent Utility
State Project 17BP.3.R.26 is in compliance with 23 CFR Part 771.111(f) which lists the FHWA
characteristics of the independent utility of a project. The project meets the criteria for independent
utility as discussed below:
The project has logical termini and independent utility and is of sufficient length to
address environmental matters on a broad scope;
The project is usable and a reasonable expenditure of funds, even if no additional
transportation improvements are made in the area; and
The project does not restrict consideration of alternatives for other reasonably foreseeable
transportation improvements.
5
7.0 Resource Status
The project is located in the Lumber River Basin and lies within Hydrologic Unit 03040206
(Subbasin 03-07-57). This is within the Middle Atlantic Coastal Plain ecoregion.
7.1 Wetland Delineations
The wetlands within the study area were delineated based on the 1987 U.S. Army Corps of
Engineers (USACE) Wetland Delineation Manual (Atlantic and Gulf Coastal Plain Supplement) and
a roadway design was prepared to avoid and minimize impacts to wetlands to the maximum extent
possible. Wetland delineations for the study area were performed on September 07, 2011 by
NCDOT staff members Lance Fontaine, John Merritt and Chris Underwood. Chris Manley and
Stoney Mathis further defined the jurisdictional areas in early 2013. The wetland area to the far
north and right side of the project beginning at approximate Station 42+80 RT was added in late
April 2013 by Chris Manley and Stoney Mathis when the scope of the project area was extended.
This delineation was later field verified by Mr. Brad Shaver (USACE, Wilmington District) on April
17, 2013. The study area was revisited by Stoney Mathis (NCDOT), Hal Bain (RK&K), Pete
Stafford (RK&K) and Audrey Burnette (RK&K) on November 04, 2013. Again the delineation
boundaries were extended at the southern end of the project on both the east and west sides of the
proposed road to accommodate possible aerial utility relocations. The delineation was performed by
Brad Shaver (USACE Wilmington District) and Mason Herndon (NCDWR) and Stoney Mathis
(NCDOT) on October 2, 2014.
7.2 Stream Delineations
Data collected for streams were derived from USGS topographic maps, the Brunswick County Soil
Survey (USDA, 1990), and site reconnaissance. The data included stream classifications, which are
presented in the attached documentation. A stream characterization and delineation was conducted
by Hal Bain (RK&K) and Pete Stafford (RK&K) on November 04, 2013. A previous site visit to
confirm the presence of jurisdictional streams within the project study area was conducted by Stoney
Mathis (NCDOT), Brad Shaver (USACE Wilmington District) and Mason Herndon (NCDWR) on
April 17, 2013.
7.3 Characterization of Jurisdictional Sites
7.3.1 Wetlands
There is approximately 2.41 acres of wetlands within the project area. There is one wetland
community found within the project study area. Field investigations conducted on September 07,
2011, on November 04, 2013 and revisited on October 2, 2014 identified one wetland community
(Riverine Swamp Forest) found within the project study area. This community dominates the project
study area and generally begins at the toe of the existing roadway fill section. Information about this
wetland complex can be found in the attachments to this letter report which includes a vicinity map,
USACE wetland data forms and final design plans depicting the extent of the wetlands within the
project study area.
6
7.3.2 Streams
There is approximately 177 linear feet of stream within the project area. Best Usage Classification
for the jurisdictional stream, Honey Island Swamp, is C & Sw (Swamp Waters). Neither High
Quality Waters (HQW), Water Supplies (WS-I: undeveloped watersheds or WS-II: predominately
undeveloped watersheds), nor Outstanding Resource Waters (ORW) occur within 1.0 mile of the
project study area. The two stream segments are not designated as a North Carolina Natural or
Scenic River, or as a National Wild and Scenic River. Honey Island Swamp is not listed on the
Final 2012 Section 303(d) list of impaired waters.
7.4 Impacts to Jurisdictional Resources
Impacts to jurisdictional wetlands for State Project 17BP.3.R.26 are summarized below:
Permanent Impacts: Proposed permanent impacts for the replacement of Bridge Nos. 16 and 20
include fill in wetlands and mechanized clearing in wetlands totaling 0.96 acres of permanent
impacts to riparian wetlands.
Temporary Impacts: There will be 0.33 acres of temporary hand-clearing at the bridges and along
the roadway due to the relocation of the aerial utilities in jurisdictional wetland. There will be less
than 0.01 acres of temporary fill in wetlands due to the construction of the 48” pipe extension at
station 20+12 lt. There is 0.10 acres of the proposed hand clearing that lies within the already cleared
area under the existing aerial utilities.
Utility Impacts: All underground and aerial utilities in conflict with the proposed construction will
be relocated aerially prior to construction.
It is anticipated that no impacts to streams will result from the proposed project construction.
8.0 Protected Species
Plants and animals with federal classification of Endangered (E), Threatened (T), Proposed
Endangered (PE), and Proposed Threatened (PT) are protected under provisions of Section 7 and
Section 9 of the Endangered Species Act of 1973, as amended, or by provisions of the Bald and
Golden Eagle Act (BGPA). The United States Fish and Wildlife Service (USFWS, 2013) lists 15
federally protected species for Brunswick County as of the November 18, 2013 listing (Table 1).
Table 1 Federally Protected Species in Brunswick County
Common Name Scientific Name Federal
Status*
Habitat
Present
Biological Conclusion
American alligator Alligator
mississippiensis T (S/A) Yes N/A
Atlantic sturgeon Acipenser oxyrinchus
oxyrinchus E No No Effect
Bald eagle Haliaeetus BGPA No No Effect
7
Common Name Scientific Name Federal
Status*
Habitat
Present
Biological Conclusion
leucocephalus
Green sea turtle Chelonia mydas T No No Effect
Kemp’s ridley sea
turtle Lepidochelys kempii E No No Effect
Leatherback sea turtle Dermochelys coriacea E No No Effect
Loggerhead sea turtle Caretta caretta T No No Effect
Piping plover Charadrius melodus T No No Effect
Red-cockaded
woodpecker Picoides borealis E No No Effect
Shortnose sturgeon Acipenser brevirostrum E No No Effect
West Indian manatee Trichechus manatus E No No Effect
Wood stork Mycteria americana E No No Effect
Cooley’s meadowrue Thalictrum cooleyi E No No Effect
Rough-leaved
loosestrife
Lysimachia
asperulaefolia E No No Effect
Seabeach amaranth Amaranthus pumilus T No No Effect
* BGPA = Bald and Golden Eagle Protection Act, E = Endangered, T = Threatened, T(S/A) =
Threatened (Similarity of Appearance)
The NC Natural Heritage Program (NCNHP) database (updated November 2013) was also reviewed
for recorded occurrences of protected species. No occurrences of federally protected species were
recorded within one mile for the project study area. Comments received from the USFWS dated
September 15, 2011 are included in the attachments to this package.
8.1 Bald and Golden Eagle Protection Act (BGPA)
In the July 9, 2007 Federal Register (72:37346-37372), the bald eagle was declared recovered, and
removed (de-listed) from the Federal List of Threatened and Endangered Wildlife. This delisting
took effect August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act)
(16 U.S.C. 668-668d) became the primary law protecting bald eagles. No nesting and/or foraging
habitat for the bald eagle is present within the project study area or within 660 feet of the project
study area.
8.2 Moratorium
There is no in-water work moratorium recommended for State Project 17BP.3.R.26. The
communication with the North Carolina Wildlife Resources Commission (Travis Wilson) is included
as an attachment to this package.
8
9.0 Cultural Resources
The potential effect of the proposed project on cultural resources in the project area was evaluated in
accordance with Section 106 of the National Historic Preservation Act of 1966, as amended.
NCDOT Historic Architecture staff communications, dated November 20, 2013 determined that
replacement of the existing structures (Bridge Nos. 16 and 20) will Not Adversely Impact any
historic buildings or landscapes. The referenced communications are included as attachments to this
package.
An archaeological survey of the project’s Area of Potential Effect (APE) was conducted by NCDOT
archaeologists to determine the project’s impact on significant archaeological or historical resources.
NCDOT Archaeological staff communications, dated November 06, 2013 indicate that no
archaeological sites were found within the project’s APE. Therefore, no additional archaeological
investigation is recommended for this project. The referenced communications are included as
attachments to this package.
10.0 FEMA Compliance
Honey Island Swamp is a FEMA regulated stream. Bridge Nos. 16 and 20 can be found on FIRM
maps 37201184 and 37201186, dated June 2, 2006. The replacement of these bridges produced a
0.01 foot increase in the water surface elevation between the Revised Model and the Corrected
Effective Model just downstream of the bridge. No existing structures are impacted by this increase.
This increase is categorized as a Type 2D MOA, which is a category within the Memorandum of
Agreement (MOA) between NCDOT and Floodplain Mapping. This increase has already been
approved by the appropriate state and local officials as well as the Federal Emergency Management
Agency (FEMA) to assure compliance with federal, state, and local floodway regulations.
11.0 Mitigation Options
The NCDOT has investigated potential on-site wetland mitigation opportunities. However, on-site
mitigation is not feasible and mitigation will be provided by the North Carolina Department of
Environment and Natural Resources Ecosystem Enhancement Program (NCEEP). In accordance
with the Memorandum of Agreement dated July 22, 2003 between NCDOT and U.S. Army Corps of
Engineers, the NCEEP may provide off-site mitigation to satisfy the Federal Clean Water Act
compensatory mitigation requirements for this project. Permanent impacts to jurisdictional wetlands
totaling 0.96 acres of Riverine Swamp Forest (NCWAM wetland type) will occur as a result of
project construction adjacent to the existing roadway/bridge location.
9
11.1 Avoidance and Minimization
All jurisdictional features were delineated, field verified and surveyed within the corridor for the NC
211 bridge replacements. Using these surveyed features, the roadway design was adjusted to avoid
and/or minimize impacts to jurisdictional areas. NCDOT employs many strategies to avoid and
minimize impacts to jurisdictional areas in all of its designs. Many of these strategies have been
incorporated into BMP documents that have been reviewed and approved by the resource agencies
and which will be followed throughout construction. Individual avoidance and minimization items
are as follows:
No staging of construction equipment or storage of construction supplies will be allowed in
wetlands or near surface waters.
The project was designed to avoid or minimize disturbance to aquatic life movements by use of
single span bridges. The spans were maximized while maintaining the same vertical clearances
as the existing bridges. There are no deck drains. The bridge runoff is collected at the low point
of each bridge and discharges outside of the jurisdictional waters. A rip rap pad was used to
diffuse the velocities before entering the wetlands at the pipe outlet for the drainage structure at
Bridge No. 20. A preformed scour hole was used to diffuse the velocities before entering the
wetlands at the pipe outlet for the drainage structure at Bridge No. 16. There is a swale from sta.
36+10 to sta. 37+50 LT that dissipates the roadway runoff before it enters the wetland area.
NCDOT will minimize long-term water quality impacts through the use of the most recent Best
Management Practices for Protection of Surface Waters, as identified in the Federal Aid
Highway Program (FHPM) and North Carolina Administrative Code, Chapter 4.
NCDOT and its contractors will not excavate, fill, or perform land clearing activities within
Waters of the U.S. or any areas under the jurisdiction of the USACE, except as authorized by the
USACE. To ensure that all borrow and waste activities occur on high ground, except as
authorized by permit, the NCDOT shall require its contractors to identify all areas to be used to
borrow material, or to dispose of dredged, fill or waste material. Documentation of the location
and characteristics of all borrow and disposal sites associated with the project will be available to
the USACE on request.
