Loading...
HomeMy WebLinkAbout20131298 Ver 1_Emails_20141014McGill A S S O C I A T E S October 10, 2014 US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Ave., Room 208 Asheville, NC 28801 -5006 Attn: Tasha Alexander RE: Powell Road Greenway Sewer Replacement Action ID: 2014 - 00203; DWR# 13 -1298 Lenoir, NC Tasha, This letter is to inform you of a design change to the referenced project at Impact Site S- 2. The change is requested due to landowner concerns and to prevent debris build -up in the culvert. The original plans call for an aerial crossing of UT -Zacks Fork downstream of an existing 36" CMP; the new plans show this aerial crossing being shifted to the upstream end of the same pipe. The shift will require 10 linear feet of the 36" CMP to be removed and a new headwall will be installed. Stream banks, adjacent to the removed pipe section, will be graded to match existing undisturbed banks immediately upstream and will be stabilized with coin matting and seeded with native riparian seed mix. The 10 linear foot section of stream bed will be stabilized with riprap. The old sewerline pipe downstream of the culvert will be cut flush with the stream banks and permanently plugged. There will be no additional impacts at this location. The original permit authorized 35 linear feet of impacts at this location. The revision will result in total impacts at this location of no more than 20 linear feet. Attached are copies of the original and revised plans showing the changes to Impact Site S -2. Please contact me if you have any question. Thank yo ��� J C. Vilas McGill Associates, P.A. Program Services Manager- Environmental Cc: Tim Fox, NCDWR En v i r o n m entaI Planning Finance .1fcGtAdsaacinlas, P.A. • 3761 Roniinger Rand, Banner B11, Nm't4 Cnrolma 28604 OfNa 828 -297 -6946 •Fns: 828 -297 -1982 Via$= 7 fF a 9& LL s$o S�hx 0 cs v c� wm wgffiz P S OZcX Z O O LL \� % Q W l uj .,z% wm wgffiz P S OZcX