EROSION CONTROL MEASURE - INITIAL PHASE:
1. ENSURE ALL APPROVALS HAVE BEEN OBTAINED PRIOR TO ANY LAND DISTURBANCE.
2. CONDUCT ON -SITE PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, OWNER, ENGINEER AND CONSTRUCTION MANAGER TO REVIEW THE PROJECT AND
EROSION CONTROL SEQUENCES.
3. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WITHIN AND IMMEDIATELY ADJACENT TO THE PROJECT AREA.
4. INSTALL CONSTRUCTION ENTRANCE AT LOCATION SHOWN ON THE PLAN - OFF OF EDGE OF EXISTING PAVEMENT ON ALPINE DRIVE.
5. FLAG LIMITS OF ALL DISTURBED AREA AS SHOWN ON THE PLANS FOR INSTALLATION OF PERIMETER EROSION CONTROL DEVICES - SILT FENCE AND SILT
FENCE OUTLET AND SEDIMENT BASIN WHERE SHOWN ON THE PLANS.
6. INSTALL ALL SILT FENCE AND SEDIMENT BASINS AS SHOWN ON THE PLANS.
7. CONSTRUCT TEMPORARY DIVERSION DITCHES AS SHOWN ON THE PLANS.
8. "EROSION AND SEDIMENT CONTROL(E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES
OCCUR. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE
DURING INSPECTION." THE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT E-NOI FORM ATDE .NC.GOV/NCG01. PLEASE NOTE
( ) Q ,
THE E-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN APPROVED.
9. WITHIN 14 CALENDER DAYS OF COMPLETION OF ANY PHASE OF GRADING, GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT
GROUND COVER SHALL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 14 CALENDER DAYS OR 60 CALENDER DAYS (WHICHEVER IS SHORTER) FOLLOWING
COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
10. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE FOLLOWING
COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE :
https-.//files.nc.gov/ncdeq/Energy%20Mineral%20and%2OLand%2OResources/Stormwater
/NPDES%20General%2OPermits/DEMLR-CSW-Monitoring-Form-Rev-August-8-2019.pdf
TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS
RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. (GS 113A-54.1 (E), 15ANCAC 04B.0131, NCG01 PART III SECTIONS A AND B).
11. CLEAR AND GRUB SITE (WHERE REQUIRED) AND LEGALLY DISPOSE OF ALL DEBRIS OFF SITE.
12. "SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND
WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS
DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT
THE PROJECT SITE FOR MONITORING.
13. TOTAL SITE DISTURBED AREA = 7.52 AC.
V
-- - --------- _
W W------- W � -� W
f
CONTROLCORNER S
EXISTING 5/8" SOLID IRON I
NC GRID COORDINATES I CL
NORTH: -446 J 94
EAST: 1,987,948.35' -
NAD 83-2011 �S >
SF
XISTING 5/2
CnI In 113l1rkI
GENERAL NOTES:
PURSUANT TO G.S. 133-A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE
NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR
OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES.
IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF
COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED
WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION. PERMANENT GROUNDCOVER WILL BE PROVIDED FOR ALL
DISTURBED AREAS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDER
DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER
SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED
AREAS WITHIN 15 CALENDAR DAYS OR 60 CALENDAR DAYS (WHICHEVER IS SHORTER)
FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
ANY BORROW MATERIAL BROUGHT ONTO THIS SITE MUST BE FROM A LEGALLY
PERMITTED MINE SITE OR OTHER APPROVED SOURCE. A SINGLE -USE BORROW OR
WASTE AREA SITE IS ONLY PERMISSIBLE IF IT IS OPERATED UNDER CONTROL OF THE
FINANCIALLY RESPONSIBLE PERSON OR FIRM THAT IS DEVELOPING THIS SITE. AN
APPROVED EROSION AND SEDIMENT CONTROL PLAN IS REQUIRED FOR ALL SINGLE
USE BORROW AND WASTE SITES.
EROSION CONTROL DESIGN, DETAILS AND MAINTENANCE SPECIFICATIONS SHALL
COMPLY WITH CURRENT NORTH CAROLINA EROSION AND SEDIMENT CONTROL
PLANNING AND DESIGN MANUAL.
SELF INSPECTION NOTE:
THE LANDOWNER, THE FINANCIALLY RESPONSIBLE PARTY, OR THE LANDOWNER'S
OR THE FINANCIALLY RESPONSIBLE PARTY'S AGENT SHALL PERFORM AN
INSPECTION OF THE AREA COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN
HAS BEEN COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND
COVER IN ACCORDANCE WITH
G.S. 113A-57(2). THE PERSON WHO PERFORMS THE INSPECTION SHALL MAINTAIN
AND MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE SITE OF THE
LAND -DISTURBING ACTIVITY. THE RECORD SHALL SET OUT ANY SIGNIFICANT
DEVIATION FROM THE APPROVED EROSION CONTROL PLAN, IDENTIFY ANY
MEASURES THAT MAY BE REQUIRED TO CORRECT THE DEVIATION, AND
DOCUMENT THE COMPLETION OF THOSE MEASURES. THE RECORD SHALL BE
MAINTAINED UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED AS
REQUIRED BY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE
INSPECTIONS REQUIRED BY THIS SUBSECTION SHALL BE IN ADDITION TO
INSPECTIONS REQUIRE BY G.S. 113A-61.1. SEE NCGO1 INSPECTION,
RECORDKEEPING AND REPORTING PLAN SHEET.
EMERGENCEY
SPILLWAY
4¢2� W 441 440 - 439- - ` 43&-
ALPINE DRIVE -,NCSR 1141-
60' PIUBLIC RIGHT -OF -'WAY (PAVED)
SFO 5,og„ E � _ 440 SFO 3
SF SF �, , - SF
44 W EX. 12" WM _
443.
- 444�
TD \
o a <�
445 \
SKIMMER BASIN
14471 1 _ o LENGTH AT SPILLWAY: 172'
WIDTH AT SPILLWAY: 86'
!IWEIR LENGTH: 43'
✓ ; ��� ° WEIR ELEV: 438.00'
TOP OF DAM: 439.50'
BOTTOM OF BASIN: 434.50'
s 3:1 SIDE SLOPES
5.0' WIDE DAM
SEDIMENT CLEANOUT ELEV: 436.25'
SFO
SYMBOL PRACTICE DESCRIPTION
(� E
CONSTRUCTION ENTRANCE
A STONE STABILIZED PAD LOCATED AT ANY POINT THAT TRAFFIC WILL BE
LEAVING A CONSTRUCTION SITE TO A PUBLIC RIGHT-OF-WAY, STREET,
ALLEY, SIDEWALK, OR PARKING PLOT WHICH WILL REDUCE OR ELIMINATE
THE TRANSPORT OF MUD FROM THE CONSTRUCTION SITE.
A TEMPORARY STRUCTURE USED TO SLOW THE VELOCITY OF RUN-OFF,
SILT FENCE
CAUSE SEDIMENT DEPOSITION AT THE STRUCTURE, AND FILTER SEDIMENT
FROM RUN-OFF.
S FO
SILT FENCE OUTLET
PROTECTION
A TEMPORARY STRUCTURE AS A REINFORCED OUTLET AT LOW POINTS OF
THE SILT FENCE. INSTALL #57 WASHED STONE AT UPSTREAM FLOW WITH
HARDWARE CLOTH. (SEE DETAIL)
TEMPORARY
A TEMPORARY RIDGE OR EXCAVATED CHANNEL OR COMBINATION RIDGE
TD
DIVERSION
AND CHANNEL CONSTRUCTED ACROSS SLOPING LAND ON A
PREDETERMINED GRADE.
CONSTRUCTION LIMITS
A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR
DURING CONSTRUCTION.
S K
SKIMMER SEDIMENT
AN EARTHEN EMBANKMENT SUITABLY LOCATED TO CAPTURE RUNOFF,
WITH A TRAPEZOIDAL SPILLWAY LINED WITH AN IMPERABLE GEOTEXTILE
BASIN
OR LAMINATED PLASTIC MEMBRANE, AND EQUIPPED WITH A FLOATING
SKIMMER FOR DEWATERING.
POROUS BARRIERS INSTALLED INSIDE A TEMPORARY SEDIMENT TRAP,
SKIMMER BASIN, OR SEDIMENT BASIN TO REDUCE THE VELOCITY AND
B F
POROUS BAFFLE
TURBULENCE OF THE WATER FLOWING THROUGH THE MEASURE, AND TO
FACILITATE THE SETTLING OF SEDIMENT FROM THE WATER BEFORE
DISCHARGE.
TEMPORARY DIVERSION DITCHES
DITCH NAME
LENGTH
AVE. SLOPE
(0/0)
TOTAL DEPTH
(FT)
BERM HEIGHT
(FT)
BOTTOM BERM
WIDTH (FT)
TOP BERM WIDTH
(FT)
01-OFFSITE
420
1.0
1.5
1.3
6.0
2.0
01-4
178
1.0
1.5
1.0
6.0
2.0
01 B
455
1.0
1.5
0.8
6.0
2.0
2
500
17 To
1.5
0.6
6.0
2.0
I HEADWALL TOP: 431.73' 1
®gam INV IN: 426.24'
I I 11 p 1 l
A�
Q
- W
- SFO
7S F 436
0
DEVICE:
�IIiSKIMMER SIZE: 4"
ORIFICE SIZE: 3"
1 DEWATERING TIME: 3.47 DAYS
�II�
IIlI it a
�Iollll� d'IIIIS c ��
x II III
r f I I I l
\ \ i�/✓ - \ \ ' \ ` N / / \ / i I / _ I III II ��/
-30�\==�
rn \ \ _ = - - -
NJ 4 _ -=43 _ _43_3 43-243 7 - - - _ - �- = - _ _ - f JI / �° / // I w
\� �� o _ - - 43 =4231 -� = 49'-� //1 o
_------_ ---_ -431
3
445 m _ x =4 - - - - _ -42
-49 - 447 \ Qr I 4 435
/450- MAINTAIN DIVERSION SLOPE TO BOTTOM / (D4
A -
OF THE BASINS IN ORDER TO PREVENT / - - -
4 °�' 6 - - 432 -43� X -4
EROSION OF BASIN. PROVIDE CLASS B RIPRAP / 0 -3
MINIMUM 20LF. (TYP OF ALLY v - - 33
/ / S F Q/ �� a /� 1
> /
POROUS COIR / 14: 23�
FIBER BAFFLE
(3EACH) \
450
4 _ +/-�100 8-ACRES REMAINING
N SFO �� INVESTORS, LLC �3r� w / a 50
- - - DEED BOOK 1145, PAGE 347
� PLAT BOOK 2010, PAGES 674-677
1\ .
_ I PIN: 9586-98-1436000
450-- -- �49 TEMPORARY STOCKPILE � � � v 4 �37- - -
_ = AREA WITH SILT FENCE. \ PID: 03958701 0020
_ -a4 v � v 11,_0 � �� - � REID: 0040470
---4-39-_ a v!r
I I A I 436-- o
SF -- -- 440--
_ 44 \A- k k I 1 9
k
BEGIN DITCH TRANSITION �4A� kk kk k 11� / / 44 �� - ��5 49
FROM 01A TO 0113
TD TD v v v
-436
- - - - - - - - - - - - - - - - - - -
- - - �44 442 441 4
bo
S 83°34'52" W 699. TD TD
LIMITS OF WEST POINTE DRIVE
DISTURBANCE / 60' PUBLIC R/W & PUBLIC UTILITY- 31' B-B I I
PROPERTY LINE
48 I
SCALE IN FEET
0' 25 50 100
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
NO.
4
REVISION DESCRIPTION
PER NCDNER COMMENTS
\N CARo
ESS/��
.Q
E ;
• 35
�O••.....•• 0
E,N.\
O
m E
M O
U
N bA
z m
• r-- N
N rr) (1)
OU0.��
4- z N �O
N Lr) IZ
O M *k
L m
U Ln Ol -c C:
CTl • • �J U
O m U
�X�-z
O
ate-+ CO d �E
� O
M
wt-
Q
W
J
(D
z_
W
Q
�O
J
O
OQ
1
�
zW
L�
O
V)
J
W
z0
U
TQ
i
U)
U)
z
�
z
O
J
~�
�
v/,
<
7
O
_
Qo
�
z
=�
W
_
DESIGNED BY: JEH
DRAWN BY:
DATE: APPROVED BY. .IEH
5/23/22 SHEET:
3.0
CIVIL
ERO-C3.0, 5/24/2022 7:10:59 AM, ARCH full bleed D (36.00 x 24.00 Inches)
n
N D
D
NJ�F
� 0
0
'T1
U, O
ALPINE DR
0
1141
WEST
p01NTE DR
W
m
�z
m
VICINITY MAP
NOT TO SCALE
2519
2518
CONSTRUCTION SEQUENCE & EROSION CONTROL
MEASURES - CONSTRUCTION PHASE:
1. CHECK ALL SILT FENCE AND TEMPORARY DIVERSION DITCHES, REPAIR AS
NECESSARY. ASSURE ANY ERODED AREA ARE STABILIZED WITH TEMPORARY
SEEDING AND MULCH.
2. INSTALL THE SEWER AND WATER SYSTEMS AS SHOWN ON THE PLANS.
3. INSTALL STORM DRAINAGE SYSTEMS. (SEE STORM TRUNK CONSTRUCTION NOTE
THIS SHEET.)
4. INSTALL INLET/ OUTLET BMP'S WHERE REQUIRED.
5. GRADE AND PREPARE SUBGRADE FOR PAVEMENT AREA.
6. PLACE COMPACTED G.A.B.0 FOR ASPHALT CONSTRUCTION.
7. FINISH FINE GRADING THE ROAD RIGHT OF WAY AND OPEN SPACES.
8. PLACE ASPHALT, PAVEMENT MARKINGS AND SIGNAGE WHERE APPLICABLE.
9. FOR PHASE 3 CONSTRUCTION: REMOVE TEMPORARY SEDIMENT BASIN AND FILL IN
AND GRADE SITE TO PROPOSE GRADE. SEE BASIN REMOVAL SEQUENCE.
