Loading...
HomeMy WebLinkAboutTPB NCDOT - Replace Bridge 9 on SR 1112 (B-5614)STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR September 7, 2022 NC Dept. of Environmental Quality Division of Coastal Management 400 Commerce Street Moorhead City, NC 28557 ATTN: Mr. Stephen Lane, NCDOT Coordinator J. ERic BoYETrE SECRETARY Subject: Application for CAMA Major Development Permit for the Proposed Replacement of Bridge No. 9 on SR 1112 (Mouth of The Creek Rd) in Beaufort County, North Carolina; TIP No. B-5614; Federal Aid Project BRZ-1112 (017); Debit $475 from WBS No. 45569.1.1 Dear Mr. Lane: The Department requests authorization to replace bridge No. 9 on SR 1112 (Mouth of The Creek Road) over Blounts Creek. Please see enclosed copies of the Division of Coastal Management Major Permit Forms 1 and 5, permit plans, buffer plans, and utility plans for the above referenced project. This project calls for a letting date of April 18, 2023 and a review date of February 8, 2023. The project schedule may be advanced if funding becomes available. A Categorical Exclusion was completed in November 2021 and distributed shortly thereafter. Additional copies are available at the NCDOT website: https://xfer.services.ncdot.aoy/t)dea/EnvironmentalDocs/Documents/STIP B-ProjectsB- 5614 CE Final 11.05.2021 Signed.pdf NCDOT requests that the proposed work be authorized under a Coastal Area Management Act Major Permit. Adjacent riparian landowner certified mail return receipts will be provided once they are received. Mailing Address: NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-707-6000 Location: ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 CENTURY CENTER, BUILDING B 1598 MAIL SERVICE CENTER 1000 BIRCH RIDGE DRIVE RALEIGH NC 27699-1598 Website: www.ncdot.gov RALEIGH NC, 27699 A copy of this permit application will be posted on the NCDOT Website at https://xfer.services.ncdot.gov/pdea/Perm.Apps/. Should you have any questions regarding this information, please contact Deanna Riffey at (919) 707-6151 or driffeyAncdot.gov. Sincerely, Piz C ' �- Chris Rivenbark, Eastern Team Lead Environmental Coordination and Permitting Group cc: Cathy Brittingham, NCDCM Raleigh „. STA7Fa yo. GW+ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY September 7, 2022 Jonathan Kassnove & Howard Pinkham 1441 Boyd Galloway Rd Grimesland, NC 27837 Dear Landowner: The North Carolina Department of Transportation is planning to replace bridge number 9 on Mouth of The Creek Road over Blounts Creek. The proposed project will replace the aging existing structure over Blounts Creek. The project will replace the existing 600-foot bridge with a 962-foot bridge. The additional length will allow for the replacement of a substandard structure. The bridge replacement will be on new alignment to the south of the existing bridge while traffic will be maintained on the existing bridge. This project crosses an Area of Environmental Concern, as defined by the North Carolina Division of Coastal Management (DCM), and must be approved by the DCM under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The full permit application detailing the work planned, including vicinity map and site drawings, is enclosed for your review. The attached form is submitted to ensure that you have an opportunity to comment on the proposal. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Stephen Lane N.C. Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 Thank you for your cooperation. Sincerely, Chris Rivenbark, Eastern Team Lead Environmental Coordination and Permitting Group cc: Mr. Stephen Lane, NCDCM File — TIP B-5614 Mailing Address: Telephone: (919)707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Customer Service: 1-877-368-4968 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Website: www.ncdot.gov RALEIGH NC 27699 1598 MAIL SERVICE CENTER Ra,LEIGH NC 27699-1598 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR September 7, 2022 Gerard Alpern Parker, Jr. 504 Country Club Dr Trent Woods, NC 28562 Dear Landowner: J. ERic BOYETTE SECRETARY The North Carolina Department of Transportation is planning to replace bridge number 9 on Mouth of The Creek Road over Blounts Creek. The proposed project will replace the aging existing structure over Blounts Creek. The project will replace the existing 600-foot bridge with a 962-foot bridge. The additional length will allow for the replacement of a substandard structure. The bridge replacement will be on new alignment to the south of the existing bridge while traffic will be maintained on the existing bridge. This project crosses an Area of Environmental Concern, as defined by the North Carolina Division of Coastal Management (DCM), and must be approved by the DCM under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The full permit application detailing the work planned, including vicinity map and site drawings, is enclosed for your review. The attached form is submitted to ensure that you have an opportunity to comment on the proposal. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Stephen Lane N.C. Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 Thank you for your cooperation. Sincerely, Chris Rivenbark, Eastern Team Lead Environmental Coordination and Permitting Group cc: Mr. Stephen Lane, NCDCM File — TIP B-5614 Mailing Address: Telephone: (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Customer Service: 1-877-368-4968 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Wehsite: www.ncdot.gov RALEIGH NC 27699 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR September 7, 2022 James & Mary Lewis 211 WIlliamsburg Rd Washington, NC 27889 Dear Landowner: J. ERIC BOYETTE SECRETARY The North Carolina Department of Transportation is planning to replace bridge number 9 on Mouth of The Creek Road over Blounts Creek. The proposed project will replace the aging existing structure over Blounts Creek. The project will replace the existing 600-foot bridge with a 962-foot bridge. The additional length will allow for the replacement of a substandard structure. The bridge replacement will be on new alignment to the south of the existing bridge while traffic will be maintained on the existing bridge. This project crosses an Area of Environmental Concern, as defined by the North Carolina Division of Coastal Management (DCM), and must be approved by the DCM under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The full permit application detailing the work planned, including vicinity map and site drawings, is enclosed for your review. The attached form is submitted to ensure that you have an opportunity to comment on the proposal. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Stephen Lane N.C. Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 Thank you for your cooperation. Sincerely, Chris Rivenbark, Eastern Team Lead Environmental Coordination and Permitting Group cc: Mr. Stephen Lane, NCDCM File —TIP B-5614 Mailing Address: Telephone: (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Customer Service: 1-877-368-4968 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Website: www.ncdot.gov RALEIGH NC 27699 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 ST�7f„ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR September 7, 2022 Sema E. Lederman 204 Glennview Place Chapel Hill, NC 27516 Dear Landowner: J. ERIC BOYETTE SECRETARY The North Carolina Department of Transportation is planning to replace bridge number 9 on Mouth of The Creek Road over Blounts Creek. The proposed project will replace the aging existing structure over Blounts Creek. The project will replace the existing 600-foot bridge with a 962-foot bridge. The additional length will allow for the replacement of a substandard structure. The bridge replacement will be on new alignment to the south of the existing bridge while traffic will be maintained on the existing bridge. This project crosses an Area of Environmental Concern, as defined by the North Carolina Division of Coastal Management (DCM), and must be approved by the DCM under provisions of the Coastal Area Management Act (CAMA). One of the prerequisites to this approval is that adjacent riparian landowners be given an opportunity to comment on the proposal. The full permit application detailing the work planned, including vicinity map and site drawings, is enclosed for your review. The attached form is submitted to ensure that you have an opportunity to comment on the proposal. If you have no objections to the proposal, please return the form with your response within 30 days to this office. If you do have objections to the project, please forward your comments to: Mr. Stephen Lane N.C. Division of Coastal Management 400 Commerce Ave. Morehead City, NC 28557 Thank you for your cooperation. Sincerely, Chris Rivenbark, Eastern Team Lead Environmental Coordination and Permitting Group cc: Mr. Stephen Lane, NCDCM File — TIP B-5614 Mailing Address: Telephone: (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Customer Service: 1-877-368-4968 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Website: www.ncdot.gov RALEIGH NC 27699 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 IN MP-1 WFLICATION for Malor Development Pernift (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) North Carolina Department Of Transportation B-5614 Applicant 1: First Name MI Last Name Deanna Riffey Applicant 2: First Name MI Last Name N/A N/A N/A If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State Environmental Analysis Unit, 1598 Mail Service Center Raleigh NC ZIP Country Phone No. FAX No. 27610 USA 919 - 707 - 6151 ext. - Street Address (if different from above) City State ZIP EAU - Centery Center A, 1000 Birch Ridge Drvie Raleigh NC 27610- Email driffey@ncdot.gov 2. Agent/Contractor Information Business Name N/A Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No.1 ext. Phone No 2 ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> 252-803-2808 1-888-4RCOAST ., www.nccoastalmanagament.net Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Beaufort County Mouth of the Creek Road 1112 Subdivision Name City State Zip NA Blounts Creek NC 27814 - Phone No. Lot No.