Loading...
HomeMy WebLinkAboutWQ0000484_Monitoring - 07-2022_20220811FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of _) Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: July Year: 2022 Field Name: A Field Name: B Field Name: C Field Name: D Field Name: E Area (acres): 8.25 Area (acres): 6.75 Area (acres): 13.6 Area (acres): 3.5 Area (acres): 4.7 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES 0 NO Field Loaded? ❑ YES NO Field Loaded? ❑ YES NO Field Loaded? ❑ YES n NO Field Loaded? ❑ YES ❑ NO z z 0 0 o z z 0 z T zd 0 zo aQ• a Q a aQ• -Q a@ a � Q• a Q n m > Q Q m >CL m n N J a Q o > 0 a Q a a .0 0 Q a ao 0Q £ z @ J = z U M Jz O Jz - _c@1O zE Ea N C C = E U c d a Q OQj U o Qj U o QU o Q C Vo vm> aj > > > > > Month gal mg/L Ibs/ac 29.9 I Ibs/ac 1 29.9 gal 1,215,000 mg/L 24.33 Ibs/ac 36.5 Ibs/ac 36.5 gal 2,898,000 mg/L 24.33 Ibs/ac 43.2 Ibs/ac 43.2 gal mg/L 24.33 Ibs/ac Ibs/ac gal mg/L 24.33 Ibs/ac Ibs/ac August 1,215,000 c•,.33 September 936,000 10.5 9.9 39.8 936.000 10.5 12.1 48.7 1,494,000 10.5 9.6 52.9 10.5 10.5 October 733,500 16.12 12.0 51.8 733,500 16.12 14.6 63.3 900,000 16.12 8.9 61.8 16.12 16.12 November 706,500 18.66 13.3 65.1 706,500 18.66 16.3 79.6 0 18.66 0.0 61.8 18.66 18.66 December 769,500 16.31 12.7 77.8 769,500 16.31 15.5 95.1 360,000 16.31 3.6 65.4 16.31 16.31 January 580,500 11.05 6.5 84.3 580,500 11.05 7.9 103.0 324,000 11.05 2.2 67.6 11.05 11.05 February 540,000 15.48 8.5 92.7 540.000 15.48 10.3 113.3 1,224,000 15.48 11.6 79.2 15.48 15.48 March 706,500 10.89 7.8 1 100.5 715,500 10.89 9.6 123.0 1,908,000 10.89 12.7 91.9 10.89 10.89 April 688,500 12.18 8.5 109.0 796,500 12.18 12.0 134.9 1,530,000 12.18 11.4 103.3 12.18 12.18 May 765,000 14.11 10.9 119.9 765,000 14.11 13.3 148.3 1,512,000 14.11 13.1 116.4 14.11 14.11 June 630,000 8.26 5.3 125.1 11 810,000 8.26 8.3 156.5 2,340,000 8.26 11.9 128.3 8.26 8.26 July 1,134,000 16.85 19.3 144.5 1,134,000 16.85 23.6 180.2 1,548,000 16.85 16.0 144.3 16.85 16.85 12 Month Floating PAN Load (Ibs/ac/yr): 144.5 180.2 144.3 Annual PAN Load Limit (Ibs/ac/yr): 350 350.00 264.00 350.00 350.00 AUG 11 202"'_ FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page , _ of h} Permit No.: WO 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: July Year: 2022 Field Name: F Field Name: G Field Name: H Field Name: I Field Name: J Area (acres): 26.53 Area (acres): 47.489 Area (acres): 14.19 Area (acres): 13.58 Area (acres): 58.22 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES ❑ NO Field Loaded? I1 YES [ ] NO Field Loaded? ❑ YES ❑ NO Field Loaded? YES ❑ NO Field Loaded? ❑YES ❑ NO Z o Z °' Z o Z °' Z o Z °' Z o Z °' Z o Z a Q ._ a ;� Q a m > 'O .a Q • a m Q m > 'O .a Q • cL Q m > 'O R a Q a Q m > a m •a Q a Q a m > -o m m a Q a 0 0 Q 41 a B 0 n Q d a v o a Q A N a a ;� o a Q m N v % 0 �+ M J z �• @ J Z �• f7 J z �• f6 J >` M J z a £ a Fz 0) 0 > U a > 7 U > O U CaE pn U -6 0 QU 0 a v 5 > QU Month gal mg/I Ibs/ac 38.5 Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac August 5,037,000 24- 38.5 4,140,000 24.33 17.7 17.7 1,452,000 24.33 20.8 20.8 1,125:000 24.33 16.8 16.8 8,918,000 24.33 31.1 31.1 September 4,071,000 10.5 13.4 52.0 9,960,000 10.5 18.4 36.1 1,506,000 10.5 9.3 30.1 650,000 10.5 4.2 21.0 8,942,500 10.5 13.5 44.5 October 4,577,000 16.12 23.2 75.2 9,120,000 16.12 25.8 61.9 1,080,000 16.12 10.2 40.3 625,000 16.12 6.2 27.2 9,824,500 16.12 22.7 67.2 November 4,301,000 18,66 25.2 100.4 9,090,000 18.66 29.8 91.7 858,000 18.66 9.4 49.7 1,525,000 18.66 17.5 44.7 7,325,000 18,66 19.6 86.8 December 4,646,000 16.31 23.8 124.2 9,480,000 16.31 27.2 118.8 930,000 16.31 8.9 58.6 2,037,500 16.31 20.4 65.1 61541,000 16.31 15.3 102.1 January 4,669,000 11.05 16.2 140.4 8,760,000 11_05 17.0 135.8 768,000 11.05 5.0 63.6 1,150,000 11.05 7.8 72.9 7.962,500 11,05 12.6 114.7 February 3,059,000 15.48 14.9 155.3 7,140,000 15.48 19A 155.2 792,000 15.48 7.2 70.8 1,587,500 15.48 15.1 88.0 6,566,000 15.48 14.6 129.2 March 4,025,000 10.89 13.8 169.1 8,700,000 10.89 16.6 171.9 1,074,000 10.89 6.9 77.7 2,237,500 10.89 15.0 102.9 6.590,500 10.89 10.3 139.5 April 552,000 12.18 2.1 171.2 9,000,000 12.18 19.3 191.1 1,434,000 12.18 10.3 87.9 2,050,000 12,18 15.3 118.3 7,521,500 12.18 13.1 152.6 May 4,554,000 14.11 20.2 191.4 8,280,000 14.11 20.5 211.6 900,000 14.11 7.5 95.4 2,250,000 14.11 19.5 137.8 6,517,000 14.11 13.2 165.8 June 4,071,000 8.26 10.6 202.0 2,040,000 8.26 3.0 214.6 1,224,000 8.26 5.9 101.4 2,250,000 8.26 11.4 149.2 9,016,000 8.26 10.7 176.5 July 14,416,000 1 16.85 23.4 225.4 31630,000 16.85 10.7 225.3 1 1,362,000 16.85 13.5 1 114.8 11 2,375,000 1 16.85 24.6 173.8 7,742,000 16.85 1 18.7 195.2 12 Month Floating PAN Load 225.4 225.3 114.8 195.2 (Ibs/ac/yr): Annual PAN Load Limit 350 350.00 350.00 350.00 350.00 (Ibs/ac/yr): FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 7, of 'I Permit No.: WO 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: July Year: 2022 Field Name: K