10. EXTEND SILT FENCE TO PROPERTY CORNER.
11. REPEAT CONSTRUCTION SEQUENCES OF PHASE 1 AND 2 TO PHASE 3.
12. PLACE ASPHALT, PAVEMENT MARKINGS, AND SIGNAGE WHERE APPLICABLE.
BASIN REMOVAL SEQUENCE:
1. SCHEDULE A SITE MEETING WITH THE ENVIRONMENTAL ENGINEER/CONSULTANT TO
DETERMINE IF THE BASIN CAN BE REMOVED. INSTALL SILT FENCING AND EXTEND TO
PROPERTY CORNER.
2. REMOVE BASIN AND ASSOCIATED TEMPORARY DIVERSION DITCHES. FINE GRADE
AREAS IN PREPARATION FOR SEEDING.
3. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ASPHALT TACH AND
RESULTING BARE AREA IMMEDIATELY.
4. WHEN SITE IS FULLY STABILIZED, CALL NCDEQ FOR APPROVAL OF REMOVING
REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE
CAN BE ISSUES A CERITIFICATE OF COMPLETION.
� RIPRAP APRON
CLASS B -
4.5'x10'x11.5'
18" THICK
-------- -
W
PROVIDE 127 LF
OF SILT FENCE
- - OP
CONTROLCORNER �L
EXISTING 5/8" SOLID IRON
NC GRID COORDINATES C
- N$RT . i
EAST: 987,948.35'
NAD 83-2011 16
CONCRETE CWA
WASHOUT
3
IP
IP 0
® IP
z
0
rn
w
41
STABILIZE SWALE WITH
PERMANENT VEGETATION.
A I
0)
AREA REQUIRING 7-DAY
GROUND COVER (DITCHES)
00, �C
050PC'4 O,\p��O��
O
O��0
iQ L'b RR
QOJOO�O'�O'\��300
O
Q�P Q Q\O
PROVIDE 284 LF
OF SILT FENCE
(PHASE 1 AND 2)
I
kSF
CONSTRUCTION SEQUENCE & EROSION
CONTROL MEASURES - FINAL PHASE:
1. UPON COMPLETING ALL SITE IMPROVEMENTS AND FINAL GRADING, STABILIZE ALL
DISTURBED AREAS PER LANDSCAPE PLAN. WATER AND MAINTAIN ALL LANDSCAPED
AREAS TO ENSURE PROPER GROUND COVERAGE PRIOR TO FINAL APPROVAL
2. RE -GRADE AND CONVERT SEDIMENT BASIN TO TEMPORARY OUTFALL BASIN FOR
STORM DRAINAGE
DISCHARGE. FILL IN EASTERN HALF OF THE SEDIMENT BASIN AND REMOVE DAM. LEVEL
BOTTOM BASIN TO EXISTING GRADE AS SHOWN ON THE PLANS. STABILIZED BASIN
BANK AND BOTTOM BASIN WITH PERMANENT VEGETATION AND EROSION CONTROL
MATTING.
3. CONSTRUCT PIPE DISCHARGE DITCH AS SHOWN ON THE PLAN. DITCH SHALL GRADE
TO RE -GRADED SEDIMENT BASIN AS SHOWN ON THE PLANS.
4. INSTALL CLASS B RIPRAP LINING AS SHOWN ON THE PLAN.
5. PERIMETER MEASURES, SILT FENCE AND TEMPORARY DIVERSION MUST BE LEFT
INPLACE UNTIL ALL UPLAND AREAS ARE STABILIZED WITH PERMANENT VEGETATION.
11110USIALUDYil:L�1�l��:ti��1 • • 1►1�:ii��NL[�Ii1►11�:ii]�1�/_ll�
7. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION
CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY
MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT
BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPS UNTIL ALL
UPLAND AREAS ARE PERMANENTLY STABILIZED. (GS 113A-57(3). 15A NCAC 04B. 0113)
8. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO
CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT
CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01
TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL
GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT.
ALPINE DRIVE - NCSR 1141
LIMITS OF 60' PUBLIC RIGHT-OF-WAY (PAVED)
DISTURBANCE
(TYP)
OP SFO 5'09" E 700.35'
-=
SF
❑® IP aQ)D ❑®
IP i
I
TEMP. DIVERSION
® IP DITCH -02
LINER: SEED MULCH WITH
CONTRACTOR'S BLEND
12" DEPTH, 3.53' WIDE
AT FLOW SURFACE.
(TO REMAIN DURING BOTH
PHASE 1 & 2 CONSTRUCTION)
SILT FENCE
GROUND STABILIZATION REQUIREMENTS
CONTRACTOR SHALL BE REQUIRED TO ESTABLISH GROUND
STABILIZATION AS PER FOLLOWING CHART.
SITE AREA
STABILIZATION
STABILIZATION TIME
APPLICABLE
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
THIS PROJECT
PERIMETER DIKES,
7 DAYS
NONE
SWALES, DITCHES AND
YES
SLOPES
HIGH QUALITY WATER
7 DAYS
NONE
(HQW) ZONES
NO
FLATTER THAN 4:1
SLOPES STEEPER
7 DAYS
IF SLOPES ARE 10' OR LESS
THAN 3:1
IN LENGTH AND ARE NOT
NO
STEEPER THAN 2:1 14 DAYS
ARE ALLOWED
SLOPES 3:1 OR
14 DAYS
7 DAYS FOR SLOPES GREATER
YES
FLATTER
THAN 50 FEET IN LENGTH
ALL OTHER AREAS
14 DAYS
NONE
WITH SLOPES
(EXCEPT FOR PERIMETER
YES
FLATTER THAN 4:1
AND HQW ZONES)
TYPICAL GROUND COVER STABILIZATION TYPES - GRASS
AND OR SOD, WHEAT STRAW, MULCH, BIODEGRADABLE
STRAW MATTING, SYNTHETIC MATTING, ETC.
SFO
STORM TRUNK CONSTRUCTION:
THE STORM TRUNK LINE OF FES-1 THROUGH CB-12 AND THE BRANCH STORM LINE OF
CB-5 THROUGH CB-17B SHALL ALL BE CONSTRUCTED AS PART OF PHASE 1. ALL OTHER
BRANCH STORM LINES SHALL BE CONSTRUCTED AS PART OF THEIR RESPECTIVE PHASE.
SYMBOL PRACTICE DESCRIPTION
P
INLET PROTECTION
A TEMPORARY SEDIMENT BARRIER LAID AROUND A STORM DRAIN INLET
TO PREVENT SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM.
TEMPORARY FACILITY PROVIDED ONSITE FOR CONCRETE TRUCKS TO
CONCRETE WASHOUT
WASHOUT PRIOR TO LEAVING CONSTRUCTION SITE, CONTRACTOR MAY
CWA
AREA
RELOCATE ONSITE AS DEEMED NECESSARY THROUGH -OUT
CONSTRUCTION
I I
HEADWALL TOP: 431.73'
I I pp'z lNV lN: 426.24'
W
AREA REQUIRING 7-DAY
GROUND COVER (DITCHES)
SFO
JSF SF
-- 14 ,
w- w
a a s-� a a
IP IP a
IP
i
IP
❑® IP ❑® IP 'P ❑® ❑®
I
I
I
I
i
I
i TEMP. DIVERSION
DITCH - 01A
LINER: SEED MULCH WITH
i CONTRACTOR'S BLEND
7" DEPTH, 2.25' WIDE
i AT FLOW SURFACE.
(TO REMAIN DURING BOTH
PHASE 1 AND PHASE 2
PHASE 2 CONSTRUCTION)
r.� M
PHASE I P
SF
I
i IP
IP
I
I
I
I
I
i
i E)SFO
r
w CONSTRUCTION
_'= STAGING AREA
a
IP
® i -
k N k k k
1 k
TD
k lk/ k k k k k
k k k k k
k k
BEGIN DITCH TRANSITION w�w k k k k k kk k>
FROM 01A TO 01B = = I k k
TD - la
EXISTING 5/8" S 83'34'52" W 699. TD
SOLID IRON SFO \1
SILT FENCE TO BE REMOVE UPON LIMITS OF WEST POINTE DRIVE
II COMPLETION OF PH1 AND 2 AND I DISTURBANCE / 60' PUBLIC R/W & PUBLIC UTILITY -31' B-B TEMP. DIVERSION
OPEN SPACE COMPLETELY STABILIZED PROPERTY LINE DITCH - 01-OFFSITE
WITH VEGETATION. I LINER: SEED MULCH WITH
CONTRACTOR'S BLEND
4" DEPTH, 10' NATURAL
FLOW SPREAD AT TERMINUS
I
+/- Inn R ACRFC RFNADII\IINIr
Q?)
AREA REQUIRING 7-DAY
GROUND COVER (DITCHES)
I
I 9' x 20' x 23' CLASS B, I I I
I 18" THICK I I
I I I I
i t j j I I
IMMEDIATELY STABILIZED SLOPE I I
WITH PERMANENT VEGETATION. I
\ , I
\ I I x I
AREA REQUK4Nrz7-DAY I I
GROUND COVER (DITZHI S}-� \ I
to \----- I
00 ---
x---------- /
m
�--max ------
SKIMMER BASIN TO BE REMOVED UPON
Ln COMPLETION OF PHASE 2 AND BEGINNING
OF PHASE 3. EXTEND SILT FENCE TO
SF PROPERTY CORNER.
i ��
CARS
�'c�0 � ESS��j�• �9"'
.� 9:
.Q
E
' 35
00••.....••
O
m E
M O
U
N r-1 bA
U m
r-- N
N rr) �
OU0.��
K z I �°O
cn -p � cL
O M *k
N 4-
U c a) = N
U c/) Ql -I-- C:
-0oi °U'
O MU
O
ate-+ m
� O
0
I
M
4
%-4
SFO
I
z
+/- 100.8 ACRES REMAINING
ALLIED INVESTORS, LLC 50
Q
W
w
DEED BOOK 1145, PAGE 347
�
Q
i
PLAT BOOK 2010, PAGES 674-677
Z
AREA REQUIRING 7-DAY
GROUND COVER (DITCHES)
PROVIDE 615 LF
PIN: 9586-98-1436.000
PID: 03958701 0020
Q
_
Q
J
O
TO BE INSTALLED PRIOR
TO FINAL PHASE BEFORE
REID: 0040470
0
/•�
I..L
O
SEDIMENT BASIN AND
I
�/
L.f`�
Q
SF DIVERSIONS ARE REMOVED.
1
_
z
0
L�
I
49
O
�
J
w
O
z
U
U
z
CD
z
_
Cn
- TEMP. DIVERSION w z
DITCH - 01B (J )
LINER: SEED MULCH WITH I I 0 z O
CONTRACTOR'S BLEND
12" DEPTH, 3.06' WIDE �' /�/ O _
AT FLOW SURFACE. I W W
TO REMAIN UNTIL PHASE 1 AND2 4$
=ARE COMPLETELY STABILIZED.
SCALE IN FEET 0
s DESIGNED BY: JEH
' 0' 25 50 100
DRAWN BY:
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
NO. REVISION DESCRIPTION: DATE: APPROVED BY: I .IEH
I PER NCDNER COMMENTS 5/23/22 SHEET.
2
3 C3.1
4 CIVIL
ERO-C3.1, 5/24/2022 7:10:48 AM, ARCH full bleed D (36.00 x 24.00 Inches)
�I
D
Q
ALPINE DR
1141
W EST
POINTE DR
VICINITY MAP
NOT TO SCALE
m F
2519
518
CONSTRUCTION SEQUENCE & EROSION CONTROL
MEASURES - FINAL PHASE:
1. UPON COMPLETING ALL SITE IMPROVEMENTS AND FINAL GRADING, STABILIZE ALL DISTURBED AREAS
PER LANDSCAPE PLAN. WATER AND MAINTAIN ALL LANDSCAPED AREAS TO ENSURE PROPER GROUND
COVERAGE PRIOR TO FINAL APPROVAL
2. PERIMETER MEASURES, SILT FENCE AND TEMPORARY DIVERSION MUST BE LEFT INPLACE UNTIL ALL
UPLAND AREAS ARE STABILIZED WITH PERMANENT VEGETATION.
3.SEE SEEDING SCHEDULE PROVIDED IN EROSION CONTROL DETAIL.
4. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES
AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND
GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO
PERMANENT BMPS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. (GS 113A-57(3). 15A NCAC
04B. 0113)
5. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC
PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT,
THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION
(e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED
OUT.
W -
W
CONTROLCORNER
EXISTING 5/8" SOLID IRON -
NC GRID COORDINATES
NORTH: 568,650.9
EAST: 1 987,948.35'
NAD 83-2011
V
W W
- W W -
ALPINE DRIVE - NCSR 1141
60' PUBLIC RIGHT-OF-WAY (PAVED)
AI Q2°')S'nQ" P 7nn 2c�'
GROUND STABILIZATION REQUIREMENTS
CONTRACTOR SHALL BE REQUIRED TO ESTABLISH GROUND
STABILIZATION AS PER FOLLOWING CHART.
SITE AREA
STABILIZATION
STABILIZATION TIME
APPLICABLE
DESCRIPTION
TIME FRAME
FRAME EXCEPTIONS
THIS PROJECT
PERIMETER DIKES,
7 DAYS
NONE
SWALES, DITCHES AND
YES
SLOPES
HIGH QUALITY WATER
7 DAYS
NONE
(HQW) ZONES
NO
FLATTER THAN 4:1
SLOPES STEEPER
7 DAYS
IF SLOPES ARE 10' OR LESS
THAN 3:1
IN LENGTH AND ARE NOT
NO
STEEPER THAN 2:1 14 DAYS
ARE ALLOWED
SLOPES 3:1 OR
14 DAYS
7 DAYS FOR SLOPES GREATER
YES
FLATTER
THAN 50 FEET IN LENGTH
ALL OTHER AREAS
14 DAYS
NONE
WITH SLOPES
(EXCEPT FOR PERIMETER
YES
FLATTER THAN 4:1
AND HQW ZONES)
TYPICAL GROUND COVER STABILIZATION TYPES - GRASS
AND OR SOD, WHEAT STRAW, MULCH, BIODEGRADABLE
STRAW MATTING, SYNTHETIC MATTING, ETC.