The use of reinforced 2:1 fill slopes in jurisdictional areas which will be stabilized with
geotextile fabric and vegetation as outlined in the Geotechnical Report dated 12/2013. This
report is included as part of the project Contract Documents.
NCDOT will implement Best Management Practices for Bridge Demolition and Removal. The
asphalt-wearing surface of the two bridges and bridge rails will be removed without dropping
them into the water prior to bridge demolition.
Turbidity curtains will be installed around existing interior bents prior to extraction of the piles.
The timber piles encased in concrete will be extracted with a vibratory hammer and crane, to
minimize disturbance to the natural stream.
Silt fence and coir fiber wattle barrier will be used during construction to prevent sediment from
entering the wetlands and jurisdictional waters.
The use of hand clearing rather than mechanized clearing where possible.
High visibility fencing will be utilized to identify environmentally sensitive areas that are not to
be impacted.
10
11.2 Compensation
NCEEP is available for mitigation by compensation,. See Section 11.0 Mitigation Options for more
information.
12.0 Indirect and Cumulative Effects
Information associated with the subject project study area revealed that no significant impacts to
natural, ecological, cultural, scenic, or community resources are expected due to the construction of
the subject project. Any direct impacts to resources have been avoided (where possible), minimized,
and mitigated. The bridges are being replaced immediately upstream of the existing structures and
these replacements are not creating any new development access to adjacent land or offering any
significant travel time savings. Therefore, no indirect or cumulative effects are expected due to the
construction of State Project 17BP.3.R.26.
13.0 Regulatory Approvals
Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the
above-described activities.
Section 401: We are also requesting a Section 401 Water Quality Certification from the NCDWR.
In compliance with Section 143-215.3D(e) of the NCAC, we will provide $570.00 to act as payment
for processing the Section 401 permit application previously noted in this application (see Subject
line). We are providing electronic copies of this application package to Mason Herndon and Sonia
Carrillo (NCDWR), for their approval.
CAMA Consistency Determination: A Federal Consistency Determination letter will be submitted
along with project information to Steve Sollod (NCDCM reviewer).
If you have any questions or need additional information, please contact me at 919-878-9860 or
aburnette@rkk.com.
W15
60.7962.06
65.59
58.16 63.50 61.52 59.38
SHEET 1 OF 17
PERMIT DRAWINGWETLAND AND SURFACE WATER IMPACTS PERMIT
PAVEMENT REMOVAL
NSRS 2007
NAD 83/
DHV
D
T
V
=
=
=
=
=
=MPH
ADT
ADT
% *
FUNC CLASS =
PROFILE (HORIZONTAL)
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATAGRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
li
c
s
\
P
E
R
M
IT
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l\
D
r
a
w
i
n
g
s
\
0
9
0
0
16
&
2
0
_
h
y
d
_
P
E
R
_
T
S
H
.
d
g
n
d
e
f
a
u
lt
C
O
N
T
R
A
C
T
:
A
R
T
MEN
N
A
S
O
H
D
E
P
T
O
F TRA SPORT
T
IO
N
T
A TEOFN RT
CAR
O
LI
N
A
TO BOLTON
211
211
BRUNSWICK COUNTY
RESURFACING
GRADING, DRAINAGE, PAVING, STRUCTURES AND
VICINITY MAP
-L- STA. 19+70.00
BEGIN PROJECT
Island
Honey
Cl
e
ar
Br
a
nch
TO SUPPLY
211
100
100
PROJECT LENGTH
LETTING DATE:
DIVISION OF HIGHWAYS
FOR
CONTRACTOR :
SIGNATURE:
SIGNATURE:
P.E.
P.E.
RIGHT OF WAY DATE:
DESIGN - BUILD TEAM
1-888-521-4455 OR 919-878-9560
NC LICENSE NO. F-0112
RALEIGH, NORTH CAROLINA 27609
900 RIDGEFIELD DRIVE, SUITE 350
RUMMEL, KLEPPER & KAHL, LLP
Corporation
S. T. Wooten
WILSON, NORTH CAROLINA 27894
3801 BLACK CREEK ROAD
P.O. BOX 2408
S. T. WOOTEN CORPORATION
4,400
55
* TTST =3%DUAL 4%
COLLECTOR
0.474 mi
0.031 mi
0.443 mi
17BP.3.R.26
B
R
I
D
G
E
S
0
9
0
0
16
&
0
9
0
0
2
0
C
2
0
2
9
4
2
Airport
Bear Pin
211
B runsw ick C ounty
C olum bus C ounty
Driving Creek
Swamp
Green
7
MARCH 29, 2012
50 0 50
50 0 50
2010010
MARCH 29, 2012
4
5
GREEN SWAMP ROAD
-L- STA. 25+85.00
BEGIN BRIDGE
-L- STA. 26+70.02
END BRIDGE
-L- STA. 33+00.00
BEGIN BRIDGE
-L- STA. 33+80.00
END BRIDGE
S
R
1
4
3
0
E
x
u
m
R
d
.
SR 1431 Egypt Rd.
N/A
N/A
17BP.3.R.26 PE, ROW, UTIL.
& CONST.
BRIDGE NO. 090016
BRIDGE NO. 090020
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
Michael T. Merritt, P.E.
B. Keith Skinner, P.E.
NCDOT CONTACT:
Virginia Mabry
PRIORITY PROJECTS OFFICE MANAGER
2012 STANDARD SPECIFICATIONS
H
O
N
EY
IS
LA
N
D
S
W
A
M
P
H
O
N
EY
IS
LA
N
D
S
W
A
M
P
OFFSET ON A REGIONAL ROUTE.
* DESIGN EXCEPTION NEEDED FOR 4’ BRIDGE
-L- STA. 44+75.00
END PROJECT
TOTAL LENGTH TIP PROJECT 090016&090020.............
LENGTH STRUCTURE TIP PROJECT 090016&090020.....
LENGTH ROADWAY TIP PROJECT 090016&090020......
Bridge Nos. 090016 & 090020
SWAMP ON NC 211
BRIDGE NOS. 090016 & 090020 OVER HONEY ISLAND
R
H
E
ON
P
RT NFEO
NAO
E
SEAL
INNG
L
RE
SSI
AC O IL
R
A
21122
MIC
HAEL T. MERRITT
R
H
E
ON
P
RT NFEO
NAO
E
SEAL
INNG
L
RE
SSI
AC O IL
R
A
036821
E
L
EN
I .RIGGS
M
ENGINEER
HYDRAULICS
ENGINEER
DESIGN
ROADWAY
W15
W15
BS1D1D5
D3BS3
D6
BS2
T
24’ BST
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
WOODS
WOODS
WOODS
WOODS
15
0
.
0
0
’
24’ BST
NC 211 - GREEN SWAMP RDTO SUPPLY
T
HH
4
8
"
C
M
P
16-1
16-2
T
24’ BST
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
BS1D1D5
D3BS3
BS4
D4 D6
D2
BS2
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
#09-0020
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
WOODS
1
2
15
0
.
0
0
’
24’ BST
NC 211 - GREEN SWAMP RD
TO SUPPLY
T
HH
.0
6
F-
F
3
3’
TYP.26.00’
.0
5
.06
2
4
’
8:1
8:1
8:1
.
0
5
.
0
4
.
0
4
.
0
2
.
0
3
.
0
5
.
0
6
F-
F
3
3’
P
.
S
.
8
’
P
.
S
.
4
’
TYP.
25.75’
TYP.26.00’
-L- POT STA. 25+85.00
BEGIN BRIDGE
-L- POT STA. 26+70.02
END BRIDGE
2
4
’
E
X
IS
T
AND ABUTMENTS
REMOVE EXISTING BRIDGE
P.S.8’
24’
P.S.8’
.0
5
.05
.04
.03
.02
.01
TYP.26.00’
.
0
6
.
0
2
.
0
6
.
0
2
+89.95
20’
4
SHEET 2 OF 17
PERMIT DRAWING
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
090016 & 090020
EXIST. POWER POLE
PROP. POWER POLE
1"=50’
SCALE
MECHANIZED CLEARING
WETLANDS
FILL IN
HAND CLEARING
HC HC
CLEARING
DENOTES HAND
FILL IN WETLANDS
HAND CLEARING
TEMPORARY SHORING
FROM AERIAL UTILITIES
EXISTING IMPACTS
FILL IN WETLANDS
MECHANIZED CLEARING
HAND CLEARING
IN WETLANDS
TEMPORARY FILL
IN WETLANDS
TEMPORARY FILL
F F FILL IN WETLAND
DENOTES TEMPORARY T T
T
T
TYPE III
TYPE III
TYPE III
0401
2GI
TB
15" RCP-IV
15" RCP-IV F
F
60’
+84.30
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
8
/
1
7
/
9
9
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
p
s
h
0
4
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
SHEET NO.PROJECT REFERENCE NO.
60
70
50
40
NAD 83 (CORS96)
80
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
30
60
70
50
80
STA. 31+00 SEE SHEET 5
M
ATCHLINE -L-
S
E
E
S
H
E
E
T
5
-
L-
S
TA
.
3
1+
0
0
M
A
TC
H
LIN
E
ENGINEER
ROADWAY DESIGN HYDRAULICS
ENGINEER
R/W SHEET NO.
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
EXCAVATION
UNDERCUT
GRAU-350
-L- STA. 19+70.00
BEGIN PROJECT
TYPE III
TYPE III
TYPE III
TYPE III -L-
-L-
GRAU-350
2
0
2
5
30
-L- PCC Sta. 26+84.30
-L- PC Sta. 21+38.42
-L- PT Sta. 30+33.28
+30.00
0401
0402
RETA
IN
W/ 5 SY GEO FAB
1 TON CL B RIPRAP
0403
HW
62.28
-L- 34+02
NOTE: COLLAR AND EXTEND EXISTING 48" CSP AT -L- STA. 20+13.5 LT, AS NEEDED (HEADWALL REQUIRED)
EXIST. 48" CSP 5LF
COLLAR AND EXTEND
2GI
TB
2GI
TB
15" RCP-IV
15" RCP-IV
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
PI = 21+50.00
EL = 61.10’
(+)0.3606%(+)1.2088%
VC = 170’
K = 200
PI = 25+55.00
EL = 66.00’
VC = 340’
K = 116 PI = 29+25.00
EL = 59.67’
(-)1.7105%(+)1.3603%
VC = 360’
K = 117
EL = 60.46’
-L- STA 19+70.00
BEGIN GRADE
V = 70mph
V = 55mph
V = 55mph
HP Sta.= 25+25.78
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
STR #090020 Sta. 26+27.50 -L-
NWS SURVEY = 5/7/12
52.8’
NWS
NORMAL WATER SURFACE ELEV = 52.8 FT
57.0’
100-YR.
-L- STA. 25+85.00
BEGIN BRIDGE #090020 -L- STA. 26+70.02
END BRIDGE #090020
PROP. EL.=84.18’EXIST. EL.=84.18’ - RT.
T HWF
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
NEW HAND CLEARING NOT REQUIRED.
EXISTING AERIAL UTILITY CORRIDOR.
D1D2
D6 D5
D3
BS1BS2
#09-0016
STRUCTURE
BRIDGE
NCDOT GPS MON. 16-2
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTON
NC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
WOODS
WOODS
WOODS
EXISTING R/W
TT
T
C
R/W MON EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R
MON.