Field Name: L Field Name: M Field Name: N Field Name: 0 Area (acres): 9.86 Area (acres): 24.94 Area (acres): 23.07 Area (acres): 78.87 Area (acres): 19.9 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES ❑ NO Field Loaded? ;_ I YES [ NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES i- l NO Field Loaded? ❑ YES [ NO Z o Z m Z a Z ° Z o Z m Z o Z m Z o Z o Q a Q a > a o Q a Q m y o m Q Q a% Q m > a u Q- a Q m > v Q Q a Q m > v @ m a Q m d @ o a Q d a o >, o a Q d a >• @ o o Q R N a a >� o a Q m O a o T @ o 0 Cn A J J z M J J z N J J z l` N J J z M J J Z E , U C E 3 E @ V C E E R V C E E V r E E R J E 7 > C O a U 3 > C O 3 a U 3 � C O 3 a U > > C O 3 a U > C O 3 a v Q� Q� 0 Q� 0 Q� 0 Q�°, r2 Month gal mg/L Ibst-^ 3( ' 18.0 Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac August 1,904,000 24.33 39.2 4,316,000 24.33 35A 35.1 2,750,000 24.33 24.2 24.2 11,050,000 24.33 28.4 28.4 1,392,000 24.33 14.2 14.2 September 2,031,500 10.5 t 57.2 2,665,000 10.5 9.4 44.5 2,475,000 10.5 9.4 33.6 9,999,000 10.5 11.1 39.5 2,796,000 10.5 12.3 26.5 October 1,717,000 16.12 23.4 80.6 3,965,000 16.12 21.4 65.8 2,007,500 16.12 11.7 45.3 9,834,000 16.12 16.8 56.3 2,916,000 16.12 19.7 46.2 November 1,878,500 18.66 29.6 110.3 3,471,000 18.66 21.7 87.5 2,750,000 18.66 18.6 63.8 8,217,000 18.66 16.2 72.5 2,784,000 18.66 21.8 68.0 December 1173,000 16.31 16.2 126.5 2,600,000 16.31 14.2 101.7 1,512,500 16.31 8.9 72.7 8,052,000 16.31 13.9 86.4 2,472,000 16.31 16.9 1 84.9 January 1,946,500 11.05 18.2 144.7 3,107,000 11.05 11.5 113.2 3,602,500 11.05 14.4 87.1 7,260,000 11.05 8.5 94.9 2,304,000 11.05 10.7 95.5 February 425,000 15.48 5.6 150.2 2,496,000 15,48 12.9 1 126.1 605,000 15.48 3.4 90.5 8,118,000 15.48 13.3 108.2 1 2,988,000 1 15.48 19.4 114.9 March 0 10.89 0.0 1 150.2 2,756,000 10.89 10.0 136.1 1,430,000 10.89 5.6 96.2 11,385,000 10.89 13.1 121.3 2,832,000 10.89 12.9 127.8 April 1,521,500 12.18 15.7 165.9 3,575,000 12,18 14.6 150.7 0 12.18 0.0 96.2 10,494.000 12.18 13.5 134.8 2,664,000 12.18 13.6 141.4 May 1,088,000 14.11 13.0 178.9 12,652,000 14.11 12.5 163.2 2,860,000 14.11 14.6 110.7 7,392,000 14.11 11.0 145.8 2,304,000 14.11 13.6 155.1 June 1,751,000 8.26 12.2 191.1 3,354,000 8.26 9.3 172.5 3,300,000 8.26 9.9 120.6 9,075,000 8.26 7.9 153.7 2,208,000 8.26 7.6 162.7 July 2,023,000 16.85 28.8 220.0 1 2795000 15.7 188.2 2,200,000 16.85 13.4 134.0 12,111,0 0: 16.85 21.6 LVU, 2,436,000 16.85 17.2 1 179.9 12 Month Floating PAN Load 220.0 188.2 134.0 175.3 179.9 (Ibs/ac/yr): a Annual PAN Load Limit 350 350.00 350.00 350.00 350.00 (Ibs/ac/yr): FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page' of_�__ Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: July Year: 2022 Field Name: P Field Name: Q Field Name: R Field Name: S Field Name: T Area (acres): 28.64 Area (acres): 23.8 Area (acres): 19.16 Area (acres): 12.74 Area (acres): 6.25 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES ❑ NO Field Loaded? I YES (j NO Field Loaded? ❑ YES ❑ NO Field Loaded? I I YES I j NO Field Loaded? ❑ YES ❑ NO m z o z m z o z z o� zo zv z o zd a a a a >o R a a a ao a > aa a a , �=> a '0 o a a ;o CL a o a o J M 0 3 Z R J 7 O Z 7 Lz O JO Z V ac E E c E a E cJE a E 2 J E a E 2E ao E o a a U o o a o a U 0 L) ° ° V 0aL)> > > Month gal mg/L Ibs/ar lbs/ac ' 33.5 gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac August 4.734,000 24.33 33.E 3,465.000 24.33 29.5 29.5 912,000 24.33 9.7 9.7 2,433,500 24.33 38.8 38.8 1.021,500 24.33 33.2 33.2 September 1,548,000 10.5 4.7 38.3 3,585,000 10.5 13.2 42.7 2,892,000 10.5 13.2 22.9 1,875,000 10.5 12.9 51.6 810,000 10.5 11.3 44.5 October 828,000 16.12 3.9 42.2 1,950,000 16.12 11.0 53.7 3,372,000 16.12 23.7 46.5 1,007,500 16.12 10.6 62.3 652,500 16.12 14.0 58.5 November 3,816,000 18.66 20.7 62.9 3,285,000 18.66 21.5 75.2 2,604,000 18.66 21.2 67.7 403,000 18.66 4.9 67.2 517,500 18.66 12.9 71.4 December 3,798,000 16.31 18.0 80.9 2,790,000 16.31 15.9 91.2 2,220,000 16.31 15.8 83.4 1,472,500 16.31 15.7 82.9 868,500 16.31 18.9 90.3 January 3,024,000 1 11.05 9.7 90.7 2,985,000 11.05 1 11.6 102.7 2,064,000 11.05 9.9 93.4 1,147,500 11.05 8.3 91.2 675,000 11.05 10.0 100.3 February 4,680,000 1 15.48 21.1 111.8 3,735,000 15.48 20.3 123.0 1,980,000 15.48 13.3 106.7 1,627,500 15.48 16.5 107.7 585,000 15.48 12.1 112.4 March 3,312,000 10.89 10.5 122.3 3,870,000 10.89 14.8 137.8 2,784,000 10.89 13.2 119.9 1,720,500 10.89 12.3 120.0 679,500 10.89 9.9 122.2 April 3,924,000 12.18 13.9 136.2 4,560,000 12.18 19.5 157.2 3,504,000 12.18 18.6 138.5 1,767,000 12.18 14.1 134.1 774,000 12.18 12.6 134.8 May 3,582,000 14.11 14.7 150.9 3,525,000 14.11 17.4 174.7 2,796,000 14.11 17.2 155.7 1,720,500 14.11 15.9 150.0 666,000 14.11 12.5 147.4 June 3,816,000 8.26 9.2 160.1 3,270,000 8.26 9.5 184.1 2,364,000 8.26 8.5 164.2 1,968,500 8.26 10.6 160.6 630,000 8.26 6.9 154.3 July 4,626,000 16.85 22.7 182.8 4,150,000 16.85 24.5 208.6 2,724,000 16.85 20.0 184.1 1,999,500 16.85 22.1 1 Z 891,000 16.85 20.0 174.3 12 Month Floating PAN Load 182.8 208.E 184.1 182.7 174.3 (Ibs/ac/yr): Annual PAN Load Limit 350 350.00 350.00 350.00 350.00 (Ibs/ac/yr): FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of� Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: July Year: 2022 Field Name: U Field Name: V Field Name: W Field Name: X1 Field Name: X2 Area (acres): 3.65 Area (acres): 14.7 Area (acres): 11.08 Area (acres): 25.83 Area (acres): 11.55 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES 0 NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES n NO Field Loaded? ❑ YES ❑ NO v z o z m z o z T z o z °' z o z °i z o z a Q .