SYMBOL PRACTICE DESCRIPTION
(� LM
CONSTRUCTION LIMITS
A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR
DURING CONSTRUCTION.
SEEDING SCHEDULE FOR
Ds3
NOTES:
PERMANENT VEGETATION
GIANT BERMUDA SEED, INCLUDING NK-37, SHALL NOT BE USED.
SCHEDULE
COMMON NAME
RATE PER ACRE
PLANTING
NO.
OF SEED
(LBS.)
DATES
THE CONTRACTOR SHALL OBTAIN A SATISFACTORY STAND OF
PERENNIAL VEGETATION WHOSE ROOT SYSTEM SHALL BE DEVELOPED
SUFFICIENTLY TO SURVIVE DRY PERIODS AND WINTER WEATHER, AND
COMMON BERMUDA
210
MARCH 16
1
(HULLED)
TO
BE CAPABLE OF RE-ESTABLISHMENT IN THE SPRING. THE PERENNIAL
TALL FESCUE
140
AUG. 31
VEGETATIVE COVER SHALL HAVE A MINIMUM COVERAGE DENSITY OF
70% FOR THE SEEDED AREAS. CONTRACTOR SHALL DETERMINE ALL
RATES OF APPLICATION NECESSARY TO PRODUCE THE REQUIRED
SEPT. 1
2
COMMON BERMUDA
175
O
STAND OF GRASS, AND SHALL FOLLOW THE APPLICATION
(UNHULLED)
MARCH 15
PROCEDURES AS SPECIFIED HEREIN.
irvVIN. 428.62' -
Ds3 r
II I HEADWALL TOP: 431.73'
pp I I lNV IN., 426.24'
!NV IN 427.21'
W
W W W
lNV OUT, 426.68'
HEADWALL TOP: 429.69'
INV OUT' 42702'
_ —443 _TT�4 — - X
\ o a 44 V M
4
— — — —
° 00,0
0 0 0 ° °o Q.Q ---------
o0000 2 M -_-- d
° 0 o o° ° 4§ ------------
0 0 0
000 0°°0
00000000 —
0 0 0 00 o a a------446-�
o°\°o°
o°°o
o0 A
000i
o I
°o0 0° o
0000°0,0
I
III o
449
448
III
I
I
o I
m
N I
Co
A
Ql �,
Cn IUPON COMPLETION OF RESIDENTIAL
V PROJECTAND UPSTREAM GROUND
V STABILIZATION, REMOVE AND
FILL-IN SEDIMENT BASIN
(TYP OF ALL)
1ti 11 I
O�OPk, A�0
Q0"ipQ
J� ,�'L4)pQP ��bpp'Lp li
Qo
Q�P Q QUO w M
u, W
LPHASE 2 a =
PHASE 1
W W
AM
—
1$ RCP x X
INV OUT.- 428.60,
RISER TOP: 5. 3'
I I INV OUT.- 427
I I I I x
I I I I
I I I I I
I I I I
I I I I
I I I I I
\ I I I
\\ I I I I
x
6 SKIMMER REMOVAL NOTE: I I
� 1
I o UPON COMPLETION AND STABILIZATION OF THE PROJECT, CLEANOUT ALL SEDIMENT FROM THE BASIN
N AND ALLOW THE BASIN TO DEWATER VIA SKIMMER PRIOR TO REMOVAL. ALL DOWNSTREAM EROSION �
+,AND SEDIMENTATION CONTROL DEVICES SHALL REMAIN UNTIL THE BASIN ARE COMPLETELY REMOVED.
r
m---------- /
X
X/ X
v _ _
+/- 100.8 ACRES REMAINING f
ALLIED INVESTORS, LLC
DEED BOOK 1145, PAGE 347
PLAT BOOK 2010, PAGES 674-677
PIN: 9586-98-1436.000
PID: 03958701 0020
R E I D: 0040470
I
I
I
60' PUBLIC R/W & PUBLIC UTILITY - 31' B-B + I
_ I
I
+/- 100.8 ACRES REMAINING
ALLIED INVESTORS, LLC 4
I I DEED BOOK 1145, PAGE 347 47 46 1
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
SCALE IN FEET
0' 25 50 100
NO. REVISION DESCRIPTION
PER NCDNER COMMENTS
2
3
4
O
cM E
m 0
� U
N r-1
U m i
N rn O lD
OU0.��
z �° O
O M L *k
y c6
U = N
L
U V) CY) -c C
N J
•� x 0 CCU
L z
0
4-J m
� O
cn
4
rk
%4
-
z
Q
J
LU
z
J
�O
0
OQ
U
_
z
LL
O LEI
�
_j O
U
rW v rn�
V !
z=
V
�
O
�
Lu 0-
cn Q
Oz
Q0
L.I. —
= 07
�O
LU LL
�?
DESIGNED BY.
JEH
DRAWN BY.
APPROVED BY:
JEH
DATE:
5/23/22
SHEET:
C3.2
CIVIL
ERO-C3.2, 5/24/2022 7:10:37 AM, ARCH full bleed D (36.00 x 24.00 Inches)
GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH
Implementing the details and specifications on this plan sheet will result in the construction
activity being considered compliant with the Ground Stabilization and Materials Handling
sections of the NCG01 Construction General Permit (Sections E and F, respectively). The
permittee shall comply with the Erosion and Sediment Control plan approved by the
delegated authority having jurisdiction. All details and specifications shown on this sheet
may not apply depending on site conditions and the delegated authority having jurisdiction.
SECTION E: GROUND STABILIZATION
Required Ground Stabilization Timeframes
Stabilize within this
Site Area Description
many calendar
Timeframe variations
days after ceasing
land disturbance
(a) Perimeter dikes,
swales, ditches, and
7
None
perimeter slopes
(b) High Quality Water
7
None
(HQW) Zones
(c) Slopes steeper than
If slopes are 10' or less in length and are
3:1
7
not steeper than 2:1, 14 days are
allowed
-7 days for slopes greater than 50' in
length and with slopes steeper than 4:1
-7 days for perimeter dikes, swales,
(d) Slopes 3:1 to 4:1
14
ditches, perimeter slopes and HOW
Zones
-10 days for Falls Lake Watershed
-7 days for perimeter dikes, swales,
(e) Areas with slopes
ditches, perimeter slopes and HQW Zones
flatter than 4:1
14
-10 days for Falls Lake Watershed unless
there is zero slope
Note: After the permanent cessation of construction activities, any areas with temporary
ground stabilization shall be converted to permanent ground stabilization as soon as
practicable but in no case longer than 90 calendar days after the last land disturbing
p g Y g
activity. Temporary ground stabilization shall be maintained in a manner to render the
surface stable against accelerated erosion until permanent ground stabilization is achieved.
GROUND STABILIZATION SPECIFICATION
Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the
techniques in the table below:
Temporary Stabilization
Permanent Stabilization
• Temporary grass seed covered with straw or
• Permanent grass seed covered with straw or
other mulches and tackifiers
other mulches and tack"rriers
• Hydroseeding
• Geotextile fabrics such as permanent soil
• Rolled erosion control pmductswith or
reinforcement matting
without temporary grass seed
• Hydroseeding
• Appropriately applied straw or other mulch
• Shrubs or other permanent plantings covered
• Plastic sheeting
with mulch
• Uniform and evenly distributed ground cover
sufficientto restrain erosion
• Structural methods such as concrete, asphalt or
retaining walls
• Rolled erosion control products with grass seed
POLYACRYLAMIDES (PAMS) AND FLOCCULANTS
1. Select flocculants that are appropriate for the soils being exposed during
construction, selecting from the NC DWR List of Approved PAMS/Flocculants.
2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.
3. Apply flocculants at the concentrations specified in the NC DWR List of Approved
PAMS/Flocculants and in accordance with the manufacturer's instructions.
4. Provide ponding area for containment of treated Stormwater before discharging
offsite.
5. Store flocculants in leak -proof containers that are kept under storm -resistant cover
or surrounded by secondary containment structures.
EQUIPMENT AND VEHICLE MAINTENANCE
1. Maintain vehicles and equipment to prevent discharge of fluids.
2. Provide drip pans under any stored equipment.
3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the
project.
4. Collect all spent fluids, store in separate containers and properly dispose as
hazardous waste (recycle when possible).
5. Remove leaking vehicles and construction equipment from service until the problem
has been corrected.
6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products
to a recycling or disposal center that handles these materials.
LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE
1. Never bury or burn waste. Place litter and debris in approved waste containers.
2. Provide a sufficient number and size of waste containers (e.g dumpster, trash
receptacle) on site to contain construction and domestic wastes.
3. Locate waste containers at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
4. Locate waste containers on areas that do not receive substantial amounts of runoff
from upland areas and does not drain directly to a storm drain, stream or wetland.
5. Cover waste containers at the end of each workday and before storm events or
provide secondary containment. Repair or replace damaged waste containers.
6. Anchor all lightweight items in waste containers during times of high winds.
7. Empty waste containers as needed to prevent overflow. Clean up immediately if
containers overflow.
8. Dispose waste off -site at an approved disposal facility.
9. On business days, clean up and dispose of waste in designated waste containers.
PAINT AND OTHER LIQUID WASTE
1. Do not dump paint and other liquid waste into storm drains, streams or wetlands.
2. Locate paint washouts at least 50 feet away from storm drain inlets and surface
waters unless no other alternatives are reasonably available.
3. Contain liquid wastes in a controlled area.
4. Containment must be labeled, sized and placed appropriately for the needs of site.
5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from
construction sites.
PORTABLE TOILETS
1. Install portable toilets on level ground, at least 50 feet away from storm drains,
streams or wetlands unless there is no alternative reasonably available. If 50 foot
offset is not attainable, provide relocation of portable toilet behind silt fence or place
on a gravel pad and surround with sand bags.
2. Provide staking or anchoring of portable toilets during periods of high winds or in high
foot traffic areas.
3. Monitor portable toilets for leaking and properly dispose of any leaked material.
Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace
with properly operating unit.
EARTHEN STOCKPILE MANAGEMENT
1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least
50 feet away from storm drain inlets, sediment basins, perimeter sediment controls
and surface waters unless it can be shown no other alternatives are reasonably
available.
2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of
five feet from the toe of stockpile.
3. Provide stable stone access point when feasible.
4. Stabilize stockpile within the timeframes provided on this sheet and in accordance
with the approved plan and any additional requirements. Soil stabilization is defined
as vegetative, physical or chemical coverage techniques that will restrain accelerated
erosion on disturbed soils for temporary or permanent control needs.
ONSITE CONCRETE WASHOUT
STRUCTURE WITH LINER
� 6
>Mnor° `-1�rra,
,. �l N o RM m r-
�o R
PLAN 1� elad
..
BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE SHOUT STRUCTURE
CONCRETE WASHOUTS
1. Do not discharge concrete or cement slurry from the site.
2. Dispose of, or recycle settled, hardened concrete residue in accordance with local
and state solid waste regulations and at an approved facility.
3. Manage washout from mortar mixers in accordance with the above item and in
addition place the mixer and associated materials on impervious barrier and within
lot perimeter silt fence.
4. Install temporary concrete washouts per local requirements, where applicable. If an
alternate method or product is to be used, contact your approval authority for
review and approval. If local standard details are not available, use one of the two
types of temporary concrete washouts provided on this detail.
5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk
sections. Stormwater accumulated within the washout may not be pumped into or
discharged to the storm drain system or receiving surface waters. Liquid waste must
be pumped out and removed from project.
6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it
can be shown that no other alternatives are reasonably available. At a minimum,
install protection of storm drain inlet(s) closest to the washout which could receive
spills or overflow.
7. Locate washouts in an easily accessible area, on level ground and install a stone
entrance pad in front of the washout. Additional controls may be required by the
approving authority.
8. Install at least one sign directing concrete trucks to the washout within the project
limits. Post signage on the washout itself to identify this location.
9. Remove leavings from the washout when at approximately 75% capacity to limit
overflow events. Replace the tarp, sand bags or other temporary structural
components when no longer functional. When utilizing alternative or proprietary
products, follow manufacturer's instructions.
10. At the completion of the concrete work, remove remaining leavings and dispose of
in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance
caused by removal of washout.
HERBICIDES, PESTICIDES AND RODENTICIDES
1. Store and apply herbicides, pesticides and rodenticides in accordance with label
restrictions.
2. Store herbicides, pesticides and rodenticides in their original containers with the
label, which lists directions for use, ingredients and first aid steps in case of
accidental poisoning.
3. Do not store herbicides, pesticides and rodenticides in areas where flooding is
possible or where they may spill or leak into wells, stormwater drains, ground water
or surface water. If a spill occurs, clean area immediately.
4. Do not stockpile these materials onsite.
HAZARDOUS AND TOXIC WASTE
1. Create designated hazardous waste collection areas on -site.
2. Place hazardous waste containers under cover or in secondary containment.
3. Do not store hazardous chemicals, drums or bagged materials directly on the ground.
NCGOI GROUND STABILIZATION AND MATERIALS HANDLING
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION A: SELF -INSPECTION
Self -inspections are required during normal business hours in accordance with the table
below. When adverse weather or site conditions would cause the safety of the inspection
personnel to be in jeopardy, the inspection may be delayed until the next business day on
which it is safe to perform the inspection. In addition, when a storm event of equal to or
greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be
performed upon the commencement of the next business day. Any time when inspections
were delayed shall be noted in the Inspection Record.