CON
N
4
4
4
0
’0
9
"
E
3
0
0
.
7
9
’
N
4
4
4
0
’0
9
"
E
3
0
1.
4
4
’
STATE OF NORTH CAROLINA
FIRE TOWER
D1D2
D6
D4
D5
D3
BS1BS2
BS3BS4
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTONNC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
#09-0016
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
NCDOT GPS MON. 16-3NCDOT GPS MON. 16-2
EXISTING R/W
TT
T
C
EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R.
0
1
.
0
0
.
0
1
.
0
2
.0
0
.
0
1
.0
2
.
0
2
.
0
3
.
0
4
.
0
4
.
0
3
.
0
2
.
0
1
.
0
0
.
0
1
.
0
2
.
0
3
.
0
4
TYP.26.25’
TYP.
26.25’
.0
4
.0
3
.
0
2
.0
1
.
0
0
.
0
1
.
0
2
+
2
4
.
6
9
TYP.
26.25’
+
0
8
.
2
3
5090016&20
SHEET 3 OF 17
PERMIT DRAWING
EXIST. POWER POLE-RT.
EXIST. POWER POLE-LT.
EXIST. POWER POLE - LT
1"=50’
SCALE
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
HC HC
CLEARING
DENOTES HAND
MECHANIZED CLEARING
HAND CLEARING
FILL IN WETLANDS
WETLANDS
FILL IN
MECHANIZED CLEARING
TEMPORARY SHORING
FROM AERIAL UTILITIES
EXISTING IMPACTS
PROP. POWER POLE - LT.
TEMPORARY PIPE
DITCH
TEMPORARY
F F FILL IN WETLAND
DENOTES TEMPORARY T T
-L-
TYPE-III
TYPE-III
TYPE-III
TYPE-III
TB 2GI
R
C
P
-
IV
1
5
"
15" RCPF
F
8
/
1
7
/
9
9 SHEET NO.PROJECT REFERENCE NO.
N
A
D
83 (
C
O
RS96)
S
TA
.
3
1+
0
0
S
E
E
S
H
E
E
T
4
M
A
TC
H
LIN
E
-
L-
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
p
s
h
0
5
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
60
70
50
40
80
32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
30
60
70
50
80
RR SPIKE SET IN 15" OAK
-L- STA. 34+03.82 75.58’ LT.
BM#2 EL = 56.24’
SKETCH SHOWING ROADWAY IN RELATION TO PROPOSED STRUCTURE 090016
31+00
S
EE
S
H
E
E
T
4
-
L-
S
TA
.
3
1+
0
0
M
A
TC
H
LIN
E
ENGINEER
ROADWAY DESIGN
R/W SHEET NO.
HYDRAULICS
ENGINEER
42+00 43+00
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
PAVEMENT REMOVAL
SUB-BASE IS TO BE LEFT IN PLACE.
ONLY PAVEMENT IS TO BE REMOVED
* NOTE: STA. 37+25.00 TO 38+00.00 LT.
EXCAVATION
UNDERCUT
GRAU-350
GRAU-350
-L- STA. 44+75.00
END PROJECT
-L-
TYPE-III
TYPE-III
TYPE-III
TYPE-III
3
5
4
0 4
5
P
O
T
S
t
a
. 4
6
+
18
.2
9
-L- PC Sta. 36+47.19
-L- PRC Sta. 39+99.60
-L- PT Sta. 43+43.23
SEE DETAIL A
HOLE
PREFORMED SCOUR
TB 2GI
-L- 32+74.09
HP
-L- 37+56.82
LP -L- 41+66.81
HP
TB 2GI
W/ 5 SY GEO FAB
1 TON CL B RIP RAP
W/ 5 SY FIL FAB
1 TON CL B RIP RAP
Flatter4:1 or
D
4:
1
( Not to Scale)
DETAIL B
Min. D=0.5 Ft.
Ground
Natural
Slope
Ditch
Front
PREFORMED SCOUR HOLE DETAIL A
-L- STA. 34+02 RT
W=4.0 Ft.
D=1.0 Ft.
B=3.75 Ft.
not shown for clarity)
(Rip Rap in basin
GROUND
NATURAL
Outlet
Pipe or Ditch
Scour Hole (PSH)
Square Preformed
WITH GEOTEXTILE FABRIC
LINER: CLASS B RIPRAP
D
PSRM
MIN. 1’ TUCK
WITH NATURAL GROUND
INSTALL LEVEL AND FLUSH
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
Seed with native
grasses at installation.
*NOT TO SCALE
B
FI
LL
S
LOP
E
2:12:
1
PIPE (d = 15" OR 18")
INFLOW
3/08
SPECIAL CUT DITCH
Q5=0.4cfs, V=0.3fps, S=0.30%
FROM -L- STA. 38+50 TO 39+50 LT;
Q5=1.1cfs, V=0.5fps, S=0.81%
FROM -L- STA. 36+10 TO 37+50 LT;
SEE DETAIL B
SPECIAL CUT DITCH
SEE DETAIL B
SPECIAL CUT DITCH
RC
P
-
IV
15
"
15" RCP
SEE DETAIL C
SP. LAT. V DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
Q5=1.4cfs, V=1.1fps, S=0.24%
FROM -L- STA. 40+50 TO STA. 45+00 LT
Min. D= 1.0Ft.
DETAIL C
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
F
F
F
F
F
F
F
F
F
C
F
C
F
C C
C
F
C
C C
F
F
F
F
F F
F
PI = 32+80.00
EL = 64.50’
(+)1.3603%
(-)1.4613%
VC = 330’
K = 117
EL = 60.14’
-L- STA 44+75.00
END GRADE
V = 55mph
V = 55mph
HP Sta.= 32+74.09
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
NORMAL WATER SURFACE ELEV = 52.8 FT
NWS SURVEY = 5/7/12
STR #090016 Sta. 33+40 -L-
-L- STA. 33+00.00
BEGIN BRIDGE #090016
-L- STA. 33+80.00
END BRIDGE #090016
PI = 37+15.00
EL = 58.14’
VC = 260’
K = 118
(+)0.7500%
V = 55mph
PI = 41+25.00
EL = 61.22’
(+)0.7500%(-)0.3077%
VC = 200’
K = 189
57.0’
100-YR.
PROP. EL.=84.18’
52.8’
NWS
EXIST. EL.=79.18’ - LT.EXIST. EL.=79.18’-LT.
W/ 5 SY FIL FAB
1 TON CL B RIPRAP
504T
GRADE TO DRAIN GRADE TO DRAIN
12
"
RC
P
-
IV
GRADE TO DRAIN
GRADE TO DRAIN
H
O
N
E
Y
IS
LA
N
D
S
WA
M
P
H
O
N
E
Y
IS
LA
N
D
S
WA
M
P
H
ONE
Y
IS
LAN
D
S
WAMP
H
ONE
Y
IS
LAN
D
S
WAMP
INV=57.0
INV=58.3
W15
W15
BS1D1D5
D3BS3
D6
BS2
T
24’ BST
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
150.00’
#09-0020
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
WOODS
15
0
.
0
0
’
24’ BST
NC 211 - GREEN SWAMP RDTO SUPPLY
T
HH
INV.=51.29
INV.=51.55
4
8
"
C
M
P
5
6
5
T
24’ BST
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
BS1D1D5
D3BS3
BS4
D4 D6
D2
BS2
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
#09-0020
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
WOODS
1
2
BM#1
15
0
.
0
0
’
24’ BST
NC 211 - GREEN SWAMP RD
TO SUPPLY
T
HH
INV.=51.55
55 555555
5
5
5
5
5
5
510152
0
2
5
3
0
3
5
4
0
4
5
5
0
5
0
5
0
55 55
55
5
5
55
55
55
55
5555
55
5
5
55
5
5
55
5
5
55
5
5
5
5
555555
5
5
5
5
5
5 55
55
55
5
5
55
5
5
5
5
5
5
55
55
5
5
55
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
60
60
60
60
60
60
60
60
60
60
60
6
0
60
60
60
60
5
0
5
0
5
5
.06
.
0
5
.
0
4
.
0
4
.
0
2
.
0
3
.
0
5
.
0
6
TYP.
25.75’
TYP.26.00’
.0
5
.05
.04
.03
.02
.01
TYP.26.00’
.
0
6
.
0
2
.
0
6
.
0
2
+89.95
4
SHEET 4 OF 17
PERMIT DRAWING
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
090016 & 090020
PROP. POWER POLE
1"=50’
SCALE
MECHANIZED CLEARING
WETLANDS
FILL IN
HAND CLEARING
HC HC
CLEARING
DENOTES HAND
FILL IN WETLANDS
FILL IN WETLANDS
TEMPORARY SHORING
EXIST. POWER POLE-RT.
FROM AERIAL UTILITIES
EXISTING IMPACTS
MECHANIZED CLEARING
IN WETLANDS
TEMPORARY FILL
HAND CLEARING
IN WETLANDS
TEMPORARY FILL
HAND CLEARING F F FILL IN WETLAND
DENOTES TEMPORARY T T
T
T
TYPE III
TYPE III
TYPE III 15" RCP-IV F
F
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
8
/
1
7
/
9
9
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
p
s
h
0
4
_
C
O
N
.
d
g
n
d
e
f
a
u
l
t
SHEET NO.PROJECT REFERENCE NO.
60
70
50
40
NAD 83 (CORS96)
80
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
30
60
70
50
80
STA. 31+00 SEE SHEET 5
M
ATCHLINE -L-
S
E
E
S
H
E
E
T
5
-
L-
S
TA
.
3
1+
0
0
M
A
TC
H
LIN
E
ENGINEER
ROADWAY DESIGN HYDRAULICS
ENGINEER
R/W SHEET NO.
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
EXCAVATION
UNDERCUT
GRAU-350
-L- STA. 19+70.00
BEGIN PROJECT
TYPE III
TYPE III
TYPE III
TYPE III -L-
-L-
GRAU-350
2
0
2
5
30
-L- PCC Sta. 26+84.30
-L- PC Sta. 21+38.42
-L- PT Sta. 30+33.28
RETA
IN
W/ 5 SY GEO FAB
1 TON CL B RIPRAP
HW
EXIST. 48" CSP 5LF
COLLAR AND EXTEND
2GI
TB
2GI
TB
15" RCP-IV
15" RCP-IV
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
PI = 21+50.00
EL = 61.10’
(+)0.3606%(+)1.2088%
VC = 170’
K = 200
PI = 25+55.00
EL = 66.00’
VC = 340’
K = 116 PI = 29+25.00
EL = 59.67’
(-)1.7105%(+)1.3603%
VC = 360’
K = 117
EL = 60.46’
-L- STA 19+70.00
BEGIN GRADE
V = 70mph
V = 55mph
V = 55mph
HP Sta.= 25+25.78
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
STR #090020 Sta. 26+27.50 -L-
NWS SURVEY = 5/7/12
52.8’
NWS
NORMAL WATER SURFACE ELEV = 52.8 FT
57.0’
100-YR.
-L- STA. 25+85.00
BEGIN BRIDGE #090020 -L- STA. 26+70.02
END BRIDGE #090020
PROP. EL.=84.18’EXIST. EL.=84.18’ - RT.
T HWF
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
NEW HAND CLEARING NOT REQUIRED.
EXISTING AERIAL UTILITY CORRIDOR.