- ;� Q m > 'a a a Q' Q d > a a Q .- Q m >'0 a Q- Q m > -a 'a Q .- Q m > a m a a a 0 o a ;� a o @ m 0 a Q a. R d a a >• m m 0 a Q IL % Q a v >• m 0 a Q a m a v >• @ M 0 o E R °� E z £ W J E z R M J E z E_j M J E z m @ J E z > >= o ' a a > c a s a °' = a s m= a Q m= 3 Q aU U aU 0 g U aU 0 U 0 aU 0 Ua a aL) 0 va Month gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac August 407,250 24.33 22.6 22.6 2,346,000 24.33 32.4 32.4 2,460,000 24.33 45.1 45.1 3,069,000 24.33 24.1 24.1 1,348,500 24.33 23.7 23.7 September 304,500 10.5 7.3 29.9 2,363,000 10.5 14.1 46.5 2,250,000 10.5 17.8 62.8 3,531,000 10.5 12.0 36.1 1.232,500 10.5 9.3 33.0 October 225,000 16.12 8.3 38.2 2,125,000 16.12 19.4 65.9 1,710,000 16.12 20.7 83.6 3,762,000 16.12 19.6 55.7 1,653,000 16.12 19.2 52.3 November 265,500 18.66 11.3 49.6 2,006,000 18.66 21.2 87.1 1,725,000 18.66 24.2 107.8 3,993,000 18.66 24.1 79.7 1,754,500 18.66 23.6 75.9 December 258,750 16.31 9.6 59.2 2,669,000 16.31 24.7 111.8 213,000 16.31 2.6 110.4 3,630,000 16.31 19.1 98.8 1,595,000 16.31 18.8 1 94.7 January 220,500 11.05 5.6 64.8 1,955,000 11.05 12.3 124.1 1,725,000 11.05 14.3 124.8 4,026,000 11.05 14.4 113.2 1,769,000 11.05 14.1 108.8 February 297,000 15.48 10.5 75.3 2,176,000 15.48 19.1 143.2 1,920,000 15.48 22.4 147.1 2,738,000 f 15.48 13.7 126.9 1,783,500 15.48 19.9 128.8 March 342,000 10.89 8.5 83.8 1,802,000 10.89 11.1 154.3 2,025,000 10.89 16.6 1 163.7 4,290,000 10.89 15.1 142.0 1,580,500 10.89 12.4 141.2 April 274,500 12.18 7.6 91.4 2,142,000 12.18 14.8 169.1 1,110,000 12.18 10.2 173.9 3,729,000 12.18 14.7 156.6 1,667,500 12.18 14.7 155.8 May 240,750 14.11 7.8 99.2 2,363,000 14.11 18.9 188.0 0 14.11 0.0 173.9 3,531,000 14.11 16.1 172.7 1,551,500 14.11 15.8 171.7 June 290,250 8.26 5.5 104.7 646,000 8.26 3.0 191.1 300,000 8.26 1.9 175.8 3,333,000 8.26 8.9 181.6 1,464,500 8.26 8.7 180.4 July 481,500 16.85 18.5 123.2 1,700,000 16.85 16.3 207.3. 1,500,000 16.85 1A 94.8 2,772,000 16.85 15.1 196.7 1,218,000 16.85 14.8 195.2 12 Month Floating PAN Load (Ibs/ac/yr): 123.2 207.3 19 196.7 1952 Annual PAN Load Limit (Ibs/ac/yr): 350 350.00 35 350.00 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page Es of f Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc County: Robeson Month: July Year: 2022 Field Name: Y Field Name: Z Field Name: Field Name: Field Name: Area (acres): 3.65 Area (acres): 14.7 Area (acres): Area (acres): Area (acres): Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES [] NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES M NO Field Loaded? ❑ YES NO Field Loaded? ❑ YES NO cv ° ° cc 0 Q a Q Q a Q a Q i M a - Q oa a (� o a ao @ o a Q a >. o a Q an a> o C Z Ct Z C Z Z J E a £ ` ° E a E RVCJ E E mc JE C Q am CO=Z J EE o o 3a U o ' a. o ao Uav a 0 a; ; o ; Qj Month I gal I mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibslac I Ibs/ac I gal mg/L Ibs/ac I Ibs/ac gal mg/L Ibs/ac Ibs/ac August 506,250 24.33 28.1 28.1 24.33 24.33 24.33 24.33 September 408,750 10.5 9.8 38.0 10.5 10.5 10.5 10.5 October 427,500 16.12 15.7 53.7 16.12 16.12 16.12 16.12 November 495,000 18.66 21.1 74.8 18.66 18.66 18.66 18.66 December 408,750 16.31 15.2 90.0 16.31 16.31 16.31 16.31 January 367,500 11.05 9.3 1 99.3 11.05 11.05 11.05 11.05 February 311,250 15,48 11.0 110.3 15.48 15.48 15.48 15.48 March 228,750 10.89 5.7 116.0 10.89 10.89 10.89 10.89 April 326,250 12.18 9.1 125.1 12.18 12.18 12.18 12.18 May 401,250 14.11 12.9 138.0 14.11 14.11 14.11 14.11 June 378,750 8.26 7.1 145.2 8.26 8.26 8.26 8.26 July 11 315,000 16.85 12.1 1 157.3 16.85 16.85 16.85 16.85 12 Month Floating PAN Load (Ibs/ac/yr): 157.3 0.0 0.0 Annual PAN Limit 350 350.00 350.00 350.00 y 350.00 1Ibs ac/y ):� FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page i of l Did the mass loading rates exceed the limits in Attachment B of your permit? Ev] compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification 11 Permittee Certification I ORC: Robert Jackson Certification Number: 1008145 Grade: IV OIT Phone Number: 910-359-5275 Has the ORC changed since the previous NDMLR? ❑ Yes [,] No J Signature By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee: Mountaire Farms Inc Signing Official: David White Signing Officials Title: Director of Processing Phone No.: / 910-359-5275 Permit Exp.: 2/28/23 ,// 8/3/22" 8/3/22 Date Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 r• FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 0 off_ Permit No.: WQ0000484 Facility Name: Mountalre Farms County: Robeson Month: July Year: 2022 Did irrigation Field Name: A Field Name: B Field Name: C Field Name: D occur -.