HomeMy WebLinkAboutWQCSD0223_Compliance Evaluation Inspection_20221010ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Lee Simaan
Quail Acres MHP
P.O. Box 549
Summerfield, NC 27358-0549
NORTH CAROLINA
Environmental Quality
October 10, 2022
SUBJECT: Compliance Evaluation Inspection
Quail Acres MHP Collection System
NPDES Permit No. WQCSD0223
Rockingham County
Dear Mr. Simaan,
On September 27, 2022, Gary Hudson of this office met with Anthony Montero, Operator
in Responsible Charge (ORC), to perform a Compliance Evaluation Inspection at the
above referenced wastewater collection system. This type of inspection consists of two
basic parts: an in -office file review and an on -site inspection of the treatment facility. The
attached EPA inspection form details the areas that were evaluated during this inspection.
The inspection of the facility was satisfactory. If you have any questions regarding the
inspection or this report, please contact Gary Hudson or me at (336) 776-9800 or by email
at gary.hudson@ncdenr.gov or lon.snider@ncdenr.gov.
Sincerely,
II DocuSigned by:<
C I—/n l . Jn,l&ts'
145B49E225C94EA..
Lon Snider
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments: EPA Water Compliance Inspection Report
cc: WSRO
GDE
NORTH C OLI JA '
omm mr� ep..of o�.i
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105
336.776.9800
Compliance Inspection Report
Permit: WQCSD0223 Effective: 03/01/00 Expiration:
SOC: Effective: Expiration:
County: Rockingham
Region: Winston-Salem
Contact Person: Lee Simaan
Directions to Facility:
Owner : Lee Simaan
Facility: Quail Acres MHP Collection System
Title: Phone: 336-274-2208
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09/27/2022
Primary Inspector: Gary Hudson
Secondary Inspector(s):
Entry Time 10:OOAM Exit Time: 12:OOPM
Phone: 336-776-9694
Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling
Permit Inspection Type: Deemed permitted collection system management and operation
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Miscellaneous Questions General Grease Control
II Spills/Response Plan Inspections
(See attachment summary)
Page 1 of 4
Permit: WQCSD0223 Owner - Facility: Lee Simaan
Inspection Date: 09/27/2022
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Inspection Summary:
*Mr. Montero does a good job keeping maintenance and inspection records.
*FOG flyers are mailed out twice per year.
*The Spill Response Action Plan was presented during the inspection. No discrepancies were noted.
*There are no pump stations in the system.
*There are no high priority lines in the system.
*AII the maintenance and inspection logs are kept at the wastewater treatment plant. The collection system appeared to be
well operated and maintained. No discrepancies were noted during the inspection.
Page 2 of 4
Permit: WQCSD0223 Owner - Facility: Lee Simaan
Inspection Date: 09/27/2022
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
General
# Is this system a satellite system?
# If Yes, what is system name or permit number?
Is there a overall sewer system map?
Does the map include:
Pipe sizes
Pipe materials (PVC, DIP, etc)
Pipe location
# Flow direction
# Approximate pipe age
# Pump station ID, location and capacity
# Force main air release valve location & type
# Location of satellite connections
Are system maintenance records maintained?
Comment:
Grease Control
Is grease/sewer education program documented with req'd customer distribution?
# Are other types of education tools used like websites, booths, special meetings, etc?
If Yes, what are they? (This can reduce mailing to annual.)
*Mr. Montero does a good job keeping maintenance and inspection records.
For public systems, is there a Grease Control Program via an ordinance/agreement?
If Yes, does it require grease control devices at applicable locations?
Is the Grease Control Program enforced via periodic inspections/records review?
Is action taken against violators?
Comment: *FOG flyers are mailed out twice per year.
Spills and Response Action Plan
# Is system free of known points of bypass?
# Have there been any sewer spills in the past 3 years?
If Yes, were they reported to the Division if meeting the reportable criteria?
If applicable, is there documentation of press releases and public notices issued?
Are all spills or sewer related issues/complaints documented?
# Are there repeated overflows/problems (2 or more in 12 months) at same location?
# If Yes, is there a corrective action plan?
Is a Spill Response Action Plan available?
Is a Spill Response Action Plan available for all personnel?
Yes No NA NE
• ❑ ❑ ❑
❑ • ❑ ❑
• ❑ ❑ ❑
❑ • ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
DEED
Yes No NA NE
O 000
O 000
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑• ❑
Yes No NA NE
• ❑ ❑ ❑
❑•❑ ❑
❑ ❑•❑
❑ ❑ • ❑
• ❑ ❑ ❑
❑ • ❑ ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page 3 of 4
Permit: WQCSD0223 Owner - Facility: Lee Simaan
Inspection Date: 09/27/2022
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Does the plan include:
# 24-hour contact numbers • ❑ ❑ ❑
# Response time • ❑ ❑ ❑
# Equipment list and spare parts inventory ❑ ❑ ❑ •
# Access to cleaning equipment • ❑ ❑ ❑
# Access to construction crews, contractors, and/or engineers • ❑ ❑ ❑
# Source of emergency funds ❑ ❑ ❑ •
# Site sanitation and cleanup materials • ❑ ❑ ❑
# Post-overflow/spill assessment • ❑ ❑ ❑
Comment: *The Spill Response Action Plan was presented during the inspection. No discrepancies were
noted.
Inspections
Are adequate maintenance records maintained?
Are pump stations being inspected at the required frequency?
Is at least one complete functionality test conducted weekly per pump station?
Is there a system or plan in place to observe the entire system annually?
Is the annual inspection documented?
# Does the system have any high -priority lines/locations?
Are inspections of HPL documented at least every 6 months?
Are new lines being added to the HPL list when found or created?
Comment: *There are no pump stations in the system.
*There are no high priority lines in the system.
*AII the maintenance and inspection logs are kept at the wastewater treatment plant. The
collection system appeared to be well operated and maintained. No discrepancies were noted
during the inspection.
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ • ❑ ❑
Page 4 of 4