(s) (if many, attach additional page with list) - ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar -Pamlico River Basin Blounts Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Pamlico River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Beaufort County 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 294 236,713 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 15' ❑NHW or ®NWL e. Vegetation on tract Maintained/Disturbed: Lawns, fields, and roadside shoulders are mostly open with scattered trees such as sweetgum, red maple, and flowering dogwood; Mesic Mixed Hardwood: bald cypress, black gum, green ash, loblolly pine, wax myrtle, sweetgum, red maple, jewel weed, lizard's tail, netted chainfern, and Japanese honeysuckle; Pine Plantation: loblolly pine, American holly, sawtooth blackberry, and laurel leaf smilax: Salt Marsh: smooth cordgrass, small spike false nettle, needlegrass rush, big cordgrass, narrowleaf cattail, alli atorweed, and water willow. f. Man-made features and uses now on tract Features are: SR1112 (Mouth of the Creek Road, Bridge #9, electric and water utility lines, residential homes. Uses are: transportation, residential, and recreational. g. Identify and describe the existing land uses Jacent to the proposed project site. Land use in the project study area is a combination of maintained roadsides, residential, and undeveloped natural areas. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ❑No ❑NA If yes, by whom? NCDOT Archaeology I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes [:]No (Attach documentation, if available) 52-808-2808 .. 1-888-4RCOAST .. www.nccoastaismanagement.net Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. NA - no existing storm water management or treatment systems 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑ Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed bridge replacement will provide an updated creek crossing over Blounts Creek for local commuters. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. A workbridge will be used to build the new structure. Typical construction equipment insluces crane, excavator, dump trucks, etc. d. List all development activities you propose. A temporary causeway will be built near the north side of the bridge. Once the new roadway is complete, the existing bridge and causeway will be removed. e. Are the proposed activities maintenance of an existing project, new work, or both? new work -- bridge replacement f. What is the approximate total disturbed land area resulting from the proposed project? 1.4 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Existing drainage flow directly off of the existing bridge into Blounts Creek, existing bridge approaches have overland flow which discharges to Blounts Creek. The proposed drainage will be picked up within 2G1's at the end of bridge and will discharge to proposed grassed swales which eventually tie in with existing drainage features. i. Will wastewater or stormwater be discharged into a wetland? ®Yes ❑No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes ®No ❑NA I. Is there any mitigation proposed? ®Yes ❑No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. 252.308-2308 .. 1-833-4RCt3AST .. vbww.nccoastalmanagennent.nat Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name See Attached List Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. N/A h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7, Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 7/.2DA Z Print Name tC�J'�✓vbar� Signature WA r Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information 252.803-2808 .. 1.888.4RCOAST .. www.nccoastalmanagement.net Nm AtRMFS BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ❑This section not applicable a. Is the proposed bridge: b. Water body to be crossed by bridge: ❑Commercial ®Public/Government ❑Private/Community Blounts Creek C. Type of bridge (construction material): d. Water depth at the proposed crossing at NLW or NWL: Modified Bulb Tee (concrete) 12.0 e. (i) Will proposed bridge replace an existing bridge? ®Yes ❑No f. (i) Will proposed bridge replace an existing culvert? []Yes ®No If yes, If yes, (ii) Length of existing bridge: 600' (ii) Length of existing culvert: (iii) Width of existing bridge: 24' (iii) Width of existing culvert: (iv) Navigation clearance underneath existing bridge: 15' (iv) Height of the top of the existing culvert above the NHW or (v) Will all, or a part of, the existing bridge be removed? NWL: (Explain) All of existing bridge will be removed (v) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge: 962' h. Width of proposed bridge: 33' i. Will the proposed bridge affect existing water flow? ❑Yes ®No j. Will the proposed bridge affect navigation by reducing or If yes, explain: increasing the existing navigable opening? ❑Yes ®No If yes, explain: k. Navigation clearance underneath proposed bridge: 15' I. Have you contacted the U.S. Coast Guard concerning their approval? ®Yes ❑No If yes, explain: Coast Guard Permit will be required. m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: NA waters? ❑Yes ®No If yes, explain: 2. CULVERTS ®This section not applicable a. Number of culverts proposed: b. Water body in which the culvert is to be placed: < Form continues on back> C. Type of culvert (construction material): 252-808-2808 :; 1-8884RCOAST .; •w N,,v.ncr-oastaimanagamenb.net revised: 101;26 06 Form DCM MP-5 (Bridges and Culverts, gage 2 of 4) d. (i) Will proposed culvert replace an existing bridge? e. (i) Will proposed culvert replace an existing culvert? ❑Yes [--]No ❑Yes [:]No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) If yes, (ii) Length of existing cuivert(s): (iii) Width of existing culvert(s): (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) f. Length of proposed culvert: 9 Width of proposed culvert: h. Height of the top of the proposed culvert above the NHW or NWL. i. Depth of culvert to be buried below existing bottom contour. j. Will the proposed culvert affect navigation by reducing or k. Will the proposed culvert affect existing water flow? increasing the existing navigable opening? ❑Yes []No ❑Yes ❑No If yes, explain: If yes, explain: 3. EXCAVATION and FILL [-I This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any b. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? []Yes ®No excavation within coastal wetlands/marsh (CW), submerged If yes, aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square (ii) Avg. length of area to be excavated: feet affected. (iii) Avg. width of area to be excavated: ❑CW ❑SAV ❑SB (iv) Avg. depth of area to be excavated: ❑WL ®None (v) Amount of material to be excavated in cubic yards: (ii) Describe the purpose of the excavation in these areas: C. (i) Will the placement of the proposed bridge or culvert require any high -ground excavation? ®Yes ❑No If yes, (ii) Avg. length of area to be excavated: 16.5 (iii) Avg. width of area to be excavated: 50 (iv) Avg. depth of area to be excavated: 4_5 (v) Amount of material to be excavated in cubic yards: 150 23:2-508-230 :; 1.888-4 ,,.OAST :; re At N,nccoastaimanagement.net revised. 10.26/06 Form DCNI P-5 (Bridges and Culverts, Page 3 of A) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: To be determined by Contractor (ii) Dimensions of the spoil disposal area: To be determined by Contractor (iii) Do you claim title to the disposal area? ❑Yes ®No (If no, attach a letter granting permission from the owner) (iv) Will the disposal area be available for future maintenance? ❑Yes []No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ®None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? []Yes ®No If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any f. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ®Yes ❑No be placed within coastal wetlands/marsh (CW), submerged If yes, aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square (ii) Avg. length of area to be filled: 32'-6" (per bent - there are feet affected. 7 bents) ®CW 335 ❑SAV ❑SB (iii) Avg. width of area to be filled: T-6" (diameter) ®WL 15,912 ❑None (iv) Purpose of fill: proposed bridge bents (ii) Describe the purpose of the excavation in these areas: Proposed Roadway embankment and bridge approaches. g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ®Yes [:]No If yes, (ii) Avg. length of area to be filled: 1,1 X (iii) Avg. width of area to be filled: 40' (iv) Purpose of fill: proposed roadway embankment 14. GENERAL a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ®Yes ❑No detour structures? ❑Yes ®No If yes, explain: The project includes relocation of power If yes, explain: lines and telecommunitcations. If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on back> c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion ❑Yes ®No controlled? If yes, complete Form DCM-MP-2. Design Standards in Sensitive Watersheds will be adhered to throughout construction 252-8 8-2303 :. 1 383-=4 OAST : w,,vw.nccoastalrnananeznent.net revised: 110126/06 Form DC - (Bridges and Culverts, Page 4 of 4) e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? temporary work bridge, cranes, excavators, bulldozer g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ❑Yes ®No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. Se,p4erin6er -7 , a 0 a- 2 Date 6 - SCE ► '-( Project Name If C[lriS ��J2v�v�ar Applicant Name —M �� C Applicant Signature f. Will wetlands be crossed in transporting equipment to project site? ®Yes ❑No If yes, explain steps that will be taken to avoid or minimize environmental impacts. Safety fence and sediment and erosion control devices will be installed to delineate the work area and minimize environmental impacts to additional adjacent features. 252-808-2308 :: 1-888-4RCOA6T :: aw tiw,nccoastair7anat3ement.net revises!: i 03 26i06 tt%Pl\V:'1'1' North Carolina Department of Transportation .. Slt?rtl tx�vr_11 tfCi' Highway Stormwater Program STORMWATER MANAGEMENT PLAN oterstan 3 W Released August 20211 FOR NCUOT PROJECTS WBS Elumem: 4 , i t ......_ ...