-.._....___.__ Area (acres): _ -_. 8.2 Area (acres): 6.75 Area (acres): 13.6 Area (acres): 3.5 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: p� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: p� Coastal/Rye Y e YES ❑ NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 78 Weather Freeboard Field Irrigated? ❑YES [J No Field Irrigated? [YES NO Field Irrigated? YES ] No Field Irrigated? = YES [ No m j L af4i 3 m fl_ E N F- 1° Q d a m m O fn m m w c0i T Q Q N w - E m CLE p O- i Q a m a _ rn -' c J E °' c E o X cL J v E m o a i Q ° m; _ °' -? o mc J E> rn � C � E X O 1: 0a J E 2 o a > -o _ rn O m J E rn E= a X O c3 J v v E T o a > a v _ rn Q J E > 6' E �v X O 0 J OF in ft ft gal min in in gal min in in gal I min in in gal min in in 1 R 85 0.1 7 2 CL 91 8 108,000 720 0.49 0.04 108,000 720 0.59 0.05 3 CL 98 8 4 CL 90 8 5 CL 94 8 99,000 660 0.44 0.04 99,000 660 0.54 0.05 6 C 98 8 252,000 420 0.68 0.10 7 C 97 1.7 7 8 C 94 0.25 7 9 PC 93 7 108,000 720 0.49 0.04 108,000 720 0.59 0.05 10 R 78 1 7 11 C 85 7 12 C 91 7 126,000 840 0.57 0.04 126,000 840 0.69 0.05 504,000 840 1.36 0.10 13 C 87 7 14 CL 87 7 99,000 660 0.44 0.04 99,000 660 0.54 0.05 15 C 89 7 99,000 660 0.44 0.04 99,000 660 0.54 0.05 16 C 89 0.5 7 17 C 92 7 18 C 92 7 19 C 92 7 108,000 720 OA9 0.04 108,000 720 0.59 0.05 432,000 720 1.17 0.10 20 C 92 6 21 CL 91 6 90,000 600 0.40 0.04 90,000 600 0.49 0.05 22 C 94 6 126,000 840 0.57 0.04 126,000 840 0.69 0.05 23 C 96 6 24 C 95 7 25 C 94 7 90,000 600 0.40 0.04 90,000 600 0.49 0.05 360,000 1 600 0.97 1 0.10 26 C 95 7 27 C 96 7 81,000 540 0.36 0.04 81,000 540 0.44 0.05 28 C 99 7 29 CL 99 1 1 7 30 CL 94 1 7 311 R 94 0.1 1 8 Monthly Loading: 1,134,000 5.09 1,134,000 6.19 1,548;000 4.19 0 0.00 12 Month Floating Total (in): E 41.99 52.94 43.43 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page:� of'S' Permit No.: W00000484 Facility Name: MOuntalre Farms County: Robeson Month: July Year: 2022 Did irrigation Field Name: E Field Name: F Field Name: G Field Name: H occur Area (acres): 4.7 Area (acres): 26.53 Area (acres): 47.489 Area (acres): 14.19 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye _J YES ❑ NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 91 Annual Rate (in): 91 Weather Freeboard Field Irrigated? ❑ YES 1 NO Field Irrigated? ❑ YES ] NO Field Irrigated? ❑ YES ❑ NO Field Irrigated? ❑ YES ❑ NO m � a U M v d a, Q E N r � ° Q .0 d a °' `L° O fn y m a ° U '- >, O. R Q N � w o E m 7 Q O Q Q a m Y E m .` rn c v M 0 0 J E rn ' E 'v 'X O m i 0 J E a, a O Q Q a) � E 01 ,L _ v f0 0 0 J 2, �' E 3 'v 'X O M N 2 0 J E m 7 a O Q � Q m m E@ ,L _ T c' m a �p O J c E v 'X o m 2 0 J E m a O a J Q m �' E o) ,` _ > c �v N O J 2, c E v 'X O M = O J °F in ft 7 gal min in in gal min in in gal min in in gal min in in 1 R 85 0.1 2 CL 91 8 552,000 720 0.77 0.06 720,000 720 0.56 0.05 3 CL 98 8 4 CL 90 8 5 CL 94 8 506,000 660 0.70 0.06 1 1 156,000 780 0-40 1 0.03 6 C 98 8 7 C 97 1.7 7 506,000 660 0.70 0.06 132,000 660 0.34 0.03 8 C 94 0.25 7 630,000 630 0.49 0.05 126,000 630 0.33 0.03 9 PC 93 7 10 R 78 1 7 11 C 85 7 12 C 91 7 13 C 87 7 598,000 780 0.83 0.06 156,000 780 0.40 0.03 14 CL 87 7 15 C 89 7 506,000 660 0.70 0.06 16 C 89 0.5 7 720,000 720 0.56 0,05 144,000 720 0.37 0.03 17 C 92 7 18 C 92 7 19 C 92 7 20 C 92 6 414,000 540 0.57 0.06 144,000 720 0.37 0.03 21 CL 91 6 460,000 600 0.64 0.06 22 C 94 6 23 C 96 6 840,000 840 0.65 0.05 168,000 840 0.44 0.03 24 C 95 7 251 C 94 7 96,000 480 0.25 0.03 26 C 95 7 460,000 600 0.64 0.06 27 C 96 7 414,000 540 0.57 0.06 28 C 99 7 144,000 720 0.37 0.03 29 CL 99 7 720,000 720 0.56 0.05 30 CL 94 7 96,000 480 0.25 0.03 31 R 94 0.1 8 6.13 66.61 Monthly Loading: F--,2 Month Floating Total (in): 0 0.00 0.00 4,416,000 3,630,000 2.8241 69.29 1,362,000 3.54 34.72 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of {` Permit No.: W00000484 Facility Name: Mountalre Farms County: Robeson Month: July Year: 2022 Did irrigation Field Name: I Field Name: J Field Name: K Field Name: L occur Area (acres): 13.58 Area (acres): 58.22 Area (acres): 9.86 Area (acres): 24.94 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye YES NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 91 Annual Rate (in): 91 Annual Rate (in): 91 Annual Rate (in): 91 Weather Freeboard Field Irrigated? YES J NO Field Irrigated? YES [j NO Field Irrigated? [] YES ❑ NO Field Irrigated? YES [1 No >` o O Um L v r f0 CL E d ° i Q y d m o U) m a� Q U > a m a 0 �6 � w - m y E °' o a > Q v U7 Y E rn F '` _ rn >+ C a f° v o 0 J E rn C y` C E X o m M= 0 J m E D ° o a > Q N 4; E m rn F •` _ rn T C _ 'v '0 o o J E rn ` C E .x O @= o J m y E 2 __ ° o a > Q N .