Frequency
Inspect
(during normal
Inspection records must include:
business hours)
(1) Rain gauge
Daily
Daily rainfall amounts.
maintained in
If no daily rain gauge observations are made during weekend or
good working
holiday periods, and no individual -day rainfall information is
order
available, record the cumulative rain measurement for those un-
attended days (and this will determine if a site inspection is
needed). Days on which no rainfall occurred shall be recorded as
"zero." The permittee may use another rain -monitoring device
approved by the Division.
(2) E&SC
At least once per
1. Identification ofthe measures inspected,
Measures
7calendar days
2. Date and time ofthe inspection,
and within 24
3. Name of the person performing the inspection,
hours ofa rain
4. Indication of whetherthe measures were operating
event 1.0 inch in
properly,
24 hours
5. Description of maintenance needsfor the measure,
6. Description, evidence, and dateof corrective actionstaken.
(3)Stormwater
At least once per
1. Identification ofthe discharge outfalls inspected,
discharge
7calendar days
2. Date and time ofthe inspection,
outfalls{S00s)
and within 24
3. Name of the person performing the inspection,
hours ofa rain
4. Evidence of indicators ofstormwater pollution such as oil
event> 1.0 inch in
sheen, floating or suspended solids or discoloration,
24 hours
5. Indication of visible sediment leaving the site,
6. Description, evidence, and date of corrective actions taken.
(4) Perimeter of
At least once per
Ifvisible sedimentation is found outside site limits, then a record
site
7calendar days
ofthe following shall be made:
and within 24
1. Actions taken to clean up or stabilize the sediment that has left
hours ofa rain
the site limits,
event 1.0 inch in
2. Description, evidence, and dateof corrective actions taken, and
24 hours
3. An explanation asto the actionstaken to control future
releases.
(5) Streams or
At least once per
Ifthe stream or wetland has increased visible sedimentation or a
wetlandsonsite
7calendar days
stream has visible increased turbidityfrom the construction
or offsite
and within 24
activity, then a record of the following shall be made:
(where
hours ofa rain
1. Description, evidence and date ofcorrective actionstaken,and
accessible)
event> 1.0 inch in
2. Records ofthe required reports tothe appropriate Division
24 hours
Regional Office per Part III, section C, Item (2)(a) ofthis permit.
(6) Ground
After each phase
1. The phase of grading (installation of perimeter E&SC
stabilization
of grading
measures, clearing and grubbing, instal lation of storm
measures
it rainage faci lltle5, completion of all landdistu rbi ng
activity, construction or redevelopment, permanent
ground cover).
2. Documentation thatthe required ground stabilization
measures have been provided within the required
timeframe or an assurance that they will be provided as
soon as possible.
NOTE: The rain inspection resets the required 7 calendar day inspection requirement.
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION B: RECORDKEEPING
1. E&SC Plan Documentation
The approved E&SC plan as well as any approved deviation shall be kept on the site. The
approved E&SC plan must be kept up-to-date throughout the coverage under this permit.
The following items pertaining to the E&SC plan shall be kept on site and available for
inspection at all times during normal business hours.
Item to Document
Documentation Requirements
(a) Each E&SC measure has been installed
Initial and date each E&SC measure on a copy
and does not significantly deviate from the
ofthe approved E&SC plan or complete, date
locations, dimensions and relative elevations
and sign an inspection reportthat lists each
shown on the approved E&SC plan.
E&SC measure shown on the approved E&SC
plan. This documentation is required upon the
initial installation ofthe E&SC measures or if
the E&SC measures are modified after initial
installation.
M A phase of grading has been completed.
Initial and date a copy ofthe approved E&SC
plan or complete, date and sign an inspection
report to indicate completion ofthe
construction phase.
(c) Ground cover is located and installed
Initial and date a copy of the approved E&SC
in accordance with the approved E&SC
plan or complete, date and sign an inspection
plan.
report to indicate compliance with approved
ground cover specifications.
(d) The maintenance and repair
Complete, date and sign an inspection report.
requirements for all E&SC measures
have been performed.
(e) Corrective actions have been taken
Initial and date a copy ofthe approved E&SC
to E&SC measures.
plan or complete, date and sign an inspection
report to indicate the completion ofthe
corrective action.
2. Additional Documentation to be Kept on Site
In addition to the E&SC plan documents above, the following items shall be kept on the
site and available for inspectors at all times during normal business hours, unless the
Division provides a site -specific exemption based on unique site conditions that make
this requirement not practical:
(a) This General Permit as well as the Certificate of Coverage, after it is received.
(b) Records of inspections made during the previous twelve months. The permittee shall
record the required observations on the Inspection Record Form provided by the
Division or a similar inspection form that includes all the required elements. Use of
electronically -available records in lieu of the required paper copies will be allowed if
shown to provide equal access and utility as the hard -copy records.
3. Documentation to be Retained for Three Years
All data used to complete the a-NOI and all inspection records shall be maintained for a period
of three years after project completion and made available upon request. [40 CFR 122.41]
PART II, SECTION G, ITEM (4)
DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT
Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down
for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather),I
Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met:
(a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal
shall not commence until the E&SC plan authority has approved these items,
(b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit,
(c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include
properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems,
(d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above,
(e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and
(f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters ofthe United States.
EFFECTIVE: 04/01/19
PART III
SELF -INSPECTION, RECORDKEEPING AND REPORTING
SECTION C: REPORTING
1. Occurrences that Must be Reported
Permittees shall report the following occurrences:
(a) Visible sediment deposition in a stream or wetland.
(b) Oil spills if:
• They are 25 gallons or more,
• They are less than 25 gallons but cannot be cleaned up within 24 hours,
• They cause sheen on surface waters (regardless of volume), or
• They are within 100 feet of surface waters (regardless of volume).
(c) Releases of hazardous substances in excess of reportable quantities under Section 311
of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA
(Ref: 40 CFR 302.4) or G.S. 143-215.85.
(d) Anticipated bypasses and unanticipated bypasses.
(e) Noncompliance with the conditions of this permit that may endanger health or the
environment.
2. Reporting Timeframes and Other Requirements
After a permittee becomes aware of an occurrence that must be reported, he shall contact
the appropriate Division regional office within the timeframes and in accordance with the
other requirements listed below. Occurrences outside normal business hours may also be
reported to the Department's Environmental Emergency Center personnel at (800)
858-0368.
ihiu rrerl Re urtin Timefr nri(After ➢iscove ) and other Requfm ears
(pl Yklibleardlment • Within 24 hours. an aral or electron lc ovOica tion,
deposition in a • Within 7 calendar days, a report thaL cur rlai ns a descriplI ri V the
stream or wetland + dlmenl -and anions taken to address the Cdu.y` of the depaalllun-
Dlvlsion staff rndy waive the requirement for a written re pu rL on
case-b4-Case basis.
• Ir die stream is named on the NC 303(d) tilt as Gnpelrad for sediment -
related Ca uses, the pernridee may be required to pet furni addltlonal
I""Ib]rrn0, InsPectionsor dpPly moreSLringarrt Praclkkti H SWff
determine ih:fL a d drUcin a l req u ire areal are needed to ass u re du MIDI fan tx
with the f@deraI or state irnpa it ed-waters Bond luoil S.
M Dil spills and Within 24 hours, an oral or electronic notificaupn. The notlfka[ktrr
release of shall include lit hfrmatkfn about the date, lime, nature, volume and
hazardous location of the spill or release.
j witistarl per Item
1(hy-(cy above
(cl Ant cipated 1 • A report of least ten days before the date of the hypos, f/possible.
byoasses 140 CFR The re poft. 1AII Include arl eva l pA WFI of the an4ciild quality dil d
122.41(m)(y)I ellect of Lhe bypass.
(d) Unanticipated • Within 24 hours, an oral or electronic notifi®Lion.
bypasses 140 CFR • Within 7 colemdor days, a report that: includes an evaluation of the
122.41(m)(3)l qua l lty and effect of shah pass.
(e) Noncompliance • Within 24 hours, an drat or electronic notil don,
with the condh inn•. • Within 7 calendar days, a report that contains a descr rPWri of the
or Lhls permit that noncompllance,and iLscauses; the period of noncompliance,
may endanger includi nR exact dates and times, and 0the noncompliance has not
hea!I or the been corrected, the anticipated time noncompllance Is enpected to
envronmer l4D continue; and site pstaken or planned to red uce,ell urinate, and
CrR 322A1(4E70 p reven t reoccur re nce of the npncom pl lance, (40 CFR 122.43(1)(6).
• Dlvlsion staff may waive the req ui rem en for a written report on a
u35e-bi'-r:a� 1laslti.
NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/19
Know what's below
Call before you dig.
® Dial 811
Or Call 800-632-4949
NO.
2
3
4
REVISION DESCRIPTION:
_
_
E
35
• =
0
00
••....•
��
0
p
O
M
r,
O
v
�
1
Z
M
z-0
N m
v
�.o
O
O
U 0000
z 1
. C:rn
�
0
.
C)
O M
LLI
5
L
O�
M
N
0
U
-0
(A ICY)
v
0
U_
im •'
N
U
J
�
X O
�
MU
4-J
z
W
■
QIM
CL
r
0
Z
D
O
Or_
V
J
O
1
Z
O
U
Z
LD
O
rc
W
W
O
Z
Z
_O
U
^W
I..L
Z
J
W
Z
Q
J
w
w
Z
ry
Q
Q
Z_
NJ
I..L
Q
U
0
Z
v)
z
U)
O
U)
DESIGNED BY. JEH
DRAWN BY:
DATE: APPROVED BY: JEH
SHEET:
C3.4
CIVIL
2"-3" COURSE AGGREGATE
@ 6" DEEP MINIMUM WITH
FILTER FABRIC UNDERLINER
C E TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE DETAIL
NOT TO SCALE
12" THICK SEDIMF"'T
CONTROL ST(
FLOW
STRUCT�' 1-1
STONE
CROSS SECTION
24"
n 111%-rrn.
1. STRUCTURAL STONE SHALL BE
CLASS 'B" STONE FOR EROSION
CONTROL PURPOSES. SEDIMENT
CONTROL STONE SHALL BE
#5 OR #57 STONE.
2. OUTLETS TO BE PLACED AT
LOW POINTS ALONG SILT FENCE.
CONSTRUCTION SPECIFICATIONS:
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL
VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL
AND PROPERLY GRADE IT.
2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND
DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT.
3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT
TRAP OR OTHER SUITABLE OUTLET.
4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE
STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO
SEEPAGE OR HIGH WATER TABLE.
MAINTENANCE.
1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT
MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.
THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH
STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE
USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY.
IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS
SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.
CONSTRUCTION SPECIFICATIONS
1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE
PLAN ON A FILTER FABRIC FOUNDATION.
2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW
NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL
BANKS.
3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO
KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK
DAM.
4. PROTECT THE CHANNEL AFTER THE DAM FROM HEAVY FLOW
THAT COULD CAUSE EROSION.
6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST
UPSTREAM DAM IS STABLE.
7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS
CULVERT ENTRANCES BELOW THE DAM, ARE NOT SUBJECT TO
DAMAGE OR BLOCKAGE FROM DISPLACED STONES.
8. SEE SILT FENCE DETAIL FOR CONSTRUCTION SPECIFICATIONS.
WOVEN GEOSYNTHETIC
FILTER FABRIC
EXTEND FABRIC AND
WIRE INTO TRENCH
COMPACTED
BACKFILL
�
Vk
4,
V/
NOTE:
VY
REMOVE SEDIMENT DEEPER THAN
12". REPAIR ANY UNDERMINE
IMMEDIATELY.
CONSTRUCTION SPECIFICATIONS:
CONSTRUCTION:
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD
STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES
NOT EXCEED 24 INCHES ABOVE GROUND SURFACE.
3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS
ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID
JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN
THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET
MINIMUM OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE
MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE
POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM
OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN
FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR
PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE
STRENGTH.
5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE
POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS
SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM
OF 24 INCHES.
STEEL POSTS
8' O.C. WITH WIRE
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING
DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY
FASTEN THE FILTER FABRIC DIRECTLY TO THE POSTS. WIRE OR
PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE
STRENGTH.
7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8
INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE
FROM THE BARRIER.
8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE
OF THE TRENCH.
9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER
FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL
IS CRITICAL TO SILT FENCE PERFORMANCE.
10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES
SF SILT FENCE DETAIL
NOT TO SCALE
COMPACTED SOIL
2' MIN.
6' (TYP.)
MATERIAL:
1. USE SYNTHETIC FILTER FABRIC OFAT LEAST 95% BY WEIGHT OF
POLYOLEFIN OR POLYESTER, WHICH IS CERTIFIED BY THE
MANUFACTURER OR SUPPLIER AS CONFORMING TO THE
REQUIREMENTS IN ASTM D 6461.
2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR
FT STEEL WITH A MINIMUM LENGTH OF 4 FEET. MAKE SURE THAT
STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE
FABRIC.
3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC,
USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM
MESH SPACING OF 6 INCHES.
MAINTENANCE:
1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER
EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY.
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR,
DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.
3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE
ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE
PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING
THE FENCE DURING CLEANOUTS
4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT
DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT
AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY
STABILIZED.
H-11011 111 III III
III. 111.. 1I1 II ..II 111-III-111.. 111-
6' (TYP.)
� ' ��o r ssi •. �
U e 9�
- E
35
0 p
M
r, O O
U�
z M
a)
Z-0 N m v �.o
0U0O,�rn
� z 00
I Nco
W Ln a
O m
LU c rn `� v
i ca rl - cn
U rn
-0 Ol •• U
LL �_ N
x
O U
m z
� I
E
LU -zt N
C M I
I
I
I
I
�I
I�
I�
CONSTRUCTION SPECIFICATIONS
19 GAUGE HARDWARE
MAINTENANCE
CLOTH -114" OPENINGS
1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE
J
TOP OF SILT FENCE
STEEL POST
INSPECT DAM AND CHANNELS AT LEAST WEEKLY AND AFTER
MATERIAL.