D1D2
D6 D5
D3
BS1BS2
#09-0016
STRUCTURE
BRIDGE
NCDOT GPS MON. 16-2
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTON
NC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
WOODS
WOODS
WOODS
EXISTING R/W
TT
T
C
R/W MON EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R
MON.
CON
N
4
4
4
0
’0
9
"
E
3
0
0
.
7
9
’
N
4
4
4
0
’0
9
"
E
3
0
1.
4
4
’
STATE OF NORTH CAROLINA
FIRE TOWER
NEW HAND CLEARING NOT REQUIRED.
EXISTING AERIAL UTILITY CORRIDOR.
D1D2
D6
D4
D5
D3
BS1BS2
BS3BS4
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTONNC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
#09-0016
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
NCDOT GPS MON. 16-3NCDOT GPS MON. 16-2
EXISTING R/W
TT
T
C
EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R
5
0
55
55
55
5
5
55 5
5
50
5 0
5
5
55
55
55
55
55
5
5
5
5
55
55
55
55 55
55
55
55
5
5
55 55
5
5 55
55
5
5
5
5
555
555
5
5
55
5555
55
55 55555555
55
60 60 60
606060606060
60
60
60
60
.
0
1
.
0
0
.
0
1
.
0
2
.0
0
.
0
1
.0
2
.
0
2
.
0
3
.
0
4
.
0
4
.
0
3
.
0
2
.
0
1
.
0
0
.
0
1
.
0
2
.
0
3
.
0
4
TYP.26.25’
TYP.
26.25’
.0
4
.0
3
.
0
2
.0
1
.
0
0
.
0
1
.
0
2
+
2
4
.
6
9
TYP.
26.25’
+
0
8
.
2
3
5090016&20
SHEET 5 OF 17
PERMIT DRAWING
EXIST. POWER POLE-RT.
EXIST. POWER POLE-LT.
EXIST. POWER POLE - LT
1"=50’
SCALE
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
HC HC
CLEARING
DENOTES HAND
HERBACEOUS WETLANDSDENOTES RESTOREDHERBACEOUS WETLANDSWETLAND CONVERTED TO DENOTES FORESTED
MECHANIZED CLEARING
HAND CLEARING
FILL IN WETLANDS
PROP. PERM. POWER POLE - LT
MECHANIZED CLEARING
WETLANDS
FILL IN
TEMPORARY SHORING
FROM AERIAL UTILITIES
EXISTING IMPACTS
DITCH
TEMPORARY
TEMPORARY PIPE
F F FILL IN WETLAND
DENOTES TEMPORARY T T
-L-
TYPE-III
TYPE-III
TYPE-III
TYPE-III
TB 2GI
R
C
P
-
IV
1
5
"
15" RCPF
F
8
/
1
7
/
9
9 SHEET NO.PROJECT REFERENCE NO.
N
A
D
83 (
C
O
RS96)
S
TA
.
3
1+
0
0
S
E
E
S
H
E
E
T
4
M
A
TC
H
LIN
E
-
L-
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
p
s
h
0
5
_
C
O
N
.
d
g
n
d
e
f
a
u
l
t
60
70
50
40
80
32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
30
60
70
50
80
RR SPIKE SET IN 15" OAK
-L- STA. 34+03.82 75.58’ LT.
BM#2 EL = 56.24’
SKETCH SHOWING ROADWAY IN RELATION TO PROPOSED STRUCTURE 090016
31+00
S
EE
S
H
E
E
T
4
-
L-
S
TA
.
3
1+
0
0
M
A
TC
H
LIN
E
ENGINEER
ROADWAY DESIGN
R/W SHEET NO.
HYDRAULICS
ENGINEER
42+00 43+00
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
PAVEMENT REMOVAL
SUB-BASE IS TO BE LEFT IN PLACE.
ONLY PAVEMENT IS TO BE REMOVED
* NOTE: STA. 37+25.00 TO 38+00.00 LT.
EXCAVATION
UNDERCUT
GRAU-350
GRAU-350
-L- STA. 44+75.00
END PROJECT
-L-
TYPE-III
TYPE-III
TYPE-III
TYPE-III
3
5
4
0 4
5
P
O
T
S
t
a
. 4
6
+
18
.2
9
-L- PC Sta. 36+47.19
-L- PRC Sta. 39+99.60
-L- PT Sta. 43+43.23
SEE DETAIL A
HOLE
PREFORMED SCOUR
TB 2GI
-L- 32+74.09
HP
-L- 37+56.82
LP -L- 41+66.81
HP
TB 2GI
W/ 5 SY GEO FAB
1 TON CL B RIP RAP
W/ 5 SY FIL FAB
1 TON CL B RIP RAP
Flatter4:1 or
D
4:
1
( Not to Scale)
DETAIL B
Min. D=0.5 Ft.
Ground
Natural
Slope
Ditch
Front
PREFORMED SCOUR HOLE DETAIL A
-L- STA. 34+02 RT
W=4.0 Ft.
D=1.0 Ft.
B=3.75 Ft.
not shown for clarity)
(Rip Rap in basin
GROUND
NATURAL
Outlet
Pipe or Ditch
Scour Hole (PSH)
Square Preformed
WITH GEOTEXTILE FABRIC
LINER: CLASS B RIPRAP
D
PSRM
MIN. 1’ TUCK
WITH NATURAL GROUND
INSTALL LEVEL AND FLUSH
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
Seed with native
grasses at installation.
*NOT TO SCALE
B
FI
LL
S
LOP
E
2:12:
1
PIPE (d = 15" OR 18")
INFLOW
3/08
SPECIAL CUT DITCH
Q5=0.4cfs, V=0.3fps, S=0.30%
FROM -L- STA. 38+50 TO 39+50 LT;
Q5=1.1cfs, V=0.5fps, S=0.81%
FROM -L- STA. 36+10 TO 37+50 LT;
SEE DETAIL B
SPECIAL CUT DITCH
SEE DETAIL B
SPECIAL CUT DITCH
RC
P
-
IV
15
"
15" RCP
SEE DETAIL C
SP. LAT. V DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
Q5=1.4cfs, V=1.1fps, S=0.24%
FROM -L- STA. 40+50 TO STA. 45+00 LT
Min. D= 1.0Ft.
DETAIL C
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
F
F
F
F
F
F
F
F
F
C
F
C
F
C C
C
F
C
C C
F
F
F
F
F F
F
PI = 32+80.00
EL = 64.50’
(+)1.3603%
(-)1.4613%
VC = 330’
K = 117
EL = 60.14’
-L- STA 44+75.00
END GRADE
V = 55mph
V = 55mph
HP Sta.= 32+74.09
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
NORMAL WATER SURFACE ELEV = 52.8 FT
NWS SURVEY = 5/7/12
STR #090016 Sta. 33+40 -L-
-L- STA. 33+00.00
BEGIN BRIDGE #090016
-L- STA. 33+80.00
END BRIDGE #090016
PI = 37+15.00
EL = 58.14’
VC = 260’
K = 118
(+)0.7500%
V = 55mph
PI = 41+25.00
EL = 61.22’
(+)0.7500%(-)0.3077%
VC = 200’
K = 189
57.0’
100-YR.
PROP. EL.=84.18’
52.8’
NWS
EXIST. EL.=79.18’ - LT.EXIST. EL.=79.18’-LT.
W/ 5 SY FIL FAB
1 TON CL B RIPRAP
504T
GRADE TO DRAIN GRADE TO DRAIN
OR PLUG AND FILL WITH FLOWABLE FILL
REMOVE TEMPORARY PIPE @ STA. 36+80
UPON SHIFTING OF TRAFFIC TO NEW ALIGNMENT,
12
"
RC
P
-
IV
GRADE TO DRAIN
GRADE TO DRAIN
H
O
N
E
Y
IS
LA
N
D
S
WA
M
P
H
O
N
E
Y
IS
LA
N
D
S
WA
M
P
H
ONE
Y
IS
LAN
D
S
WAMP
H
ONE
Y
IS
LAN
D
S
WAMP
INV=57.0
INV=58.3
SHEET 6 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
1
0
/
3
1
/
2
0
1
4
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
WE
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
40 40
19+50.00
45 45
50 50
55 55
60 60
65 65
40 40
20+00.00
45 45
50 50
55 55
60 60
65 65
40 40
20+50.00
45 45
50 50
55 55
60 60
65 65
40 40
21+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
21+50.00
X-1090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
STA. 19+70.00
BEGIN PROJECT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
60.41
WETLANDS
WETLANDS
60.32
S.S. 60.14
0.060 0.020
2:1
S.S. 56.43
EXIST. ROW
WETLANDS EXIST. ROW
WETLANDS
60.27
S.S. 57.06
0.054 0.020
3:1
S.S. 57.46
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
2:
1
60.27
S.S. 56.17
0.040 0.025
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
2:
13:1
S.S. 58.65
1 :1
60.22
S.S. 54.63
0.044 0.044
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
2:
1
3:1
S.S. 58.95
1 :1
PROP. ROW
SHEET 7 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
70 70
40 40
22+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
22+50.00
50 50
55 55
60 60
65 65
70 70
45 4523+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
23+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
24+00.00
X-2090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
59.87
S.S. 54.23
0.060 0.060
EXIST. ROW WETLANDS EXIST. ROW
WETLANDS3:1
S.S. 59.61
2:
1
1 :1
PROP. ROW
58.90
S.S. 53.90
0.060 0.060
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
S.S. 60.34
3:1 2:
1
1 :1
PROP. ROW
57.32
S.S. 53.50
0.060 0.060
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
S.S. 60.52
3:1 2:
1
1 :1
PROP. ROW
55.90
EXIST. ROW
WETLANDS 3:1 0.060 0.060
EXIST. ROW
WETLANDS
S.S. 60.60
2:
1
1 :1
PROP. ROW
55.45
0.060 0.060
3:1
S.S. 60.53
EXIST. ROW
WETLANDS WETLANDS EXIST. ROW
2:
1
1 :1
PROP. ROW
SHEET 8 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
70 70
40 40
24+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
25+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
25+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
26+00.00
55 55
60 60
65 65
70 70
50 5026+50.00
X-3090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
STA. 25+85.00
BEGIN BRIDGE 090020
STA. 26+70.02
END BRIDGE 090020
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
55.61
0.060 0.060
3:1
S.S. 60.64
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
1 :1
PROP. ROW2:
1
55.88
0.060 0.060
3:1
EXIST. ROW
WETLANDS
EXIST. ROW
WETLANDS
S.S. 60.74
2:
1
1 :1
PROP. ROW
54.25
0.060 0.060
S.S. 60.45
3:1
EXIST. ROW
EXIST. ROW
WETLANDS
2:
1
1 :1
PROP. ROW
WETLANDS
54.74
0.060 0.060
EXIST. ROW WETLANDSEXIST. ROW WETLANDS
PROP. ROW
1 :1
52.82
EXIST. ROW EXIST. ROW
0.060 0.0600.060 0.060
PROP. ROW
WETLANDS WETLANDS
SHEET 9 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
70 70
40 40
27+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
27+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
28+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
28+50.00
X-4090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
55.31
0.054 0.054
3:1
1 :1
2:
1
EXIST. ROW EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
54.81
0.050 0.0503:1
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
54.71
0.050 0.050
2:
1
1 :1
EXIST. ROW EXIST. ROW
WETLANDS
WETLANDS PROP. ROW
3:1
55.07
0.050 0.050
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
8%