�.. E rn •` rn T C _ 'v i0 o o J E rn T C E o K o M = o J m n E D ° o a > Q N 4; E m M F- •2 _ rn >. C _ 'v ❑ o J E rn E a X o a m x o J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 R 85 0.1 7 2 CL 91 8 588,000 720 0.37 0.03 204,000 720 0.76 0.06 312,000 720 0.46 0.04 3 CL 98 8 4 CL 90 8 5 CL 94 8 637,000 780 0.40 0.03 221,000 780 0.83 0.06 6 C 1 98 8 175,000 420 0.47 0.07 343,000 420 0.22 0.03 182,000 1 420 0.27 0.04 7 C 97 1.7 7 275,000 660 0.75 0.07 187,000 660 0.70 0.06 286,000 660 0.42 0.04 8 C 94 0.25 7 273,000 630 0.40 0.04 9 PC 93 7 300,000 720 0.81 0.07 588,000 720 0.37 0.03 204,000 720 0.76 0.06 10 R 78 1 7 11 C 85 7 12 C 91 7 13 C 87 7 325,000 780 0.88 0.07 637,000 780 0.40 0.03 221,000 780 0.83 0.06 14 CL 87 7 275,000 660 0.75 0.07 539,000 660 0.34 0.03 286,000 660 0.42 0.04 15 C 89 7 16 C 89 0.5 7 588,000 720 0.37 0.03 204,000 720 0.76 0.06 17 C 92 7 18 C 92 7 19 C 92 7 20 C 92 6 225.000 540 0.61 0.07 588,000 720 0.37 0.03 204,000 720 0.76 0.06 21 CL 91 6 588,000 720 0.37 0.03 204,000 720 0.76 0.06 312,000 1 720 0.46 0.04 22 C 94 6 350,000 840 0.95 0.07 23 C 96 6 686,000 840 0.43 0.03 364,000 840 0.54 0.04 24 C 95 7 25 C 94 7 392,000 480 0.25 0.03 26 C 95 7 250,000 600 0.68 0.07 27 C 96 7 1 170,000 600 0.63 0.06 260,000 600 0.38 0.04 281 C 99 7 588,000 720 0.37 0.03 312,000 720 0.46 0.04 29 CL 99 7 588,000 720 0.37 0.03 204,000 720 0.76 0.06 30 CL 1 94 7 200,000 480 0.54 0.07 392,000 480 0.25 0.03 208,000 480 0.31 0.04 31 R 94 0.1 18 Monthly Loading: 12,375,000 6.44 7,742,00005 4.90 2,023,000 7.56 2,795,000 4.13 12 Month Floating Total (in): 53.84 59.13 66.15 50.93 FORM: NDAR-1 08-11 Page `� of ta' NON -DISCHARGE APPLICATION REPORT (NDAR-1) 9 Permit No.: WQ0000484 Facility Name: MOuntalre Farms County: Robeson Month: July Year: 2022 Did irrigation Field Name: M Field Name: N Field Name: O Field Name: P occur Area (acres): 23.07 Area (acres): 78.87 Area (acres): -- 19.9 Area (acres): 28.64 at this facility? Cover Crop:Coastal/Rye Y a Cover Crop: p� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: p� e Coastal/Rye Y YES ] NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 52 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? [I YES ❑ NO Field Irrigated? [] YES 8(E] NO Field Irrigated? YES [j NO Field Irrigated? ❑YES ❑ NO m o o :0i c N y m a E N 0 ° +�-' a E y � ° ° to d in.0 CL U - > a a fC dv E °i ° a 0 °" i Q v d Y E m rn F' '� rn >. C o m 0 O J E rn 7 2' G E a X o m f0 x 0 J ma E N ° a °° i Q N .Q; E° rn ~ 'L _ rn T C m 0 J E rn 3 E° 'v X 0 m x 0 J my E 61 _a a °CL Q v d +�, E M �- ' _ rn >. C ,0 a m 0 0 J E rn 7 C E° �0 X 0° N x 0 J m E N ° a ° °' Q N .4; E m rn P '` _ rn T C ,� a m 0 J E rn 3` C E X 0 m N x° J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 R 85 0.1 7 660,000 600 0.31 0.03 240,000 600 0.44 0.04 360,000 600 0.46 0.05 2 CL 91 8 792,000 720 0.37 0.03 3 CL 98 8 4 CL 90 8 363,000 330 0.17 0.03 132,000 330 0.24 0.04 198,000 330 0.25 0.05 5 CL 94 8 726,000 660 0.34 0.03 6 C 98 8 385,000 420 0.61 0.09 528,000 480 0.25 0.03 192,000 480 0.36 0.04 288,000 480 0.37 0.05 7 C 97 1.7 7 660,000 600 0.31 0.03 8 C 94 0.25 7 240,000 600 0.44 0.04 360,000 600 0.46 1 0.05 9 PC 93 7 792,000 720 0.37 0.03 10 R 78 1 7 Ill C 85 7 12 C 91 7 264,000 660 0.49 0.04 13 C 87 7 726,000 660 0.34 0.03 396,000 660 0.51 0.05 14 CL 87 7 605,000 660 0.97 0.09 15 C 89 7 858,000 780 0.40 0.03 288,000 720 0.53 0.04 468,000 780 0.60 0.05 16 C 89 0.5 7 792,000 720 0.37 0.03 432,000 720 0.56 0.05 17 C 92 7 18 C 92 7 19 C 92 7 336,000 840 0.62 0.04 504,000 840 0.65 0.05 20 C 92 6 660,000 720 1.05 0.09 792,000 720 0.37 0.03 21 CL 91 6 792,000 720 0.37 0.03 22 C 94 6 312,000 780 0.58 0.04 468,000 780 0.60 0.05 23 C 96 6 924,000 840 0.43 0.03 24 C 95 7 25 C 94 7 192,000 480 0.36 0.04 26 C 95 7 792,000 720 0.37 0.03 432,000 720 0.56 0.05 27 C 96 7 550,000 600 0.88 0.09 240,000 600 0.44 0.04 28 C 99 7 594,000 540 0.28 0.03 29 CL 99 7 792,000 720 0.37 0.03 432,000 720 0.56 0.05 30 CL 94 7 528,000 480 0.25 0.03 288,000 480 0.37 0.05 311 R 94 1 0.1 8 Monthly Loading: 12 Month Floating Total (in): 7200,000 dJIM 3.51 40.70 # ### 5.66 52.76 2,436.000 4.51 55.70% 4,626,000 5.95 53.61 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 Did irrigation Field Name: Q Field Name: R Field Name: S Field Name: T occur Area (acres): 23.8 Area (acres): 19.16 Area (acres): - 12.74 Area (acres): 6.25 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: p� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: P� Coastal/Rye Y e ❑Q YES [_] NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? YES I NO Field Irrigated? [] YES 8(E] NO Field Irrigated? [J YES LINO NO Field Irrigated? U YES (J NO >' o d o U •= m- �' y @ y E N c ° w a d R fn N Q- V T Q c6 Q Q@ - m E °i a Q 0 °- �! Q -a U7 d E F >. c ® 0 J E rn >> c E a o cxo = p cL J v o E N a s 0 0. % a v d a E F _ 0) T c @ o 0 p J E rn a c E a = p J m E N a s 0 O_ � Q D