Q
MUST BEAT LEAST 1'
TOP VIEW
EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND
ABOVE TOP OF THE
SEE SILT FENCE
REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR
2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS.
WASHED STONE.
4 MAX
WEIR
DETAIL
OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN
LU
W
NEEDED.
3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS
Q
V
Z
THE SPECIFIED SETTLEMENT.
J
ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE DAM
J
0
AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE
4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT.
O
O
0
DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT
5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN
U
0
0 0 0
0 0 0 0
o
EROSION OCCURS AROUND DAM, ADDITIONAL MEASURES CAN
30 WORKING DAYS.
(%)
2
BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN
12" MAX.
THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE
MAINTENANCE
z
L
O
AND PAVED CHANNELS).
J
NATURAL
INSTALL FILTER FABRIC
O
W
GROUND
UNDER RIP RAP AND GRAVEL
REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE
U
(f)
Cf7
FILTERED
NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION,
SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND
z
WATER
ALLOW THE CHANNEL TO DRAIN THROUGH THE DAM, AND
MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE
Z
FRONT VIEW
PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE
THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY
O
'�
E
�
DAM.
STABILIZE IT.
LLJ
CD
ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT
AND CROSS SECTION.
O
Q
O
SILT FENCE OUTLET
DETAIL
T
TEMPORARY DIVERSIONS
D
w
=
�
SFO
SCALE: N.T.S.
NOT TO SCALE
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
DESIGNED BY: JEH
DRAWN BY:
NO. REVISION DESCRIPTION: DATE: APPROVED BY. JEH
1 SHEET:
2
3 C3.5
4 CIVIL
STEEL POSTS
(QUANTITY VAR.)
SKIMMER SEDIMENT BASIN PLAN VIEW
DESIGN CRITERIA
DRAINAGE
AREA < 10 AC.
(ACRES) INFLOW
STRUCTURE
MIN.
LENGTH TO 2:1
WIDTH RATIO
MAX.
LENGTH TO 6:1
WIDTH RATIO
MIN. 1800 AVERAGE AREA*
VOLUME (CU. FT. WIDTH IN =
L
REQUIRED PER AC.
DISTURBED) *AREA OF BASIN WATER SURFACE
AT TOP OF PRINCIPAL SPILLWAY
325
SURFACE (SQ. FT. PER
AREA CFS Q10)
REQUIRED CROSS-SECTION VIEW
INFLOW
STRUCTURE COIR BAFFLES
DEWATERING
ZONE
FILTER FABRIC
SEDIMENT
STORAGE ZONE
10,
MIN.
SKIMMER
DEWATERING
EMBANKMENT
NOTES:
1. REFER TO NCESCPDM SECTION
#6.64 FOR ADDITIONAL DESIGN
SPECIFICATIONS REGARDING
SKIMMER SEDIMENT BASINS.
2. REFER TO STD. 524.1 FOR BAFFLE
SPACING AND INSTALLATION.
DEVICEN�i EMERGENCY SPILLWAY
1
COIR FIBER BAFFLES
(PRAC. STND 6.65)
V FREEBOARD
6" MIN. INVERT ELEVATION
OF EMERGENCY SPILLWAY
Z=F MAX. I 1
H=2' MIN.
SIDE VIEW
CLASS B STONE PAN
(4'x4'x 1'MIN)
S K SEDIMENT SKIMMER BASIN
SCALE: N. T. S.
ARY ASSEYDLY
•C• ENCLOSURE
WATER ENTRY UNIT
°ERSPECTIVE VIEW
PVC VLNI
IVC tN0 W'\ PVC ELBOW PIPE
WATER SURFACE
PVC ETD CAP
PVC TIFF SCICOLLF 40
'/2- HOLES IN PVC PIPL
PVC TrE UNDERSIDE
PVC TEE
FLEFI
- OSE 1 e
END VIEW FRONT VIEW
SC-EINTC OF SKIYYER TAKEN TROY PENVSIVAYM EROSON AND SEDMENT POLL1110N CONTROL MMU04. 00CH 2000,
GENERAL NOTES:
SCHEDULE 40
PVC PIPE
ORIFICE
PLATE
W=5' MIN.
EMBANKMENT
T=1.5' MIN.
EMERGENCY
SPILLWAY
ANTI -SEEP
COLLAR
1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE
PIPE.
2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN
CORRECT AMOUNT OF TIME. MODIFICATIONS MAYBE REQUIRED IF FIELD
CONDITIONS WARRANT A CHANGE.
3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS.
4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION
INSTALLED.
5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT
THE DISCHARGE END OF THE PIPE.
6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT
MANNER.
7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT
SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE.
SKIMMER DEWATERING DEVICE
IPC�y�C�1�YN_'1�a
MAINTENANCE
CONSTRUCTION SPECIFICATION
1. CLEAR, GRUB, AND STRIP AREA UNDER THE EMBANKMENT OF ALL VEGETATION
AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF
ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE
MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL
MEASURES BELOW BASIN AS NEEDED.
2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY
VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL
IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE
EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT.
3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE
FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR
PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER.
TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT
LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY
(REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION).
9. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS
MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT
BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL
OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER
CONSTRUCTION ( REFERENCES: SURFACE STABILIZATION).
10. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65
11. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED,
REMOVE THE STRUCTURE AND AIL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND
WITH THE ADJOINING AREAS AND STABILIZE PROPERLY ( REFERENCES: SURFACE STABILIZATION).
r-UU1VUfi I IUIV Ur- IIVII`-CMVIUUJ OUIL. UU IVU 1 UJC /`-MCVIVUJ IVlfi I Cml/_iL 000M /io 0fi1VU, 1.7m/-AVCL,
OR CRUSHED STONE AS A BACK FILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE
PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST
THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE
PIPE FROM THE FIRM CONTRACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE MAINTENANCE
HAUNCHES.
PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACK FILL OVER THE PIPE SPILLWAY
BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT, IN NO CASE SHOULD THE PIPE CONDUIT
BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS
COMPLETE.
5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURES INSTRUCTIONS, OR AS DESIGNED.
6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT
THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND
POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE
TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE
SKIMMER TO THE SIDE FOR MAINTENANCE.
7. EARTHEN SPILLWAYS - INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST
EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND
ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE
SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH THE LAMINATED PLASTIC OR IMPERMEABLE
GEO TEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM
AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES
MAY BE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO
EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST
BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE FABRIC. IF
THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY,
MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH, MAYBE USED. THE UPPER SECTIONS
SHOULD OVERLAP THE LOWER SECTIONS SO THAT WATER CANNOT FLOW UNDER THE FABRIC.
SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS.
INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL
EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL
DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE BATTLE. PULL
THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED.
EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE
FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD
DOWN THE SKIMMER.
REPAIR THE BAFFLES IF THEYARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING
UNDERNEATH OR AROUND THEM.
IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY
JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE
DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE
AND REMOVE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER FOR DEBRIS.
IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE
OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND
REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER.
CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH THE
FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS,
AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND
SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER
DEBRIS FROM THE SKIMMER AND POOL AREAS.
FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS
(ADAPTED FROM "A MANUAL FOR DESIGNING, INSTALLING AND MAINTAINING SKIMMER SEDIMENT SHOULD BETAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE.
BASINS. " FEBRUARY 1999 J.W. FAIR CLOTH & SON.)
8. INLETS - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE
1. PULL SKIMMER OVER TO THE SIDE OF BASIN AND
REMOVE DEBRIS AND EXCESS SEDIMENTS THAT HAVE
ACCUMULATED FROM RAINFALL EVENTS.
2. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS
WATER IN THE BASIN, JERK THE SKIMMER TO BOB UP
AND DOWN TO DISLODGE THE DEBRIS AND RESTORE
FLOW. CHECK ORIFICE INSIDE THE SKIMMER FOR
CLOGGING AND REMOVE AS NEEDED.
3. IF SKIMMER ARM OR BARREL PIPE IS CLOGGED, REMOVE
THE ORIFICE AND THE OBSTRUCTION CAN BE CLEARED
WITH PLUMBER'S SNAKE OR BY FLUSHING WITH WATER.
REPLACE THE ORIFICE BEFORE REPOSITIONING THE
SKIMMER.
STAKE TO
SUPPORT WIRE
SUPPORT ROPE — STEEL
TO WIRE TO POST (TYP.)
PREVENT SAGGING
U --
� I
T
COIR MESH OR SIMILAR,
STAPLED OR TRENCHED
INTO BOTTOM OR SIDE SUPPORT POST
24" INTO BOTTOM
OR SIDE (TYP.)
BAFFLE SECTION
FIRST CHAMBER
25% OF SURFACE AREA
10,p-\
5
OUTLET
INLET ZONE
35% OF SURFACE AREA
BAFFLE (TYP.)
SECOND CHAMBER
25 % OF SURFACE AREA
BAFFLE PLAN OUTLET ZONE
15 % OF SURFACE AREA
CONSTRUCTION SPECIFICATIONS:
GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO
SIDE.
INSTALL POSTS OR SAW HORSES ACROSS THE WIDTH OF THE SEDIMENT TRAP
STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24", SPACED A MAXIMUM OF 4' APART,
AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD
BE 6" HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 21,
LOWER THAN THE TOP OF THE BERMS.
INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET
DISHARGE POINT. BASINS LESS THAN THE TOP OF THE BERMS.
WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE
MEASURE TO PREVENT SAGGING.
WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER A
SAWHORSE OR THE TOP WIRE. HAMMER REBAR INTO THE SAWHORSE LEGS FOR
ANCHORING. THE FABRIC SHOULD HAVE FIVE TO TEN PERCENT OPENINGS IN THE
WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES,
WIRE OR STAPLES.
`moo ••'r SS1 •' '/ ;1
- E
35
U) `
0 ro
p
M
r, O
0 U �
z M
. I� N
Z -0 N I.
v �.o
p 000000.�rn
� z 00
1 0
W _ Ln
O rn
LU 5 c a) � N
i M rl — cn
� U cn rn v
p-0oi U
LL �_ N J
� x
O ro U �
IS
z
z a
� I
E
LU N
CL M I�
I�
%4
I
I�
I
�I
I�
\A
I�
I
J
THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR
PINNED WITH 8" EROSION CONTROL MATTING STAPLES.
Q
DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN
LU
LL]
Q
Z
Q i
J
O
MAINTENANCE:
U
INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY
C/) _
REQUIRED REPAIRS IMMEDIATELY.
z
LL
O
O
Jz
BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF BAFFLEUj
COLLAPSE, TEAR DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.
U
(n co
REMOVE SEDIMENT DEPOSITS WHEN IT REACHED HALF FULL TO PROVIDE ADEQUATE
z
Z
STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PROESSURE ON THE BAFFLES.
TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH
O
_
LU �
SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH.
z 0
0
AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL
O
BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE,
1
_ 0-
AND STABILIZE IT.
W
R. BAFFLES FOR TEMPORARY SEDIMENT TRAPS
1. J I / NOT TO SCALE
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
REVISION DESCRIPTION:
DESIGNED BY. JEH
DRAWN BY:
DATE: APPROVED BY. JEH
SHEET:
C3.7
CIVIL
M Vl
l0
CO
Ql
00 1 l
O
T N
O
.1
;;
ci N
N N
ci N
O
m
Op
m
Up
mmm
U V Vryl
mm
UU�
co co
UUp
mm
UU�p
mm
UU^
m
U�0
mm
UU,�
mm
UUW
in
0
`-0
00
O
O
V
M M 00
l0
-4 W
v 0
O Ln
L!1
W -4
O
I, N
00
lD
�
ci l0
O
M m
N
Ol
N
O Ql
O N
•--I ul
I� M
O O N ul
N M
n al
l0 M
Ln I- ^
I� M
ci M
a) M
a1 M O
O
M O
0
Ln ci
Ql
m m N
In
O
O 0
N
lD Ln
M
0 W I" n
N W N'
l0 ^ 00
-1 0 0 m
0 O O�
S 0�
00 `1 N�
'T
N N NT
V
Un �
II
Ln � II
p II
M M M
(Yj II
M M
a II
M M
II
M M
�(j � II
V V
�(j II
l0 II
�p II
V
^ II
^ II
�
M II �
Z
�
Z
Z Z Z
Z Z
Z Z
Z Z
Z Z
Z
Z Z
Z Z
c1 0
II
II p
II 0
II 0
Ln
II
�00
^ II 0
II O
O II 0
Oil 0
II 0
cN-I II O
wZ
m� Z Z
m� Z Z
m� Z Z Z Z
m� Z Z Z
m� Z Z Z
m� Z Z Z
m� Z Z Z
m� Z Z
m� Z Z Z
m� Z Z Z
co Z
460
458
456
454
452
450
448
446
444
442
440
438
436
434
432
430
428
426
424
0
422
420
"
CP @ 1.66%
"
RCP @ 1.17
<< 64-LF
---
<< 69-LF 24" RCP
@ 1.00 0
<< 79-LF 24" R
P @ °
" RCP @
- F 30" RCP @
1.00%
�
« 58-LF 30'
RCP @ 1.0 °
3.02%
«176 LF 3
„
89-LF
°
0
00
00
00
0
rn
—0
M
I-N
M
0to
M
00
0
NM
00
I-
ON
N
00
0
00
00
0
1-
c0
In
n
00
O
NP7
N4
M4
1:
1:
40
wiwi
rt0
1�c0
00
1--
000
006
HOR: 1" = 30
VERT: 1" = 5
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
r-I ifl r-I
ci
m m m
UUUm
m
U,n
N
MMO,�
0�
°°• O
O O N
O
�a�
O1Cnmm
m ':t v u
M II
�D II
ZZZ 0
z
p
II
> > > >
m II O
m > >
� II
>
m
Uo_ Z Z Z Z
UZ Z
00
UE Z
460
458
456
454
452
450
448
446
444
442
440
438
436
434
432
430
428
426
424
422
2
�IF
N
PROPOSED
GRADE
<< 206-LF 1
"RCP @ 0.88%
„ CP @ 3.6
°
0
�c(0
Ind
00
(0�
OM
M
M
O
4
N
cA
N
In
r5
0
HOR: 1" = 30
VERT: 1" = 5
0+00
5+00
5+50
6+00
6+50
co C0 00
U U U M
N
Oq
00 m m Ln
N O O
c
O1 m m m a
v
a�
II ZZZ0
m� Z Z Z Z
In II 0
co Z
OFE
460 460
460
458
458
458
456
456
456
454
454
454
452
452
452
450
450
450
448
448
PROPOSED
GRADE
448
446
446
446
444
444
444
442
442
440
442
RCP �° 3
440
<< 12
440
438
438
438
436
436
436
434
434
434
432
432
432
430
430
430
428
428
428
426
426
426
424
424
�0
ON
N00
_
424
1L6
"i
L6
422 422 �
HOR: 1" = 30
422
VERT: 1" = 5
420
420 420
0+50 1+00 1+50 2+00 2+50 3+00 0+00 0+50 1+00
7+00
7+50
8+00
460
458
456
454
452
450
448
446
444
442
440
438
436
434
432
430
428
426
424
422
420
1) ALL RCP STORM DRAINAGE PIPES ARE CLASS III.
