Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220501_Design Calculations (Riprap) (2)_20220825
• ' ' • • DATE DESIGN PHASE 1 02-11-22 PRELIM PROJECT NAME CONSTR ! X PROJECT NO South Park '1722 REVISION RECORD LOCATION BY Hoe Mills, North Carolina CJP JOTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= PO 17 Q10/Qfull = 0.08 Pipe Dia= 15 in V/Vfull = 0.59 Q10 = 1.15 cfs V = 7.1 fps Qfull = 14.76 cfs `,/full = 12.01 fps From Fig. 8.06.b.1. Zone — 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Length I Apron Width @ End = 8.8 ft Storm Outlet Structure FES No.= PO 12 Q10/Qful1 = 0.20 Pipe Dia= 24 in V/Vfull = 0.78 Q10 = 11.77 cfs V = 14.8 fps Qfull = 59.49 cfs Vfull = 18.91 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 18 in 3 Apron Length = 12.0 ft Apron Width @ Outlet = 6 ft Length Apron Width @ End = 14.0 ft 1722 Storm System.xlsx LATEST REVISION: 3/30/2022 1:22 PM PAGE 1 OF 3