SHEET 10 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
70 70
40 4029+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
29+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
30+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 4030+50.00
X-5090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
55.23
0.050 0.050
1 :1
2:
1EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
8%
54.73
0.050 0.050
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
8%
55.84
0.046 0.046
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
3:1
54.80
0.026 0.026
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS PROP. ROW
3:1
SHEET 11 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
70 70
40 4031+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 4031+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 4032+00.00
45 45
50 50
55 55
60 60
65 65
70 70
40 40
32+50.00
X-6090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
55.08
0.020 0.008
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
3:1
54.77
0.020 0.012
1 :1
2:
1EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
3:1
55.32
0.020 0.020
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
3:1
56.12
0.020 0.020
2:
1
1 :1
EXIST. ROW EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
3:1
SHEET 12 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
70 70
40 40
33+00.00
50 50
55 55
60 60
65 65
70 70
45 4533+50.00
45 45
50 50
55 55
60 60
65 65
70 70
40 4034+00.00
45 45
50 50
55 55
60 60
65 65
40 4034+50.00
45 45
50 50
55 55
60 60
65 65
40 4035+00.00
X-7090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUTSTA. 33+00.00
BEGIN BRIDGE 090016
STA. 33+80.00
END BRIDGE 090016
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
56.01
0.020 0.020
EXIST. ROW EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
1 :1
52.43
0.020 0.020
EXIST. ROW EXIST. ROW
WETLANDS
PROP. ROW
WETLANDS
WETLANDS
WETLANDS
WETLANDS
55.43
0.020 0.020
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDSWETLANDS
PROP. ROWWETLANDS
WETLANDS
3:1
55.16
0.020 0.020
2:
1
1 :1
EXIST. ROW
EXIST. ROW
WETLANDSWETLANDS
PROP. ROWWETLANDS
WETLANDS
3:1
S.S. 54.94
0.020 0.0203:1
1 :1
2:
1
55.79
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
SHEET 13 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
45 45
50 50
55 55
60 60
65 65
40 4035+50.00
45 45
50 50
55 55
60 60
65 65
40 4036+00.00
55 55
60 60
65 65
50 5036+50.00
55 55
60 60
65 65
50 50
37+00.00
55 55
60 60
65 65
50 50
37+50.00
55 55
60 60
65 65
70 70
50 50
38+00.00
X-8090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
S.S. 54.42
0.020 0.0103:1
2:
1
1 :1
56.33
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW
S.S. 54.91
0.020 0.011
S.S. 57.70
2:
1
1 :1
57.26
EXIST. ROW
EXIST. ROW
WETLANDS
WETLANDS
PROP. ROW10.28:1
3:
1
S.S. 55.93
0.026 0.026
57.19
EXIST. ROW
EXIST. ROW
WETLANDS PROP. ROW
58.31
56.39
3
:1 4:1
S.S. 59.81
3:
1
0.0400.040
S.S. 55.8456.69
EXIST. ROW EXIST. ROW
PROP. ROW
57.71 56.80
5:1
S.S. 59.92
3
:1
3:
1
0.0400.040
S.S. 56.75
57.29
EXIST. ROW
EXIST. ROW
PROP. ROW
57.2056.99
6:1
S.S. 59.97
3
:1
3:
1
0.0400.040
S.S. 57.99
S.S. 59.98
58.48
EXIST. ROW
EXIST. ROW
PROP. ROW
57.86
3
:1
SHEET 14 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
55 55
60 60
65 65
50 50
38+50.00
55 55
60 60
65 65
50 50
39+00.00
55 55
60 60
65 65
50 50
39+50.00
60 60
65 65
55 5540+00.00
60 60
65 65
55 5540+50.00
60 60
65 65
55 5541+00.00
55 55
60 60
65 65
50 50
41+50.00
60 60
65 65
55 5542+00.00
X-9090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
3:
1
0.0400.040
S.S. 58.55
S.S. 60.24
58.12
EXIST. ROW EXIST. ROW
57.49
6:13
:1
3:
1
0.0390.039
S.S. 58.12
S.S. 60.16
57.55
EXIST. ROW EXIST. ROW
57.34
6:13
:1
3:
1
0.0200.020
S.S. 58.0257.04
EXIST. ROW EXIST. ROW
59.11
57.19
58.88
S.S. 58.19
0.001 0.001
3:
1
58.97
EXIST. ROW EXIST. ROW
59.42
58.98
0.018 0.0183:1
3:
1
S.S. 58.32
S.S. 60.40 59.83
EXIST. ROW
EXIST. ROW
0.037 0.037
S.S. 58.14
3:1
3:
1
S.S. 60.30
60.26
EXIST. ROW EXIST. ROW
3:
1 3:1
56.92
S.S. 58.07
0.0400.040
3
:13:1S.S. 57.57 60.26
EXIST. ROW EXIST. ROW
3:
1 3:1
57.04
0.040 0.040
3
:1
S.S. 58.63
S.S. 58.77
60.28
EXIST. ROW EXIST. ROW
5.3:1
3:
1 3:1
57.16
SHEET 15 OF 17
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
0
9
0
0
1
6
&
2
0
_
P
E
R
_
x
p
l
_
L
_
W
E
T
.
d
g
n
d
e
f
a
u
l
t
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
60 60
65 65
55 5542+50.00
55 55
60 60
65 65
50 50
43+00.00
55 55
60 60
65 65
50 50
43+50.00
55 55
60 60
65 65
50 50
44+00.00
55 55
60 60
65 65
50 50
44+50.00
60 60
65 65
55 5545+00.00
X-10090016 & 090020
-L-
5 10
EXCAVATION
UNDERCUT
GREATER THAN 3:1
REPORT FOR CONSTRUCTION OF FILL SLOPES
NOTE: SEE PROJECT JAN. 28, 2014 GEOTECHNICAL
STA. 44+75.00
END BRIDGE 090016
0.040
3
:1
0.0403:1
S.S. 59.23
S.S. 58.60
60.30
EXIST. ROW EXIST. ROW
3:
1 3:1
57.28
0.040
3
:1
0.040
S.S. 58.29
S.S. 58.88
60.35
EXIST. ROW EXIST. ROWWETLANDSWETLANDS
6.57:1
3:
1 3:1
57.40
0.024
3
:1
0.024
S.S. 58.41
S.S. 58.61
60.24
EXIST. ROW EXIST. ROWWETLANDS
8:1
3:
1 3:1
57.52
3
:1
0.0053:1
S.S. 57.88
S.S. 57.88
60.18
0.020
EXIST. ROW EXIST. ROW
WETLANDS
3:
1 3:1
57.64
0.020
3
:1
0.0143:1S.S. 57.92
60.06
S.S. 59.012
EXIST. ROWEXIST. ROW
WETLANDS
57.76
3:13:
1
60.10
EXIST. ROWEXIST. ROW
WETLANDS
NAMES AND ADDRESSES
PARCEL NO.ADDRESSESNAMES
PROPERTY OWNERS
SHEET 16 OF 17
DIVISION OF HIGHWAYS
NCDOT
BRUNSWICK COUNTY
BRIDGE NO. 16 & 20 OVER
HONEY ISLAND SWAMP
ON NC 211 (GREEN SWAMP RD.)
PROJECT: 17BP.3.R.26 (090016 & 090020)
12/10/2013
16-1 RED MOUNTAIN TIMBER CO., LLC
STATE OF NORTH CAROLINA
Ha
n
d
Ex
i
s
t
i
n
g
E
x
i
s
t
i
n
g
Pe
r
m
a
n
e
n
t
E
x
i
s
t
i
n
g
T
e
m
p
o
r
a
r
y
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
S
t
a
t
i
o
n
S
t
r
u
c
t
u
r
e
F
i
l
l
I
n
A
e
r
i
a
l
F
i
l
l
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
S
i
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
I
m
p
a
c
t
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
*
*
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
1
1
9
+
8
4
-
4
5
+
0
0
R
o
a
d
w
a
y
0
.
5
6
<
0
.
0
1
<
0
.
0
1
0
.
2
8
BR
0
2
0
&
0
1
6
B
r
i
d
g
e
s
0
.
0
1
0
.
0
5
*
2
1
+
0
0
-
3
6
+
0
0
R
o
a
d
w
a
y
0
.
2
3
0
.
1
6
<
0
.
0
1
TO
T
A
L
S
:
0
.
7
9
<
0
.
0
1
0
.
1
7
0
.
3
3
*
I
m
p
a
c
t
s
i
n
W
e
t
l
a
n
d
s
d
u
e
t
o
s
l
o
u
g
h
i
n
g
d
u
r
i
n
g
u
n
d
e
r
c
u
t
o
p
e
r
a
t
i
o
n
s
**
0
.
1
0
2
a
c
o
f
P
r
o
p
o
s
e
d
H
a
n
d
C
l
e
a
r
i
n
g
l
i
e
s
w
i
t
h
i
n
t
h
e
f
o
o
t
p
r
i
n
t
o
f
t
h
e
c
l
e
a
r
e
d
a
r
e
a
s
o
f
t
h
e
e
x
i
s
t
i
n
g
a
e
r
i
a
l
u
t
i
l
i
t
i
e
s
AT
N
R
e
v
i
s
e
d
3
/
3
1
/
0
5
SH
E
E
T
1
7
o
f
1
7
1
0
/
2
9
/
2
0
1
4
BRUNSWICK COUNTY
NC
D
E
P
A
R
T
M
E
N
T
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
DI
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
WB
S
-
1
7
B
P
.
3
.
R
.
2
6
(
0
9
0
0
1
6
&
0
2
0
)
W
E
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
SU
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
WE
T
L
A
N
D
I
M
P
A
C
T
S
MON.
CON
N
4
4
4
0
’0
9
" E
3
0
0
.
7
9
’
N
4
4
4
0
’0
9
"
E
3
0
1.4
4
’
FIRE TOWER
W15
60.7962.06
65.59
58.16 63.50 61.52 59.38
Final Phase
Both Phases
Clearing and Grubbing Phase
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
0
9
/
0
8
/
9
9
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
C
A
D
D
\
P
S
H
\
0
9
0
0
16
&
2
0
_
e
c
_
t
i
t
l
e
s
h
t
.
d
g
n
F
k
e
y
s C
O
N
T
R
A
C
T
:
17BP.3.R.26
C
2
0
2
9
4
2
PE, ROW, UTIL.
& CONST.
17BP.3.R.26
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
50 25 50 100
50 25 50 100
10 5 10 20
ROADWAY DESIGN ENGINEER
HYDRAULICS ENGINEER
LEVEL III CERTIFICATION NUMBER
EROSION AND SEDIMENT CONTROL DESIGN ENGINEER
Michael T. Merritt, P.E.
P.E.
LETTING DATE:
DIVISION OF HIGHWAYS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
FOR
CONTRACTOR :
Michael T. Merritt, P.E.
RIGHT OF WAY DATE:
DESIGN - BUILD TEAM
1-888-521-4455 OR 919-878-9560
NC LICENSE NO. F-0112
RALEIGH, NORTH CAROLINA 27609
900 RIDGEFIELD DRIVE, SUITE 350
RUMMEL, KLEPPER & KAHL, LLP
Corporation
S. T. Wooten
WILSON, NORTH CAROLINA 27894
3801 BLACK CREEK ROAD
P.O. BOX 2408
S. T. WOOTEN CORPORATION
Corporation
S. T. Wooten
WILSON, NORTH CAROLINA 27894
3801 BLACK CREEK ROAD
P.O. BOX 2408
S. T. WOOTEN CORPORATION
MARCH 29, 2012
MARCH 29, 2012
2012 STANDARD SPECIFICATIONS
B. Keith Skinner, P.E.
NCDOT CONTACT: Zak Hamidi, PE
DESIGN BUILD PROJECT ENGINEER
NATURAL RESOURCES DIVISION OF WATER QUALITY.
ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND
NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011
WITH THE REGULATIONS SET FORTH BY THE
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY
ENGINEER.
NEED TO BE INSTALLED AS DIRECTED BY THE
ADDITIONAL EROSION CONTROL DEVICES MAY
REQUIRE PRIOR APPROVAL BY ENGINEER.
NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
BRUNSWICK COUNTY
LOCATION:
EC-1
EROSION AND SEDIMENT CONTROL MEASURES
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
1606.01 Special Sediment Control Fence
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
EW
CFW
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01 Coir Fiber Baffle
1645.01 Temporary Stream Crossing
Audrey B. Burnette, P.E.
Audrey B. Burnette, P.E.
3081
B
R
I
D
G
E
S
0
9
0
0
1
6
&
0
9
0
0
2
0
TYPE OF WORK:
SWAMP ON NC 211
BRIDGE NOS. 090016 & 090020 OVER HONEY ISLAND
RESURFACING
GRADING, DRAINAGE, PAVING, STRUCTURES AND
LOCATION:
NSRS 2007
NAD 83/
5
PLANS FOR SHEET RF-1.
SEE WETLAND RESTORATION
TO BOLTON
211
211
BRUNSWICK COUNTY
RESURFACING
GRADING, DRAINAGE, PAVING, STRUCTURES AND
-L- STA. 19+70.00
BEGIN PROJECT
TO SUPPLY
PROJECT LENGTH
DESIGN - BUILD TEAM
4
GREEN SWAMP ROAD
-L- STA. 25+85.00
BEGIN BRIDGE
-L- STA. 26+70.02
END BRIDGE
-L- STA. 33+00.00
BEGIN BRIDGE
-L- STA. 33+80.00
END BRIDGE
BRIDGE NO. 090016
BRIDGE NO. 090020
H
O
N
EY
IS
LA
N
D
S
W
A
M
P
H
O
N
EY
IS
LA
N
D
S
W
A
M
P
OFFSET ON A REGIONAL ROUTE.
* DESIGN EXCEPTION NEEDED FOR 4’ BRIDGE
-L- STA. 44+75.00
END PROJECT
SWAMP ON NC 211
BRIDGE NOS. 090016 & 090020 OVER HONEY ISLAND
DATE: 10-23-2014
SUBMITTAL NO. S-204
ROADWAY RFC PLANS
VICINITY MAP
Island
Honey
Cl
e
ar
Br
a
nc
h
211
B
R
I
D
G
E
S
0
9
0
0
1
6
&
0
9
0
0
2
0
Airport
Bear Pin
211
B runsw ick C ounty
C olum
bus C ounty
Driving Creek
Swamp
Green
S
R
1
4
3
0
E
x
u
m
R
d
.
SR 1431 Egypt Rd.
Bridge Nos. 090016 & 090020
T
24’ BST
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
1
5
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
WOODS
WOODS
WOODS
WOODS
BM#1
15
0
.
0
0
’
24’ BST
NC 211 - GREEN SWAMP RDTO SUPPLY
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
T
H
H
4
8
"
C
M
P
W15
T
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
BS1D1D5
D3BS3
BS4
D4 D6
D2
BS2
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
1
5
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
#09-0020
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
WOODS
1
2
BM#1
15
0
.
0
0
’
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
T
H
H
5101
52
0
2
5
3
0
3
5
4
0
4
5
5
0
5
0
5
0
55 55
55
5
5
55
55
55
5
5
5555
55
5
5
55
5
5
55
5
5
55
5
5
5
5
555555
5
5
5
5
5
5
55
55
55
5
5
55
5
5
5
5
5
5
55
5
5
5
5
55
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
60
60
60
60
60
60
60
60
60
60
60
6
0
60
60
60
60
.0
6
2
4
’
8:1
8:1
8:1
.
0
5
.
0
4
.
0
4
.
0
2
.
0
3
.
0
5
.
0
6
F-
F
3
3’
P
.
S
.
8
’
P
.
S
.
4
’
TYP.
25.75’
TYP.26.00’
-L- POT STA. 25+85.00
BEGIN BRIDGE
-L- POT STA. 26+70.02
END BRIDGE
2
4
’
E
X
IS
T
AND ABUTMENTS
REMOVE EXISTING BRIDGE
P.S.8’
24’
P.S.8’
.0
5
.05
.04
.03
.02
.01
TYP.26.00’
.
0
6
.
0
2
.
0
6
.
0
2
+89.95
20’
PROJECT REFERENCE NO.
R/W SHEET NO.
HYDRAULICS
ENGINEER
ROADWAY DESIGN
ENGINEER
SHEET NO.
EC-4/CONST.4SF-090016&20
TEMPORARY SHORING
RE
TA
IN
W/ 5 SY GEO FAB
1 TON CL B RIPRAP
HW
EXIST. 48" CSP 5LF
COLLAR AND EXTEND
2GI
TB
2GI
TB
15" RCP-IV
15" RCP-IV
T
T
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
C
A
D
D
\
P
S
H
\
0
9
0
0
1
6
&
2
0
_
E
C
_
p
s
h
0
4
.
d
g
n
F
k
e
y
s
60
70
50
40
NAD 83 (CORS96)
80
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
30
60
70
50
80
STA. 31+00 SEE SHEET 5
M
ATC
HLINE -L-
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
1
+
0
0
M
A
T
C
H
LI
N
E
ENGINEER
ROADWAY DESIGN HYDRAULICS
ENGINEER
R/W SHEET NO.
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
EXCAVATION
UNDERCUT
GRAU-350
-L- STA. 19+70.00
BEGIN PROJECT
TYPE III
TYPE III
TYPE III
TYPE III -L-
-L-
GRAU-350
2
0
2
5
30
-L- PCC Sta. 26+84.30
-L- PC Sta. 21+38.42
-L- PT Sta. 30+33.28
+30.00
0401
0402
RE
TA
IN
W/ 5 SY GEO FAB
1 TON CL B RIPRAP
0403
HW
62.28
NOTE: COLLAR AND EXTEND EXISTING 48" CSP AT -L- STA. 20+13.5 LT, AS NEEDED (HEADWALL REQUIRED)
EXIST. 48" CSP 5LF
COLLAR AND EXTEND
2GI
TB
2GI
TB
15" RCP-IV
15" RCP-IV
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
PI = 21+50.00
EL = 61.10’
(+)0.3606%(+)1.2088%
VC = 170’
K = 200
PI = 25+55.00
EL = 66.00’
VC = 340’
K = 116 PI = 29+25.00
EL = 59.67’
(-)1.7105%
(+)1.3603%
VC = 360’
K = 117
EL = 60.46’
-L- STA 19+70.00
BEGIN GRADE
V = 70mph
V = 55mph
V = 55mph
HP Sta.= 25+25.78
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
STR #090020 Sta. 26+27.50 -L-
NWS SURVEY = 5/7/12
52.8’
NWS
NORMAL WATER SURFACE ELEV = 52.8 FT
57.0’
100-YR.
-L- STA. 25+85.00
BEGIN BRIDGE #090020 -L- STA. 26+70.02
END BRIDGE #090020
60’
+33.28
60’
+84.30
EXIST. ROW
+91.12
R = 1120
R = 2160
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
RCP EXTENSION CONSTRUCTION SEQUENCE STA. 20+13 -L-
5. TIE ROADWAY EMBANKMENT TO NEW HEADWALL.
4. REMOVE IMPERVIOUS DIKES.
3. INSTALL APPROX. 20 FEET OF 48" RCP AND CONSTRUCT HEADWALL. COMPLETE PIPE EXTENSION IN ONE DAY.
2. USE PUMP AROUND OPERATIONS TO DEWATER CONSTRUCTION AREA. INSTALL SPECIAL STILLING BASINS AS SHOWN IN PLAN.
1. INSTALL IMPERVIOUS DIKES ON BOTH ENDS OF EXISTING 48" PIPE, AS SHOWN IN PLAN.
FCW
F
C
W
FCWF
C
W
FCW
FCW
FCW
FCW
FCW
FCW
FC
W
FCW
FCW
DIKE
IMPERVIOUS
DIKE
IMPERVIOUS
BASIN
STILLING
SPECIAL
BASIN
STILLING
SPECIAL
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTON
NC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
WOODS
WOODS
WOODS
EXISTING R/W
H
O
N
E
Y
IS
L
A
N
D
S
WA
M
P
TT
T
C
R/W MON EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R
MON.
CON
N
4
4
4
0
’
0
9
"
E
3
0
0
.
7
9
’
N
4
4
4
0
’
0
9
"
E
3
0
1.
4
4
’
FIRE TOWER
STATE OF NORTH CAROLINA
DB 2721 PG 1074
D1D2
D6
D4
D5
D3
BS1BS2
BS3BS4
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTONNC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
#09-0016
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
NCDOT GPS MON. 16-3NCDOT GPS MON. 16-2
EXISTING R/W
H
O
N
E
Y
IS
L
A
N
D
S
WA
M
P
TT
T
C
EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R
5
0
5 0
5
5
55
55
55
55
5
5
5
5
5
5
55
55
55
55 55
55
55
55
5
5
55 55
5
5 55
55
5
5
5
5
555
555
5
5
55
5555
55
55 55555555
55
60 60 60
606060606060
60
60
60
60
.
0
1
.
0
0
.
0
1
.
0
2
.0
0
.
0
1
.
0
2
.
0
2
.
0
3
.
0
4
.
0
4
.
0
3
.
0
2
.
0
1
.
0
0
.
0
1
.
0
2
.
0
3
.
0
4
TYP.
26.25’
TYP.
26.25’
.
0
4
.
0
3
.
0
2
.
0
1
.
0
0
.
0
1
.
0
2
+
2
4
.
6
9
TYP.
26.25’
+
0
8
.
2
3
PROJECT REFERENCE NO.SHEET NO.
EC-5/CONST.5SF-090016&20
TEMPORARY SHORING
TEMPORARY PIPE
0501
0502
SEE DETAIL A
HOLE
PREFORMED SCOUR
TB 2GI
TB 2GI
0503
W/ 5 SY GEO FAB
1 TON CL B RIP RAP
W/ 5 SY FIL FAB
1 TON CL B RIP RAP
Flatter4:1 or
D
4:
1
( Not to Scale)
DETAIL B
Min. D=0.5 Ft.
Ground
Natural
Slope
Ditch
Front
PREFORMED SCOUR HOLE DETAIL A
-L- STA. 34+02 RT
W=4.0 Ft.
D=1.0 Ft.
B=3.75 Ft.
not shown for clarity)
(Rip Rap in basin
GROUND
NATURAL
Outlet
Pipe or Ditch
Scour Hole (PSH)
Square Preformed
WITH GEOTEXTILE FABRIC
LINER: CLASS B RIPRAP
D
PSRM
MIN. 1’ TUCK
WITH NATURAL GROUND
INSTALL LEVEL AND FLUSH
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
Seed with native
grasses at installation.