2) PROVIDE MINIMUM OF 2 FEET OF COVER.
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
SCALE IN FEET
0' 15 30
NO. REVISION DESCRIPTION:
1
2
3
4
z
oA caRo
•
I— = 35
0 0
M
O N O
z r1
U
I z m
r�' z N m N
a) lD
O OU0 �oMO
z N O
W N Lr) -
1 O 170 L
UUI j c m v
L m r-I = cn
U Ln rn -I-- v
Q of • • �J U
LL �_ N J
' O m U
� X �
i
� O m z
•C6
J r-I I
W
CM
4
L4
**4
LL
0
w
v
z_
^�
'+
Q
J
LU
O
0�
U
QV
J
=
z
L�
Q
w°
V)
0
(D
z
JLLJ
Nz
Q
O
V
U)
DESIGNED BY. JEH
1
60 DRAWN BY:
DATE: APPROVED BY. .IEH
SHEET:
C4.1
CIVIL
DRAINAGE C4.1, 5/17/2022 10:13:44 PM, ARCH full bleed D (36.00 x 24.00 Inches)
z
oA caRo
.Q
• 35
ao ao ao LL co w (/)
UU UN c 0 ~ v 9•. `Q
LID rl lD N 00 O O I, • • 'C••
l0 ^ ,,0 Ln � -, lD O � (DO Cn OO•.....`.., Q
II l6 II 0 00 II Q 00 II U
II a II a II m � ~
II z z O ko u Z 0 � II z 0 u p
Ln cod>>> cod>> m>> co > 0
U� Z Z Z U2 Z Z U Z Z U Z L Q
460 460
M
O N U
458 458 z
U
I z m �
456 456
z o U � M
454 454 0 — z (V 0
` I
CID
452 452 W Ln -
O M i
LLJ � � Ql • � �
450 450 i = N
U�rn1�
448 448 O -0 Q1 • • @) U
E N � � J
' O m U
446 446 � LL • i O
N d -
444 444 Q � 0 E
442 442
J rl
LU
440 440
� M
438 438
436 436
434 434
432 432
430 430
428 428
426 426 � \
424 424 �!!4
422 422
420 420
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50
T
ri 00
m m m m m m m m m
00 U U W U m O
� N^ O O 61 m m O m O Ol
Ql a-i 00 N Ol a-i a N C, 'n � ('I) L!1 c-I ^ M
IT IT M O V V M � 00 I� N 'T � ci to
Ln II ^ II Lf1 II ^ II �p II ^ II III n II ^ II
II II F II II D � II II D 1* D II II D II D � �
II Z Z � Ol II p 00 II z z O Oil O O II Z Z p N II O II z z p N n Z 0 N II O
m� > > > m� > z z z °�� z 00� z z z °°� z °c� z z z z z 0o z
U� z_ z_ z_ U7Y z t�� — — — ucc _ uoc _ _ _ uz — Ucc _ _ _ us — — voc _
460 460 460 460 460 460 460 460
458 458 458 458 458 458 458 458
456 456 456 456 456 456 456 456
454 454 454 454 454 454 454 454
452 452 452 452 452 PROPOSED GRA E 452 452 452
450 450
450 PROPOSED GRADE 450 450 450 450 450
PROPOSED GRA E EXISTING GRADE 448 448 448 448 448 448 448 448
TING GIRm-
446 446 446 446 446 446 446 446
o
444 444 444 444 444 R ° 444 444 « 444 m
15"
-LF 15" RCP
442 4% 442 442 « 12 442 442 442 442 . /0 442 N � Ln z V
« 122-LF ° A > > W
LU w z J
440 440 440 440 440 440 440 440 453 LL LL 453
LL
438 438 438 438 438 438 438 438 451 451 O W
436 436 436 436 436 436 436 436 449 449 V z
EXISTING GRAD �/ ` J
434 434 434 434 434 434 434 434 447 447 O. 0
OQ
432 432 432 432 432 432 432 432 445 445 v ()
18" RCP a@ 0.5
(CLASS V) V J
430 430 430 430 430 430 430 430 443 443
428 428 428 428 428 428 428 428 441 441 Q UJ O
426 426 426 426 426 426 426 426 439 439 V J (D
0 z
424 Co rn 424 424 rn LO 00 424 424 rn rn 424 424 LO rn 424 437 LO 0 437 cc E
0� ON Inl- I-00 M0 OO I-00 O►) I-N 00- OM r-00 G w
4L6 4C6 CpCp into CO6 I�� nco nn 00n 00n �In In CO (n
422 lt It It It 422
422 It 14 � 422 422 � � 422 422 � 1* � � 422 435 � 435 Z
HOR: 1" = 30 lt It It It HOR: 1" = 30 HOR: 1" = 30 HOR: 1" = 30 HOR: 1" = 30 O � �
VERT: 1" = 5 420 VERT: 1" = 5 420 420 VERT: 1" = 5 420 420 VERT: 1" = 5 420 433 VERT: 1" = 5 433 0 Q 0
420 420
0+00 0+50 1+00 0+00 0+50 1+00 0+00 0+50 1+00 0+00 0+50 1+00 0+00 0+50 U)
DESIGNED BY. JEH
DRAWN BY:
NO. REVISION DESCRIPTION: DATE: APPROVED BY. .IEH
� Know what's b@IOW
Call before you dig. 1 SHEET.
® Dial 811 2
Or Call 800-632-4949 C4.2
3
1 4 CIVIL
PROPOSED
OON
N
GRADE
0
�
o
LF 15"
�c00
INN
cOr
ON
Inn
rnf�
�O
N�
NM
�
M
In
�
CO
In
CO
O
�
O
�
00
00
00
00
a0
a0
ao
ao
HOR: 1" = 30
VERT: 1" = 5
DRAINAGE C4.2, 5/17/2022 10:13:49 PM, ARCH full bleed D (36.00 x 24.00 Inches)
EX
SCALE IN FEET
0' 10 20 40
1"
SERVIC
FROM
1. METER AND SERVICE LINE NOT IN CONTRACT UNLESS SPECIFIED METER SETTER WITH
2. INCLUDE STONE IN PRICE OF METER BOX. DOUBLE CHECK VALVE
3. METER SETTER SIZE AS NOTED ON PLANS. (BACKFLOW PREVENTER)
4. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE.
.TYPICAL 1 " METER SETTER INSTALLATION DETAIL
NO SCALE
0
PLAN
r----1
ELEV^TMO
flY flas..am tmew"M•&M m AM
w
z, yr
6 3/4"x4" STEEL PLASTIC
HINGED ACCESS HATC LID 63W
+ + + + + + + + + + +
++++ ++++
+++++++++++
+++++++++++
+++++++++++
++++++++++
TYPICAL METER BOX DETAIL FOR 1" SERVICE
NO SCALE
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
NO.
4
REVISION DESCRIPTION
U �N caRo
.Q
E _
t
U
z
C) p
� m E
O N O
z
U
00a) "D
o U 00 C: m
C z fI C 0
W " L
,o
W c rn •`� v
ru r
v V) rn -I-- v
C -0 Qi •• U
.�_ N C J
' O c6 U
X
CO z
z�0
E
W -zt
Cm
4
J
Q
W
0
tml
C
J
0
Wcq Q
Z_
NQ J
L.L �
0a
vJ �
LL
J z
W
U) m
Z_
w
Z �
Q 0
DESIGNED BY. I JEH
DRAWN BY. I -
DATE: I APPROVED BY. I JEH
UTILITY, 5/17/2022 10:14:00 PM, ARCH full bleed D (36.00 x 24.00 Inches)
SHEET:
C5.0-
CIVIL
�2.00'"" �2.00'�
A" A
W/ 1- MIN. OVERLAP
I
PLAN
TOP ELEVATION
DITCH GRADE
MIN. ALL SIZES
13" MIN.
B.. J BAflS @n p
"HIT BANS f~
@ 8 CIS.
o f L I o r II1r I I
- 1 -
L -
SECTION X-X
DITCH GRADE
fE
TOUNGE&
GROOVE
JOINTS
MASTIC SEAL
SECTION "A" -CIA"
PIPE JOINT
SCALE: N.T.S.
r 114 BAR
6DOWEL-A
OPENING J
IN WALL FOR
TROUGH DOWEL B2
PART SECTION V-V
DOUBLE FRAME 6 GRA-
rl
DOWEL-C
QUANTITY TO BE ADDED FOR EACH 2' INCREMENT INLET OPENING
AOOITIONAL INLETS
2'-0"
4'-0"
6' -0"
8,-011
10'-011
12'-0'
CONCRETE CU. VOS.
0. 191
0.417
0.885
0.897
1.145
11.380
CONCRETE APRON CU. YDS.
10. 065
10.132
1 0.198
0.263
0.329
10.395
SLOPE TRENCH PI
OSHA REQUIREMEN-
Z
GENERAL NOTES: Tn
y
USE CLASS "B" CONCRETE THROUGHOUT. Q ¢
JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID Z = U
CONCRETE BLOCKS NAY BE USED IN LIEU OF CLAY BRICKS. 0
PROVIDE ALL DROP INLETS OVER 3'-0" IN DEPTH WITH STEPS 12" 0 0 = Z
ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING '40.68.
Z
USE M4 BAR DOWELS AT 12" CENTERS. F U C, LLO CD USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. F = H Z
IF SEINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, AUG TO SLAB U)�- U.
J
AS SHOWN ON STD. NO. 840.00. O ¢
CONSTRUCT WITH PIPE GROANS MATCHING. OZ H ¢
MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION F >
IS 12 FEET.UJ
CL O
USE STANDARD TRADES AND GRATES 840.22 (SHOWN), 840.24(SHMN), 840.20, 0
0
840.29, AND 840.33.
SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN.
CHAMFER ALL EXPOSED CORNERS V.
DRAWING NOT TO SCALE.
a
W
d
LL
L7
FZ4 W HWa,
CONSCRETE EALANCC
T APRON a Z d
e� O ~ _
C.0 D. � L. "B"� 2„
CONCRETE o
Q C x
�Cc
oH-
a" W
MASONRY EXPI (- N
ANCHOR MAT. 3
BRICK
:
�Y
:.i
SECTION Y-Y DETAIL m
DITCH GRADE (APRON SUPPORT NOTCH)
_II l _
it I�-GRATED D.I.
DOWELITC"�
DOWEL-C"
PART SECTION U-U
1. �s-o
Z
Ocp
DNS BAR
�
¢ ¢
�
DOWEL-61
g 6
FOR 12" THS��U 36" INLET
LLO JO N = Z
OHIyOJ
m[:F7#4
BAR
00�¢
Z
7
DOWEL-B2
RAME 6 GRATE
w o
O
a
DIMENSIONS AGO QUANTITIES FOR BRICK GRATED MOP INLET (BASED ON DIN. HEIGHT, H)
DIMENSIONS
OF
BOX AND
PIPE
REINFORCING
STEEL - N0.
4 BARS
W.YDS. CONC.
IN BOX
CU.YDS. BRICK
MASONRY IN BOX
BRICK
AND
CONC.ONE
TOTAL
DEDUCTIONS
FOR
PIPE
PIPE
SPAN
WIDTH
SPAN
WIDTH
HEIGHT
BARS E
BARS F
BARS G
BAITS H
TorAL
LBS.
D
J
K
L
M
H
NO.
LENGTH
NO.
LENGTH
NO.
LENGTH
N0.
LENGTH
TOP
SLAB
BOTTOM
SLAB
APRON
TOTAL
H
TOTAL
H PER
FT HT
C.S.
R.C.
