Loading...
HomeMy WebLinkAboutWQCSD0223_Compliance Evaluation Inspection_20221010ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Lee Simaan Quail Acres MHP P.O. Box 549 Summerfield, NC 27358-0549 NORTH CAROLINA Environmental Quality October 10, 2022 SUBJECT: Compliance Evaluation Inspection Quail Acres MHP Collection System NPDES Permit No. WQCSD0223 Rockingham County Dear Mr. Simaan, On September 27, 2022, Gary Hudson of this office met with Anthony Montero, Operator in Responsible Charge (ORC), to perform a Compliance Evaluation Inspection at the above referenced wastewater collection system. This type of inspection consists of two basic parts: an in -office file review and an on -site inspection of the treatment facility. The attached EPA inspection form details the areas that were evaluated during this inspection. The inspection of the facility was satisfactory. If you have any questions regarding the inspection or this report, please contact Gary Hudson or me at (336) 776-9800 or by email at gary.hudson@ncdenr.gov or lon.snider@ncdenr.gov. Sincerely, II DocuSigned by:< C I—/n l . Jn,l&ts' 145B49E225C94EA.. Lon Snider Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: EPA Water Compliance Inspection Report cc: WSRO GDE NORTH C OLI JA ' omm mr� ep..of o�.i North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 Compliance Inspection Report Permit: WQCSD0223 Effective: 03/01/00 Expiration: SOC: Effective: Expiration: County: Rockingham Region: Winston-Salem Contact Person: Lee Simaan Directions to Facility: Owner : Lee Simaan Facility: Quail Acres MHP Collection System Title: Phone: 336-274-2208 System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/27/2022 Primary Inspector: Gary Hudson Secondary Inspector(s): Entry Time 10:OOAM Exit Time: 12:OOPM Phone: 336-776-9694 Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Deemed permitted collection system management and operation Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions General Grease Control II Spills/Response Plan Inspections (See attachment summary) Page 1 of 4 Permit: WQCSD0223 Owner - Facility: Lee Simaan Inspection Date: 09/27/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: *Mr. Montero does a good job keeping maintenance and inspection records. *FOG flyers are mailed out twice per year. *The Spill Response Action Plan was presented during the inspection. No discrepancies were noted. *There are no pump stations in the system. *There are no high priority lines in the system. *AII the maintenance and inspection logs are kept at the wastewater treatment plant. The collection system appeared to be well operated and maintained. No discrepancies were noted during the inspection. Page 2 of 4 Permit: WQCSD0223 Owner - Facility: Lee Simaan Inspection Date: 09/27/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General # Is this system a satellite system? # If Yes, what is system name or permit number? Is there a overall sewer system map? Does the map include: Pipe sizes Pipe materials (PVC, DIP, etc) Pipe location # Flow direction # Approximate pipe age # Pump station ID, location and capacity # Force main air release valve location & type # Location of satellite connections Are system maintenance records maintained? Comment: Grease Control Is grease/sewer education program documented with req'd customer distribution? # Are other types of education tools used like websites, booths, special meetings, etc? If Yes, what are they? (This can reduce mailing to annual.) *Mr. Montero does a good job keeping maintenance and inspection records. For public systems, is there a Grease Control Program via an ordinance/agreement? If Yes, does it require grease control devices at applicable locations? Is the Grease Control Program enforced via periodic inspections/records review? Is action taken against violators? Comment: *FOG flyers are mailed out twice per year. Spills and Response Action Plan # Is system free of known points of bypass? # Have there been any sewer spills in the past 3 years? If Yes, were they reported to the Division if meeting the reportable criteria? If applicable, is there documentation of press releases and public notices issued? Are all spills or sewer related issues/complaints documented? # Are there repeated overflows/problems (2 or more in 12 months) at same location? # If Yes, is there a corrective action plan? Is a Spill Response Action Plan available? Is a Spill Response Action Plan available for all personnel? Yes No NA NE • ❑ ❑ ❑ ❑ • ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ DEED Yes No NA NE O 000 O 000 • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑• ❑ Yes No NA NE • ❑ ❑ ❑ ❑•❑ ❑ ❑ ❑•❑ ❑ ❑ • ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 3 of 4 Permit: WQCSD0223 Owner - Facility: Lee Simaan Inspection Date: 09/27/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Does the plan include: # 24-hour contact numbers • ❑ ❑ ❑ # Response time • ❑ ❑ ❑ # Equipment list and spare parts inventory ❑ ❑ ❑ • # Access to cleaning equipment • ❑ ❑ ❑ # Access to construction crews, contractors, and/or engineers • ❑ ❑ ❑ # Source of emergency funds ❑ ❑ ❑ • # Site sanitation and cleanup materials • ❑ ❑ ❑ # Post-overflow/spill assessment • ❑ ❑ ❑ Comment: *The Spill Response Action Plan was presented during the inspection. No discrepancies were noted. Inspections Are adequate maintenance records maintained? Are pump stations being inspected at the required frequency? Is at least one complete functionality test conducted weekly per pump station? Is there a system or plan in place to observe the entire system annually? Is the annual inspection documented? # Does the system have any high -priority lines/locations? Are inspections of HPL documented at least every 6 months? Are new lines being added to the HPL list when found or created? Comment: *There are no pump stations in the system. *There are no high priority lines in the system. *AII the maintenance and inspection logs are kept at the wastewater treatment plant. The collection system appeared to be well operated and maintained. No discrepancies were noted during the inspection. Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ Page 4 of 4