HomeMy WebLinkAboutSW6220603_Plansheet - Set (2)_20220711n� D N Z 00 Q ALPINE DR 1141 WEST POINT DR W m � Z m VICINITY MAP NOT TO SCALE F" V 00 2519 2518 EROSION CONTROL MEASURE - INITIAL PHASE: 1. ENSURE ALL APPROVALS HAVE BEEN OBTAINED PRIOR TO ANY LAND DISTURBANCE. 2. CONDUCT ON -SITE PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, OWNER, ENGINEER AND CONSTRUCTION MANAGER TO REVIEW THE PROJECT AND EROSION CONTROL SEQUENCES. 3. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WITHIN AND IMMEDIATELY ADJACENT TO THE PROJECT AREA. 4. INSTALL CONSTRUCTION ENTRANCE AT LOCATION SHOWN ON THE PLAN - OFF OF EDGE OF EXISTING PAVEMENT ON ALPINE DRIVE. 5. FLAG LIMITS OF ALL DISTURBED AREA AS SHOWN ON THE PLANS FOR INSTALLATION OF PERIMETER EROSION CONTROL DEVICES - SILT FENCE AND SILT FENCE OUTLET AND SEDIMENT BASIN WHERE SHOWN ON THE PLANS. 6. INSTALL ALL SILT FENCE AND SEDIMENT BASINS AS SHOWN ON THE PLANS. 7. CONSTRUCT TEMPORARY DIVERSION DITCHES AS SHOWN ON THE PLANS. 8. "EROSION AND SEDIMENT CONTROL(E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTION." THE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT E-NOI FORM ATDE .NC.GOV/NCG01. PLEASE NOTE ( ) Q , THE E-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN APPROVED. 9. WITHIN 14 CALENDER DAYS OF COMPLETION OF ANY PHASE OF GRADING, GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 14 CALENDER DAYS OR 60 CALENDER DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 10. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE : https-.//files.nc.gov/ncdeq/Energy%20Mineral%20and%2OLand%2OResources/Stormwater /NPDES%20General%2OPermits/DEMLR-CSW-Monitoring-Form-Rev-August-8-2019.pdf TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. (GS 113A-54.1 (E), 15ANCAC 04B.0131, NCG01 PART III SECTIONS A AND B). 11. CLEAR AND GRUB SITE (WHERE REQUIRED) AND LEGALLY DISPOSE OF ALL DEBRIS OFF SITE. 12. "SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 13. TOTAL SITE DISTURBED AREA = 7.52 AC. V -- - --------- _ W W------- W � -� W f CONTROLCORNER S EXISTING 5/8" SOLID IRON I NC GRID COORDINATES I CL NORTH: -446 J 94 EAST: 1,987,948.35' - NAD 83-2011 �S > SF XISTING 5/2 CnI In 113l1rkI GENERAL NOTES: PURSUANT TO G.S. 133-A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PERMANENT GROUNDCOVER WILL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDER DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 CALENDAR DAYS OR 60 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. ANY BORROW MATERIAL BROUGHT ONTO THIS SITE MUST BE FROM A LEGALLY PERMITTED MINE SITE OR OTHER APPROVED SOURCE. A SINGLE -USE BORROW OR WASTE AREA SITE IS ONLY PERMISSIBLE IF IT IS OPERATED UNDER CONTROL OF THE FINANCIALLY RESPONSIBLE PERSON OR FIRM THAT IS DEVELOPING THIS SITE. AN APPROVED EROSION AND SEDIMENT CONTROL PLAN IS REQUIRED FOR ALL SINGLE USE BORROW AND WASTE SITES. EROSION CONTROL DESIGN, DETAILS AND MAINTENANCE SPECIFICATIONS SHALL COMPLY WITH CURRENT NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SELF INSPECTION NOTE: THE LANDOWNER, THE FINANCIALLY RESPONSIBLE PARTY, OR THE LANDOWNER'S OR THE FINANCIALLY RESPONSIBLE PARTY'S AGENT SHALL PERFORM AN INSPECTION OF THE AREA COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS BEEN COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND COVER IN ACCORDANCE WITH G.S. 113A-57(2). THE PERSON WHO PERFORMS THE INSPECTION SHALL MAINTAIN AND MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE SITE OF THE LAND -DISTURBING ACTIVITY. THE RECORD SHALL SET OUT ANY SIGNIFICANT DEVIATION FROM THE APPROVED EROSION CONTROL PLAN, IDENTIFY ANY MEASURES THAT MAY BE REQUIRED TO CORRECT THE DEVIATION, AND DOCUMENT THE COMPLETION OF THOSE MEASURES. THE RECORD SHALL BE MAINTAINED UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED AS REQUIRED BY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE INSPECTIONS REQUIRED BY THIS SUBSECTION SHALL BE IN ADDITION TO INSPECTIONS REQUIRE BY G.S. 113A-61.1. SEE NCGO1 INSPECTION, RECORDKEEPING AND REPORTING PLAN SHEET. EMERGENCEY SPILLWAY 4¢2� W 441 440 - 439- - ` 43&- ALPINE DRIVE -,NCSR 1141- 60' PIUBLIC RIGHT -OF -'WAY (PAVED) SFO 5,og„ E � _ 440 SFO 3 SF SF �, , - SF 44 W EX. 12" WM _ 443. - 444� TD \ o a <� 445 \ SKIMMER BASIN 14471 1 _ o LENGTH AT SPILLWAY: 172' WIDTH AT SPILLWAY: 86' !IWEIR LENGTH: 43' ✓ ; ��� ° WEIR ELEV: 438.00' TOP OF DAM: 439.50' BOTTOM OF BASIN: 434.50' s 3:1 SIDE SLOPES 5.0' WIDE DAM SEDIMENT CLEANOUT ELEV: 436.25' SFO SYMBOL PRACTICE DESCRIPTION (� E CONSTRUCTION ENTRANCE A STONE STABILIZED PAD LOCATED AT ANY POINT THAT TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE TO A PUBLIC RIGHT-OF-WAY, STREET, ALLEY, SIDEWALK, OR PARKING PLOT WHICH WILL REDUCE OR ELIMINATE THE TRANSPORT OF MUD FROM THE CONSTRUCTION SITE. A TEMPORARY STRUCTURE USED TO SLOW THE VELOCITY OF RUN-OFF, SILT FENCE CAUSE SEDIMENT DEPOSITION AT THE STRUCTURE, AND FILTER SEDIMENT FROM RUN-OFF. S FO SILT FENCE OUTLET PROTECTION A TEMPORARY STRUCTURE AS A REINFORCED OUTLET AT LOW POINTS OF THE SILT FENCE. INSTALL #57 WASHED STONE AT UPSTREAM FLOW WITH HARDWARE CLOTH. (SEE DETAIL) TEMPORARY A TEMPORARY RIDGE OR EXCAVATED CHANNEL OR COMBINATION RIDGE TD DIVERSION AND CHANNEL CONSTRUCTED ACROSS SLOPING LAND ON A PREDETERMINED GRADE. CONSTRUCTION LIMITS A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR DURING CONSTRUCTION. S K SKIMMER SEDIMENT AN EARTHEN EMBANKMENT SUITABLY LOCATED TO CAPTURE RUNOFF, WITH A TRAPEZOIDAL SPILLWAY LINED WITH AN IMPERABLE GEOTEXTILE BASIN OR LAMINATED PLASTIC MEMBRANE, AND EQUIPPED WITH A FLOATING SKIMMER FOR DEWATERING. POROUS BARRIERS INSTALLED INSIDE A TEMPORARY SEDIMENT TRAP, SKIMMER BASIN, OR SEDIMENT BASIN TO REDUCE THE VELOCITY AND B F POROUS BAFFLE TURBULENCE OF THE WATER FLOWING THROUGH THE MEASURE, AND TO FACILITATE THE SETTLING OF SEDIMENT FROM THE WATER BEFORE DISCHARGE. TEMPORARY DIVERSION DITCHES DITCH NAME LENGTH AVE. SLOPE (0/0) TOTAL DEPTH (FT) BERM HEIGHT (FT) BOTTOM BERM WIDTH (FT) TOP BERM WIDTH (FT) 01-OFFSITE 420 1.0 1.5 1.3 6.0 2.0 01-4 178 1.0 1.5 1.0 6.0 2.0 01 B 455 1.0 1.5 0.8 6.0 2.0 2 500 17 To 1.5 0.6 6.0 2.0 I HEADWALL TOP: 431.73' 1 ®gam INV IN: 426.24' I I 11 p 1 l A� Q - W - SFO 7S F 436 0 DEVICE: �IIiSKIMMER SIZE: 4" ORIFICE SIZE: 3" 1 DEWATERING TIME: 3.47 DAYS �II� IIlI it a �Iollll� d'IIIIS c �� x II III r f I I I l \ \ i�/✓ - \ \ ' \ ` N / / \ / i I / _ I III II ��/ -30�\==� rn \ \ _ = - - - NJ 4 _ -=43 _ _43_3 43-243 7 - - - _ - �- = - _ _ - f JI / �° / // I w \� �� o _ - - 43 =4231 -� = 49'-� //1 o _------_ ---_ -431 3 445 m _ x =4 - - - - _ -42 -49 - 447 \ Qr I 4 435 /450- MAINTAIN DIVERSION SLOPE TO BOTTOM / (D4 A - OF THE BASINS IN ORDER TO PREVENT / - - - 4 °�' 6 - - 432 -43� X -4 EROSION OF BASIN. PROVIDE CLASS B RIPRAP / 0 -3 MINIMUM 20LF. (TYP OF ALLY v - - 33 / / S F Q/ �� a /� 1 > / POROUS COIR / 14: 23� FIBER BAFFLE (3EACH) \ 450 4 _ +/-�100 8-ACRES REMAINING N SFO �� INVESTORS, LLC �3r� w / a 50 - - - DEED BOOK 1145, PAGE 347 � PLAT BOOK 2010, PAGES 674-677 1\ . _ I PIN: 9586-98-1436000 450-- -- �49 TEMPORARY STOCKPILE � � � v 4 �37- - - _ = AREA WITH SILT FENCE. \ PID: 03958701 0020 _ -a4 v � v 11,_0 � �� - � REID: 0040470 ---4-39-_ a v!r I I A I 436-- o SF -- -- 440-- _ 44 \A- k k I 1 9 k BEGIN DITCH TRANSITION �4A� kk kk k 11� / / 44 �� - ��5 49 FROM 01A TO 0113 TD TD v v v -436 - - - - - - - - - - - - - - - - - - - - - - �44 442 441 4 bo S 83°34'52" W 699. TD TD LIMITS OF WEST POINTE DRIVE DISTURBANCE / 60' PUBLIC R/W & PUBLIC UTILITY- 31' B-B I I PROPERTY LINE 48 I SCALE IN FEET 0' 25 50 100 Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 NO. 4 REVISION DESCRIPTION PER NCDNER COMMENTS \N CARo ESS/�� .Q E ; • 35 �O••.....•• 0 E,N.