*NOT TO SCALE
B
FI
L
L
S
L
O
P
E
2:1
2:
1
PIPE (d = 15" OR 18")
INFLOW
SPECIAL CUT DITCH
Q5=0.4cfs, V=0.3fps, S=0.30%
FROM -L- STA. 38+50 TO 39+50 LT;
Q5=1.1cfs, V=0.5fps, S=0.81%
FROM -L- STA. 36+10 TO 37+50 LT;
SEE DETAIL B
SPECIAL CUT DITCH
SEE DETAIL B
SPECIAL CUT DITCH
R
C
P
-
IV
15
"
15" RCP
SEE DETAIL C
SP. LAT. V DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
Q5=1.4cfs, V=1.1fps, S=0.24%
FROM -L- STA. 40+50 TO STA. 45+00 LT
Min. D= 1.0Ft.
DETAIL C
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
W/ 5 SY FIL FAB
1 TON CL B RIPRAP
INV=57.0
504T
GRADE TO DRAIN GRADE TO DRAIN
INV=58.3
OR PLUG AND FILL WITH FLOWABLE FILL
REMOVE TEMPORARY PIPE @ STA. 36+80
UPON SHIFTING OF TRAFFIC TO NEW ALIGNMENT,
12
"
R
C
P
-
IV
GRADE TO DRAIN
GRADE TO DRAIN
N
A
D
83 (
C
O
RS96)
S
T
A
.
3
1
+
0
0
S
E
E
S
H
E
E
T
4
M
A
T
C
H
LI
N
E
-
L-
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
C
A
D
D
\
P
S
H
\
0
9
0
0
1
6
&
2
0
_
E
C
_
p
s
h
0
5
.
d
g
n
F
k
e
y
s
60
70
50
40
80
32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
30
60
70
50
80
31+00
S
E
E
S
H
E
E
T
4
-
L-
S
T
A
.
3
1
+
0
0
M
A
T
C
H
LIN
E
ENGINEER
ROADWAY DESIGN
R/W SHEET NO.
HYDRAULICS
ENGINEER
42+00 43+00
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
PAVEMENT REMOVAL
SUB-BASE IS TO BE LEFT IN PLACE.
ONLY PAVEMENT IS TO BE REMOVED
* NOTE: STA. 37+25.00 TO 38+00.00 LT.
EXCAVATION
UNDERCUT
GRAU-350
GRAU-350
-L- STA. 44+75.00
END PROJECT
-L-
TYPE-III
TYPE-III
TYPE-III
TYPE-III
3
5
4
0 4
5
P
O
T
S
t
a
. 4
6
+
18
.2
9
-L- PC Sta. 36+47.19
-L- PRC Sta. 39+99.60
-L- PT Sta. 43+43.23
0501
0502
SEE DETAIL A
HOLE
PREFORMED SCOUR
TB 2GI
TB 2GI
0503
W/ 5 SY GEO FAB
1 TON CL B RIP RAP
W/ 5 SY FIL FAB
1 TON CL B RIP RAP
Flatter4:1 or
D
4:
1
( Not to Scale)
DETAIL B
Min. D=0.5 Ft.
Ground
Natural
Slope
Ditch
Front
PREFORMED SCOUR HOLE DETAIL A
-L- STA. 34+02 RT
W=4.0 Ft.
D=1.0 Ft.
B=3.75 Ft.
not shown for clarity)
(Rip Rap in basin
GROUND
NATURAL
Outlet
Pipe or Ditch
Scour Hole (PSH)
Square Preformed
WITH GEOTEXTILE FABRIC
LINER: CLASS B RIPRAP
D
PSRM
MIN. 1’ TUCK
WITH NATURAL GROUND
INSTALL LEVEL AND FLUSH
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
Seed with native
grasses at installation.
*NOT TO SCALE
B
FI
L
L
S
L
O
P
E
2:1
2:
1
PIPE (d = 15" OR 18")
INFLOW
3/08
SPECIAL CUT DITCH
Q5=0.4cfs, V=0.3fps, S=0.30%
FROM -L- STA. 38+50 TO 39+50 LT;
Q5=1.1cfs, V=0.5fps, S=0.81%
FROM -L- STA. 36+10 TO 37+50 LT;
SEE DETAIL B
SPECIAL CUT DITCH
SEE DETAIL B
SPECIAL CUT DITCH
R
C
P
-
IV
15
"
15" RCP
SEE DETAIL C
SP. LAT. V DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
Q5=1.4cfs, V=1.1fps, S=0.24%
FROM -L- STA. 40+50 TO STA. 45+00 LT
Min. D= 1.0Ft.
DETAIL C
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
F
F
F
F
F
F
F
F
F
C
F
C
F
C C
C
F
C
C C
F
F
F
F
F F
F
PI = 32+80.00
EL = 64.50’
(+)1.3603%
(-)1.4613%
VC = 330’
K = 117
EL = 60.14’
-L- STA 44+75.00
END GRADE
V = 55mph
V = 55mph
HP Sta.= 32+74.09
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
NORMAL WATER SURFACE ELEV = 52.8 FT
NWS SURVEY = 5/7/12
STR #090016 Sta. 33+40 -L-
-L- STA. 33+00.00
BEGIN BRIDGE #090016
-L- STA. 33+80.00
END BRIDGE #090016
PI = 37+15.00
EL = 58.14’
VC = 260’
K = 118
(+)0.7500%
V = 55mph
PI = 41+25.00
EL = 61.22’
(+)0.7500%(-)0.3077%
VC = 200’
K = 189
57.0’
100-YR.
PROP. EL.=84.18’
52.8’
NWS
EXIST. EL.=79.18’ - LT.EXIST. EL.=79.18’-LT.
CONSTRUCTION SHEET 5
EROSION CONTROL FOR
CLEARING AND GRUBBING
FCWF
C
W
FCW
FCWFCW
W
FCW
FCW
B
FCW FCW
FCW
F
C
W
FCWFCW
FC
W
T
24’ BST
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
1
5
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
WOODS
WOODS
WOODS
WOODS
BM#1
15
0
.
0
0
’
24’ BST
NC 211 - GREEN SWAMP RDTO SUPPLY
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
T
H
H
INV.=51.29
INV.=51.55
4
8
"
C
M
P
16-1
16-2
5
6
5
W15
T
ELEV=84.18’
LOW POINT
AERIAL LINE
AERIAL LINE
WOODS
WOODS
BS1D1D5
D3BS3
BS4
D4 D6
D2
BS2
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
1
5
0
.
0
0
’
150.00’
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
#09-0020
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
WOODS
1
2
BM#1
15
0
.
0
0
’
H
O
N
E
Y I
S
L
A
N
D
S
W
A
M
P
T
H
H
.0
6
.
0
5
.
0
4
.
0
4
.
0
2
.
0
3
.
0
5
.
0
6
TYP.
25.75’
TYP.26.00’
.0
5
.05
.04
.03
.02
.01
TYP.26.00’
.
0
6
.
0
2
.
0
6
.
0
2
+89.95
PROJECT REFERENCE NO.
R/W SHEET NO.
HYDRAULICS
ENGINEER
ROADWAY DESIGN
ENGINEER
SHEET NO.
EC-6/CONST.4SF-090016&20
TEMPORARY SHORING
0401
0402
RE
TA
IN
W/ 5 SY GEO FAB
1 TON CL B RIPRAP
0403
HW
EXIST. 48" CSP 5LF
COLLAR AND EXTEND
2GI
TB
2GI
TB
15" RCP-IV
15" RCP-IV
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
C
A
D
D
\
P
S
H
\
0
9
0
0
1
6
&
2
0
_
E
C
_
p
s
h
0
6
.
d
g
n
F
k
e
y
s
60
70
50
40
NAD 83 (CORS96)
80
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
30
60
70
50
80
STA. 31+00 SEE SHEET 5
M
ATC
HLINE -L-
S
E
E
S
H
E
E
T
5
-
L-
S
T
A
.
3
1
+
0
0
M
A
T
C
H
LI
N
E
ENGINEER
ROADWAY DESIGN HYDRAULICS
ENGINEER
R/W SHEET NO.
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
EXCAVATION
UNDERCUT
GRAU-350
-L- STA. 19+70.00
BEGIN PROJECT
TYPE III
TYPE III
TYPE III
TYPE III -L-
-L-
GRAU-350
2
0
2
5
30
-L- PCC Sta. 26+84.30
-L- PC Sta. 21+38.42
-L- PT Sta. 30+33.28
0401
0402
RE
TA
IN
W/ 5 SY GEO FAB
1 TON CL B RIPRAP
0403
HW
EXIST. 48" CSP 5LF
COLLAR AND EXTEND
2GI
TB
2GI
TB
15" RCP-IV
15" RCP-IV
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
PI = 21+50.00
EL = 61.10’
(+)0.3606%(+)1.2088%
VC = 170’
K = 200
PI = 25+55.00
EL = 66.00’
VC = 340’
K = 116 PI = 29+25.00
EL = 59.67’
(-)1.7105%
(+)1.3603%
VC = 360’
K = 117
EL = 60.46’
-L- STA 19+70.00
BEGIN GRADE
V = 70mph
V = 55mph
V = 55mph
HP Sta.= 25+25.78
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
STR #090020 Sta. 26+27.50 -L-
NWS SURVEY = 5/7/12
52.8’
NWS
NORMAL WATER SURFACE ELEV = 52.8 FT
57.0’
100-YR.
-L- STA. 25+85.00
BEGIN BRIDGE #090020 -L- STA. 26+70.02
END BRIDGE #090020
PROP. EL.=84.18’EXIST. EL.=84.18’ - RT.
C
FCW
F
C
W
FCWF
C
W
FCW
FCW
FCW
C
FCW
FCW
FCW
FC
W
FCW
FCW
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTON
NC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
STATE OF NORTH CAROLINA
RED MOUNTAIN TIMBERCO I LLC
WOODS
WOODS
WOODS
EXISTING R/W
H
O
N
E
Y
IS
L
A
N
D
S
WA
M
P
TT
T
C
R/W MON EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R
MON.
CON
N
4
4
4
0
’
0
9
"
E
3
0
0
.
7
9
’
N
4
4
4
0
’
0
9
"
E
3
0
1.
4
4
’
STATE OF NORTH CAROLINA
FIRE TOWER
STATE OF NORTH CAROLINA
DB 2721 PG 1074
D1D2
D6
D4
D5
D3
BS1BS2
BS3BS4
AERIAL LINE
ELEV=79.18’
LOW POINT
AERIAL LINE
TO BOLTONNC 211 - GREEN SWAMP RD
23’ BST
WOODS
EXISTING R/W
EXISTING R/W
EXISTING R/W
15
0
.
0
0
’
T
#09-0016
STRUCTURE
BRIDGE
WOODS
WOODS
WOODS
NCDOT GPS MON. 16-3NCDOT GPS MON. 16-2
EXISTING R/W
H
O
N
E
Y
IS
L
A
N
D
S
WA
M
P
TT
T
C
EXISTING R/W
EXISTING R/W
30" RCP 15" RCP
15" RCP
WOODS WOODS
WOODS
WOODS
S
OIL
G
R.
0
1
.
0
0
.
0
1
.
0
2
.0
0
.
0
1
.
0
2
.
0
2
.
0
3
.
0
4
.
0
4
.
0
3
.
0
2
.
0
1
.
0
0
.
0
1
.
0
2
.
0
3
.
0
4
TYP.
26.25’
TYP.
26.25’
.
0
4
.
0
3
.
0
2
.
0
1
.
0
0
.
0
1
.
