HomeMy WebLinkAboutWQ0031317_Monitoring - 08-2022_20220921Monitoring Report Submittal
Permit Number #* WQ0031317
Name of Facility:* Global Nuclear Fuel - Americas
Month: * August Year: * 2022
Report Information
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR Aug 22 NDMR Sanitary.pdf 140.93KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address:* andrew.reeside@ge.com
Name of Submitter: * Andrew Reeside
Signature:
146ka?�'
Date of submittal: 9/21/2022
This will be filled in automatically
Initial Review
Reviewer: Gerald, Wanda
Is the project number correct?* WQ0031317
Is the monitoring report accepted?* Yes No
Regional Office* Wilmington
Reviewer: _anonymous
Review Date: 10/10/2022
= _ M s 0-13
_
-'E _=
'D
Pain all
s a
-Amen--Amen-cas
- --
CoupWn
New H n ve-
. one e Al
Ceara 2022
ass
= ,
_ �P Z
3 "- _
£_ ;
�
P� s_ _
nee
s
�
IRS
-
Waffm
ti
M.
--
-
_
_
O_
:OU _ B
..
20
-
-- —
-
25
_
_
�-00
Dally MAMMUM:M.
um-DIMP TV".
Sam" =tea 1
_
,
Sampling Person(s)
qame: Mike Phipps
-Name: Global Nuclear Fuel - Americas
......................... .........
Does all monitoring data and sampling frequencies most the requirements in Attachment A of your permit?
Operator In Responsible Charge (ORC) Certification
ORC- Mike Phipps
Carfification No.. M536
Graft. ww 11 Phone Number 910-617-9373
Has ORC changed since the previous NDMR? [] Yes E( No
Signature ode
1111 1111111111 11 !Jill 1111111
Pormittell Dggp2 IM110
Signing Official: 21,111101LO-4ga—
Signing Official's Title: Yffini plant no r
Phone Number: 21Q:112-7140 - - Permit Expiration,
C unr , New _ v _ _ re
p!;
F - - Ms"uMn Pam°_
-MOTjUpdrig p
—wgtw
E p _
_
-56 _
alit
_ 00 _ _
_ Comm
_3M
:
_-
Ew'
GPO
9-1100
-
_
-
OIB
024
O&OU
1
<2-
_ 275
072
023
.;-
24
26 :0 _
=
29
_
_ _ _020
12
OA_ -12'a0-2
_
a
_
i -1
samni -ape; _
- -
--
G _
_
-
_ Q _ R
n v, Limes
_
_
_
-
10
i
FORM: NDMR 10-13 NON -DISCHARGE MONITORING REPORT (NDMR) Page 2 of 2
Sampling Person(s) Certified Laboratories
Name: Mike Phipps Name: Environmental Chemists
Name: Jeff Hollis Name: Global Nuclear Fuel ® Americas
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? a C.0'" [:] Nomearnocant
It the facility is non -compliant, please explain In the Wee bakre the reason(s) the facility was not In compliance, Provide in your explanation Me datels) of the non-compliance and describe the corrective
adkin(s) taken. Attach additional sheets it necessary.
Operator In Responsible Charge (ORC) Certification Permittee Certification
C. Mike Phipps Pennines., Dygniii MjIgn
certification No.: SM36 Signing Official: DMIaLVAk2n
Grade, vww 11 Phone Number 910-617-9373 Signing Official's Tifile:
Has ORC changed since the previous NOMR? Yes No Phone Number 2jQ&jq-714QPermit Expiration: qZ0_rM
C7
signature Lk'C'e-Z VV Date
Signature Date 'I ® under pectafty of law. that this document and all attachments were prepared under my d1ractiort or supervision In accordance
wAth a system designed to seem that all quallfim! pontonnal property trathered laid evaluated the Information submitted Based an my
Inquiry of to person w persons who manage Or* system or thase persons directly responsible for gathering Ow Infunnaflon, the
By Me signature. I certify that this rental In accurate and cor*ota to the beat of my knowledge. Infannadoin sulargued K to the best ®f my knowkskis sm! balref, tros, accurate, and completa. I wn aware had Uwe are aignificars
Panels" far stationers; false Informatkom Including the ine"Itility of fines and Impriscammat for knmWn9 viatattorm"
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, NC 27699-1617