Q' d E@ �- °' _ M >. C @ v O J E rn >> C E a m = O J y a E N a 0 Q i Q a> E F"' _ a> O J E a> E a a R = O J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 R 85 0.1 7 300,000 600 0.46 0.05 240,000 600 0.46 0.05 2 CL 91 8 360,000 720 0.56 0.05 372,000 720 1.08 0.09 108,000 720 0.64 0.05 3 CL 98 8 4 CL 90 8 165,000 330 0.26 0.05 132,000 330 0.25 0.05 170,500 330 0.49 0.09 5 CL 94 8 99,000 660 0.58 005 6 C 98 8 240,000 480 0.37 0.05 192,000 480 0.37 0.05 7 C 97 1.7 7 90,000 600 0.53 0.05 8 C 94 0.25 7 300,000 600 0.46 0.05 240,000 600 0.46 0.05 9 PC 93 7 372,000 720 1.08 0.09 10 R 78 1 7 11 C 85 7 121 C 91 7 330,000 660 0.51 0.05 264,000 660 0.51 0.05 341,000 660 0.99 0.09 13 C 87 7 99,000 660 0.58 0.05 14 CL 87 7 15 C 89 7 360,000 720 0.56 0.05 288,000 720 0.55 0.05 16 C 89 0.5 7 360,000 720 0.56 0.05 108,000 720 0.64 0.05 17 C 92 7 181 C 92 7 19 C 92 7 420,000 840 0.65 0-05 336,000 840 0.65 0.05 20 C 92 6 372,000 720 1.08 0.09 108,000 720 0.64 0.05 21 CL 91 6 22 C 94 6 1 390,000 780 0.60 0.05 312,000 780 0.60 0.05 23 C 96 6 126,000 840 0.74 0.05 241 C 95 7 25 C 94 7 240,000 480 0.37 0.05 192,000 480 0.37 0.05 26 C 95 7 372,000 720 1.08 0.09 27 C 96 7 300,000 600 0.46 0.05 240,000 600 0.46 0.05 28 C 99 7 81,000 540 0.48 0.05 29 CL 99 7 360,000 720 0.56 0.05 288,000 720 0.55 0.05 30 CL 94 7 72,000 480 0.42 0.05 31 R 94 0.1 8 5.24 58.08 891,000 5.25 51.68 Monthly Loading: 12 Month Floating Total (in): 4,125,000 6.38 64.98 2,724,000 1,999,500 5.78 55.34 ,: FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of_� Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: .July Year: 2022 Did irrigation Field Name: U Field Name: V Field Name: W Field Name: X1 occur Area (acres): 3.65 Area (acres): 14.7 -- Area (acres): 11.08 Area (acres): 25.83 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye F11 YES I-1 NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? DJ YES ❑ NO Field Irrigated? YES 8❑ NO Field Irrigated? [ j YES j j NO Field Irrigated? YES ❑ NO > 0 o U uf° m 1 7 % CL E F- C o is Q E 0- m rn L° (n d N n o c`6i - CL M N _ m D E A' c Q Q 0 CL~ D w ;; E C - rn > c '� o J E rn c c E n v m= J 2 y o E m c a 0 CL~ Q o an d E io a> c 'v J E a� 3> c E= 'v M 0 m D E m c a Q 0 CL~ D m: m - w > c 0 =v J E rn c 2` c E o t6 = J 2 D E m a iW Q D m ;; E m ~ - rn > c 'v J E rn c , c E o @= J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 R 85 0.1 7 2 CL 91 8 54,000 720 0,54 0.05 3 CL 98 8 4 CL 90 8 5 CL 94 8 49,500 660 0.50 0.05 6 C 98 8 36,000 480 0.36 0.05 7 C 97 1.7 7 660,000 600 0.94 0.09 8 C 94 0.25 7 9 PC 93 7 54,000 720 0.54 0.05 408,000 720 1.02 0.09 360,000 720 1.20 0.10 10 R 78 1 7 11 C 85 7 12 C 91 7 13 C 87 7 49,500 660 0.50 0.05 14 CL 87 7 726,000 660 1.04 0.09 15 C 89 7 16 C 89 0.5 7 54,000 720 0.54 0.05 408,000 720 1.02 0.09 360,000 720 1.20 0.10 17 C 92 7 18 C 92 7 19 C 92 7 20 C 92 6 54,000 720 0.54 0.05 21 CL 91 6 54,000 720 0.54 0.05 792,000 720 1.13 0.09 22 C 94 6 23 C 96 6 476,000 840 1.19 0.09 420,000 840 1.40 0.10 24 C 95 1 7 25 C 94 7 26 C 95 7 27 C 96 7 28 C 99 7 40,500 540 0.41 0.05 594,000 540 0.85 0.09 29 CL 99 7 1 1 408,000 720 1.02 1 0.09 360,000 720 1 1.20 0.10 30 CL 94 7 36,000 480 0.36 0.05 31 R 94 0.1 1 8 ng: MonthlMTotal 481,500 4.86 1,700,000 4.26 1,500,000 4.99 2,772,000 3.95 12 Month Floatingin): 36.37 60.86 62.67 60.46 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 1 of Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 Field Name: X2 Field Name: Y Field Name: Z Field Name: Did irrigation occur — Area (acres): 11.55 Area (acres): 3.21 Area (acres): 7.1 Area (acres): at this facility. ❑ YES [_f NO Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? YES ] NO Field Irrigated? YES 8�1 NO Field Irrigated? YES ❑ NO Field Irrigated? J YES No > m '° U m �,, c 2 N m N M M N '° E d 'o d +; CA ? c E T LA a c N 'o E °' '6 m w LA > c E c N '° E m 'O m a; > c E ° c d 'a E d "o m; m > c E T °— c :° mCL E m f0 w K 'o M ' Q E rn ° m X o m '° E rn '° m X o R ° a E rn m 0 CL a p a o a CL M H E y fn i] M ; Q _ J J i Q — J J i Q J J > Q — J J � OF i. ft ft gal min in in gal min in in gal min in in gal min in in 1 R 85 0.1 7 2 CL 91 8 3 CL 98 8 4 CL 90 8 5 CL 94 8 6 C 98 8 7 C 97 1.7 7 290,000 600 0.92 0.09 75,000 600 0.86 0.09 8 C 94 0.25 7 9 PC 93 7 10 R 78 1 7 11 C 85 7 12 C 91 7 13 C 87 7 14 CL 87 7 319,000 660 1.02 0.09 82,500 660 0.95 0.09 15 C 89 7 16 C 89 0.5 7 17 C 92 7 18 C 92 7 19 C 92 7 20 C 92 6 21 CL 91 6 348,000 720 1.11 0.09 90,000 720 1.03 0.09 22 C 94 6 23 C 96 6 24 C 95 7 25 C 94 7 26 C 95 7 27 C 96 7 28 C 99 7 261,000 540 0.83 0.09 67.500 540 0.77 0.09 Monthly• .. . Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): FORM: NDAR-1 08 11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of,L_ Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑� Compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant ❑J Compliant ❑ Non -Compliant ❑' Compliant ❑ Non -Compliant 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director Of Processing Has the ORC changed since the previous NDAR-1? ❑ Yes E No Phone Number: 910-359-527`5 Permit Exp.: 2/28/23 �— 8/3/22 8/3/22 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, incAuding the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM. NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ) of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 PPI: 005 Flow Measuring Point: ❑ Influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑Influent ❑Effluent ❑Groundwater Lowering ❑ Surface water Parameter Code -► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 c O y O E m E Q m F- N N L- O U m e Y o o Z F_ Z J E ro U 2 F- NO r a- O N is U Z N 24-hr hrs GPD 0 su mg!'. mg/L mr!1 mg/L #/100 rnl mg/L mg/I mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 2 0800 4 0 _ 3 0 4 0600 H 10,885 5 0600 10 3,515 6 0600 10 2,548 _ 7 0600 10 4,711 8 0600 10 3,292 9 0800 4 0 10 19,196 11 0600 10 12,661 12 0600 10 10,225 13 0600 10 3,932 14 0600 10 13,391 15 0600 10 6,773 16 0800 4 0 17 12,887 18 0600 10 5,811 19 0600 10 4,018 20 0600 10 5,290 21 0600 10 4,669 22 0600 10 3,865 23 0800 4 0 24 6,680 25 0600 10 3,695 26 0600 10 2,784 27 0600 10 2,894 28 0600 10 2,404 29 0600 10 2,663 30 0800 4 0 311 1 0 Average: 4,800 Daily Maximum: 19,196 Daily Minimum: 0 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? L Yes ❑ No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 8/3/2022 ,�.�G/'�L 8/3/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of Permit No.: VVQ0000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 PPI: 004 Flow Measuring Point: ❑ Influent n Effluent ❑ No flow generated Parameter Monitoring Point: - Influent Effluent ❑ Groundwater Lowering ❑ Surface water Parameter Code —11 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 p a) O O 0 O Q E . O M p E E Q ) v oao Fy to — LL O U 2 16 Z o � d s m U F-a s N O a pof E m U YE Z N 24-hr hrs GPD su mg/L _ mg/L mg/L mg/L #1100 mL mg/L mg/L mg/L mg/L mg/L mg/L mgh- mg/L mg/L 1 0600 10 3,000,000 7.1 1 2 0800 4 400,000 t 3 310,000 4 0600 H 140,000 H 5 0600 10 2,770,000 6.5 6 0600 10 2,850,000 7.1 7 0600 10 3,030,000 7.1 30.9 8 0600 10 3,100,000 6.8 9 0800 4 360,000 10 530,000 11 0600 10 2,760,000 6.5 12 0600 10 2,910,000 7 13 0600 10 3,340,000 7.1 14 0600 10 2,960,000 7.2 151 0600 10 2,940,000 7.2 16 0800 4 370,000 17 480,000 18 0600 10 3,040,000 7.3 19 0600 10 3,070,000 7 20 0600 10 2,970,000 7.1 21 0600 10 2,980,000 7.2 22 0600 10 3,070,000 7.1 23 0800 4 270,000 24 450,000 25 0600 10 2,820,000 6.7 26 0600 10 2,890,000 7.2 27 0600 10 3,070,000 7.1 28 0600 10 2,980,000 7.1 29 0600 10 3,050,000 7.1 30 0800 4 580,000 311 1 400,000 Average: 2,060,968 30.90 Daily Maximum: 3,340,000 7.30 30.90 Daily Minimum: 140,000 6.50 30.90 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page - of_?__ Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OJT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes 0 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 8/3/2022 8/3/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 PPI: 003 Flow Measuring Point: [ ] Influent [_1 Effluent _] No flow generated Parameter Monitoring Point: ❑ Influent F ] Effluent ❑ Groundwater Lowering ❑ Surface Water Parameter Code 11- 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 @ . > N Q E (� F. O c O m E y i= U 0 3 ° LL a E (n c R Q O m Cp E E Q mg/L « C '6 o Q .o F N N � _ ru m 1_ O c d m Y Q " F R Z a6i J E .� E U y t o p H a v O 7 u co U Y p Z U c N 24-hr hrs GPD su mg/L mg/L mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L Tj 0600 10 1 25,100 7.1 2 0800 4 8,000 3 7,100 4 0600 H 25,800 H 5 0600 10 23,900 6.5 6 0600 10 24,800 7.1 7 0600 10 27,400 7.1 8 0600 10 24,200 6.8 9 0800 4 8,000 10 10,500 11 0600 10 25,100 6.5 12 0600 10 25,300 7 13 0600 10 25,000 7.1 14 0600 10 25,800 7.2 15 0600 10 23,700 7.2 16 0800 4 7,800 17 9,900 181 0600 10 23,700 7.3 19 0600 10 24,000 7 20 0600 10 25,500 7.1 21 0600 10 24,700 7.2 22 0600 10 23,700 7.1 23 0800 4 7,800 24 6,800 251 0600 1 10 24,000 6.7 26 0600 10 25,500 7.2 27 0600 10 25,300 7.1 28 0600 10 25,300 7.1 29 0600 10 24,800 7.1 30 0800 4 8,400 311 6,600 Average: 19,468 Daily Maximum: 27,400 7.30 Daily Minimum: 6,600 6.50 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page .Z Of Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 2] Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes 21 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 8/3/2022 / 8/3/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page i of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 PPI: 002 Flow Measuring Point: influent Effluent ❑ No flow generated Parameter Monitoring Point: Influent Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code —► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 0 O F LY C 0 d I= y ~ U 3 LL = a E F0 LC35 R m m p E Q W M C '6 ~ N fn O _ `p LL O U L `° a) p� Y O f0 Z 10 m Z J U W ` N t