HomeMy WebLinkAboutSite Inspection 10.10.22 Br 99 on SR1168 EVineyardWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20201574
NCDOT - Replace Bridge 99 on SR 1168
Clay
NCDOT - Replace Bridge 99 on SR 1168
NC DOT Division 14 - Sylva
10/10/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 39' 44''+35° 02'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on October 10, 2022 by Kevin Mitchell with the Asheville Regional Office. No one was
present during the inspection.
Site work is complete. Site is compliant with the 401 Water Quality Certification with additional conditions.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20201574
10/10/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2