12"
3'-8"
2'-G"
3'-B"
2'-0'
3'-9"
-
-
-
-
-
-
-
-
-
-
0.308
0.351
0.659
1.301
1,960
0.020
0.032
IS-
3.8"
2'-0-
3'-8"
2'-0'
4'-0"
-
-
-
-
-
-
-
-
-
-
0.308
0.351
0.659
1.407
0,346
ABOVE
2.068
0.031
0.047
18"
2'-0"
4'-3"
-
-
-
-
-
-
-
-
-
-
0.308
0.659
1.471
NIN H
2.130
0.044
0.065
2a"
z'-,o"
a'-e"
e
,'-3"
6
4'-9"
-
-
-
-
2 s
0.185
0.388
o.922
1.eae
G.s46
2.568
0.078
0.113
30"
3'-B"
3'-5"
5'-3"
8
1' 10"
7
4'-9"
-
-
-
-
32
0.301
0.410
1.082
1.938
2.998
0.122
0.170
36"
3'-10"
3'-10"
5'.9"
8
2'-3"
8
4'-10"
4
0'-7"
2
4'-11"
46
0.374
0.494
1.219
2.187
3.406
0.176
0.238
42"
4'-8"
4'-61.
e'-3" 1110
1 2'-11"
9
1 5'-7"
1'-3"
3
5'-7"
68
0.555
0.630
1.536
2.717
4.253
0.240
0.323
48"
5'-0"
5'-0"
6'-9"
11
3'-5"
10
8'-1"
1'-9"
4
e'-1"
87
0.705
0.743
1.799
3.221
H
5.020
0.313
0.422
54"
5'-8"
2'
'_3" 7'-3"
L7
12
3'-11"
11
8'-7"
2'-9"
5
8'-7"
108
0.888
0.885
2.084
3.786
5.870
0.396
0.535
6G"
8'-2"
6'-2"
13
4'-7"
12
7'-9"
2'-11"
6
7' 3"
135
1.104
1.042
2.497
4.701
7.198
0.489
0.680
68"
8'-9"
6'-9"
8'-3"
14
5'-2"
14
7'-10"
3'-8"
7
7'-10"
168
1.328
1.210
2.889
5.189
8.078
0.591
O'798
15
8'-5"
4
4'-1"
8
W-5"
198
1.569
1.391
0.851
3.311
5.9541
0.3481
8.9051
0,7041
0,950
NOTE: CONTRACTOR CAN USE 840.17 IN LIEU OF 840.26
NCDOT -DROP INLET - TYPE 'A'
NOT TO SCALE
W
d
U_
,, 6" 0
HZ4 W a
3 J -
¢ Z 0.
C3 M =
@dam
o�
Qom=
y Q H
'a UA r
a
o"cc
m
TRIAL
DDING
SEE
_OW.
NOTES:
1. MIN. 6" #57 STONE BEDDING SHALL BE REQUIRED IF TRENCH
BOTTOM IS BELOW THE GROUND WATER TABLE.
2. FILL SHALL BE NATIVE MATERIAL FREE OF LARGE ROCKS,
DEBRIS OR ORGANICS PLACED IN 6" LIFTS AND COMPACTED
TO 95% OF THE SOIL'S MODIFIED PROCTOR.
REINFORCED CONCRETE PIPE BEDDING
SCALE: N.T.S.
Y GENERAL NOTES: ZO
USE CLASS "B" CONCRETE THROUGHOUT. O
y
JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID Q ¢
CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICKS. ¢ F 3
PROVIDE ALL DROP INLETS OVER 3'.6" IN DEPTH WITH STEPS 12"
X ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.86. d = Z
x N
USE W4 BAR DOWELS AT 12" CENTERS.
USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. LL LL U 6 < O
IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB ¢
AS SHOWN ON STD. NO. 840.00. N F ~ W
CONSTRUCT WITH PIPE CROWNS MATCHING. 0' O ¢
USE STANDARD FRAMES AND GRATES 840.22 (SHOWN), 840.24(SHOMW), 840.20, Z OC
a40.29, AND 840.33. F >
SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. 2 0
UJ
CONCRETE APRON 0
CHAMFER ALL EXPOSED CORNERS 1". UJ
DRAWING NOT TO SCALE.
MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION
Y IS 12 FEET.
PLAN
r SEALANT
FRAME AND GRATES CLASS "BIT / d
LU
CONCRETE APRON 4" CONCRETE ^ CONCRETE
DITCH GRADE 2" APR N O
TOP ELEVATION SEE DETAIL Ll
- - - - - ..., ::.. ..•m..; •.." RY "EXPANSION �' W
A ^I 8" B 8" BRICK TERIAL Z W ,
all8" J. MASON MASONRY �i' J
TLET PIPE ANCHOR O Z d
LO DETAIL ¢ w
DOW3 SEEENOTE" MAX. PIPE THIS SIDE - 18" (APRON SUPPORT NOTCH) ¢p C. C,
SECTION X-X z p =
SECTION Y-Y F
c¢
DITCH GRADE W
3
y F N
' 1 ; i W4 BAR O
I--- a
MINIMUM DIMENSIONS
AND QUANTITIES
FOR MICK GRATED
DROP INLET
PIPE
SPAN
WIDTH
HEIGHT
O W W
DWC IE BSI
CU. YD. OF MICK
MAGGLY IN BOX
TOTAL
W. M.
DEOUGTION3
FOR ONE
PIPE
0
A
B
H
BOTTOM
SLAB
H PER
FT. HT.
TOTAL H
IN BOX
12"
2' -0"
1'-e"
0.309
0.948 TO.548
0.857
0.020
0.092
15"
3'-8"
2'-01,
1'-11"
0.309
0.348
0.834
0.943
0.029
0.038
18"
3'-8.
2'-0"
2'-2"
0.309
0.348
1 0.721
1.UG0
0.088
0.099
IA'
3'-8"
2'-0"
2'-8"
0.309
0.346
0.923
1.232
0.059
0.085
90"
3'-BIT
2'.0"
3'-2"
0.309
0.848
1.098
1.405
0.092
0.127
36"
3'-8"
2'.0"
3'-8"
0.309
0.948
1.269
1.578
0.192
0.1]8
1 II
O
CC Y
1 � rYEDIAB D.I. L�
M
6. 1 I I
m
DOWEL "A""A"
DOTE: CONTRACTOR CAN USE 840.19 IN LIEU OF 840.28
NCDOT -DROP INLET -TYPE 'D'
NOT TO SCALE
Z
4'-01I oy
Aa N1 21,4
Y�Cm a <r
LL J O
X o Xl �1�7 1- �Uo`
aP= 1 - - T-
O N11 �- i' 2" o Go v~iF�LLo
O N Noy I - -f11� O¢ O ¢
11 � N N0.8
2
0.
Y III_ L� Nf a
PLAN I�
GRATE SECTION Y-Y FOR fig" DIA. BOLT F
a
��ill
1H 111 r FRAME SECTION Y-Y cccc
A �� �r" I o a
LL
= fA
2'-0
a ~
L 1'�11�I coGRATE SECTION X-X a 3
GRATE SECTION X-X x �o X z
LV O _J to C
toZ
L7• � � � � 0 y
� ao
0 0=
3'-101''L� a a
1'-111j#F, YJ s
4r-Orr
PLAN
W
FRAME SECTION X-X
FRAME SECTION X-X LL
NOTE:
SEE STD. DWG. 840.25
FOR FRAME ANCHORAGE. 840.24
NCDOT FRAME AND GRATE DETAIL
NOT TO SCALE
DIMENSIONS
DIA.
L
1511
6'-111
1811
6'-111
2411
6'-111
3011
6'-1 3/4"
3611
81-211
SECTION A -A
FLARED END SECTION
SCALE: N.T.S.
MANHOLE
�o
C
PLAN SEE STANDARD 64G.54 BRACFO 6
'0.MAHNOLE COVER 6 TRADE C. TO C.
OI TIOML
BRICK MAY BE I15ED TO
ADJUST FRABE 6 COVER
TO SOIFACE ELEVATION MAX. I'
A
COURSES
T T
I
.e.le- -I
OUTLET ELEVATION
SECTION X-X
SEE STANDARD G40.S4
FON YANOLE COVER a FRAM
BRICK WY BE USED TO
ADJUST FRAME 6 COVER
TO SURE ACE ELEVATION MAX. 1
SECTION Y-Y
11
3611
ABOVE FINISH
GRADE ELEV.
6" 4' x 4' CONCRETE PAD
(3000psi MIN.)
COMPACTED GABC,
SEE PAVEMENT SECTION
GENERAL NOTES:
CHAMFER ALL EXPOSED CORNERS 1-.
"6•
D,.. y
H
USE CLASS CONCIIETE TIMUOIWT.
a
115E 64 BAR DOWELS AT 12• CENTERS.
�H
CONCAVE TOO ALL EXPOSED JOINTS.
-0 0.
USE FORMS TO CONSTRUCT THE BOTTOM SLAB,-
N
JIMDO BRICK WILL BE PEwITTEO. CONCRETE BRICK OR 4'
HUQO�
SOLID CONCRETE BLOC" NY M USED IN LIEU OF CLAY BRICK.
= F z
FOR 8'.0• IN HEIGHT ON LESS, USE S" MALL. OVER ".0• IN
Wl LLO J
HEIGHT. 115E 12• WALL TO 0'.0- FROW TO► OF LL, AND S• MALL
FOR THE REMAINING T.0•. ADJUST 0 NWIONS AND QUANTITIES
cch
p a
g Q
ACCOW INGLY.
F >
IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX,
d
ADD TO BASE AS SHOWN ON STANDARD NO. 840.00.
W
O
PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS
12" ON CENTERS IN ACCOMOUICE WIN STD. NO. 660.N.
ADJUST THE 01[[L, CONL11l TC AYO MILK MASONRY OIMNTITICbB
TO INC10E THE ADDITION THE IMNPOIf (I.E. OIAOON4L RAS
a
MONTE 0 AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE
"EIGHT BRICK MASONRY, OPENING IN TOP SLAB.)
MAX. DEPTH 0 THIS STRUCTURE FRONT TOP OF BOTTOM SW TO
TM lLEVATIM 15 12 FEET.
�r
1
2
LL
c�o_j
z_m7g=�
e"
a
a a
T
SECTION °
i
cc N
C-C OR D-D DOWEL
¢ i°o
DIMENSIONS AND OUANTI"ES FOR BRICK JUNCTION BOXES
OIDENB10M5
a<
BOX AAD
PIPE
AEIATORLfAN NI
SANG
TOP SLAB
DIMENSIONS
CONC.
Nit rA11pb
MICK WARRANT'
DD.CTIO"1 f0E 0.[
PIPE QI.Y%.
PIPE
MAB
WIDTH
NBIOMt
D
A
G
N
W.IdOTN
E
I
BOTTOM
cu.w.
NBIGHT
. vo
MMLLFIX
PT. W.
a. `D.
C...
N.C.
12.
2.0•
2.0•
2'.3"
12
3'. 1'
3'. 4'
V.4'
0.412
0.591
O.M3
0.020
0.032
16.
2' 0•
2' 0•
2'.6"
12
3'. 1"
3' 4•
3' 4•
0.412
0.637
O.2N
0.031
0.0-1
U•
2'-4"
2'..'
2`9"
1.
3'-SIT
3%8"
3'-a"
0.495
0.814
0.29e
0.044
O.OeS
24'
3'-0•
3'-0•
3' 3"
16
4' 1"
.'.4"
4' 4'
0.005
1.176
0.362
0.070
0. 113
30•
3'.4•
3'.4•
3' 9"
%
4'-S•
4' e"
4'-S"
0.807
1.Q,
0.325
0.122
0.170
7e•
4'•0•
4'•0•
40•3"
M
S'•Y'
W-4"
5'•4"
1 1.053
1.859
0..61
1 0.176
0.236
.2"
4'-S'
4'.9"
4'.9"
22
6'-6'
S'-0-
6'.0"
1 1.333
2.603
0.621
1 0.240
0.323
AB'
40•
5S''-.39"`
23.9b
0.1.AB 411
BR-
SS-,
S5'-140•
M
66'-'-"S'•
>'-2-
T'-2•
0.6
00..33%13
O.m
GO•
G'd•
e' {•
G' a"
30
7' 7"
7' 10'
Tie2.272
47a
o.m
amm
0.6so
M-
7'•1•
7'-1•
G'•O"
32
6' 2'
a S'
1 8' 6•
1 2.624
4.776
1 0.709
1 0.ss,
0.7M
NCDOT JUNCTION BOX DETAIL
NOT TO SCALE
PLAN VIEW
"" TO BE MONOLITHIC
REINFORCING TO BE
-INUOUS
3 - #4 REBARS
x
18" MIN.
i
6" STEEL CASE BOLLARD
FILLED WITH CONCRETE
AND MOUNDED ON TOP
PAINTED YELLOW
FINISH GRADE ELEVATION
TO MATCH BOTH SURFACES
ASPHALT, SEE
PAVEMENT SECTION
RESERVED
PARKING
18"
R7-8
VAN
ACCESSIBLE
R;-sa
11 s_ WHERE
12
APPLICABLE
RESERVED
PARKJM
j 6" DIA. STEEL SLEEVE
\� ENCASED IN CONCRETE
NOTE:
HANDICAP SIGN TO CONFORM WITH THE "MANUAL ON
4 \%\
UNIFORM TRAFFIC CONTROL DEVICES" LATEST EDITION
\\/
LOCATION: HANDICAPPED PARKING SIGNS SHALL BE
LOCATED 4 FT MIN. OFF OF BACK OF CURB ON CENTER
WITH THE WHEEL STOP.
CONCRETE BOLLARD
SCALE: N.T.S.
DOUBLE FRAME AND GRATE
(STD 840.24) WITH
CONCRETE APRON (STD 840.27)
s" 16" BRICK DROP INLET
8" STD. 840.27
RCP RCP SCOPE
s MINIMUM OF ONE 4'-0" LONG
SECTION OF REINFORCED CONCRETE
PIPE BETWEEN BASINS. SEE NOTE 5
THIS SHEET FOR PIPE SIZE.
SECTION A -A VIEW
HANDICAP PARKING SIGN (R7-8 8a)
SCALE: N.T.S.
2" MINIMUM NCDOT403
TYPE B ASPHALT
SLOPE AS SHOWN ON PLAN
8" MIN. COMPACTED STABILIZED
24' PREPARED SUBGRADE PLACED IN
AGGREGATE BASE COURSE (G.A.B.C.)
