Loading...
HomeMy WebLinkAboutSite Inspection 10.10.22 Br 99 on SR1168 EVineyardWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20201574 NCDOT - Replace Bridge 99 on SR 1168 Clay NCDOT - Replace Bridge 99 on SR 1168 NC DOT Division 14 - Sylva 10/10/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 39' 44''+35° 02' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on October 10, 2022 by Kevin Mitchell with the Asheville Regional Office. No one was present during the inspection. Site work is complete. Site is compliant with the 401 Water Quality Certification with additional conditions. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20201574 10/10/2022 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2