\ O m E M O U N bA z m • r-- N N rr) (1) OU0.�� 4- z N �O N Lr) IZ O M *k L m U Ln Ol -c C: CTl • • �J U O m U �X�-z O ate-+ CO d �E � O M wt- Q W J (D z_ W Q �O J O OQ 1 � zW L� O V) J W z0 U TQ i U) U) z � z O J ~� � v/, < 7 O _ Qo � z =� W _ DESIGNED BY: JEH DRAWN BY: DATE: APPROVED BY. .IEH 5/23/22 SHEET: 3.0 CIVIL ERO-C3.0, 5/24/2022 7:10:59 AM, ARCH full bleed D (36.00 x 24.00 Inches) n N D D NJ�F � 0 0 'T1 U, O ALPINE DR 0 1141 WEST p01NTE DR W m �z m VICINITY MAP NOT TO SCALE 2519 2518 CONSTRUCTION SEQUENCE & EROSION CONTROL MEASURES - CONSTRUCTION PHASE: 1. CHECK ALL SILT FENCE AND TEMPORARY DIVERSION DITCHES, REPAIR AS NECESSARY. ASSURE ANY ERODED AREA ARE STABILIZED WITH TEMPORARY SEEDING AND MULCH. 2. INSTALL THE SEWER AND WATER SYSTEMS AS SHOWN ON THE PLANS. 3. INSTALL STORM DRAINAGE SYSTEMS. (SEE STORM TRUNK CONSTRUCTION NOTE THIS SHEET.) 4. INSTALL INLET/ OUTLET BMP'S WHERE REQUIRED. 5. GRADE AND PREPARE SUBGRADE FOR PAVEMENT AREA. 6. PLACE COMPACTED G.A.B.0 FOR ASPHALT CONSTRUCTION. 7. FINISH FINE GRADING THE ROAD RIGHT OF WAY AND OPEN SPACES. 8. PLACE ASPHALT, PAVEMENT MARKINGS AND SIGNAGE WHERE APPLICABLE. 9. FOR PHASE 3 CONSTRUCTION: REMOVE TEMPORARY SEDIMENT BASIN AND FILL IN AND GRADE SITE TO PROPOSE GRADE. SEE BASIN REMOVAL SEQUENCE. 10. EXTEND SILT FENCE TO PROPERTY CORNER. 11. REPEAT CONSTRUCTION SEQUENCES OF PHASE 1 AND 2 TO PHASE 3. 12. PLACE ASPHALT, PAVEMENT MARKINGS, AND SIGNAGE WHERE APPLICABLE. BASIN REMOVAL SEQUENCE: 1. SCHEDULE A SITE MEETING WITH THE ENVIRONMENTAL ENGINEER/CONSULTANT TO DETERMINE IF THE BASIN CAN BE REMOVED. INSTALL SILT FENCING AND EXTEND TO PROPERTY CORNER. 2. REMOVE BASIN AND ASSOCIATED TEMPORARY DIVERSION DITCHES. FINE GRADE AREAS IN PREPARATION FOR SEEDING. 3. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ASPHALT TACH AND RESULTING BARE AREA IMMEDIATELY. 4. WHEN SITE IS FULLY STABILIZED, CALL NCDEQ FOR APPROVAL OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON WHEN SITE CAN BE ISSUES A CERITIFICATE OF COMPLETION. � RIPRAP APRON CLASS B - 4.5'x10'x11.5' 18" THICK -------- - W PROVIDE 127 LF OF SILT FENCE - - OP CONTROLCORNER �L EXISTING 5/8" SOLID IRON NC GRID COORDINATES C - N$RT . i EAST: 987,948.35' NAD 83-2011 16 CONCRETE CWA WASHOUT 3 IP IP 0 ® IP z 0 rn w 41 STABILIZE SWALE WITH PERMANENT VEGETATION. A I 0) AREA REQUIRING 7-DAY GROUND COVER (DITCHES) 00, �C 050PC'4 O,\p��O�� O O��0 iQ L'b RR QOJOO�O'�O'\��300 O Q�P Q Q\O PROVIDE 284 LF OF SILT FENCE (PHASE 1 AND 2) I kSF CONSTRUCTION SEQUENCE & EROSION CONTROL MEASURES - FINAL PHASE: 1. UPON COMPLETING ALL SITE IMPROVEMENTS AND FINAL GRADING, STABILIZE ALL DISTURBED AREAS PER LANDSCAPE PLAN. WATER AND MAINTAIN ALL LANDSCAPED AREAS TO ENSURE PROPER GROUND COVERAGE PRIOR TO FINAL APPROVAL 2. RE -GRADE AND CONVERT SEDIMENT BASIN TO TEMPORARY OUTFALL BASIN FOR STORM DRAINAGE DISCHARGE. FILL IN EASTERN HALF OF THE SEDIMENT BASIN AND REMOVE DAM. LEVEL BOTTOM BASIN TO EXISTING GRADE AS SHOWN ON THE PLANS. STABILIZED BASIN BANK AND BOTTOM BASIN WITH PERMANENT VEGETATION AND EROSION CONTROL MATTING. 3. CONSTRUCT PIPE DISCHARGE DITCH AS SHOWN ON THE PLAN. DITCH SHALL GRADE TO RE -GRADED SEDIMENT BASIN AS SHOWN ON THE PLANS. 4. INSTALL CLASS B RIPRAP LINING AS SHOWN ON THE PLAN. 5. PERIMETER MEASURES, SILT FENCE AND TEMPORARY DIVERSION MUST BE LEFT INPLACE UNTIL ALL UPLAND AREAS ARE STABILIZED WITH PERMANENT VEGETATION. 11110USIALUDYil:L�1�l��:ti��1 • • 1►1�:ii��NL[�Ii1►11�:ii]�1�/_ll� 7. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. (GS 113A-57(3). 15A NCAC 04B. 0113) 8. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT. ALPINE DRIVE - NCSR 1141 LIMITS OF 60' PUBLIC RIGHT-OF-WAY (PAVED) DISTURBANCE (TYP) OP SFO 5'09" E 700.35' -= SF ❑® IP aQ)D ❑® IP i I TEMP. DIVERSION ® IP DITCH -02 LINER: SEED MULCH WITH CONTRACTOR'S BLEND 12" DEPTH, 3.53' WIDE AT FLOW SURFACE. (TO REMAIN DURING BOTH PHASE 1 & 2 CONSTRUCTION) SILT FENCE GROUND STABILIZATION REQUIREMENTS CONTRACTOR SHALL BE REQUIRED TO ESTABLISH GROUND STABILIZATION AS PER FOLLOWING CHART. SITE AREA STABILIZATION STABILIZATION TIME APPLICABLE DESCRIPTION TIME FRAME FRAME EXCEPTIONS THIS PROJECT PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES AND YES SLOPES HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES NO FLATTER THAN 4:1 SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS THAN 3:1 IN LENGTH AND ARE NOT NO STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES GREATER YES FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS 14 DAYS NONE WITH SLOPES (EXCEPT FOR PERIMETER YES FLATTER THAN 4:1 AND HQW ZONES) TYPICAL GROUND COVER STABILIZATION TYPES - GRASS AND OR SOD, WHEAT STRAW, MULCH, BIODEGRADABLE STRAW MATTING, SYNTHETIC MATTING, ETC. SFO STORM TRUNK CONSTRUCTION: THE STORM TRUNK LINE OF FES-1 THROUGH CB-12 AND THE BRANCH STORM LINE OF CB-5 THROUGH CB-17B SHALL ALL BE CONSTRUCTED AS PART OF PHASE 1. ALL OTHER BRANCH STORM LINES SHALL BE CONSTRUCTED AS PART OF THEIR RESPECTIVE PHASE. SYMBOL PRACTICE DESCRIPTION P INLET PROTECTION A TEMPORARY SEDIMENT BARRIER LAID AROUND A STORM DRAIN INLET TO PREVENT SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM. TEMPORARY FACILITY PROVIDED ONSITE FOR CONCRETE TRUCKS TO CONCRETE WASHOUT WASHOUT PRIOR TO LEAVING CONSTRUCTION SITE, CONTRACTOR MAY CWA AREA RELOCATE ONSITE AS DEEMED NECESSARY THROUGH -OUT CONSTRUCTION I I HEADWALL TOP: 431.73' I I pp'z lNV lN: 426.24' W AREA REQUIRING 7-DAY GROUND COVER (DITCHES) SFO JSF SF -- 14 , w- w a a s-� a a IP IP a IP i IP ❑® IP ❑® IP 'P ❑® ❑® I I I I i I i TEMP. DIVERSION DITCH - 01A LINER: SEED MULCH WITH i CONTRACTOR'S BLEND 7" DEPTH, 2.25' WIDE i AT FLOW SURFACE. (TO REMAIN DURING BOTH PHASE 1 AND PHASE 2 PHASE 2 CONSTRUCTION) r.� M PHASE I P SF I i IP IP I I I I I i i E)SFO r w CONSTRUCTION _'= STAGING AREA a IP ® i - k N k k k 1 k TD k lk/ k k k k k k k k k k k k BEGIN DITCH TRANSITION w�w k k k k k kk k> FROM 01A TO 01B = = I k k TD - la EXISTING 5/8" S 83'34'52" W 699. TD SOLID IRON SFO \1 SILT FENCE TO BE REMOVE UPON LIMITS OF WEST POINTE DRIVE II COMPLETION OF PH1 AND 2 AND I DISTURBANCE / 60' PUBLIC R/W & PUBLIC UTILITY -31' B-B TEMP. DIVERSION OPEN SPACE COMPLETELY STABILIZED PROPERTY LINE DITCH - 01-OFFSITE WITH VEGETATION. I LINER: SEED MULCH WITH CONTRACTOR'S BLEND 4" DEPTH, 10' NATURAL FLOW SPREAD AT TERMINUS I +/- Inn R ACRFC RFNADII\IINIr Q?) AREA REQUIRING 7-DAY GROUND COVER (DITCHES) I I 9' x 20' x 23' CLASS B, I I I I 18" THICK I I I I I I i t j j I I IMMEDIATELY STABILIZED SLOPE I I WITH PERMANENT VEGETATION. I \ , I \ I I x I AREA REQUK4Nrz7-DAY I I GROUND COVER (DITZHI S}-� \ I to \----- I 00 --- x---------- / m �--max ------ SKIMMER BASIN TO BE REMOVED UPON Ln COMPLETION OF PHASE 2 AND BEGINNING OF PHASE 3. EXTEND SILT FENCE TO SF PROPERTY CORNER. i �� CARS �'c�0 � ESS��j�• �9"' .� 9: .Q E ' 35 00••.....•• O m E M O U N r-1 bA U m r-- N N rr) � OU0.�� K z I �°O cn -p � cL O M *k N 4- U c a) = N U c/) Ql -I-- C: -0oi °U' O MU O ate-+ m � O 0 I M 4 %-4 SFO I z +/- 100.8 ACRES REMAINING ALLIED INVESTORS, LLC 50 Q W w DEED BOOK 1145, PAGE 347 � Q i PLAT BOOK 2010, PAGES 674-677 Z AREA REQUIRING 7-DAY GROUND COVER (DITCHES) PROVIDE 615 LF PIN: 9586-98-1436.000 PID: 03958701 0020 Q _ Q J O TO BE INSTALLED PRIOR TO FINAL PHASE BEFORE REID: 0040470 0 /•� I..L O SEDIMENT BASIN AND I �/ L.f`� Q SF DIVERSIONS ARE REMOVED. 1 _ z 0 L� I 49 O � J w O z U U z CD z _ Cn - TEMP. DIVERSION w z DITCH - 01B (J ) LINER: SEED MULCH WITH I I 0 z O CONTRACTOR'S BLEND 12" DEPTH, 3.06' WIDE �' /�/ O _ AT FLOW SURFACE. I W W TO REMAIN UNTIL PHASE 1 AND2 4$ =ARE COMPLETELY STABILIZED. SCALE IN FEET 0 s DESIGNED BY: JEH ' 0' 25 50 100 DRAWN BY: Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 NO. REVISION DESCRIPTION: DATE: APPROVED BY: I .IEH I PER NCDNER COMMENTS 5/23/22 SHEET. 