0
2
+
2
4
.
6
9
TYP.
26.25’
+
0
8
.
2
3
PROJECT REFERENCE NO.SHEET NO.
EC-7/CONST.5SF-090016&20
D
TEMPORARY SHORING
D
TEMPORARY PIPE
0501
0502
SEE DETAIL A
HOLE
PREFORMED SCOUR
TB 2GI
TB 2GI
0503
W/ 5 SY GEO FAB
1 TON CL B RIP RAP
W/ 5 SY FIL FAB
1 TON CL B RIP RAP
Flatter4:1 or
D
4:
1
( Not to Scale)
DETAIL B
Min. D=0.5 Ft.
Ground
Natural
Slope
Ditch
Front
PREFORMED SCOUR HOLE DETAIL A
-L- STA. 34+02 RT
W=4.0 Ft.
D=1.0 Ft.
B=3.75 Ft.
not shown for clarity)
(Rip Rap in basin
GROUND
NATURAL
Outlet
Pipe or Ditch
Scour Hole (PSH)
Square Preformed
WITH GEOTEXTILE FABRIC
LINER: CLASS B RIPRAP
D
PSRM
MIN. 1’ TUCK
WITH NATURAL GROUND
INSTALL LEVEL AND FLUSH
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
Seed with native
grasses at installation.
*NOT TO SCALE
B
FI
L
L
S
L
O
P
E
2:1
2:
1
PIPE (d = 15" OR 18")
INFLOW
SPECIAL CUT DITCH
Q5=0.4cfs, V=0.3fps, S=0.30%
FROM -L- STA. 38+50 TO 39+50 LT;
Q5=1.1cfs, V=0.5fps, S=0.81%
FROM -L- STA. 36+10 TO 37+50 LT;
SEE DETAIL B
SPECIAL CUT DITCH
SEE DETAIL B
SPECIAL CUT DITCH
R
C
P
-
IV
15
"
15" RCP
SEE DETAIL C
SP. LAT. V DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
Q5=1.4cfs, V=1.1fps, S=0.24%
FROM -L- STA. 40+50 TO STA. 45+00 LT
Min. D= 1.0Ft.
DETAIL C
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
W/ 5 SY FIL FAB
1 TON CL B RIPRAP
INV=57.0
504T
GRADE TO DRAIN GRADE TO DRAIN
INV=58.3
OR PLUG AND FILL WITH FLOWABLE FILL
REMOVE TEMPORARY PIPE @ STA. 36+80
UPON SHIFTING OF TRAFFIC TO NEW ALIGNMENT,
12
"
R
C
P
-
IV
GRADE TO DRAIN
GRADE TO DRAIN
N
A
D
83 (
C
O
RS96)
S
T
A
.
3
1
+
0
0
S
E
E
S
H
E
E
T
4
M
A
T
C
H
LI
N
E
-
L-
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
10
/
3
1/
2
0
14
R
:
\
H
y
d
r
a
u
l
i
c
s
\
C
A
D
D
\
P
S
H
\
0
9
0
0
1
6
&
2
0
_
E
C
_
p
s
h
0
7
.
d
g
n
F
k
e
y
s
60
70
50
40
80
32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00
30
60
70
50
80
31+00
S
E
E
S
H
E
E
T
4
-
L-
S
T
A
.
3
1
+
0
0
M
A
T
C
H
LIN
E
ENGINEER
ROADWAY DESIGN
R/W SHEET NO.
HYDRAULICS
ENGINEER
42+00 43+00
STA. 43+00.00 TO 44+75.00
STA. 19+70.00 TO 20+25.00
MILLING LIMITS:
PAVEMENT REMOVAL
SUB-BASE IS TO BE LEFT IN PLACE.
ONLY PAVEMENT IS TO BE REMOVED
* NOTE: STA. 37+25.00 TO 38+00.00 LT.
EXCAVATION
UNDERCUT
GRAU-350
GRAU-350
-L- STA. 44+75.00
END PROJECT
-L-
TYPE-III
TYPE-III
TYPE-III
TYPE-III
3
5
4
0 4
5
P
O
T
S
t
a
. 4
6
+
18
.2
9
-L- PC Sta. 36+47.19
-L- PRC Sta. 39+99.60
-L- PT Sta. 43+43.23
0501
0502
SEE DETAIL A
HOLE
PREFORMED SCOUR
TB 2GI
TB 2GI
0503
W/ 5 SY GEO FAB
1 TON CL B RIP RAP
W/ 5 SY FIL FAB
1 TON CL B RIP RAP
Flatter4:1 or
D
4:
1
( Not to Scale)
DETAIL B
Min. D=0.5 Ft.
Ground
Natural
Slope
Ditch
Front
PREFORMED SCOUR HOLE DETAIL A
-L- STA. 34+02 RT
W=4.0 Ft.
D=1.0 Ft.
B=3.75 Ft.
not shown for clarity)
(Rip Rap in basin
GROUND
NATURAL
Outlet
Pipe or Ditch
Scour Hole (PSH)
Square Preformed
WITH GEOTEXTILE FABRIC
LINER: CLASS B RIPRAP
D
PSRM
MIN. 1’ TUCK
WITH NATURAL GROUND
INSTALL LEVEL AND FLUSH
AA
W
PLAN VIEW
SECTION A-A
(4’min typ.)
Permanent Soil Reinforcement
matting (PSRM)
Seed with native
grasses at installation.
*NOT TO SCALE
B
FI
L
L
S
L
O
P
E
2:1
2:
1
PIPE (d = 15" OR 18")
INFLOW
3/08
SPECIAL CUT DITCH
Q5=0.4cfs, V=0.3fps, S=0.30%
FROM -L- STA. 38+50 TO 39+50 LT;
Q5=1.1cfs, V=0.5fps, S=0.81%
FROM -L- STA. 36+10 TO 37+50 LT;
SEE DETAIL B
SPECIAL CUT DITCH
SEE DETAIL B
SPECIAL CUT DITCH
R
C
P
-
IV
15
"
15" RCP
SEE DETAIL C
SP. LAT. V DITCH
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
Q5=1.4cfs, V=1.1fps, S=0.24%
FROM -L- STA. 40+50 TO STA. 45+00 LT
Min. D= 1.0Ft.
DETAIL C
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
F
F
F
F
F
F
F
F
F
C
F
C
F
C C
C
F
C
C C
F
F
F
F
F F
F
PI = 32+80.00
EL = 64.50’
(+)1.3603%
(-)1.4613%
VC = 330’
K = 117
EL = 60.14’
-L- STA 44+75.00
END GRADE
V = 55mph
V = 55mph
HP Sta.= 32+74.09
BRIDGE HYDRAULIC DATA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR FREQUENCY
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING DISCHARGE = 4,300
= 500+
= 2,100
= 1,700
= 50
= 100
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
YRS
= 56.5
= 57.0
= 59.0
NORMAL WATER SURFACE ELEV = 52.8 FT
NWS SURVEY = 5/7/12
STR #090016 Sta. 33+40 -L-
-L- STA. 33+00.00
BEGIN BRIDGE #090016
-L- STA. 33+80.00
END BRIDGE #090016
PI = 37+15.00
EL = 58.14’
VC = 260’
K = 118
(+)0.7500%
V = 55mph
PI = 41+25.00
EL = 61.22’
(+)0.7500%(-)0.3077%
VC = 200’
K = 189
57.0’
100-YR.
PROP. EL.=84.18’
52.8’
NWS
EXIST. EL.=79.18’ - LT.EXIST. EL.=79.18’-LT.
C
C
FCWF
C
W
FCW
FCWFCW
W
FCW
FCW
B
FCW FCW
FCW
F
C
W
FCWFCW F
C
WFC
W
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
EC-2
ISOMETRIC VIEW
SF-090016&20
A
A
MATERIAL
FILL
OF FILL
TOE
FILL SLOPE
A
A
FENCE
SILT
GRADE
ROAD
WATTLE
SILT FENCE
3 FT.
2 FT.
6"
SILT FENCE POST
POST
SILT FENCE
STAKE
2’ WOODEN
2"
10"-11"
SIDE VIEW
STAPLE
9 FT.
VIEW FROM SLOPE
DOWNSLOPE STAKE
UPSLOPE STAKE
SEE INSET A
12" WATTLE
12" WATTLE
1"-2" TRENCH
INSET A
SILT FENCE COIR FIBER WATTLE BREAK DETAIL
STANDARD SPECIFICATIONS.
INSTALL TEMPORARY SILT FENCE IN ACCORDANCE WITH SECTION 1605 OF THE
WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED.
WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF
U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
ANGLE TO WEDGE WATTLE TO GROUND.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
DO NOT PLACE WATTLE ON TOE OF SLOPE.
EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED.
LENGTH OF 10 FT.
USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE AND
NOTES:
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
SF-090016&20 EC-2A
NATURAL GROUND
NATURAL GROUND
FLOW
2’(MAX.)
CROSS SECTION
CROSS SECTION
TRAPEZOIDAL DITCH
VEE DITCH
EDGE OF PAVEMENT
ISOMETRIC VIEW
PAVEMENT
SHLD.
SLOPE
BACK
SLOPEDITCH
STAKE
2’ UPSLOPE
MATTING
STAKE
2’ DOWNSLOPE
STAKE
2’ UPSLOPE
MATTING
STAKE
2’ DOWNSLOPE
TOP VIEW
6’(MIN.)
12"(MIN.)
STAKE
UPSLOPE
STAKE
DOWNSLOPE
MATTING
MATTING
See Inset C
INSET C
See Inset B
INSET B
STAPLES
VAR.
2’(MIN.)
2 IN.
See Inset A
INSET A
STAKES
PAM
PAM
(1 OZ.)
(1 OZ.)
COIR FIBER WATTLE WITH
POLYACRYLAMIDE (PAM) DETAIL
PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR EXCEEDS 0.50 IN.
WATER WILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF WATTLE. REAPPLY
INITIALLY APPLY 2 OUNCES OF ANIONIC OR NEUTRALLY CHARGED PAM OVER WATTLE WHERE
TO BE APPLIED TO EACH WATTLE.
LOCATION, AND FROM OFFSITE MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS.
AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE
U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A
TO WEDGE WATTLE TO BOTTOM OF DITCH.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE
WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION.
USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE.
NOTES:
COIR FIBER WATTLE
FLOW
PAM
(2 OZ.)
PAM
(1 OZ.)
PAM
(1 OZ.)
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
ISOMETRIC VIEW
SF-090016&20
A
MATERIAL
FILL
OF FILL
TOE
A
GRADE
ROAD
WATTLE
3 FT.
2 FT.
6"
UPSLOPE STAKE
FRONT VIEW
STAKE
2’ WOODEN
2"
15"-16"
TOP VIEW
EC-2B
DOWNSLOPE STAKE
TOE OF FILL
18" WATTLE
18" WATTLESEE INSET A
2"-3" TRENCH
INSET A
FILL SLOPE
COIR FIBER WATTLE BARRIER DETAIL
FOR BREAKS ALONG LARGE SLOPES, USE MAXIMUM SPACING OF 20 FT.
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
CROSS SECTION.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
DO NOT PLACE WATTLES ON TOE OF SLOPE.
EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED.
WATTLE AND LENGTH OF 10 FT.
USE MINIMUM 18 IN. NOMINAL DIAMETER COIR FIBER (COCONUT)
NOTES:
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
SF-090016&20
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50’ IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3