-.._-........w......a ........._._ T TIP(Pr No 3 '.t614 Cou, �(les). 5 A l oit ... ... .... _ _ ._ P t. ........ 1 of Z _._.......,... _ _.,..... _.. - .. .._ . .. . .._.-.m........._ .. Generat Project information WBS Element: 45569.11 ITIP Number: B-5614 Project T e: Brid e Replacement Date: 3/28,2022 NCDOT Contact: David Stunts. PE Contractor l Desl ner: Rabi Robot Address: 1581 Mail Service Center Address: 940 Main Campus Drive, Suite 500 Raleigh, NC 27699-1581 Raleigh, NC 27606 Phone: 919)707-6442 Phone: 919 829-0328 Email: dstults ncdot. ov Email: notxrllWOb.com Ci !Town: Biounts Creek Court ies : Beaufort River Basins : Tar Pamlico CAMA County? Wetlands within Pro ect Limits? Yes- Project De$Grt tlon Project Length (lin. miles or foot): 0.398 rni. Surroundin Land Use: k Sr er'_tcal, Wixjded, Agriculture ;Pro osed Pr 'act Exisfin Site Project Built -Upon Area sc. 1.4 12 IuC Typical Cross Section Description. 2 g 10' lanes with 2' paved shoulders and 1' grass shoulders (.road) and 2 Cq? 10' lanes 2 C� 10' lanes with 2' paved shoulders and 1' grass shoulders with 5' paved shoulders (bridge) Annual Avg Daily Traffic (vehlhrlday): Desi n•'Future < 1000 Year: 2041 Existing 11000 Year: 2021 General Project Narrative: Project B-5614 involves the replacement of the existing NCDOT Bridge 9060009 on SR 1112 over Blounts Creak in Beaufort County. Bridge 0060009 is a 601.1' timber dock on (Description of Minimization of Water 1-breams crested bridge with a 15 span arrangement (14@40.0', 1 @41.1') with vertical timber abutments. The proposed bridge is a 960'. 63" Modred Bulb Tee design with a Quality Impacts) 8 r@120' span arrangement and 4'-0" end caps. According to the effective Flood insurance Rate Map (FIRM), the study area is located in Zone AE in a Coastal Area Management Act (CAMA) county. As such, the low chord of the proposed bridge was designed to be at or higher than the low chord of the existing bridge per CAMA county requirements. There are both CAMA wetlands and 404 wetlands OR the project site, impacts to these are noted on the wetland impact summary table. The project site is also subject to the Tarr Pamlico Buffer Rules and stormwater outfalls were placed outside of the buffer zones and were provided rip -rap pads to help dissipate energy and to reduce velocity at all proposed outfalls. No deck drains are required for the proposed bridge. t i1 �St'il , Stornhltair,er (Version 8"00; Released August 2021) North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS 4, WBS Element: 1_i_i TIPIPro" No.: ?+ 5514 _._ __. _ __-____--____. .____ _..,_-___ 1 _. _ _ Coui �ies� Beaufort _..._._. ....------ _ _ _.._ ._.T _._.., .___.— General Project Information .._... Page 2 ................ Waterbody Information Surface Water Body _ f3lounts l,reek NCDWR Stream Index No.: 29-9-1-(3) NCDWR Surface Water Classification for Water Body Prima Classification: Class SB Su lemental Classification: Nutrient Sensitive Waters INSW Other Stream Classification: None Impairments: None Aquatic T&E Species? Yes Comments: 1131ounts Creek is classified as an anadiomous fish spawning area NRTR Stream ID: Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? 1yes Deck Drains Discharge Over Buffer? INo Dissi ator Pads Provided in Buffer? lNo Deck Drains Dischar a Over Water Body? INo y, t0w ihor in tip c naval Project Narrative) (if yes: provide justification in the. •3eneral Project Narrative) of yes, describe in the General Project Narrative, if no, justify in the General Project Narrative) B-5614 Utilities Narrative July 281h, 2022 COUNTY: BEAUFORT STIP: B-5614 VHB Engineering NC, P.C. DESCRIPTION: Project B-5614 involves the replacement of the existing NCDOT Bridge #060009 on SR 1112 over Blounts Creek in Beaufort County. The utility conflicts for the subject NCDOT Project are listed below: TIDELAND EMC AND LUMEN — POWER LINES AND TELEPHONE CABLES Plans include the construction of Tideland EMC temporary and permanent overhead power lines and Lumen underground telephone cables. The proposed temporary overhead powerline, which is located from -L- station 11+97 to 17+92 LT will require less than .01 AC of hand clearing in wetlands. The proposed permanent overhead power lines from -L- 12+02 to 17+91 RT will require 0.14 AC of hand clearing in wetlands. A portion of this hand clearing is in buffer zones; it will result in 203 SF of impact in Buffer Zone one and 105 SF of impact in Buffer Zone two. These proposed power lines and telephone cables will also create additional buffer impacts due to trenching operations from -L- 17+62 to 18+12 LT. Trenching work will require 834 SF of impact in Buffer Zone one, and 197 SF in Buffer Zone 2. BEAUFORT COUNTY WATER According to the utility coordination, two 8" water lines will be relocated on both sides of the proposed bridge from station -WL- 5+10 to 8+73 and station -WL2- 5+00 to 8+77. The existing waterlines within these limits will be abandoned. The proposed waterlines will not create additional wetland or buffer impacts outside of impacts covered in the Bridge Replacement environmental permit.