2 3 C3.1 4 CIVIL ERO-C3.1, 5/24/2022 7:10:48 AM, ARCH full bleed D (36.00 x 24.00 Inches) �I D Q ALPINE DR 1141 W EST POINTE DR VICINITY MAP NOT TO SCALE m F 2519 518 CONSTRUCTION SEQUENCE & EROSION CONTROL MEASURES - FINAL PHASE: 1. UPON COMPLETING ALL SITE IMPROVEMENTS AND FINAL GRADING, STABILIZE ALL DISTURBED AREAS PER LANDSCAPE PLAN. WATER AND MAINTAIN ALL LANDSCAPED AREAS TO ENSURE PROPER GROUND COVERAGE PRIOR TO FINAL APPROVAL 2. PERIMETER MEASURES, SILT FENCE AND TEMPORARY DIVERSION MUST BE LEFT INPLACE UNTIL ALL UPLAND AREAS ARE STABILIZED WITH PERMANENT VEGETATION. 3.SEE SEEDING SCHEDULE PROVIDED IN EROSION CONTROL DETAIL. 4. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. (GS 113A-57(3). 15A NCAC 04B. 0113) 5. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT. W - W CONTROLCORNER EXISTING 5/8" SOLID IRON - NC GRID COORDINATES NORTH: 568,650.9 EAST: 1 987,948.35' NAD 83-2011 V W W - W W - ALPINE DRIVE - NCSR 1141 60' PUBLIC RIGHT-OF-WAY (PAVED) AI Q2°')S'nQ" P 7nn 2c�' GROUND STABILIZATION REQUIREMENTS CONTRACTOR SHALL BE REQUIRED TO ESTABLISH GROUND STABILIZATION AS PER FOLLOWING CHART. SITE AREA STABILIZATION STABILIZATION TIME APPLICABLE DESCRIPTION TIME FRAME FRAME EXCEPTIONS THIS PROJECT PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES AND YES SLOPES HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES NO FLATTER THAN 4:1 SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS THAN 3:1 IN LENGTH AND ARE NOT NO STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES GREATER YES FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS 14 DAYS NONE WITH SLOPES (EXCEPT FOR PERIMETER YES FLATTER THAN 4:1 AND HQW ZONES) TYPICAL GROUND COVER STABILIZATION TYPES - GRASS AND OR SOD, WHEAT STRAW, MULCH, BIODEGRADABLE STRAW MATTING, SYNTHETIC MATTING, ETC. SYMBOL PRACTICE DESCRIPTION (� LM CONSTRUCTION LIMITS A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR DURING CONSTRUCTION. SEEDING SCHEDULE FOR Ds3 NOTES: PERMANENT VEGETATION GIANT BERMUDA SEED, INCLUDING NK-37, SHALL NOT BE USED. SCHEDULE COMMON NAME RATE PER ACRE PLANTING NO. OF SEED (LBS.) DATES THE CONTRACTOR SHALL OBTAIN A SATISFACTORY STAND OF PERENNIAL VEGETATION WHOSE ROOT SYSTEM SHALL BE DEVELOPED SUFFICIENTLY TO SURVIVE DRY PERIODS AND WINTER WEATHER, AND COMMON BERMUDA 210 MARCH 16 1 (HULLED) TO BE CAPABLE OF RE-ESTABLISHMENT IN THE SPRING. THE PERENNIAL TALL FESCUE 140 AUG. 31 VEGETATIVE COVER SHALL HAVE A MINIMUM COVERAGE DENSITY OF 70% FOR THE SEEDED AREAS. CONTRACTOR SHALL DETERMINE ALL RATES OF APPLICATION NECESSARY TO PRODUCE THE REQUIRED SEPT. 1 2 COMMON BERMUDA 175 O STAND OF GRASS, AND SHALL FOLLOW THE APPLICATION (UNHULLED) MARCH 15 PROCEDURES AS SPECIFIED HEREIN. irvVIN. 428.62' - Ds3 r II I HEADWALL TOP: 431.73' pp I I lNV IN., 426.24' !NV IN 427.21' W W W W lNV OUT, 426.68' HEADWALL TOP: 429.69' INV OUT' 42702' _ —443 _TT�4 — - X \ o a 44 V M 4 — — — — ° 00,0 0 0 0 ° °o Q.Q --------- o0000 2 M -_-- d ° 0 o o° ° 4§ ------------ 0 0 0 000 0°°0 00000000 — 0 0 0 00 o a a------446-� o°\°o° o°°o o0 A 000i o I °o0 0° o 0000°0,0 I III o 449 448 III I I o I m N I Co A Ql �, Cn IUPON COMPLETION OF RESIDENTIAL V PROJECTAND UPSTREAM GROUND V STABILIZATION, REMOVE AND FILL-IN SEDIMENT BASIN (TYP OF ALL) 1ti 11 I O�OPk, A�0 Q0"ipQ J� ,�'L4)pQP ��bpp'Lp li Qo Q�P Q QUO w M u, W LPHASE 2 a = PHASE 1 W W AM — 1$ RCP x X INV OUT.- 428.60, RISER TOP: 5. 3' I I INV OUT.- 427 I I I I x I I I I I I I I I I I I I I I I I I I I I I \ I I I \\ I I I I x 6 SKIMMER REMOVAL NOTE: I I � 1 I o UPON COMPLETION AND STABILIZATION OF THE PROJECT, CLEANOUT ALL SEDIMENT FROM THE BASIN N AND ALLOW THE BASIN TO DEWATER VIA SKIMMER PRIOR TO REMOVAL. ALL DOWNSTREAM EROSION � +,AND SEDIMENTATION CONTROL DEVICES SHALL REMAIN UNTIL THE BASIN ARE COMPLETELY REMOVED. r m---------- / X X/ X v _ _ +/- 100.8 ACRES REMAINING f ALLIED INVESTORS, LLC DEED BOOK 1145, PAGE 347 PLAT BOOK 2010, PAGES 674-677 PIN: 9586-98-1436.000 PID: 03958701 0020 R E I D: 0040470 I I I 60' PUBLIC R/W & PUBLIC UTILITY - 31' B-B + I _ I I +/- 100.8 ACRES REMAINING ALLIED INVESTORS, LLC 4 I I DEED BOOK 1145, PAGE 347 47 46 1 Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 SCALE IN FEET 0' 25 50 100 NO. REVISION DESCRIPTION PER NCDNER COMMENTS 2 3 4 O cM E m 0 � U N r-1 U m i N rn O lD OU0.�� z �° O O M L *k y c6 U = N L U V) CY) -c C N J •� x 0 CCU L z 0 4-J m � O cn 4 rk %4 - z Q J LU z J �O 0 OQ U _ z LL O LEI � _j O U rW v rn� V ! z= V � O � Lu 0- cn Q Oz Q0 L.I. — = 07 �O LU LL �? DESIGNED BY. JEH DRAWN BY. APPROVED BY: JEH DATE: 5/23/22 SHEET: C3.2 CIVIL ERO-C3.2, 5/24/2022 7:10:37 AM, ARCH full bleed D (36.00 x 24.00 Inches) GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HOW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing p g Y g activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tack"rriers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control pmductswith or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficientto restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER � 6 >Mnor° `-1�rra, ,. �l ­N o RM m r- �o R PLAN 1� elad .. BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE SHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGOI GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification ofthe measures inspected, Measures 7calendar days 2. Date and time ofthe inspection, and within 24 3. Name of the person performing the inspection, hours ofa rain 4. Indication of whetherthe measures were operating event 1.0 inch in properly, 24 hours 5. Description of maintenance needsfor the measure, 6. Description, evidence, and dateof corrective actionstaken. (3)Stormwater At least once per 1. Identification ofthe discharge outfalls inspected, discharge 7calendar days 2. Date and time ofthe inspection, outfalls{S00s) and within 24 3. Name of the person performing the inspection, hours ofa rain 4. Evidence of indicators ofstormwater pollution such as oil event> 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per Ifvisible sedimentation is found outside site limits, then a record site 7calendar days ofthe following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours ofa rain the site limits, event 1.0 inch in 2. Description, evidence, and dateof corrective actions taken, and 24 hours 3. An explanation asto the actionstaken to control future releases. (5) Streams or At least once per Ifthe stream or wetland has increased visible sedimentation or a wetlandsonsite 7calendar days stream has visible increased turbidityfrom the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours ofa rain 1. Description, evidence and date ofcorrective actionstaken,and accessible) event> 1.0 inch in 2. Records ofthe required reports tothe appropriate Division 24 hours Regional Office per Part III, section C, Item (2)(a) ofthis permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, instal lation of storm measures it rainage faci lltle5, completion of all landdistu rbi ng activity, construction or redevelopment, permanent ground cover). 