HomeMy WebLinkAboutSW6211205_Supplement-EZ Form_20220712SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
BROOKSTONE VILLAGE
2
Project Area ec
60.64
3
Coastal Welland Area ac
0
4
Surface Water Area ac
0
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
lWidth of vegetated setbacks provided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCM9:
Infiltration S tem
Bioretention Cell
Wet PondStormwater
Welland
r
Permeable Pavement
Sand Filter
Ralmvater Harvestin RWHGreen
Roof
19
Level Spreader -Filter p Strip LS-FS
20
Disconnected Impewious Surface DIS
21
Treatment Swale
22
Dry Pond
23
Sto mi'ilter
24
Silva Cell
25
Be i0er
26
Fitiema
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and This:
Andraw Richards, PE
28
Or anization:
Paremounte Engineering, Inc.
29
Street address:
122 Cinema Dr.
30
Cl State, ZI :
Wilmington, NC 28403
31
Phorre num s :
910-791-6707
32
Email:
adchards@paramounte-eng.com
Certification Statement
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form Is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the Information provided here.
Irk ' E S/OOI/
2:Q� 7
SEAL
Z : 052507 Q
:O •'•FiyGINif
/1�//E
Sig re of De ner
3/Z 3 ZvZz
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this ro'ect have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
GE AREA INFORMATION
Entire Site
1
4
Type of SCM
WET POND
5
Total drainage area (sq ft
2641478
2565939
6
Onsite drainage area (sq ft
2633164
2557625
7
Offsite drainage area (sq ft
8314
8314
8
Total BUA in project (sq ft
1380437 sf
1380437 sf
9permitting)
New BUA on subdivided lots (subject to
s ft
239580 sf
239580 sf
10permitting)
New BUA not on subdivided lots (subject to
sf
1140857 sf
1140857 sf
11
Offsite BUA (sq ft
8314 sf
8314 sf
12
1 Breakdown of new BUA not on subdivided lots:
Parking (sq ft
Sidewalk (sq ft
13939 sf
13939 sf
Roof (sq ft
Roadway s ft
67518 sf
67518 sf
Future (sq ft
1051086 sf
1051086 sf
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement not on
subdivided lots (sq ft
15permitting)
Existing BUA that will remain (not subject to
s ft
16
1 Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
52%
54%
19
Design storm inches
1"
20
Design volume of SCM cu ft
207792 cf
21
Calculation method for design volume
SIMPLE
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
I
WET POND
11 Drainage area number 1
21 Minimum required treatment volume cu ft 114187 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump preferred
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
171
Was the SCM designed by an NC licensed rofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
234.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
235.00
221
Elevation of the bottom of the vegetated shelf (fmsl)
240.00
231
Elevation of the permanent pool (fmsl)
241.00
24
Elevation of the top of the vegetated shelf (fmsl)
241.00
25
Elevation of the temporary pool (fmsl)
243.50
26
Surface area of the main permanent pool (square feet)
57355
27
Volume of the main permanent pool (cubic feet)
265380 cf
28
Average depth of the main pool (feet)
5.20 ft
29
Average depth equation used
Equation 3
301
If using equation 3, main pool perimeter (feet)
1119.0 ft
31
If using equation 3, width of submerged veg. shelf (feet)
6.0 ft
32
Volume of the forebay (cubic feet)
50688 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
12 in
35
Design volume of SCM (cu ft)
207792 cf
36
Is the outlet an orifice or a weir?
Orifice
371
If orifice, orifice diameter (inches)
6 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.94
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
431
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
1 Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
BERMUDA
54
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 3 4:29 PM 6/29/2022