F t a 7 O (n 2Y c6 U Z U N 24-hr hrs GPD 3,000,000 su mg/L. mg/L mg/l mg/L #1100 mi. mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mglL 1 0600 10 7.1 2 0800 4 400,000 3 310,000 4 0600 H 140,000 H 5 0600 10 r 770,000 6.5 6 0600 10 2,850,000 7.1 7 0600 10 3,030,000 7.1 8 0600 10 3,100,000 6.8 9 0800 4 360,000 10 530,000 11 0600 10 2,760,000 6.5 12 0600 10 2,910,000 7 13 0600 10 3,340,000 7.1 14 0600 10 2,960,000 7.2 151 0600 10 2,940,000 7.2 16 0800 4 370,000 17 480,000 18 0600 10 3,040,000 7.3 19 0600 10 3,070,000 7 20 0600 10 2,970,000 7.1 21 0600 10 2,980,000 7.2 22 0600 10 3,070,000 7.1 23 0800 4 270,000 24 450,000 25 0600 10 2,820,000 6.7 26 0600 10 2,890,000 7.2 27 0600 10 3,070,000 7.1 28 0600 10 2,980,000 7.1 29 0600 10 3,050,000 7.1 30 0800 4 580,000 31 400,000 Average: 2,060,968 Daily Maximum: 3,340,000 7.30 Daily Minimum: 140,000 6.50 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page .)I— of iZ Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑. Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective dcuunts/ rdrten. ruidcn duumuiidi shears n Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ yes 0 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 8/3/2022 �`� 8/3/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page �_ of Permit No.: WO0000484 Facility Name: Mountalre Farms County: Robeson Month: July Year: 2022 PPI: 001 Flow Measuring Point: 1_1 Influent ❑ Effluent 71 No flow generated Parameter Monitoring Point: ❑ influent �] Effluent ❑ Groundwater Lowering ❑ Surface Water Parameter Code -► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 a, Q E X~ O C O Y 1- Fn U O 3 o FL =¢ N c @ O m 0 E E Q 76 •C o Q p ~ U) N N `0 "= LL 0 E N N Ql Y Q N Z o H j6 Z V m J 2 E U 0 _ 0 0 ~ 0 a 3 fCp n 7 U Y Z V N 24-hr hrs GPD su mg/L mg/L mg/L mg/L #1100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0600 10 3,000,000 7.1 2 0800 4 400,000 3 310,000 4 0600 H 140,000 H 1 5 0600 10 2,770,000 6.5 1 1 6 0600 10 2,850,000 7.1 7 0600 10 3,030,000 7.1 2.75 3 41.1 25 4440 44 0.05 0,001 0.001 0.77 110 3.17 0.0102 0.0113 8 0600 10 3,100,000 6.8 9 0800 4 360,000 10 530,000 11 0600 10 2,760,000 6.5 12 0600 10 2,910,000 7 13 0600 10 3,340,000 7.1 14 0600 10 2,960,000 7.2 21.6 32.5 22.7 4440 37.5 0.05 1.59 15 0600 10 2,940,000 7.2 161 0800 4 370,000 17 480.000 18 0600 10 3,040,000 7.3 19 0600 10 3,070,000 7 20 0600 10 2,970,000 7.1 15.7 23.4 25 24.8 0.46 21 0600 10 2,980,000 7.2 22 0600 10 3,070,000 7.1 23 0800 4 270,000 24 450,000 25 0600 10 2,820,000 6.7 26 0600 10 2,890,000 7.2 27 0600 10 3,070,000 7.1 28 0600 10 1 2,980,000 7.1 29 0600 10 3,050,000 7.1 301 0800 4 580,000 311 400,000 Average: 2,060,968 2.75 13.43 32.33 24.23 4.440.00 35.43 0.05 0.00 0.00 0.94 110.00 3.17 0.01 0.01 Daily Maximum: 3,340,000 7.30 2.75 21.60 41.10 25.00 4,440.00 44.00 0.05 0.00 0.00 1.59 110.00 3.17 0.01 0.01 Daily Minimum: 140,000 6.50 2.75 3.00 23.40 22.70 4,440.00 24.80 0.05 0.00 0.00 0.46 110.00 3.17 0.01 0.01 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous SxWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _2,_ of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: July Year: 2022 PPI: 001 Flow Measuring Point: ❑Influent ❑Effluent ❑ No flow generated Parameter Monitoring Point: Influent j Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code i 50050 01042 00931 WQ09 70300 50060 00940 00600 > p Q _E U� U c O E° U� O o _ LL n a V c o ? a° -o m 0 Q d o c rn m- o D_ >Z Q m? v 0 0- H aU) p an d �a c o 0 ds U m v_ 0 r U c m rn 0 0 F-b Z 24-hr I hrs GPD mg/L Ratio I mg/L mg/L mg/L mg/L mg/L 1 0600 10 3,000,000 0.21 2 0800 4 400,000 0.45 3 310,000 0 4 0600 H 140,000 0 5 0600 10 1 2,770,000 0.15 6 0600 10 1 2,850,000 0.3 7 0600 10 3,030,000 0.136 10.86 2118 0.25 44 8 0600 10 3,100.000 0.45 9 0800 4 360,000 0 10 530,000 0 11 0600 10 2,760,000 0 12 0600 10 2,910,000 0.24 13 0600 10 3,340,000 0.68 14 0600 10 2,960,000 17.3 0.42 37.5 15 0600 10 2,940,000 0.33 16 0800 4 370,000 0 17 480,000 0 18 0600 10 3,040,000 0 19 0600 10 3,070,000 0.93 201 0600 10 2,970,000 0.25 21 0600 10 2,980,000 12.08 0.15 24.9 22 0600 10 3,070,000 0.84 23 0800 4 270,000 0 24 450,000 0 25 0600 10 2,820,000 0.29 26 0600 10 2,890,000 0.24 27 0600 10 3,070,000 0 28 0600 10 1 2,980,000 0 29 0600 10 3,050,000 0 30 0800 4 580,000 0.7 311 400,000 0 Average: #REF! #REF! 10.86 16.85 0.22 35.47 Daily Maximum: #REF! #REF! 10.86 21.18 0.93 44.00 Daily Minimum: #REF! #REF! 10.86 12.08 0.00 24.90 Sampling Type: Recorder Grab Calculated Calculated Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous I Monthly Monthly 2xMonthly 3xYearly 5xWeek 3xYear 2x Month FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -� of 3 Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑� Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes [] No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023 k"(Z- 8/3/2022 (N 8/3/2022 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617