2. Documentation thatthe required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the ofthe approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection reportthat lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation ofthe E&SC measures or if the E&SC measures are modified after initial installation. M A phase of grading has been completed. Initial and date a copy ofthe approved E&SC plan or complete, date and sign an inspection report to indicate completion ofthe construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy ofthe approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion ofthe corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather),I Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters ofthe United States. EFFECTIVE: 04/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. ihiu rrerl Re urtin Timefr nri(After ➢iscove ) and other Requfm ears (pl Yklibleardlment • Within 24 hours. an aral or electron lc ovOica tion, deposition in a • Within 7 calendar days, a report thaL cur rlai ns a descriplI ri V the stream or wetland + dlmenl -and anions taken to address the Cdu.y` of the depaalllun- Dlvlsion staff rndy waive the requirement for a written re pu rL on case-b4-Case basis. • Ir die stream is named on the NC 303(d) tilt as Gnpelrad for sediment - related Ca uses, the pernridee may be required to pet furni addltlonal I""Ib]rrn0, InsPectionsor dpPly moreSLringarrt Praclkkti H SWff determine ih:fL a d drUcin a l req u ire areal are needed to ass u re du MIDI fan tx with the f@deraI or state irnpa it ed-waters Bond luoil S. M Dil spills and Within 24 hours, an oral or electronic notificaupn. The notlfka[ktrr release of shall include lit hfrmatkfn about the date, lime, nature, volume and hazardous location of the spill or release. j witistarl per Item 1(hy-(cy above (cl Ant cipated 1 • A report of least ten days before the date of the hypos, f/possible. byoasses 140 CFR The re poft. 1AII Include arl eva l pA WFI of the an4ciild quality dil d 122.41(m)(y)I ellect of Lhe bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notifi®Lion. bypasses 140 CFR • Within 7 colemdor days, a report that: includes an evaluation of the 122.41(m)(3)l qua l lty and effect of shah pass. (e) Noncompliance • Within 24 hours, an drat or electronic notil don, with the condh inn•. • Within 7 calendar days, a report that contains a descr rPWri of the or Lhls permit that noncompllance,and iLscauses; the period of noncompliance, may endanger includi nR exact dates and times, and 0the noncompliance has not hea!I or the been corrected, the anticipated time noncompllance Is enpected to envronmer l4D continue; and site pstaken or planned to red uce,ell urinate, and CrR 322A1(4E70 p reven t reoccur re nce of the npncom pl lance, (40 CFR 122.43(1)(6). • Dlvlsion staff may waive the req ui rem en for a written report on a u35e-bi'-r:a� 1laslti. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/19 Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 NO. 2 3 4 REVISION DESCRIPTION: _ _ E 35 • = 0 00 ••....• �� 0 p O M r, O v � 1 Z M z-0 N m v �.o O O U 0000 z 1 . C:rn � 0 . C) O M LLI 5 L O� M N 0 U -0 (A ICY) v 0 U_ im •' N U J � X O � MU 4-J z W ■ QIM CL r 0 Z D O Or_ V J O 1 Z O U Z LD O rc W W O Z Z _O U ^W I..L Z J W Z Q J w w Z ry Q Q Z_ NJ I..L Q U 0 Z v) z U) O U) DESIGNED BY. JEH DRAWN BY: DATE: APPROVED BY: JEH SHEET: C3.4 CIVIL 2"-3" COURSE AGGREGATE @ 6" DEEP MINIMUM WITH FILTER FABRIC UNDERLINER C E TEMPORARY GRAVEL CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE 12" THICK SEDIMF"'T CONTROL ST( FLOW STRUCT�' 1-1 STONE CROSS SECTION 24" n 111%-rrn. 1. STRUCTURAL STONE SHALL BE CLASS 'B" STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE #5 OR #57 STONE. 2. OUTLETS TO BE PLACED AT LOW POINTS ALONG SILT FENCE. CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE. 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. CONSTRUCTION SPECIFICATIONS 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. PROTECT THE CHANNEL AFTER THE DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE DAM, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. 8. SEE SILT FENCE DETAIL FOR CONSTRUCTION SPECIFICATIONS. WOVEN GEOSYNTHETIC FILTER FABRIC EXTEND FABRIC AND WIRE INTO TRENCH COMPACTED BACKFILL � Vk 4, V/ NOTE: VY REMOVE SEDIMENT DEEPER THAN 12". REPAIR ANY UNDERMINE IMMEDIATELY. CONSTRUCTION SPECIFICATIONS: CONSTRUCTION: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE GROUND SURFACE. 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. STEEL POSTS 8' O.C. WITH WIRE 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO THE POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES SF SILT FENCE DETAIL NOT TO SCALE COMPACTED SOIL 2' MIN. 6' (TYP.) MATERIAL: 1. USE SYNTHETIC FILTER FABRIC OFAT LEAST 95% BY WEIGHT OF POLYOLEFIN OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 4 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUTS 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. H-11011 111 III III III. 111.. 1I1 II ..II 111-III-111.. 111- 6' (TYP.) � ' ��o r ssi •. � U e 9� - E 35 0 p M r, O O U� z M a) Z-0 N m v �.o 0U0O,�rn � z 00 I Nco W Ln a O m LU c rn `� v i ca rl - cn U rn -0 Ol •• U LL �_ N x O U m z � I E LU -zt N C M I I I I I �I I� I� CONSTRUCTION SPECIFICATIONS 19 GAUGE HARDWARE MAINTENANCE CLOTH -114" OPENINGS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE J TOP OF SILT FENCE STEEL POST INSPECT DAM AND CHANNELS AT LEAST WEEKLY AND AFTER MATERIAL. Q MUST BEAT LEAST 1' TOP VIEW EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND ABOVE TOP OF THE SEE SILT FENCE REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. WASHED STONE. 4 MAX WEIR DETAIL OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN LU W NEEDED. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS Q V Z THE SPECIFIED SETTLEMENT. J ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE DAM J 0 AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. O O 0 DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN U 0 0 0 0 0 0 0 0 o EROSION OCCURS AROUND DAM, ADDITIONAL MEASURES CAN 30 WORKING DAYS. (%) 2 BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN 12" MAX. THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE MAINTENANCE z L O AND PAVED CHANNELS). J NATURAL INSTALL FILTER FABRIC O W GROUND UNDER RIP RAP AND GRAVEL REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE U (f) Cf7 FILTERED NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND z WATER ALLOW THE CHANNEL TO DRAIN THROUGH THE DAM, AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE Z FRONT VIEW PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY O '� E � DAM. STABILIZE IT. LLJ CD ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. O Q O SILT FENCE OUTLET DETAIL T TEMPORARY DIVERSIONS D w = � SFO SCALE: N.T.S. NOT TO SCALE Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 DESIGNED BY: JEH DRAWN BY: NO. REVISION DESCRIPTION: DATE: APPROVED BY. JEH 1 SHEET: 2 3 C3.5 4 CIVIL STEEL POSTS (QUANTITY VAR.) SKIMMER SEDIMENT BASIN PLAN VIEW DESIGN CRITERIA DRAINAGE AREA < 10 AC. (ACRES) INFLOW STRUCTURE MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 AVERAGE AREA* VOLUME (CU. FT. WIDTH IN = L REQUIRED PER AC. DISTURBED) *AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY 325 SURFACE (SQ. FT. PER AREA CFS Q10) REQUIRED CROSS-SECTION VIEW INFLOW STRUCTURE COIR BAFFLES DEWATERING ZONE FILTER FABRIC SEDIMENT STORAGE ZONE 10, MIN. SKIMMER DEWATERING EMBANKMENT NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SKIMMER SEDIMENT BASINS. 2. REFER TO STD. 524.1 FOR BAFFLE SPACING AND INSTALLATION. DEVICEN�i EMERGENCY SPILLWAY 1 COIR FIBER BAFFLES (PRAC. STND 6.65) V FREEBOARD 6" MIN. INVERT ELEVATION OF EMERGENCY SPILLWAY Z=F MAX. I 1 H=2' MIN. SIDE VIEW CLASS B STONE PAN (4'x4'x 1'MIN) S K SEDIMENT SKIMMER BASIN SCALE: N. T. S. ARY ASSEYDLY •C• ENCLOSURE WATER ENTRY UNIT °ERSPECTIVE VIEW PVC VLNI IVC tN0 W'\ PVC ELBOW PIPE WATER SURFACE PVC ETD CAP PVC TIFF SCICOLLF 40 '/2- HOLES IN PVC PIPL PVC TrE UNDERSIDE PVC TEE FLEFI - OSE 1 e END VIEW FRONT VIEW SC-EINTC OF SKIYYER TAKEN TROY PENVSIVAYM EROSON AND SEDMENT POLL1110N CONTROL MMU04. 