LIFTS NOT EXCEEDING 8 INCHES IN
COMPACTED TO 98% OF THE
EXISTING
COMPACTED THICKNESS AND DENSIFIED
SOILS MODIFIED PROCTOR MAXIMUM
SUBGRADE
IN -PLACE TO 987 OF THE SOILS STANDARD
DRY DENSITY (ASTM D 1557)
PROCTOR MAXIMUM DRY DENSITY
(ASTM D 698)
TYPICAL
PAVEMENT
SECTION
SCALE: N.T.S.
GENERAL NOTES:
1. INSTALLATION REQUIRES A MINIMUM OF ONE 4'-0" LONG SECTION OF
REINFORCED CONCRETE PIPE BETWEEEN CATCH BASINS.
2. CONSTRUCT TWO SINGLE BASINS PER NCDOT STANDARD WITH
DOUBLE INTERIOR WALL.
3. ALL CONCRETE TO BE 3000 P.S.I COMPRESSIVE STRENGTH.
4. BASE SLAB SHALL BE MONOLITHIC.
5. PIPE SECTION D2 CONNECTING CATCH BASINS SHALL HAVE A
MINIMUM DIAMETER SAME AS OF OUTLET PIPE D3.
6. ALL REINFORCING STEEL SHOWN ON NCDOT STANDARDS IS TO BE
PROVIDED AS CONTINUOUS MEMBERS. NO LAPS, USED AS A SINGLE
CONTINUOUS BAR IN THE SLAB)
Know what's below
Call before you dig.
® Dial811
Or Ca11800- 632-4949
NO.
4
REVISION DESCRIPTION:
z:.,,,0"
O �N••c�Ro��
Essig.
U
• 9
_ Me •
- � E
3,
p oo••..N���
O
f► m 0
O N U
z rl Ib
( zz mE i
rl-� �-0Nm
�D
O OU0000•�ro
�00
z N
V)-0
LLJ �53�
O M
LU U Ol - v
r-i-�
U v) rn _E
�
p-0oi ••�v
LL •c:N c��
FINISH GRADE ( X Q m U
�
m z
Q � O •�
C •C6
C � E I � � v
C m I%4
I
I
��
%�I
' I
I�
\�
I�
I
WQ
CD z_
_J
'NQr
Ii
O<
I-
L
O
J
W z
Q
U)vi
z
�
�
W
~
W
�
U)Z
W
I—
::)
Q�
V 1
�
DESIGNED BY.
JEH
DRAWN BY.
APPROVED BY.
JEH
DATE:
SHEET:
C6.0
CIVIL
----------
W
W
CONTROLCORNER
EXISTING 5/8" SOLID IRON - - -Cn
NC GRID COORDINATES m
NORTH: 568,650.99' < SHRUBS
./-
EAST: 1,987,948.35' m RED MAPLE (LIGUSTRUM)
NAD 83-2011 11 (ACER RUBRUM) TYP. OF ALL
TYP OF ALL N 83°25'09" E 700.35'
EXISTING 20' PRIVATE STORM WATER EASEMENT
PLAT BOOK 2010, PAGES 674-677
------(� -----
N
1
w
W
W
W EX. 12" WM W
1�►, 1�
i
1 1
l,. 1
-1 1 _1
1 1 1 1 1
1 1 l
_I ,�
-0 0 C
ii
II
I
LU
o c
o,
00
ww
Y
a si
li II
NOMINEEII
_ II
II II
oZo=oZ��o�o�
00
u
OFFICE SPACE
o
II
II
II II
II
C7 II
77-1
40.00'
z w w
w w
w
N
- - - -
41
. . / i /
TREE/SHRUB PLAN LIST:
COMMON NAME
LARGE TREES:
RED MAPLE
3" MIN.
I X
TREE PLANTING (6' - 10')
NOT TO SCALE
NOTE:
1. CONTRACTOR TO REGRADE, SOD OR HYDROSEED, AND STRAW MULCH ALL AREAS DISTURBED AS
A RESULT OF HIS/HER WORK.
2. UPRIGHT STAKES TO BE USED ON TREES UP TO 12' IN HEIGHT. LARGER TREES MUST BE GUYED.
3. 118 OF ROOT BALL TO BE ABOVE FINISHED GRADE.
4. DO NOT COVER CROWN OF ROOT BALL EVERGREEN TREES WHICH ARE TIGHTLY SPACED SHALL
BE TIED TOGETHER IN ONE CONTINUOUS BED. (CONTRACTOR TO INCLUDE
THIS MULCHING IN HIS/HER BID)
5. TREES WHICH ARE LOCATED WITHIN 4 FEET OF AN ADJACENT SHRUB BED SHALL HAVE THEIR
MULCHED AREA CONNECTED WITH THE MULCHED BED OF THE SHRUBS.
6. PRUNE AND REMOVE BROKEN OR DEAD LIMBS/BRANCHES FROM TREES AND SHRUBS AFTER
PLANTING. RETAIN NATURAL SHAPE OF PLANT.
RUBBER HOSE
TREE WRAP MAIN TRUNK
14 GAUGE STEEL WIRE
3" MULCH
6' DIA. WATER RETENTION RING
SOIL MIX: 2/3 TOPSOIL & 1/3 ORGANIC MATTER
X = 2 TIMES THE DIAMETER OF THE CONTAINER OR
ROOT BALL DIAMETER
EXACT RANGE (WITHIN INDICATED RANGE) TO BE
DETERMINED BY ENGINEER IN THE FIELD
SHRUBS:
PRIVET
EVERGREEN JUNIPER
NOTE:
1. BEDS TO HAVE SMOOTHLY CONTOURED AND CLEANLY DEFINED EDGES. BEDS SHALL CURVILINEAR EXCEPT AS NOTED ON PLAN.
2. PROPOSED BEDS MUST BE LAID OUT ON SITE AND APPROVED BY OWNER, IF REQUESTED BY OWNER.
3. REMOVE TOP 113 OF ALL BURLAP FABRIC AROUND ROOT BALL.
4. COMPLETELY REMOVE ALL STRINGS, RIBBONS, AND TABS FROM THE PLANT.
5. SCARIFY ROOTS ON POT BOUND PLANTS.
6. PLANT SPACING VARIES - (SEE PLAN)
7. ALL SHRUBS TO BE PLANTED IN MULCHED BEDS.
8. PRUNE ALL BROKEN, DISEASED, AND WEAK BRANCHES.
9. ALL SHRUB BEDS TO BE COMPLETELY EXCAVATED OF ALL EXISTING SOIL TO REQUIRED DEPTH AND BACKFILLED WITH REQUIRED
SOIL MIX.
10. SOIL MIX: 213 TOPSOIL & 113 ORGANIC MATTER.
11. TOP DRESS BED WITH 10-6-4 FERTILIZER AT THE RATE OF 5 LBS. PER 100 S.F. OF BED AREA.
SHRUB PLANTING BED
NOT TO SCALE
UNIT8
BOTANICAL NAME
ACER RUBRUM
LIQUSTRUM
GENERAL NOTES
I- - - - I - _ 10
W W EXISTING PUBLIC WATER LINE - 12" & 2W W
0" (PER COUNTY GIS)
ALPINE DRIVE - NCSR 1141 - -
60' PUBLIC RIGHT-OF-WAY (PAVED)
2" CAL, 6' HT
UNIT 9
COUNT SYMBOL
22
122
6
A
It
In
In
N D
N z
N m
J r
J O
Ln
�
1
00
J z
m
-n
Ln So
ALPINE DR
1 _41
0
1.1 THIS PLAN IS FOR LANDSCAPE PURPOSES ONLY. LANDSCAPE PLAN PROVIDED IS FOR MINIMUM COMPLIANCE WITH HARNETT COUTY UDO AND
SHOULD NOT BE CONSIDERED AN ENHANCED LANDSCAPE PLAN. CONSULT WITH A REGISTERED LANDSCAPE ARCHITECT FOR SPECIFIC PLANTING
RECOMMENDATIONS.
1.2 UNDERGROUND UTILITIES HAVE NOT BEEN VERIFIED BY THE OWNER, LANDSCAPE ARCHITECT, OR THEIR REPRESENTATIVES. PLEASE CALL BEFORE
YOU DIG.
1.3 THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT RESULT FROM THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY
UNDERGROUND UTILITIES TO REMAIN.
1.4 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS TO ENSURE THAT THE NEW WORK SHALL FIT INTO THE EXISTING SITE IN THE MANNER
INTENDED AND AS SHOWN ON THE DRAWINGS. SHOULD ANY CONDITIONS EXIST THAT ARE CONTRARY TO THOSE ON THE DRAWINGS, THE CONTRACTOR
SHALL NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO PERFORMING ANY WORK IN THE AREA INVOLVING DISCREPANCIES. NOTIFICATION SHALL BE
MADE IN THE FORM OF A DRAWING OR SKETCH INDICATING FIELD MEASUREMENTS AND NOTES RELATING TO THE AREA.
1.5 ALL WORK SHALL MEET OR EXCEED THE REQUIREMENTS OF ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES AND REQUIREMENTS
1.6 IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL WORK IN A MANNER THAT PROTECTS COMPLETED WORK BY OTHERS, SUCH AS
CURBS, UTILITIES, STORM DRAINAGE, FENCES, DRIVEWAY APRONS, DRIVES, VEGETATION, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COST OF SATISFACTORY REPAIR OF ALL DAMAGES IN KIND RESULTING FROM HIS/HER FAILURE TO COMPLY.
1.7 THE CONTRACTOR IS TO VERIFY ALL QUANTITIES SHOWN ON THE PLAN AND IN THE PLANT SCHEDULE. IF DISCREPANCIES OCCUR, THE
CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY. QUANTITIES OF PLANTS SHOWN BY LANDSCAPE SYMBOLS SHALL GOVERN
OVER THE QUANTITIES SHOWN IN THE PLANT SCHEDULE.
1.8 ALL MATERIALS SHALL BE SUBJECT TO APPROVAL BY THE LANDSCAPE ARCHITECT. THE OWNER SHALL RECEIVE TAGS FROM EACH PLANT SPECIES
AND A LIST OF PLANT SUPPLIERS. WHERE ANY REQUIREMENTS ARE OMITTED FROM THE PLANT LIST, THE PLANTS FURNISHED SHALL MEET THE NORMAL
REQUIREMENTS FOR THE VARIETY OR CULTIVAR PER THE AMERICAN STANDARD FOR NURSERY STOCK, LATEST EDITION, PUBLISHED BY THE AMERICAN
ASSOCIATION OF NURSERYMEN (AAN). PLANTS SHALL BE PRUNED PRIOR TO DELIVERY ONLY UPON THE APPROVAL OF THE LANDSCAPE ARCHITECT.
1.9 NO SUBSTITUTIONS OF PRODUCTS, PLANT TYPES OR SIZES SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE OWNER, LANDSCAPE ARCHITECT,
AND MUNICIPAL REVIEW AGENCY. REQUESTS FOR SUBSTITUTION SHALL BE IN WRITING, AND SHALL STATE THE REASONS FOR THE SUBSTITUTION
REQUEST, THE SUGGESTED ALTERNATIVE, AND THE CHANGES IN COST. REQUESTS FOR SUBSTITUTION IN PLANT MATERIAL SHALL STATE THE NAMES OF
NURSERIES WHO HAVE BEEN UNABLE TO SUPPLY THE ORIGINALLY SPECIFIED MATERIAL.
1.10 PLANTING SHALL ONLY OCCUR DURING SPECIFIED PLANTING SEASONS. SPRING SEASON SHALL BE FROM MARCH 1 TO JUNE 15. FALL PLANTING
SEASON SHALL BE FRO SEPTEMBER 15 TO NOVEMBER 15.
1.11 THE CONTRACTOR SHALL GUARANTEE ALL LANDSCAPE IMPROVEMENTS, INCLUDING SEEDING, FOR ONE FULL YEAR AS REQUIRED BY THE
SPECIFICATIONS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL PLANT MAINTENANCE DURING THE GUARANTEE PERIOD.
1. 12 INSTALLED UNIT PRICES FOR ALL PLANT MATERIAL SHALL BE SUPPLIED TO THE OWNER AND LANDSCAPE ARCHITECT AT THE TIME OF BIDDING.
1.13 THE LANDSCAPE CONTRACTOR IS TO PERFORM A THOROUGH CLEANUP AND QUALITY CONTROL INSPECTION WITHIN 12 HOURS PRIOR TO THE
OPENING OF THE POOL.
1.14 THE LANDSCAPE CONTRACTOR IS SUBJECT TO RANDOM INSPECTIONS BY THE OWNER AND/OR THE OWNER'S REPRESENTATIVE AT ANY TIME DURING
THE INSTALLATION PROCESS.
Know what's below
Call before you dig.
® Dial 811
Or Call 800- 632-4949
W EST
POINTE DR
VICINITY MAP
2519
\``\\Ill...... „ .
CAR
Ssi�i
U
_ :' Q 9<•
2518
_
E _
35
:
U
„\4
rE o
LL
0
m
E
Q
m
N
O
z
U
m
O J
z
v
- N m lD
O
�
mUoO _
Co
w
Ln
I
" -0
j
O m S__ i�
C a> N
UU1
L
U
Ca r-I (n
V) � -c C
(z)
LL
_0
Ql U
J
N C
'
.0
�
O (10 U
X �
Cm°�z
z
.,
0
J
U
r-I
E
i
j
-
dJ
Cm
'N FEET
0' 15 30 60
Z
NO. REVISION DESCRIPTION:
1
2
3
4
J
Q
I-
W
0
0
LU
z
Q
z
Q
O
z
OQ
QV
J
J =
LL �
J O
w
Lu z
01-
U) m
Q
z
LLJ 0-
0
z
Q
0-
= U)
J
DESIGNED BY.
JEH
DRAWN BY.
APPROVED BY.
JEH
DATE:
SHEET:
L 1.0
CIVIL
LANDSCAPE PLAN, 5/17/2022 10:14:20 PM, ARCH full bleed D (36.00 x 24.00 Inches)