Loading...
HomeMy WebLinkAboutSW5220601_Email_20221011 Farkas, Jim J From:Farkas, Jim J Sent:Tuesday, October 11, 2022 10:19 AM To:josh.smith31@ymail.com Cc:Zach Gardner; Valentine, Thad; Mack Summey; kacey.hargrove@chathamcountync.gov; larry.meadows@chathamcountync.gov Subject:RE: SW5220601 Community Baptist Church Good Morning, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on October 3, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW5220601, dated October 11, 2022, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, Lois Lynch, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Community Baptist Church of Siler City, Inc. Attn: Lois Lynch, Registered Agent 2575 Hamp Stone Road Siler City, NC, 27344 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Raleigh Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 1 From: Tran, Kieu M <kieu.tran@ncdenr.gov> Sent: Friday, July 8, 2022 11:06 AM To: josh.smith31@ymail.com; Zach Gardner <zach@summeyengineering.com> Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Valentine, Thad <thad.valentine@ncdenr.gov> Subject: SW5220601 Community Baptist Church Good morning, We received your post-construction stormwater permit application for the above mentioned project on 6/20/2022. Reviews under the standard permitting process generally take 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 45 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW5220601 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Mrs. Kieu Tran Stormwater Program Administrative Assistant Office: (919) 707- 3640 Kieu.Tran@ncdenr.gov North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Stormwater Program 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 2