00CH 2000, GENERAL NOTES: SCHEDULE 40 PVC PIPE ORIFICE PLATE W=5' MIN. EMBANKMENT T=1.5' MIN. EMERGENCY SPILLWAY ANTI -SEEP COLLAR 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAYBE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. SKIMMER DEWATERING DEVICE IPC�y�C�1�YN_'1�a MAINTENANCE CONSTRUCTION SPECIFICATION 1. CLEAR, GRUB, AND STRIP AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL MEASURES BELOW BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). 9. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION ( REFERENCES: SURFACE STABILIZATION). 10. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65 11. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND AIL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY ( REFERENCES: SURFACE STABILIZATION). r-UU1VUfi I IUIV Ur- IIVII`-CMVIUUJ OUIL. UU IVU 1 UJC /`-MCVIVUJ IVlfi I Cml/_iL 000M /io 0fi1VU, 1.7m/-AVCL, OR CRUSHED STONE AS A BACK FILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTRACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE MAINTENANCE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACK FILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT, IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURES INSTRUCTIONS, OR AS DESIGNED. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 7. EARTHEN SPILLWAYS - INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH THE LAMINATED PLASTIC OR IMPERMEABLE GEO TEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE FABRIC. IF THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH, MAYBE USED. THE UPPER SECTIONS SHOULD OVERLAP THE LOWER SECTIONS SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE BATTLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. REPAIR THE BAFFLES IF THEYARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE AND REMOVE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER FOR DEBRIS. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH THE FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS (ADAPTED FROM "A MANUAL FOR DESIGNING, INSTALLING AND MAINTAINING SKIMMER SEDIMENT SHOULD BETAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. BASINS. " FEBRUARY 1999 J.W. FAIR CLOTH & SON.) 8. INLETS - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE 1. PULL SKIMMER OVER TO THE SIDE OF BASIN AND REMOVE DEBRIS AND EXCESS SEDIMENTS THAT HAVE ACCUMULATED FROM RAINFALL EVENTS. 2. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, JERK THE SKIMMER TO BOB UP AND DOWN TO DISLODGE THE DEBRIS AND RESTORE FLOW. CHECK ORIFICE INSIDE THE SKIMMER FOR CLOGGING AND REMOVE AS NEEDED. 3. IF SKIMMER ARM OR BARREL PIPE IS CLOGGED, REMOVE THE ORIFICE AND THE OBSTRUCTION CAN BE CLEARED WITH PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. STAKE TO SUPPORT WIRE SUPPORT ROPE — STEEL TO WIRE TO POST (TYP.) PREVENT SAGGING U -- � I T COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE SUPPORT POST 24" INTO BOTTOM OR SIDE (TYP.) BAFFLE SECTION FIRST CHAMBER 25% OF SURFACE AREA 10,p-\ 5 OUTLET INLET ZONE 35% OF SURFACE AREA BAFFLE (TYP.) SECOND CHAMBER 25 % OF SURFACE AREA BAFFLE PLAN OUTLET ZONE 15 % OF SURFACE AREA CONSTRUCTION SPECIFICATIONS: GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. INSTALL POSTS OR SAW HORSES ACROSS THE WIDTH OF THE SEDIMENT TRAP STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24", SPACED A MAXIMUM OF 4' APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6" HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 21, LOWER THAN THE TOP OF THE BERMS. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISHARGE POINT. BASINS LESS THAN THE TOP OF THE BERMS. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE MEASURE TO PREVENT SAGGING. WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER A SAWHORSE OR THE TOP WIRE. HAMMER REBAR INTO THE SAWHORSE LEGS FOR ANCHORING. THE FABRIC SHOULD HAVE FIVE TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES, WIRE OR STAPLES. `moo ••'r SS1 •' '/ ;1 - E 35 U) ` 0 ro p M r, O 0 U � z M . I� N Z -0 N I. v �.o p 000000.�rn � z 00 1 0 W _ Ln O rn LU 5 c a) � N i M rl — cn � U cn rn v p-0oi U LL �_ N J � x O ro U � IS z z a � I E LU N CL M I� I� %4 I I� I �I I� \A I� I J THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 8" EROSION CONTROL MATTING STAPLES. Q DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN LU LL] Q Z Q i J O MAINTENANCE: U INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY C/) _ REQUIRED REPAIRS IMMEDIATELY. z LL O O Jz BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF BAFFLEUj COLLAPSE, TEAR DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. U (n co REMOVE SEDIMENT DEPOSITS WHEN IT REACHED HALF FULL TO PROVIDE ADEQUATE z Z STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PROESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH O _ LU � SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. z 0 0 AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL O BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, 1 _ 0- AND STABILIZE IT. W R. BAFFLES FOR TEMPORARY SEDIMENT TRAPS 1. J I / NOT TO SCALE Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 REVISION DESCRIPTION: DESIGNED BY. JEH DRAWN BY: DATE: APPROVED BY. JEH SHEET: C3.7 CIVIL M Vl l0 CO Ql 00 1 l O T N O .1 ;; ci N N N ci N O m Op m Up mmm U V Vryl mm UU� co co UUp mm UU�p mm UU^ m U�0 mm UU,� mm UUW in 0 `-0 00 O O V M M 00 l0 -4 W v 0 O Ln L!1 W -4 O I, N 00 lD � ci l0 O M m N Ol N O Ql O N •--I ul I� M O O N ul N M n al l0 M Ln I- ^ I� M ci M a) M a1 M O O M O 0 Ln ci Ql m m N In O O 0 N lD Ln M 0 W I" n N W N' l0 ^ 00 -1 0 0 m 0 O O� S 0� 00 `1 N� 'T N N NT V Un � II Ln � II p II M M M (Yj II M M a II M M II M M �(j � II V V �(j II l0 II �p II V ^ II ^ II � M II � Z � Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z c1 0 II II p II 0 II 0 Ln II �00 ^ II 0 II O O II 0 Oil 0 II 0 cN-I II O wZ m� Z Z m� Z Z m� Z Z Z Z m� Z Z Z m� Z Z Z m� Z Z Z m� Z Z Z m� Z Z m� Z Z Z m� Z Z Z co Z 460 458 456 454 452 450 448 446 444 442 440 438 436 434 432 430 428 426 424 0 422 420 " CP @ 1.66% " RCP @ 1.17 << 64-LF --- << 69-LF 24" RCP @ 1.00 0 << 79-LF 24" R P @ ° " RCP @ - F 30" RCP @ 1.00% � « 58-LF 30' RCP @ 1.0 ° 3.02% «176 LF 3 „ 89-LF ° 0 00 00 00 0 rn —0 M I-N M 0to M 00 0 NM 00 I- ON N 00 0 00 00 0 1- c0 In n 00 O NP7 N4 M4 1: 1: 40 wiwi rt0 1�c0 00 1-- 000 006 HOR: 1" = 30 VERT: 1" = 5 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 r-I ifl r-I ci m m m UUUm m U,n N MMO,� 0� °°• O O O N O �a� O1Cnmm m ':t v u M II �D II ZZZ 0 z p II > > > > m II O m > > � II > m Uo_ Z Z Z Z UZ Z 00 UE Z 460 458 456 454 452 450 448 446 444 442 440 438 436 434 432 430 428 426 424 422 2 �IF N PROPOSED GRADE << 206-LF 1 "RCP @ 0.88% „ CP @ 3.6 ° 0 �c(0 Ind 00 (0� OM M M O 4 N cA N In r5 0 HOR: 1" = 30 VERT: 1" = 5 0+00 5+00 5+50 6+00 6+50 co C0 00 U U U M N Oq 00 m m Ln N O O c O1 m m m a v a� II ZZZ0 m� Z Z Z Z In II 0 co Z OFE 460 460 460 458 458 458 456 456 456 454 454 454 452 452 452 450 450 450 448 448 PROPOSED GRADE 448 446 446 446 444 444 444 442 442 440 442 RCP �° 3 440 << 12 440 438 438 438 436 436 436 434 434 434 432 432 432 430 430 430 428 428 428 426 426 426 424 424 �0 ON N00 _ 424 1L6 "i L6 422 422 � HOR: 1" = 30 422 VERT: 1" = 5 420 420 420 0+50 1+00 1+50 2+00 2+50 3+00 0+00 0+50 1+00 7+00 7+50 8+00 460 458 456 454 452 450 448 446 444 442 440 438 436 434 432 430 428 426 424 422 420 1) ALL RCP STORM DRAINAGE PIPES ARE CLASS III. 2) PROVIDE MINIMUM OF 2 FEET OF COVER. Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 SCALE IN FEET 0' 15 30 NO. REVISION DESCRIPTION: 1 2 3 4 z oA caRo • I— = 35 0 0 M O N O z r1 U I z m r�' z N m N a) lD O OU0 �oMO z N O W N Lr) - 1 O 170 L UUI j c m v L m r-I = cn U Ln rn -I-- v Q of • • �J U LL �_ N J ' O m U � X � i � O m z •C6 J r-I I W CM 4 L4 **4 LL 0 w v z_ ^� '+ Q J LU O 0� U QV J = z L� Q w° V) 0 (D z JLLJ Nz Q O V U) DESIGNED BY. JEH 1 60 DRAWN BY: DATE: APPROVED BY. .IEH SHEET: C4.1 CIVIL DRAINAGE C4.1, 5/17/2022 10:13:44 PM, ARCH full bleed D (36.00 x 24.00 Inches) z oA caRo .Q • 35 ao ao ao LL co w (/) UU UN c 0 ~ v 9•. `Q LID rl lD N 00 O O I, • • 'C•• l0 ^ ,,0 Ln � -, lD O � (DO Cn OO•.....`.., Q II l6 II 0 00 II Q 00 II U II a II a II m � ~ II z z O ko u Z 0 � II z 0 u p Ln cod>>> cod>> m>> co > 0 U� Z Z Z U2 Z Z U Z Z U Z L Q 460 460 M O N U 458 458 z U I z m � 456 456 z o U � M 454 454 0 — z (V 0 ` I CID 452 452 W Ln - O M i LLJ � � Ql • � � 450 450 i = N U�rn1� 448 448 O -0 Q1 • • @) U E N � � J ' O m U 446 446 � LL • i O N d - 444 444 Q � 0 E 442 442 J rl LU 440 440 � M 438 438 436 436 434 434 432 432 430 430 428 428 426 426 � \ 424 424 �!!4 422 422 420 420 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 T ri 00 m m m m m m m m m 00 U U W U m O � N^ O O 61 m m O m O Ol Ql a-i 00 N Ol a-i a N C, 'n � ('I) L!1 c-I ^ M IT IT M O V V M � 00 I� N 'T � ci to Ln II ^ II Lf1 II ^ II �p II ^ II III n II ^ II II II F II II D � II II D 1* D II II D II D � � II Z Z � Ol II p 00 II z z O Oil O O II Z Z p N II O II z z p N n Z 0 N II O m� > > > m� > z z z °�� z 00� z z z °°� z °c� z z z z z 0o z U� z_ z_ z_ U7Y z t�� — — — ucc _ uoc _ _ _ uz — Ucc _ _ _ us — — voc _ 460 460 460 460 460 460 460 460 458 458 458 458 458 458 458 458 456 456 456 456 456 456 456 456 454 454 454 454 454 454 454 454 452 452 452 452 452 PROPOSED GRA E 452 452 452 450 450 450 PROPOSED GRADE 450 450 450 450 450 PROPOSED GRA E EXISTING GRADE 448 448 448 448 448 448 448 448 TING GIRm- 446 446 446 446 446 446 446 446 o 444 444 444 444 444 R ° 444 444 « 444 m 15" -LF 15" RCP 442 4% 442 442 « 12 442 442 442 442 . /0 442 N � Ln z V « 122-LF ° A > > W LU w z J 440 440 440 440 440 440 440 440 453 LL LL 453 LL 438 438 438 438 438 438 438 438 451 451 O W 436 436 436 436 436 436 436 436 449 449 V z EXISTING GRAD �/ ` J 434 434 434 434 434 434 434 434 447 447 O. 0 OQ 432 432 432 432 432 432 432 432 445 445 v () 18" RCP a@ 0.5 (CLASS V) V J 430 430 430 430 430 430 430 430 443 443 428 428 428 428 428 428 428 428 441 441 Q UJ O 426 426 426 426 426 426 426 426 439 439 V J (D 0 z 424 Co rn 424 424 rn LO 00 424 424 rn rn 424 424 LO rn 424 437 LO 0 437 cc E 0� ON Inl- I-00 M0 OO I-00 O►) I-N 00- OM r-00 G w 4L6 4C6 CpCp into CO6 I�� nco nn 00n 00n �In In CO (n 422 lt It It It 422 422 It 14 � 422 422 � � 422 422 � 1* � � 422 435 � 435 Z HOR: 1" = 30 lt It It It HOR: 1" = 30 HOR: 1" = 30 HOR: 1" = 30 HOR: 1" = 30 O � � VERT: 1" = 5 420 VERT: 1" = 5 420 420 VERT: 1" = 5 420 420 VERT: 1" = 5 420 433 VERT: 1" = 5 433 0 Q 0 420 420 0+00 0+50 1+00 0+00 0+50 1+00 0+00 0+50 1+00 0+00 0+50 1+00 0+00 0+50 U) DESIGNED BY. JEH DRAWN BY: NO. REVISION DESCRIPTION: DATE: APPROVED BY. .IEH � Know what's b@IOW Call before you dig. 1 SHEET. ® Dial 811 2 Or Call 800-632-4949 C4.2 3 1 4 CIVIL PROPOSED OON N GRADE 0 � o LF 15" �c00 INN cOr ON Inn rnf� �O N� NM � M In � CO In CO O � O � 00 00 00 00 a0 a0 ao ao HOR: 1" = 30 VERT: 1" = 5 DRAINAGE C4.2, 5/17/2022 10:13:49 PM, ARCH full bleed D (36.00 x 24.00 Inches) EX SCALE IN FEET 0' 10 20 40 1" SERVIC FROM 1. METER AND SERVICE LINE NOT IN CONTRACT UNLESS SPECIFIED METER SETTER WITH 2. INCLUDE STONE IN PRICE OF METER BOX. DOUBLE CHECK VALVE 3. METER SETTER SIZE AS NOTED ON PLANS. (BACKFLOW PREVENTER) 4. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE. .TYPICAL 1 " METER SETTER INSTALLATION DETAIL NO SCALE 0 PLAN r----1 ELEV^TMO flY flas..am tmew"M•&M m AM w z, yr 6 3/4"x4" STEEL PLASTIC HINGED ACCESS HATC LID 63W + + + + + + + + + + + ++++ ++++ +++++++++++ +++++++++++ +++++++++++ ++++++++++ TYPICAL METER BOX DETAIL FOR 1" SERVICE NO SCALE Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 NO. 4 REVISION DESCRIPTION U �N caRo .Q E _ t U z C) p � m E O N O z U 00a) "D o U 00 C: m C z fI C 0 W " L ,o W c rn •`� v ru r v V) rn -I-- v C -0 Qi •• U .�_ N C J ' O c6 U X CO z z�0 E W -zt Cm 4 J Q W 0 tml C J 0 Wcq Q Z_ NQ J L.L � 0a vJ � LL J z W U) m Z_ w Z � Q 0 DESIGNED BY. I JEH DRAWN BY. I - DATE: I APPROVED BY. I JEH UTILITY, 5/17/2022 10:14:00 PM, ARCH full bleed D (36.00 x 24.00 Inches) SHEET: C5.0- CIVIL �2.00'"" �2.00'� A" A W/ 1- MIN. OVERLAP I PLAN TOP ELEVATION DITCH GRADE MIN. ALL SIZES 13" MIN. B.. J BAflS @n p "HIT BANS f~ @ 8 CIS. o f L I o r II1r I I - 1 - L - SECTION X-X DITCH GRADE fE TOUNGE& GROOVE JOINTS MASTIC SEAL SECTION "A" -CIA" PIPE JOINT SCALE: N.T.S. r 114 BAR 6DOWEL-A OPENING J IN WALL FOR TROUGH DOWEL B2 PART SECTION V-V DOUBLE FRAME 6 GRA- rl DOWEL-C QUANTITY TO BE ADDED FOR EACH 2' INCREMENT INLET OPENING AOOITIONAL INLETS 2'-0" 4'-0" 6' -0" 8,-011 10'-011 12'-0' CONCRETE CU. VOS. 0. 191 0.417 0.885 0.897 1.145 11.380 CONCRETE APRON CU. YDS. 10. 065 10.132 1 0.198 0.263 0.329 10.395 SLOPE TRENCH PI OSHA REQUIREMEN- Z GENERAL NOTES: Tn y USE CLASS "B" CONCRETE THROUGHOUT. Q ¢ JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID Z = U CONCRETE BLOCKS NAY BE USED IN LIEU OF CLAY BRICKS. 0 PROVIDE ALL DROP INLETS OVER 3'-0" IN DEPTH WITH STEPS 12" 0 0 = Z ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING '40.68. Z USE M4 BAR DOWELS AT 12" CENTERS. F U C, LLO CD USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. F = H Z IF SEINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, AUG TO SLAB U)�- U. J AS SHOWN ON STD. NO. 840.00. O ¢ CONSTRUCT WITH PIPE GROANS MATCHING. OZ H ¢ MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION F > IS 12 FEET.UJ CL O USE STANDARD TRADES AND GRATES 840.22 (SHOWN), 840.24(SHMN), 840.20, 0 0 840.29, AND 840.33. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. CHAMFER ALL EXPOSED CORNERS V. DRAWING NOT TO SCALE. a W d LL L7 FZ4 W HWa, CONSCRETE EALANCC T APRON a Z d e� O ~ _ C.0 D. � L. "B"� 2„ CONCRETE o Q C x �Cc oH- a" W MASONRY EXPI (- N ANCHOR MAT. 3 BRICK : �Y :.i SECTION Y-Y DETAIL m DITCH GRADE (APRON SUPPORT NOTCH) _II l _ it I�-GRATED D.I. DOWELITC"� DOWEL-C" PART SECTION U-U 1. �s-o Z Ocp DNS BAR � ¢ ¢ � DOWEL-61 g 6 FOR 12" THS��U 36" INLET LLO JO N = Z OHIyOJ m[:F7#4 BAR 00�¢ Z 7 DOWEL-B2 RAME 6 GRATE w o O a DIMENSIONS AGO QUANTITIES FOR BRICK GRATED MOP INLET (BASED ON DIN. HEIGHT, H) DIMENSIONS OF BOX AND PIPE REINFORCING STEEL - N0. 4 BARS W.YDS. CONC. IN BOX CU.YDS. BRICK MASONRY IN BOX BRICK AND CONC.ONE TOTAL DEDUCTIONS FOR PIPE PIPE SPAN WIDTH SPAN WIDTH HEIGHT BARS E BARS F BARS G BAITS H TorAL LBS. D J K L M H NO. LENGTH NO. LENGTH NO. LENGTH N0. LENGTH TOP SLAB BOTTOM SLAB APRON TOTAL H TOTAL H PER FT HT C.S. R.C. 12" 3'-8" 2'-G" 3'-B" 2'-0' 3'-9" - - - - - - - - - - 0.308 0.351 0.659 1.301 1,960 0.020 0.032 IS- 3.8" 2'-0- 3'-8" 2'-0' 4'-0" - - - - - - - - - - 0.308 0.351 0.659 1.407 0,346 ABOVE 2.068 0.031 0.047 18" 2'-0" 4'-3" - - - - - - - - - - 0.308 0.659 1.471 NIN H 2.130 0.044 0.065 2a" z'-,o" a'-e" e ,'-3" 6 4'-9" - - - - 2 s 0.185 0.388 o.922 1.eae G.s46 2.568 0.078 0.113 30" 3'-B" 3'-5" 5'-3" 8 1' 10" 7 4'-9" - - - - 32 0.301 0.410 1.082 1.938 2.998 0.122 0.170 36" 3'-10" 3'-10" 5'.9" 8 2'-3" 8 4'-10" 4 0'-7" 2 4'-11" 46 0.374 0.494 1.219 2.187 3.406 0.176 0.238 42" 4'-8" 4'-61. e'-3" 1110 1 2'-11" 9 1 5'-7" 1'-3" 3 5'-7" 68 0.555 0.630 1.536 2.717 4.253 0.240 0.323 48" 5'-0" 5'-0" 6'-9" 11 3'-5" 10 8'-1" 1'-9" 4 e'-1" 87 0.705 0.743 1.799 3.221 H 5.020 0.313 0.422 54" 5'-8" 2' '_3" 7'-3" L7 12 3'-11" 11 8'-7" 2'-9" 5 8'-7" 108 0.888 0.885 2.084 3.786 5.870 0.396 0.535 6G" 8'-2" 6'-2" 13 4'-7" 12 7'-9" 2'-11" 6 7' 3" 135 1.104 1.042 2.497 4.701 7.198 0.489 0.680 68" 8'-9" 6'-9" 8'-3" 14 5'-2" 14 7'-10" 3'-8" 7 7'-10" 168 1.328 1.210 2.889 5.189 8.078 0.591 O'798 15 8'-5" 4 4'-1" 8 W-5" 198 1.569 1.391 0.851 3.311 5.9541 0.3481 8.9051 0,7041 0,950 NOTE: CONTRACTOR CAN USE 840.17 IN LIEU OF 840.26 NCDOT -DROP INLET - TYPE 'A' NOT TO SCALE W d U_ ,, 6" 0 HZ4 W a 3 J - ¢ Z 0. C3 M = @dam o� Qom= y Q H 'a UA r a o"cc m TRIAL DDING SEE _OW. NOTES: 1. MIN. 6" #57 STONE BEDDING SHALL BE REQUIRED IF TRENCH BOTTOM IS BELOW THE GROUND WATER TABLE. 2. FILL SHALL BE NATIVE MATERIAL FREE OF LARGE ROCKS, DEBRIS OR ORGANICS PLACED IN 6" LIFTS AND COMPACTED TO 95% OF THE SOIL'S MODIFIED PROCTOR. REINFORCED CONCRETE PIPE BEDDING SCALE: N.T.S. Y GENERAL NOTES: ZO USE CLASS "B" CONCRETE THROUGHOUT. O y JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID Q ¢ CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICKS. ¢ F 3 PROVIDE ALL DROP INLETS OVER 3'.6" IN DEPTH WITH STEPS 12" X ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.86. d = Z x N USE W4 BAR DOWELS AT 12" CENTERS. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. LL LL U 6 < O IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB ¢ AS SHOWN ON STD. NO. 840.00. N F ~ W CONSTRUCT WITH PIPE CROWNS MATCHING. 0' O ¢ USE STANDARD FRAMES AND GRATES 840.22 (SHOWN), 840.24(SHOMW), 840.20, Z OC a40.29, AND 840.33. F > SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. 2 0 UJ CONCRETE APRON 0 CHAMFER ALL EXPOSED CORNERS 1". UJ DRAWING NOT TO SCALE. MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION Y IS 12 FEET. PLAN r SEALANT FRAME AND GRATES CLASS "BIT / d LU CONCRETE APRON 4" CONCRETE ^ CONCRETE DITCH GRADE 2" APR N O TOP ELEVATION SEE DETAIL Ll - - - - - ..., ::.. ..•m..; •.." RY "EXPANSION �' W A ^I 8" B 8" BRICK TERIAL Z W , all8" J. MASON MASONRY �i' J TLET PIPE ANCHOR O Z d LO DETAIL ¢ w DOW3 SEEENOTE" MAX. PIPE THIS SIDE - 18" (APRON SUPPORT NOTCH) ¢p C. C, SECTION X-X z p = SECTION Y-Y F c¢ DITCH GRADE W 3 y F N ' 1 ; i W4 BAR O I--- a MINIMUM DIMENSIONS AND QUANTITIES FOR MICK GRATED DROP INLET PIPE SPAN WIDTH HEIGHT O W W DWC IE BSI CU. YD. OF MICK MAGGLY IN BOX TOTAL W. M. DEOUGTION3 FOR ONE PIPE 0 A B H BOTTOM SLAB H PER FT. HT. TOTAL H IN BOX 12" 2' -0" 1'-e" 0.309 0.948 TO.548 0.857 0.020 0.092 15" 3'-8" 2'-01, 1'-11" 0.309 0.348 0.834 0.943 0.029 0.038 18" 3'-8. 2'-0" 2'-2" 0.309 0.348 1 0.721 1.UG0 0.088 0.099 IA' 3'-8" 2'-0" 2'-8" 0.309 0.346 0.923 1.232 0.059 0.085 90" 3'-BIT 2'.0" 3'-2" 0.309 0.848 1.098 1.405 0.092 0.127 36" 3'-8" 2'.0" 3'-8" 0.309 0.948 1.269 1.578 0.192 0.1]8 1 II O CC Y 1 � rYEDIAB D.I. L� M 6. 1 I I m DOWEL "A""A" DOTE: CONTRACTOR CAN USE 840.19 IN LIEU OF 840.28 NCDOT -DROP INLET -TYPE 'D' NOT TO SCALE Z 4'-01I oy Aa N1 21,4 Y�Cm a <r LL J O X o Xl �1�7 1- �Uo` aP= 1 - - T- O N11 �- i' 2" o Go v~iF�LLo O N Noy I - -f11� O¢ O ¢ 11 � N N0.8 2 0. Y III_ L� Nf a PLAN I� GRATE SECTION Y-Y FOR fig" DIA. BOLT F a ��ill 1H 111 r FRAME SECTION Y-Y cccc A �� �r" I o a LL = fA 2'-0 a ~ L 1'�11�I coGRATE SECTION X-X a 3 GRATE SECTION X-X x �o X z LV O _J to C toZ L7• � � � � 0 y � ao 0 0= 3'-101''L� a a 1'-111j#F, YJ s 4r-Orr PLAN W FRAME SECTION X-X FRAME SECTION X-X LL NOTE: SEE STD. DWG. 840.25 FOR FRAME ANCHORAGE. 840.24 NCDOT FRAME AND GRATE DETAIL NOT TO SCALE DIMENSIONS DIA. L 1511 6'-111 1811 6'-111 2411 6'-111 3011 6'-1 3/4" 3611 81-211 SECTION A -A FLARED END SECTION SCALE: N.T.S. MANHOLE �o C PLAN SEE STANDARD 64G.54 BRACFO 6 '0.MAHNOLE COVER 6 TRADE C. TO C. OI TIOML BRICK MAY BE I15ED TO ADJUST FRABE 6 COVER TO SOIFACE ELEVATION MAX. I' A COURSES T T I .e.le- -I OUTLET ELEVATION SECTION X-X SEE STANDARD G40.S4 FON YANOLE COVER a FRAM BRICK WY BE USED TO ADJUST FRAME 6 COVER TO SURE ACE ELEVATION MAX. 1 SECTION Y-Y 11 3611 ABOVE FINISH GRADE ELEV. 6" 4' x 4' CONCRETE PAD (3000psi MIN.) COMPACTED GABC, SEE PAVEMENT SECTION GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1-. "6• D,.. y H USE CLASS CONCIIETE TIMUOIWT. a 115E 64 BAR DOWELS AT 12• CENTERS. �H CONCAVE TOO ALL EXPOSED JOINTS. -0 0. USE FORMS TO CONSTRUCT THE BOTTOM SLAB,- N JIMDO BRICK WILL BE PEwITTEO. CONCRETE BRICK OR 4' HUQO� SOLID CONCRETE BLOC" NY M USED IN LIEU OF CLAY BRICK. = F z FOR 8'.0• IN HEIGHT ON LESS, USE S" MALL. OVER ".0• IN Wl LLO J HEIGHT. 115E 12• WALL TO 0'.0- FROW TO► OF LL, AND S• MALL FOR THE REMAINING T.0•. ADJUST 0 NWIONS AND QUANTITIES cch p a g Q ACCOW INGLY. F > IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, d ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. W O PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCOMOUICE WIN STD. NO. 660.N. ADJUST THE 01[[L, CONL11l TC AYO MILK MASONRY OIMNTITICbB TO INC10E THE ADDITION THE IMNPOIf (I.E. OIAOON4L RAS a MONTE 0 AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE "EIGHT BRICK MASONRY, OPENING IN TOP SLAB.) MAX. DEPTH 0 THIS STRUCTURE FRONT TOP OF BOTTOM SW TO TM lLEVATIM 15 12 FEET. �r 1 2 LL c�o_j z_m7g=� e" a a a T SECTION ° i cc N C-C OR D-D DOWEL ¢ i°o DIMENSIONS AND OUANTI"ES FOR BRICK JUNCTION BOXES OIDENB10M5 a< BOX AAD PIPE AEIATORLfAN NI SANG TOP SLAB DIMENSIONS CONC. Nit rA11pb MICK WARRANT' DD.CTIO"1 f0E 0.[ PIPE QI.Y%. PIPE MAB WIDTH NBIOMt D A G N W.IdOTN E I BOTTOM cu.w. NBIGHT . vo MMLLFIX PT. W. a. `D. C... N.C. 12. 2.0• 2.0• 2'.3" 12 3'. 1' 3'. 4' V.4' 0.412 0.591 O.M3 0.020 0.032 16. 2' 0• 2' 0• 2'.6" 12 3'. 1" 3' 4• 3' 4• 0.412 0.637 O.2N 0.031 0.0-1 U• 2'-4" 2'..' 2`9" 1. 3'-SIT 3%8" 3'-a" 0.495 0.814 0.29e 0.044 O.OeS 24' 3'-0• 3'-0• 3' 3" 16 4' 1" .'.4" 4' 4' 0.005 1.176 0.362 0.070 0. 113 30• 3'.4• 3'.4• 3' 9" % 4'-S• 4' e" 4'-S" 0.807 1.Q, 0.325 0.122 0.170 7e• 4'•0• 4'•0• 40•3" M S'•Y' W-4" 5'•4" 1 1.053 1.859 0..61 1 0.176 0.236 .2" 4'-S' 4'.9" 4'.9" 22 6'-6' S'-0- 6'.0" 1 1.333 2.603 0.621 1 0.240 0.323 AB' 40• 5S''-.39"` 23.9b 0.1.AB 411 BR- SS-, S5'-140• M 66'-'-"S'• >'-2- T'-2• 0.6 00..33%13 O.m GO• G'd• e' {• G' a" 30 7' 7" 7' 10' Tie2.272 47a o.m amm 0.6so M- 7'•1• 7'-1• G'•O" 32 6' 2' a S' 1 8' 6• 1 2.624 4.776 1 0.709 1 0.ss, 0.7M NCDOT JUNCTION BOX DETAIL NOT TO SCALE PLAN VIEW "" TO BE MONOLITHIC REINFORCING TO BE -INUOUS 3 - #4 REBARS x 18" MIN. i 6" STEEL CASE BOLLARD FILLED WITH CONCRETE AND MOUNDED ON TOP PAINTED YELLOW FINISH GRADE ELEVATION TO MATCH BOTH SURFACES ASPHALT, SEE PAVEMENT SECTION RESERVED PARKING 18" R7-8 VAN ACCESSIBLE R;-sa 11 s_ WHERE 12 APPLICABLE RESERVED PARKJM j 6" DIA. STEEL SLEEVE \� ENCASED IN CONCRETE NOTE: HANDICAP SIGN TO CONFORM WITH THE "MANUAL ON 4 \%\ UNIFORM TRAFFIC CONTROL DEVICES" LATEST EDITION \\/ LOCATION: HANDICAPPED PARKING SIGNS SHALL BE LOCATED 4 FT MIN. OFF OF BACK OF CURB ON CENTER WITH THE WHEEL STOP. CONCRETE BOLLARD SCALE: N.T.S. DOUBLE FRAME AND GRATE (STD 840.24) WITH CONCRETE APRON (STD 840.27) s" 16" BRICK DROP INLET 8" STD. 840.27 RCP RCP SCOPE s MINIMUM OF ONE 4'-0" LONG SECTION OF REINFORCED CONCRETE PIPE BETWEEN BASINS. SEE NOTE 5 THIS SHEET FOR PIPE SIZE. SECTION A -A VIEW HANDICAP PARKING SIGN (R7-8 8a) SCALE: N.T.S. 2" MINIMUM NCDOT403 TYPE B ASPHALT SLOPE AS SHOWN ON PLAN 8" MIN. COMPACTED STABILIZED 24' PREPARED SUBGRADE PLACED IN AGGREGATE BASE COURSE (G.A.B.C.) LIFTS NOT EXCEEDING 8 INCHES IN COMPACTED TO 98% OF THE EXISTING COMPACTED THICKNESS AND DENSIFIED SOILS MODIFIED PROCTOR MAXIMUM SUBGRADE IN -PLACE TO 987 OF THE SOILS STANDARD DRY DENSITY (ASTM D 1557) PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) TYPICAL PAVEMENT SECTION SCALE: N.T.S. GENERAL NOTES: 1. INSTALLATION REQUIRES A MINIMUM OF ONE 4'-0" LONG SECTION OF REINFORCED CONCRETE PIPE BETWEEEN CATCH BASINS. 2. CONSTRUCT TWO SINGLE BASINS PER NCDOT STANDARD WITH DOUBLE INTERIOR WALL. 3. ALL CONCRETE TO BE 3000 P.S.I COMPRESSIVE STRENGTH. 4. BASE SLAB SHALL BE MONOLITHIC. 5. PIPE SECTION D2 CONNECTING CATCH BASINS SHALL HAVE A MINIMUM DIAMETER SAME AS OF OUTLET PIPE D3. 6. ALL REINFORCING STEEL SHOWN ON NCDOT STANDARDS IS TO BE PROVIDED AS CONTINUOUS MEMBERS. NO LAPS, USED AS A SINGLE CONTINUOUS BAR IN THE SLAB) Know what's below Call before you dig. ® Dial811 Or Ca11800- 632-4949 NO. 4 REVISION DESCRIPTION: z:.,,,0" O �N••c�Ro�� Essig. U • 9 _ Me • - � E 3, p oo••..N��� O f► m 0 O N U z rl Ib ( zz mE i rl-� �-0Nm �D O OU0000•�ro �00 z N V)-0 LLJ �53� O M LU U Ol - v r-i-� U v) rn _E � p-0oi ••�v LL •c:N c�� FINISH GRADE ( X Q m U � m z Q � O •� C •C6 C � E I � � v C m I%4 I I �� %�I ' I I� \� I� I WQ CD z_ _J 'NQr Ii O< I- L O J W z Q U)vi z � � W ~ W � U)Z W I— ::) Q� V 1 � DESIGNED BY. JEH DRAWN BY. APPROVED BY. JEH DATE: SHEET: C6.0 CIVIL ---------- W W CONTROLCORNER EXISTING 5/8" SOLID IRON - - -Cn NC GRID COORDINATES m NORTH: 568,650.99' < SHRUBS ./- EAST: 1,987,948.35' m RED MAPLE (LIGUSTRUM) NAD 83-2011 11 (ACER RUBRUM) TYP. OF ALL TYP OF ALL N 83°25'09" E 700.35' EXISTING 20' PRIVATE STORM WATER EASEMENT PLAT BOOK 2010, PAGES 674-677 ------(� ----- N 1 w W W W EX. 12" WM W 1�►, 1� i 1 1 l,. 1 -1 1 _1 1 1 1 1 1 1 1 l _I ,� -0 0 C ii II I LU o c o, 00 ww Y a si li II NOMINEEII _ II II II oZo=oZ��o�o� 00 u OFFICE SPACE o II II II II II C7 II 77-1 40.00' z w w w w w N - - - - 41 . . / i / TREE/SHRUB PLAN LIST: COMMON NAME LARGE TREES: RED MAPLE 3" MIN. I X TREE PLANTING (6' - 10') NOT TO SCALE NOTE: 1. CONTRACTOR TO REGRADE, SOD OR HYDROSEED, AND STRAW MULCH ALL AREAS DISTURBED AS A RESULT OF HIS/HER WORK. 2. UPRIGHT STAKES TO BE USED ON TREES UP TO 12' IN HEIGHT. LARGER TREES MUST BE GUYED. 3. 118 OF ROOT BALL TO BE ABOVE FINISHED GRADE. 4. DO NOT COVER CROWN OF ROOT BALL EVERGREEN TREES WHICH ARE TIGHTLY SPACED SHALL BE TIED TOGETHER IN ONE CONTINUOUS BED. (CONTRACTOR TO INCLUDE THIS MULCHING IN HIS/HER BID) 5. TREES WHICH ARE LOCATED WITHIN 4 FEET OF AN ADJACENT SHRUB BED SHALL HAVE THEIR MULCHED AREA CONNECTED WITH THE MULCHED BED OF THE SHRUBS. 6. PRUNE AND REMOVE BROKEN OR DEAD LIMBS/BRANCHES FROM TREES AND SHRUBS AFTER PLANTING. RETAIN NATURAL SHAPE OF PLANT. RUBBER HOSE TREE WRAP MAIN TRUNK 14 GAUGE STEEL WIRE 3" MULCH 6' DIA. WATER RETENTION RING SOIL MIX: 2/3 TOPSOIL & 1/3 ORGANIC MATTER X = 2 TIMES THE DIAMETER OF THE CONTAINER OR ROOT BALL DIAMETER EXACT RANGE (WITHIN INDICATED RANGE) TO BE DETERMINED BY ENGINEER IN THE FIELD SHRUBS: PRIVET EVERGREEN JUNIPER NOTE: 1. BEDS TO HAVE SMOOTHLY CONTOURED AND CLEANLY DEFINED EDGES. BEDS SHALL CURVILINEAR EXCEPT AS NOTED ON PLAN. 2. PROPOSED BEDS MUST BE LAID OUT ON SITE AND APPROVED BY OWNER, IF REQUESTED BY OWNER. 3. REMOVE TOP 113 OF ALL BURLAP FABRIC AROUND ROOT BALL. 4. COMPLETELY REMOVE ALL STRINGS, RIBBONS, AND TABS FROM THE PLANT. 5. SCARIFY ROOTS ON POT BOUND PLANTS. 6. PLANT SPACING VARIES - (SEE PLAN) 7. ALL SHRUBS TO BE PLANTED IN MULCHED BEDS. 8. PRUNE ALL BROKEN, DISEASED, AND WEAK BRANCHES. 9. ALL SHRUB BEDS TO BE COMPLETELY EXCAVATED OF ALL EXISTING SOIL TO REQUIRED DEPTH AND BACKFILLED WITH REQUIRED SOIL MIX. 10. SOIL MIX: 213 TOPSOIL & 113 ORGANIC MATTER. 11. TOP DRESS BED WITH 10-6-4 FERTILIZER AT THE RATE OF 5 LBS. PER 100 S.F. OF BED AREA. SHRUB PLANTING BED NOT TO SCALE UNIT8 BOTANICAL NAME ACER RUBRUM LIQUSTRUM GENERAL NOTES I- - - - I - _ 10 W W EXISTING PUBLIC WATER LINE - 12" & 2W W 0" (PER COUNTY GIS) ALPINE DRIVE - NCSR 1141 - - 60' PUBLIC RIGHT-OF-WAY (PAVED) 2" CAL, 6' HT UNIT 9 COUNT SYMBOL 22 122 6 A It In In N D N z N m J r J O Ln � 1 00 J z m -n Ln So ALPINE DR 1 _41 0 1.1 THIS PLAN IS FOR LANDSCAPE PURPOSES ONLY. LANDSCAPE PLAN PROVIDED IS FOR MINIMUM COMPLIANCE WITH HARNETT COUTY UDO AND SHOULD NOT BE CONSIDERED AN ENHANCED LANDSCAPE PLAN. CONSULT WITH A REGISTERED LANDSCAPE ARCHITECT FOR SPECIFIC PLANTING RECOMMENDATIONS. 1.2 UNDERGROUND UTILITIES HAVE NOT BEEN VERIFIED BY THE OWNER, LANDSCAPE ARCHITECT, OR THEIR REPRESENTATIVES. PLEASE CALL BEFORE YOU DIG. 1.3 THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT RESULT FROM THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY UNDERGROUND UTILITIES TO REMAIN. 1.4 THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS TO ENSURE THAT THE NEW WORK SHALL FIT INTO THE EXISTING SITE IN THE MANNER INTENDED AND AS SHOWN ON THE DRAWINGS. SHOULD ANY CONDITIONS EXIST THAT ARE CONTRARY TO THOSE ON THE DRAWINGS, THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO PERFORMING ANY WORK IN THE AREA INVOLVING DISCREPANCIES. NOTIFICATION SHALL BE MADE IN THE FORM OF A DRAWING OR SKETCH INDICATING FIELD MEASUREMENTS AND NOTES RELATING TO THE AREA. 1.5 ALL WORK SHALL MEET OR EXCEED THE REQUIREMENTS OF ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES AND REQUIREMENTS 1.6 IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM ALL WORK IN A MANNER THAT PROTECTS COMPLETED WORK BY OTHERS, SUCH AS CURBS, UTILITIES, STORM DRAINAGE, FENCES, DRIVEWAY APRONS, DRIVES, VEGETATION, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF SATISFACTORY REPAIR OF ALL DAMAGES IN KIND RESULTING FROM HIS/HER FAILURE TO COMPLY. 1.7 THE CONTRACTOR IS TO VERIFY ALL QUANTITIES SHOWN ON THE PLAN AND IN THE PLANT SCHEDULE. IF DISCREPANCIES OCCUR, THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT IMMEDIATELY. QUANTITIES OF PLANTS SHOWN BY LANDSCAPE SYMBOLS SHALL GOVERN OVER THE QUANTITIES SHOWN IN THE PLANT SCHEDULE. 1.8 ALL MATERIALS SHALL BE SUBJECT TO APPROVAL BY THE LANDSCAPE ARCHITECT. THE OWNER SHALL RECEIVE TAGS FROM EACH PLANT SPECIES AND A LIST OF PLANT SUPPLIERS. WHERE ANY REQUIREMENTS ARE OMITTED FROM THE PLANT LIST, THE PLANTS FURNISHED SHALL MEET THE NORMAL REQUIREMENTS FOR THE VARIETY OR CULTIVAR PER THE AMERICAN STANDARD FOR NURSERY STOCK, LATEST EDITION, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN (AAN). PLANTS SHALL BE PRUNED PRIOR TO DELIVERY ONLY UPON THE APPROVAL OF THE LANDSCAPE ARCHITECT. 1.9 NO SUBSTITUTIONS OF PRODUCTS, PLANT TYPES OR SIZES SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE OWNER, LANDSCAPE ARCHITECT, AND MUNICIPAL REVIEW AGENCY. REQUESTS FOR SUBSTITUTION SHALL BE IN WRITING, AND SHALL STATE THE REASONS FOR THE SUBSTITUTION REQUEST, THE SUGGESTED ALTERNATIVE, AND THE CHANGES IN COST. REQUESTS FOR SUBSTITUTION IN PLANT MATERIAL SHALL STATE THE NAMES OF NURSERIES WHO HAVE BEEN UNABLE TO SUPPLY THE ORIGINALLY SPECIFIED MATERIAL. 1.10 PLANTING SHALL ONLY OCCUR DURING SPECIFIED PLANTING SEASONS. SPRING SEASON SHALL BE FROM MARCH 1 TO JUNE 15. FALL PLANTING SEASON SHALL BE FRO SEPTEMBER 15 TO NOVEMBER 15. 1.11 THE CONTRACTOR SHALL GUARANTEE ALL LANDSCAPE IMPROVEMENTS, INCLUDING SEEDING, FOR ONE FULL YEAR AS REQUIRED BY THE SPECIFICATIONS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL PLANT MAINTENANCE DURING THE GUARANTEE PERIOD. 1. 12 INSTALLED UNIT PRICES FOR ALL PLANT MATERIAL SHALL BE SUPPLIED TO THE OWNER AND LANDSCAPE ARCHITECT AT THE TIME OF BIDDING. 1.13 THE LANDSCAPE CONTRACTOR IS TO PERFORM A THOROUGH CLEANUP AND QUALITY CONTROL INSPECTION WITHIN 12 HOURS PRIOR TO THE OPENING OF THE POOL. 1.14 THE LANDSCAPE CONTRACTOR IS SUBJECT TO RANDOM INSPECTIONS BY THE OWNER AND/OR THE OWNER'S REPRESENTATIVE AT ANY TIME DURING THE INSTALLATION PROCESS. Know what's below Call before you dig. ® Dial 811 Or Call 800- 632-4949 W EST POINTE DR VICINITY MAP 2519 \``\\Ill...... „ . CAR Ssi�i U _ :' Q 9<• 2518 _ E _ 35 : U „\4 rE o LL 0 m E Q m N O z U m O J z v - N m lD O � mUoO _ Co w Ln I " -0 j O m S__ i� C a> N UU1 L U Ca r-I (n V) � -c C (z) LL _0 Ql U J N C ' .0 � O (10 U X � Cm°�z z ., 0 J U r-I E i j - dJ Cm 'N FEET 0' 15 30 60 Z NO. REVISION DESCRIPTION: 1 2 3 4 J Q I- W 0 0 LU z Q z Q O z OQ QV J J = LL � J O w Lu z 01- U) m Q z LLJ 0- 0 z Q 0- = U) J DESIGNED BY. JEH DRAWN BY. APPROVED BY. JEH DATE: SHEET: L 1.0 CIVIL LANDSCAPE PLAN, 5/17/2022 10:14:20 PM, ARCH full bleed D (36.00 x 24.00 Inches)